Loading...
HomeMy WebLinkAboutAgenda - 11-09-1999 - 1ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 9, 1999 Action Agenda Item No. 1 SUBJECT: Solid Waste Matters DEPARTMENT: County Manager /Solid Waste PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT: As listed in "Background" John Link/Rod Visser, ext 2300 Gayle Wilson, 968 -2885 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane 336- 227 -2031 PURPOSE: To discuss various solid waste management matters, as outlined in the "Background" section of this abstract. BACKGROUND: a. 60 Acre Greene Tract Portion Set Aside as Solid Waste Management Site The Board will continue the discussion it began on this topic during the November 3, 1999 meeting. The Board may also wish to discuss the process for, and timing of, the necessary zoning of the designated 60 acres of the Greene Tract to permit certain solid waste activities, as contemplated in the approved Solid.Waste Interlocal Agreement (see Attachment 1 -a). b. Construction and Demolition Waste Recycling and Disposal Options The Board requested a report on options available for the recycling and disposal of C &D waste. Chapel Hill Solid Waste staff have prepared the report at Attachment 1 -b. Staff will be prepared to respond to the Board's questions, and to accept the Board's direction on subsequent steps to be taken related to C &D recycling and disposal. Staff will also present information on a discussion between the County Manager and staff at the State's Solid Waste Division that relates to the process and timing of the submission of a permit application for a possible Eubanks Road C &D site. c. "Future Search" Process for Solid Waste Management Triangle J Council of Governments (TJCOG) has convened regular meetings of the region's local government solid waste planners since 1991. This group, the Triangle Region Solid Waste Planners Committee, recently issued a report urging the Triangle's local governments to work more closely on planning infrastructure to manage solid waste beyond the next ten years. As a means to initiate productive action on a regional level, the Triangle Region Solid Waste Planners Committee is proposing that the region conduct a "Future Search," which is a dynamic, interactive process used by groups to identify trends, common ground, and action steps. A "Future Search" is limited to 60 to 70 participants in order to allow everyone to fully participate. In order to be effective, the event must include participants who are key decision - makers, participants who have relevant information, and participants who are significantly affected by the outcome. TJCOG requests that two Commissioners, as well as the County Manager and Solid Waste Director, participate in this event which is planned for late February 2000. Staff will make a brief presentation about this process. At the request of Commissioner Jacobs, the Board agreed to set aside time at this November 9 work session to discuss what "next steps" the Board should take related to various solid waste management issues. d. Owner's Request to Relocate High Rock Road Solid Waste Convenience Center The owner of the site leased by the County for its solid waste site on High Rock Road has indicated his desire to terminate that lease, and replace it with a lease for a different site about 1,000 feet further northwest on High Rock Road. The staff memo at Attachment 1 -d -1 provides more background information about this request and indicates staffs plans to bring this item forward for the Board's approval at the November 16, 1999 meeting. An informational flyer (Attachment 1 -d -2) for citizens who use the site has been prepared for distribution. This item is provided for information only — no Board action is required at this time. FINANCIAL IMPACT: There is no direct financial impact associated with discussing these items. However, subsequent Board decisions, particularly related to construction and demolition waste management, will have significant impacts of the Landfill Enterprise Fund. RECOMMENDATION(S): The Manager recommends that the Board receive and discuss the reported information, and provide appropriate direction to staff. 41 Atf 0, Make reports. The County will make, or cause to be made, any reports or audits relating to the System as may be required by law. The County, as often as may reasonably be requested, will furnish such other information as the County may have reasonably available concerning the System or its operation as the Advisory Board or any Party may reasonably request. The County, which the Parties have designated as. a local lead, agency, and the Towns will cooperate in preparing and submitting any reports or solid waste plans that a Party may be required to file with governmental authorities, such as the State's Division of Waste Management. Approve budget. The County will approve the 1999 -2000 System operating budget together with Chapel Hill. Effective date. The County will assume solid waste management responsibility the day following-the effective date of the zoning of the property described in Exhibit E which makes solid waste management uses, not including burial of mixed solid waste or construction and demolition waste, a permitted use under the Chapel Hill Development Code /Ordinance, as provided in Part 5 of this Agreement, so long as that date is at least 180 days after the execution and delivery of this Agreement by the current owners of the System and so long as the Greene Tract Owners have agreed on the boundaries of the property described in Exhibit E. The date the County assumes solid waste management responsibility is the effective date of this Agreement. Provided, however, the effective date of this Agreement will be January 1, 2000 so long as this Agreement is executed by and delivered to the current owners of the System on or before September 7, 1999, the zoning change described above and in Part 5 of this Agreement is adopted by the Town of Chapel Hill on or before January 1, 2000 and is effective on or before January 1, 2000 and the Greene Tract Owners have, on or before January-1, 2000, agreed on the boundaries of the property described in Exhibit E. The Parties shall take actions provided for in this Agreement, or which may otherwise be necessary or appropriate, in a timely :fashion to permit the County's assumption of solid waste responsibility on the effective date. 2. The Parties will deliver Solid Waste and County Recyclables to the System. The County and the Towns all agree to deliver, or cause to be delivered, to System Management Facilities for disposal or processing, respectively, all Solid_ Waste and County Recyclables under their respective control. This delivery obligation includes (without limitation) all Solid Waste and County Recyclables collected by any Party's employees, Solid waste collection contractors, solid waste collection licensees or solid waste collection franchisees. There is no such obligation to deliver Other Recyclables. All Solid Waste and County Recyclables delivered to System Management Facilities, or to County employees, solid waste collection contractors, solid waste collection licensees or solid waste collection franchisees, or properly placed in a designated container at a convenience center, will be County property upon such delivery. 3 S. The Greene Tract will remain a landfill asset. Sixty acres of the Greene Tract will be' reserved for solid waste management purposes, and the three owners will work together to determine the ultimate use of the remainder. The Parties agree that the Greene Tract remains a landfill asset. Chapel Hill, Carrboro and the County (the "Greene Tract Owners ") will transfer to the County title to that portion of the Greene Tract described on Exhibit E, which contains approximately sixty acres. The County may' use the property described on Exhibit E for System purposes. The County states its current intention not to bury mixed solid waste or construction and demolition waste on any portion of the Greene Tract. The County states its recommendation to future County Governing Boards that the County make no such burial. The deed to this property will include a restriction prohibiting the use of the property described on Exhibit E for burying mixed solid waste or construction and demolition waste. This restriction becomes effective at the same time that the. zoning change described in the next paragraph is effective; and it will remain effective so long as zoning remains effective which allows solid waste management uses, other than burial of mixed solid waste or construction and demolition waste, as permitted uses as described in the next paragraph. Chapel Hill agrees to commence, and states its current intent to complete, the process to make solid waste management uses not including_ burial of mixed solid waste or construction and demolition waste, but expressly including, -but not limited to, a solid waste transfer facility and a materials recovery facility, uses of the Exhibit E property "permitted" uses under The Chapel Hill Development Code /Ordinance, subject,,.only to staff level site plan and similar reviews and not subject. to special use or similar processes. Chapel Hill agrees to provide'..," Ehe other Parties with a plan, including a planned schedule of reviews and approvals, to process the zoning change described in this paragraph. The Parties agree-that nothing that they have agreed to herein constitutes an agreement on the part of Chapel Hill to. zone the Exhibit E property in a particular way. It is instead, an agreement that if the Exhibit E property is zoned a particular way one event will follow and if the Exhibit E property is not zoned in a particular way another event will follow. The Greene Tract Owners agree to bargain together in good faith and with all due diligence, and to use their respective best efforts, to determine an ultimate use or disposition of the remainder of the. Greene Tract as soon as possible and in any event by December 31, 2001, or two years after the effective date, whichever is later. During this -bargaining period," no Greene Tract Owner shall make any use of the remaining portion of the Greene Tract without the consent of the other Greene Tract Owners. a I The Greene Tract Owners agree that among the issues to be addressed in the bargaining process are (1) the specific future uses, or ranges of use; to be made of the remainder of the Greene Tract (including' issues of devoting different portions to different uses, devoting portions to public uses and the possibility of making portions available for sale or private use), and (2) whether to impose specific use restrictions, either through deed restrictions or through governmental regulation.-The Greene Tract Owners agree that during the "bargaining period" each should provide.opportunity for public comment on possible or proposed uses or dispositions. During the "bargaining period," no Greene Tract Owner shall (1) file any legal action or proceeding to force any sale or division of the Greene Tract, or (2) enter into any agreement to sell, mortgage or otherwise transfer all or any part of its ownership interest in the Greene Tract, in either case without the consent of the other Greene Tract Owners. To the extent permitted by law, Chapel Hill agrees not to initiate any proceeding to rezone any portion of the Greene Tract during the "bargaining period," without the consent of the other Greene Tract Owners. Execution and delivery of this*Agreement by the Greene Tract Owners constitutes consent of the Greene Tract Owners for Chapel Hill-to rezone the Exhibit E property as described in this Part S. Chapel Hill states its current intent to accommodate any agreed - upon future uses or range of uses of the remainder of the Greene Tract in its Development Code /Ordinances and states its recommendation to future Chapel Hill Governing Boards to the same effect. After the "bargaining period" is completed, namely, the day after the last day of the bargaining period, no Greene Tract Owner shall (1) file any legal action or proceeding to force any sale or division of the Greene Tract, or (2) enter into any agreement to sell,.mortgage or otherwise transfer all or any part of its ownership interest in the Greene Tract, in either case without giving the other Greene Tract Owners at least 60 days, 'rior notice of such filing or entering into an agreement. In addition,.after__the "bargaining period" is completed, any Greene Tract Owner may give 60 days' prior notice of an *election to be no longer bound by the above restrictions pertaining to the uses of and whether to impose use restrictions on the-remainder of the Greene Tract, and such election shall be effective at the end of the notice period. The Parties agree that. any non System use of any portion of the remainder of the Greene Tract or any disposition of any portion of the remainder of the Greene Tract shall result in payment to the County of the Reimbursement Amount Tor deposit in the System enterprise fund. 6. The County will finance community benefits from System funds to the extent legally permissible. The Parties will cooperate to provide public benefits to the community of residents and property owners in the neighborhood of the existing landfill. 9 ATTACHMENT 1 -b Prepared for: Board of Orange County Commissioners Work Session Tuesday November 9, 1999 7:30 p.m. Orange County Government Services Bldg. Hillsborough, NC Report on: C &D Materials Management in Orange County Prepared by: Solid Waste Management Dept. Town of Chapel Hill (919) 968 -2885 phone, (919) 932 -2900 fax 306 N. Columbia Chapel Hill, NC 27516-2113 Construction & Demolition Materials Management November 9, 1999 Table of Contents Executive Summary 1. Status of C &D Management in Orange County A. Waste Characterization B. Waste Tonnage Projections C. Current Recycling and Waste Reduction Practices D. Connection to Integrated Solid Waste Management Plan/Goals 2. Temporary Options for C &D Management (key issues /costs) A. Temporary option until new landfill developed 1) placing C &D in MSW landfill 2) suspension of acceptance of C &D 3) amending existing C &D landfill permit to allow modest vertical expansion 4) hauling C &D to Durham Transfer Station (this option was mentioned at a BOCC meeting, however, staff level discussions with City of Durham have concluded that this may not be an option that Durham's staff would recommend to their Manager /Council) B. Temporary option until MSW landfill full (assumes C &D will go into MSW landfill) C. Temporary option of developing new C &D site (with capacity to coincide with remaining MSW capacity) 3. Long Term Options for C &D Management (key issues /costs) A. Selecting Eubanks Rd. Site B. Permanently Ceasing C &D Management C. C &D Transfer Station D. Joint C &D/MSW Transfer Station E. Regional Solutions F. Initiating New Site Search Process 1) criteria 2) schedule 4. C &D Recychng/Waste Reduction (key issues /costs) A. Prior Staff Research B. Regulatory Measures C. Processing/Sorting D. Differential Fees/Bans E. Available Grants F. Successful Facilities Elsewhere 5 Solid Waste Advisory Board/C &D Task Force Role 6. BOCC Guidance to Staff Executive Summary Construction and Demolition Waste Materials Management This report provides information about the current state of construction and demolition waste management in Orange County, describes past studies and staff reports undertaken on C &D both in the County and regionally, and outlines key issues regarding options for future C &D management. The report is primarily descriptive with no specific staff recommendations from among the options described. We believe that the Board of Commissioners is at a critical juncture regarding management of construction and demolition waste in Orange County and moving towards concrete decisions at this time on management of C &D would greatly assist both short and long -term planning for siting, financing and designing any equipment and facilities that would be used in C &D management. Development of policy tools that would complement the strategies selected to physically manage C &D could also begin as decisions are made on facilities. For each of the management choices for C &D we have outlined the key issues and associated costs. The options are grouped as short-term disposal (Chapter 2), long -term disposal (Chapter 3) and reduction/recycling options (Chapter 4). The cost estimates are general and the key issues presented in a bullet form to highlight important points. We await guidance from the Board before providing detailed analysis of specific options. The staff has recently completed an engineering analysis of the current C &D site at Eubanks Road and determined that is feasible to raise the height of the current working area by 18 — 20 feet with no detriment to operations, surrounding aesthetics or the environment. We plan, if there are no objections, to submit our permit application to the State for this vertical expansion. We estimate a gain of up to eighteen months of C &D landfill space by this expansion while remaining below the treeline and lower than the finished grade for the MSW landfill on the south side. While this vertical expansion, if approved by the State, buys us valuable time for planning, siting and designing any new facilities, we believe it is wise to continue with the C &D management decision - making process now underway. The options described in this report can be broken into two general categories — management of C &D that must be buried and methods for recycling, reusing and reducing the amount of C &D destined for landfilling. The categories complement each other. We believe this County would be well - served by implementing a comprehensive, integrated approach to C &D management that combines policy and fiscal tools to encourage reduction of C &D generation, a means and location to recycle and process C &D that has markets or can be reused, and a secure, final destination or transfer station to manage what cannot be reduced, reused or recycled. Chapter 1 of the report estimates percentages of various materials in the C &D waste stream, based on three separate analyses conducted in 1990, 1995 and 1996. From the average of the three studies we estimated about 43% of the waste is inert including brick rock dirt and concrete, 32% is wood of all types including 20% recyclable, and 12% painted and treated wood, 12% is drywall and 2.5% metal. We outline how these potentially recyclable fractions of the waste could be managed. We project C &D waste for a 20 year planning horizon. Assuming a 10% waste reduction over time, the C &D stream remains in the 30,000 ton per year range. On a per capita basis, this means that C &D waste generated falls 34% per person to 464 pounds per year compared with the base year of 1991, when it was estimated at 699 pounds per person per year. Achieving our adopted 61% reduction goal would put it at 273 pounds per capita and require significant additional effort to reach. Chapter 2 discusses temporary, relatively short-term options for C &D management. If the vertical expansion we are seeking is approved, the time frame to implement even the remaining short-term options is lengthened to the point where we may not need to implement them, if we proceed with deliberation on long -term solutions. If the C &D area of the landfill closes we could combine C &D with MSW shortening the projected life of the MSW landfill by two years. We could suspend acceptance of C &D at our facility and thereby forgo $113,000 per month in revenue, risk increased illegal dumping and incur mixing of C &D with MSW. A fourth short-term option would be to haul C &D to Durham's transfer station. No formal arrangements have been made for this option and we are aware that the Durham Transfer station's ability to accept any additional waste is very limited to non - existent at this time. Finally, we could develop a short-term, six -year C &D landfill site to coincide with closure of the MSW landfill. There are no obvious advantages to this approach and it would entail all the siting and development requirements of any larger facility. Chapter 3 describes what we consider long -term options for C &D management. Those include selection of the Eubanks 33 acre site, permanently ceasing C &D management, building a C &D -only transfer station, building a joint MSW /C &D transfer station, continuing to try regional solutions, and initiating a new site search. The Eubanks Road site is the only one remaining from the last two site search processes conducted over the past two years. The site is small, of limited life, readily available and easily made operational due to ability to integrate into the current operation. Permanently ceasing C &D operation is obviously the least expensive approach but would result in annual revenue loss of $1.3 million and clearly increase costs to builders and haulers in the County for C &D disposal. It is possible to build a C &D -only transfer station but the material is bulky, hard to compact, abrasive on both processing and hauling equipment and, tellingly, there are no C &D -only transfer stations in the nation of which we are aware. Integrating C &D into a transfer station designed for MSW is also possible but with a ratio of 2:1 MSW to C &D, the station would still face the operational difficulties outlined in the C &D only option. Regional solutions appear attractive, but we have been unsuccessful in eight years of attempting to apply them to our solid waste problems. We continue to investigate the options and our upcoming "Future Search" planned for February 2000 will bring together 70 people from throughout the Triangle to envision long -term solid waste management solutions and then set plans to implement them. While we are optimistic about the process, we view its potential for success over a longer term than we are able to wait. We are also uncertain about the ability of this diverse set of interests throughout the Triangle to meet our immediate C &D management needs. Finally, it is possible to initiate a new site search. If that were the Board's decision, we believe it would be necessary to move ahead quickly, even with the potential for 18 additional months of life at the current site. We believe, based on recent experience, that another site search could cost $200,000 or more. Chapter four summarizes three years of previous C &D research and details some strategies for C &D reduction. The strategies are broken into regulatory approaches and physical recycling measures. The regulatory approaches would mandate source - separation of targeted recyclables including wood and metal with concomitant landfill bans and incentive fees to reinforce separation by builders and haulers of C &D. Recycling options include providing methods and facilities to accept source - separated or mixed materials. Costs for managing source- separated materials are much less than for separating and managing mixed materials at a centralized site. Markets for C &D recycling are typically low -value and economically limited at this time to metal, wood and drywall. In our piedmont region, availability of high quality rock and dirt for construction especially limits markets for inert materials, the largest part of the C &D waste. Equipment for centralized processing is expensive and successful facilities elsewhere that handle mixed material typically manage far more tonnage than our current and projected C &D waste stream. We believe the optimal approach would be one that integrated regulations, economic incentives and processing capacity. Chapter five and six outline immediate future steps for C &D management. The Board is prepared to appoint a limited- duration task force specifically to examine the options for C &D management. We understand that the BOCC may use the recommendations of this task force to inform its future decision - making on C &D management. We await the BOCC's guidance on how it wishes to pursue C &D management for Orange County. Chapter 1 Status of C &D Management in Orange County A. Waste Characterization Since 1990, we have conducted three waste characterizations of construction and demolition waste delivered to Orange Regional Landfill. In 1990 and 1995, the characterizations were conducted as part of the waste study conducted. on contract with SCS Engineers. They physically sampled the weights of C &D waste along with mixed solid waste during the first three seasonal sorts in 1989 -1990; the fourth was a visual sort. In 1995 all sorting was visual and volumes were converted to weights. In 1996, the staff conducted a visual waste sort for one week of all loads entering the C &D area of the landfill. The data from those sorts are summarized in the table on next page. The percentages in each category of material refer to percentage by weight. Shaded categories are those with near -term or immediate recycling potential. The remander of this page is intentionally left blank. Table la. Construction and demolition waste Orange Regional Landfill Year of Sort 1990 (SCS) 1995 (SCS) 1996 (staff) Average of %'s Material Type by % Inert 45.1 38.2 46.1 43.1 Rock 1.6 15.7 N/a -- Dirt'. &1, Concrete 0.8 7.3 10.5 6.2 Block, Tile and Brick N /al N /al 24.2 -- Asphalt 20.7 4.7 .74 12.72 Other Inert 15.9 N/a N/a -- INywail: 8.4 Wood 29.8 42.2 22.7 31.6 Pallets 12' . = :. ` 014' 2.2 1.9' SQIid`.umler° ; : 1.5:37 U.4- 13.6 Yard Waste 0.5 8.3 0.53 3.1 Other (painted & treated wood included) 10.8 11.1 6.4 9.4 Metals 1.9 0.2 5.4 2.5 Ferrous 1.5 0.01 1 4.0 1 1 L.B Non-ferrous,,,,,, 0.4.; .. 0.2; 1.4 . Other' 5.1 11.3 17.4 11.3 Carpet N /a° N /a4 0.2 -- Plastics 1 0.4 0.25 0.6 Shingles N /a5 N /a5 12.1 -- Paper 1 0.4 0.8 0.7 Miscellaneous. -- 3.9 4.1 -- NOTES: 1. Included in "other inert". 2.. Includes shingles. 3..." Other" is a `forced' category including everything not accounted for individually. 4. Included with other above 5. Included with asphalt in " inert" Our ability to develop programs and policies that reduce the amount of construction and demolition waste landfilled is based on the composition of waste and markets for those materials. The first two studies by SCS Engineers are not exactly comparable to the third one conducted by staff on all loads entering the C &D area, but some inferences can be made from the data to determine the potential for diversion. Inert Debris Averaging the percentages of materials by category over the three sorting sampling events shows that inert material, at, 43 %, is the largest category of C &D waste. While this material is 4 generically useful as road base or alternative daily /weekly landfill cover, the local market is very limited by availability of high quality quarried stone and cheap cover material. We therefore assume that with a semi - automated processing facility, a maximum of 35% of the 43% that is inert (15% of all C &D waste) may be readily useful for some of the required weekly cover on the C &D debris working face or other on -site uses. We believe the road -base grade material that could be made from crushing the concrete, brick and rock could not at this time compete economically with the locally available quarried aggregate, nor would it be likely to meet most technical specifications for compaction, especially those for public road construction. Clean Wood Waste and Pallets The clean wood and lumber category represents an average 17 % by weight of the C &D waste. This does not include painted and treated wood for which there are no markets. Due to its bulky nature, wood takes up a disproportionate share of air space so diverting it has value above the market value of the end - product. Wood has proven current markets as reusable lumber, boiler fuel, mulch and similar low grade products. Potential future markets include particle board furnish or finger jointed lumber. The actual product mix produced for a boiler fuel or mulch would be determined by the specific market. We assume that an absolute maximum of 90 percent of this material could be diverted from landfilling for recycling, using a 10% tolerance level at the landfill for discards and uncapturable material. That is 15% of the C &D waste. There is almost no possibility of reaping net revenue from producing boiler fuel or mulch, once grinding and transportation costs are accounted for. However the fact that there are markets makes clean wood an attractive target for diversion. Pallets average 2% of our waste stream or 670 tons. They can be marketed as whole pallets or become part of the wood waste stream for mulch or boiler fuel if unsalable. We estimate we could capture a total about 90% of them. We are now capturing 7% of them through the salvage program. We realize $0.50 per pallet revenue for about 50% of pallets salvaged for reuse sized 40" x48" or grocery store types. The other sizes are given to the pallet re- manufacturer at no fee or price. Drywall Drywall averages 12% of the waste stream. There are limited but proven negative markets for this material if it is clean, unpainted and not contaminated with other construction waste. We assume about 50% of this could be available for recycling either source - separated or through a hand - separation process. The known market for separated dry wall is a negative market in which we would have to pay a tipping fee of at least $12 per ton plus our handling and transportation costs. 3 Metals Metals represent about 2.5% of the waste stream on average. We assume a maximum of 90% of that could be captured. We are now capturing an estimated 40% or 30 tons per month. The markets are long -term and stable although prices vary widely, beginning at $30 per ton last year down to $10 per ton now. All other C &D materials The remaining materials including carpet, insulation, plastics, treated and painted wood and other unrecoverable materials make up an average 11% of the waste stream. While there are some emerging markets for certain types of carpeting and other specialty materials, these are a very small amount of our waste and must be thoroughly separated to have any market value at all. B. Waste Tonnage Projections Below in Table lb, we present six years of data from separated landfilling of construction and demolition waste from mixed waste. Prior to 1993, we combined C &D waste with mixed solid waste, separating out only the inert debris, yard waste and stumps. Generally C &D has averaged about one -third of the overall waste stream, excluding coal ash. It is difficult to predict the flow of construction and demolition waste in Orange County. We have presented a truncated table of possible future C &D generation based on a report submitted previously to the Owners Group by Joyce Engineering as part of our C &D landfill search. Their tonnages to be landfilled already assume a diversion rate of 10 %. A review of the fluctuation in C &D waste landfilled in Table 1 b shows no correlation with the population growth in Orange County. There is also no correlation with implementation of construction and demolition waste reduction efforts except that, in general, C &D landfilled per capita is below the baseline 1991 -92, for each year of record in which C &D was landfilled separately from mixed solid waste. rI Table lb. C &D waste generation 1993- 2020 Orange Regional Landfill Year Tonnage Populatio n1 Pounds of C &D/Person % change from base year 1991 -92 34,1452 97,746 699 (est) N/a 1993 -94 25,9633 102,598 506 -2% 94 -95 32,286 104,196 620 -11% 95 -964 31.207 105,769 590 -16% 96 -97 33,858 107,253 632 -10% 97 -98 30,168 108,752 555 -21 % 98 -99 33,576 110,581 607 -13% 99 -20 to date 7,652 112,436 N/A N/A 99 -2000 est. 29,370 112,436 522 -25% 2000 -01 30,848 114,268 540 -23% 2004 -05 29,103 121,365 479 -31% 2009 -10 30,060 129,461 464 -34% 2014 -15 31,944 137,689 464 -34% 2019 -2020 33,974 146,440 1464 -34% NOTES: 1. Population estimates from office of state planning 2. Estimated based on 1/3 of total waste as C &D 3. Combines C &D and inert debris plus stumps 4. Corrugated cardboard ban instituted March 1996 Section C. Current Recycling _and Waste Reduction Practices This section summarizes the Landfill Owners Group's efforts over the past six years to reduce the amount of construction and demolition waste landfilled in Orange County. The options vary widely from projects conducted at the landfill, including the currently successful, but limited salvage program to non - structural, and regulatory measures such as solid waste planning component of The Town of Chapel Hill's development ordinance. We have included as attachment 1 -1 a summary of regional C &D projects undertaken over the past six years by Triangle J Regional Council of Governments. The COG's regional solid waste planning effort has provided practical information to builders on how to reduce waste including their Waste Spec manual and networking opportunities for solid waste planners in the region to discuss C &D recycling. Further, the COG has attempted to develop and promote regional solutions to some of the construction and demolition waste problems that all the counties in our region now face. None of those has been successful. 1.Summary of Construction and Demolition Waste Reduction Activities in Orange County 1992- 1999 1992: Town of Chapel Hill enacted a Solid Waste Planning requirement as amendment to its Development Ordinance. This ordinance amendment requires any developments needing a special use permit or zoning compliance permit to develop a solid waste management plan that states how they will manage construction waste, how they will provide for on -site storage of recyclable materials and how they will consider use of building materials with recycled content. The ordinance has been effective primarily in the area of requiring storage for recyclable materials in the finished development. The component detailing how construction and demolition wastes could be recycled and reduced lacks strong enforcement provisions but is currently undergoing revisions. Information on building materials with recycled content is regularly provided to builders, but there has been limited opportunity to followup on their use at our current staffing levels. 1995 —1996: Wood waste diversion. In 1995, we diverted a sample of unpainted, untreated construction wood waste including both solid sawn lumber and plywood for testing. The material was ground up, aged, mixed with yard waste and tested for heavy metals and volatile organic compounds. The stormwater runoff was also sampled. The results of testing showed no heavy metals or volatile organic compounds present in the wood samples. The State DENR ruled that, in order to accept plywood or other engineered wood in the yard waste grinding program, we would have to receive a special permit for composting at the landfill. There was speculation that the material would not gain market acceptance as the yard waste had due to the presence of recognizable chunks of plywood and long splinters of lumber. The project was terminated in 1997. Marketing studies for wood waste were conducted in 1995 -6 and again in 1998. The second round of market study identified several opportunities for wood waste diversion through contractors and industrial use. Further wood market work is required to ensure that any construction lumber diverted from landfilling is productively reused, composted, or recycled. That work will occur this year. November, 1995: Landfill and local governments enacted a ban on landfilling non - residential corrugated cardboard. (implemented March, 1996) This ban, actually a penalty equal to twice the tipping fee, has resulted in an almost complete elimination of the landfilling of corrugated cardboard in the construction and demolition waste landfill. Cardboard that is included in loads of construction and demolition waste delivered to the landfill can, to avoid the double tip fee penalty, be diverted to dumpsters dedicated to recycling cardboard that we have located on the landfill site. A 1999 amendment to the ban increasing the double tipping fee penalty by $400 for large loads containing over 50% corrugated cardboard further decreased the volume of cardboard disposed by a small group of violators. 0 June — August 1996: Conducted outreach to building and construction sector on developing alternatives for managing construction and demolition wastes through a roundtable with local builders and planning department regulators. At the roundtable, the builders' key point was they preferred economic incentives and price signals to any further regulations. September 1996: Issued a Request for Expression of Interest in development of construction and demolition waste facility at Orange Regional Landfill. Most of the seven replies were not directly responsive. One substantive reply from Phoenix Recycling, then of Havelock NC, now of Charlotte, NC, required a waste stream of over 60,000 tons per year as a minimum and at tip fee of $22 per ton. [NOTES: The Havelock C &D recycling facility, still identified as Phoenix Recycling, operates under different management and also accepts selected loads of construction waste containing recyclable materials such as wood, metal and dirt but not very mixed loads with large amounts of unrecyclable material. At their current Charlotte facility, Phoenix accepts mixed loads at $28 per ton and source separated loads at $15. They receive approximately 240 tons per day, but need 300 tons. By contrast we received approximately 120 tons per working day or 33, 600 tons last year of C &D at Orange Regional Landfill] 1993,1998: Differential fees for recyclable construction wood and metal. In 1993, the landfill implemented a ban on yard waste and initiated a lower tipping fee for separated yard waste than solid waste. The lower fee was also applied to solid sawn lumber, excluding pallets and engineered wood waste. That was to encourage separation of wood waste from construction. The differential fee is now $12 v. $40 for mixed construction waste. Very little construction wood is observed to be diverted in response to the differential fees. 1998: the Landfill Owners Group authorized reduction in tipping fees for separated metal to $0. Eighteen percent of the scrap metal recycled at the landfill or 64 tons were diverted as a result of eliminating the fee. The remaining 295 tons were salvaged by the landfill recycling materials handler. 1997- 98: Establishment of salvage program at Orange Regional Landfill C &D working face. One -man salvage operation averages 39 tons per month of scrap metal, pallets, reusable lumber, doors, windows and other items. This represented 1.4% of C &D tonnage last year. The scrap metal (77% of total) and pallets (8 %) are resold to scrap dealers. Reusable goods (14 %) are used in landfill construction, donated to local area non - profits and businesses, or sold to the public. A small amount ( <1 %) was test - ground as wood chips and sold to a local industrial boiler operator. The chips did not meet the company's specifications. No more chips have been produced. Section D Connection to Integrated Solid Waste Management Plan/Goals In 1997, the governments adopted solid waste management goals of a reduction of waste by 45% per person by 2001 and 61% per person by 2006 when compared with a 1991 -92 baseline. The 7 initial focus of the waste reduction effort was to be on mixed solid waste or what we commonly think of as garbage. The plan framework adopted by the governments included methods for reduction of mixed solid waste but not construction and demolition waste specifically. (see attachment 1 -2) Initially a lesser emphasis in the earlier phase of the solid waste plan was to be placed on reducing construction and demolition waste, a target reduction of 20% per person was set in the plan (see attachment 1 -3). The bigger reduction push for the C &D sector, was to follow complete implementation of the elements of the plan to reduce mixed solid waste. However, over the past six months, C &D issues have become more important due to the imminent closure of the C &D landfill. Therefore, the short term emphasis is now on resolving construction and demolition waste management efforts. That resolution may include a significant effort to reduce C &D. Attachment 1 -3 shows a much greater projected reduction in C &D per capita to reach the overall goal by 2006, going down from the 699 pounds per person per year to 300 pounds per person per year by 2006. One thing is clear from the table and from the nature of our waste stream consisting of one -third C &D. We will not meet our adopted goals without a reduction in construction and demolition waste landfilled. In the intervening two and a half years since the plan framework was adopted, management of C &D has clearly become more a priority due to the impending closure of the C &D area of the current landfill. Thus, the planning priorities for solid waste reduction may change in the short run to focus more on methods to reduce C &D while we also look for a more permanent solution for managing the non - recoverable C &D. As of June 30, 1999, due only in some small part to our direct efforts at reducing C &D waste, the C &D generation rate has fallen 15% to 607 pounds per person compared with the 1991 -92 base year estimated generation rate of 699 pounds per person. Table 1 b shows a considerable fluctuation in C &D per capita regardless of population in any given year. Our initial analysis has shown a closer correlation of C &D landfilled per person with weather conditions, specifically annual rainfall, than population growth. Regardless of the causes of reduction in C &D to date, we will not meet our planned C &D goal of 300 pounds per person by 2006 without a plan, a strategy and resources in getting to the reduction goals. Section 4 of this report addresses some possible strategies for moving towards our waste reduction goals in C &D. 8 Chapter 2 Temporary Options for C &D Management In evaluating potential options for managing C &D wastes on a temporary basis we have identified three reasons for which a temporary solution may be necessary. Each of the reasons for a temporary (interim) solution will be discussed in some detail, offering options for proceeding. 1) to provide for C &D wastes until a new C &D landfill is ready, 2) a decision is made to place C &D wastes into the lined MSW landfill, with the intention of finding a final solution for both MSW and C &D wastes once the MSW facility is full, 3) a decision is made to develop a new C &D landfill site that is sized to reach capacity at the same time as the MSW facility, with the intention of finding a final solution for both MSW and C &D waste once the MSW facility is full. A. Development of a New C &D Landfill Will Not Be Completed In Time The only site currently still under consideration as a C &D landfill is the 33 acre Eubanks Road site. Significant geotechnical and other permitting work has been performed and a site plan application is ready for submission to the state for review, pending resolution of two permitting issues. If this site is ultimately selected, we believe that a minimum of 8 months from the BOCC decision to choose this site would be necessary to complete the design and construct the facility. Essentially, this means that if the BOCC makes this decision prior to the winter holiday vacation, we believe the site could be ready when needed (approx. July, 2000). If a new siting process is initiated, we believe that having the facility ready when the existing facility reaches capacity is improbable. It would be our estimate that a new siting process, permitting, design, and construction would take a minimum of one year. It is unclear what the cost of a new siting process might be until a process is more clearly defined. 1. Amending Existing C &D Permit for Vertical_ Expansion We have recently evaluated the concept of vertically expanding the existing C &D landfill by about 18' -20'. It is our estimate that such a modest expansion would extend the life of the existing facility by about 18 months (from July 2000 to January 2002). This expansion would still be 12' below the adjacent closed MSW landfill and would also be well below the surrounding buffer of trees to the north and east. The expansion would not be more noticeable from surrounding neighbors than the current permitted C &D elevation. Unless otherwise directed, we are proceeding to prepare our amendment for submission to the state for approval. Our staff landfill engineer will draft the necessary documents and submit them by Z mid - November, assuming BOCC concurrence. We anticipate that the state will provide a timely approval. Key Issues * additional capacity could obviate the need for a temporary solution and allow time to finalize decisions regarding a new C &D landfill or other permanent solution * relatively easy to prepare the amendment * uncomplicated and noncontroversial nature of amendment anticipated to lead to prompt state approval * no lapse in fund tipping fee revenue Costs There would be virtually no cost related to this option, excepting the staff time involved preparing the amendment and some limited survey work. 2. Placing C &D in MSW Landfill In the event that a new C &D landfill would not be ready at the time that our existing facility is full, one option is to simply shift the C &D wastes, for a few weeks to a few months, to the lined MSW landfill. There are several key issues that we believe should be considered regarding this option. Key Issues * each two months C &D is diverted to the MSW area we would loose one month (approximately) of MSW life * the lined landfill is permitted to receive C &D wastes * there would be no disruption of local disposal service * there would be no interruption of enterprise fund revenue * there would be no illegal dumping or other potential negative repercussions of not having local disposal options * there would be some modest reduction in C &D salvage opportunities Costs The only cost associated with this option is the difference between the value of MSW (lined) airspace and C &D airspace. It is generally understood that a significant difference exists between the value of lined landfill space and unlined landfill space. While precise calculations are not readily available for our facility, the customary estimate of the difference that has been used in professional journals and in discussions with other solid waste professionals is about $20,000- 40,000 /acre for unlined C &D space to about $250,000- $350,000 /acre for lined space. 10 3. Suspension of Acceptance of C &D It is possible to suspend Orange County's provision of C &D disposal services for a few weeks or months. Users could be provided a list of other available permitted disposal alternatives within the Piedmont region and asked to take their materials there until a local facility becomes available. A comprehensive list of permitted C &D facilities state -wide is included as attachment 2 -1 Key Issues * some level of illegal disposal activity should be anticipated * fund would forgo approximately $113,000 /month revenue * inconvenience for Orange County users * hauler could be mix C &D materials with MSW requiring disposal in the lined landfill * relatively easy to implement * would be the first time in 27 years that no local C &D disposal option is available Costs Other than the lost tipping fee revenue for Orange County, all other costs would be borne by the haulers. These additional expenses would primarily be associated with increased hauling costs to more distant facilities. 4. Hauling C &D to the Durham Transfer Station Hauling Orange County C &D to the City of Durham transfer station is an option that the solid waste staffs of both governments`have previously discussed. Several operational/contractual issues have been raised regarding this option (as well as other joint transfer station concepts). Nevertheless, this remains an option, notwithstanding concerns. Key Issues * staff of both governments raise concerns regarding any but the most short term use of this option * there would be disruption of local service * fund would forgo $113,000 /month revenue * it is uncertain what level of illegal disposal may occur * relatively easy to implement * we would anticipate a reduction in C &D salvage opportunities * would require some formal agreement with the City of Durham * inconvenience to Orange County haulers * Durham's transfer station has limited capabilities for accepting any additional waste, particularly C &D wastes 11 Costs Orange County would experience a temporary loss of tipping fee revenue. The haulers would incur additional hauling costs to the Durham transfer facility. B. Placing_C &D in MSW Landfill for the Duration of MSW Capacity This option assumes that the BOCC directs that C &D wastes be placed in the MSW facility until the MSW facility reaches capacity. It also assumes that prior to capacity being reached, that a long term solution for both C &D and MSW is formulated and implemented. If, as is our understanding, the long term solution for managing MSW is to develop a transfer station, then it is our recommendation that we quickley begin the transfer station development process, including the necessary first step of formally selecting a site. As previously stated, we estimate that for each two months of C &D waste going to the MSW facility, we would lose about one month of MSW capacity. This estimation results from current C &D tonnages operating at about half of the MSW tonnages. Key Issues * each two months C &D is diverted to the MSW area we would loose one month (approximately) of MSW life * the lined landfill is permitted to receive C &D wastes * there would be no disruption of local disposal service * there would be no illegal dumping or other potential negative repercussions of not having local disposal options * there would be some reduction in C &D salvage opportunities * MSW landfill would reach capacity in 2004 rather than the currently estimated 2006 * preparations for the development of a transfer station must be advanced to become a current priority * the current transfer station financing scheme must be revisited Costs There are important costs considerations associated with this option. By advancing the need to begin development of a transfer station, we must reexamine the current financing strategy of paying for the facility from a reserve fund that is currently scheduled to have the funds for the facility on hand in FY 2005/06 rather than 2003 /04. The new schedule would leave us about $1,225,000 deficient in this reserve fund. Significant adjustments in the landfill fund reserve fund would be necessary in order to fully fund a transfer station in 2004. Please see also the earlier discussion regarding the relative values of C &D and MSW air space. 12 C. Develop a New Interim C &D Landfill Whose Capacity Would Coincide With the Remaining Capacity of the MSW Landfill This option would require a new C &D landfill be developed, however, the new facility would be sized to reach capacity at the same time as the MSW (lined) landfill reaches capacity. It assumes that a long term approach for both types of waste will have been developed and implemented by the 2006. It does not necessarily assume that there is one solution for both wastes, however, this could be the case. There is no apparent financial or operational benefit to developing such a short duration site except that it could be done in order to coincide with the remaining capacity of the MSW facility. Key Issues * siting and permitting process/decisions for a small, approximately 5 -6 year site would be virtually identical to that of a long term, permanent site * presumably a smaller property could be developed, however, the minimum 200' buffer requirements would still apply * would result in two siting processes/decisions rather than one (interim and permanent) if the long term C &D solution is to continue landfilling what cannot be recycled * costs for siting/development/permitting for a smaller site similar to that of a larger site with much less return on the public fund investment * there would be no disruption of local disposal service * small site development/operations would cost more per ton and generate less revenue per ton * there would be no illegal dumping or other potentially negative repercussions of not having local disposal options * could negatively impact the ability to salvage /recycle because of long term uncertainties regarding location and the reluctance to develop permanent recycling facilities at a temporary disposal site * such a small site would still be committed to a 30 year post - closure maintenance/monitoring required of C &D facilities and related expenses Costs The economics of siting, permitting, and operating a small, limited duration site would be very unfavorable. In fact, we believe that there is no financial benefit to purposely developing a 5 -6 year C &D disposal facility. We believe that it would be much less costly to simply divert C &D to the MSW landfill and develop a final solution for both materials in 2004 rather than in going through the difficulty and expense of developing a new C &D landfill for such a short period of time. 13 Chapter 3 Long Term Options for C &D Management (key issues /costs) We have identified several possible options for long term management of C &D wastes which cannot reasonably be recycled. As each option is examined, it may be useful to keep in mind various long term considerations that are relative to each. These include: * financial impacts/risks * environmental impacts/risks * operational reliability /sustainability * consistency with overall goals /objectives * local control * community acceptance /need * flexibility to accommodate future changes * compatibility with waste reduction/recycling Once the BOCC determines which of the options presented are of most interest, staff can provide more detailed operational and cost information as necessary. A. Selecting the Eubanks Road Site Earlier this year the local governments instituted a C &D landfill siting study which resulted in two sites being considered. These sites resulted from siting criteria developed by the Landfill Owners Group. The BOCC subsequently removed one of the sites from further consideration. The remaining site is a 33 acre site located adjacent to the current landfill on Eubanks Road. Depending on the level of commitment to C &D recycling/waste reduction, the site could last from 14 to 19 years. Key Issues * only remaining site from recent siting process * with minimal recycling/waste reduction site should be considered interim * with significant commitment to recycling site could be considered permanent * would require condemnation of three small parcels totaling about 14 acres * would require agreement with Duke University regarding use of Duke property for buffer area; Duke has agreed * site could be quickly and inexpensively developed * Rogers Road community opposed to site * site could be integrated into existing solid waste operations * selection of this site would resolve a major solid waste problem and allow attention to be diverted to C &D/MSW recycling and waste reduction * would continue to provide a source of revenue to the enterprise fund * significant investment already made for preliminary geotechnical/engineering work * will provide location for emergency /disaster waste response 14 Costs Approximately $64,000 has been spent to date for permitting/engineering for this site. Additional costs to acquire and develop this site would be approximately $350,000. We believe that no other site in Orange County could be acquired and developed as inexpensively. This is due in part to some of the proposed site already being owned by the Landfill Fund and Duke University providing the buffer area. Additional savings are available due to the site's proximity to our existing landfill infrastructure. Funds are available in a Landfill Reserve Fund - Reserved for Acquisitions & Construction. B. Permanently Ceasing C &D Management The option of Orange County simply getting out of the business of managing C &D wastes has been discussed previously. Since state law does not require Orange County to provide such facilities, C &D waste management could be considered as not being an essential public service. C &D waste for FY 1998 -99 totaled 33,577 tons, or 36.6% of all Orange County waste disposed. It is clear that as Orange County continues it's rapid growth the production of C &D wastes will continue. In May of 1998 we conducted an analysis (attachment 3 -1) of the 2,089 C &D waste deliveries for the month. Of the total, 1,255 (60.1 %) were loads of less than 1 ton. This indicates that the majority of the loads are quite small. The analysis also indicated that the Orange County government (permits) was the single largest identifiable small load customer at 286 loads or 23% of all loads under 1 ton. This analysis would seem to conclude that the absence of a "local" C &D disposal facility would most heavily impact customers with smaller loads of C &D waste. Additionally, we also conducted a survey of all incoming loads for a one week period in June of 1998. The results of this survey are also included in attachment 3 -1. Key Issues * have provided local C &D management options since 1972 * no law requiring Orange County to provide these facilities * no other Orange County C &D disposal options available * limited regional C&D options available * would likely result in use of illegal handling of C &D waste by illegal dumping, burning, on -site burying, etc. * continued generation of significant amounts of these wastes is likely given level of growth in the county * even if these wastes were hauled our -of -county they would still count against Orange County in calculating progress toward waste reduction goals 15 * absence of a local disposal facility would likely result in significant reduction of local C &D recycling opportunities * even if major advances made in C &D waste reduction/recycling there will still be substantial waste remaining needing disposal * ceasing C &D operations would be relatively easy to implement * would be likely to increase the cost of construction in the county * would result in the loss of about $1,350,000 annually to the landfill enterprise fund * will not provide for adequate means for emergency /disaster waste response Costs There would be a substantial loss of revenue to the landfill fund budget, estimated at about $1,350,000 annually. Direct costs could include advertising the closure of the facility, cleanup of illegal dumping, and stepped up enforcement of littering and other illegal acts. Indirect costs could include increased cost of hauling and disposal for Orange County haulers that would result in an increased cost for building construction. C. C &D Transfer Station We believe it is possible to construct a transfer station for C &D wastes. We have, however, been unable to locate a transfer station dedicated to C &D materials anywhere in the United States. We have spoken to public and private solid waste professionals, engineering consultants, and equipment vendors nationwide in our pursuit of information regarding these facilities. Such a facility may simply not exist. There are some municipal solid waste transfer stations that accept C &D wastes, however, the percentage of C &D received is generally low primarily due to less expensive disposal alternatives for C &D wastes. We believe the primary reason that these facilities do not exist is due to the nature of C &D materials. C &D waste is bulky, difficult to compact, abrasive, dense, and heavy. The transfer equipment commonly used for municipal solid waste would have to be considerably strengthened and enhanced to withstand the additional punishment of these materials. We think, however, that these enhancements could be made. Additionally, the trailers used to haul the materials would have to be made of 1/4" to 3/8" steel, particularly the floors. This would add significant additional weight to the trailer. Given the strict federal and state weight limits on these vehicles, the quantity of waste they could carry would be diminished, resulting in excessively high costs for transportation. Whereas, the trailers used for transporting municipal solid waste are made of aluminum, thus allowing a greater amount of waste to be hauled in each load. lull Key Issues * would likely require special equipment to be procured * no such facilities exist which we could emulate; no apparent history * hauling large quantities of these materials even short distances would be expensive * permitted facilities which could receive our C &D waste exist within the region at a reasonable tipping fee * we believe it would be possible to build a transfer station that could handle both C &D and MSW wastes * will not provide for adequate means for emergency /disaster waste response Costs While we have not conducted the research necessary to provide reliable cost information, we are certain that the costs to transfer this material would exceed the cost of a typical municipal solid waste transfer station. We would expect the cost of disposal at the distant facility, however, would be reasonable. D. Joint C &D/MSW Transfer Station Most of the issues surrounding transferring C &D waste were discussed in section C. above. We believe that it would be possible to construct a transfer station capable of handling both C &D and MSW. Key Issues * would likely require special equipment to be procured * facilities do exist with receive MSW and small quantities of C &D * hauling costs for MSW would be increased while disposal costs for C &D would be greater * mixing C &D waste with MSW would require the C &D materials to be placed in an expensive lined landfill at a greater distance from Orange County that if C &D were kept separate * will not provide for adequate means for emergency /disaster waste response Costs We believe that the costs for such a dual purpose facility would be significantly more than a MSW only facility. Also, if the two materials were co- mingled, the C &D portion would be required to be buried in a lined, Subtitle D landfill at a much greater cost that disposal in a C &D landfill. 17 E. Regional Solutions Several efforts at regional waste management have been pursued in the triangle area over the past few years, with little apparent success: 1. Greater Triangle Regional Council - Solid Waste Management Task Force This Council was established in 1997, producing a report dated September 1997. The Council did not address C &D waste management but focused on MSW. 2. Triangle J Council of Governments a) We believe the most successful regional effort regarding C &D waste management is Triangle J's Waste Spec. This is a publication that contains model specifications for construction waste reduction, reuse, and recycling. The Solid Waste Department routinely refers this document to architects and engineers. b) The Triangle Region Solid Waste Planners Committee is a permanent committee consisting of solid waste managers/directors from the triangle area. It has on several occasions discussed regional opportunities for managing C &D wastes, including creation of a special C &D Task Force. Due to the nature of C &D waste and its high cost of transportation these groups have been unable to identify practical alternatives for regional cooperation. c) Triangle J's Solid Waste Planners Committee released a report dated April 12, 1999 titled "Regional Cooperation in Municipal Solid Waste Management in the Triangle J Region — Recommendations for Longterm Planning" This report included C &D waste management in its discussions. The report recommended additional work by Triangle J in developing desirable future scenarios that could eventually lead to future research or action. The timeframe for completion of the work is uncertain. d) Triangle J is sponsoring an event called Future Search. This event will bring together about 70 people from the Triangle J area to 1) envision how we should be managing our solid waste one or two decades from now, and 2) begin planning how we might act together to achieve this vision. The group will consist of a diverse group of stakeholders including elected officials and staff from Orange County governments. I Informal Discussions Between the City of Durham and Orange County Please see discussion in Chapter 2.A.4 18 F. Initiating a New Site Search It would be possible to initiate a new C &D landfill site search. A decision by the BOCC to do so would likely need to begin as soon as possible due to the remaining capacity at the current facility. However, if we obtain the vertical expansion of our existing facility and gain and additional 18 months, a new siting process could be concluded and new site permitted and developed without any interruptions. If this option is considered the BOCC should, as soon as possible, begin to contemplate the county screening and selection criteria that would guide the search. A schedule should also be considered. Given the Orange County governments past lack of success at siting solid waste facilities, there is little indication that such a new process would be successful. Key Issues * would create another difficult siting process for both citizens living near the identified sites as well as elected officials and staff * no assurance of success in identifying a site, particularly as property must be freely offered * some new site could be discovered that could provide long term security for C &D disposal as well as accommodate expanded recycling programs * could expend $200,000+ in the search process Cost The costs associated with a comprehensive C &D landfill siting process would likely exceed $200,000. If a long term facility is identified and developed, it would provide a permanent source of supplemental revenue for the landfill enterprise fund. 19 Chapter 4 C &D Recycling Report Recycling/Waste Reduction A. Prior Staff Research The staff has conducted a significant amount of research on construction and demolition waste over the past four years. A descriptive list of the research is included below. Work related to the recent C &D siting process is not included in this list. List and Description of Studies and projects on Construction and Demolition Waste Undertaken by the Town of Chapel Hill Solid Waste Management Department 1996 —1999. Prepared October 5, 1999. Updated October 21, 1999. March, 1996: Implemented pilot program to divert 200 tons of asphalt roofing shingles from landfill by charging lower tipping fee and working with roofers to prepare shingles for diversion. Project ended in 1997 with no long term market available for old shingles. June 20, 1996: Options for reducing construction and demolition waste. This memorandum outlined regulation of waste on -site, use of differential tipping fees to encourage source separation, processing of mixed construction waste, development of a new C &D landfill and establishing a C &D waste reduction goal to complement the MSW waste reduction goal. July 11,1996: Establish construction waste reduction goal of 25% reduction, recommend that local governments adopt an ordinance strengthening the solid waste planning ordinance. August 15, 1996: Alternatives to Landfilling Construction and Demolition Wastes at Orange Regional Landfill: This memorandum describes several alternatives to pursue including burial in the lined landfill, acquiring additional land for burial, banning C &D waste, acquiring additional land for a recycling facility. September 1996: Solicitation of expression of interest in C &D recycling in Orange County. 60 requests packets sent out. Seven replies received. One feasible proposal from among those. That one required 60,000 tons per year of C &D. October 1996: Week -long visual survey by staff of all loads entering C &D area. Data compiled and translated from volume estimate to weight estimate. November 21, 1996: Presentation of results of construction waste sort conducted in October 1996. This showed a diversion potential of approximately 25% of the waste stream — wood, metal and drywall. December, 1996: Presentation of construction waste reduction options with cost estimates attached. Building a semi - automated facility could cost $1.5 million. Estimate and concept plan were reviewed by consulting engineers with expertise in C &D processing. 20 January, 1997: Established public forum on construction and demolition waste management and provided information for the forum. January, 1997: Regulating C &D through ordinances: This resolution urges the boards to pass C &D ordinances that require separation of C &D and incorporates solid waste plan regulations into all the plan development processes. January, 1997: Selection of C &D waste management options: developed cost estimates for five options for Orange County — expand landfill at existing site, new landfill, no- build, semi - automated recycling facility, transfer station. February, 1997: presentation by Richard Franck of Chapel Hill Town Council on Regional Approaches to construction and demolition waste. Review of option in Sarasota County Florida (Slides only, no written report) Presentation of data on potentially recyclable construction waste. (previously presented, November 1996) May, 1997: Budget items for Construction and Demolition waste separation program: passed, staff hired December 1997 and program initiated. First quarter 1999, average diversion of 45 tons per month averaging. 50% metal. 40% pallets, 10% reusable items including other lumber, furniture, and fixtures. May, 1997: Construction waste reduction program: Request to establish source - separation and enforcement program and ordinances for each jurisdiction, not passed. June, 1997: Consideration of funding mechanisms for source separation and enforcement program other than use of tipping fees. One approach presented was use of a surcharge on building permits. That approach later found to be not allowed by statute. Revenue from permits was not closely enough tied to expenditure for C &D waste prevention. February, 1998: Alternatives for a C &D disposal facility: Options for locating a C &D disposal facility. Resolution by LOG to local governments recommending search for a new site. *Included Joyce Engineering Report on " Study of Solid Waste Management Options for Greene and Neville Tracts, Orange Co. NC" submitted Feb 4, 1998. Part of report specifically about C &D landfill options for this site including conceptual plan. March, 1998: Search for a C &D disposal site. This memorandum to the Chapel Hill Town Council presented the State's criteria for a C &D site and requested Council authorization to proceed with a search for a stand -alone C &D landfill site. May, 1998: Consideration of Future C &D sites. Joyce Engineering study of five potential C &D sites resulting from previously authorized search for property in Orange County for C &D landfill. By the time of the meeting, two sites were sold, two were available, one was too wet for a landfill. 21 May, 1998: Survey of C &D origin of loads: surveyed all trucks for one week carrying C &D to landfill. One conclusion: 50% of vehicles were pickup trucks. June, 1998: Funding for C &D site acquisition September, 1998: Public hearing on C &D sites with preliminary engineering/information reports on Eubanks, Blackwood and site off Old NC 86. October, 1998: Regulating Construction and Demolition Wastes: Memo recommends that Owners Group consider regulating construction and demolition wastes to reduce their generation. Ordinance prepared for Chapel Hill by attorney /intern for Solid Waste Dept. and given to County Attorney for review. December, 1998: Update on construction and demolition waste options. Re- presented previous information on regulating C &D for source - separation and semi - automated, centralized, mechanical separation. December, 1998: Engineering report on additional C &D siting options with maps of various sites. February 1999: Letter report from Orange County Planning Department regarding: Burying C &D materials in Orange County. March, 1999: Request for information on C &D landfill siting. Description of criteria used for identifying potential sites for a C &D landfill. Reply to LOG member query. That stated 16 sites were identified, none of which was ultimately found suitable. May, 1999: Construction and Demolition Waste Reduction Program and Ordinance The report summarizes the possible approaches to regulating construction and demolition waste. The resolution from the LOG recommends that the County develop a single county -wide ordinance regulating C &D waste rather than have each jurisdiction establish its own regulatory procedures. B. Regulatory Measures One of the two general approaches to reducing construction wastes involves use of a combination of regulatory measures and pricing tools to control the management of C &D debris. One C &D management model couples use of these regulatory and pricing measures with source - separated processing and marketing of materials at a centralized, publicly controlled site. The other general approach is to construct and operate a centralized sorting facility to separate and process mixed C &D materials. The sorting facility approach is addressed in section C2 below. Section B immediately below focuses on the first approach. Section C1 focuses on the corollary processing and sorting of the source - separated materials. 22 Construction and demolition waste can be regulated in four ways: * using planning requirements, * by requiring job site separation, * requiring separation by the hauler, and * at the landfill /management site. In addition, prior information and education of designers, builders and developers can take place that creates the potential to reduce waste through efficient design. An example of this approach is Waste Spec, the publication produced by Triangle J Council of governments that provides designers and architects with model specifications for how to handle every aspect of construction and demolition waste. Use of these specifications has been proven in specific case studies documented by the COG (attachment 4 -1) to reduce waste management costs at most construction projects where the specs were applied. The most effective approach to reducing the amount of construction waste landfilled would integrate all these methods. 1.Plannin,Q for waste reduction: As a condition of granting permits to develop, a government could require that each developer submit a plan demonstrating how they intend to manage the discards from the construction and demolition process at the proposed development. For example: The Town of Chapel Hill now requires a solid waste plan submittal for any project requiring a special use permit or zoning compliance permit. The Solid Waste Management Department manages this function as well as provides information on construction materials with recycled content. The Town's Development Ordinance requires that the project developer submit a solid waste plan that states: How he /she will reduce and recycle construction and demolition waste generated at the job site. How recyclable materials generated at the completed facility will be handled, including the number and location of containers and how service vehicles will be able to access them. The Town's solid waste plan requirement creates an opportunity to educate designers, developers and builders on construction waste reduction and recycling, but as it is currently written, there is no requirement to implement the parts of the plan that address how material could be recycled from the job site. Only section b, requiring that some outdoor space be allocated for recycling, is enforceable undercurrent Town Development Ordinance. The solid waste plan requirement is currently being re -written to strengthen and streamline it. W Key Issues: A solid waste planning requirement could be adopted by other jurisdictions in the County as a condition of issuance of development permits. This would require coordination among jurisdictions to adopt similar ordinances and staff to enforce the ordinances. The Planning and Building Inspections Departments would need to be involved to track when and where developments were permitted, scheduled and initiated. Costs Staff would be required for effective implementation of these ordinances. Generally a requirement to plan is useful if either economics or enforcement of regulations results in implementation of its measures. The sections below outline how those regulations might be implemented. 2.Requiring waste separation at the source. It is possible to require that builders separate recyclable materials. This would essentially be a mandatory recycling ordinance for construction, and possibly demolition, waste. It could be enforced by requiring source separation of certain marketable materials as a condition of issuance of the building permit or as part of a general ordinance regulating construction and demolition waste management in Orange County. There are some nuances as to how this type of regulation may be implemented and enforced by local governments. An attorney, working as an intern in the Solid Waste Mangement Department previously (October 1997) developed a memorandum analyzing local authority to implement such regulations. Subsequently he drafted an ordinance (Feb. 1998) that would regulate construction and demolition waste separately from the building inspections framework. The draft ordinance was written in the context of the North Carolina municipal code which may differ from the County code. We have requested a review of this ordinance by the County attorney to determine its applicability to County code of ordinances. Key Issues: We believe that mandating source - separation of construction waste it is better pursued as a separate ordinance under the police powers of the County, because it appears strategically, politically, and legally difficult to make a mandatory source - separation ordinance part of the building code for only Orange County or anywhere in North Carolina as long as approval of the Building Codes Council is required. 24 A single county -wide ordinance could be used to require source - separation that each jurisdiction would adopt by reference. Costs: Staff would be required to ensure enforcement of separation. If building inspection staff were used to enforce the source - separation requirements, considerable inter - departmental coordination would be required. 3. Licensing Waste Haulers in the County and making separation of construction and demolition materials a condition of the license. This is a measure that would be necessary along with the mandatory source - separation requirement for builders to further ensure proper separation. There is so much construction that on -site inspection of all sites is not practical. It is also possible that haulers could go to disposal locations other than the local landfill so enforcement at the only the landfill would also be insufficient. Requiring separation by haulers is part of the draft ordinance referred to above. The point of enforcing the source separation ordinance for haulers is to create another legal tool for separating construction and demolition waste. It may be difficult to enforce source - separation at the building site only. Under the draft ordinance, haulers would have to be licensed to do business in Orange County, and the license would be revocable if the hauler were found hauling improperly segregated materials. Key Issues: Licensing of haulers is an additional administrative function that would have to be applied to those based in the county as well as doing business here. Many nuances to the licensing procedure would need to be worked out before it could be properly constructed and applied. Inspection of loads and enforcement would be potentially complex. Costs Licensing costs are likely small and could be integrated into existing issuance of business licenses and other similar permits. Enforcement of source - separation by haulers would require staff. 4. Providing Differential Tipping Fees and Material Bans at the C &D Landfill These measures are corollary to requiring waste separation at the construction site. They are discussed in more detail in section D. Bans and fees would be necessary to provide waste reduction incentives at the local, publicly -owned landfill, but not sufficient because the C &D waste may have a different destination. Regardless of where construction and demolition waste generated in Orange County is disposed it will count against our waste reduction goals no matter 25 where it is disposed. Further, disposal at sites other than a local site simply shifts the location but does not contribute to waste reduction. Mandatory source - separation of multiple C &D materials is not practiced anywhere in North Carolina. The only places in the country we are aware of now requiring source separation of construction and demolition wastes are Portland Oregon and Passaic New Jersey. Any strategy based on policing of C &D waste to ensure proper separation for recycling or reuse, would require significant enforcement infrastructure. Key Issues: This is the simplest aspect of regulatory measures to implement as we have control over the existing C &D landfill. The Board of Commissioners could enact disposal bans or additional fees for improperly separated loads. Too rigorous a set of enforcement regulations could result in illegal dumping, loss of revenue from materials going to other facilities or numerous conflicts over tolerance levels for "banned" materials. e.g. "How much wood is too much mixed in a load where clean construction wood was "banned ?" Costs: We believe that if bans or differential fees were implemented, we would be obligated to provide alternative management facilities and techniques for the source - separated materials. Those facilities would require staff and capital investments to be effective. C. Processing and Sorting Construction and demolition materials may be source - separated as result of regulation, economic incentives and disincentives, or desire of construction and demolition contractors to conform to environmentally sound practices. Separated materials are typically delivered to a processing site. Even when source - separated, additional handling and processing are required before such materials are marketable. C &D materials may also be mixed together at the work site and delivered to a disposal or recycling facility and disposed or separated there. Typically, it is less expensive and more efficient to processing and recycling operations at a disposal site to eliminate need to further handle and transport residues and unrecyclable loads. 1. Source Separation Under either the source - separated or mixed debris processing scenario, there are expenses associated with sorting and processing materials for markets. It is typically simpler and less expensive to manage source - separated materials than mixed materials received at a recycling site because the sorting costs have been " shifted" upstream to the generator or hauler. 26 Providing differential fees or bans on landfilling of certain materials can result in source separation. Whether bans are state - mandated or locally passed; they can be effective with rigorous enforcement. For example, The Orange Regional Landfill has had success with the state - mandated ban on yard waste and the local ban non - residential corrugated cardboard. We now convert over 5,000 tons annually of yard waste to marketable mulch and divert enough corrugated cardboard to have saved eight months of landfill space over the remaining life of the landfill. Many C &D facilities throughout the country routinely offer lower tipping fees to attract source separated material. Salvage operations at the working face or tipping floor can also be effective ways to divert reusable and recyclable materials from the waste stream. The three centralized processing facilities described in the table below, Iowa Central Demolition and Recycling facility, Mecklenberg County's C &D recycling facility and the Gabbert and Meyer facility in Sarasota Florida referenced below all have a hand- picking salvage component upstream of their centralized processing areas. Very few facilities that manage C &D have only a hand - picking operation or source - separated processing only. It is most often an integrated component of a larger centralized processing system. The section below draws examples of processing needed to further manage source - separated loads from primarily our staff experience at Orange Regional Landfill C &D area. The handling and market quality issues we have identified are typical of those faced by any C &D processor. At the working face of our current C &D landfill, we collect for diversion to recycling or reuse approximately 40 -50 tons per month of scrap metal, reusable goods, pallets and dimension lumber. Some of this material arrives at the landfill source- separated, some is picked from the working face and some is identified as an easily separable part of the load and contractors are requested to separate the material further. Some small contractors voluntarily source - separate with no additional incentives other than to avoid landfilling of potentially reusable materials.. Under any conditions, even source - separated materials require further handling and processing, therefore costs before they can be marketed. Metals: At a minimum, metals recycled at the landfill now must be inspected by staff for contaminants, drums, and other types of metal objects prohibited by the scrap buyer. Once materials are inspected, we load and compact metal in rolloff containers prior to collection by the scrap dealer. A zero tipping fee for metals provides some separation incentive. About 20% or 64 tons of the 332 tons of scrap metals collected at the landfill last fiscal year, were brought in source - separated and received the zero tipping fee. Clean Wood: All the potential markets we have identified have stated, wood waste must be free of painted and treated wood and most also require that most nails and other be removed. Some potential markets accept only solid lumber and no plywood or other engineered wood products may be accepted even if unpainted and untreated. Rigorous inspection would be 27 required to ensure any separated wood was free of unwanted materials. Our current incentive fee of $12 per ton for separated wood attracts almost no separated loads of wood waste. Wood markets are so depressed that in most cases, we must pay to grind the wood and load it into trailers before it is marketable. Typical market value is about $10 per ton delivered. Grinding costs routinely exceed $10 per ton. The nearest solid fuel boilers are at least 40 miles away. The one whole -board market we have identified in Charlotte requires that lumber be free of nails and over 4 feet long and pays nothing for the wood. Wooden shipping pallets must be mostly intact, to the point where they are stackable and staff must stack and sort them by size once they are deposited at the landfill. We are paid a price of $0.50 for only one popular size of pallet that makes up an average of about 50% of the load. The other sizes are taken at no fee. We must load them and the company hauls them to Greensboro. Drywall must be source - separated and free of contaminants. Typical handling includes dumping drywall on a covered concrete tip floor, screening for contaminants, loading into a shipping container, keeping drywall dry and shipping a minimum of 35 miles one -way to a market in Goldston. The tip fee is $12 per ton their gate plus the hauling costs. We estimate a development cost of about $100,000 for a drywall processing facility and transportation equipment. Additional staff requirements would be determined by the development of other operations situated in proximity to a drywall facility. Inert Debris: Recycling of this material costs about $7.00 per ton according to national studies. Locally quarried stone for road base and other construction applications is typically available for less than this cost. Dirt which would compete with the fines or small particles produced as a by- product in any C &D processing operation is cheaper and more readily usable than fines. Any separated inert materials such as brick, block concrete, must be crushed for market and meet various engineering specifications. It must compete against locally quarried, high quality rock products. State and local engineering specifications often limit the applications of crushed inert products to very low impact areas such as under sidewalks. Other: There are niche markets for plastic buckets, free of residues and debris, vinyl pipe and siding, and certain types of carpeting. Market specifications are rigorous. We receive relatively small amounts of these materials and source separation would entail a large storage and preparation area with little material potentially available for diversion. No viable market has yet been identified for post - consumer shingles. It is possible to use a series of regulations and economic incentives to cause some source - separation. The per ton cost to process these materials at a central site is probably less than if a centralized facility to process mixed C &D were built. Key issues: Tolerance levels for receiving materials as source separated require rigorous inspection. 28 Costs With the exception of metals, all the materials markets are fairly low -value unless a capital intensive, value -added processing line, such as producing wood furnish for particle board, is added to the separation facility.There are costs associated with handling all types of materials, source - separated or commingled. 2. Centralized Processing for mixed C &D Center There are a number of semi - automated C &D processing facilities around the nation. In our December 1998 report to the Landfill Owners Group, we reviewed three of them. All have a specific relation with the public entities in whose jurisdiction they operate, ranging from being co- located at a public landfill to free County land to flow control ensuring that C &D waste enters the facility. All offer differential fees for source - separated materials. That economic incentive can be sufficient to encourage separation if the fees for mixed materials are high enough and the alternative destinations for materials are far enough away to cause haul costs to exceed the lower tipping fees such facilities might offer. The results are shown in a table below and have been updated for the current year. Semi - automated recycling facilities for management of mixed construction and demolition waste can divert from 25% to 95% of incoming materials from landfilling, depending on what is permitted to enter the facility, prevailing tipping fees, available markets, and other specific local conditions. The three facilities from which we gathered information handled a minimum of 50,000 tons per year each. We accept about 30,000 tons per year of in- county C &D only. To be cost - effective, these capital- intensive facilities typically handle more than our waste stream alone would provide. The remander of this page is intentionally left blank. Q, Table 4 -1 Construction and Demolition Waste Processine Facilities Name and location Tons per Tipping Fee Percent Types of Remarks year Diversion Materials Recycled Phoenix, Charlotte NC. Free land 45- 50,000 $25 per ton 25%-35% Wood, metal, Manager says donated from Mecklenberg Co. Inert debris, they need to be adjoins County compost facility drywall, cardboard. at a landfill. where wood waste can go. They ship out residues for landfilling Meyer & Gabbert, Sarasota FL. 55,600 $44 per ton or 95% Everything except Inert material Special contract with County. Co- $9.65 per cubic carpet, insulation, used at located at public landfill yard ungrindable paper, adjoining plastic sheeting, publicly owned filter cloth, landfill for furniture and cover and road buckets materials Central Demolition and 93,500 $30 per ton 45% Yard waste, Wood, Recycling rate Construction. Des Moines, Iowa mixed waste, "recovered" metal, drywall, is that reported (All private at private landfill). $20 per ton for for reuse, corrugated to State of Has flow control arrangement all -wood loads recycling, or cardboard. Asphalt Iowa. Landfill with local solid waste authority. from select large diversion e.g. shingles (20% of to close within customers, $45 43% used for recovered two years. per ton for cover materials) now Opening new stumps. Wood material used used in road blend recycling plant used for binder for cover at for dust control on on 50 acre site in compost, MSW local County gravel in 2000. marketed &C &D road. Will blend Facility is self cooperatively landfill. <1% with black top in supporting with private organic paving parking lots from tip fees composter, content. and bike paths. Test plus revenues wood fuel and every load for for material furnish for fiber asbestos. sold. Have board. contractual relationship with the public sector requiring material to go there. C &D processing facilities are capital- intensive and relatively high -risk operations. Most of those surveyed have a specific relationship with the public entities in their region that reduces risk and shares costs. One possible approach to developing a facility. might be to solicit bids, contract with a company to establish a construction and demolition waste management facility on land that we own and allow them to own and operate the facility and charge a tipping fee. This would enable greater 9TO control over facility operations than if a private facility were simply encouraged to set up operations and accept C &D wastes originating in Orange County. Other public - private partnership arrangements are also possible. Any public - private arrangement would require using a contractor with a proven track record in this arena due to the high risk of such operations and high failure rate acrooss the nation. There is often a differential between reported true recycling and actual practice. For example materials reported as "beneficial fill" may go to improve a road on -site or fill in a " low area". Another approach could entail building, owning and operating our own facility. Under this sceanrio, any revenue from tipping fees or sale of materials would come to us. In December 1996, staff conducted an analysis of constructing a semi - automated construction and demolition waste recycling facility with some hand - picking and some automated sorting.. (The whole December 1996 memorandum is available on request) An update to the costs of the facility shows an estimated first year cost of $2.09 million including land, equipment, labor and maintenance. Annual costs including an eight year amortization would be about $650,000. The cost per ton estimate is increased from $53.00 per ton to about $56 per ton, assuming one- third of incoming materials can be recycled, including wood, metal, drywall and reusables. This does not include the heavy construction debris of rock, block, brick and concrete that could be used as aggregate in road construction because the crushed mixed inert loads won't passs NCDOT compaction regulations and the cost of locally available rock is currently too low to make crushing the inert fraction a worthwhile endeavor. Inert debris is much cheaper to landfill. If this material becomes marketable, the percentage recyclable could increase to an estimated 70 %. Key issues: Siting, designing, building and operating such a facility is a major undertaking. Most facilities investigated take in far more than the 30,000 tons per year of C &D we average. Many restrict materials to exclude the heterogeneous mix with accept to landfill now. Cost: Processing facilities are capital and equipment intensive. They can also employ a significant amount of manual labor to hand -pick materials, high grade metal loads and perform the many other tasks associated with such a maintenance - intensive operation. A more detailed, updated cost estimate could be provided if the Board were interested in this approach to managing C &D. D. Differential Fees/Bans It is certainly feasible to extend the current set of differential fees and bans at the landfill to include a greater variety of materials than the yard waste and corrugated cardboard now banned from landfilling. Similar bans /penalties could be extended to include regulation of haulers and 31 prohibition on mixing C &D wastes at the building site (see Section B). Those on -site bans would be more difficult to enforce than landfill bans and would certainly require additional staff to be successful. Differential fees are practically applicable only at the gate of a C &D debris management facility. We believe that use of differential feesibans such as now applied to yard waste and corrugated cardboard could be practically applied to clean wood and metal wastes within certain limits to encourage greater diversion. A ban on drywall could also be considered. All would probably have to have a certain tolerance level to be practically acceptable by builders. It is impractical to institute too wide a range of materials bans as enforcement and determination of contaminant levels would become an issue with each hauler on each load. Use of the differential fees and bans to ensure source - separation must also include additional processing as noted in section C.2 above and additional staff, equipment and facilities would be required to manage the larger amount of materials that are separated and must be processed. E. Available Grants: Periodically both State and Federal grants are available for C &D management. This an area now receiving much more attention as recycling of the municipal solid waste stream begins to mature. In general we plan to pursue such grants as available. We have recently applied for a grant from the State of North Carolina Division of Pollution Prevention and Environmental Assistance (DPPEA) for $17,000 to encourage separation and diversion of wood wastes for grinding and marketing. The grant would cover the cost of grinding approximately 1,000 tons of wood waste. Staff effort would be involved in separating, inspecting and loading materials. The hauler would charge no additional fee to take the wood chips to market. We will also experiment with coloring some of the chips for sale as a colored mulch product. If we receive the grant, and the project is successful and we proceed with additional wood waste diversion, then we would incur ongoing handling, grinding and loading costs for each ton of wood diverted. Those costs including grinding, handling and marketing, would likely exceed the current $12 per ton fee charged for source - separated clean wood wastes. F. Successful Facilities Elsewhere: In section C above we have provided basic information about three successful recycling processing facilities we are aware of. We have also attempted to get more information about another Phoenix Recycling facility in Havelock, NC, no longer directly associated with the one in Charlotte. They have not returned our phone calls. 32 There are many other examples of successful and failed C &D recycling facilities throughout the country. They often have much higher throughputs than the 30,000 tons of mixed C &D material per year we receive at Orange Regional Landfill. Our current tip fee of $40 per ton is probably a fee level that could support on -site C &D recycling efforts in addition to those now undertaken, if revenues from C &D management were not otherwise used to support critical solid waste management operations now underway. A detailed budgetary analysis of processing options would show what types of programs could be undertaken and their estimated costs. As with other options in this report, we will pursue detailed analysis of C &D processing at the Board's request. 33 Chapter 5 Solid Waste Advisory Board/C &D Task Force Role It is our understanding that the Solid Waste Advisory Board (SWAB) will perform as an advisory board, reporting directly to the Board of County Commissioners. The Interlocal Agreement establishes the board and contains provisions relating to its membership, responsibilities, terms, voting, and procedures. The board may adopt its own rules of procedure not inconsistent with the provisions of the Interlocal Agreement or policies and procedures governing the various boards and commissions of the Board of County Commissioners. Regarding the C &D Task Force, we understand that it also will advise the BOCC directly, but with a more limited charge relating to construction and demolition recycling issues. Additionally, the Task Force will not be permanent, as is the SWAB, but exist only for a limited duration of 6 months. The Solid Waste Management Department will assist the County Manager in providing staff support for both groups. 34 Chapter 6 Board of County Commissioners Guidance to Staff Following the November 9 work session, staff will be available to conduct additional research or provide any other additional information the BOCC may request. We will be prepared to explore new or modified C &D recycling/waste reduction options. We will be prepared to examine new or modified temporary/permanent scenarios for the management of C &D waste that cannot be recycled and must be disposed. We are also prepared to immediately began providing staff support to both the C &D Task Force and/or the Solid Waste Advisory Board. If the BOCC can agree on some fundamental elements of a C &D management system they wish to pursue, we will welcome the opportunity to formulate a comprehensive operational and financial analysis for further consideration and possible implementation. 35 ATTACHMENTS ATTACHMENT 1 -1 C &D Related Projects by Triangle J Council of Governments Prepared by Judy Kincaid, Solid Waste Projects Director, TJ COG, October 1999 * Produced WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling, an award- winning, comprehensive manual for architects and engineers. * Produced ten case studies of construction projects from around the United States that successfully used the WasteSpec manual without increasing project cost. * Produced a guide to construction and demolition waste recycling and disposal sites in the Triangle region, including a map. * Partnered on the production of an instructional video on taking down old buildings and salvaging the materials for reuse. * Produced a state - funded project to study construction and demolition waste reduction strategies in four Triangle counties. * Conducted a field study illustrating the cost equivalence of recycling versus not recycling on a residential construction site in Durham. * Initiated a study conducted by the National Association of Home Builders Research Center on reducing residential remodeling waste. * Assisted with the production of a 12- minute video in Spanish and English aimed at giving construction workers basic information on how and why their waste should be reduced and recycled. * Organized a site visit to Wilmington for Triangle entrepreneurs to learn about the economics and practicalities of starting a construction site clean-up and recycling business, which had been established for Wilmington contractors. * Organized, with the Wake County Solid Waste Management Division, a day -long workshop on green building for architects who design local government buildings in Wake County. ATTACHMENT 1 -2 Chapter 3 Each plan shall be designed to achieve the solid waste reduction goals established by the plan. The basis for the overall reduction goals of 45% by 2001 and 61% by 2006 is a desire by all governing bodies in the County to substantially reduce the amount of material that has to be landfilled. Implementation of the plan would thereby lessen the impact of any future landfill that might be built in Orange County or elsewhere and divert valuable materials for reuse and recycling. Those percentage goals were set to conform to the State base year. Table 2 -1 shows the percent reduction by sector necessary to meet the per capita goals in the target years of 2001 and 2006. The plan framework shown immediately below addresses reduction of mixed solid waste Construction and demolition waste is addressed separately. I. Mixed Solid Waste Plan Framework for Orange County, North Carolina [This framework was approved by the Landfill Owners Group May 281997 and recommended to the local governments. Each individual local governments considered and approved this plan framework throughout the month of June 19971 raoie s -i VASTE PREVENTION (To be decided by individual govenunents) • Collection Bans • Volume based fees of vranee %;ountv's Bona waste rian for mixea Bona waste xeaucaon COLLECTION I PROCESSING (To be decided by individual governments) • Convenience centers for rural residential solid waste • Yard waste and bulky item collections (for a fee ?) Universal at- the - source solid waste collection for urban commercial and residential sectors • Mulching facility to handle yard and wood waste (already in place) Not part of plan now but may be considered at a future date; • Centralized Organics Composting to handle MRF mixed paper residuals and other organics Planning level cost data for program implementation are provided following the description of the program framework. The waste reduction plan framework for mixed solid waste includes: 3 -1 A. Waste prevention: [The first three items below can be considered by the Landfill Owners Group. The last two -- mandatory recycling and volume -based solid waste costs - could, under current agreements, be enacted by the individual local governments only.] 1. Public education: increases in the amount, type and targeted audiences. 2. Differential landfill fees: We have these in place now for yard waste, clean wood waste and corrugated cardboard. Higher or lower fees could be applied to other materials to encourage their diversion from the landfill in favor of some type of separation. 3. Non - economic incentives : This includes all the other strategies for influencing waste reduction such as the solid waste plans now required for new, non - residential construction in Chapel Hill. 4. Mandatory recycling, Also known as collection bans individual governments could apply a variety of bans in each sector -- residential, commercial or apartments. Some enforcement would be necessary for success. 5. Volume -based fees: Also known as pay -per- throw, treats solid waste as a utility. Under this approach, local governments would set up a system of user fees under which residents and businesses would pay for varying amounts of garbage collected. A proper fee structure with good enforcement has proven to reduce waste in many other communities. B. Collection: [Of solid waste and recyclables] The Owners Group has recommended and the governments adopted a strategy that includes weekly universal recycling collection in incorporated areas for residential, commercial and apartments and also for commercial recycling in unincorporated areas. For the unincorporated areas, in the near term, the Owners Group recommends continuation of every other week curbside recycling in the relatively densely settled subdivisions, combined with the system of sanitation sites such as now exist for solid waste and recycling collection. This means about 50% of residences in the unincorporated areas will receive curbside recycling in the short run. In the longer term, the unincorporated areas may receive more widespread curbside recycling, leaving only those estimated 10%u of homes that are physically inaccessible by large recycling trucks to use solid waste collection centers. Recycling tonnage and costs shown in Table 3 -2 assume this more universal recycling in the unincorporated residential sector. Currently, there is no universal commercial recycling. That would be the biggest single new collection expense; it would also have the greatest potential for increasing recycling. Solid waste collection and management would continue to be under local government control. Their programs are described in each local government's report. It is possible that large increases in recycling may reduce the need for solid waste collection so the local governments may save on collection and disposal costs as the rate of waste generation goes down. 3 -2 C. Processing: If the amount and types of recyclables is increased significantly to reach the overall 61 % reduction goal by 2006, then Orange County would need a processing facility to sort out the recyclables and make them market- ready. Collection at the curb or business is, in some ways, the easiest part of the recycling cycle. Processing, sale and reuse are more challenging, since that is where the real "business" of recycling is. Sorting and processing are especially important if we are to achieve a long -term stable market for mixed paper. D. Disposal Any comprehensive solid waste management plan must account for final disposal of residuals remaining following waste reduction, recycling, composting and other volume reduction measures. The plan described for Orange County assumes that the Orange Regional Landfill will continue to be the final disposal facility as long as it is available. The current projection shows it lasting until 2005, without inclusion of construction and demolition wastes. At this time, there is no additional disposal facility selected, so we cannot state definitively how will handle disposal during the last two years of the ten year horizon stipulated in this plan. E. Goal for mixed solid waste 1. The goal for 2001 for all of Orange County is to reduce solid waste per capita by 45% by 2001. This includes a reduction in mixed solid waste from the current 1,100 pounds (0.55 tons) per person to 920 pounds (0.46 tons) per person by 2001. (see table 2 -1) 2. The goal for 2006 is to reduce waste 61% per capita when compared with 1991 -92. This includes further reduction of mixed solid waste to 760 pounds (0.38 tons) per person by 2006. According to the state of North Carolina, through the end of 1995 -96, we have reduced mixed solid waste per capita by 19% compared to 1991 -92. F. Timetable for Meeting the Mixed Solid Waste Reduction Goals Meeting the timetable for achieving the mixed solid waste reduction rates is dependent upon increasing waste prevention efforts, broadening recycling collections and development of a materials recovery facility that can process and market both commingled and source - separated recyclables. Meeting the 2001 goal assumes the following schedule: 1997 -98: Evaluate the alternatives for ownership, operation and design of the materials recovery facility (MRF) acquire facility construction agreement, 1998 -99: Construct MRF 1999 -2000: Open it for operation 3 -3 ATTACHMENT 1 -3 Table 2 -1 Comparing Waste Reduction Goals Using 1988 -89 v. 1991 -92 as Base Year Waste reduction goals are shown for each sector for each target year. Row 9 shows the percent reduction in mixed solid waste compared to the 1991 -92 base year. Note that the total tons of mixed solid waste landfilled (Row 6) and the per capita landfilled (Row 7) are the same; the percentages change only due to a change in the base year. Similar information is presented for construction and demolition waste (Rows 10 -13), the total of mixed waste and construction and demolition waste (Rows 14 -17) and Total Waste as defined by the State (Rows 22 -25). -End Chapter 2- 2 -2 A B C D E F GI H I J I K 3 LOG NC 4 Base year Base Year Goal Year Goal Year 5 Year 1988 -89 1991 -92 1995 -96 2401 2M 6 Mixed Solid Waste tons 67,502 ' 65,981 ' 58,372 ` 53,783 47,794 7 Mixed Solid Waste (tons/capita 0.76 0.69 0.55 0.46 0.38 8 Percent reduction versus 1988 -89 n/a 10% 28% 40% 50% 9 Percent reduction versus 1991 -92 n/a n/a 19% 33% 44% 10 Construction &Demolition Waste tons 31,624 34,145 31,452 34,075 18,621 11 Construction & Demolition tons/ ita 0.36 0.35 0.30 0.29 0.15 12 Percent reduction versus 1995 -96 n/a n/a n/a 4% 50% 13 Percent reduction versus 1991 -92 n/a n/a n/a 20% 58% 14 ITotal MSW + C &D landfilled tons 99,126 100,126 89,824 87,858 66,415 15 Total MSW + C &D landfilled tons/ca ha 1.12 1.04 0.85 0.75 0.53 16 Percent reduction versus 1988 -89 n/a 7% 24% 33% 53% 17 Percent reduction versus 1991 -92 n/a n/a 18% 28% 49% 18 Other Materials base year/landfilled) 19 Coal Ash,Yardwaste,White Goods 9,996 �'� 30,206 c3' - 20 Tires - 736 557 649 1 692 21 Total Other Materials 9,996 30,941 1 557 649 1 692 22 Total Tons Managed bs Aandfilled 109,122 131,067 90,381 88,506 67,106 23 Total tons mane edlla dfilled (per capita) 1.23 1.36 0.85 0.75 0.54 24 Percent reduction versus 1988 -89 n/a -10% 31% 39% 57% 25 Percent reduction versus 1991 -92 n/a n/a 37% 45% 61% 26 27 Population 88,484 96,302 105,821 117,500 (s 125,300 29 Notes: 30 1. This tonnage includes recycled materials in the base rar, per guidance from State Solid Waste section 31 2. This tonnage is estimated at 1/3 of tonne a landfilled. 32 3. This tonnage includes an estimate for white goods although they were diverted. 33 14. This tonnage includes waste landf Hied out of county from state records.. 34 15. Future population projections from Office of State Planning May 1997. Waste reduction goals are shown for each sector for each target year. Row 9 shows the percent reduction in mixed solid waste compared to the 1991 -92 base year. Note that the total tons of mixed solid waste landfilled (Row 6) and the per capita landfilled (Row 7) are the same; the percentages change only due to a change in the base year. Similar information is presented for construction and demolition waste (Rows 10 -13), the total of mixed waste and construction and demolition waste (Rows 14 -17) and Total Waste as defined by the State (Rows 22 -25). -End Chapter 2- 2 -2 Construction and Demolition Landfills H Z W 4 Q Page 1 01.3 Construction and Demolition Landfills COUNTY SITE NAME PERMIT SITE ADDRESS 11SITE CITY ST CONTACT PHONE FAX ITITLE ADDRESS CITY ALAMANCE QUARTER C &D UNIT 0104 S.R. 2148 SAXAPAHAW C ALVIN CAGLE 2701 AUSTIN I QUARTER RD esi ent, o e s Foster 's GRAH Foster 's ALAMANCE 11L ANDFILL 0105 Store Road Liberty �C Kent Coble 3365654750 3365654752 Sandrock Inc Store Road Libert ADM BLDG 255 ALEXANDER CHARLES LILEDOUN ALEXANDER COUNTY CDLF 0201 SR 1620 TAYLORSVILLE C MASHBURN 7046329332 7046320059 ROAD TAYL COUNTY C &D MOUNTAIN COUNTY AVERY LANDFILL 0603 ROAD INGALLS NC DON BAKER 8287338202 8287338209 MANAGER PO BOX 640 WL FRUNSWICK BRUNSWICK COUNTY CDLF 1007 ISR 1401 11SUPPLY �C JIMMY I VARNER 9102532000 9102537022 COUNTY MANAGER 11PO BOX 249 BOLI PANTHER BUNCOMBE RANCH COUNTY C &D ROAD SR LANDFILL 30 VALLEY BUNCOMBE UNIT 1107 1745 ALEXANDER C TERRY MEARS 7042555066 7042555722 MANAGER STREET ASHE IBURKE COUNTY CDLF 1203 11SR 1505 MORGANTON NC DALE MEYER 7044394394 7044394396 PO BOX 1486 FOR JBFI- CHARLOTTE 5105 TOR MOREHEAD DAVE [M51005HEAD RECABARRUS SPEEDWAY 1301 ROAD CONCORD C CONRAD 7047822004 7047822177 AD HARK 11CABARRUS CABARRUS COUNTY CDLF 1302 SR 2411 CONCORD �C RICK PAYNE 7047823811 7047864955 PO BOX 707 [CONC CLEVELAND COUNTY CDLF 2301 C 180 SHELBY ]PC LOCKRIDGE 7044805478 7044823432 PO BOX 1210 SHEL CUMBERLAND COUNTY C &D 698 ANN WJOHNBITTLE 698 ANN CUMBERLAND UNIT 2601 STREET FAYETTEVILLE 9104834897 STREET FAYE CUMBERLAND C &D LANDFILL 2608 ROAD GINEER AFZA -PW OF DIRECTOR PO BOX 1000 F NC BILL SQUIRE 9103963702 9194731101 919473521$ FORT MANT DARE C &D LANDFILL 2803 INC 264 STUMPY POINT JEDWARD MANN FDAVIE I C &D LANDFILL 3003 S.R. 1605 IMO CKSVILLE ]PC GERALD CARD 336988262 3369987560 DIRECTOR P.O BOX 937 imoc EDGECOMBE EDGCOMBE COUNTY CDLF 3301 SR 1601 TARBORO PIHATHAWAYI LARRY 9198274253 9198230228 PO BOX 10 TA WINSTON- SALEM CITY OF SALISBURY UTILITIES FORSYTH C &D LANDFILL 3412 ROAD WINSTON -SALEM C STEVE DULIN 3367278418 3367278432 SUPERINTENDENT PO BOX 2511 WINS GRANVILLE COUNTY'CDLF 3902 ISR 1004 BUTNER ��C JASON FALLS 9196031354 9196908610 PO BOX 906 10 6-//wastenot.ei&1W.hc.us/S O dfaclst.htm n(JESSIE 1 1 /7/99 on and GUILFORD ��1 L CITY OF CDLF 103 1SR 1239 STREET JISNOW HILL GREENSBORO 1U1TYNDALL NC COGGINS 9197475720 3363752244 9197475720 3363752215 BLDG.,STI�. STREET ][GREE y� HALIFAX COUNTY CDLF 204 P.O. Box 327 HALIFAX �C Frank Ralph 9195864748 9195862184 P.O. Box 70 ][IALlf HARNETT CO ANDERSON CRK C &D JERRY SOLID WASTE HARNETT LANDFILL 4303 S.R. 1164 LILLINGTON NC BLANCHARD 9108937536 9108934992 DIRECTOR PO BOX 940 LILLI GENERAL HARNETT JERRY SERVICES COUNTY HARNETT COUNTY CDLF 302 SR 1725 DUNN/ERWIN NC BLANCHARD 9108937536 9108143967 DIRECTOR 11OFFICE BLDG. LILLI IREDELL COUNTY C &D RONALD EPOBOX [STAT IREDELL UNIT 903 S.R. 2319 IREDELL C WEATHERMAN 7048785430 7048785429 788 KSUN COUNTY 401 LANDFILL SOLID WASTE GRINDSTAFF lSYLv JACKSON CDLF 5002 US441 DILLSBORO NC CHAD PARKER 7045867577 7045867528 DIRECTOR COVE ROAD COUNTY C &D ISR RICK JOHNSTON LANDFILL 5101 1503 SMITHFIELD NC PROCTOR 9199344576 9199347174 PO BOX 2263 SMIT LEE LEE C LZA NDFILL 5301 S.R. 1177 LEMON SPRINGS I]CICHERRY 9197748440 9197746526 LANDFILL PO BOX 1968 S IL ENOIR UNOIR COUNTY CDLF W:]ISR 1524 LAGRANGE aC BRAFFORD 99195271290 PO BOX 757 KINST NORMAN QUARRY DAVID FACILITY =7UARRY [STAN LINCOLN LANDFILL 5504 LANE STANLEY C CRADDUCK 7048223033 7048223013 MANAGER OLN COUNTY C &D CITIZENS LINCOLN UNIT 5503 SR 1169 LINCOLNTON C STAN KISER 7047329030 7047329048 CENTER LILAC MACON Landfills 5704 Drivelerra Franklin aC LARRY LAKEY 8283492215 8283492185 ST! DIRECTOR S5 TWREESF T 7FRAN SON COUNTY C&---D BRIGMAN MARSHALL 101 BRIGMAN [MARS MADISON UNIT 5803 PROPERTY TOWNSHIP C JIM BROWN 7046492311 7046492311 FARM ROAD MA COUNTY C &D MARTIN LANDFILL 5901 S.R. 1440 WILLIAMSTON NC DONNIE PITTMAN 9197921901 PO BOX 668 WILLI NORTT-I MECKLENBURG HOLBROOKS LARRY 00 HOLBROOKS [HUNT MECKLENBURG C &D LANDFILL 6013 ROAD HUNTERSVILLE C GRIFFIN 7048753367 7048753358 ROAD N INASH COUNTY C&D LANDFILL 116403 11 ASHVILLE aC GREG GRIFFIN 9194599899 9194599834 1PO BOX 849 ASH N as County CDLF Unit 6401 IS.R.1411 a Greg Griffin r I o Waste aste Director P.O. Box 849 16hvi 306 NORTH COUNTY C &D GAYLE COLUMBIA [CHAP ORANGE UNIT 6801 S.R. 1727 CHAPEL HILL NC WILSON 9199682885 9199322900 STREET n: / /wastenot.e .sta e.nc. OME/ dfaclst.htm 1]6/7/99 and 4peidn ills MIKE rag a U1 .3 [nstruction ASQUOTANK LANDFILL 7002 S.R. 1144 ELIZABETH CITY iC ETHERIDGE 9193381144 9193350866 PO BOX 39 ELIZA ROBESON ROBESON COUNTY CDLF 7803 C 20 ST. PAULS W.C. BAXLE� 8006822014 9108655126 DIRECTOR 1PO BOX 366 ST. PA RU HERFORD COUNTY C &D DON 18282876125 601 NORTH [RUTH RUTHERFORD UNIT 8103 SR 2203 RUTHERFORDTON C BAYNARD 8282876312 MAIN STREET BFI-SAMPSON 7437— COUNTY C &D ROSEBORO DISTRICT [ROSE SAMPSON UNIT 8203 HIGHWAY R NC WADE ROGERS 9105254132 9105254150 MANAGER PO BOX 2096 S SCOTLAND CDLF 8301 $R 1611 MAXTON JIM BLACKWELL OUNTY ENGINEER PO BOX 489 LAUR STANLY 11CITY OF, CDLF 118401 11SR 1740 LBEMARLE P JAMES COBLE [70498496671 7049849445 DIRECTOR STREET ALBE 3322 OLD GRIFFIN FARMS RICHARD S CAMDEN [MON UNION C &D LANDFILL NC 200 NC GRIFFIN 7042892595 7042912108 OWNER ROAD UNION UNION COUNTY C &D 19002 PNC GORDON 7042964222 7042964232 fUNION COUNTY PUBLIC WORKS 11PO BOX 987 M VANCE IVANCE COUNTY CDLF 9101 INC39 1HENDERSON a TODD CLARK 9194307171 9194925873 COURTHOUSE YOUNG STREET H BFIHOLLY SPRINGS WRODGER WADE [RTP WAKE DISPOSAL INC 9214 CSR 1153 HOLLY SPRINGS 9195570519 9195570619 PO BOX 12018 WAKE CDLF 19203 C 55 FELTONSVILLE WOODLIEF 9198566186 9198566233 DEPARTMENT PO BOX 550 ]FRALEI SHINGTON COUNTY C &D COUNTY [PLYM WASHINGTON LANDFILL 9404 S.R. 1363 ROPER C LEE SMITH 9197935615 MANAGER PO BOX 1007 FWATAUGA COUNTY C &D "—]BOON 17, 842 W. [B:0:0N LANDFILL 9502 E C BOB FRYE 8282645305 8282641702 KING ST EWAYNE WAYNE 11SRI SOLID WASTE LANDFILL [DUDL COUNTY CDLF 9601 129 DUDLEY NC LLOYD COOK 9196892994 9196892995 MANAGER ROAD W TY CDLF 9801 11SR 1503 WILSON :::]p CLAYTON 9193992823 9193990904 WCAC & LEC BOX 1728 IWILS YADKIN COUNTY C &D LARRY SOLID WASTE [YADK YADKIN LANDFILL 9902 S.R. 1589 YADKINVILLE C ADAMS 9106794243 9106796005 DIRECTOR PO BOX 146 YANCEY YANCEY- MITCHELL C &D LANDFILL 10002 C TOM TIfTONJ 8286789180 8286824301 PUBLIC WORKS DIRECTOR COUN TY COURTHOUSE BURN Last Updated on 1011199 By Rebecca Gagliardi http: / /w.astenot.ehnr. state.nc.us /SWHOME /Cdfaclst.htin 10/7/99 ,4 To: Gavle Wilson From: Ed%vard Pullan Date: June-29,1998 ATTACHMENT 3 -1 Re: C&D Tickets from May, 1998; and Construction and Demolition Waste Survey C &D Tickets from May. 1998 A preliminary review of the C&D deliveries for the month of W. 1998 show that there had been 2,089 C&D deliveries to the landfill during the calendar month, the majority of those coming from smaller loads. Of 2,089 total C&D deliveries, 1,255 (60.1 %) were less than one -ton. In terms of the number of customers potentially impacted: 116 different landfill customers delivered C&D waste to the landfill during the month and 80 (69.0 %) has deliveries of 1 -ton or less. The greatest number of small loads were received, not unexpectedly, from "Miscellaneous Cash Customer" and "Orange County." Customer (Cult. #) Total Loads Less than 1 -ton Misc. Cash Customers (044) 908 662 (72.9 %) Orange County (107) 325 286 (88.0 0/6) Other landfill accounts that appear likely to deliver smaller C&D loads include public agencies and smaller non -profit organizations: Customer (Cost. #) Total Loads Less than 1 -ton Town of Chapel Hill 62 59 (95.2 %) Carrboro 21 12 (57.1 %) UNC and Hospital 42 19 (45.2 0/6) CH- Carrboro YMCA 4 4(100%) PTA Thrift Shop 5 4(80.0%) It would appear that the absence of a "local" C&D disposal facility would most heavily impact customers with smaller loads of C&D waste to dispose of as the additional cost and distance to transport that waste to a distant facility would be most burdensome and add to their costs of operations. Construction and Demolition Waste Survev A surrey of all in- coming loads of C&D waste was conducted at the landfill between Friday and Tuesday (June 26's to 30`s). consisting of the questions and possible responses outlined below. The responses to each question have been tabulated to show the raw number of each type of response and the percentage of particular responses to each question. s� uestion 1: What is the origin of this load? Responses Responses: remodeling e.,dsting home new home construction General residentail cleanup Commercial contractor, small Commercial contractor, large Other Total - page 2 - of Response Percentage 82 37.27% 23 10.45 77 35.00 16 7.27 8 3.64 14 6.36 220 99.99 Ouestion 2: Estimated Number of Annual Trips to this Landfill? (Responses were permitted in an open format, but for convenience of tabulation, the responses have been grouped into the following categories.) Responses of Response Percentage Responses: 1 to 2 41 18.64% 3 to 5 25 11.36 6 to 10 25 11.36 11 to 20 25 11.36 21 to 50 42 19.09 51 to 100 25 11.36 101+ 37 16.82 Totals 220 99.99% Ouestion 3: What would hauler do if there were no C &D landfill in Orange County and the nearest permitted facility was 35 miles away? Responses : of Response Percentage Responses: drive to adjacent county 99 45.00% don't know 35 15.91 other 86 39.09 Totals 220 100.00% In addition to these questions, the survey allowed the respondent to provide any additional information which they cared to, or to clarify their response of "other" concerning what would they do if there were no UD landfill within Orange County. In reviewing those free -form responses, they were grouped into the categories shown below, with the number of responses and percentage of those prodding comments shown for each. Other of Response Percentage Responses: Burn it 23 22.33% Dump it (illegal) 20 19.42 Bury/Dump it on property 7 6.80 Rent dumpsters / have someone else haul it 12 11.65 Stop hauling / Go out of Business 12 11.65 increase prices / pass it along 7 6.80 '.1 in a series of 10 case studies Erickson's Headquarters Hudson, WI How specifications were used to reduce construction waste The specifications required the successful bidder to submit draft and final waste management plans. The contractor hired an independent waste manager to work with the subcontractors and contractor to set a realistic waste reduction goal and see that it was met. A 75% waste reduction goal was set, and it was achieved primarily through weekly site meetings, written updates to all site employees, and free lunches. The contractor reported that the waste manager improved his company's ability to recycle waste on all its projects. Another benefit reported by the contractor was increased quality, safety and productivity. For example, to reduce waste, the contractor ordered many items on pallets instead of in boxes. This saved labor time unboxing and also made parts more visible and therefore easier to locate. This building incorporated other aspects of sustainable design such as energy efficiency, indoor air quality, and use of recycled materials and native landscaping. ATTACHMENT 4 -1 ()Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post- consumer recycled paper .` 2 in a - series of 10 case studies Tidyman's Grocery Spokane, WA How specifications were used to reduce construction waste When the project went out to bid, each subcontractor was required to include a line item for disposal costs. This amount was subtracted from the final bid and an independent waste manager was hired to handle all waste recycling and disposal. The waste managers set up recycling containers and met with subcontractors at their weekly safety meetings to discuss problems and report progress toward recycling goals. The waste manager also posted regular updates on the amount of material recycled so all employees could see the results of their efforts. Waste manage- ment costs were 56% less than they would have been with the original bids. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post- consumer recycled paper ` 3 in a series of 10 case studies Public Health Clinics Austin, TX ssa Ate. _. i � l 3 ((:SYwLrVATICN _ '1 �iN i:CV ♦'uh -_- _7'LY How specifications were used to reduce construction waste Specific materials were required to be recycled. These included branches and trees; lumber; bricks and blocks; metal; cardboard; plastic; and paints, stains, solvents, and sealants. The specifications also followed the City of Austin's Green Builder Program guidelines in requiring other waste reduction measures such as setting aside lumber cut -offs for use as blocking or spacers. As a general requirement, the specifications stated that an "underlying commitment to sustainable architecture and construction practices shall be reflected in all aspects of the project." The bids on the project were comparable to what they would have been otherwise. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post- consumer recycled paper 4 in a series of 10 case studies Four Times Square New York, NY How specifications were used to reduce construction waste Contractors were required to efficiently use resources and energy "to the fullest extent possible," which included recycling waste generated during the demolition and construction process. The contractors and subcontractors were also required to track what was recycled and where it went. The tracking report for demolition reported recycling of 1,800 tons of steel; 95 tons of scrap metal; 8,000 cubic yards of brick, concrete, and dirt; and 1,000 doors, beams, and copper and stone architectural elements. This building also incorporates state -of -the -art energy saving and environmentally sensitive building design elements. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post - consumer recycled paper V 5 in a series of 10 case studies Police Station Issaquah,. WA How specifications were used to reduce construction waste The specifications merely " encouraged" disposal alternatives to landfilling, with reuse and recycling to the extent practical. However, this language was followed up by verbal encouragement at the pre - demolition meeting and thereafter. The contractor was also told to document recycling and reuse measures. The contractor was creative and therefore very successful in achieving salvage on the project. For example, bulletproof glass from the old police station was reused in fish tank construction. i Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post- consumer recycled paper `6 in a series of 10 case studies Western Michigan University Kalamazoo, MI How specifications were used to reduce construction waste The specifications required the contractor to separate and salvage or recycle waste materials. The contractor required each subcontractor to separate and salvage or recycle its own materials. Subcontractors reported that their bids did not increase due to the salvaging measures and that they were getting used to recycling on the job. Individual workers responsible for contaminating bins were fined to cover the cost of cleaning up the contamination. i Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.usMCOG /. Printed on 20% post- consumer recycled paper 19 7 in a series of 10 case studies Community Centers New York, NY How specifications were used to reduce construction waste The specifications required the successful bidder to submit draft and final waste management plans aimed at salvaging, reusing, and recycling as many materials as possible in order to minimize landfilling of wastes. Materials required to be included in the plans were cardboard, clean dimensional wood, land clearing debris, beverage containers, concrete, bricks, concrete masonry units, asphalt, and metals. The successful bidder reported that these requirements did not increase the amount of the bid. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG/. Printed on 20% post- consumer recycled paper 8 in a series of 10 case studies YMCA San Francisco, CA How specifications were used to reduce construction waste The specifications required the successful bidder to submit draft and final waste management plans aimed at reusing, salvaging, or recycling as many wastes materials as economically feasible. Materials required to be included in the plans were cardboard, land clearing debris, clean dimensional wood, beverage containers, concrete, bricks, concrete masonry units, asphalt, drywall, carpet, plastics, and metals. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post - consumer recycled paper '` 9 in a series of 10 case studies House Museum Villanova, PA How specifications were used to reduce construction waste The specifications required that the following items be salvaged, reused, or recycled: tree limbs, wood, concrete, asphalt paving, stone masonry, gravel, and metals. The specifications also required the successful bidder to submit a waste management plan. Bidders were provided with a list of local recycling firms for information only. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.usMCOG /. Printed on 20% post- consumer recycled paper " 10 in a series of 10 case studies Antioch University Seattle, WA How specifications were used to reduce construction waste The specifications required the successful bidder to submit draft and final waste management plans. The plans were required to include recycling of at least the following items: clean dimensional lumber, concrete, bricks, concrete masonry units, and metal. The contractor also recycled drywall, acoustical ceiling tile, and fluorescent light bulbs. The light bulbs were advertised to local businesses which took all of them for replacing outdated models no longer sold in stores. Recycling measures reduced project costs by 25 to 50 percent. Printed by Triangle J Council of Governments, publishers of WasteSpec: Model Specifications for Construction Waste Reduction, Reuse, and Recycling. For further information or a WasteSpec order form, call 919 -549 -0551 or visit our Website at www.tjcog.dst.nc.us/TJCOG /. Printed on 20% post- consumer recycled paper Orange County Public Works Depa►'"en INTRODUCTION , Jr., the Public Works Department is proposing to At the request of property owner, Carl Walters roximately 1000 feet northwest to the High Rock. Solid Waste Convenience Center app reloca Mr. Walters. High Rock Road, to a site also owned by Orange. County currently .leases from Carl Walters the High Rock Solid Waste Convenience Center property as well as another parcel on Saddle Club Road. December 21, 1987 and was converted to ■ The High Rock Road lease originally commenced on DO Ober 1993. The most recent renewal one of the staffed solid waste convenience' centers in June 30, 2003. The monthly lease cost for this site is currently $200. on lease expires on 1995 and expires ■ The Saddle Club Road lease originally commenced on January 1' December 31, 2005. The monthly lease amount is $ 200. (The Sadd le Club Road site was nter with a stationary originally leased with the intent-�fo establish a solid waste convenience center compactor rather than front -end containers). Both leases contain a termination clause whereby the lessor or the lessee may terminate the lease upon submitting a ninety- (90) day written notice to the other party. Mr. Walters has stated his wish to terminate the lease agreements for these two properties and en ei into a new agreement for the proposed relocation site only. The proposed lease agreement would bt for an eight -acre parcel, with only one acre being used for the actual convenience center due to 12.5% impervious surface limitation. The existing solid waste and recycling containers as well as the fence gates would be relocated. In addition to landscape buffer materials and surfacing materialE some additional solid waste containers and chain link fencing would be required. Since receiving Mr. Walter's .request, the Public W orks Department has proceeded to determine if the , Proposed site would be suitable for use as a solid waste convenience center. Director of Public Works, and Paul Thames, County Engineer Wilbert McAdoo, determined that the site would be suitable. Aland serve have inspected the proposed site and developed. Y as been performed and a site plan At their request, Public Works Department staff already discussed the proposed relocation with some residents of the High Rock community, including residents of the Cotton Run area. General concerns identified include type of buffer, lighting, noise, unpleasing odors, rodent control, roadside litter, storm water run -off and traffic. Based on experience I at the six existing Convenience Centers, staff feels these concerns can be mitigated to the satisfaction of all parties. RECOMMENDATION The proposed relocation would be beneficial to the County. In recent years significant growth has been experienced in this area. As a result, the solid waste containers at this site now have to be emptied prior to opening on Sundays. The proposed site would allow placement of some additional Haste containers, thereby reducing or eliminating the need for weekend dumping, and would allow iew and /or expanded reuse and recycling opportunities (i.e. add additional recycling containers to accommodate the volume of recyclables, addition of a salvage shed). A larger site would also )rovide improved traffic flow. 'he existing High Rock Road site is the only solid waste convenience center easily accessible to the midents of the northwest area of .'the County. If the High Rock Road convenience center is not ,located as requested by the property owner, residents of the High Rock Road community would ive to travel to one of the five other sites to dispose of their household waste and recyclables until iother site could be identified and developed. The closest solid waste convenience centers to the 'gh Rock Road site are located on Walnut Grove Church Road, Bradshaw Quarry Road and ghway 57. Usage at these sites has also increased significantly in recent years. Additional waste ►m the High Rock Road area would likely necessitate additional collection service at these locations well increase congestion. ould the Board wish to proceed with the proposed relocation: an application for a minor subdivision plat would be submitted to the County Planning Department; signs would be installed at the existing and proposed site to inform the surrounding community of the proposed relocation; • informational notices would be hand delivered to residents living within 500' of the proposed site; • informational notices would be mailed to residents living beyond 500' but within 1500' of the proposed site; • informational notices would be made available at the High Rock Solid Waste Convenience Center; • cost estimates for site relocation would be developed; and • a new lease agreement for the proposed new site would be drafted; such lease to contain a termination clause for the present High Rock and Saddle Club Road lease agreements to coincide with execution of anew agreement; the term of the new lease shall be five years and the monthly lease amount $ 200. The Public Works Department request that we present this proposed relocation request to the Board at their November 9 work session to consider for approval at their November 16 regular meeting. In October 1993, Orange County began operating six Solid Waste Convenience Centers throughout the County, including the site at High Rock Road. The High Rock Road site was developed on property owned by Carl Walters, Jr. The County also holds a lease on property on Saddle Club Road that was previously proposed for use —A, as a solid waste convenience center. R ia, I Toga 44 jme.n+1",:L- 2 OF 1 SOLIDWASTE At the request of the property owner, Orange County is proposing to relocate the existing Solid Waste Convenience Center approximately 1000 feet northwest on High Rock Road to a new site. The County is proposing to lease an eight -acre parcel with one -acre used for the actual convenience center. The leases on the existing site and the Saddle Club Road site would be terminated following relocation to the new site. The proposed relocation would allow Orange County to pro) improved, more efficient service to Convenience Center use including greater reuse and recycling opportunities such as a salvage shed and yard waste collection area. The new center would also provide improved traffic flow. If you have questions, or would like additional information about the proposed relocation, please contact Orange County Public Works at 245 -2625. L �Em I IW PA I 0 1� , -W ,.AM% %I- - DM NmLfsbff� aene � cz z5way,pive Buffar Ontions- TOWN OF CHAPEL HILL Fax:919- 967 -8406 Nov 9 1999 13:53 P.02 AN ORDINANCE AMENDING THE CHAPEL HILL DEVELOPMENT ORDINANCE REGARDING A NEW ZONING DISTRICT FOR A SOLID WASTE MANAGEMENT FACILITY (99 -11 -8 -104) WHEREAS, the Council of the Town of Chapel Hill has considered the proposed amendment to the Chapel Hill Development Ordinance to provide for a new zoning district for a new land use called Solid Waste Management Facility, and finds that the amendments are appropriate due to changed or changing conditions in a particular area or in the jurisdiction generally and achieve the purposes of the Comprehensive Plan; NOW, THEREFORE, BE IT ORDAINED by the Council of the Town of Chapel Hill as follows: Section 1. Section 2 of the Chapel Hill Development Ordinance is hereby amended by adding a new Subsection 2.121.2 to read as follows: "2.121.2 Solid Waste Management Facility: Solid Waste Management Facility shall be operated by or on behalf of a governmental agency and shall include, but not be limited to, a solid waste transfer facility and a materials recovery facility. A solid waste management facility shall not include the burial of any waste material." Section 2. Section 3.1 of the Chapel Hill Development Ordinance is hereby amended be adding a new Subsection 3.1.9.1 to read as follows: "3.1.9.1 Materials Handling District (MH) The Materials Handling (MH) district is intended to provide for public operation of a Solid Waste Management Facility." Section 3. Section 12.3, Use Group A, B, and C of the Chapel Hill Development Ordinance is hereby amended to add MH to the current column containing RT. Section 4. Section 12.3 of the Chapel Hill Development Ordinance is hereby amended to list, as "Permitted Principal Use" in the Materials Handling (MH) zoning district, "Solid Waste Management Facility" as Use Group C and as "Permitted Principal Use" and "Permitted Accessory Use" for Agricultural : Livestock and Non - Livestock as Use Group A. Section 5. Section 12.3 of the Chapel Hill Development Ordinance is hereby amended to provide the following additional language to the "Key" at the bottom of each page of the schedule: "'Key: "--" Not Permitted; "A" Permitted as an Accessory Use; "P" Permitted as a Principal Use if floor area of proposed development is less than 20,000 square feet and area of disturbed land is less than 40,000; otherwise, permitted as a Special Use in all districts except 01 -3 and MH and for all uses except existing Elementary and Secondary TOWN OF CHAPEL HILL Fax:919 -967 -8406 Nov 9 1999 13:54 N Schools. In 0I -3 and MH "P" Permitted as a Principal Use, "S" Permitted as a Special Use. For existing Elementary and Secondary Schools "P" Permitted as a Principal Use." Section 6. Subsection 13.11.1, Use Group A; Subsection 13.11.2, Use Group B; Subsection 13.11.3, Use Group C, Schedule of Intcnsity Regulations are hereby amended to provide for a new zone called MH, the same requirements as the current RT provisions. Section 7. Section 19.2 of the Chapel Hill Development Ordinance is hereby revised by adding the following language at the end: "g) Any development of a Solid Waste Management Facility on a zoning lot." Section 8. The first paragraph of Section 14.12.2 of the Chapel Hill Development Ordinance is hereby amended to read as follows: "A buffer is a strip of land together with the screening required thereon. Except as otherwise specifically provided in this chapter, the type of buffer required between a proposed development and adjacent streets, land uses or zoning designations shall be as specified in Subsection 14.12.6, Schedule of Required Buffers. Where the proposed development site and the adjacent land are both located within either Town Center District, no buffer shall be required. Where the proposed development site is located in the Residential -High Density -12 zoning district, no buffer shall be required. Where the proposed development site is located in the Materials Handing (MH) zoning district, a 204 foot landscape bufferyard shall be required_" Section 9. Section 14.13.7 of the Chapel Hill Development Ordinance is hereby amended to read as follows: "14.13.7 Signs in Residential, Materials Handling, and Rural Transition Districts and in PD -H Developments No sign shall be erected or displayed in any Residential, Materials Handling,, or Rural Transition district or in any Planned Development- Housing except as allowed under subsection 14.13.4 or as provided below: Section 1 i .Development identification signs containing the name and/or logo of a subdivision, multi - family development, or planned development, provided such signs are limited to one free - standing sign at each principal point of access to the development, sixteen (16) square feet in area per display surface, and a maximum height of six (6) feet above finished grade; or two (2) signs mounted on wooden, brick, or stone entry walls, eight (8) square feet per display surface, and a maximum height of six (6) feet above finished grade. Section I (.Nonresidential signs identifying nonresidential uses permitted as a .principal or special use in Residential, Materials Handling„ or Rural TOWN OF CHAPEL HILL Fax:919- 967 -8406 Nov 9 1999 13:54 P.04 3 Transition districts or as an accessory use in PD -H developments provided such signs are limited to one ground or wall sign per zoning lot and sixteen (16) square feet in area per display surface. Section 11.Lighting of signs in Residential, Materials Handling, and Rural Transition Districts and in PD -H Developments is permitted if illumination levels are low, all fixtures are concealed, and spill -over of light is minimal." Section 14. That all ordinances and portions of ordinances in conflict herewith are hereby repealed. Section 11. That these amendments shall become effective upon adoption. This the 80' day of November, 1999. 7!0 HILL Fax:919- 967 -8406 3 Nov 9 1999 13:54 P.05 1-1 � NEVILLE SZG4TW1NG VUTM USE bF T GREED �•� A UWLUTIO N TiMCTS (9g- llal8tR -S.1) 14ju tw the Coun& wisbes to 90 IT RESOLVED by ft COUnci1 of the Town Of ft of ft y $ back to the Orange County C002i reprding the Cwem Tract; and BE 1T MRTHER MOLD that the � � mom Raving the Gee Tract as a of th Irrterlocal with the Ft7RTHFSt RESOLVED that du COQ Mould lace to have a mexliated ° H Town BE rT pnp� to discuss ft Caem T� and how the O�►ge County ttte Ora County a wO& tom: and Couuctl d desires to use the following y$� 4S s�S BE Tf FURTHER RESOLVED that the Cow 1 HiU and the Oran$ points for a discussion between the Tow" of Chape to examiue the highest and best Uses for the Greene mrd Neville `Tracts. The following goals agreements that we could collectively reach. 1. that the Greene and Neville Tracts are p�reeious coutmmmty assets and shoe not be Agee used for solid waste activities. Z. Agroc that these two tracts of land be kept intact and as publicly -owned land. I Agee that the Greene Tract will be kept largely in a natural state with selected areas used for a mixture of housing for low and moderate income single citizens and families. 4. Ague that the Neville Tract should be used at► a park with both passive and active r -On facilities when its use as landfill cover is cvenpleted. This sbouid include very large buffet for U,"S W* and rm lightms for any Raying Ad& that we built. S. Agree to unde+ uke both a cnitnral and cm kmncnta1 amt of the Greek Tract to he* . set goals and determine uses. b. Agree that the Ckeene Tract will be put in a community knd trust developed exclusively for these two tracts, a land utter which could aver both the preserved land and the land developed for housing, which would keep the botttung dkrdable. This Ind host should be made up of elected of bls, f man the tax gout ng bodies in pr+epo&m to ownaship, neighbors of the tracts, as well as residem of dw tract if love and moderate kwotne housing is built, and citizens from throngbout the Cowsy who an the owners of this tae paid land. U M TORN OF CHAPEL HILL Fax:919 -967 -8406 Nov 9 1999 13:54 3 A RESOLUTION REGARDING FUTURE USE OF THE GREENS. &IN EVILLE TRACTS (W114" S.1) BE IT RESOLVED by the Council of the Town of Chapel Hill that the Council wishes to go back to the Orange County Commissioners to discuss the part of the interlocal Amt regarding the Greene Tract; and BE IT FURTHER RESOLVED that the Council reconsiders having the Greene Tract as a part of the Interlocal Agreement; and BE rT FURTHER RESOLVED that the Council would h1w to have a mediated dialogue with the Orange County Commissioners to discuss the Greene Tract and how the Chapel Hill Town Council and the Orange County Commissioners work together; and BE rr FURTHER RESOLVED first the Council desires to use the following goals as starting points for a discussion between the Town of Chapel MR and the Orange County Commissioners to examine the highest and beat uses for the Greene and Neville Tracts. The following goals are agreements that we could collectively reach: 1. Agree that the Greene and Neville Tracts are precious community assets and should not be used for solid waste activities. 2. Agree that these two tracts of land be kept intact and as publicly -owned land. 3. Agree that the Greene Tract will be kept largely in a natural state with selected areas used for a mixture of housing for low and moderate income single citizens and families. 4. Agree that the Neville Tract should be used as a park with both passive and active recreation facilities when its use as landfill cover is completed This should include very large buffers for u ighlm" and rho lighting for any playing fialds drat arc built. S. Agree to undertake both a cultural and envirvnmeatal awcssmamt of the Greene Tract to help set goals and determine uses. 5. Agree that the Greene Tract will be put in a community land trust developed exclusively for these two tracts, a land trust which could administer both the preserved land and the land developed for housing, which would keep the housing affordable. This land trust should be made up of elected officials from the three governing bodies in proportion to ownership, neighbors of the tracts, as well as residents of the tract if low and moderate income housing is built, and citizens fiaat throughout the County who are the owners of this tax paid land. TOWN OF CHAPEL HILL Fax:919- 967 -8406 Nov 9 1999 13:55 P.06 4 7. Agree that ariy building built on these tracts would be built acowding to green building standards, which would include, but not limited to, certified green building materials, the W highest energy efficiency standards passible, and use of renewable energy. This the 8a' day of November, 1999. TOWN OF CHAPEL HILL Fax:919- 967 -8406 Nov 9 1999 13:55 P.O? A RESOLUTION REGARDING FUTURE USE OF THE GREENE AND NEVILLE TRACTS (99- 11 -O81R * *) BE IT RESOLVED that the Council of the Town of Chapel Hill that the Council wishes to request the Orange County Commissioners to consider alternate sites for transfer stations and other solid waste operations at a suitable site, and; BE IT RESOLVED that if the Commissioners site a transfer station on the Green tract it be a state of the art facility which addresses air pollution and noise concerns of the neighbors, and; BE IT FURTHER RESOLVED that the Council requests Orange County and Carrboro enter into facilitated discussions as to how the remainder of the tract will be used. i `10 / r .i ism_ / � 113 -TOM OF CHAPEL HILL Fax:919 -967 -$406 Nov 9 1999 13:54 P.05 3 Qf� A, RESOLUTION REGARDING FUTURE USE OF THE GREEhiE. l 'KII.LE TRACTS (W- 114MR -SI) BE rr RESOLVED by die Coin of ft Towa of Cbapd Hill that the Coil wisba to $o beer W. the_ OraW Cody Canmriseioaaa�s to disc= dna pert of the kiNdocal A rig the Greece Tract and BE rr FURTM RESOLVED thal'tbe Coin re000aW= hxviag the Cueane Tract as j pmt of the tift loc it and . BE rT FURTMM USOLVED than the Cconcg would iiloe so la " a mediated Mbw wft the Oraoga Coamy Comn*sioaata to Maim ft ; Otemx Trsct and how ere C hWd RM Toga Cauncil.and the Oraup County CocmWssionm wvdc togp&er; ana BE U MRTM RESOLVED tW the Count it desires to um ft following pab as as tfaq; points foci a boa belvvatmt do Town of Chapel HM and ft tkaoge Cmay Cosmm ssia�cs to usimiue dia b4bm t nand beat vies for the (kode slid Neville Tracts. Tbc 20mft V* are dud we col tdllecdver reach: 1, AS= that the tlnr m ad Neville Trees m pimciam cor malty asps And shale not be used for solid waste se iviities. 2. Agrce that these two tracts of land be kept intact and as pubbcbwwncd hod. 3. As= dw the C%nt Tract will be kopt largely in a.nslmal state with sdocftd mm used for a miatme *fbousing for low and mod eaft income single citizens And f3tmilies. 4. Agm.*d tic Neville Troia should be used as a pAtk with loth passive And active recra don heffities when its use as lmdfill coma is complmd. This should include very liege bye &r =iigis my aid no Usbdns for =v pbwb* mtti built. S. Aguas to u *& both a cultmul and IWAV"vrm taI anessiu t of &a Oro= T=CL to bfp set Book and determine woes. �. Arm that the Greene 'treat will be put is a conximity hoed trust dovdoped emAnively £oc these two use% a land first Which could aft*idw -both the pe amwed lmd and doe hod dowla d for housing, which, would keep the hotmg Wlxdable This bed um dmM be n� up .of dected oi8ocue firm► the dose govetmng bodies in prapottion to ownaaltip, of the tracts, as well As rte: of the tract if low and modecme hmm h ft is built, and ciduns from thmaglout dw County who an the amas of this tax paid land. L TOWN OF CHAPEL HILL Fax:919 -967 -8406 Nov 91999 1355 P.07 I Tao4wu A RESOLUTION REGARDING FUTURE USE OF THE GREENE AND NEVILLE TRACTS (99-11 -Og/R * *) BE IT RESOLVED that the Council of the Town of Chapel Hill that the Council wishes to request the Orange County Cossioners to consider alternate sites %r transfer stations and other solid waste operations at a suitable site, and; BE IT RESOLVED that ifthe Commissioners site a transfer station on the Green tract it be a state of the art facility which iddresses air ponution and noise concerns of the ncighbors, and; BE IT FURTHER RESOLVED that the Council requests Orange County and Cwzboro enter into facilitated discussions as to how the remainder of the tract will be used. � film �� ally ..................... a ❑❑ ❑ ❑ ❑ ❑❑ ❑ 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y' 6Y 6Y 6Y 6Y 6Y 6Y o Yard ti� Q vQ Waste Q� m n �o o �n� ZI h 0 Vl D ry z a Bulk IteMs White Goods Scrap Metal Tires Ispolo(k rere LEE] � a \ 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y 6Y by 6Y 6Y 6Y /® 8Y 8Y C:1 Fence Line & Edge of Gravel Surf ace Z.............. oe of ........... ................. . x % ........... + FRI m 0 FRI Pl S Edge CW umvet 3urf4=