Loading...
HomeMy WebLinkAboutAgenda - 10-05-1999 - 8nORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 5, 1999 Action Agenda Item No. g_ h SUBJECT: Temporary Lease Adjustment; 501 West Franklin Street, Suite 105 DEPARTMENT: Purchasing 8~ Central Services PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Pam Jones extension 2652 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider amending the lease amount for Rental Resources for a period of six-months. BACKGROUND: Rental Resources of Durham/Chapel Hill occupies suite 105 at 501 West Franklin Street. The lease extends through May 31, 2000 at a monthly rate of $1,076.89. As we reported in a previous abstract, the suite has flooded several times over the past two years in periods of significant rainfall. The problem was diagnosed by engineers as being a hydrostatic water problem, with the water source likely to be rainwater runoff that accumulated around the building. The issue was addressed as part of the Skills Development Center renovations by providing additional drainage for the water that accumulated around the building during periods of heavy rain. However, during the recent high wind and heavy rain incident, the roof was damaged and the suite flooded once again to the point the interior two rooms are not serviceable to the tenant. The roof damage allowed water to accumulate between the two inner walls of the 501 and 503 buildings and seep into the suite. The roof is scheduled for replacement within the next couple of years per the roof study completed last year. However, in light of the recent problems with this suite and with the threat of significant damage to the newly renovated Skills Development Center, compounded by the recent storm damage, we believe it prudent to move forward with roof replacement rather than continuing to patch. Bidding of that work is imminent. The tenant has indicated discomfort with allowing equipment to be placed in the two offices most affected by the water until the leak is repaired. She has requested that her rent be reduced to $800 per month until such time that repairs are made and it is determined that this fix is permanent and she can again use the two interior offices. We are recommending that the rent be reduced to $800 per month from September, 1999 through March, 2000, by which time work will be completed and determination of the success of the mitigation efforts can be verified. FINANCIAL IMPACT: Lease revenue will decrease by approximately $1600 for FY 99-2000. RECOMMENDATION(S):: The Manager recommends that the Board authorize adjustment of the rent amount for Rental Resources to be $800 per month from September 1999 through March 2000.