HomeMy WebLinkAboutAgenda - 12-01-2008 - 6bORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: December 1, 2008
Action Agenda
Item No. (p — b
SUBJECT: Resolution Submitting Comments Regarding Options for the Durham - Chapel
Hill - Carrboro Metropolitan Planning Organization's Draft 2035 Long Range
Transportation Plan
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No
ATTACHMENT(S): INFORMATION CONTACT:
1. Resolution
2. OUTBoard Recommendation Karen Lincoln, 245 -2594
3. Table of Four (4) Transportation Craig Benedict, 245 -2592
Options
4. Maps of Transportation Projects
5. 2035 LRTP Transportation Options
Report (Previously Provided Under
Separate Cover)
PURPOSE: To consider a resolution submitting comments to the Durham - Chapel Hill - Carrboro
(DCHC) Metropolitan Planning Organization (MPO) Transportation Advisory Committee (TAC)
regarding transportation systems proposed for the Preferred Option for the Long Range
Transportation Plan (LRTP).
BACKGROUND: Every four years the DCHC MPO updates the LRTP. The 2035 LRTP will list
the highway, transit, bicycle, and other transportation projects and services to be implemented
between 2008 through the year 2035 to best meet the expected transportation demand in the
region. The LRTP is fiscally constrained, and includes revenue sources to pay for the projects
and services. Transportation projects and services must be in the LRTP in order to receive
state and federal funding.
The Board of Commissioners, at its meeting on September 22, 2008, received a presentation
and endorsed comments regarding the Triangle Regional Model results /analysis for
combinations of various transportation alternatives and land use alternatives being studied to
assess the effect those scenarios would have on future traffic and congestion. The MPO staff
reviewed comments received from the local jurisdictions and the public and has prepared four
(4) transit options and one (1) option each for highway, bicycle, and other transportation modes
for further study. The four (4) options look at each of the four (4) transit options paired with the
projects proposed for the highway, bicycle, and other modes. Attachment 3 lists the four (4)
options followed by maps (Attachment 4) of each transit option, the highway option, and the on-
road and off -road bicycle /pedestrian options.
The full transportation options report also includes cost and traditional revenue forecasts for
each of the four (4) options and revenue forecasts for two local revenue sources, '/2 cent sales
2
tax and an extra $10 vehicle registration fee, based on comments submitted on the Alternatives
Analysis. The full report, which was previously provided under separate cover, can be
downloaded under 2035 LRTP Options at www.dchcmpo.org.
Orange Unified Transportation Board Recommended Comments
The Orange Unified Transportation Board (OUTBoard), at its meeting on November 19, 2008,
received a presentation on the options being considered for the Draft 2035 LRTP and
recommended the following transportation approaches:
• Support rail transportation including commuter rail service between Burlington and Raleigh
that would serve Orange County, as well as light rail to serve the triangle area;
• Consider extending light rail from the University of North Carolina at Chapel Hill to connect to
potential commuter rail (University Station) ending in Carrboro;
• Consider using existing power grids (utility easements) for light rail lines;
• Support enhanced local bus and express bus service with shorter delays;
• Ensure good connectivity of services that feed larger transit systems;
• Include private transportation providers in the process, especially with respect to provision of
services to transportation terminals and areas on fringe of service routes;
• Concentrate limited resources on transit and not on expanding highway capacity; and
• Invest in roadway "hotspots" /intersection improvements instead of overall roadway widening.
Next Steps
The MPO Transportation Advisory Committee and technical staff will evaluate the four (4)
transportation options and consider public input to develop the Preferred Option, which the TAC
will adopt as the Draft 2035 LRTP. The TAC expects to approve the Draft 2035 LRTP in early
December and the Draft 2035 LRTP will then go through an evaluation and public input process
to ensure that the plan meets air quality conformity regulations.
FINANCIAL IMPACT: There is no direct financial impact associated with this item, although
implementation of many of the alternatives will require new local and state funding.
RECOMMENDATION(S): The Manager recommends the Board:
1. Receive the information and OUTBoard comments; and
2. Endorse the resolution submitting those comments to the DCHC MPO TAC.
Attachment 1
ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS
A RESOLUTION TO PROVIDE COMMENTS TO THE DURHAM - CHAPEL HILL -
CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION
ADVISORY COMMITTEE REGARDING OPTIONS FOR DEVELOPING
THE DRAFT 2035 LONG -RANGE TRANSPORTATION PLAN
3
WHEREAS, Orange County has participated in regional transportation planning as a
member of the Durham - Chapel Hill - Carrboro (DCHC) Metropolitan Planning
Organization (MPO); and
WHEREAS, the Durham - Chapel Hill- Carrboro Transportation Advisory Committee is
preparing a Long -Range Transportation Plan, and has released the Options for
developing the Preferred Option for the Draft DCHC 2035 Long -Range Transportation
Plan (LRTP) for public comment; and
WHEREAS, Orange County seeks ample opportunities to review and comment on
regional transportation plans and policies; and
WHEREAS, the Orange Unified Transportation Board has submitted comments
regarding the Preferred Option for the Draft 2035 LRTP; and
WHEREAS, the Orange County Board of Commissioners has submitted comments
regarding the Alternatives Analysis for the 2035 LRTP and has reviewed the Options for
the Preferred Option for the Draft 2035 LRTP;
NOW, THEREFORE BE IT RESOLVED the Orange County Board of Commissioners
recommends to the Transportation Advisory Committee that the 2035 Durham - Chapel
Hill- Carrboro Metropolitan Planning Organization Long Range Transportation Plan give
priority to projects that encourage alternatives to automobile travel, minimize adverse
impacts on the natural environment and cultural sites, and foster economic development
in designated economic development districts.
BE IT FURTHER RESOLVED the Orange County Board of Commissioners
recommends that the following approaches be considered in the Draft 2035 Long
Range Transportation Plan:
• Support rail transportation including commuter rail service between Burlington and Raleigh
that would serve Orange County, as well as light rail to serve the Triangle area;
• Consider extending light rail from the University of North Carolina at Chapel Hill to connect
to potential commuter rail (University Station) ending in Carrboro;
• Consider using existing power grids (utility easements) for light rail lines;
• Support enhanced local bus and express bus service with shorter delays;
• Ensure good connectivity of services that feed larger transit systems;
• Include private transportation providers in the process, especially with respect to provision of
services to transportation terminals and areas on fringe of service routes;
• Concentrate limited resources on transit and not on expanding highway capacity; and
Attachment 1 4
• Invest in roadway "hotspots" /intersection improvements instead of overall roadway widening.
Upon motion of Commissioner , seconded by Commissioner
2008. the foregoing resolution was adopted this the day of ,
I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North
Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the
proceedings of said Board at a meeting held on September 16, 2008, as relates in any
way to the adoption of the foregoing and that said proceedings are recorded in the
minutes of said Board.
WITNESS my hand and the seal of said County, this day of , 2008
Clerk to the Board of Commissioners
Attachment 2
OUTBoard Comments
Regarding Options for the DCHC MPO
Draft 2035 Long Range Transportation Plan
Orange Unifie4 Transportation Board
PO Box 8181
Hillsborough, NC 27278
Memorandum
Date: November 19, 2008
To: Orange County Board of County Commissioners
From: Sam Lasris, Chair
Orange Unified Transportation Board
Subject: Comments Regarding Options for the Durham - Chapel
Hill- Carrboro Metropolitan Planning Organization Draft
2035 Long Range Transportation Plan
5
The Orange Unified Transportation Board (OUTBoard) met Wednesday, November 19,
2008, to discuss transportation options considered for the Durham - Chapel Hill - Carrboro
Metropolitan Planning Organization Draft 2035 Long Range Transportation Plan, and
endorsed the following comments to recommend for Orange County to submit to the
Transportation Advisory Committee.
The OUTBoard does not support any one transit option, and recommends
transportation approaches that include:
• Support rail transportation including commuter rail service between Burlington and
Raleigh that would serve Orange County, as well as light rail to serve the Triangle
area;
• Consider extending light rail from the University of North Carolina at Chapel Hill to
connect to potential commuter rail (University Station) ending in Carrboro;
• Consider using existing power grids (utility easements) for light rail lines;
• Support enhanced local bus and express bus service with shorter delays;
• Ensure good connectivity of services that feed larger transit systems;
• Include private transportation providers in the process, especially with respect to
provision of services to transportation terminals and areas on fringe of service
routes;
• Concentrate limited resources on transit and not on expanding highway capacity;
and
• Invest in roadway " "hotspots" /intersection improvements instead of overall
roadway widening.
Summary of Preferred Options(1) Section 1 -- Introduction
Preferred Option
Highway
Bus Transit
Fixed Guideway
Bus Transit
• HOV /HOT on I -40 (from Wake Co.
•
Local bus expansion
• No fixed guideway service
(from Bus Intensive Alternative)
to NC 86)
o Peak headways 10 -20 minutes
• Triangle Parkway (toll)
o Off -Peak headways 15 -30 minutes
• US 15 -501 freeway
•
Express bus expansion
• 7 Highway Trust Fund "loop"
•
Regional bus expansion (to outlying
projects (including East End
communities)
Connector)
•
Employment center circulators
Commuter Rail
• Same as above
•
Same with addition of bus feeder service • Commuter Rail — Hillsborough to
(from Moderate multi -modal
to commuter stations
Downtown Durham to RTP to
alternative)
Downtown Raleigh to Clayton
• Commuter Rail — Downtown Durham to
Carrboro via Carolina North
• Bus Rapid Transit — Downtown Durham
to UNC- Chapel Hill
STAG —DMU
• Same as above
•
Same with addition of bus feeder service
• Rail Transit -- Duke to Downtown
((from Fixed Guideway
to rail transit stations
Raleigh using Diesel Multiple Units
alternative)
(DMU) starting in 2019
• Light Rail Transit — Duke to UNC -
Chapel Hill using electric rail cars
starting in 2025
STAC — Electric
• Same as above ;
•
Same with addition of bus feeder service
• Light Rail Transit — UNC- Chapel Hill to
(New alternative —the only Preferred
to rail transit stations
Duke to Downtown Durham starting in
Option not evaluated as part the
2019, then to NCCU to RTP to
Alternatives Analysis
Downtown Raleigh using electric rail
cars starting in 2025
ti) ) Sutne netprtu uenmuons: by v inO t = High Occupancy vehicle /toll; lanes that can only be used by vehicles that pay a toll or have at least a specified number of
passengers. Headway = minutes to wait before next bus arrives. Peak = period of highest travel, generally 7am -9am and 4pm -6pm. BRT = Bus Rapid Transit, which are
buses on a separate roadway. Fixed Guideway = transit vehicles on traveling on separate track or roadway. STAC = Special Transit Advisory Commission, which was a
regional commission that recommended major transit investments. Highway Trust Fund "loop' = Highway projects designated in state legislation to receive special
funding, in DCHC MPO these include: a) East End Connector; b) US 70 widening and freeway upgrade between Wake County and East End Connector; c) I -85 widening
in Durham County; d) all three section of the Northern Durham Parkway; and, e) North Roxboro Road widening. DMU = Diesel Multiple Unit; each car carries own
propulsion capacity and thus trains can be scaled more easily to meet demand. However, the DMUs are relatively large and heavy, and cannot be mixed on streets with
regular traffic. Electric = Using electric rail cars (often called light rail transit) that can be, to some extent, mixed on streets with regular traffic. Commuter Rail =
Locomotive passenger trains running on mainline rail tracks that have stations relatively far apart and typically only run during peak commute hours.
1 -4
Section 3 -- Highway Projects
DURHAM CHAPEL HILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
Roadway Improvements in Preferred Option
if hapel Hill
,rboro
4 507
6-Lane Divided Improvement
US and NC Highways
Upgrade to Freeway
Preferred Option Projects
_� New Freeway /Expressway
2 -3 Lane New Location
Upgrade Existing Freeway
- 2 -3 Lane Improvement
�f
Interstates
6-Lane Divided Improvement
US and NC Highways
Upgrade to Freeway
Preferred Option Projects
_� New Freeway /Expressway
2 -3 Lane New Location
Upgrade Existing Freeway
- 2 -3 Lane Improvement
O Intersection Improvements
• • • • 45 Lane Divided New Location
HOV Projects
45 Lane Divided Improvement
Carrboro ,.'� =,!. MPO Boundary
Chapel Hill L _ -J County Boundaries
Durham
Hillsborough
Other Municipalities
Research Triangle Park
3 -4
7
2036
The Louis
Berger Group, Inc.
8.6.2008
MNee
0 1.25 2.5 5
3 -4
7
DURHAM CHASPEL SILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
Transit Preferred Option -Bus Transit
d 0
J
MEIROPOLIiAN
10232008
,
,r
j, "'iur !ake.
Interstates Transit In Bus Intensive Scenario Carrboro
US and NC Highways - - -- Local Bus Chapel Hill
MPO Boundary Express Bus Durham
County Boundaries Hillsborough
Other Municipalities
Research Triangle Park
TO
L:
MEIROPOLIiAN
10232008
L:
DURHAM CHASPELnILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
Transit Preferred Option- Commuter Rail
rx - -_ -- - - - --
ate' 15 x ' ,� o
lb/
b
J�,r Jun 1 ua,e_
Intorslales
Transit in Modified Scenario
Carrbwo
US and NC Highways
Local Bus
Chapal Hit
MPO Boundary
Express Bus
Duft_
�- -- -J County Boundaries
C—.LA r Rell
Higsborough
OBaa MunicipaNlies
Resear h Tdangle Park
r_
v►
'
DCHC II�
METROPOLITAN
R rl•
ows
I
DURHAM CHASPELIILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
Transit Preferred Option -Rail Transit
0
501
;
This fixed guideway corridor will be light 157
uy rail to the west of the Durham Muultimodal,
Center, and will be Diesel Multiple Unit
(DMU) to the east , , ' A
`1':„.
Y'
is
ORail Transit Stations
Transit In Fixed Guideway Scenario
Carrbom
era < 501
�
Y
Chapel Hill
US and NC Highways
Express
Durham
" "f�"� Jorda�l Luke
Qfi/ S
Hillsborough
j County Boundaries
ORail Transit Stations
Transit In Fixed Guideway Scenario
Carrbom
Interstates
Local Bus
Chapel Hill
US and NC Highways
Express
Durham
#; a MPO Boundary
Rail Transit
Hillsborough
j County Boundaries
Other Municipalities
Research Triangle Park
V IJ
Eill
'
DCHC /1i
MEiRO;C L!
r rr:
N
DURHAM CHAPEL HILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
Transit Preferred Option -Light Rail Transit
Light Rail Stations Transit in Fixed Guideway Scenario Carrboro
Interstates Local Bus Chapel Hill
US and NC Highways - Express Durham
MPO Boundary Electric Light Rail Hillsborough
County Boundaries Electric Light Rail Deviation to NCCU Other Municipalities
Research Triangle Park
'
DCHC i11
METROPOLITAN
A
50, w;
r
Jo, l aka
Light Rail Stations Transit in Fixed Guideway Scenario Carrboro
Interstates Local Bus Chapel Hill
US and NC Highways - Express Durham
MPO Boundary Electric Light Rail Hillsborough
County Boundaries Electric Light Rail Deviation to NCCU Other Municipalities
Research Triangle Park
'
DCHC i11
METROPOLITAN
1 11:
DURHAM GIiAPELP ILQL GARRBORO
METROPOLITAN PLANNING ORGANIZATION
On -Road Bicycle Facilities
IMN
V&
7-7=1�
-- - -= - --
'
The
2
Y b
r `5507 ', _.,
l
1
8.6.2008
Mies
0 0.5 1 2
5 -3
n
B Ere
hp J...
r�n _ Of fi
Labe
Interstates Regional Bicycle Facilities Camboro
US and NC Highways On -Road Bicycle Facilities Chapel Hill
•. MPO Boundary Durham
County Boundaries Hillsborough
Other Municipalities
Research Triangle Park
v►
�a
Louts
0 3 5
The
2
Berger Group, Inc.
8.6.2008
Mies
0 0.5 1 2
5 -3
�a
Section 5 -- Bicycle and Pedestrian Projects
DURHAM CHAPEL HILL CARRBORO
METROPOLITAN PLANNING ORGANIZATION
Off -Road Bicycle Facilities
= k;
v►
3
Off-Road Bicycle Facilities
Carrbom
Interstates
Chapel Hill
US and NC Highways
Durham
MPO Boundary
Hillsborough
County Boundaries
Other Municipalities
Research Triangle Park
v►
3
2 0 5
The Louis
Berger Group, Inc.
8.6.2008
Miks
o 1.25 z.s s
5 -4
r3