Loading...
HomeMy WebLinkAbout2008 NS Purchasing - Risk Managememt Associates Security Design Services Justice Facilitity1a. II Q ORANGE COUNTY Justice Expansion Security System Design Project PROPOSAL December 10, 2007 • TABLE OF CONTENTS I. Introduction and Objectives II. Scope of Work III. Client Responsibilities IV. Schedule of Deliverables V. Consulting Services Agreement • 3 ~~ Section I -Introduction Managing risk has always been a necessity. In today's world, a proper response to risk is even more critical. Even security departments within large corporations often fmd themselves lacking manpower or specific expertise to adequately respond to risk. Since 1988, RMA has provided professional security consulting, system design, investigation, and training services. By providing security consulting services that satisfy the client's needs at the level of service required, Risk Management Associates offers a viable, cost-effective solution. Risk Management Associates maintains a professional staffwith diverse but complementary skills and abilities. RMA presently employs a staff of over twenty people with various backgrounds in the public and private sectors, including police, corporate, technical, intelligence, military, financial, administrative, and security operations. RMA's strength and unique capacity for matching client requirements with applicable consulting expertise is based not only on our reservoir of talent, but upon our ability to work together. The mutual respect among our staff and our team-oriented approach to projects has proven effective in every aspect of our work. Risk Management Associates is honored ,. to have an outstanding client list covering many of our fifty states. RMA has enjoyed along-standing client relationship with many companies, .~.;.;; ~,~. agencies, and corporations and will be ~"~'' "~ pleased to provide references upon request. These references include ~" several major pharmaceutical companies, federal, state and local governments, corporate security managers, security providers, engineering and architectural firms, public utilities, financial institutions and a cross section of the business world. We believe that by working with our clients, performing and excelling in the security arena, we can make a difference. Risk Management Associates appreciates the opportunity to offer this proposal to work with Orange County. V ~~ 0 G O .a O L f+ C O d • Section I -Objectives This proposal will address in a phased approach the Orange County Construction Document development, procurement, construction, and testing of an integrated security system. Risk Management Associates will survey, analyze and design security systems for the Justice-Expansion that will include a security management system, digital video system and emergency communications. Our design package will include devices layouts, installation details, low voltage and data riser diagrams as well as detailed system requirements and specifications. ~ d Risk Management Associates will handle the project from start to completion. Our objective in this project will be to provide design development and overall project V management for an efficient, accurate, and timely project completion. We will verify ~ that the system design is a sound, logical plan that incorporates the newest technology 0 and current security design trends. We will review the project to determine that proper installation techniques are used so that Orange County receives the best system 'a possible. The design will be coordinated to provide proper integration with existing and ~ proposed systems. The completed systems will look and perform as outlined by Orange County. O V • .a O L 0 ~+ V J~~~ 3 2 rnm~curltycom 5 Section II -Scope of Work The scope of work will consist of: Phase 1-Construction Document Development (55%) 1. Conduct one (1) meeting, as necessary, for the defmition of the system layout, i.e. meetings with administrators and officials, meetings with facilities groups and user groups, as directed by management. This will be to determine the operational requirements and the desired locations and expected results of the security systems. 2. Develop the system layout package. The package shall present any RMA recommendations for security as well as options for specific security systems and/or components. Y L 3. Conduct one meeting with management to review the security system layout and design. ~ O 4. Research, design and develop the complete drawing package to include, d communication diagrams, equipment installation and typical details, and C • revisions to the system layout. V 5. Develop and prepare the security system specifications outlining equipment and ~ installation requirements for the system. Maintain coordination of the design concept with management. 6. Conduct one meeting with management to review the fmal Construction ~ Documents. ~ 7. Develop Request for Proposal documents for the installation of the security ~ systems that will allow Orange County and the General Contractor to negotiate the contract price with select security vendor. Phase 2 -Contract Negotiations (12%) 8. Conduct aPre-Bid Meeting with qualified security vendors. 9. Review and evaluate proposals submitted by the security vendors to determine technical accuracy and fair market value all equipment. 10. Assist Orange County and the General Contractor in the negotiation process with the security vendors. ~~~ • 3 rtnasecueitycom ~O Phase 3 -Construction (23%~ 11. Review shop drawings and submittals. 12. Conduct four meetings and/or site visits to assist the Project Manager as security project overseer for installation of conduit, wiring, and security system equipment. Phase 4 -Record Documentation /System Acceptance ,10%~ 13. Conduct one site visit to inspect and evaluate installed security system equipment, develop a final punch-list, and approve system when completed and performing as specified. 14. Review and approve as-built documentation. 4 Y L ~F• Q 0 V V • • ~L'~ti - rnsasecu~ltycom • • • Section III -Client Responsibilities 1. LIAISON -Orange County should provide an individual to act as a single point of contact for RMA personnel 2. ACCESS -Orange County should provide access, through the liaison, to the facilities as required by RMA. 3. DOCUMENTATION -Orange County should provide supporting documents, proposed procedures, etc. which may exist and that will aid in the project management. 4. TAX EXEMPTION -Orange County must provide documentation oftax-exempt d status, if applicable. ._ N C O ~. N d d ._ V I O ~:+ V ~~~ 5 ~,,. Section IV -Schedule of Deliverables Deliverables shall include: 1. Security System Layout that outlines the integrated security systems for the Justice Expansion. 2. Construction Documents that include a fmal set of drawings, request-for- proposal and specifications submitted as a package. 3. Documentation of meetings and conversations regarding all aspects of this project. 4. Project status reports. 5. Punch-list of installation problems and/or vendor problems. 6. Statement of installed system condition. 7. As-built documentation. RMA will review for accuracy the as-built documents for the facilities prior to conveyance to the owner. Following RMA's review, the contractors will provide as-built documents to Orange County in both paper and electronic formats. 6 N L 0 O _~ 3 t V I O ._ • • ~.N.~.~. fre~secuetyix~n Y Section V -Acceptance Agreement Risk Management Associates is an approved GSA contractor. As such, our rates for Orange County will follow the fee structure established for GSA. Commercial GSA Price lFF GSA Category Castomer Pricing Discount Fee Proposed (-) (+) Price Senior Security Consultant $160/hour 5% 0.75% $153 Security Consultant $140/hour 5% 0.75% $134 Security Research Analyst $140/hour 10% 0.75% $127 CAD Operator $140/hour 36% 0.75% $90 Daily rates aze based upon actual number of the hours worked during the day. Hours spent in travel to or from a project for assigned work will be billed as a part of the hours for that project. Reimbursement of expenses will follow government regulations concerning pricing and travel costs. Expenses aze chazged as direct pass through costs. No mazkup is allocated except where fees aze assigned as a part of payment. Fees are based on the description of services provided. RMA shall bill for actual time spent plus incurred expenses. RMA shall bill on a Time & Materials basis following the fees represented above. Total chazges represented in Section II aze a good faith estimate of the services to be provided and should not exceed $27,378.00, including expenses, without additional approvals from the client. (Expenses include portal to portal mileage at the government allowable rate, currently $0.485 per mile.) ~J Fees are due as service is provided. The accumulated additional fees may be invoiced on a monthly basis or at the completion of tasks in the project Scope of Work. Orange County Risk Management Associates By: By: Title: Title: Date: Date: •.+ C L Q V C .~.+ V V Q I O •+ 7 . ~D .. Contacting RMA RMA/Risk Management Associates is available for you. If you would like to discuss issues or provide information in reference to defining a scope, or engage in conversation in reference to understanding a project, or review of a proposal, please contact us as listed below. Risk Management Associates 127 West Hazgett Street Raleigh, NC 27601 Post Office Box 1783 Raleigh, NC 27602 (919) 834-8584 Fax: (919) 834-8150 Michael K. Tucker, Chairman William F. Booth, Chief Executive Officer Michael Longmire, President Jerry Blanchard, Senior Vice President Christine Peterson, Vice President, Administration www.rmasecurity.com •-+ C L Q V C .~ V V • • Q C O a' V d 8 ~z~.a. 11~Fn.j~c~llc3]F :~>~Ui'KtIC~