Loading...
HomeMy WebLinkAboutAgenda -11-06-2008 - 4rORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 6, 2008 Action Agen a Item No. _~ SUBJECT: Educational Facilities Impact Fee DEPARTMENT: Planning /Budget PUBLIC HEARING: (Y/N) No ATTACHMENT(S): 1. Adopted Educational Facilities Impact Fees and Results of 2007 Study 2. Graphs of Historical Impact Fee Collections for Both School Districts 3. A. Impact Fee at Various Levels and Projected Level Necessary to Generate $1.6 million in CHCCS B. Educational Facilities Impact Fees in Relationship to New Single Family Dwelling Sales Prices 4. Proposed Timeline 5. Adopted Student Generation Rates and Results of 2007 and Relationship to SAPFO (Schools Adequate Public Facilities Ordinance) 6. Letters from CHCCS and OCS 7. Legal Ad for Public Hearing 8. Draft Report for CHCCS 9. Draft Report for OCS (Previously Provided Under Separate Cover) INFORMATION CONTACT: Craig Benedict, 245-2592 Donna Coffey, 245-2151 Perdita Holtz, 245-2611 PURPOSE: To 1) set the public hearing for the December 1, 2008 regular Board meeting; 2) approve the fee level range as proposed by staff; and 3) approve the public hearing legal advertisement. BACKGROUND: Orange County adopted the Educational Facilities Impact Fee Ordinance in 1993 and last updated impact fee levels in 2001. In 2007, the County contracted with TischlerBise, Inc. to produce an updated impact fee study. Copies of the draft reports were sent to the School Districts, BOCC, and municipal Planning Directors on July 22, 2008 and the Board formally received the draft Educational Facilities Impact Fee reports at its October 7, 2008 regular meeting. This topic was also discussed at the September 25, 2008 Joint Schools meeting and at the October 14, 2008 BOCC work session. Letters received from the school districts are included as Attachment 6. 2 Attachment 1 summarizes the adopted educational facilities impact fee levels and the results of the 2007 study. The proposed legal advertisement for the public hearing is Attachment 7 and includes the fee level ranges proposed by staff to be considered for the public hearing. The proposed ranges are as follows: • $5,069 to $11,423 for a new single-family detached dwelling in the Chapel Hill - Carrboro City Schools (CHCCS) district, and • $3,000 to $5,623 for a new single-family detached dwelling in the Orange County Schools (OCS) district. As is shown in Attachment 3A, the projected impact fee required in the CHCCS district to generate the budgeted amount of $1.6 million to offset CHCCS debt service is $5,069. This is the staff-recommended lower end of the impact fee range. The staff-recommended upper end of the range ($11,423) is 60% of the Maximum Supportable Impact Fee (MSIF), which is consistent with the adopted percentage of the 2001 MSIF. In the OCS district, the lower end of the staff-recommended range is the current impact fee of $3,000 and the upper end of the range ($5,623) is 60% of the MSIF. Attachment 3B shows impact fee levels in relation to the sales price of new single family detached dwellings. In CHCCS, the 2001-adopted impact fee of $4,407 is 1.21% of the 2001 median sales price of a new single family detached dwelling. If the impact fee were to be increased to 1.21 % of the 2007 median sales price of a new single family detached dwelling, the corresponding impact fee would be $9,249. In OCS, the 2001-adopted impact fee of $3,000 is 1.32% of the median sales price of a new single family detached dwelling. If the impact fee were to be increased to 1.32% of the 2007 median sales price of a new single family detached dwelling, the corresponding impact fee would be $3,762. The impact fee level for housing types other than single family detached dwellings would be set at the same percentage of maximum supportable impact fee for the particular type of dwelling as the percentage set for single family detached dwellings. For example, if impact fees were to be set at 60% of the maximum supportable impact fee for single family detached dwellings, the impact fee for a manufactured home would be set at 60% of the maximum supportable impact fee for manufactured homes. Precise changes, if any, in the present fees would be determined by the Board of Commissioners following public comment at the public hearing and otherwise. In no event would educational facilities impact fees be changed to an amount or amounts that exceed the maximums determined by the 2007 Technical Reports. FINANCIAL IMPACT: Other than advertising costs and staff time, there is no financial impact in approving the public hearing legal advertisement. As Attachment 3A shows, an increase in impact fees to $5,069 per new single family detached dwelling is projected to be necessary to generate the budgeted amount of $1.6 million to offset CHCCS debt service. RECOMMENDATION(S): The Manager recommends the Board: 1) set the public hearing for the December 1, 2008 regular Board meeting; 2) approve the fee level range as proposed by staff; and 3) approve the public hearing legal advertisement. Attachment 1 0 Adopted Educational Facilities Impact Fees and Results of 2007 Study Impact fees were last updated in 2001 and were adopted at the following levels: Adopted School Impact Fees (2001) [NOTE: Fee levels were adopted at 60% of the Maximum Supportable Im act Fee MSIF for CHCCS and 56% of the MSIF for OCS Chapel Hill-Carrboro Orange County Schools Schools Single-Family & Multi-wide $4 407 $3 000 Manufactured Homes , , Multi-Family 8~ Single-wide $1 979 $1 420 Manufactured Homes , Since 2001, construction costs have risen dramatically and land prices have appreciated. For example, as the chart on page 16 of the Chapel Hill-Carrboro City Schools draft report shows, when Scroggs Elementary was constructed in Fall 2000 the project cost was slightly higher than $17.5 million (adjusted to 2007 dollars) while Morris Grove Elementary, constructed in the Fall of 2008, cost slightly more than $24.6 million (adjusted to 2007 dollars). Additionally, land costs have risen substantially in the CHCCS District and buildable parcels of a size suitable for a school have gotten scarce. It is estimated that land acquisition costs in the CHCCS will be $100,000 per acre for sites suitable for a school. The 2007 TischlerBise study has found the following Maximum Supportable Impact Fee (MSIF) for each district: 2007 Stud Maximum Su ortable Im act Fees Chapel Hill-Carrboro Schools Orange County Schools Sin le-Famil Detached $19,039 $9,372 Sin le-Famil Attached $11,016 - Multifamil $2,144 - Single-Family Attached / Multifamil - $2,905 Manufactured Homes $8,232 $4,463 Since 1995, Orange County has offered an impact fee reimbursement program for school impact fees paid on affordable housing units. From FY2002-03 through FY2007-08, $196,698 in collected impact fees has been reimbursed for the 59 affordable housing units constructed in that time period. As was done when the impact fees were updated in 2001 (adopted at 56% of the Maximum Supportable Impact Fee [MSIF] in OCS and 60% MSIF in CHCCS), the BOCC has discretion to adopt fee levels at less than 100% of the Maximum Supportable Impact Fee. $1,400,000 ~ $1,200,000 c 'c ~• C ~ ~ ~ $1,000,000 ~ W V v c $800,000 OO a o .o N $600,000 m m ~ ~ _R ~_ 0 ~ ~ $400,000 '0 0 ~w a $200,000 $0 School Construction Impact Fee Orange County Schools Does Not Reflect School Construction Impact Fees Collected on Behalf of City of Mebane 09/16/2008 654 School Construction Impact Fee Increase *620 Effective June 25, 2001 /1 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Fiscal Year (1) Includes School Construction Impact Fees Collected for Certificates of Occupancy Issued by Orange County Planning Department. Does not inlcude School Construction Impact Fees collected on behalf of City of Mebane. (2) Certificates of Occupancy data provided by Orange County Planning Department. 7 700 600 a 500 H ,~ N V ~ G C ,~ 400 ~a O« c c 300 .y~'. ~j ~ °~ c L 200 v O ro .. a 100 0 School Construction Impact Fees Orange County Schools $1,600,000 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 $0 09/16/2008 ~~~ 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Fiscal Year ^Collected by Orange County Planning for Certificates of Occupancy Issued Collected by Orange County Planning on Behalf of City of Mebane ~ School Construction Impact Fee Chapel Hill Carrboro City Schools $3,000,000 c ~ $2,500,000 ea Q $2,000,000 H 30 ~ ~ $1,500,000 ~ V °~ $1,000,000 0 V e~ a $500,000 $0 School Construction Impact ~~ Fee Increase Effective June 972 25, 2001 \ ~ 851 628 571 67 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Fiscal Year 1,200 d a 1,000 t V 0 H 800 ~ ,~ r ~ v ~ Q 0 ~a 600 y V ~~ E _~ a~- 400 a~ _ c :o .~ m 200 a 0 (1) Building permit data provided by Towns of Chapel Hill and Carrboro Planning Departments Attachment 3A ~I Necessary to Generate $1.6 million in CHCCS ~rtable impact fee (MSIF) as defined in the 2007 technical reports pre ared b Current Impact Fee for Single Family Homes located in CHCCS School District ty Schools 50% 40% 32% 30% 2Z% 9tO 20% 10% $9,520 $7,616 $6,092 $5,712 $5 069. $3,808 $1,904 $5,508 $4,406 $3,525 5 $2,203 $1,102 $1,072 $858 $68 $643 $429 $214 A N/A N/A N/A N/A N/A N/A $4,116 ,293 $2,634 $2,470 $1,646 $823 Current Impact Fee for Single Family Homes located in OCS School hoots 50% 40% 3296 30% 27% 20% 10% $4,686 $3,749 000 $2,812 $2,530 $1,874 $937 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ,743 $1,453 $1,162 $872 $784 $581 $290 $2,232 $1,785 $1,339 $1,205 $893 $446 Attachment 3B Educational Facilities Impact Fees Fees in Relationship to New Single Family Dwelling Sales Prices Chapel Hill - Carrboro City Schools District New SF 2001 Impact Fee 2007 2008 Impact detached (217 closed ($4,407) % of (74 closed Fee if at same dwellin sales Price sales % as 2001 Average $393,445 1.12 $805,707 $9,024 Sales Price Median $364,900 1.21 $764,394 $9,249 Sales Price Source of data: MLS closed sale date for Average; proprietary appraisal software for Median, using MLS data. It should be noted that all sales are not entered into the MLS. Orange County Schools District New SF 2001 Impact Fee 2007 2008 Impact detached (95 closed ($3,000) % of (110 closed Fee if at same dwellin sales Price sales % as 2001 Average $233,626 1.28 $337,775 $4,324 Sales Price Median $228,000 1.32 $284,968 $3,762 Sales Price Source of data: MLS closed sale date for Average; proprietary appraisal software for Median, using MLS data. It should be noted that all sales are not entered into the MLS. Attachment 4 Proposed Timeline July 22, 2008 Draft reports sent to School Systems, BOCC, and municipal Plannin Directors. August 22, 2008 Date stated in transmittal letter for submittal of comments from School Districts (letters have been received from both school districts . September 16, Draft reports on BOCC agenda for formal receipt of reports 2008 and direction. (Dela ed due to time constraints September 25, Educational Facilities Impact Fees (EFIF) discussed at the 2008 Joint BOCC/School Board meetin . October 7, 2008 BOCC formal) received draft re orts. October 14, 2008 BOCC discussed to is at work session. November 6, 2008 Item on BOCC agenda to receive information from staff regarding fee level range to be considered for adoption and to a rove le al advertisement for ublic hearin . November 19 and Legal advertisement for public hearing runs in papers for 2 26, 2008 consecutive weeks. December 1, 2008 Public hearing on draft reports and to receive input on the potential fee levels. (Consultant attends to present reports and answer questions). Direct Consultant to finalize draft reports. Direct staff to bring back amendments to Educational Facilities Impact Fee Ordinance for adoption consideration on December 11, 2008. December 11, BOCC adopts updated impact fee levels and determines 2008 effective date for new fee levels. Attachment 5 ~~ Adopted Student Generation Rates and Results of 2007 Study and Relationship to SAPFO (Schools Adequate Public Facilities Ordinance) Student generation rates have increased in both school districts from the rates calculated in 2001. The Adopted (2001) student generation rates are as follows: Ado ted Student Generation Rates 2001 Cha el Hil l-Carrboro Schools Ora n a Coun Sch ools Elem. Middle High All Elem. Middle High All Grades Grades Single- Famil 0.168 0.095 0.123 0.386 0.150 0.075 0.084 0.309 Other 0.094 0.042 0.043 0.179 0.084 0.033 0.030 0.147 All Housing 0.134 0.070 0.086 0.290 0.140 0.068 0.076 0.284 T es The analysis for the 2007 draft report found the student generation rates in the following table. Some data was aggregated slightly differently for the school districts since the housing types found in each district vary (i.e., Single Family Attached / Multifamily was combined for OCS since there is minimal single family attached housing in the OCS district). 2007 Stud Student Generation Rates Cha el Hill-C arrboro Schools Ora n a Cou n Schools Elem. Middle High All Elem. Middle High All Grades Grades Single-Family Detached 0.263 0.143 0.197 0.603 0.168 0.090 0.126 0.384 Single-Family Attached 0.158 0.077 0.115 0.350 - - - - Multifamil 0.038 0.015 0.017 0.070 - - - - Single-Family Attached / - - - - 0.066 0.022 0.034 0.122 Multifamil - Manufactured Homes 0.141 0.066 0.061 0.268 0.096. 0.041 0.049 0.186 All Housing T es 0.149 0.078 0.105 0.332 0.145 0.074 0.102 0.321 The contract with TischlerBise, Inc. includes an update to student generation rates because student generation rates are a factor, along with school construction costs, in the Maximum Supportable Impact Fee calculation. The Educational Facilities Impact Fee Ordinance is independent of and preceded the Schools Adequate Public Facilities Ordinance (SAPFO) effective date. Student generation rates are also a part of SAPFO and the Certificate of Adequate Public Schools (CAPS) system that is component of SAPFO. Although it is logical to update SAPFO processes with the most up-to-date data available, there is not a requirement that SAPFO student generation rates be updated prior to or concurrent with changes to the Educational Facilities Impact Fee Ordinance. For example, the 2001 impact fee study included student generation rates which were adopted into SAPFO in 2003 because they were readily available. The SAPFO MOU contains a process for updating student generation rates (and other statistical methods). The process is as follows: 1. The Board may change the projected student membership growth rate, the methodology used to determine this rate, or the student generation rate if the Board concludes that such a change is necessary to predict growth more accurately. 2. Before making any such change, the Board shall receive and consider the recommendation of a staff committee consisting of the planning directors of the Town(s) and -the County and a representative of the School District appointed by the Superintendent. 3. The committee shall provide, in a timely manner, a copy of its recommendation to the governing boards at the time it provides such recommendation to the BOCC and the BOCC shall provide an opportunity for the governing boards to comment on the recommendation. 4. If a change is made, the BOCC shall inform the governing boards prior to February 1St in any year in which such change is intended to become effective what change was made and why it was necessary. is ~CF~ '~=jEI~ $~~ 4 9 ZaoB BY: September 8, 2008 Barry Jacobs, Chair Board of County Commissioners PO Box 8181 Hi(Isborough, NC 27278 Dear Commissioner Jacobs: At its meeting on September 3, 2008, the Chapel Hill-Carrboro Board of Education approved the following resolution: Be it, therefore, resolved that the Board of Education urges the Orange County Board of Commissioners to increase the school impact fees in order to provide a source of funding to construct new schools to keep pace with the district's growing student population and the escalating cost of construction. Be it further resolved that the Board of Education urges the Orange County Board of Commissioners to continue to reimburse the impact fee for newly constructed affordable housing. We look forward to further discussion on this important topic at our joint meeting on September 25, 2008. Sincerely, Pamela S. Hemminger, Chair Board of Education C: Laura Blackmon Neil Pedersen Lincoln Center, 750 S. Merritt Mill Road • Chapel Hill, NC 27516-2878 • (919) 967-8211 • www.chccs.kl2.nc.us G. Patrick Rhodes (919} 732-8126 Telephone Superintendent (919) 732-8120 Fax www.orange.kl2.nc.us September 19, 2008 Mr. Craig Benedict, Director Orange County Planning and Inspections I?epartrnent 306 F Revere Road, PO Box 8181 Hillsborough, NC 27278 Dear Mr. Benedict: RE: School Impact Fees The Orange County Board of Education held a discussion at their September 2, 2008 Board meeting regarding the Draft School Impact Fees Report completed by TischlerBise. In response to the request for our Board to provide comments pertaining to the report, I am providing dze following excerpt from the approved minutes of the September 2 meeting: Board members agreed by consensus to reply to the County Commissioners stating the Board of Education supports the County Commissioners in all their efforts to fully fund our school district Administration recommends the percentage of the maximum supportable impact fee remain at 56°/a The Orange County Board of Education fully supports the Board of County Commissioners' efforts to fund the Orange County Schools and supports the current impact fee levels. Please let me know if you need any additional information. Sincerely, ~. ~' G. Patrick Rhodes Superintendent /pmc cc: Orange County Board of Education ~Q$ ~~ ~ SEp ~ 3 2 Attachment 7 ~T NOTICE OF PUBLIC HEARING ORANGE COUNTY BOARD OF COMMISSIONERS A public hearing will be held in the Judge F. Gordon Battle Superior Courtroom of the New Orange County Courthouse, 106 E. Margaret Lane, Hillsborough, North Carolina, on Monday, December 1, 2008, at 7:30 PM for the purpose of giving all interested citizens an opportunity to speak for or against the following item: 1. Draft Educational Facilities Impact Fee Reports Effective July 1, 1993, the Board of County Commissioners established a system of impact fees to help recover a portion of the school capital needs created by growth in the county. Since that date, an impact fee has been collected for each new housing unit constructed or installed in the county, including single-family home, multi-family housing units, apartments, and manufactured homes. Fees collected in each of the two school districts within the county (Chapel Hill -Carrboro City Schools and Orange County Schools) are deposited into separate special accounts and used exclusively for the construction of new school facilities in the school district in which the fee was collected. The impact fee supplements funds provided by the County from sales tax and property tax revenues for school capital projects. The educational facilities impact fee presently collected (last updated in 2001) in each district for each new residential unit is as follows: Adopted School Impact Fees (2001) [NOTE: Fee levels were adopted at 60% of the Maximum Supportable Impact Fee (MSIF) for CHCCS and 56% of the MSIF for OCS Cha el Hill-Carrboro Schools Oran a Count Schools Single-Family & Multi-wide Manufactured Homes $4,407 $3,000 Multi-Family & Single-wide Manufactured Homes $1,979 $1,420 The Board of County Commissioners employed a consultant to evaluate impact fee levels and determine the maximum legally defensible fee for new development in each of the school districts with the County to subsequently decide the maximum justifiable fee it will to charge. The full draft reports (one for each school district) are available on the Orange County website at: http://www.co.orange.nc.us/OCCLERKS/0809166dO.pdf (Orange County Schools) and http://www.co.orange.nc.us/OCCLERKS/0809166dC.pdf (Chapel Hill -Carrboro City Schools). The 2007 Technical Reports determined the Maximum Supportable Impact Fees as follows: /5 2007 Stud Maximum Su ortable Im act Fees Cha el Hill-Carrboro Schools Oran a Count Schools Sin le-Famil Detached $19,039 $9,372 Sin le-Famil Attached $11,016 - Multifamil $2,144 - Single-Family Attached / Multifamil - $2,905 Manufactured Homes $8,232 $4,463 The Board of Commissioners will consider whether or not to change educational facilities impact fees following the December 1, 2008 public hearing. THE MAXIMUM LEGALLY PERMISSABLE FEES CALCULATED IN THE REPORTS OF THE CONSULTANT ARE NOT A PROPOSAL TO CHARGE THOSE LEVELS OF FEES. The Board of Commissioners is currently considering a range of between $5,069 and $11,423 for a new single-family detached dwelling in the Chapel Hill - Carrboro City Schools district and a range of between $3,000 and $5,623 for a new single-family detached dwelling in the Orange County Schools district. Impact Fees for other housing types would be set at the same percentage of maximum supportable impact fee for the particular type of dwelling as the percentage set for single-family detached dwellings. For example, if impact fees were to be set at 60% of the maximum supportable impact fee for single-family detached dwellings, the impact fee for a manufactured home would be set at 60% of the maximum supportable impact fee for manufactured homes. Precise changes, if any, in the present fees will be determined by the Board of Commissioners following public comment at the public hearing and otherwise. In no event will educational facilities impact. fees be changed to an amount or amounts that exceed the maximums determined by the 2007 Technical Reports. Purpose: To receive public comment on the Draft Educational Facilities Impact Fees reports and the impact fee range under consideration. Changes may be made in the advertised proposal that reflect debate, objections and discussion at the hearing. Accommodations for individuals with physical disabilities can be provided if the request is made to the Director of Planning at least 48 hours prior to the Public Hearing by calling the appropriate number listed below. Questions regarding the proposal may be Department located in .the Planning and Hillsborough, North Carolina. Office hours through Friday. You may also call 245-257 staff member who will answer your questions. directed to the Orange County Planning Agricultural Center, 306E Revere Road, are from 8:00 a.m. to 5:00 p.m. Monday i or 245-2585 and you will be directed to a PUBLISH: l~ News of Qrange Chapel Hill Herald November 19, 2008 November 19, 2008 November 26, 2008 November 26, 2008