HomeMy WebLinkAboutAgenda - 10-19-1999 - 8dORANGE COUNTY. BOARD OF COMMISSIONERS ACTION. AGENDA ITEM ABSTRACT .Meeting Date: October 19,1999 Action Agenda Item No. g d_ SUBJECT: Professional services authorization; design of ceiling replacement and relighting project at Planning and Ag Building DEPARTMENT: Purchasing & Central Services PUBLIC HEARING: (Y/N) No ATTACHMENT(S): Proposal from Sunderland INFORMATION CONTACT: Pam Jones ,Purchasing Director, ext 2652 Wilbert McAdoo, Public Works Director ext 2625 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 ___ PURPOSE: To consider authorizing the use,, of Sunderland Engineering to completed design work associated with the installation of a new suspended ceiling and the renovation of the electrical system at the Planning and Agriculture Building at 306 Revere Road, Hillsborough. BACKGROUND: The Planning and Ag Building was converted from a grocery store to county offices in the late 1980's. For the most part, the original renovation, maintained the existing lighting and electrical service that served the grocery store. In most areas of the building, for example, the eight foot (8') florescent tube light fixtures are turned off at a central location rather than in individual offices. This sets up the inefficient requirement that much of the building must be lighted when the use of only a single office or conference room is needed. The lighting service will be upgraded to allow light operation to be located within the offices. In order to bring the light closer to the work space and provide a more even lighting pattern, suspended ceilings with lay-in fixtures will be installed in the areas of the building where they do not presently exist. The building ~is also scheduled to receive an upgrade to the HVAC system. The suspended ceilings will allow the duct work to be installed more easily and less obtrusively. The HVAC work will be scheduled to coincide with .the ceiling/electrical renovation work so the new ceiling will not be damaged by the installation of new ducts. Since the building will remain open for business during this period, sequencing of the work will be prescribed to the contractor to minimize business disruptions to the resident departments and their public. Sunderland Engineering has submitted a proposal to: • design and complete all specifications, drawings and other construction documents necessary to bid this work, and '^ e work with bidders in the event negotiations are necessary after bids have been received; and • provide construction observation and management as the project proceeds. ~,~ ;~ 2 This work will be completed for an amount not to exceed $4,500, plus reimbursable expenses (such as costs to print the appropriate number of plans/specs.) Sunderland is prepared to commence work upon approval of .this work by the Board of Commissioners and completed the design work within 60 days. Bidding is anticipated in January, 2000. FINANCIAL IMPACT: The Board approved the work included in this contract as part of the 1998-99 Capital Investment Program. RECOMMENDATION(S):: The Manager recommends that the Board authorize the use of Sunderland Engineering for design work of the ceiling installation and electrical renovation at the Planning and Agricultural Center, 306 Revere Road, Hillsborough, in an amount not to exceed $4,500 plus reimbursable expenses; and authorize the Chair to sign a contract reflecting same, subject to staff and attorney review. Q9t?9t1999 1~t:27 9196a~3~116 ORr~NGE CO PUBLIC 4J0 From: Cary Sundedane Te: wiibett mcadou [date: 9127169 Time:12:3R:iQ PM {919a 477 7031 September 24, 19519 1N'ilbert Mc,A,doolWayne Fentin Qra~nge County 1'ubiic '~TVarks i-lighway 8h Ird'artk~ I;Iillsboraugh, NC 2?278 Dear v4lilbertlt~Ta3nne, i~l'P, NC 27709 wwNasunderiartder~g.com 'VV'e are pleased to submit this proposal to you far design services pestaisaing to the Ceiling replacement and religbting prrrject at the P'l.anning and Agriculture Center in 1:Iillsbtu'o~ugb, NC. Included in this letter is an outline of the proposed design s+~rvices, fee rcqui~zemeats and expected Schedule. Sunderland t`ngineering gilt provide services to you to invesfiigate the existing co~nditiazYS and prepare canstructiazt documents fq~r the project. Included in the design services is all work required to complete the hid docunaems, construction drawings, details, aztd specifications far the project which is defined as 11,5U(f sgft nmovatirnt with panelhaaxd replacement, ceiling grid installation, light fi~cture and diffusor repl,aoetnent. Also. included are bid negotiations, snap drawing review and constructiaa observation as required. throughout ttte completion of the prvjec#. Sunderland Engineering will complete the work described above for a fixed fee of $rd54Q.04, pins expenses for document preparation.. We will provide additional services for any further work as recluestad an an hourly basis, based on the rate of $75.011 p~ hour for engiaocring services and $45.00 per hour for drafting services. We area competent and z~liable firm, able to begirx work and complete the project as expected and according to schedule. We appreciate this opportunity and lank forward to oc'xtgnning work with you on the project. Flease cal! me with any questions you may have regarding the conteart of this proposat, I would be giaGd tv provide further informafiion. Sincerely, Gaty L. Stmd+etland, PE file 1Ui106 ENGINEERING o.a~ ,_'