HomeMy WebLinkAboutAgenda - 10-21-2008 - e 5 early~X~I~~~~ ZONING ARTICLE 14 SITE PLAN APPROVAL PROCEDURES 1. The site plan process, including time line, is noted on the attached sheet. 2. When a use is permitted by right (in contrast to uses permitted by Special Use Permit Class A or B or use requests requiring a rezoning), the site plan review process does not include any requirement for public notice, hearing, or discussion of the proposed project unless an Environmental Impact Statement (EIS) is required as outlined in the County's Environmental Impact Ordinance. 3. In addition, the Planning Department and various internal and external review agencies cannot ask or require additional conditions above and beyond what is required by the Zoning Ordinance unless agreed to or volunteered by the applicant. 4. To address aspects of items 2 and 3 above the applicant can prior to submittal, independently pursue the following. The applicant is free to meet, on their own accord, with local property owner to discuss the impacts of the project and identify solutions to address neighbor or public concerns. If the applicant wishes to provide/proposes above code enhancements, they may submit to the Planning Department these proposals for review and action during the normal permit review process. Note: When the County is the applicant of a site plan request such as a park or solid waste transfer station, the process before submittal to a local .government (the County Planning Department in this case) can capture the public involvement input. The Board of County Commissioners reviews a guiding version of the site plan and approves the submittal of a concept or master plan to the local government. This plan can include whatever site plan attributes that have been developed through the County's site development input processes before the site plan submittal. Source: Orange County Planning and Inspections Department October 2008 TYPICAL ARTICLE 14 SITE PLAN APPROVAL PROCEDURES 14.1 Intent 14.2 Application 14.2.1 Professional Design 14.2.2 Submittal • Traffic Impact Analysis (TIA) only after 800 trips • Environmental Assessment (EA) /Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) if necessary 14.2.3 Specification 14.3 Site Plan Review 14.3.1 Application • Site Plan Sufficiency Determination (5 days) Determined if application has submitted the necessary aspects of a review but not that they are correct. ® If application is complete, it is sent for agency review and a Development Advisory Committees (DAC) is scheduled (approximately 10 working days) Orange County Planning & Inspection Orange County Environmental Health Orange County Building Inspections Joint Planning or Courtesy Review Orange County Attorney Orange County Solid Waste Orange County ERCD Soil Conservation Services Orange County Emergency Services Public Utilities NC DOT District Engineer Orange County Board of Education • General Criteria a. Compliance with all applicable ordinances b. Extent and intensity of impacts to the surrounding area c. Respect for existing site conditions, including slope, vegetation, drainage patterns, etc. d. Efficient use of the land to minimize disturbance and grading and to conserve energy e. Safe and efficient vehicular and pedestrian circulation; and f. Logical placement of structures and other site functions. g. No open burning of trees, limbs, stumps and construction debris associated with the permitted activity. 14.3.2 Site Plan Action (within 21 working days after sufficiency) if all aspects are compliant 14.3.3 EIS receipt if necessary This will effect timeline by approximately 60 calendar days. 14.4 Appeal to Board of Adjustments (BOA) Provisions 14.5 Improvement Guarantees Source: Orange County Planning and Inspections Department October 2008