HomeMy WebLinkAboutAgenda - 09-30-1999 - 11 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 30, 1999 Action Agenda Item No. SUBJECT: CORBIN DOWNS TRAFFIC/NCDOT REPORT FISCAL IMPACT DEPARTMENT: Planning PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Report Craig Benedict, Director Ext. 2592 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane 336 - 227 -2031 PURPOSE: To present the preliminary traffic report from NCDOT on Corbin Downs. BACKGROUND: TRANSPORTATION The preliminary review by NCDOT was completed on September 9, 1999 which was one day after our joint meeting. NCDOT analysis was based on the original Hillsborough Place proposal which had more residential and less office. Even without the inclusion of the additional traffic generated by the change to Corbin Downs and an increase in office and retail development, NCDOT's comments were extensive and preliminary. An abridged version follows: Old 86 - South Access • Recommends a complete Traffic Impact Analysis (TIA) to include I -40 /Old 86 interchange • Suggest a multi -lane divided highway with a minimum of 1000 feet between median openings • Recommends the alignment of the existing west side Old 86 service road with new project • Recommends developer to do multilane from project access to I -40 Old 86 — North Access at Lafayette Drive • Concurs with locational alignments • Recommends full intersection length including all right and left turn lanes Other • Concern about internal project road connector between Old and New 86 being inadequate for NCDOT standards based on only two lanes and closely spaced median breaks • Recommend the I- 85/Old 86 interchange be included in the TIA As of this letter date, the developer has forwarded a revised analysis for NCDOT review in Raleigh. Orange County planning staff agrees with all prior NCDOT recommendations dated 9/9/99and where NCDOT has limitations on their authority to ask for transportation improvements, both Orange County and Hillsborough can require an augmented design and construction. FINANCIAL IMPACT: A preliminary fiscal impact statistical report is attached. The tables note expenditures (Table 1) and revenues (Table 2). The calculations are basic since the information, service populations and budget are in the formative stages of development. Non - residential fiscal impacts have never been generated previously and my office is in the process of receiving input from all departments on the impacts of non - residential activity. A model could then be more appropriately developed. Irrespective of the basal nature of the tables and calculations, the numbers do show that development in most cases is not a revenue windfall. The Town of Hillsborough analysis showed a deficit in early years with an eventual surplus in later years which is primarily due to their provision of water and sewer. Hillsborough administration (as noted in their fiscal report and presentation) and I will clearly add our disclaimers to the varied assumptions that are made in this analysis. I believe property values are high and the feasibility of the scales of non- residential development is questionable; both of which could distort revenue projections higher. .,RECOMMENDATION(S): Receive as a report. V 2 V) 1. Community Maintenance Total 2. General Administration Total 3. Taxation and Records Total 4. Community Planning Total 5. Human Service Total Social Services Total Health Total Other (Aging, Library, P &R, etc.) 6. Public Safety Total 7. Public Works Total 8. Education Total 9. Non - Departmental Total Total Expenditures Expenditures 1999 -00 Manager Recommendation $ 1,139,006 $ 3,584,887 $ 2,305,096 $ 2,099,527 $22,112,944 $12,280,575 $ 4,757,088 $ 5,075,281 Underline = applicable service population TABLE 1. EXPENDITURES Percentage Per Capita @ 110,000 1.13 3.56 2.29 2.09 21.98 12.20 4.73 5.04 10.35 32.59 20.96 $19.09 201.03 $111.64 $43.25 $46.14 Per Capita @ 45,000 $25.31 $79.66 $51.22 46.66 $491.40 $272.90 $105.71 $112.78 NOTE 25a /o' 10V Per Capita Serv. Pop. Mix $10.35 $32.59 $20.96 $11.67 $201.03 $ 8,992,764 8.94 $81.75 $199.84 65a/o' $129.89 $ 3,431,552 3.41 $31.20 12626 $76.26 $36,580,779 36.35 _ $322.55 $812.91 $812.91 $20,374,947 20.25 $185.23 $452.78 40e /a' $185.23 $100,621,502 100 $914.74 $2,236.03 $1,293.49 1-25% Share of County (item is Services) costs relates to building inspection servicm . coordination with regional transportation planning and economic development associated services. t-65% Share of County (Item 6 Services) costs relates to partial Sheriff impacts, and complete EMS impacts- 'F-405% Share of County non -dept costs relates to partial impacts to outside agency funding, debt service (schools, countywide buildings, etc.). ° -109% Share of County for the availability of day time services such as library, bus, parks & ree Per Capita Non - Resident 11.67 11.28 99.92 122.87 Resident Population Type NO. PPH TOTAL Single Family 180 x 3.5 = 630 Town house 91 x 2.5 = 228 MF Apts 40 x 2.0 = 920 Assisted Living 100 x 1.0 = 100 Retirement 60 x 1.0 = 60 TOTAL 1,938 Subtotal Cost to provide Services to Resident Pop = (1,293.49 x 1,938) _ $2,506,784.00 Non - Resident Population Trips/Day Employees 4,632 9,264 Patrons 13,052 26,103 TOTAL 17,684 35,367 (17,694 _ 4) = 4,421 x $122.87 = $543,208.27 GT $3,049,992.27 TABLE 2. REVENUE 1999 -00 Manager Recommendation Percentage A. Total Property Tax $64,872,798 B. Total Sales tax $13,948,795 C. Total Licenses and permits $ 907,900 D. Total intergovernmental $11,677,669 E. Total Charges Service $ 4,938,837 F. Total Miscellaneous $ 4,275,503 G. Total Revenue $100,621,502 $243,000,000 .917 $ 2,228,310 A 64.47% 479,206 B 13.86% 345.635 X 10.00% $ 6,053,151 (Mix of C,D,E,F) 64.47 13.86 .90 11.61 4.91 4.25 100.00 L1 0 4i1 STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVERNOR September 9, 1999 ORANGE COUNTY Margaret A. Hauth, Planning Director Town of Hillsborough - P. O. Box 429 Hillsborough, NC 27278 Subject: Proposed Hillsborough Assemblage Access onto NC 86, SR 1009 Dear Ms. Hauth: > s DAVID McCOY SECRETARY Per your request, a preliminary review of the above mentioned subject was reviewed by the Congestion Management Section of NCDOT in Raleigh. Attached for your files is a copy of their recommendations and comments. In addition and for your information, I am attaching two memos from Orange County which have been received since your July 12`h letter. Due to the traffic associated with the subject, we are concerned with Congestion Management's recommendation for a Traffic Impact Analysis (TIA). I would recommend that you require a TIA from the developer and allow us to review the site again with more detailed information. If you have any further questions or comments, please contact Michael Venable, Assistant District Engineer, at 336 -570 -6833. atta. TJD:MSV:kww cc: J. W. Watkins, P.E. Vance Barham Gary Faulkner grange County Sincerely, T� D T. J. Dyer, P.E. DISTRICT ENGINEER P. O. Box 766, Graham, NC 27253 -0766 - -cam IV,4. ECE y SEP 21999 STATE OF NORTH CAROLINA N. C. DEPT. OF TRANSPORT, �� 10: 1 DIVISION OF HIGHWAYS • itn 01"4 DEPARTMENT OF TRANSPORTA'DI T i . �' � `: James B. Hunt Jr. P.O. BOX 25201, RALEIGH, N.C. 27611 -5201 David McCoy GOVERNOR SECRETARY August 26, 1999 MEMORANDUM In reply refer to File No. SC -99 -123 TO: T.J. Dyer, P.E., District Engineer (Attention: M. Venable) FROM: G.C. Faulkner, Design Review Engineer Congestion Management Section SUBJECT: Proposed Hillsborough Assemblage Access onto NC 86, SR 1009 Orange County Per your request, the Access Review Squad of the NCDOT Traffic Engineering Branch has completed a preliminary review of the subject site. Based on our analysis of the site plan and the submitted portion of the TIA performed by Kimley -Horn and Associates, Inc. with consideration to its impacts on the adjacent traffic facilities, we offer the following comments: Background SR 1006 (Old NC 86) is a two -lane major thoroughfare with a 1997 ADT value of 13,700 vehicles per day. NC 86 is a two -lane major thoroughfare, with a 1997 ADT of 11,500 vehicles per day and a posted speed limit of 45 miles per hour. SR 1224 is a service road which connects to Old NC 86 from the west approximately 1,400 feet north of the westbound ramp terminal of the I -40 / Old NC 86 interchange. Proposed Development The multi -use development is proposed to be located between NC 86 and Old NC 86, north of I -40, and is proposed to include single - family homes, townhouses, apartments, a hotel, an assisted living community, a day care facility, a fire station, and extensive retail and office development. Requested access to the site is includes a full movement access connection onto Old NC 86 opposite Lafayette Drive, a full movement access onto Old NC 86 between the I -40 / Old NC 86 interchange and SR 1224, and a full movement access onto NC 86. T.J. Dyer August 26, 1999 Page 2 Thoroughfare Plan The 1997 Transportation Plan for the Town of Hillsborough indicates the need for NC 86 and Old NC 86 to be widened to multi -lane facilities within the project vicinity. Trip Generation Based on the methodology of the ITE Trip Generation Manual (6th Edition), the proposed development is expected to generate approximately 35,367 trips per average weekday. The breakdown of entering and exiting traffic at peak hours is listed below. PEAK HOUR ENTER EXIT AM 1,450 835 PM 1,520 2,008 Observations/Recommendations Given the magnitude of this development and its proximity to I -40 and I -85, we recommend a complete Traffic Impact Analysis (TIA) be performed which identifies current land use proposals within the site, and addresses the capacity of the 1 -40 / Old NC 86 interchange as it stands to be affected by the proposed development. Given the limited information available addressing land use, the location of the proposed driveway connections, and the lane geometry of these connections, it should be noted that the following traffic related comments are preliminary. Old NC 86 Access, Southern Drive • Given the high traffic volumes expected on Old NC 86 and the function of Old NC 86 as a major north -south connector between I -40 and the Town of Hillsborough, it appears a multi- lane divided type facil- is apprgriate for Old NC 86 in the vicinity of the project. In d to provide full movement access onto Old NC 86 it will be necessary to comply with the current Median Crossover Guidelines (June, 1998), should a divided type facility be implemented. With a 55 mile per hour speed limit posting, a minimum of 1,500 feet is required between median openings; with a 45 mile per hour speed limit posting, a minimum of 1,000 feet is required between median openings. This criterion should be considered when determining the final location of the proposed driveway connection onto Old NC 86. • We recommend the existing service road located approximately 1,400 feet north of the I -40 / Old NC 86 interchange and the proposed driveway be aligned. • Given the high traffic volumes associated with the site and its southernmost access connection, a multilane facility should be constructed (as a minimum) between the southern I -40 / Old NC 86 ramp terminal and the main development entrance. Old NC 86 Access, Northern Drive • We concur with the proposed location of the driveway located opposite Lafayette Drive. • We recommend providing a northbound right -turn lane on Old NC 86 to remove turning vehicles from the through movement. • We concur with the proposed southbound left -turn lane on Old NC 86. 7 T.J. Dyer August 26, 1999 $ Page 3 NC 86 Access We concur with the proposed southbound right -turn lane and northbound left -turn lane at this driveway. Other • The traffic information provided did not address any traffic impacts this development will have on the critical I-40 / Old NC 86 interchange area. We strongly recommend traffic impacts to this interchange be determined and addressed before any access connections to this development are considered. We have concerns with the proposed new internal road connecting NC 86 to Old NC 86 through the site. This new facility would function as a major connector between these roads and is expected to serve a significant volume of traffic not associated with the proposed development. It appears from the current development sketch plan that this new road is proposed as a two -lane divided facility with many closely spaced median breaks, which could pose operational and safety problems. If the developer anticipates adding or petitioning for addition to the State System, all roads should be designed and constructed in conformance with the current North Carolina Department of Transportation design and construction guidelines. We also have concerns with the impact this development will have on the I -85 / Old NC 86 interchange. Although there is considerable distance between this interchange and the northernmost development driveway, much of the traffic entering and exiting the site is expected to utilize the I -85 / Old NC 86 interchange. Consideration should be given to including capacity analysis for this interchange as part of the recommended TIA. Closing In addition to the above recommendations, reference should also be made to the information included in the General Recommendations Attachment. If we can provide further assistance. please contact G.C. Faulkner or myself at 250 -4151. GCF/RWS/MAD:md Attachment cc: J.W. Watkins, P.E. (Attention: V.E. Barham) J.F. Permar, P.E. T.A. Peoples, P.E. (Attention: E.Y. Stafford P.E.) T.M. Hopkins, P.E. GENERAL RECOMMENDATIONS ATTACHMENT (For SC 99 -123 / Hillsborough Assemblage) Adequate horizontal and vertical sight distances should be reserved at all proposed entrances. Foliage that interferes with sight distance should be cut back to protect lines of sight. The District Engineer should determine if all drainage facilities are adequate. Curb cuts and curb ramps should be constructed in conformance with the Guidelines for Curb Cuts and Curb Ramps for Handicapped Persons, if applicable. The developer may be required to obtain an approved encroachment agreement covering proposed work within the state right -of -way. If this is the case, the encroachment should be cross referenced to this review. All street and driveway entrances onto state system roadways should be controlled with appropriate traffic control devices, including but not limited to, stop, yield, directional, regulatory, and advisory signs and pavement markings. All traffic control devices shall conform to the requirements set forth in the Manual on Uniform Traffic Control Devices. Final pavement marking and signing plans should be submitted to the Division Traffic Engineer for approval prior to the installation of any signs and /or pavement markings. A recommended width of 40 foot (face to face) should be used at each drive. It is also recommended that 30 foot (minimum) radii be used at each drive to accommodate any service or truck traffic that may visit the site. If the developer anticipates adding or petitioning for addition to the State System, all roads /streets should be designed and constructed in conformance with the current North Carolina Department of Transportation design and construction guidelines. All "outparcels" or "excluded areas" should be served internally with no additional access onto abutting roadways. The developer should convey this condition in any lease or sell agreements. As required by the "Policy on Street and Driveway Access to North Carolina Highways" manual the applicant is responsible for identifying all right -of -way and /or control -of- access limits and for including this information on all submittals. Failure to accurately disclose R/W and C/A limits could result in the denial or closure of access points. Adequate Right -Of -Way for widening and Sight Distance triangles should be reserved. Consideration should be given to the possible future need for signalization and the associated span poles, controller and pad, and guy wires. Where possible opposite side drives should be aligned to prevent the operational and safety problems caused by offset drives. Any additional development, either within this site or adjacent to this site, that intends on using this development's access will require an updated driveway permit and re- evaluation of geometric and traffic control needs. fa All widening should include appropriate transitional and deceleration tapers. Recommended turn lane and transitional treatments are shown on page 54 (Figure 28) of the "Policy on Street and Driveway Access to North Carolina Highways." E S` 4• G 16 1999 N. C. DEPT. Of TR0,,SFORTATION DIVISION OF HIGHWAYS' 7th DIV DISTRICT I : C"nHAM �, .._... 1- 40/01d N.C.Highway as District ;w Other than 1-40, only one road has been included an the Orange County and H hborough Thoroughfare Plans - Old N.C.Highway 86. Classified as an arterial street, Old N.C.Highway s6 is currently capable of handing 10,000 vehicles per day and had an average daisy traffic volume of 8,300 vehicles per day in 1986. By the year 2005, traffic on the road is expected to reach 19,600 vehicles per day. With traffic volumes expected to exceed the capacity of the road, the Hillsborough Thoroughfare Plan calls for the widening of Old N.C.Highway s6. The proposed cross section for widening is a.four -lane facility, with sidewalks and two travel tans in either direction, plus a center turn lane. To accampfish the widening, the right - of-way would also have to be expanded from 60 feet to so feet. 100' ROW Travel lanes. Travel lanes t s' 12' 1 1 -s' Sidewalk -4s' Sidewalk 4' Bike lane I 2W Landscape Mediae 4' Bike lane Pr�oasrdl�acP�lxir crassseefAOVllfar- O.ddncc. kgo Rather than utilize the five -lame facility proposed in the HMsbcrough Thoroughfare Plan, a different crass section is 'Amerx><� 1- 17 -St3 - desired. To provide an attractive entranceway into Hi bborough and to prevent the strip commercialicross-traffic turning movements associated With Churton Street, the crass Section would be changed to provide a landscape median instead of a center turn lane. Turn lanes would only be available at designated access points. These points were identified on the schematic plans presented in section 2. 1, Development Areas. In addition to the landscape median, the outside lane would be widened from 12 feet to 16 feet to accommodate bike lanes Etarr m c Deveftrwnt &rftts Desirt MarxW Pape 3.3. 10 r on either side. Old N.C.Highway 86 is recommended as a bicycle route in the Regional Bicycle Plan for Durham and Orange Counties, and the provision of bike lanes through the Economic Development District would provide opportunities for recreation as well as travel to work. To accommodate these improvements, the right- of-way for Old N.C.Highway 86 would have to be widened from 6o feet to 100 feet. 11- 85N.S.Highway 70 District: In the 1- 85 /U.S.Highway 70 area, U.S. Highway 70 has been classified as an arterial road, and Old N.C.Highway 1 o, Mount Herman Church Road, Pleasant Green Road, and N.C. Highway 751 as collector roads. Specific deficiency analysis data is not available in the Durham - Chapel Hill- Carrboro (DCHC) Thoroughfare Plan other than to note that U.S.Highway 70 will be over capacity by the year 2000. As noted in section 2.1, Development Areas, Mount Herman Church Road is being realigned as part of the 1-85 widening. A 24 -10ot pavement in a 60 -foot right- of-way is proposed. However, as was the case with Old N.C. Highway 86, Mount Herman Church Road has been recommended as a bicycle route in the Regional Bicycle Plan for Durham and Orange Counties. The addition of four feet to each side, resulting in a 32 400t pavement, will assure that bike lanes are provided as part of the improvements. The same condition exists with Old N.C. Highway 10 and 9 Y Pleasant Green Road. Both roads have 20 -foot pavements in 6o -foot rights -af -way, and both roads are part of the bicycle system recommended in the Regional Bicycle Plan: The preferred cross - section for these roads is a 24 -foot roadway with a four -foot bike lane on each side. 19 As part of the 1 -85 widening project, improvements will be made to U.S. Highway 70 at the interchange; e.g., expansion to a four -lane divided facility, including two 12 -foot travel lanes in either direction. Given the deficiency noted for U.S. Highway 70 by the year 2000 and the proposed Eno Drive extension, the preferred cross - section for that road is an extension of the four -lane divided facility. Econorn►ic DevekpmntDistricts Deson M&vja( Pape 3J. rl 13 1- 40101d NC 66 District* The 1- 40101d N.C. 85 Economic Development District encompasses all four corners of a major interstate interchange south of Hillsborough. The area consists of 724 acres, distributed among the principal land use categories in the schematic plan as follows: Primary Development Area Primary t d Primary 11 115 Acres Primary Overlay 24 Acres Secondary Development Area 109 Acres Open Space Area 207 Acres Rights -of :Way 92 Acres • 0 • r • 1' 13 1- 40101d NC 66 District* The 1- 40101d N.C. 85 Economic Development District encompasses all four corners of a major interstate interchange south of Hillsborough. The area consists of 724 acres, distributed among the principal land use categories in the schematic plan as follows: Primary Development Area Primary t 200 Acres Primary 11 115 Acres Primary Overlay 24 Acres Secondary Development Area 109 Acres Open Space Area 207 Acres Rights -of :Way 92 Acres The district is characterized by widely scattered single - family residential development, consisting of low - density subdivisions and a mobile home park. Two subdivisions which adjoin the district, Stagecoach'Run and Cornwallis Hills, deserve special attention. Lots in Stagecoach Run average approximately one -and- one- half acres in size. Because of the low- density of the subdivision, a Secondary Development Area has been designated adjacent to its boundaries where residential densities are limited to two dwelling units per acre. Areas within which this density limit applies have been identified on the schematic plan with an "R -2" designation. f- W /0&/YC.ff0way 86 The Secondary Development Area has been extended around Ecaraarnx Am Pr Iq rner t the full circumference of the district except where it abuts Cates Creek, the northern boundary of the district. The floodplain and the steep slopes bordering Cates Creek and its tributaries allow. a Primary I Development Area to be located adjacent to Cornwallis Hills, a moderate - density subdivision with densities of three dwelling units per acre. Because this "natural buffer" may not be sufficient to eliminate land use impacts such as noise, site plans must include mitigation devices for this purpose. Criteria for the 'Arrmended r-17-St5 preservation of the floodplain as well as other natural features "Armnde+d s -2s -95 are discussed in section 32 - Landscape Design. Ecotaomk Deve# rent Disftts Desk rr M&xW Page 2. r. s 14- Techniques for reducing noise levels are highlighted in 2.4 - Environmental Factors. The northern portion of the district includes a "finger -like" projection along the west side of Old NC Highway 86, extending from Cates Creek to Oakdale Drive. Because of its proximity to existing single-family homes in the Cornwallis Hills Subdivision, that portion of the district has been designated as a Primary Overlay Area. Manufacturing and wholesale trade uses are not permitted, and retail uses are allowed only after approval of a Speciar Use Permit. While hours of operation are limited, the landscape -to- building ratios are the same as required in the Primary I Development Area." AcCe33 to the four quadrants of this district is generally available from Old N.C. Highway 86 or by- ray -of service roads paralleling 1 -40. Primary I Development Areas on the north side of 1 -40 are focused on these thoroughfares because they link directly with 1 -40 and provide the most efficient means of moving people, goods, and services in and out of the area. Nevertheless, because of the potential for strip commercial development, access is limited to certain locations. These access points as well as a collector road system and transit access point are identified on the schematic plan for the district. Standards for intersection and roadway design are explained in greater detail in section 3.3, Circulation & Parking. To the south of 1-40, a Primary II Development Area has been designated adjacent to the interstate highway and its Intersection with Old N.C. Highway 86. While the range of permitted uses is similar to that of the Primary I Development Area., retail uses are limited, and higher landscape -to- building ratios are required. These ratios and their application are explained in detail in section 2.3 - Land Use Intensity. "Aiwrxtd s -29-SS Two significant resources existing within the boundaries of the district include a bottomland hardwood forest bordering Cates Creek and the remnants of the "New Chapel Hill Road". The old roadway, illustrated on George Tate's I SS t map of the Econw* Devedopinent Districts Desj7n Marxjaf Pave 2.1.7 ■ 0 No SIC f�T /US.Hg�a4tray Mt. Eca�a�r� G�+�k��anx��Ocsti�xf 'AmenoW 10 -a -94 IS county, is also shown on the USGS quadrangle map of the area. The forest, identified in the Inventory of Natural Areas and Wildlife Habitats as Site *Eo7, is located an the west side of Old N.C.86 where it intersects with Cates Creek. Rather than eliminating such features from design consideration, they should be recognized and used as a focal point for the development. Criteria for this purpose are discussed in section 32 - Landscape Design. 1- 8$IU.S. Highway 70 District The I- es /U.S. Highway 70 Economic Development District extends almost two miles along either side of I -s s and is located in the Lower Eno River Watershed. Like the I- es /Buckhorn Road District, land uses are subject to watershed protection standards governing impervious surface and the control of storrnwater.Impervious surface limits and standards for detention basin construction and maintenance are discussed further in section 2.3 - Land Use Intensity and Appendix C - Wet Detention Basin Standards, respectively. This District is distinguished by many existing uses, ranging from single - family and mobile home park developments to small -scale service and commercial operations. Although existing development is scattered and vacant land is available, in -fill development will characterize new growth in the area. Acreage in the schematic plan is distributed among the three principal land use categories as follows: Primary Development Area 297 Acres Secondary Development Area 100 Acres Open Space Area 1 ss Acres Rights- of-Way so Acres Rhodes Creek is the major drainageway in the District, flowing in a northerly direction to the Eno River. Its floodpfain is extensive in places and could limit development in some locations. In addition, steeper slopes adjacent to Rhodes Creek and its tributaries could be somewhat restrictive for development. Overall, though, the gently rolling topography of the District poses no problems. Access to all sites is generally available from U.S. Highway 70, but steep slopes adjacent to some portions of the roadway Eca ?arrik Devekpwrnent Districts Desi7n /►4&wjd PVe 2.1.9 0 INN to '�'• .. r..I�w :— (4 p6xe-E Ja �u lie 1%anc� Ala C)w 4m(& P,*rec-r C( U c; A/C )>�T )v- t Y awn of A11,51-ofozyh AKOo7 7 <AMcI AZ-xS x-rYA:,,. De,qN;4-E: 6CUN S` 1P;W r Ar 5r Dr (z 17 570 -l..P3-3 J -X, V -W /of PXf N4 x -Z S�2 1rd Orange County JUL 2 1 0% Planning & Inspections Depart n DES OF TSPORTATI& P.O. Box 8181 DIVISION OF HIGHWAYS a Ah Div D iICI I - GR:�# ANT Hillsborough, NC 2 72 78 Mime: (919) 732 -8181 or 967 -9251, x2575 Frtx: (919) 644 -3002 Alt MINIM$$:7_��I 111u I TO: Tommy Dyer, P.E., District Engineer, NCDOT FROM: Eddie Kirk, Planner II '', ;,/, DATE: July 15, 1999 SUBJECT: Hillsborough Assemblage (AKA Hillsborough Place) located off SR 1009 near I -40 in Hillsborough The Orange County Planning Staff appreciates your notification letter of July 13, 1999 regarding future NCDOT review of the proposed Hillsborough Assemblage project off SR 1009. The Planning Staff previously received a copy of the initial proposal and provided the attached preliminary comments to the Orange County Manager. One section of these comments related to traffic and the transportation issues that would be associated with a proposal of this size. The Orange County Planning Staff would like to meet with you and Mr. Faulkner and the Town of Hillsborough at your convenience to discuss the proposal and any issues or concerns relating to transportation and improvements needed regarding the project. Please give me a call to possibly discuss a time we can meet regarding the project. I can be reached at 732 -8181, extension 2582. xc: Craig N. Benedict, Orange County Planning Director Gary Faulkner, Traffic Engineering, NCDOT (Raleigh) ORANGE COUNTY PLANNING DEPARTMENT 19 306F REVERE ROAD HILLSBOROUGH, NORTH CAROLINA 27278 MEMORANDUM TO: JOHN LINK, COUNTY MANAGER FROM: CRAIG BENEDICT, PLANNING DIRECTOR SUBJECT: HILLSBOROUGH PLACE DATE: JUNE 24, 1999 JUL 2 1 S9 N. C. DEPT. Of TRAMPOR•T910 " . DIVISION OF HIGHW AYS a17th G+,, DISTRICT 1 The development proposal, including traffic generation and phasing, is listed on Attachment 1 & 2 with a location and development plan on Map 1. The project is a 342 -acre parcel at the northeast quadrant of Old 86/1 -40 to be developed as a Planned Unit Development (PUD) which is a mixed -use proposal. This memo will accent the primary issue areas. • TRAFFIC Page 2 • ECONOMIC DEVELOPMENT DESIGN & MTC GUIDELINES Page 3 • PUBLIC SERVICE IMPACTS Page 4 (Schools, parks, police, fire, EMS, etc.) • ENVIRONMENTAL ISSUES /OPEN SPACE/LANDSCAPE ASPECTS Page 5 • DEVELOPMENT REVIEW Page 5 • MISCELLANEOUS Page 5 TRAFFIC '20 This project is the linchpin of the important I- 85/1 -40 triangle. After reviewing the submitted site plan for the proposed new Hillsborough Place development the Orange County Planning Department recommends the following items be addressed regarding Transportation issues: OLD NC 86 • A four lane divided cross - section with turn lanes should be provided along Old NC 86 for a distance 300 feet north of the Lafayette Drive/NW Project Drive entrance to Interstate 40. The application does not show if ownership is in place for the NW Project Drive. • Signalintion should be required at the Hillsborough Place Parkway Intersection and the Lafayette Drive/NW Project Drive Intersection on Old NC 86. • Right and Left turn lanes should be provided on NW Project Drive at the Intersection with Old NC 86. A left turn lane should be provided on Hillsborough P1ace'Parkway at the Intersection with Old NC 86. • Access points along Old NC 86 should be limited. The access drive directly north of Hillsborough Place Parkway onto Old NC 86 should be closed and traffic diverted back to Hillsborough Place Parkway or the entrance drive to the north. NC 86 • An improved cross - section with turn lanes should be provided along NC 86 for distance 300 feet north and 300 feet south of the Intersection of Hillsborough Place Parkway and NC 86. • A left turn lane should be provided on Hillsborough Place Parkway at the Intersection with NC 86. • Signalimtion should be required at the Hillsborough Place Parkway and NC 86 Intersection. INTERNAL • Access points along Hillsborough Place Parkway and NW Project Drive should be limited and located directly across from each other. Left and right turn lanes should be considered at these intersections since the roadways are only a two lane divided section. • Stubouts should be considered for the lot directly south of the proposed Hotel and the undeveloped lot directly south of NW Project Drive. Also, another stubout should be considered in the east to northeast quadrant of the project which could eventually provide another connection to NC 86. • Park and Ride lots should be indicated and Transit stops shown. OTHER CONSIDERATIONS • The proposed Hillsborough Bypass should be constructed in a timely manner. • Churton Street/ Old 86 expansion should be accelerated to match construction with this project. • Consider future connectivity to a potential rail station north of this project. 7 ■ ECONOMIC DEVELOPMENT DISTRICT 21 The intent of I-40 /Old NC 86 district is to create a Business Park setting. Outparcels are discouraged including freestanding service stations, restaurants, and retail buildings for this district. Dine -in restaurants and retail uses within consolidated buildings is permitted. • 100 -foot buffer around district required by the EDD. There appears to be a section along Old 86 that does not adhere to the 100 -feet requirement. • Architectural features that screen rooftops from Interstate 40 and Old 86. There is a grade difference between 1-40 and this site. • No air conditioners/compressors to be visible from Interstate 40 or placed on rooftops without screening. • Solid waste/recycling containers to be screened. • Stormwater management plan to be submitted? Method of control? • Management of construction and land clearing, debris should be specified. Where will excess debris be trucked. • Is an existing water tank available to handle water usage? If not, where will one be built? • Is the property proposed to be subdivided and lots sold off? What maximum impervious surface coverage will be allowed on each lot? • What types of materials (metal, brick, stucco, etc.) are to be used within the project? What will be in place to guarantee adherence to percentages? • Retain existing trees on individual lots. According to the submitted plans the single- family development destroys virtually all existing trees stands with the exception of buffers. • Signs within the development are required to be architecturally consistent with the buildings. Maximum size= 75 square feet. Maximum height = 12 feet. Maximum number of freestanding signs per site =1. Maximum number all signs = 3. Maximum square footage of all signs per site = 200 square feet. Major Transportation Corridor (MTC) Overlay District Purpose: To protect and enhance those natural and environmental features which constitute important physical, aesthetic, recreational an economic assets through the provision for special controls of public and private development along major transportation corridors. • Service areas (i.e. truck loading spaces and dumpsters) shall be screened to block visibility from 1-40. • Double aesthetic fronts on all buildings visible from I-40. a �''1� .� 4# 1.3..:aK i.#.�+� �t�3PW ,.�•.,.- �� Y �� � �b��� -�l:'� R�q , -) ��r., w} ,�„r�""+ =" .� ,h � R�.' -�"' -mod"''`-- ?'�'��r� '+, .�'' y _ S:: ;a i _ ,_� r _� . 'jai^ r- ° ....: X23 ENVIRONMENTAL ISSUES /OPEN SPACE/LANDSCAPE The project is within the Neuse River Watershed basin. The project has relatively higher elevations and serves as a head waters area near a basin divide with little or no permanent streams. The site is completely forested with; pine forest, pine/hardwoods mix forest, hardwood forest. There are no major environmentally sensitive areas noted at this time. The open space plan attempts to preserve small areas of forest but because of the large impervious requirements of non - residential development and development elevation changes, limited areas of forest are preserved in the concept plan. The landscape plans including entry features and streetscapes are well designed. The internal roadway corridors create a consistent theme to assist in their overall architectural design concept. DEVELOPMENT REVIEW Physical design features to unify the development and to create compatibility with neighboring areas. 1. Most of the southern portion of Hillsborough Place (about 2/3 of project) lies in the I- 40/ Old 86 EDD. Majority of parcels abutting this portion of the project are presently undeveloped, thus Hillsborough Place will set tone/strongly influence future development on abutting properties. Recommend strict adherence to EDD Design Manual, particularly: • Section 3.1- Architectural Design (special attention to unified design concept) • Section 3.2 - Landscape Design (with special attention to land use buffers). 2. Northern portion of Hillsborough Place is predominantly residential and abuts existing or future residential development. Recommend strict adherence to Article 12 of Zoning Ordinance (Landscaping and Buffer Requirements). MISCELLANEOUS Erosion Control: A project of this scale and use should develop a high intensity erosion control program including full use of phasing and BMP's. Review Process: A project of this scale would, under most growth management guidelines, be considered a'Development of Regional Impact' (DRI). The impact affect more than one jurisdiction and accordingly should be reviewed jointly with full input from affected parties which include the county, school district and transportation MPO's. Annexation: An annexation feasibility study should be conducted which relates to the timing and ability for all affected parties to adequately service the area with essential public services. Building Permit Review and Inspection: Presently there is not enough building division staff and fee structure to accommodate this project. gAcraig\hi1place \6- 24 -99 \dg Mr. Charies M. Elam, May 26, 1999, Page 2 C � � IGmley -Horn : • and Associates, Inc. Table 1 ITE Traffic Generation (Vehicles) ITE 24 Hour AM Peak PM Peak Code Land Use In Out In Out In Out 210 180 Single Family 890 890 34 102 117 66 Homes 220 600 Apartments 1,865 1,865 48 253 230 113 230 '275 Townhouses 769 769 19 .95 95 47 250 60 Horne Retirement 58 58 4 5 8 6 Community 252 100 Home Congregate 108 108 4 2 10 7 Care Facility 310 ' 200 Room Hotel 892 892 73 53 62 64 565 4,000 SF Day. Care 159 159 27 24 24 .27 710 335,000 SF Office 1,679 1,679 430 59 77 378 770 500 000 SF Business 3,060 3,060 589 112 148 496 Park 820 400,000 SF Shopping 8,311 8,311 223 142 752 815 Center Total New Trips 17,791 17,791 1,451 847 1,523 27019 Table 1 shows that under full development, the Hillsborough Assemblage project will potentially have 17,791 trips to the site and 17,791 'trips away from the site on an average day Access to the development will consist of two driveways along Old NC 86 and one driveway along NC 86. All of these driveways are proposed to have full movement access. The proposed generated trips were assigned to the surrounding roadway network. The directional distribution and assignment was based on existing peak -hour turning movements as well as a review of the land uses and population densities in the area and the surrounding roadway network. The directional distribution is as follows: 38% to /from the north on Old NC 86 ■ 41% to /from the south on Old NC 86 ■ 10% to /from the north on NC 86 ■ PHASING SCHEDULE l lHASING H I L L S B O R O U G H PLACE P Pa planning purposes iTilLbmuugh .' H Place has been whatfuted for PLANNED UNIT DEVELOPMENT d development over the wit six y=% HILLSBOROUGH. NORTH CAROLINA a although it b reasonable to :aidcipota that soma pwaah, those P PREPARED BY: ELAM TODD d- AMBRO81. PA r remain p�tilyyu devtio e 2 E 0 NOTTINGHAM DRIVE d deselopmeot timelable has been C A R Y, N O R T H CAROLINA e established in two phases with a umber ofpwcels going Under I I caoahuction at the was time. It should 1 11 rIs$ l YEAR t Y206 f Y■ R 4 Ildll!. Y868 @ >L2@81 soTV►1 tsls 2ele test tut 2uq ses4 test b bemtcd did development d@lelopment may not neoeswfily 6n in helots w A $INDLE -FAM ILT 74.0 129 UNIT* @. 0 f O 10WNNOUiE1 $2.0 2rf UNIT$ 10 2f 2f 'lf ff /s PATIO NOME, 11 t0 20 !0 2i 2 17 C ASSIST NO LIVING 10.4 its UNIT* - let D RETIREMENT 10.0 of UNIT, so E DAYCARE 4.f 1 F RETAIL 2 8.r 200 fol 00. FT. tosses fells sates G RETAIL 26.1 269,191 Os-. FT. legal - at$$# losses- If OFFICE 17's 20e 0@f 00. FT. I losses 1000@• 1 A R MEN i 26.4 380 UNIT, 200 J PUBLIC *AFETY *TA. 2.9 K O FIC FLNX *PACE 41.1 921 ,119 00 FT , logf1@@—I losses 191996 tofave losses L AP RTMENT$ 22.0 see UNIT* fa@ IN OFFICE 11.4 125 foe 80. FT.— Mot foes@ 29909 R HOTEL 1.2 lot ROOM* vuuWse w 006 phase on the ma Phase begias. PHASE L• A thong demand Is andelpated for both single - family detached and s604imilf attached waits, elsaw homing, and a Number of ma& bmiiy horsing Units daring the first 1bur yam Abu during phase an will be a sums demnd he diffived type of oon4aideaW Uses a @bows in Am phasing wbednle. PHASE H: 9 1 The seomd phase will air. we coEdmred building pr6aaily Is trail, office, attached, cl uter units and aingie-filmily homing. I)t is "COW that tha Hillabotwlgh Place Hoalenad will completed Sewer hunk Noes and wain distribution, linen will be coDshucled b serve Phfse 11 d-dopmatpuctiL to PHASING SCHEDULE 20 vuuWse w 006 phase on the ma Phase begias. PHASE L• A thong demand Is andelpated for both single - family detached and s604imilf attached waits, elsaw homing, and a Number of ma& bmiiy horsing Units daring the first 1bur yam Abu during phase an will be a sums demnd he diffived type of oon4aideaW Uses a @bows in Am phasing wbednle. PHASE H: 9 1 The seomd phase will air. we coEdmred building pr6aaily Is trail, office, attached, cl uter units and aingie-filmily homing. I)t is "COW that tha Hillabotwlgh Place Hoalenad will completed Sewer hunk Noes and wain distribution, linen will be coDshucled b serve Phfse 11 d-dopmatpuctiL to PHASING SCHEDULE 20 wain distribution, linen will be coDshucled b serve Phfse 11 d-dopmatpuctiL to PHASING SCHEDULE 20 ,.. _ .Z:..,iK_`iK+a",. ^.Pig __1� ,+1. _ .S1GCV�y�i Tf FUNCTIONAL AREA 1. Community Maintenance 2. General Administration 3. Taxation and Records 4. Community Planning 5. Human Services Social Services SERVICES 217 Commissioners, Courts, Elections, Soil and Water County Manager, Budget Office, Personnel, Finance, Purchasing, Central Services, Rents and Insurance, Information Systems Register of Deeds, Land Records, Tax Assessor, Tax Collector Planning, Economic Resource Cons., Economic Development, Arts Commission Public Assistance, Administration, Children/Family Services, Work First, Subsidy, Long Term Care Screening, Other Assistance Programs, Skills Development Center, Veterans Services Health Management Services & Vital Records, Dental Health, Personal Health, Environmental Health, Animal Control Cooperative Extension + Recreation & Parks Orange Public Transportation Human Rights & Relations Library Child Support Mental Health Aging 6. Public Safety Sheriff EMS 7. Public Works 8. Education 9. Non - Departmental gAeddie\services\9- 23 -99 \dg Administration, Community Based Services, Elder Care Program, RSVP Administration, Fire Services, Telecommunications, Medical Services Treatment Buildings & Grounds, Motor Pool, Sanitation Current Expense, Recurring Capital Outside Agencies, Miscellaneous, Debt Service, Transfers to other Funds 1 �vl STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVERNOR SECRETARY September 16, 1999 MEMORANDUM To: Gary Faulkner, Traffic Engineering, Raleigh - From: Tommy J. Dyer, P. E., District Engineer, Graham Date: September 16, 1999 Subject: Hillsborough Assemblage located off SR 1009 near I -40 in Hillsborough Attached, please find a copy of the developer's revised Traffic Impact Analysis. The Town of Hillsborough has requested NCDOT to perform a second review on the subject site. zi This office respectfully requests your review of the subject (SC -99 -123). Please review the attached information for compliance to NCDOT Standards and inform this office of any additional information, design standards, and modifications that your office needs completed before you could recommend approving the proposed subject. If you have any questions, please contact Mr. Michael Venable at (336) 570 -6833. Attachment cc:-15range County Planning Department Hillsborough Vance Barham P. O. Box 766 Graham, NC 27253 -0766 A a -4Q'ditional 7,ta nSponation final Yszs f 6 �II 14N �FOF 1 s bo Ilillsbo-,.Ugh, bl age PrePared.for. Ela ® zn, T odd & d �Ambrosi, P KimleY -Horn and Associates, ate Inc, 1999 Kimle Y Hom Engineering Planning an4, and Associates, Inc. En�ironmenta/ Consultants 2I � ❑Kimley -Horn and Associates, Inc. September 1, 1999 Ms. Margaret Hauth Director of Planning Town of Hillsborough 101 E. Orange Street P.O. Box 429 Hillsborough, North Carolina 27278 Re: Additional Transportation Analyses For Proposed Hillsborough Assemblage Hillsborough, North Carolina Dear Ms. Hauth: Kimley -Horn and Associates, Inc. completed the Traffic Impact Analysis (TIA) for the proposed Hillsborough Assemblage mixed use development in May 1999. This letter is intended to provide you with the additional analyses of the surrounding roadway network as requested. These additional analyses summarize the traffic generation, distribution and assignment of project traffic and the roadway improvements. Background Data The proposed Hillsborough Assemblage site is located in the northeast quadrant of the Interstate 40 West and the Old NC 86 interchange in Hillsborough, North Carolina. The proposed development consists of 180 single - family homes, 275 townhouses, 100 assisted living units, a 60 -unit retirement community, a 4,000 Square Foot (SF) daycare, 400,000 SF of retail space, 835,000 SF of office space, 600 apartments, a 200 -room hotel and a fire station. The study area for this additional traffic analysis includes the following intersections: • Old NC 86 and the I -40 Eastbound Ramps • Old NC 86 and the I -40 Westbound Ramps • Old NC 86 and the I -85 Northbound Ramps • Old NC 86 and the 1 -85 Southbound Ramps • Old NC 86 and Oakdale Drive • Old NC 86 and Cardinal Drive The proposed development is located in the southern section of Hillsborough and is well served by existing thoroughfares. These thoroughfares include NC 86 to the east, which provides direct access to both Hillsborough and Chapel Hill and ■ TEL 919 677 2000 FAX 919 677 2050 30 ■ P.O. Box 33068 Raleigh, North Carolina 27636.3068 Kimley -Horn Ms. Margaret Hauth, September 1, 1999, Page 2 `3 and Associates, Inc. Old NC 86 to the west, which provides direct access to I -40 and I -85. The surrounding land use is primarily residential. Traffic Generation The traffic generation potential of the proposed site was determined using the traffic generation rates published in Trip Generation (Institute of Transportation Engineers, Sixth Edition, 1997). Table l summarizes the estimated traffic generation for the proposed development. Table 1 ITE Traffic Generation (Vehicles) ITE Code Land Use 24 Hour AM Peak PM Peak In Out In Out In Out 210 180 Single Family Homes 890 890 34 102 117 66 220 600 Apartments 1,965 1,865 48 253 230 113 230 275 Townhouses 769 769 19 95 95 47 250 60 Home Retirement Community 58 58 4 5 8 6 252 100 Home Congregate Care Facility 108 108 4 2 10 7 310 200 Room Hotel 892 892 73 53 62 64 565 4,000 SF Day Care 159 159 27 24 24 27 710 335,000 SF Office 1,679 1,679 430 59 77 378 770 500,000 SF Business Park 3,060 3,060 589 112 148 496 820 400,000 SF Shopping Center 8,311 8,311 223 142 752 815 Total New Trips 17,791 17,791 1,451 847 1,523 2,019 Table 1 shows that under full development, the Hillsborough Assemblage development will potentially have 17,791 trips to the site and 17,791 trips away from the site on an average weekday. Traffic Distribution /Assignment Access to the development will consist of three driveways along Old NC 86 and one driveway along NC 86. All of these driveways are proposed to have full movement access, except the middle drive on Old NC 86, which is proposed to be a right -in /right -out drive. The proposed generated trips were assigned to the surrounding roadway network. The directional distribution and assignment was based on existing peak -hour turning movements as well as a review of the land uses and population densities C�I1 Ms. Margaret Hauth, September 1, 1999, Page 3 Kimley -Horn and Associates, Inc. in the area and the surrounding roadway network. The directional distribution is as follows: ■ 38% to /from the north on Old NC 86 28% to /from the east on I -85 N 5% to /from the west on 1 -85 S 5% to /from the north on Old NC 85 ■ 41 % to /from the south on Old NC 86 31 % to /from the east on I-40 E 5% to /from the west on I-40 W 5% to from the south on Old NC 86 ■ 10% to /from the north on NC 86 ■ 10% to /from the south on NC 86 ■ 1 % o to /from the west on Lafayette Drive Capacity Analyses Kimley -Horn and Associates performed;peak -hour turning movement counts at the following intersections: ■ Old NC 86 and the I -40 Westbound Ramps = count performed by Kimley- Horn on July 28 and 29, 1999 ■ Old NC 86 and the I-40 Eastbound Ramps — count performed by Kimley - Horn on July 29 and 30, 1999 ■ Old NC 86 and the I -85 Southbound Ramps — count performed by Kimley - Horn on August 3, 1999 ■ Old NC 86 and the I -85 Northbound Ramps — count performed by Kimley - Horn on August 4, 1999 • Old NC 86 and Oakdale Drive — count performed by Kimley -Horn on August 23 and 24, 1999 • Old NC 86 and Cardinal Drive — count performed by Kimley -Horn on August 23 and 24, 1999 The existing AM and PM peak -hour traffic volumes are shown in Figure 1. Capacity analyses were performed for the existing AM and PM peak -hour conditions using methodologies contained in the Highway Capacity Manual (TRB Special Report 209, 1994) and are summarized in Table 2. 32 Ms. Margaret Hauth, September 1, 1999, Page 4 33 Kimley -Horn and Associates, Inc. Table 2 Existing (1999) Level -of- Service Summary AM Peak PM Peak Intersection LOS (Delay) LOS (Delay) Old NC 86 / I -40 Eastbound Ramps* Short Delays for Short Delays for Left Turns Left Turns Old NC 86 /1-40 Westbound Ramps* Short Delays for Short Delays for Left Turns Left Turns Old NC 86 / I -85 Northbound Ramps' Long Delays for Long Delays for Left Turns I Left Turns Old NC 86 / I -85 Southbound Ramps' Short Delays for Long Delays for Left Turns Left Turns Old NC 86 / Oakdale Drive C (17.1) B (10.4), Old NC 86 /Cardinal Drive B (7.0) B (5.2) - unsignaiizea The existing traffic volumes were then increased to reflect historical growth due to usage and non - specific growth throughout the area. The 1999 base year traffic volumes were increased by 3.0 percent per year for six years to reflect the 2005 anticipated background traffic volumes. To obtain total 2005 build -out traffic volumes the development traffic was added to the existing and background traffic volumes. The AM and PM peak -hour turning movements for the studied intersections were then calculated and analyzed for the 2005 build -out year. Figures 2 and 3 show the projected AM and PM peak -hour traffic volumes respectively with the proposed site for the year 2005. Roadway Improvements The following roadway improvements were identified to bring the roadway network up to an acceptable Level -of- Service. • Old NC 86 will need to be widened to a four -lane section with turn lanes from I -40 to I -85. This improvement is consistent with the current thoroughfare plan. • The interchange of I -40 and Old NC 86 will require ramp widening, signalization and turn lane additions. • The interchange of I -85 and Old NC 86 will also require ramp widening, signalization and turn lane additions. Figure 4 shows the roadway improvements that will be needed to accommodate the year 2005 total traffic volumes while Table 3 summarizes the Level -of- Service at each of the studied intersections. r=FJ Kimley -Horn Ms. Margaret Hauth, September !, 1999, Page 5 3 tL and Associates, Inc. Table 3 Projected (2005) Level -of- Service Summary with Development and Roadway Improvements Intersection AM Peak LOS (Delay) PM Peak LOS (Delay) Old NC 86 /1-40 Eastbound Ramps B (12.9) B (13.3) Old NC 86 /1-40 Westbound Ramps* Short Delays for Left Turns Moderate Delays for Left Turns Old NC 86 /1-85 Northbound Ramps B (8.5) B (11.1) Old NC 86 /1-85 Southbound Ramps C (21.0) D (30.9) Old NC 86 / Oakdale Drive C (17.1) B (10.8) Old NC 86 / Cardinal Drive B (6.1) A (4.1) * - Unsignalized We appreciate the opportunity to assist you on this project. If you have any questions or require additional information, please call me at (919) 677 -2062. Very truly yours, KIMLEY -HORN AND ASSOCIATES, INC. �������� " "��•.,,,�� i SEAL ! s R. Michael Horn, P.E. 14510 Vice President ` r '• • RMH:jmc �i,,41 C H AEA ,�.•`�� 011286.10 OW NC " 1.85 3b gg F =� Hillsborough Assemblage AM (PM) FIGURE KRB*Hom and Assodales, Ion. Traffic Impact Analysis Existing Volumes rmaloaM Arrsll {r�ur�rasi�rwO /rr.�rsarlrr�rri ron1o11+n11brY9 rlOrArO a.a ■rc�mrtrWwYprw�srrur Rw�MrOrrY4�CrtuermrWwnmwnm rs�r4ic -95 Z a� � N411 In- - m IM fills m In poll pll74 I nn poll P4 fiw Im Pull M M J ora.r." . eegend * pq1N„ — � M mfim xx 1Nn10M pal s.. T.M. fill n10o1 m1 m full m pall T.W brft a uT °, a1m pll. o.►a.l. wiw dam 1141 1141 pitimn--o- * I MN m m 4% 4 M mN m P1418 1" nrA P321 M pill PM a, on 4 i fi1 pan pan 1 �r m m m mM 1.71rT.n.om. m (11-1 nrl Mies 114 (114 o —► sl 'I" . poll m 101 u 477 0 M pool nm PSI (Alai P741 m. P69IP491 mnp1N _ 7a0 70 • i 34 (100112101 4 r 34 (all 17001 1 078 34 100) (4001 6141 14341 4 pm Im pq is 14" fill) ♦ nm nn 341 M poll 1.40 Hillsborough Assemblage protected (ZOOS) AM Peak FIGURE Traffic Impact Analysis IQmieyHom and Associates, Inc. Hour Traffic Volumes 2 r laver nor rr r a7n0 r a ®rmme a.a u r.a�ea a 0nq a nma. m w r nmrt rrt r 0m r wa o w nw0e. w7 a r w�rl nao0 a w mnn wme 0rw rm4s r ieuraol n reap r wmm ac nn n rpa urn w an4eu r rmOK s 37 OM11Cai 1 -85 P324 pal 820 1N Mt PI n 1 r 004(ma' an 117 (004 15") 110001[•111 11+7) [120+1 M tarn 147 aia o„rin.l Odw P4](0)14 --1 m aea (0) 11M na0111"01 psi 111[1157{] M (am P) 12D all a 71 MPN e.lpid. n a J ♦ 4 411 (po) - n 1mt ilia] M,1.' 1171 M la --a, t ,. PN for s7 '7 as ua : (a) Pan rol Pa1It+701 Pl nn P0P:q i+ an ,I P% ! ,O.r.rr a.l.. P1al Pal PI 1101 1101 01 1.71ma%nrai sn. 16+111101 n0»PI0" y 70 (+1 +) M741 .. w ("51111051 li IN 1. tea I+Talnaa+l r72�r� 1� :e 1 , rol nas) .01117+1 .40- nom. i Z aI Legend >a - bdsftg Mu. lapl(lr.wd TralRa PM, Sea Tram i1p11 Told Trd& M) P i )) 30 � 1301 101 0-� tis h n�u n C1=n Hillsboro=Assemblage Projected (2005) PM Pegk FIGURE 10miey M end Associates, Ina Traffic Hour Traffic Volumes 3 101..ec mrp... r airs r am mrp rrp, a r amp®. may. arm. ro r m aea imm r m r.r r r ra. m r r rnso aar ■ r �� oar rpm ream r ar.. a roar r m.0 pr ar ..mp are. a.sam r rm.r R 0 39 39 g 1.85 Legend Existing Laneoge 1 Recommended Loneage e Recommended Signal G:n Hillsborough Assemblage Roadway IGURE IfmleyHom and Assodates, loo. Traffic Impact Analysis Improvements 4 r 000ret �e ae n rmn r s raen ou x v emra o xra x eaoer er r r s®[ irat r ar r r,e a r mace. er a r rru r.ex n r emwv reel wme rcre r •wr a erere r eemnt K rn u rer nnn m serer r eem� ex 4-r HCS: Uhsignalized Intersections Release 2.1g 8640EPE.HCO Page l ---------- - - - - -- ------------------- Kimley -Horn & Associates Streets: (N -S) Old NC 86 (E-W)-I-40 E Ramps Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst..... .............. JMC Date of Analysis.......... 8/2/99 Other Information ......... PM Peak - Existing Conditions Two -way Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop /Yield Volumes PHF Grade MC' s ( o ) SU /RV's ( %) CV' s ( o ) PCE's 0 1 < 0 N 222 24 .9 .9 0 1 1 0 N 257 196 .9 .9 0 1.10 1 0 1 10 25 .9 .9 0 1.10 1.1011 Adjustment Factors 0 0 0 Vehicle Critical Follow -up Maneuver Gap ( tg) Time ( t f ) ------------------------------------------------------------------- Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic-.Minor Road 6.00 3.30 Left Turn Minor Road 4.6.50 3.40 �z HCS: Unsignalized Intersections Release 2.1g 8640EAE.HCO Page 2 Worksheet for TWSC Intersection Step 1: RT from Minor Street WB EB ------------------------------------------------------ ?- Conflicting Flows: (vph) 192 Potential Capacity: (pcph) Flow '1107 Movement Capacity: (pcph) Queue 1107 Prob. of Queue -Free State: 0.96 -------------------------------------------------------- Step 2: LT from Major Street SE NB -------------------------------------------------------- Conflicting Flows: (vph) 256 Movement Potential Capacity: (pcph) 1294 (pcph) (sec /veh) Movement Capacity: (pcph) 1294 (sec /veh) --- - - - - -- Prob. of Queue -Free State: 0.64 - - - - -- 216 -------------------------------------------------------- Step 4: LT from Minor Street WB ---- EB - - - - -- -------------------------------------------- _• Conflicting Flows: (vph) 854 Potential Capacity: (pcph) 339 Major LT, Minor TH. 6.9 EB R Impedance Factor: 1107 0_64 Adjusted Impedance Factor: A 0.64 Capacity Adjustment Factor 470 1294 due to Impeding Movements 1.9 0.64 Movement Capacity: (pcph) -------------------------------------------------- 216 - - - - -- Intersection Performance Summary Intersection Delay = 2.4 sec /veh Avg. 950 Flow Move Shared Total Queue Approach Rate-' Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph) (sec /veh) (veh) - - - - -- - - - -- (sec /veh) --- - - - - -- -- - - - - -- EB L - - - - -- 14 - - - - -- 216 - - - - -- - - - - - -- 17.8 - 0.1 C 6.9 EB R 45 1107 3.4 0.0 A SE L 470 1294 4.4 1.9 A 3.0 Intersection Delay = 2.4 sec /veh �-3 HCS: Unsignalized Intersections Release 2.1g 8640WAE.HCO Page l Kimley -Horn & Associates ----------------------------------- Streets: (N -S) Old NC 86 (E -W) I -40 W Ramps Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ............. .. JMC Date of Analysis.......... 8/2/99 Other Information ......... AM Peak - Existing Conditions -Two- way ,Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L I T R No. Lanes Stop /Yield Volumes PHF Grade MC' s M.) SU /RV's (%) CV' s W. PCE's 1 1 0 N 32 173 .9 .9 0 1.10 0 1 < 0 N 543 16 .9 .9 0 Adjustment Factors 1 0 1 14 162 .9 .9 0 1.10 1.10 Vehicle Critical Follow -up Maneuver Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic-Minor Road 6.00 3.30 Left Turn Minor-Road 6.50 3.40 Intersection Performance Summary 44 HCS: Unsignalized Intersections Release 2.1g 8640EPE.HCO Page 2 Worksheet for TWSC Intersection Shared Total Step.1: RT from Minor Street I'm EB Conflicting Flows: (vph) Rate-, 218 Potential Capacity: (pcph) Length 1074 Movement Capacity: (pcph) Movement 1074 Prob. of Queue -Free State: (pcph) (sec /veh) 0.97 Step 2: LT from Major Street SB NB Conflicting Flows: .(vph) 274 13.1 Potential Capacity: (pcph) 1269 Movement Capacity: (pcph) 1269 Prob. of Queue -Free State: 0.75 Step 4: LT from Minor Street WB EB Conflicting Flows: (vph) 3.5 764 ' Potential. Capacity: (pcph) ? 382 Major LT, Minor TH .1269 3.8 Impedance Factor: A 0.75 Adjusted Impedance Factor: 0.75 Capacity Adjustment Factor due to Impeding Movements 0.75 Movement Capacity: (pcph) 287 Intersection Performance Summary Intersection Delay = 1.6 sec /veh Avg. 95% Flow_ Move Shared Total Queue Approach Rate-, Cap Cap Delay-,: Length LOS Delay Movement (pcph) (pcph) (pcph) (sec /veh) (veh) (sec /veh) EB L 12 287 13.1 0.0 C 6.2 EB R 31 1074 3.5 0.0 A SB L 315 .1269 3.8 1.1 A 2.1 Intersection Delay = 1.6 sec /veh HCS: Unsignalized Intersections Release 2.1g 8640WPE.HCO Page -- - - - - -- -------- - - - - -- Kimley -Horn & Associates ---- - - - - -- -------------------- ------- Streets: (N -S) Old NC 86 (E -W) I -40 W Ramps Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst........... ...... JMC Date of Analysis.......... 8/2/99 Other Information ......... PM Peak - Existing Conditions Two -way Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes 1 1 0 0 1 < 0 0 0 0 1 0 1 Stop /Yield Volumes PHF Grade MCIS (a) SU /RV's (?6) CV' S M) ) PCE's N 42 190 .9 .9 0 1.10 iS Adjustment Factors 60 449 .9 .9 0 1.10 1.10 Vehicle Critical Follow -up Maneuver Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic -Minor Road 6.00 3.30 Left Turn Minor -Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1g 8640WAE.HC0 Page 2 Worksheet for TWSC Intersection Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 192 Potential Capacity: (pcph) 1107 Movement Capacity: (pcph) 1107 Prob. of Queue -Free State: 0.82 Step 2: LT from Major Street SB NB Conflicting Flows: (vph) 621 Potential Capacity: (pcph) 867 Movement Capacity: (pcph) 867 Prob. of Queue-Free-State: 0.95 -------------------------------------------------------- Step 4: LT from Minor Street WB EB Conflicting Flows: (vph) 840 Potential Capacity: (pcph) 345 Major LT. Minor TH Impedance. Factor: 0.95 Adjusted Impedance Factor: 0.9,5 Capacity Adjustment Factor due to Impeding Movements 0.95 Movement Capacity: (pcph) 329 Intersection Performance Summary Avg. 95% Flow_ Move Shared Total Queue Approach Rate-; Cap Cap Delay ` Length LOS Delay Movement (pcph) (pcph) (pcgh)(sec /veh) (veh) (sec /veh) WB L 18 329 11.6 .0.0 C 4.6 WB R 198 1107 4.0 0.7 A NB L 40 867 4.4 0.0 A 0.7 Intersection Delay = 1.0 sec /veh Intersection Delay = 3'.4 sec /veh HCS: Unsignalized Intersections Release 2.1g. 864OWPE.HC0 Page 2 Worksheet for TWSC Intersection Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 211 Potential Capacity: (pcph) 1082 Movement Capacity: (pcph) 1082 Prob. of Queue -Free State: 0.49 Step 2: LT from Major Street SB NB Conflicting Flows: (vph) 451 Potential Capacity: (pcph) 1045 Movement Capacity: (pcph) 1045 Prob. of Queue -Free State: 0.95 Step 4: LT from Minor Street - WB EB --- - - - - -- - -- - - - -- - - - - - Conflicting Flows: (vph). -- ---------------------- 702 Potential Capacity': (pcph) 415 Major LT, Minor TH Impedance Factor: 0.9 Adjusted Impedance Factor: 0.95 Capacity Adjustment Factor due to Impeding Movements 0.95 Movement Capacity: (pcph) 394 Intersection Performance Summary Avg. 95% Flow-.• Move Shared Total. Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec /veh) (veh) (sec /veh) WB L 74 394 11.2 0.8 C 7.3 WB R 549 1082 6.7 3.3 B NB L 52 1045 3.6 0.0 A 0.7 Intersection Delay = 3'.4 sec /veh HCS: Unsignalized Intersections Release 2.1g 85N86AME.HCO . Page 1 Kimley -Horn & Associates Streets: (N -S) Old NC 86 (E -W) I -85 NB Ramp Major Street Direction .. NS Length of Time Analyzed... 60 (min) Analyst ................... JMC Date of Analysis.......... 8/9/99 Other Information ......... AM Peak - Existing Conditions Two -way Stop- controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes 0 1 < 0 1 1 0 1 0 1 0 0 0 Stop /Yield N N Volumes 377 303 221 654 102 59 PHF .9 .9 .9 .9 .9 .9 Grade 0 0 0 MC' s 0 ) SU /RV's M) )' _ CV's (01). PCE's 1.10 1.10 1.10 0 Adjustment Factors Vehicle Critical Follow -up Maneuver Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic .Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1g 85N86PME.HC0 Page Kimley -Horn & Associates Streets: (N -S) Old NC 86 (E -W) I -85 NB Ramp Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... JMC Date of Analysis.... ..... 8/9/99 Other Information PM Peak - Existing Conditions Two -way Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes 0 1 < 0 1 1 0 1 0 1 0 0 0 Stop /Yield N N Volumes 737 95 156 687 76 47 PHF .9 .9 .9 .9 .9 .9 Grade 0 0 0 MC' s (% ) SU /RV's (%) CV,s �o) PCE's 1.10 1.10 1.10 Adjustment Factors Vehicle Critical Follow -up Maneuver Gap (tg) Time (tf) Left Turn Major Road 5.00 2.'10 Right Turn Minor Road 5.50 2.60 Through Traffic -Minor Road 6.00 3.30 Left Turn Minor'Road .6.50 3.40 HCS: Unsignalized Intersections Release 2.1g 85N86AME.HCO Page 2 Worksheet for TWSC Intersection Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 727 Potential Capacity: (pcph) 593 Movement Capacity: (pcph) 593 Prob. of Queue -Free State:. 0.88 Step 2: LT from Major Street SB NB Conflicting Flows: (vph) 756 Potential Capacity: (pcph) 748 Movement Capacity: (pcph) 748 Prob. of Queue -Free State: 0.64 Step 4: LT from Minor Street WB EB Conflicting Flows: (vph) 1560 Potential Capacity: (pcph) 132 Major LT,,Minor TH Impedance Factor: 0.64 Adjusted Impedance Factor: . 0.64 Capacity Adjustment Factor due to Impeding Movements 0.64 Movement Capacity: (pcph) 84 - Intersection Performance Summary Avg, 950 Flow_ Move Shared Total Queue Approach Rate -` Cap Cap Delay- Length LOS Delay Movement (pcph) (pcph) (pcph) (sec /veh) (veh) - - -- - - - -- (sec /veh) --- - - - - -- -- - - - - -- - - - - -- - - - - -- - - - - -- EB L 124 84 - - - - - -- * - - - 24.6 F 646.8 EB R 73 593 6.9 0.4 B SB L 271 748 7.5 1.9 B 1.9 Intersection Delay = 61.7 sec /veh * The calculated value was greater than 999.9. 5f HCS: Unsignalized Intersections Release 2.1g 85S86AME.HC0 Page 1 ------------------ Kimley -Horn & Associates --------- - - - - -- -------------------- -_____ Streets: (N -S) Old NC 86 (E -W) I -85 SB Ramp Major Street Direction.... NS Length of Time Analyzed.. 60 (min) Analyst ................... JMC Date of Analysis......... 8/9/99 Other Information ......,.'AM Peak - Existing Conditions Two -way Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop /Yield Volumes. PHF Grade MC' s (% ) SU /RV's ( %) CV's (O ) PCE" s - 1 1 0 N 41 438 .9 .9 0 1.10 0 1 < 0 N 789 46 .9 .9 0 Adjustment Factors 1 0 1 86 139 .9 .9 0 .1.10 1.10 Vehicle Critical Follow -up Maneuver ------------------------------------------------------------------ Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road ..6.50 3.40 HCS: Unsignalized Intersections Release 2.1g 85N86PME.HC0 Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step l: RT from Minor Street WB EB Conflicting Flows: (vph) 763 Potential Capacity: (pcph) 569 Movement Capacity: (pcph) 569 Prob. of Queue -Free State: 0.90 Step 2: LT from Major Street SB NB Conflicting Flows: (vph) 925 - Potential Capacity: (pcph) 621 Movement Capacity: (pcph) 621 Prob. of Queue -Free State: 0.69 -------------------------------------------------------- Step 4: LT from Minor Street WB EB - ------------- - - - - -- - -- ----------------------- Conflicting Flows: (vph) 1808 Potential Capacity: (pcph) 95 Major LT, Minor TH Impedance Factor: 0,69 Adjusted Impedance Factor: 0:69 Capacity Adjustment Factor due to Impeding Movements 0.69 Movement Capacity: (pcph) 66 Intersection Performance Summary Avg. 1 95% Flow Move Shared Total Queue Approach Rate -'• Cap Cap Delay ,. Length LOS Delay Movement (pcph) (pcph) (pcph) (sec /veh) (veh) (sec /veh) EB L 92 66 921.5 17.8 F 572.1 EB R 57 569 7.0 0.3 B SB L 190 621 8.3 1.5 B 1.5 Intersection Delay = 39.9 sec /veh HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -25 -1999 53 Kimley -Horn & Associates --- - - - - -- ------------ - - - - -- ------------------ -_____ Streets: (E -W) Cardinal Drive (N -S) Old NC 86 Analyst: JMC File Name: 86CDAME.HC9 Area Type: Other 8 -25 -99 AM Peak Comment: Existing Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft)'i Grade 0 Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type. RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combir 1 0 1 124 17 0.90 0.90 12.0 12.0 0 0 2 2 N N 0 Right 0 (YIN) N 3 .3 0 3.00 3.00 iat ion 1 2 0 0 0 0 Signal Operatic 3 4 1 1 0 12 653 0.90 0'.90 12.0 12.0 0 0 2 2 N N 0 Right 0 (YIN) N .: 3 3 0 3.00 3.00 ,ns 8 5 0 1 < 0 589 61 0.90 0.90 12.0 0 2 2 N N Thru 0 Right 0 (YIN) N 3 Right 0 3.00 3.00. 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 11.0A Green 7.OA 84.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 206 1770 0.668 0.117 38.3 D 36.5 D R 356 1583 0.053 0.225 23.6 C NB L 291 1770 0.045 0.833 1.7 A 1.9 A T 1552 1863 0.468 0.833 1.9 A SB TR 1198 1653 0.603 0.725 5.8 B 5.8 B Intersection Delay = 7.0 sec /veh Intersection LOS = B Lost Time /Cycle, ----------------------------------------------------------------- L = 9.0 sec Critical v /c(x) = 0.565 - - - - -- HCS: Unsignalized Intersections Release 2.1g 85S86AME.HCO Page 2 Worksheet for TWSC Intersection Step 1: RT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 487 Potential Capacity: (pcph) 784 Movement Capacity: (pcph) 784 Prob. of Queue -Free State: 0.78 Step 2: LT from Major Street SB NB Conflicting Flows: -(vph) 928 Potential Capacity: (pcph) 619 Movement Capacity: (pcph). 619 Prob. of Queue -Free State: - - 0.92 -EB Step 4: LT from Minor Street------- -------------------------------- ------ WB------- - - Conflicting Flows: (vph) 1436 it c h ac ( ). Potential .Ca P y' (pcph) 6 156 Major LT, Minor TH Impedance Factor: 0.42 Adjusted Impedance Factor: 0.92 Capacity Adjustment Factor due to Impeding Movements 0.92 Movement Capacity: (pcph) 143 Intersection Performance Summary Avg. 95% Flow- Move Shared Total Queue Approach Rate'. Cap Cap Delay `. Length LOS Delay Movement (pcph) (pcph) (pcph)(sec /veh) (veh) (sec /veh) WB L 106 143 88.6 6.1 F 37.5 WB R 169 784 5.9 0.9 B NB L. 51 619 6.3 0.2 B 0.5 Intersection Delay = 5.7 sec /veh HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -24 -1999 55 Kimley -Horn & Associates Streets: (E -W) Oakdale Drive (N -S) Old NC 86 Analyst: JMC File Name: 860DAME.HC9 Area Type: Other 8 -24 -99 AM Peak Comment: Existing Conditions Eastbound--1 Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button, Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combi n 0 > 1 < 0 186 19. 95 0.90 0.90 0.90 12.0 0 2 2 2 N N 0 0 (YIN) N - 3 0 3.00 3.00 3.00 ation 1 2 0 > 1 < 0 12 4 26 0.90 0.90 0.901 0.9.0 12.0 12.0 Thru 0 0 2 2 2 N N N Right 0 0' 0 (YIN) N N 3 3 0 �.00 3.00 3.00 3.00 Signal Operatic 3 4 5 1 1 < 0 27 412 1 0.90 0'.90 0.9.0 12.0 12.0 Thru 0 2 2 2 N N Right 0' 0 (YIN) N .• 3 3 0 3.00 3.00 3.00 ins 7 8 5 1 1 < 0 18 527 52 0.90 0.90 0.90 12.0 12.0 Thru 0 2 2 2 N N Right 0 0 (YIN) N 3 3 0 3.00 3.00 3.00 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 34.OA Green 7.OA 61.0A Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5' #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 418 1355 0.799 0.308 31.8 D 31.8 D WB LTR 364 1182 0.126 0.308 19.3 C 19.3 C. NB L 215 1770 0.140 0.642 8.1 B 11.3 B TR 993 1862 0.462 0.533 11.5 B SB L 304 1770, 0.066 0.642 6.1 B 13.9 B TR 980 1838 0.657 0.533 14.1 B Intersection Delay = 17.1 sec /veh Intersection LOS = C Lost ----------------------------------------------------------------- Time /Cycle, L = 9.0 sec Critical v /c(x) = 0.664 - - - - -- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g. 08 -25 -1999, Sd Kimley -Horn & Associates Streets: (E -W) Cardinal Drive (N -S) Old NC 86 Analyst: JMC File Name: 86CDPME.HC9 Area Type: Other 8 -25 -99 PM Peak Comment: Existing Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade o Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop Prot. Phase Combi l 0 1 79 12 0.90 0.90 12.0 12.0 0 2 2 N N Thru 0. Right 0 (YIN) N 3 3 .O. 3.00 3.00 nation 1 2 0 0 0 0 Signal Operatic 3 1 4 1 1 0 18 677 0.90 01.90 12.012.0 0 2 2 N N 0 0 (YIN) N 3 3 3.00 3.00 -------- - - - - -- )ns 5 U 1 < 0 553 123 0.90 0.90 12.0 0 2 2 N N Thru 0 Right 0 (YIN) 14 3 Right 0 3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA Green 7.OA 88.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 147 1770 0.597 0.083 38.8 D 37.1 D R 303 1583 0.043 0.192 25.5 D NB L 301 1770 0.066 0.867 1.2 A 1.3 A T 1614 1863 0.466 0.867 1.3 A SB TR 1237 1631 0.607 0.758 4.8 A 4.8 A Intersection Delay = 5.2 sec /veh Intersection LOS = B Lost Time /Cycle, ----------------------------------------------------------------- L = 9.0 sec Critical v /c(x) = 0.564 - - - - -- S7 HCS: Unsignalized Intersections Release 2.1g 85S86PME.HCO Page 1 ------- - - - - -- ----------------------- ____________ Kimley -Horn & Associates Streets: (N -S) Old NC 86 (E -W) I -85 SB Ramp Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... JMC Date of Analysis.......... 8/9/99 Other Information ......... PM Peak - Existing Conditions Two -way Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No Lanes 1 1 0 0 1 < 0 0 0 0 1 0 1 Stop /Yield N _ N Volumes 47 766 653 131 190 390 PHF .9 .9 9 .9 .9 9 Grade 0 0 0 MC's M SU /RV's (o) CV's (%) PCE's 1.10 .1.10 1.10 Adjustment Factors Vehicle Critical Follow -up Maneuver -------------------------------------_----------------------------_- Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic-Minor Road 6.00 3.30 Left Turn Minor Road .6.50 3.40 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-24-1999 St Kimley -Horn & Associates Streets: (E -W) Oakdale Drive (N -S) Old NC 86 Analyst: JMC File Name: 860DPME.HC9 Area Type: Other 8 -24 -99 PM Peak Comment: Existing Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking . Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combiz 0 > 1 < 0 92 11 42 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 3, Peds 0 3.00 3.00 3.00 cation 1 2 0 > 1 < 0 9 9 30 0.90 0.900.90 12.0 0 2 2 2 N N 0 0 (YIN) N , 3 0 3.00 3.00 3.00 Signal Operatic 3 4 1 1 < 0 71 554 2 0.90 0.90 0.90 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 3.00.3.00 3.00 Ms 5 1 1 < 0 21 428 109 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 3 Peds 0 3.00 3.00 3.00 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 18.OA Green 7.OA 77.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c I g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 226 1294 0.711 0.175 36.9 D 36.9 D WB LTR 246 1406 0.215 0.175 27.5 D 27.5 D NB L 268 1770 0.295 0.775 3.9 A 6.4 B TR 1241 1862 0.498 0.667 6.7 B SB L 265 1770 0.087 0.775 3.3 A 6.6 B TR 1204 1806 0.496 0.667 6.7 B Intersection Delay = 10.4 sec /veh Intersection LOS = B Lost Time /Cycle, L = 9.0 sec Critical v /c(x) = 0.542 HCM: SIGNALIZED INTERSECTION SUMMARY Vezsion 2.4E 08-02-I999 40 KiouIel,-Horn & Associates ======================================================================= Streets: (}]-VV) I-40 IC Ramp (N-S) Old 0C 86 Analyst: JMC ` File Name: 8640EA5I,BC9 8-2-99 �� Peak Type: Ottzer Comment: 2005 vvitlz Improvements ======================================================================= Eastbound Westbound Northbound Southbound L T Il L T Il L T R L T Il |--_- ---- ----|---- ---- ----|---- ---- ----|---- ---- ---- No Lanes Volumes Grade Parking Bus Stops Con. Peds, Ped Button Arr Type Lost Time Prop. Share Prop. Prot. I Phase C mbir * 0 I 8 7 44 0.90 0.90 12.0 12'D O � D 2 2 N N + O 2 O (YIN) J D 3' ] * O � � ]'OO 3'OO '-------------- ' u u _ u | O --------------- ' Signal Operatic 3 4 | | L <v 303 45 0.90 O'9O 12,O O'gO O 12.0 2 2 N N D ` + D 2 O (YIN) N D 3 Right * D 3'OO 3'OD , +------------� )ns - - J Peds z J- w 722 2 49 NB Left 0.90 O'gO T1hru 12.0 12.D D ` + � 2 2 D D Right * O Pedo O ({/0) J Peds � 3 3 WB Left O |'DO | | . 3'OO '--_----_---_- 5 7 - ' 8 EB Left * NB Left T1hru Thru + Right Right * Pedo Peds WB Left . * Tlzzu Thru Right Right eeoo . reds NB Right . EB Right SB Right W13 Right Green 7.OA Green 38.OA 27.OA Yellow/AR _ 6.0 �- Yellow/AR 6.0 6 ' O Cycle h; 90 oeoo Phase combination order: #I #5 #6 ----------------------------_----------_------_--------------_-------_- Intersection Performance Summary Lane Group: Ad] Gat v/ c g/C ; Approach: Mvmto Cap Flow Ratio Ratio Delay LOS Delay LOS ----- --- ----- EB I, ---- 197 ------- I770 ----- 0.493 ----- ----- 0'I11 35.9 --- D 25.2 I} ll 176 1583 0'279 0.111 23.9 C BQ3 TR 548 1644 0.706 0'333 I9'8 C 19.8 C SB I^ 16I2 3539 0.5I2 0'456 11.5 B 8.9 B T 1532 I863 0'I8I 0'822 1.1 A � Intersection Delay = 12.9 oeo/veh Intersection LOS = B L-oot Time/Cycle, I, ----------------------------------------------------------------------- = 3'0 sec critical `r/o(x) = 0.582 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -02- ,1999, Kimley -Horn & Associates bl ------------------ - - - - -- - - - - - -- - - - - - -- Streets: (E -W) I -40 E Ramp (N -S) Old NC 86 Analyst.: JMC - File Name: 8640EP5I.HC9 Area Type: Other 8 -2 -99 PM Peak Comment: 2005 with Improvements Eastbound Westbound Northbound Southbound L T R I L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Red Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combii 1 0 1 88 30 0.90 0.90 12.0 12.0 0 0 2 2 N N 0 2 0', (YIN) N 3 Right 0' 3.00 3.00 cation 1 2 0 0 0 0 Signal. Operatic 3 4 0 1 < 0 341 29 0'.90 0.90 12.0 0.90 0 12.0 2 2 N N 0 0 2 0 (YIN) N N 3 Right 0 3.00 3.00 ins (YIN) 5 Peds 2 1 0 933 335 NB Left 0.90 0.90 Thru 12.0 12.0 0 2 2 * N N Right 0 Peds 0 (YIN) N Peds 3 3 WB Left 0 3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA Green 38.OA 27.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 90 secs Phase combination order: #1.#5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 197 1770 0.498 0.111 26.0 D 25.4 D R 176 1583 0.188 0.111 23.5 C NB TR 552 1657 0.744 0.333 20.9 C 20.9 C SB L 1612 3539 0.662 0.456 13.1 B 10.0 B T 1532 1863 0.243 0.822 1.2 A Intersection Delay = 13.3 sec /veh Intersection LOS = B Lost Time /Cycle, L ----------------------------------------------------------------- = 9.0 sec Critical v /c(x) = 0.672 - - - - -- b�• HCS: Unsignalized Intersections Release 2.1g 8640WA5I.HC0 Page 1 Kimley -Horn & Associates - -- -- ------- - - - - -- Streets: (N -S) Old NC 86 (E -W) I -40 W Ramps Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst....... ......... JMC Date of Analysis.......... 8/2/99 Other Information ......... AM Peak. - 2005 with Improvements Two -way Stop- controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop /Yield Volumes PHF Grade MC' s (% ) SU /RV's (.°s) CV's (%) PCE I s 1 1 0 N 38 353 .9 .9 0 1.10 0 2 < 0 N 953 61 .9 .9 0 Adjustment Factors Vehicle Critical Follow -up Maneuver Gap (tg) Time (t f ) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic -Minor Road 6.00 3.30 Left Turn Minor'Road 6.50 3.40 43 HCS: Unsignalized Intersections Release 2.1g 8640WA5I.HC0 Page 2 Worksheet for TWSC Intersection Step 2: LT from Major Street SB NB Conflicting Flows: (vph) 1127 Potential Capacity: (pcph) 498 Movement Capacity : - (pcph) 498 Prob. of Queue -Free State: 0.91 Step 4: LT from Minor Street WB EB Conflicting Flows: (vph) 1493 Potential Capacity: (pcph) 145 Major LT, Minor TH Impedance Factor: 0.91 Adjusted Impedance Factor: 0.91 Capacity Adjustment Factor due to-Impeding Movements 0.91 Movement Capacity: (pcph) 132 Intersection PerformanceSummary Avg. 950 Flow. Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec /veh) (veh) (sec /veh) WB L 21 132 32.4 0.6 E 32.4 NB L 46'- 498 8.0 0.3 B 0.8 Intersection Delay = 0.6 sec /veh HCS: Unsignalized Intersections Release 2.1g 8640WP5I.HCO Page 1 Kimley -Horn & Associates - - - - - -- ------- - - - - -- Streets (N -S) Old NC 86 (E -W) I -40 W Ramps Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst....... ....... JMC Date of Analysis.......... 8/2/99 Other Information ......... PM Peak —2005 with Improvements Two -way Stop - controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop /Yield Volumes PHF Grade MC's C0 SU /RV's,'( %) CV' s 00 } PCE' s 1 1 0 N 50 379 .9 .9 0 1.10 0 2 < 0 N 1196 116 .9 .9 0 Adjustment Factors Vehicle Critical Follow -up Maneuver Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic-Minor Road 6.00 3.30 Left Turn Minor'Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1g ' 864OWPSI.HCO Page 2 Worksheet for TWSC Intersection ------------------------------------------------------- Step 2: LT from Major Street SB NB Conflicting Flows: ( vph)--------------------- - - - - -- -1458 Potential Capacity: (pcph) 346 Movement Capacity: (pcph) 346 Prob. of Queue -Free State: 0.82 Step 4 LT from Minor Street ----------------------- WB Eg .Conflicting Flows:. (vph) ------------- 1806------- - - - - -- Potential Capacity: (pcph) 95 Major LT, Minor TH Impedance Factor: 0.82 Adjusted Impedance Factor: 0.82 Capacity Adjustment Factor due to-Impeding Movements 0.82 Movement Capacity: (pcph) 78 Intersection Performance °Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph) (sec /veh) (veh) (sec /veh) WB L 88 78 - - - - - - - - - - 488.7 12.7 F - - - - - - - - - - 488.7 NB L 62 " . 346 12. 7 .. 0.7 C 1.5 Intersection Delay _ 19.8 sec /veh HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -31 -1999 bG Kimley -Horn & Associates Streets: (E -W) I -85 NB (N -S) Old NC 86 Analyst: JMC File Name: 85N86AMI.HC9 Area Type: Other 8 -9 -99 AM Peak Comment: 2005 --------------------- - - - - -- ------- - - - - -- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15I Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combii 1 0 1 122 141 0.90 0.90 12.0 12.0 Right 0 2 2 N N 0 2 0 (YIN) N 3 3' 0 3.00 3.00 cation 1 2 N * 0 0 0 0 Signal Operatil 3 4 NB 0 1 1 535 600 0'.90 0.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 31 0I 3.0.0 3.00 ins 5 Left 1 2 0 264 1261 Thru 0.90 0.90 Right 12.0 12.0 0 2 2 N N Peds 0 WE Left 0 (YIN) N SB Left 3 3 Thru 0 3.00 3.00 6 7 8 EB Left Thru Thru Right * Right Peds Peds WE Left SB Left Thru Thru Right Right Peds Peds NB Right * EB Right SB Right WB Right Green 12.OA Green 14.OA 76.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS - - - -- EB L - - -- 221 - - - - - -- 1770 - - - -- 0.615 0.125 35.7 D 41.2 E R 198 1583 0.793 0.125 46.0 E NB T 1226 1863 0.484 0.658 6.9 B 4.7 A R 1280 1583 0.521 0.808 2.8 A SB L 370 1770 0.792 0.825 24.2 C 5.7 B T 3074 3725 0.479 0.825 2.1 A Intersection Delay = 8.5 sec /veh Intersection LOS = B Lost Time /Cycle, L = 6.0 sec Critical v /c(x) = 0.593 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -31. -1999 6n Kimley -Horn & Associates --------------- - - - - -- --------------- - - - -- Streets: (E -W) I -85 NB (N -S) Old NC 86 Analyst: JMC File Name: 85N86PMI.HC9 Area Type: Other 8 -9 -99 PM Peak Comment: 2005 Eastbound. Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combi n 1 0 l 91 133 0.90 0.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 3 0 3.00 3.00 •-------------- - ation 1 2 0 0 0 0 i Signal Operatic 3 4 1082 679 0:90 0.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 3 0 3..00 3.00 >ns 5 1 2 0 186 1322 0.90 0.90 12.0 12.-0 0 2 2 N N 0 0 (YIN) N 3 3 0 .3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right * EB Right SB Right WB Right Green 10.OA Green 9.OA 83.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS - - - -- - - -- - - - - - -- - - - -- - - - -- - - - -- - -- - - - -- - -- EB L 192 1770 0.527 0.108 34.8 D 47.9 E R 172 1583 0.863 0.108 56.9 E NB T 1335 1.863 0.900 0.717 15.0 B 10.0 B R 1346 1583 0.560 0.850 2.1 A SB L 239 1770 0.866 0.842 45.9 E 7.0 B T 3136 3725 0.492 0.842 1.8 A Intersection Delay = 11.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = . 9.0 sec Critical v /c(x) = 0.907 ----------------------------------------------------------------- - - - - -- 0 0 0 0 i Signal Operatic 3 4 1082 679 0:90 0.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 3 0 3..00 3.00 >ns 5 1 2 0 186 1322 0.90 0.90 12.0 12.-0 0 2 2 N N 0 0 (YIN) N 3 3 0 .3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right * EB Right SB Right WB Right Green 10.OA Green 9.OA 83.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS - - - -- - - -- - - - - - -- - - - -- - - - -- - - - -- - -- - - - -- - -- EB L 192 1770 0.527 0.108 34.8 D 47.9 E R 172 1583 0.863 0.108 56.9 E NB T 1335 1.863 0.900 0.717 15.0 B 10.0 B R 1346 1583 0.560 0.850 2.1 A SB L 239 1770 0.866 0.842 45.9 E 7.0 B T 3136 3725 0.492 0.842 1.8 A Intersection Delay = 11.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = . 9.0 sec Critical v /c(x) = 0.907 ----------------------------------------------------------------- - - - - -- EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right * EB Right SB Right WB Right Green 10.OA Green 9.OA 83.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS - - - -- - - -- - - - - - -- - - - -- - - - -- - - - -- - -- - - - -- - -- EB L 192 1770 0.527 0.108 34.8 D 47.9 E R 172 1583 0.863 0.108 56.9 E NB T 1335 1.863 0.900 0.717 15.0 B 10.0 B R 1346 1583 0.560 0.850 2.1 A SB L 239 1770 0.866 0.842 45.9 E 7.0 B T 3136 3725 0.492 0.842 1.8 A Intersection Delay = 11.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = . 9.0 sec Critical v /c(x) = 0.907 ----------------------------------------------------------------- - - - - -- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -30 -1999 Lg Kimley -Horn & Associates Streets: (E -W) I -85 SB (N -S) Old NC 86 Analyst: JMC File Name: 85S86AMI.HC9 Area Type: Other 8 -9 -99 AM Peak Comment: 2005 ------------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combii 0 0 0 0 iat ion 1 2 2 0 1 510 166 0.90 0.90 12.0 12.0 0 0 2 2 N N 0 Right 0 (YIN) N 3 3 0 3.00 X3.00 Signal Operatic 3 4 1 1 0 91 566 0.90 0'.90 12.0 12.0 0 0 2 2 N N 0 Right 0 (YIN) N - 3 3._ 0 3.00 3.00 ,ns 8 5 0 1 1 1015 55 0:90 0.90 12.0 12.0 0 2 2 N N Thru 0 Right 0 (YIN) N 3 3 0 3.00 '3.00 6 7" 8 EB Left NB Left Thru Thru Right Right Peds Peds WE Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right * WE Right Green 20.OA Green 7.OA 75.OA Yellow /AR 6.0 Yellow /AR 6.0, 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------.----------------------- Intersection Performance. Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WE L 678 3539 0.861 0.192 38.0 D 36.4 D R 303 1583 0.606 0.192 31.1 D NB L 210- 1770 0.481 0.758 20.5 C 5.9 B T 1413 1863 0.445 0.758 3.6 A SB T 1211" 1863 0.932 0.650 21.3 C 20.3 C R 1372 1583 0.044 0.867 0.7 A Intersection Delay = 21.0 sec /veh Intersection LOS = C Lost Time /Cycle, L ----------------------------------------------------------------- = 9.0 sec Critical v /c(x) = 0.895 - - - - -- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -30 -1999 �q Kimley -Horn & Associates Streets: (E -W) I -85 SB (N -S) Old NC 86 Analyst: JMC File Name: 85S86PMI.HC9 Area Type: Other 8 -9 -99 PM Peak Comment: 2005 Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 0 0 0 2 0 1 1 1 0 0 1 1 Volumes 653 466 157 1016 856 156 PHF or PK15 0.90 0.90 0.90 01.90 0.90 0.90 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 Grade 0 0 0 Heavy Veh 2 2 2 2 2 2 Parking N N N N N N 'Bus Stops 0 0 0 Con. Peds 0 0 0 0 Ped Button (YIN) N (YIN) N (YIN) N Arr Type 3 3 .. 3 3 3 3 RTOR Vols 0 0 0 Lost Time 3.00 t.00 3.00 3.00 3.00 3.00 Prop. Share Prop. Prot. r Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right * WB Right Green 25.OA Green 7.OA 70.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0__ -. Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB L 826 3539 0.906 0.233 38.6 D 41.5 E R 541 1583 0.958 0.342 45.8 E NB L 210 1770 0.829 0.717 39.1 D 35.4 D T 1133 1863 0.996 0.608 34.8 D SB T 1133 1863 0.839 0.608 16.2 C 13.8 B R 1372 1583 0.126 0.867 0.8 A Intersection Delay = 30.9 sec /veh Intersection LOS = D Lost Time /Cycle, L = 6.0 sec Critical v /c(x) = 0.982 HCM': SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-24-1999 Kimley-Horn & Associates ID Streets: (E-W) Oakdale Drive (N-S) Old NC 86 Analyst: JMC File Name: 860DAMSI.HC9 Area Type: Other 8-24-99 AM Peak Comment: 2005 Conditions with Improvements Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ----- ---- ---- ---- ---- ---- ---- No. Lanes Volumes PHF or PK15 Lane W (ft) Grade k Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr- Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combii 0 > I < 0 .222 23 113 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 3 Peds 0 3.00 3.00 3.00 ---------------- cation 1 2 0 > 1 < 0 14 5 31 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 3 Peds 0 3.00 3.00 3-00 ---------------- Signal Operati( 8 3 4 Thru 1 2 < 0 32 815 1 0.90 0'.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 .3 Peds 0 3.00 3.00 3.00 ---------------- )ns 7 8 5 1 2 < 0 21 1180. 62 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2_ N N 0 0 (YIN) N 3 3 Peds 0 3.00 3.100 3.00 -------------- 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right W13 Right Green 37.OA, Green 7.OA 58.OA Yellow/AR 6.0 Yellow/AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat VIC g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS. Delay ----- LOS --- ----- EB LTR ---- 437 ------- 1311 ----- 0.913 0.333 41.5 E 41.5 E WB LTR 381 1143 0.147 0.333 18.1 C 18.1 C NB L 209 1770 0.172 0.617 10.7 B 12.7 B TR 1893 3725 0.503 0.508 12.8 B SB L 234 1770 0.098 0.617 7.1 B 16.7 C TR 1880 3698 0.771 0.508 16.8 C Intersection Delay = 18.8 sec/veh Intersection LOS = C Lost Time/Cycle, ----------------------------------------------------------------------- L = 9.0 sec Critical v/c(x) = 0.775 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-241!'*199.9 Kimley-Horn & Associates Streets: (E-W) Oakdale Drive (N-S) Old NC 86 Analyst: JMC File Name: 86ODPM5I.HC9 Area Type: Other 8-24-99 PM Peak Comment: 2005 Conditionswith Improvements Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ----- ---- ---- ---- ---- I ---- ---- ---- I ---- ---- ----- No. Lanes Volumes PHF or PK15 Lane W (ft) Grade 6 Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combir 0 > 1 < 0 110 13 50 0.90 0.90 0.90 12.0 0 2 2 2 N N 0 0 (YIN) N 3 b 3.00 3.00 3.00 ---------------- ation 1 2 0 > I < 0 11 11 36 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N - 3 3 Peds 0 3.00 3.00 �.3.00 --------------- Signal.Operatic --------------- )ns 7 3 4 5 1 2 < 0 85 1430 2 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 3 Peds 0 3.00 3.00 3.00 --------------- )ns 7 8 5 1 2 . < 0 25 1090 130 0.90 0.90 0.90 12.0 12.0 0 Thru 2 2 2 N N 0 0 (YIN) N 3 3 Peds 0 3.00 3.00 3.00 -------------- 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left SB Left Thru ,Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 18.OA Green 7.OA 77.OA Yellow/AR 6.0- Yellow/AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj sat VIC g/C Approach: Mvmts Cap Flow Ratio Ratio Delay ------ ----- LOS --- Delay ----- LOS --- ----- EB LTR ---- 213 ------- 1219 ----- 0.900 0.175 56.3 E 56.3 E WB LTR 244 1391 0.263 0.175 27.8 D 27.8 D NB L 255 1770 0.369 0.775 5.6 B 8.2 B TR 2483 3725 0.673 0.667 8.3 B SB L 239 1770 0.117 0.775 5.7 B 7.3 B TR 2444 3666 0.582 0.667 7.3 B Intersection Delay = 10.8 sec/veh Intersection LOS = B Lost Time/Cycle, ----------------------------------------------------------------------- L = 9.0 sec Critical v/c(x) = 0.713 HCM:° SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -25 -1999 Kimley -Horn & Associates -------- - - - - -- -- - - - - -- ------- - - - - -- Streets: (E -W) Cardinal Drive (N -S) Old NC 86 Analyst: JMC File Name: 86CDAM5I.HC9 Area Type: Other 8 -25 -99 AM Peak Comment: 2005 Conditions with Improvements Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combi n 1 0 1 148 20 0.90 0.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 3 '0 3.00 3.00 ation 1 2 0 0 0 0 Signal Operatic 3 4 1 2 0 14 1103 0.90 0•.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 3 0I 3.00 3.00 ins 5 0 2 < 0 1254 73 0.90 0.9c 12.0 0. 2 2 N N 0 0 (YIN) N 3 0 3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 11.0A Green 7.OA 84.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 206 1770 0.794 0.117 46.1 E 43.4 E R 356 1583 0.062 0.225 23.6 C NB L 270 1770 0.059 0.833 2.9 A 1.7 A T 3105 3725 0.415 0.833 1.7 A SB TR 2679 3695 0.578 0.725 5. -3 B 5.3 B Intersection Delay = 6.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = 9.0 sec Critical v /c(x) = 0.563 ----------------------------------------------------------------- - - - - -- 0 0 0 0 Signal Operatic 3 4 1 2 0 14 1103 0.90 0•.90 12.0 12.0 0 2 2 N N 0 0 (YIN) N 3 3 0I 3.00 3.00 ins 5 0 2 < 0 1254 73 0.90 0.9c 12.0 0. 2 2 N N 0 0 (YIN) N 3 0 3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 11.0A Green 7.OA 84.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 206 1770 0.794 0.117 46.1 E 43.4 E R 356 1583 0.062 0.225 23.6 C NB L 270 1770 0.059 0.833 2.9 A 1.7 A T 3105 3725 0.415 0.833 1.7 A SB TR 2679 3695 0.578 0.725 5. -3 B 5.3 B Intersection Delay = 6.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = 9.0 sec Critical v /c(x) = 0.563 ----------------------------------------------------------------- - - - - -- 0 2 < 0 1254 73 0.90 0.9c 12.0 0. 2 2 N N 0 0 (YIN) N 3 0 3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 11.0A Green 7.OA 84.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 206 1770 0.794 0.117 46.1 E 43.4 E R 356 1583 0.062 0.225 23.6 C NB L 270 1770 0.059 0.833 2.9 A 1.7 A T 3105 3725 0.415 0.833 1.7 A SB TR 2679 3695 0.578 0.725 5. -3 B 5.3 B Intersection Delay = 6.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = 9.0 sec Critical v /c(x) = 0.563 ----------------------------------------------------------------- - - - - -- EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 11.0A Green 7.OA 84.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 206 1770 0.794 0.117 46.1 E 43.4 E R 356 1583 0.062 0.225 23.6 C NB L 270 1770 0.059 0.833 2.9 A 1.7 A T 3105 3725 0.415 0.833 1.7 A SB TR 2679 3695 0.578 0.725 5. -3 B 5.3 B Intersection Delay = 6.1 sec /veh Intersection LOS = B Lost Time /Cycle, L = 9.0 sec Critical v /c(x) = 0.563 ----------------------------------------------------------------- - - - - -- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08 -25 -1999 Kimley -Horn & Associates ?3 Streets: (E -W) Cardinal Drive (N -S) Old NC 86 Analyst: JMC File Name: 86CDPM5I..HC9 Area Type: Other 8 -25 -99 PM Peak Comment: 2005 Conditions with Improvements Eastbound Westbound Northbound Southbound L T R L T R L . T R L T R - - - - -- - - - -- - - -- - - -- - - -- - - -- No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr 'Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combir. 1 0 1 94 14 0.90 0.90 12.0 12.0 0 0 2 2 N N 0 Oi (YIN) N 3 3 0 3.00 3.00 Lation 1 2 0 0 0 0 Signal Operatic 3 4 l 2 0 21 1576 0.90 0'.90 12.0 12.0 0 0 .2 2 N N 0 0 (YIN) N .• 3 3 0 3.00 3.00 ins 8 Peds 5 0 2 < 0 1239- 147 0.90 0.90 12.0 0 2 2 N N 0 0 (YIN) N Right 3 0 3.00 3.00 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA Green 7.OA 88.OA Yellow /AR 6.0 Yellow /AR 6.0 6.0 Cycle Length: 120 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 147 1770 0.705 0.083 44.0 E 41.6 E R 303 1583 0.053 0.192 25.6 D NB L 281 1770 0.082 0.867 2.4 A 1.6 A T 3229 3725 0.570 0.867 1.5 A SB TR 2780 3666 0.582 0.758 4.3 A 4.3 A Intersection Delay = 4.1 sec /veh Intersection LOS = A Lost ----------------------------------------------------------------- Time /Cycle, L = 6.0 sec Critical v /c(x) = 0.581 - - - - -- W CC Cc-- ���SScdN C-64.R I N 4'-'� AU -S TABLE 1 REVENUE 1999 -00 Manager Recommendation Percentage A. Total Property Tax $64,872,798 64.47 B. Total Sales tax $13,948,795 13.86 C. Total Licenses and permits $ . 907,900 .90 D. Total intergovernmental $11,677,669 11.61 E. Total Charges Service $ 4,938,837 4.91 F. Total Miscellaneous $ 4,275,503 4.25 G. Total Revenue $100,621,502 100 $243,000,000 (Estimated Value of Project) .00917 (County Tax Rate) $ 2,228,310 A 64.47% Property Tax 479,206 B 13.86% Sales Tax 345.635 X 10% (Mix of C, D, E, F) Misc. Revenue $ 3,053,151 88.33% (Less than 100% Because all Revenue Sources are not Completely applicable)