Loading...
HomeMy WebLinkAboutAgenda - 11-09-1999 - 3ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS WORK SESSION AGENDA ITEM ABSTRACT Meeting Date: November 9, 1999 SUBJECT: Orange County Priority List for 2002 — 2008 DCHC MTIP DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1) Memorandum to BOCC 2) Proposed. Priority List for 2002 -2008 MTIP 3) Orange County Transportation Priority List submitted for 1999 -2005 MTIP 4) 1999 -2005 DCHC Regional Priority List 1 Action Agenda Item No._ PUBLIC HEARING: (Y /N) No INFORMATION CONTACT: Karen Lincoln ext. 2583 Craig Benedict ext. 2592 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane (336)227 -2031 PURPOSE: To receive a written report regarding Orange County's requested projects for consideration in the development of the Regional Priority List. The purpose of the Regional Priority List is to determine the region's project priorities for the development of a fiscally constrained Durham - Chapel Hill - Carrboro Metropolitan Transportation Improvement Program. BACKGROUND: Biannually, the North Carolina Board of Transportation (BOT) adopts a multi- year State Transportation Improvement Program (STIP) that specifies needed transportation improvements across the state. On the regional level, the Durham- Chapel Hill- Carrboro Metropolitan Planning Organization (DCHC MPO) develops the DCHC Metropolitan Transportation Improvement Program (MTIP) that specifies needed transportation improvements in the urban area. Orange County submits its requested projects to be included in Regional Priority List that is then submitted by the DCHC MPO to NC DOT and the BOT for consideration in the development of the STIP. FINANCIAL IMPACT: None at this time. RECOMMENDATION: The Manager recommends that the Board receive the report only for information at this time. ATTACHMENT 2 ORANGE COUNTY PLANNING DEPARTMENT 306F REVERE ROAD HILLSBOROUGH, NORTH CAROLINA 27278 `apt N m u as i'iT:I i'i Eel c7_1►I Li TO: Orange County Board of County Commissioners FROM: Craig Benedict, Planning Director DATE: November 9, 1999 SUBJECT: BOCC November 9, 1999, Work Session: Written Report, Orange County Transportation Priority List Please review the attached transportation, priority list of Requested Projects (Attachment 2) being forwarded to the Technical Coordinating Committee for consideration in the development of the Regional Priorities List of transportation projects for the 2002 -2008 Durham - Chapel Hill - Carrboro Metropolitan Transportation Improvement Program. The projects include those from the Orange County Transportation Priority List (Attachment 3) submitted in October, 1997, by the Board of County Commissioners for consideration in the development of the 1999 -2005 DCHC MTIP. The priority list is submitted for your comment. Please forward any comments or questions to Karen Lincoln (extension 2583). Karen has shifted her planning duties to include transportation planning. Staff will prepare an agenda item for the December 7, 1999, BOCC meeting for BOCC endorsement/approval of the Orange County Priority List. The approved list will then be submitted to the TCC and Board of Transportation to be considered in the development of the 2002- 2008 DCHC MTIP. The Regional Priority List Development Projects are submitted to the Metropolitan Planning Organization (MPO) by member agencies within the metropolitan planning area. The lead planning agency staff will perform technical analyses on all projects and rank each project according to the following: • Regional goals (how well the project meets the adopted regional goals); • Cost effectiveness (cost vs. benefits); • Timing factor (will opportunity for project be lost if not included in current priority cycle ?); ATTACHMENT 1 3 • Specific project merits: ➢ 2025 Current Trend Plan or a project being considered in Tier II Analysis for 2025 Transportation Plan ➢ Degree of congestion); ➢ Safety issues-, ➢ Promotes National Highway System; ➢ Reduces use of single occupancy vehicles; ➢ Provides for more transportation choices; ➢ Promotes energy conservation; ➢ Has minimal impact on the natural environment; ➢ Encourages economic development; ➢ Adverse impacts do not disproportionately affect low income populations; ➢ Transportati n Improvement Program Status; ➢ Type of transit project (transit r)roiects onlv). A subcommittee of the TCC will meet Friday, November 12 to develop a recommendation based on a technical analysis of each project. The subcommittee will present the results of the technical analyses and the subcommittee's recommendation to the TCC at the November 17, 1999, meeting; the TCC will make a recommendation to the Technical Advisory Committee at its December 8, 1999, meeting. The TAC will recornmend a Regional Priority List to be available for public comment for a four week period. After the public comment period, the TAC will approve a Regiona Priority List to be forwarded to NCDOT for consideration in the development of he DCHC 2002 — 2008 MTIP. Attachment 4 is the 1999 -2005 Regional Priority List from which projects in the 1999 -2005 DCHC IVITIP were taken. The MTIP is updated biannually (there was no update nor priority list update last year). Staff will submit an pdate on the MTIP and process for the December 7, 1999, Board of County Co missioners agenda. ATTACHMENT 2 REQUESTED PROJECTS 4 1) U -2805. Homestead Road Widening: This project remains Orange County's top priority of new road projects requested from TIP funds. Orange County requests the further advancement of Homestead Road in the TIP schedule for the following reasons: a) in the year 2000, the completed widening of Airport Road will approximately double its capacity and provide increased access to the land served by Homestead Road; and b) there will be a period of approximately two years during which accident exposure will be increased because Homestead Road will not have been improved at the same time as Airport Road. 1) NC 86. construct bicycle lanes: from Chapel Hill (Whitfield Road) to Hillsborough (US 70). Scheduled improvements to Airport Road (NC86) in Chapel Hill will extend bicycle facilities from UNC to Whitfield Road (SR 1731) in Orange County. NC 86 from Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists using this route and there are also two new schools along this route. This route is listed as priority I of the primary bicycle routes proposed in the Orange County Bicycle Transportation Plan adopted April 6, 1999. Orange County requests that bicycle lanes be constructed. 2) US 70 Bypass Widening: from the intersection of US 70 Business to the US 70 — 1 -85 Connector, widen US 70 Bypass to a four -lane divided section with bike and pedestrian improvements. This project should be phased to address traffic counts and existing congestion. OTHER REQUESTS 1) 1 -3306 Section A: widening of 1-40 to six lanes from 1 -85 in Orange County to US 15 -501 in Durham County — Orange County requests that 1 -3306 Section A and I- 3306 Section B be divided into two separate projects and programmed separately in the TIP. Project planning and design for this facility is in progress. Orange County requests that it be included in the development of the Major Investment Study and Environmental Impact Statement for this project to insure that there are no detrimental land use impacts to the Orange County Comprehensive Plan. Orange County is opposed to any widening of 1-40 through Orange County unless there is a commitment by NCDOT to provide HOV and/or dedicated bus lanes. ATTACHMENT 2 Proiect Title: Estimated Cost. Requesting Agency: Proiect Description: Proiect Justification: 6i DURHAM CHAPEL HILL CARRBORO AETROPOLITAN PLANNING ORGANIZATION ATION IMPROVEMENT PROGRAM PROJECT REQUEST U -2805, HOMESTEAD ROAD WIDENING $4,048,000 Orange County Improve Homestead Rd. by adding lanes from High School Road (SR 1834) to Airport Rd. When completed, improvements currently under construction to widen Airport Road will double (approximately) Airport Road's capacity. Homestead Rd. is inadequate now and improvements are not scheduled until 2004. crc ecc cvaruarion (a iena: 1. An element of this "2025 Current Trend Long Range Transportation Plan" Yes 2. Degree of congestion (volume%apacity) (1997 calculation) 1.5 3. Safety (e.g., acci ents/100 million vehicle miles of travel) (1997 calculation) 467 5. Promotes Nation l Highway System No 6. Reduces use of s "ngle occupant vehicle No 7. Provides for more transportation choices Yes 8. Promotes energy conservation Yes 9. Has minimal impact on the natural environment Yes 10. Encourages economic development consistent with adopted land use plans No 11. Adverse impacts do not disproportionately affect low income populations Yes Li. a-- Wo �7 t ATTACHMENT 2 DURHAM CHAPEL HILL CARRBORO L METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Proiect Title: NC 86 Bicycle Lanes (Paved Shoulders) Estimated Cost: $1,000,000 Reauestina Agency: Orange County Proiect Description: Provide paved shoulders along NC 86 from Hillsborough to Chapel Hill. Proiect Justification: This road is popular route for bicyclists to travel from Chapel Hill to the rural roads that intersect with NC86; two new schools have been constructed along NC 86; and this route is part of the DCHC Regional Bicycle Plan and the NCDOT TIP Project E -2913. Proiect Evaluation Criteria - 1. An element of the "2025 Current Trend Long Range Transportation Plan" Yes 2. Degree of congestion (volumelcapacity) (1997 calculation) 0.7 3. Safety (e.g., accidents1100 million vehicle miles of travel) (1997 calculation) 478 5. Promotes National Highway System No 6. Reduces use of single occupant vehicle Yes 7. Provides for more transportation choices Yes 8. Promotes energy conservation Yes 9. Has minimal impact on the natural environment Yes 10. Encourages economic development consistent with adopted land use plans No 11: Adverse impacts do not disproportionately affect low income populations Yes ATTACHMENT 2 7 DURHAM CHAPEL HILL CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Proiect Title: US 70 Bypass Widening Estimated Cost: Unknown Requesting Agency. Orange County Proiect Description: Widen US 70 Bypass from the intersection of US 70 Business to the US 70 -185 Connector to a four -lane divided section with bicycle and pedestrian facilities. Project Justification: US 70 Bypass is a major thoroughfare projected to be over capacity during the design period (2020). The intersection of US 70 Bypass at NC 86 is listed as a high accident location (Hillsborough Transportation Plan) having an average of 32 accidents per year for the period from 4/92 to 4/95 — the highest accident intersection within the highest accident frequency within the Hillsborough planning area. Cost/benefit ratio for widening US 70 is +1.1, and based on its benefits, the project is rated second in priority of projects recommended in the 1997 Hillsborough Transportation Plan. Proiect Evaluation Criteria: 1. An element of the "2025 Current Trend Long Range Transportation Plan" No 2 Degree of congestion (volume%apacity) 2020 projection: 12,800 - 18,900 vpd 3. Safety (e.g., accidents/100 million vehicle miles of travel) >32/yr @ US 70 Bypass and NC86 (1992 —1995) 5. Promotes National Highway System No 6. Reduces use of single occupant vehicle No 7. Provides for more transportation choices Yes 8.. Promotes energy conservation Yes 9. Has minimal impact on the natural environment No 10. Encourages economic development consistent with adopted land use plans No 11. Adverse impacts do not disproportionately affect low income populations No ATTACHMENT 3 ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR CONSIDERATION OF FUNDING IN THE DURHAM - CHAPEL HILL - CARRBORO ( sir eM vrFawo oe-Toaa/L 15 , 09-7- N 0999�2oosj Orange County appreciates the opportunity to participate in the Durham - Chapel Hill- Carrboro Metropolitan Transportation Improvement Program process. We would also like.to commend the Lead Planning -Agency's staff: Mr. Mark Ahrendsen, Ms. Kimberley McCarter, Mr. Felix Nwoko, Mr. Wesley Parham, and Mr. Tim Saunders. We are very appreciative of their efforts and are looking forward to working with them in the future. POLICY.ISSUE - PROJECT INITIATED BY NC DOT 1) R -3829: Feasibility Study to iden Mt.Cai nel Church Road (SR 1008) to Multi -lanes - Orange County requests the following: a) that the feasibility study (R -3829) be handled through the current Durham- Chapel Hill- Carrboro (DCHC) Metropolitan Planning Organization (MPO) process for the 1999 -2005 TIP; and b) that in the future, Orange County be consulted about feasibility studies in its jurisdiction before such studies are added to the TIP. REQUESTED PROJECTS 1) U -2805: Homestead Road Widening - This project remains Orange County's .top priority for new road projects requested from TIP funds. Orange County requests the further advancement of Homestead Road in the TIP schedule for the following reasons: a) in the year 2000, the completed widening of Airport Road will approximately double its capacity and provide increased access to the land served by Homestead Road; and. b) there will be a period of approximately two years during which accident exposure will be increased because Homestead Road will not have been improved at the same time as Airport Road. 11) NC 86: construct bicycle lanes - from Chapel Hill (Whitfield Road) to Hillsborough (US 70). Scheduled Improvements to Airport Road (NC 86) in Chapel Hill will extend bicycle facilities from UNC to Whitfield Road (SR 1731) in Orange County. NC 86 from Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists using this route and there are also two new schools along this route.. Orange County requests that bicycle lanes be constructed. COMMENTS ON OTHER TIP PROJECTS INITIATED BY NC DOT 1) 1 305• widening of 185 to six lanes and reconstruction of interchanges from Orate_ Grove Road to Durham County Line - Even though 'this project remains an "IDENTIFIED FUTURE NEED ", Orange County requests that its staff 'be allowed to participate in the planning of the facility. The County is specifically interested in the following infrastructure improvements as they relate to the 1 -85/US 70 Economic Development District: ATTACHMENT 3 9 a) Erosion Control Measures - Orange County requests that permanent erosion control measures be included in the project. b) Pedestrian and Bicycle Facilities - Orange County requests that its staff be allowed to participate in the determination of where and what type of facilities are to be included in this project. Among the features requested for inclusion are sidewalks and bike lanes (see the Regional Bicycle Plan for Durham and Orange Counties) and adequate guardrails on overpasses. C) Wildlife Corridor Under 1 -85 - Orange County requests that its staff be allowed to participate during this part of the planning stage and that this issue be brought to the attention of the NCDOT Staff Biologist. Constructing this wildlife corridor is one of the recommendations presented in the "The New Hope Corridor Open Space Master Plan: Proposals for Linking Duke Forest and Eno River State Park." d) Intersection of Pleasant Green Road (SR 1567) & Mt Herman Church Road SR 1713 - This intersection was studied by the NCDOT Division 7 Traffic Engineers last year. They recommended that this intersection be included as a part of 1 -305 because of its proximity to the 1 -85 /US 70 interchange. The entire intersection needs to be realigned so that Pleasant Green Road can intersect US 70 at a 90 degree angle. e) US 70 from NC 751 to University Station Road (SR 1712) - Due to the needs of the Pleasant Green Road1US 70 intersection, Orange County requests that US 70, from NC 751 to University Station Road, be upgraded to provide for a suitable transition from /to 1 -85. An example of the need for this project is the intersection of US 70 with Old No.10 (SR 1715) which is currently operating at level of service ''F ". f) Mt Herman Church Road (SR 1713) - Preliminary plans by the Planning & Environmental Branch, Division-of Highways of NCDOT indicate'that this road may be relocated as part of 1 -305. Orange County requests that this road be designed with 12' wide travel lanes and 4' wide bicycle lanes for a total paved width of 32'. g) Old NC 10 (SR 1710) - Preliminary plans by the Planning & Environmental Branch, Division of Highways of NCDOT indicate that this road may also be relocated as part of 1 -305. Orange County requests that this road be designed with 12' wide travel lanes and 4' wide bicycle lanes for a total paved width of 32'. h) Park arid Ride Facilities - Orange County requests that its staff be allowed to participate in the determination of where and what type of facilities are to be included in this project. ATTACHMENT .3 10 11) 1 -3306 SECTION A: widening of 1-40 to six lanes from 1 -85 in Orange County to US 15 -501 in Durham County - Orange County requests that 1 -3306 Section A and 1 -3306 Section B be divided into two separate projects and programmed separately in the TIP. Project planning for this facility is scheduled to begin in 1997. Orange County requests that it be included in the development of the Major Investment Study and Environmental Impact Statement for this project to insure that there are no detrimental' land use impacts to the Orange County Comprehensive Plan. Orange County is opposed to any widening of 140 through Orange County, unless there is a commitment by NCDOT to provide HOV and/or dedicated bus lanes. III) R -2630 DURHAM NORTHWEST LOOP (ENO DRIVE): new multi -lane route from 1 -85 in Orange County to 1 -85 in Durham County - Orange County is strongly opposed to having this facility within Orange County and is also very concerned about the environmental impacts to the Eno River State Park. Orange County requests that this facility be relocated outside of Orange County. Thank you for your consideration of these requests. 0 Submitted this 15th day of October, 1997 ORANGE COUNTY BOARD OF COMMISSIONERS by; William L. Crowther, Chair Z ATTACHMENT 3 ') ' DURHAM- CHAPEL HILL - CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST E—rQZect Title: U -2805 HOMESTEAD ROAD WIDENING Estimated Cost: $3,300,000 Rego ting„Ag nev: Orange County Project Description: improve Homestead Rd. by adding lanes from High School Road (SR 1834) to Airport Rd. (NC 86), for 1.6 miles. Project .Iusti cation: Starting in 1997 Airport Rd. will be widened and its capacity will approximately double. Homestead Rd. is inadequate now and improvements are not scheduled until 2002. It is therefore imperative that the improvements to Homestead Rd. begin in 1998. ft iect valuation Criteria 1. An element of the • `Interim Comprehensive Transportation Plan" Yes 2 Consistent with the MPO's Air Quality Finding Yes 3. Degree of Congestion (volume%apacity) 1.5_ 4. Safety (e.g., accidents1100 million vehicle miles of travel) 467 S. Promotes National Highway System Arn-- 6 Reduces use of single- occupant vehicle tArn 7 Provides for more transportation choices Yes 8. Promotes energy conservation Yes 9. Has minimal impact on the natural environment Yes �- 10. Encourages economic development consistent with adopted land use plans —�a 11. Adverse impacts do not disproportionately affect low- income populationsT -- Homestead Rd SR 1777 SR 1234" r SR 1294 eMPM10AD NC IS Homestead Rd SR 1777 ATTACHMENT 3 12 0 -2 DURHAM- CHAPEL HILL- CARRBORO METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST Project Title • NC 86 Bicycle Lanes( Paved Shoulders) Estimated Cost_ $1,000,000 Re uestjn7 A _ncv. Orange County Provide paved shoulders along NC 86 from Hillsborough to Chapel Hill. Proj . ct _ tip =tr.,� • This mad is popular route for bicyclists to travel from Chapel Hill to the rural roads that intersect with NC 86, two (2) new schools have been constructed along NC 86, and this route is part of the DCHC Regional Bicycle Plan and the NCDOT TIP Project E- 2913. Project Eyaluatinr� Critertev 1. An element of the "Interim Comprehensive Transportation Plan" YP_c 2. Consistent with the MPO's Air Quality Finding Ye_ . 3.'Degree of Congestion (volume%apacity) n 4. Safety (e.g., accidents 1100 million vehicle miles of travel) requested q7V S. Promotes National Highway System Afn 6. Reduces use of single- occupant vehicle YP.v 7 Provides for more transportation choices YET 8. Promotes energy conservation Ya.c 9. Has minimal impact on the natural environment Ye.c 10. Encourages economic development consistent with adopted land use plans • s Ina : 11. Adverse impacts do not disproportionately affect low- income populations es Durham - Chapel Hill - Carrboro MPO 1999 -2005 Regional Priority List 1 11/8/1999 2:18 PM PF= Partially Funded FS= Feasibility Study IFN= Identified Future Need NR =Not Ranked Last Year H= Highway, T= Transit, E= Enhancement D D n x 3 M ,i CA) w 0 d M a rt w Y � w Z Project Name and Descri tion 1 P ° a, � r3 ; .q a s "' �' ° a o o R Oq �+ A.- W O B o +a�� 9 a �. U ,l Cx I E US 15 -501 Corridor improvements from the US 15 -501 Bypass in Durham to Franklin Street in Chapel-Hill, consisten with the recommendations of the US 15- D -.1 1 U -2807 PFJ H 501 MIS 80 1 DC -1 Yes Yes 1.161 200 Yes Nol Yes Yes Yes Nol Yes Trani D-4 2 Section PF T Durham Multimodal Trans p. Center 80 2 1 DC -5 Yes Yes NA NA Yes Yes Yes Yes Yes No Yes Alston Avenue (NC 55) widening from Holloway Street to the Durham Freeway 3 U -3308 PFJ H (NC 147) 80 4 D -6 Yes Yes 1.561 1902 Nol No Yes Yes Yes No Yes Transit Chapel Hill Transit Capital Projects 4 Section T (FY1999 -2003) 70 3 CH -1 Yes Yes NA NA NA Yes Yes Yes Yes No Yes Hillandale Road widening from from I- DC -8 5 U -2708 FS H 85 to Carver Street 80 7 D -17 Yes Yes 1.22 805 No No Yes Yes Yes No Yes Bike/Pod Cornwallis Road bicycle and pedestrian , 6 section IFN E lenhancement project 80 9 D -7 Yes Yes 1.08 NA No Yes Yes Yes Yes No Yes Transit 1paratransit DATA replacement vehicles for DC -2 71 Section T service 70 NR D -10 Yes Yes NA NA No Yes Yes Yes Yes Nol Yes South Columbia Street Improvements 8 U -3409 PF H from Manning Drive to Fordham Blvd. 80 6 CH -2 Yes Yes 1.23 394 No Yesl Yes Yes Yes No Yes Transit 9 Section T TTA Regional Bus Replacement 70 NR T -3 Yes Yes N/A N/A No Yes Yes Yes Yes No Yes Transit Regional Rail Project -Duke 10 Section PF T University/Durham to North Raleigh 80 18 1 T -1 Yesl Yes 1.4 209 No Yes Yes Yes Yes Nol Yes Estes Drive Sidewalk Project, Curtis Rd 11 E to Fordham Blvd 80 New CH -7 Yes Yes 1.15 217 No Yes Yes Yesi Yes No Yes Homestead Road Widening from High 12 U -2805 FF H School Road east to NC 86 75 12 0-1 Yes Yes 1.5 467 No No Yes Yes Yes No Yes D -5 13 E -2921 FS E American Tobacco Trail Phase 4 75 22 DC -3 Yes Yes . NA 418 Nol Yes Yes Yes Yes No Yes PF= Partially Funded FS= Feasibility Study IFN= Identified Future Need NR =Not Ranked Last Year H= Highway, T= Transit, E= Enhancement D D n x 3 M ,i CA) Durham - Chapel Hill - Carrboro MPO 1999 -2005, Regional Priority List 11/8/1999 2:18 PM PF= Partially Funded FS= Feasibility Study IFN = Identified Future Need NR =Not Ranked Last Year H= Highway, T =Transit, E--Enhancement a 7 rn Z -1 46 -A. a « Project Name and Description E • 1 p o z @ $ zz. °o All ; e a 5S' °� �L'E C x � � �' 6 � E 8'� 3" � °'� �p� EE •E� •� ••v R O '� RE p 1- �, p6 is i C 'L7 •� R NC 54 / Page Road widening and D -14 14 R -2904 IFN H Hopson Road Connector project 75 23 DC-6 Yes Yesl 0.92 317 No No Yes Yes Yes Yes Yes Roberson Place (Old Mill Village) Bikepath between Rand Rd & Wesley 15 E ISt. 75 NR CR -8 Nol Yes 1.321 540 No Yes Yes Yes Yes No Yes Feasibility Study for South Churton 16 R -2825 IFN H Street 75 New H -2 Yes Yes 2.3 490 No No Yes Yes Yes No Yes 17 BlkefPed Section IFN E NC 86 Bicycle Lanes (paved Shoulders) 75 New 0-2 Yes Yes 0.7 478 No Yesl Yes Yes Yes No Yes Seawell School Road bicycle Bike/Po improvements, Homestead Road to CR-4 181 Section IFN E JEstes Drive 75 1 NR CH -10 Yes Yesi 0.4 6191 No Yes Yes Yes Yes No Yes Estes Drive widening from North CR -2 19 U -2909 IFN H Greensboro Street to NC 86 70 8 1 CH -3 Yes Yes 1.46 282 No No Yes Yes Yes No Yes Bike/Pod Old NC 86 bicycle and pedestrian 20 Section IFN H proiect 70 10 CR -1 Yes Yes 0.64 323 No Yes Yes Yes Yes Nol Yes 21 Transit Section T DATA Bus Purchase 70 14 D -12 Yes Yes N/A N/A No Yes Yes Yes Yes No Yes Bike/P Estes Drive, NC 86 to Caswell Rd, 22 Section IFN H widen existing roadway 70 15 CH -5 Yes Yes 1.151 217 No Nol Yes Yesl Yes No Yes D -2 23 U -71 PF H lEast End Connector 70 16 DC -7 Yes Yes 1.11 1648 Yes No No Yes No No Yes 24 Transit Section I T Durham Park and Ride Lot facilities 70 17 D -13 Yes Yes N/A N/A Nol Yes Yes Yes Yes No Yes Culbreth Road bicycle improvements, 25 E Smith Level Road to US 15 -501 South 70 19 CH -6 Yesl Yes 0.35 171 No Yesl Yes Yes Yes Nol Yes B1kafPed Homestead Road Widening from High 26 Section IFN H School Road west to Old NC 86 70 21 CR -3 Yes Yes 0.53 353 No Yes Yes Yesl Yes No Yes NC 55 widening from Cornwallis Road 27 R -2908 PF H Ito the Wake County line 1 70 25 1 DC -9 Yes Yes 1.23 228 No No Yes Yes Yes No Yes PF= Partially Funded FS= Feasibility Study IFN = Identified Future Need NR =Not Ranked Last Year H= Highway, T =Transit, E--Enhancement a 7 rn Z -1 46 -A. Durham - Chapel Hill - Carrboro MPO 1999 -2005 Regional Priority List 11/8/1999 2:18 PM PF =Partially Funded FS= Feasibility Study IFN= Identified Future Need NR =Not Ranked Last Year H= Highway, T= Transit, E--Enhancement D n 2 3 rn A Cn � e � e g tL gyp° L 0 F q d '3 o Project Name and Description p°, a £ a y C U iQ o z rte°. v a�0i Oa 'v d 9 a = E� v �o o T+ pJ� O , 96 V 28 U -3808 FS H Elizabeth BMdy Road Extension 70 26 H -1 Yes Yes 2.0 888 No No Yes Yes Nol Nol Yes M. L. King, Jr. Parkway/NC 55 29 U -2405 IFN H Interchange 40 27 D -9 Yes Yes NA NA No No No No Yes No Yes PF =Partially Funded FS= Feasibility Study IFN= Identified Future Need NR =Not Ranked Last Year H= Highway, T= Transit, E--Enhancement D n 2 3 rn A Cn