Loading...
HomeMy WebLinkAboutAgenda - 12-13-1999 - 4ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 13, 1999 Action Agenda Item No. 4 SUBJECT: County /OCS /CHCCS Informational Reports DEPARTMENT: OCS /CHCCS PUBLIC HEARING: (Y /N) No ATTACHMENT(S): As listed in "Background" INFORMATION CONTACT: Randy Bridges, 732 -8126 Neil Pedersen, 967 -8211 D Donna Dean, ext 2151 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane 336- 227 -2031 PURPOSE: To receive reports from staff /elected officials regarding several school related issues. BACKGROUND: This portion of the meeting provides an opportunity for the three elected boards to receive updates on the topics noted below, and to identify any other topics that staffs may need to research and bring back as the subject of subsequent reports. a) Adopted 1999 -2000 School Budgets The two school staffs will review the budgets adopted by the two school boards for the current fiscal year and compare those to the spending plans that were presented to the Board of Commissioners in May 1999. This information was provided to the BOCC for information only as part of the agenda materials for their August 31 work session. Attachment 4a -1— OCS Adopted Budget Attachment 4a -2 — CHCCS Adopted Budget b) 2000 -2001 Standardized School Budget Format The County Budget Director has collaborated with the two school systems' Finance Officers to develop a standardized format for the presentation of the two school systems' budget requests for the next fiscal year. This standardization should permit easier comparison of the two budget requests next spring during budget work sessions. Attachment 4b — "Proposed County Budget Forms for Schools" 2 c) Number of Classrooms /Class Sizes /Capacity of All Schools, and Costs of Newer Schools Members of the BOCC indicated an interest in reviewing information related to: the number of classrooms, current capacity, and student enrollments for each school in both school systems; average class sizes by grade level groups in both systems; and the costs of constructing newer schools (all those from New Hope Elementary on). Attachment 4c -9 OCS Classroom /Capacity/Enrollment Table Attachment 4c -2 CHCCS Classroom /Capacity/Enrollment Table Attachment 4c -3 OCS Average Class Size Attachment 4c -4 CHCCS Average Class Size Attachment 4c -5 OCS Newer School Costs Attachment 4c -6 CHCCS Newer School Costs Attachment 4c -7 Extracts from Adopted Elementary, Middle, and High School Construction Standards d) Timetables /Progress Reports for Major OCS /CHCCS Capital Projects School staffs will provide brief updates on the progress of various new school and major renovation projects that are under construction or in the planning stages. Attachment 4d OCS Timetables/Progress Reports FINANCIAL IMPACT: There is no financial impact tied directly to the review /discussion at this meeting of these reports. However, any discussion is likely to influence future school operating and capital budgets. RECOMMENDATION(S): The Manager recommends that the boards receive the reports for information only. Orange Countp JRoarb of tbucation RANDY BRIDGES, SUPERINTENDENT WWborouO, RC 27275 BOARD MEMBERS 200 BAST KING STREET SUSAN DOVENBARGER, CHAIR HILLSBOROUGH, NC 27278 KEITH CORK VICE CHAIR TELEPHONE 818.752.4126 ROBERT BATEMAN FAX., 818. 7524120 RICHARD KENNEDY DAVID KOLBMKY DELORES SIMPSON BRENDASTEPHENS MEMORANDUM TO: John Link FROM: Randy Bridges RE: 1999 -2000 Budget Information DATE: August 23, 1999 I have provided the Local and Capital Budget information for the Orange County School System for the 1999 -2000 school year which was approved by the Orange County Board of Education at its July 5, 1999 Board Meeting. We have not taken the final resolution to our Board for approval at this time. We will be doing so in September. If you need additional information, or have any questions please call me. Thank you. /ha Attachment , LOCAL CURRENT EXPENSE 1999 -00 APPROVED BUDGET 1999 -00 Salary Increase 8% Certified; 3% Classified Health Insurance Increase (35% increase) Utilities Insurance (Liability) Charter Schools TOTAL 0 7/5/99 3 -1 M REQUESTED APPROVED all matching 651,672 651,672 135,528 135,528 47,184 47,184 14,500 14,500 49,341 49,341 898,225 898,225 3 -1 M LOCAL CURRENT EXPENSE 1999 -00 7/5/99 3 System Wide Spanish Teachers 143,727 - 1 Pre -K Teacher 47,909 - .5 Intellectually Gifted Coordinator OHS 23,955 23,955 2 Reading Recovery Teachers 95,818 95,818 1 Teacher for students with disabilities CWS 47,909 - 1 Teacher for students with disabilities ALS 47,909 - 1 Physical Therapist Assistant 47,909 - 1 Science Teacher OHS 47,909 47,909 1 AG Teacher 1/2 C.P; 1/2 N.H. 47,909 - Increase Local Supplement (gross 263,017, benefits 48,606) 311,623 311,623 1 Nurse 47,909 - 1 Additional Custodian ALS 27,925 - 1 Additional Custodian OHS 27,925 - 2 Technology Support Technicians 95,818 95,818 1 Additional Associate Principal 10- Months CWS 60,870 60,870 1 Secretary 1/2 Finance; 1/2 Auxiliary Services 32,388 32,388 .5 Additional Custodian at Central Office /Support Services 13,963 - CWS Additional Clerical Assistant 22,572 - OHS School Resource Officer 34,000 34,000 1 School Based Chair Person 47,909 47,909 System Wide Remediation Funding - 81,000 Grant WriterNolunteer Coordinator - 35,000 Additional Month of Employment for Guidance Dept OHS - 2,500 Local Principal Supplement - 5,000 TOTAL 1,273,8561 873,790 REQUESTED APPROVED Clerical Substitutes 4,000 4,000 Custodian Over 10,000 10,000 Vehicle Liability Insurance 2,000 2,000 -TOTAL 16,000 16,000 TOTAL DECREASES 16,000 16,000 3-2 3-3 ods 1999-00 Combined Operating Budget 18,107,065 27,617,841 Revenues and Expenditures 46,898,470 Per pupil expenditure $ 2,826 $ 4,311 $ State Public $ 7,321 Revenues Local Fund School Fund Federal Fund Total State of North Carolina 27,617,841 27,617,841 State Textbook Allocation 306,742 306,742 Federal 1,173,564 1,173,564 Orange County Appropriation 14,451,936 14,451,936 Special District Tax Other Local Revenue 3,348,387 3,348,387 Additional Revenue Requested - - Total Revenues 18,107,065 27,617,841 1,173,564 46,898,470 E INSTRUCTIONAL PROGRAMS 5100 REGULAR 4,239,958 13,737,794 75,633 18,053,385 5200 SPECIAL 694,241 2,484,140 700,987 3,879,368 5400 CO- CURRICULAR 337,802 70,281 408,083 5800 STUDENT SERVICES 171,960 1,676,057 1,848,017 5900 BENEFITS 1,840,691 3,962,904 182,234 5,985,829 5900 ADDITIONAL PAY 1,851,892 386,863 5,009 2,243,764 5000 TOTAL 9,136,544 22,247,758 1,034,144 32,418,446 SUPPORT SERVICES 6100 PUPIL SUPPORT 121,460 52,020 13,919 187,399 6200 INSTRUCTIONAL SUPPORT 697,909 383,985 29,501 1,111,395 6300 ADNINISTRATIVE SUPPORT 468,387 307,867 34,500 810,754 6400 SCHOOL ADMINISTRATION 879,740 1,347,841 2,227,581 6500 BUSINESS SUPPORT 4,066,143 2,041,688 7,000 6,1.14,831 6600 CENTRAL SUPPORT 385,634 113,353 15,000 513,987 6900 BENEFITS 934,627 950,794 9,000 1,894,421 6920 ADDITIONAL PAY 176,124 172,535 4,000 352,659 6000 TOTAL SUPPORT 7,730,024 5,370,083 112,920 13,213,027 COMMI Nrl Y SERVICES 7000 COMMUNITY SCHOOLS 854,929 - - 854,929 7000 TOTAL COMMUNITY 854,929 - - 854,929 8000 NON- PROGRAMI ED CONTINGENCY 20,000 20,000 OTHER 365,568 - 26,500 392,068 TOTAL NON - PROGRAMMED 385,568 26,500 412,068 Total Operating Expense 18,107,065 27,617,841 1,173,564 46,898,470 Per pupil expenditure $ 2,826 $ 4,311 $ 183 $ 7,321 OCS Local Fund Revenue Projections Total Students COUNTY APPROPRIATION Per Student County Appropriation OTHER REVENUE: State Textbook Allocation Sales Tax Reimbursement Tuition - Regular School Fines & Forfeitures Rental School Property ABC Revenue Interest Earned on Investments Miscellaneous Revenue Indirect Cost Community Schools Appropriated Fund Balance SUBTOTAL OTHER REVENUE LOCAL REVENUE TOTAL BUDGET REQUESTED FUNDING DIFFERENCE 6,019 ACTUAL BUDGET PROPOSED INCRDEC) % INCMEC) 1997 -98 1998 -99 1999.2000 From 98.99 from 98.99 Projected Enrollment 12, 911,160 14,451, 936 1,540,776 State projections less tuition paid 6,050 6,233 6,281 ExjstIng Charter School students 5,000 127 156 Total Students 6,050 6,360 6,437 77 1.2% 248,265 82,419 Out of County Tuition Paid Students 31 31 31 Total Students COUNTY APPROPRIATION Per Student County Appropriation OTHER REVENUE: State Textbook Allocation Sales Tax Reimbursement Tuition - Regular School Fines & Forfeitures Rental School Property ABC Revenue Interest Earned on Investments Miscellaneous Revenue Indirect Cost Community Schools Appropriated Fund Balance SUBTOTAL OTHER REVENUE LOCAL REVENUE TOTAL BUDGET REQUESTED FUNDING DIFFERENCE 6,019 6,329 6,406 77 120,000 120,000 11,487,W9 12, 911,160 14,451, 936 1,540,776 1,889 2,040 2,256 216 159,566 278,527 306,742 28,215 120,000 120,000 12,111 3,000 3,000 - 240,931 180,000 180,000 - 10,705 5,000 5,000 - 21,125 18,700 18,700 - 248,265 82,419 163,812 81,393 65,350 5,000 5,000 - 23,461 3,000 176,730 173,730 852,927 793,492 830,929 37,437 1,845,215 1,845,215 - 1,634,440 3,214,353 3,655,128 440,775 13,121, 449 16,125, 513 18,107, 064 1,961,551 18,107,064 1,540,776 440,775 - nuepmj= 1.2% 11.9% 10.6% 13.7% 14.7% Ocs Local Fund Revenue History y2K per Student Increase 1990 -91 $1,175 $118 1991 -92 1,310 135 1992 -93 1,310 0 1993 -94 1,383 53 1994 -95 1,451 88 1995 -96 1,571 120 1996 -97 1,782 211 1997 -98 1,889 107 1998 -99 2,040 151 1999-00 2,256 216 ocs Local Fund Budget Summary Approved Budget for 1999 -00 1997 -98 1998 -99 1999 -00 ACTUAL BUDGET PROPOSED CHANGE INSTRUCTIONAL PROGRAMS 51-00 REGULAR 2,801,746 3,775,515 4,239,958 12.3% 5200 SPECIAL 161,568 527,319 694,241 31.7% 5400 CO- CURRICULAR 313,982 337,802 337,802 0.0% 5800 STUDENT SERVICES 34,909 159,222 171,960 8.0% 5900 BENEFITS 1,028,978 1,662,262 1,840,691 10.7% 5900 ADDITIONAL PAY 1,439,597 1,304,763 1,851,892 41.9% 6900 BENEFITS 5000 TOTAL 5,780,780 7,766,883 9,136,544 17.6% SUPPORT SERVICES 6100 PUPIL SUPPORT 93,073 114,630 121,460 6.0% 6200 INSTRUCTIONAL SUPPORT 506,625 599,856 697,909 16.3% 6300 ADMINISTRATIVE SUPPORT 364,593 448,015 468,387 4.5% 6400 SCHOOL ADMINISTRATION 344,684 753,605 879,740 16.7% 6500 BUSINESS SUPPORT 3,346,235 3,943,780 4,066,143 3.1% 6600 CENTRAL SUPPORT 267,269 373,085 385,634 3.4% 6900 BENEFITS 463,817 808,862 934,627 15.5% 6920 ADDITIONAL PAY 138,062 163,078 176,124 8.0% 6000 TOTAL SUPPORT 5,524,358 7,204,911 7,730,024 CONQAUNITY SERVICES 7000 COMMUNITY SCHOOLS 773,828 817,492 854,929 7000 TOTAL COA04UNITY 773,828 817,492 854,929 8000 NON - PROGRAMMED CONTINGENCY 20,000 20,000 OTHER 198.722 316.227 365.568 TOTAL NON- PROGRAMIED TOTAL LOCAL FUND BUDGET 7.3% 4.6% 4.6% 0.0% 15.6% 198,722 336,227 385,568 14.7% 12,277,688 16,125,513 18,107,065 12.3% lo=12000 ocs Summary of Budget Request Local Fund Budget 1999 -00 BASE BUDGET EXPANSION: • The amount to cover a State Legislature 8% certified and 3% classified across the board salary increase and matching benefits for all Public School Employees. This amount represents our locally funded employees. $ 651,672 • The amount to cover a.State increase of 35% for health insurance coverage. $ 135,528 • Liability Insurance Increase $ 61,684 • The amount expected to cover growth in Charter Schools.. We currently have enrollment of 156. $ 49,341 TOTAL BASE BUDGET $ 898,225 NEW INITIATIVES/EXPANSION: • 2.5 Teacher Positions/Additional Transportation for Year -Round School (ALS) The school within a school Year -Round School Program continues to grow. This year we will have all three grades represented. As these numbers continue to grow, there is a need to separate the various offerings from the traditional school. These positions will go toward meeting the elective needs of the year -round students. Each year our parents request additional transportation for this program. Currently we are only able to provide transportation for the Hillsborough Elementary and A. L. Stanback attendance zones. The additional funds would allow us to assign one bus to each school to provide transportation outside their attendance zones. $159,773 1 • I School Base Chair The demands for the Exceptional Children's Program are increasing each year. We currently have classroom teachers performing their normal duties and facilitating the ]EP meetings for our students. It is extremely difficult to perform both tasks successfully. We are requesting that a School Base Chairperson be assigned to each middle school on a half time basis to facilitate IEP meetings and handle the massive amount of paper work which are required by State/Federal laws. $ 47,909 • 1/2 AG Gifted Coordinator (OHS) Our AG Plan also recommends additional services for the high school. This position would address that need. $ 23,955 • 2 Reading Recovery Teachers The Reading Recovery Program has proven to be very successful in all our elementary schools. We would like to increase the number of students receiving these services. We intend to use these two teachers in the schools with the' highest needs for reading intervention. $ 95,818 • 1 Science Teacher (OHS) The Science Department of all high schools has the largest number of End -Of- Course tests. As students continue to take more and more of the core subjects to meet graduation and college entrance requirements, it is imperative that we keep the student/teacher ratio at a reasonable level. This position would allow us to maintain our 1:25 teacher /student ratio at the high school. $ 47,909 • Increase Local Supplement (gross $263,017, benefits $48,606) The recruitment, selection, development, and retention of quality teachers remain one of the guiding'principles for our system. In order to attract, retain, and be competitive with surrounding systems in an environment where teachers are becoming more and more scarce each year, we feel it is absolutely necessary for us to increase our local supplements. $ 311,623 2 • 1 Secretary %z Finance; 1/2 Auxiliary Services We are also requesting half -time assistance for the Directors of Auxiliary Services and Finance, two cabinet level positions in central office. $ 32,388 • One Associate Principal Middle School (10 months) This was the top priority of our principals last year, as they wanted two associate principals in each of our middle schools. We were able to fund one position this year, and use a Principal Fellows Candidate in the other school. We are requesting that the second associate principal be added. $ 60,870 • Two Technology Support Technicians Technology is quickly becoming a powerful instructional tool. There is a need for constant updating in programs and repair. Our building level technology teachers are spending more and more time on the maintenance of the equipment, as opposed to working with teachers and students. It is our hope that.these two technology technicians, along with the one other person, will be able to eliminate some of the mechanical demands for our building level teachers. $ 95,818 • 1 Resource Officer (OHS) We have been able to provide School Resource Officers in our middle/high schools with grants and some local funding. The high school has over 1600 students, and there is clearly a need for more than one officer. These officers continue to be a valuable asset to our schools. Unfortunately, with the events taking place around the country, their presence has become even more needed as a preventive measure. $ 34,000 3 • System Wide Remediation Funding We have determined that providing sustained remediation assistance to our At -Risk Students has elevated our proficiency levels in reading and math over the past four years. We have been limited to providing these services the second half of the school year. We are adding additional funding to each of our schools so that these services can be expanded and offered throughout the. school year. The program will be offered both during and after school. $ 81,000 • Grant WriterNolunteer Coordinator Currently we don't have any specific person to pursue Grant opportunities for the system. It is very important that we seek any and all additional funding for our system. In addition to these responsibilities , the system is also in need of an organizer to build a pool of school volunteers. It remains very clear that the more external customers we can involve in the educational process the more successful we will be in developing the total child. $ 35,000 • Additional Month of Employment for Guidance Dept OHS Orange High School is currently the only high school in the area that doesn't have the Guidance Office open year. round. As our system continues to grow and with the number of new /transfer students coming over the summer, we need to register students and communicate with new parents as they arrive in our system. $ 2,500 4 • Local Principal Supplement We currently have two tenured principals whose local supplements have been frozen for a number of years. These funds will place their local supplement in line with our other principals who are under contracts. $ 5,000 TOTAL $ 873,790 TOTAL NEW INITIATIVES/EXPANSION $1,9319788 SAVINGS • Savings from Clerical Substitutes $ 4,000 • Savings from Overtime $ 10,000 • Savings for Vehicle Liability Insurance $ 2,000 Decreases from 1998 -99 Grand Total $16,000 $1,915,788 5 OCS Summary of Budget Requests Local Fund Revenue 1999 -00 Projected Student_ Enrollment 1999 -00 *Budgeted OCH Students (including tuition paid and excluding 6,281 present charter school students) *Budgeted Charter School students increase to actual this year. 156 *Total students requiring funding —' g'- *Total students requiring funding 6,437 *Less number of tuition paying students (31) *Total students needing County funding 6,406 Change in Revenue t *County per pupil allocation including an increase of 77 students 1,540,776 Other Revenue *State Textbooks Warehouse Account 28,215 *Sales Tax Reimbursement 120,000 *Interest Earned on Investments 81,393 *Indirect Cost 173,730 *Community Schools 37,437 Total Revenue Change 440,775 ORANGE COUNTY PER PUPIL ADM HISTORY 10/18/98 Increase County Current Expense Per Pupil ADM % 1993 -94 7,420,172 $ 1,363.00 5444 1994 -95 8,099,482 $ 1,451.00 5582 .9.15% 1995 -96 8,825,533 $ 1,571.00 5617 8.96% 1996 -97 10,121,760 $ 1,782.00 5680 14.69% 1997 -98. 11,487,900 $ 1,889.00 6081 13.50% 1998 -99 12,911,160 $ 2,040.00 6202 12.39%• 1999 -00 14,451,936 $ 2,256.00 6406 11.93% OCS 1999 -00 State Fund Budget Summary SUMMARY BY PURPOSE CODE REVENUES EXPENSES INSTRUCTIONAL PROGRAMS 5100 REGULAR 5200 SPECIAL 5800 STUDENT SERVICES 5900 BENEFITS 5900 ADDITIONAL PAY 1997 -98 1998 -99 1999 -00 ACTUAL BUDGET PROPOSED CHANGE 22,721,666 25,738,356 27,617,841 7.3% 11,106,217 12,696,667 13,737,794 2,236,906 2,298,000 2,484,140 1,212,079 1,551,905 1,676,057 3,029,266 3,662,573 3,962,904 198,608 377,427 386,863 5000 TOTAL 17,783,076 20,586,572 22,247,758 SUPPORT SERVICES 6100 PUPIL SUPPORT 33,978 51,000 52,020 6200 INSTRUCTIONAL SUPPORT 401,774 371,000 383,985 6300 ADMINISTRATIVE SUPPORT 225,604 298,900 307,867 6400 SCHOOL ADMINISTRATION 1,197,778 1,248,001 1,347,841 6500 BUSINESS SUPPORT 1,880,225 1,982,222 2,041,688 6600 CENTRAL SUPPORT 206,021 110,051 113,353 6900 BENEFITS 908,585 923,100 950,794 6920 ADDITIONAL PAY 84,625 167,510 172,535 6000 TOTAL SUPPORT 4,938,590 5,151,784 5,370,083 COMMUNITY SERVICES 7000 COMMUNITY SCHOOLS 7000 TOTAL COMMUNITY - - 8000 NON - PROGRAMMED CONTINGENCY OTHER 8.2% .8.1% 8.0% 8.2% 2.5% 8.1% 2.0% 3.5% 3.0% 8.0% 3.0% 3.0% 3.0% 3.0% 4.2% TOTAL NON - PROGRAMMED TOTAL 22,721,666 25,738,356 27,617,841 7.3% * 1999 -00 Projections are based on planning allotments which are subject to change based on the higher of the first two months ADM. X000 ocs 1999 -00 Federal Fund Budget Summary SUMMARY BY PURPOSE CODE 1997 -98 1998 -99 1999 -00 ACTUAL BUDGET PROPOSED CHANGE REVE1VUE 930,391 1,116,386 1,173,564 5.1% EXPFJVSES INSTRUCTIONAL PROGRAMS 5100 REGULAR 5200 SPECIAL 5800 STUDENT SERVICES 5900 BENEFITS 5900 ADDITIONAL PAY 5000 TOTAL SUPPORT SERVICES 6100 PUPIL SUPPORT 6200 INSTRUCTIONAL SUPPORT 6300 ADMINISTRATIVE SUPPORT 6400 SCHOOL ADMINISTRATION 6500 BUSINESS SUPPORT 6600 CENTRAL SUPPORT 6900 BENEFITS 6920 ADDITIONAL PAY 6000 TOTAL SUPPORT COMMUNITY SERVICES 7000 COMMUNITY SCHOOLS 7000 TOTAL COMMUNITY 8000 NON- PROGRAIV AM CONTINGENCY OTHER TOTAL NON - PROGRAMMED TOTAL feder2000 - 92,747 57,751 75,633 .31.0% 589,856 663,690 700,987 5.6% 12,468 69,507 70,281 1.1% 133,123 171,919 182,234 6.0% 5,106 4,060 5,009 23.4% 833,300 966,927 1,034,144 7.0% 9,478 11,184 13,919 24.5% 27,645 19,554 29,501 50.9% 21,524 32,023 34,500 7.7% 5,940 6,670 7,000 4.9% 1,065 13,100 15,000 14.5% 7,978 39,168 9,000 -77.0% 3,596 4,000 11.2% 73,630 125,295 112,920 -9.9% 23,461 23,461 930,391 24,164 26,500 24,164 ' 26,500 9.7% 9.7% 1,116,386 1,173,564 6.1% Position Budget Summary For the Local, State and Federal Funds STATED IN FULL -TIME EQUIVALENT POSITIONS (FTE) SUMMARY BY PURPOSE CODE ** State and Federal 1999-00 Budget information is estimated at this time. Local Fund State Fund Federal Fund i9w low 1998 -99 1999 -00 1998 -99 1999 -00 1998 -99 1999 -00 1998 -99 1999-00 Chg INSTRUCTION 5100 REGULAR 101 106.5 404 408 505 514.5 9.5 5200 SPECIAL 17.5 19 60.73 65.73 26.77 27.77 105 112.5 7.5 5400 Co- Cunicular coaching supplements extra duty not positions 5800 STUDENT SERVICES 2 3 29 29 31 32 1 5000 TOTAL 120.5 128.5 493.73 502.73 26.77 27.77 641 659 18 SUPPORT SERVICES 6100 PUPIL SUPPORT 2 2 1 1 0.5 0 3.5 3 -0.5 6200 INSTRUCTIONAL SUPPORT 11.5 13.5 5 5 1 17.5 18.5 1 6300 ADMINISTRATIVE SUPPORT 3.4 3.4 4.6 4.6 8 8 0 6400 SCHOOL ADNONISTRATION 15 16 36 36 51 52 1 6500 BUSINESS SUPPORT. 130 131 57 57 187 188 1 6600 CENTRAL SUPPORT 5 6 5 6 1 6000 TOTAL SUPPORT 166.9 171.9 103.6 103.6 1.5 0 272 275.5 3.5 COMMUNITY SERVICES 7000 COMMUNITY SCHOOLS 23 23 23 23 0 7000 TOTAL COMMUNITY 23 23 0 0 0 0 23 23 0 TOTAL 310.4 323.4 597.33 606.33 2827 27.77 936 957.5 21.5 ** State and Federal 1999-00 Budget information is estimated at this time. B-10-99 OCS Summary of Changes Position Budget 1999 -00 Change in State Fund Budget INCR/(DECR) * New Classroom Teacher Positions 1 * One Teacher Assistant for grades K-3 1 * Support Position 1 * Vocational Education Position 1 * Special Education Teachers 3 * Special Education Assistants 1 * Willie M Teacher Assistant 1 TOTAL ADDITIONAL STATE POSITIONS 9.0 Changes in Local Fund Budget * Additional Elective Teachers ALS 2 * Additional Math Teacher ALS 0.5 * intellectually Gt ted Coordinator OHS 0.5 * Reading Recovery Teachers 2 * Science Teacher OHS 1 * 2 Technology Support Technicians 2 * Additional Associate Principal 10- Months CWS 1 * Secretary 1/2 Finance; 142 Auxiliary Services 1 * OHS School Resource Officer 1 * School Based Chair Person 1 * Grant WriterNolunteer Coordinator 1 TOTAL ADDITIONAL LOCAL POSITIONS . 13 Changes in Federal Fund Budget * Drug Free Funds Clerical Position -0.5 TOTAL ADDITIONAL FEDERAL POSITIONS -0.5 TOTAL NEW POSITIONS 21.5 1 APPROVED OCS RECURRING CAPITAL BUDGET 1999 -2000 7 -3 -99 1 REQUEST JUSTIFICATION FUNDED CATEGORY i BUILDINGS & GROUNDS Cameron Park 4.9101.001.524 1. Replace Fire Alarm System Bring Fire Alarm System up to state code #NFPA#72, to most ADA Standards. $5,000 4.9102.001.524 2. Intercom S jUpgrade 20 year old Intercom system 40,000 Central Elementary 4.9103.001.524 1. Upgrade Fire Alarm To bring school Fire Alarm System up to code #NFPA72, to meet ADA and State Guide Unes 50,000 4.9104.001,529 9: Ceiling Tile Replace old and spotted calling We In halls 10,000 4.9105.001.523 10. Headng/Codtng one Walling and cooling window unit to old lounge area 5,000 CW STANFORD 4.9106.001.523 1. Chiller 200 Building Replace a 45 ton unit with a 80 ton unit, this will allow use to cool the entire 200 building, the present unit Is 20+ years old. Currently we can't cod the gym and classrooms at the same time. 70,000 4.9107.001.529 4. Cafeteria Hood Fire Protectors Update old hood fire protection system, State Standard Fire Code 5,000 Efland Cheeks Elementary 4.9108.001.523 1. Heating/Cooling Units Replace two roof top heating/cooling units, units are 21 years old 40,000 G. A. Brown 4.9109.001.524 1. Heafing/Coding Units Replace two water source heatinglcooling units, units are 20+ years old 35,000 Hillsborough 4.9110.001.523 3. Work Room Vent Install a vent to move heat built up by equipment used In workroom 1,000 New Hope 4.9111.001.529 1. Fencing Replace old fencing around play area, also add 3 gates 6,000 4.9112.001.529 2. Roll Gate Safety Guards Entrance roll gates to school need to have safety guards to prevent gates from sliding off rollers and severely Injuring someone. 3,000 4.9113.001.529 1 Fence Gate Install gate leading to back play area 1,000 SYSTEM WIDE 4.9114.001.529 2. Roof Repairs Maintain roofs at all buildings systemwide 25,000 4.9245.001.529 3. Bleacher Maintenance Yearly Inspection and maintenance upkeep on all bleachers and basketball backstops. 15,000 1 APPROVED OCS RECURRING CAPITAL BUDGET 1999 -2000 7-3 -99 REQUEST JUSTIFICATION FUNDED 4.9247.001.529 14.9248.001.529 4. Painting Schools painting schools on the yearly rotation painting 20,000 5. Line Painting Keep our schools parking lots properly lined and painted 10,000 4.9249.001.529 4.9251.001.529 4.9250.001.529 4.9252.001.529 4.9253.001.529 4.9254.001.529 4.9115.001.529 4.9116.001.529 4.9117.001.529 6. Cafeteria Kitchen Hood Cleaning 7. Carpet Cleaning 8. Pest Control 16. Bloodbome Paths. Waste Disp. 17. Tadc Strips/Dustiess Board 18. Landscaping all schools 19. Driveway Paving 21. Water Cooler Replacement 22. Mobile Units OHS, ALS,W Semi- Annual cleaning of cafeteria hoods, safety/health issue Yearly carpet cleaning of office areas in the system Yearly treatments of all the buildings in the system, heanh/salety issue. Conform to OSHA Standards by disposing of science lab chernicals and medical waste from school health rooms. Replace bulletin boardshadc strips in the school system Reseed and fertilize all grounds, systemwide, does not Include athletic fields Repair drivewaystpoiholes systemwide Bring all school sites up to date also ADA standards . Leased 4 mobile units 91000 10,000 9,000 6,000 3,000 12,000 10,000 31,000 22,304 Athletics 4.9233.001.326 Turf and Field Maintenance 15,000 4.9234.001.541 Turf Equipment 15,000 Maintenance. 4.9235.001.541 7. Safety Training Equipment Equipment lobe used for the training of personal systemwide videcs/equipment. 3,000 4.9236.001.541 8. (1) Bush Hog Replace bush hog mower used by Maintenance on school sites 5,000 4.9237.001.461 9. Safety Training Safety Training Serrdnar for systemwide employees to be conducted by the Orange County Schools Safety Coordinator. 5,500 Transportation 4.9118.001.529 3. Transportation Roofing Replace and reseal 10,4723q. foot of roofing. 16,000 TOTAL CATEGORY I BUILDING & GROUNDS 572,804 Category 11 Furniture & Equipment ALS APPROVED OCS RECURRING CAPITAL BUDGET 1999 -2000 7-3-99 3 REQUEST JUSTIFICATION FUNDED 4.9201.001.541.304 ADM Equipment allocation at 532. Capital Equipment 23,136 Cameron Park 4.9202.001.541.308 ADM Equipment allocation at $3Z Capital Equipment 17,952 Central Elementary 4.9203.001.541.312 ADM Equipment allocation at $32. Capital Equipment 13,696 CW STANFORD 4.9204.001.541.316 ADM Equipment allocation at $37- Capital Equipment 23,584 Efland Cheeks Elementary 4.9205.001.541.324 ADM Equipment allocation at $32. Capital Equipment 16,064 G. A. Brown 4.9206.001.541.328 ADM Equipment allocation at $3Z Capital Equipment 16,928 Hillsborough 4.9209.001.541.329 ADM Equipment allocation at $32. Capital Equipment 12,768 New Hope 4.9207.001.541.330 ADM Equipment allocation at $32. Capital Equipment 20,224 Orange High 4.9208.001.541.332 ADM Equipment allocation at $32 Capital Equipment 57,024 Administrative 4.9216.001.541 Transportation Equipment Allocation 10,000 4.9215.001.541 Maintenance Equipment Allocation 10,000 4.9119.001.523 Mechanical 15,000 4.9210.001.541 Commercial Copiers 60,000 4.9211.001.541 Human Resources Equipment Allocation 10,000 4.9213.001.541 Instructional Equipment Allocation 10,000 4.9214.001.541 Superintendent Equipment Allocation 10,000 4.9212.001.541 Finance Equipment Allocation 10,000 4.9217.001.541 Start Up for New Classrooms 45,500 3 ORANGE COUNTY SCHOOLS - CAPITAL IMPROVEMENT PLAN FOR 1999 -2009 2 -1-99 Project Title Through YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 TOTAL 1998 -99 99-00 00-01 01 -02 02 -03 03-04 0405 05-08 06.07 07.08 08 -09 Asbestos Removal 313,100 313,100 Bus Garage 200,000 200,000 Cameron Park Renovation 270,000 1 270.000 Central Elem. Media 90,000 90,000 CW Stanford Renovation 1,840,000 1,840,000 Efland- Cheeks Gym 450,000 450,000 Electrical SVS, Upgrade 575,000 575,000 Elementary School New 12,737,720 12,737,720 Energy Mgmt, systems 200,000 200,000 100,000 500.000 Enviromental Testing 150,000 150,000 Future Projects Reserve - 115,285 - 115,285 Grady Brown Renovation 100,000 100,000 Handicapped Accessibility 634,017 35,963 670,000 High School (New) 1,089,788 1,746,074 13,815,302 747,112 2,377,896 2,290,231 1,527,913 1,488,907 2,789,431 2,641,566 2,619,219 33,133,439 Hillsborough Elem. Renovation 1,161,250 1,161,250 Kitchen Projects 405,000 405,000 Maintenance Shop 155,000 155,000 Orange High Renovation 533,000 450,000 125,0001 500,000 1,608,000 Parking Lots/Playtields 100,000 265,000 365,000 Planning for Future Projects - 16,669 - 16,669 Playground Surfacing 140,000 140,000 Re- roofing Projects 456,635 750,000 159,197 1,000,000 1,140,000 250,000 3,755,832 Technology Application 5,700,000 625,000 625,000 625,000 625,000 625,000 625,000 625,000 625,000 625,000 625,000 11,950,000 TOTAL PROJECT EXPENSE 13.975,836 15,794,777 14,885,302 1,872,112 3,75$898 3,074,428 3,152,913 3,253,907 4,119,431 3,531,566 3,244,219 70,437,387 REVENUE PLAN: County Pay As You-Go 8,704,588 1,380,753 1.574,981 1,499.485 2,822,816 2,886,747 2,757.478 4850,563 3,708,021 3,111,928 2,816,189 33,713,547 Impact Fees 761,250 1,418,864 365,321 372,627 380,080 387,681 395,435 403,344 411,410 419,638 428,030 5,743,680 State Bonds 5,960,160 5,980,160 Local Bonds 92 2,000,000 2,000,000 Local Bonds 98 2,510,000 7,015,000 12,725,000 750,000 1 23,000,000 Total Revenues 13,975,836 15,794,777 14,665,302 1,872,112 3,752,896 3,074,428 3,152,913 3,253,907 4,119,431 3,531,566 3,244,219 70,437,387 ' U V 1� D CHAPEL HILL - CARRBORO CITY SC H Lincoln Center, Merritt Mill Road 1 7 1999 Chapel Hill, North Carolina 27516 -288 Telephone: (919) 967 -8211 Nell G. Pedersen Ann Y. Hart, Assistant Superintendent Superintendent of Instructional Services Chester F. Preyar, Assistwt Superintends t Of Support Serviow To. John Link, Manager Orange County FROM: Neil G. Pederse Superintettdent ' RE: Summary of Budget Request for 1999 -2000 DATE: August 16, 1999 Sorry you were not able to attend today's Managers' Luncheon. Had hoped to provide this information to you there. I have included the information sent to the Board of Education for approval at its July 15' meeting, but I have placed a blue marker denoting the information you specifically requested. Let me know if you have questions. NGP /asb 0 CHAPEL HILL- ,CARRBORO CITY SCHOOLS Lincoln Center, Merritt Mill Road Chapel Hill, North Carolina 27516 Telephone: '(919) 967 -6211 Nell Q. Pedersen Ann Hart, Assistant Superintendent Superintendent For instructional Services Chester Preyar, Assistant Superintendent For Support Services TO: Board of Education FROM: Neil G. Pedersen Superintendent RE: Recommended Operating and Capital Budgets for 1999 -2000 DATE: June 30, 1999 I am enclosing revenue and expense summary sheets for the 1999 -2000 operating and capital budgets. The operating budget has been reduced by $660,325 from the Board of Education's original request to the County Commissioners and projected revenues, excluding the county appropriation and district trot, have been increased by $270,000. These recommended revisions make up for the $930,325 shortfall in the Manager's Recommended Budget that the County Commissioners approved. The capital budget summary is identical to what was requested of the County Commissioners. The remainder of this memorandum pertains to the operating budget only. Increases in Revenues Incorporate projected sales tax reimbursements The original budget request did not include a line item for sales tax reimbursement. This is the first year that school districts are eligible for these reimbursements and we were uncertain about how to reflect this item in our budget. The Manager clarified that . reimbursements that we can claim for the 1998 -99 year should be shown as revenue in the 1999 -2000 budget. We estimate that we will receive $70,000 in sales tax reimbursement. Appropriate a total of $500,000 from fund balance In our original request, we recommended that $300,000 be appropriated from fund balance. The Manager and County Commissioners have encouraged us to appropriate more fund balance to fund recurring expenses such as the lifting of the salary cap on experienced teachers. We are recommending that an additional $200,000 be appropriated from fund balance, bringing the total to $500,000. Although this will leave us with a fund balance of less than 5.5%, the guideline cited in your policy, our fund balance should still exceed $1,000,000. This does not cause us an immediate problem. It must be emphasized, however, that we cannot be assured that next year a similar amount will be available to appropriate from fund balance. If this is the case, additional funding will be required from the County Commissioners because we are using fund balance to finance continuing expenses. M V • 2 Decreases in Expenses Reduce four positions and eliminate capital expenditures in the PREP Academy budget The PREP Academy budget is being reduced by $115,488. This reduction is accomplished by reducing the number of teacher assistants in the two academies from eight to four and by purchasing the computer hardware from Program 69 state dollars from this year's budget. Reduce the proposed budget for programs for Limited English Proficient students by almost $200,000 Funding for the LEP Task Force recommendations is decreased by $198,104; however, we are anticipating that the Task Force's recommendations very well could be fully funded and implemented. Non - personnel items are being purchased from 1998 -99 state dollars that must be expended by June 30, 1999 br else they revert back to the state. We are expecting the General Assembly to double the funding available for LEP students. If this proposed funding is approved, state funding will support the 1.5 additional state positions received this year and 3 additional positions for next year. With the one teaching position proposed for next year from local funds, we will increase the number of ESL teachers by four and be able to implement all of the strategies recommended by the LEP Task Force for the first year. If our allotment from the final budget approved by the General Assembly is not sufficient to fund the proposed positions, we could not fully fund the recommendations in light of the limited funds being reserved in the contingency fund. Defer initiative- to reduce class size No funding is recommended for reducing class size this year, therefore, further consideration will be delayed for one year. Although reducing class size is a high priority for the Board of Education, there simply.are not sufficient funds to proceed with this initiative. This will save $217,320. Reduce the number of technology . technician positions from 6.5 to 5 and decrease the length of their contracts The original budget request called for 6.5 technology technician positions with 11- month contracts. This request has been reduced to 5 positions that will work under 10.5 month contracts. This results in savings of $51,583. Reduce budgeted allocation to charter schools We have reduced the amount budgeted for charter schools by $27,830.. It is very difficult to project the payments that the district will be required to'make to charter schools; however, based on this year's experience and the closing of one charter school and the. relocation of another to Orange County, we believe that this reduction is feasible. If not, the district is committed to making these payments to charter schools and funds would need to be drawn from the contingency account. Reduce contingency funds by an additional $50,000 The 1998 -99 contingency account was $250,000. Originally, we recommended that it be reduced to $200,000. In order to fund other high priority projects, we recommend that this account be reduced by another $50,000 to a total of $150,000. If no major, unanticipated needs arise next year, this contingency should be sufficient. 3 Summary As the Board of Education has consistently stated throughout the budget process, every item in our budget request was a very high priority. Any item not funded has a' negative impact on programs and services. Nevertheless, under this budget proposal, we will be able to fund most of the programs and enhancements included in our budget request. The growth in the district will be accommodated without slighting the existing schools. Non- proficient students will be well served through an expanded summer school program and intervention programs at the end of the fifth and eighth grades. Although we anticipate' continued difficulties in supporting the effective use of technology in our schools, we will increase the attractiveness of our technology specialist positions and the support for our classroom teachers. I am particularly pleased that we will be able to fund all of the staff compensation requests although I remain concerned about our ability to compete for the very best teachers. Our supplement schedule will need to be significantly enhanced in upcoming years. Coping with the $930,325 shortfall in the revenues approved by the County Commissioners has not been easy. We benefited greatly by the anticipated doubling of state allocations for ESL programs. We. have deferred high priority items such as the reduction in class size. We have scaled back programs, including the PREP Academy and the technology technicians. We also have taken some risks. We've reduced the line item for allocations to charter schools, increased our appropriated fund balance, and reduced our contingency fund. We take these responsible risks because we believe that the additional personnel and other enhancements are critical to the success of the students in this school district. RESOLUTION: Be it, therefore, resolved that the Board of Education adopts the 1999 -2000 operating and capital budgets as presented in the attached documents. Summary of Budget Request Local Fund Budget For 1999 -00 Original Budget Revised Budget Growth Opening cost of Mary Scroggs $918,428 $918,428 Opening cost of ECHHS Additions 416,650 416,650 Increased maintenance cost 170,100 170,100 Local Teacher supplement funds 67,500 67,500 Non- personnel funds for growth 45900 45.900 1,618,578 $1,618,578 State Mandates Legislature wage increase $1,210,000 $1,210,000 Health insurance increase 297,000 297,000 Substitute teacher pay increase 44,000 44,000 Special Education Needs 185.824' 185.824 1,736,824 $1,736,824 Proficiency Standards PREP Academies $540,000 $424,512 Decentralization of summer school 105,540 105,540 'LEP Task Force recommendations 247,972 49,868 Reduction of Class size 217.320 Q $1,110,832 $579,920 Compensation Increase teacher supplement 112,000 112,000 Removal of cap 151,000 151,000 Fund enhancements recommended 95,000 95,000 Reclassification of several admin. pos. 49,000 49,000 Stipends to cover out of pocket expense 51250 5,250 Support for Teacher'Nationai Board 15,2W 15.2 $427,450 $427,450 Technology Technology Specialist contract 40,596 40,596 Technology Technicians(Elem) 119,456 142.531 Mid/High .Technicians 74.658 $183,127 $234,710 ,r Other Utility rate 56,400 56,400 Reduction of onetime cost prog. (130,000) (130,000) Reduction of Charter School funding (27,830) Reduction of contingency fund (50,000) (100,000) Capital Expenditures (40,000) (40,000) (163,600) (241,430) Total Budget Request $ 4,964,794 $41304,469 1999 -00 Combined Operating Budget Revenues and Expenditures State Public Local Fund School Fund Federal Fund Total Revenues State of North Carolina* $ 35,067,111 $ 35,067,111 State Textbook Allocation* 410,828 410,828 Federal* $ 2,118,706 2,118,706 Orange County-Appmpriation $ 20,085,168 20,085,168 Special District Tax 9,743,228 9,743,228 Other Local Revenue 1,491,500 1,491,500 Total Revenues $ 31,319,895 $ 35,477,939 $ 2,118,706 $ 68,916,541 Operating Expenses** Instructional Programs Regular $ 9,970,206 $ 20,352,221 $ 67,837 $ 30,390,263 Special 2,932,001 2,208,604 695,226 5,835,830 Co- Curricular 824,021 - - 824,021 Pupil Support 1,965,879 2,505,121 421,659 4,892,659 Other 3,178,557 5,234,483 486,750 8,899,790 Total instructional Programs 18,870,663 30,300,429 1,671,472 50,842,564 Support Services Instructional Staff 791,565 261,714 61,190 1,114,469 Administrative 272,770 72,876 8,630 354,276 School Administration 1,415,057 2,000,147 - 3,415,204 Business Support 6,464,930 1,398,954 7,863,884 Central Support 955,371 94,181 47,600 1,097,152 Other 1,914,361 910,697 118,682 2,943,740 Total Support Services 11,814,054 4,738,569 236,102 16,788,725 Community Services 14,054 28,113 - 42,167 Charter School Funds 471,125 - - 471,125 Contingency 150,000 - - 150,000 Other - 211,132 211,132 Sub -Total $ 31,319,896 $ 35,067,111 $ 2,118,706 $ 68,505,713 State Textbooks 410,828 - 410,828 Total Operating Expenses $ 31,319,896 $ 35,477,939 $ 2,118,706 $ 68,916,541 Per pupil expenditure $3,508 $4,039 $241 $7,788 *' State and Federal revenues are based on planning budgets. ** Appendix E contains explanations of expense categories. 2 -1 2 -2 Local Fund.Revenue Projections INCR /' PERCENT 1997 -1998 1998 -1999 1999 -2000 (DECR) INC /(DEC) ACTUAL Projected Enrollment of County Residents: BUDGET PROJECTION Fmm W99 98-99 State projection less tuition paid 8317 8441 8760 Existing Charter School students 143 143 Total County Resident Students 8317 8584 8903 319 Out of County Tuition Paid Students , 27 ZA _3 Total Students 8338 8611 8927 $16 Per Student County Appropriation Per Student Special District Tax.est. $1,889.00 880,74 $2,040.00 957.25 $2,256.00s 1,094.3$ $216.00 137.13 10.6% Per Student Local Funding $2,769.74 $2,997.25 $3,350.38 $353.13 14.3% 11.8% COUNTY TAXES: County Appropriation $ 15,710,819 $ 17,511,360 $ 20,085,168 $ 2,573,808 14.7% Special District Tax 7,507,334 8,217,005 9,743,228 1,526,223 18.6% SUBTOTAL FROM COUNTY $ 23,218,153 $ 25,728,365 $ 29,828,396 $ 4,100,031 15.9% OTHER REVENUE: Prior Year Special District Tax 73,415 60,000 60,000 - Sales Tax Revenue - - 70,000 70,000 State inventory Tax - 61,000 62,000 1,000 Tuition - Regular School 57,384 45,000 45,000 - Tuition -Summer School 52,771 45,000 45,000 Tuition - Preschool , 120,293 90,000 150,000 60,000 Fines & Forfeitures 317,843 320,000 320,000 - ABC Revenue 21,655 29,500 29,500 - - Interest Earned on Investments 132,787 150,000 150,000 ' Miscellaneous Revenue 37,478 15,000 20,000 5,000 Indirect Cost 105,321 40,000 40,000 - Appropriated Fund Balance 213,240 431,562 500,000 68,438 SUBTOTAL OTHER REVENUE $ 1,132,187 $ 1,287,062 $ 1,491,500 $ 204,438 15.9% LOCAL REVENUES $ 24,350,340 $ 27,015,427 $ 31,319,896. $4,304,469. 15.9% 2 -2 Local Fund Revenue History County Appropriation Special District Tax per $100 value Year Per Student Increase District Tax 1990 -91 $1,175 $118 $0.1775 1991 -92 1,310 135 $0.1735 1992 -93 1,310 •0 $0.1735 1993 -94 1,363 53 $0.1575 199495 1,451 88 $0.1540 1995 -96 1,571 120 $0.1540 1996 -97 1,782 211 $0.1900 1997 -98 1,889 107 $0.1790 * . 1998 -99 2,040 151 $0.1920 1999 -00 2,256 216 $0.2200 For 1999 -00: A $.01 District Tax increase Is estimated to generate $442,874 In additional revenue. A $.01 County General Fund Property Tax increase Is estimated to generate $670,000 in additional revenue to split between the two school districts in Orange County. CHCCS's share would be $390,000. * Re- evaluation year of property tax values 2 -3 2-4 Summary of Budget Requests Local Fund Revenue For 1999 -00 Projected Student Enrollment 1999 -00 * Budgeted CHCCS Students (including tuition paid and excluding present charter school students) 8784 * Bugeted Charter School students (same as 1997 -98 and 1998 -99 ADM). We are anticipating growth in the number of charter l43 * Total students requiring funding ' 8927 * Total students requiring funding 8927 * less number of tuition paying students -24 * Total students needing County funding. 8903 BUDGET Change in Revenue REQUESTS • County per student allocation: increase of in- county students of 319 $2,573,808 • Growth in Special District Tax base 1 52. 5.223 • Total increase from the County Commissioners $4,100,031 Other Revenuer • Increase in State inventory tax funds $1,000 • Increase in preschool tuition due to growth in program and increase in 60,000 tuition • State Tax Refimd 70,000 • Increase in miscellaneous income 5,000 * Increase in Appropriated Fund Balance 68,438 Net Other Income 204,438 TOTAL REVENUE CHANGE $4,304,469 2-4 . . Y Local Fund Budget Summary Proposed Budget for 1999 -00 1997 -98 1998 -99 1999 -00 ACTUAL BUDGET PRO_ POSED CHANGE SUMMARY BY PURPOSE CODE* INSTRUCTIONAL 5100 Regular $ 7,583,388 $ 8,303,103 $ 9,970,206 20.1% 5200 Special* 2,382,680 2,430,099 2,932,001 20.7% 5400 Co- Curricular 665,512 775,278 824,021 6.3% 5810 Education Media 300,618 349,960 448,629 28.2% 5820 Attendance/Social Work* 130,202 182,523 234,693 28.6% . 5830 Guidance Services* 450,472 405,245 459,405 13.40 5840 Health Services 139,169 153,177 181,520 18.5% 5850 Psychological Services* 87,170 8,189 26,684 225.9% 5860 Speech Pathology* 595,832 486,712 527,968 8.5% 5890 Other Pupil Support Services 69,561 83,361 86,980 .4.3% . 5900 Employee Benefits 2,527,790 2,462,467 3,178,557 29.1% 5000 TOTAL INSTRUCT.SERVICES 14,932,394 15,640,113 18,870,663 .20.7% SUPPORT SERVICES 6210 Improvement of instruction 824,094 756,551 791,565 4.6% 6200 Sub -total Instruct. Staff 824,094 756,551 791,565 4.6% 6310 Board Of Education 96,017 117,931 123,181 4.5% 6320 Executive Administration 109,250 111,608 114,630 2.7% 6390 Other Administrative Support 32,270 54,959 34,959 - 36.4% 6300 Sub -Total Admin. Staff 237,537 284,498 272,770 -4.1% 6410 Office of the Principal 985,118 1,330,214 1,415,057 6;4% 6400 Sub -total School Admin. r 985,118 1,330,214 1,415,057 6.4% 6510 Support Services 61,060 106,206 108,954 2.6% ' 6520 Fiscal Service 321,616 365,918 376,368 2.9% 6540 Operation of Plant 2,810,100 3,118,048 3,657,412 17.3° 6550 Transportation 124,231 305,303 314,506 3.0% 6560 Child Nutrition 58,908 61,264 63,102 3.096 6570 Internal Services 283,265 287,854 273,588 -5.0% 6580 Maintenance of Plant 1,378,891 1,497,160 1,671,000 11.6% 6500 Sub -total Business Support 5,038,071 5,741,753 6,464,930 12.6%. 2 -S Local Fund Budget Summary (con't) 1997 -98 1998-99 1999-00 ACTUAL BUDGET PRO._. POSED 6630 Community Relations 109,277 112,934 116,207 2.996 6640 Human Resources 217,082 382,484 502,135 31.3% 6660 Management Information Service 318,939 368,487 337,029 -8.5% 6600 Sub -total Central Support 645,298 863,905 955,371 10.6% 6900 Employee Benefits 880,482 1,224,154 1,500,776 22.8% 6930 Staff Development"- 411,555. 413,585 . 0.5% 6900 Sub -total Other Support 880,482 1,635,709 1,914,361 17,096 6000 TOTAL SUPPORT SERVICES 8,610,600 10,612,630 11,814,054 11.3% 7100 Community Services 3,176 13,001 13,241 1.8% 7910 Employee Benefits 2,811 728 813 11.7% • 7100 COMMUNITY SERVICES 5,987 13,729 14,054 2.4°% 8200 Charter School Funds 354,812 498,955 471,125 -5.6% 9990 Contingency 250,000 150,000 - 40.0% TOTAL LOCAL FUND BUDGET $ 23,903,793 $ 27,015,427 $ 31,319,896 15.9°% *Changes year to year are due to annual placement of staff on state, federal, or local budgets . where best use of fiords can be made * *Staff development was made a,separate category for the 1998 -99 school year (all local staff development is budgeted in 6930) * ** Appendix E contains explanations of expense categories. 2 -6 r Summary of Budget Requests Local Fund Budget For 1999 -00 BUDGET REQUESTS Growth * Opening costs of Mary Scroggs Elementary School in August 1999 $918,428 (see Appendix C for the details of the budget request). * Opening costs of East Chapel Hill High Additions in August 1999 (see 416,650 Appendix C for the details of the budget request). * Increased maintenance costs due to the opening of Mary Scroggs 170,100 Elementary School and East Chapel Hill High Additions in August 1999 (see Appendix C for the details of the budget request). * Local Teacher supplement funds for new state paid teacher positions. 67,500 * Non - personnel fimds for growth in the number of students and. teachers. These funds cover instructional supplies, co- curricular, staff" development, etc. allocated to schools on a per student or per teacher . 45.900 $1,418,578 State Mandates * Legislature wage increase for Teachers and Principals (8 %) and staff $1,210,000 (3 %) for positions established in the local budget. * Health insurance increase of an estimated 35% to $2,344 per fill-time 297,000 employee. The employer -paid cost of health insurance has been the same for seven years. * Substitute teacher pay increase mandated by the state legislature. 44,000 * Special Education Needs: -One System Level Class preschool autistic teacher 49,868 - One -half School Psychologist position 24,934 -Two high school Special Education Resource Teachers 99,736 - One -half Inclusion Assistant at Glenwood 11.286 $1,736,824 2 -7' r BUDGET REQUESTS Proficiency Standards * PREP Academies - A program to enable non - proficient fifth and eighth $424,'S 12 grade students to become proficient in reading, mathematics, and writing at the appropriate grade level. * Decentralization of summer school to provide a summer program at the 105,540 appropriate grade level * LEP Task Force recommendations - one system wide ESL teacher 49.858 $579,920 Compensation • * Increase teacher supplement one additional percent for those between 0 $112,000 and 9 years of experience so that minimums are 7% and 8% * Removal of cap in Teacher Supplement Program after four consecutive 151,000 years of successful teaching experience * Fund the enhancements recommended by the Supplement Study 95,000 Committee. Tuition reimbursement/bonus, relocation assistance, etc. * Reclassification of several administrative positions was recommended 49,000 by a study conducted in 1997 -98. The second phase of funding is being requested. * Stipends to cover out of pocket expenses for serving on the CHCCS 5,250 J School Board have not increased in a number of years. Recommended that the stipends double to $1,400 per member with an additional $100 for Vice Chair and $600 for Chair. * Support for Teacher National Board certification and new Teacher orientation, and materials for performance based licensure portfolio 15.200 $427,450 2 -8 BUDGET REQUESTS Technology * Technology Specialist contract extensions to 11 months (elementary $40,596 and middle schools) and 12 months (high schools) to allow more time for planning and preparation. * Technology Technicians (five technicians for 10.5 months) to support 142.531 technology maintenance. $183,127 Other • Utility rate increases anticipated (3 %) for water and power $56,400 • Reduction of one -time costs and programs: Phoenix Academy startup (130,000) funds, year -round school study, administrative salary review, prior year classroom startup funds and duty -free funds. • Reduction of Charter School funding (27,830) • Reduction of contingency fund from $250,000 to $150,000 (100,000) • Capital expenditures moved from the operating budget to the recurring capital budget L40,000) • ($241,430) Total Budget Requests $4,304,469 2 -9 State Fund Budget Summary SUMMARY BY PURPOSE CODE 1997 -98 1998 -99 1999 -00 ACTUAL BUDGET PROPOSED CHANGE Revenue $ 29,423,543 $ 32,520,805 $ 35,067,111 7.8% State Textbook Revenue 354,532 396,048 410,828 3.7% Total Revenue $ 29,778,075. $ 32,916,853 $ 35,477,939 7.8% Expenditures*`* INSTRUCTIONAL ' 5100 Regular $ 15,959,279 $ 18,459,452 $ 20,352,221 10.3% 5200 Special 2,471,998 2,103,432 2,208,504 5.0% 5400 Co- Curricular - - 5800 Pupil Support 1,459,590 2,363,322 2,505,121 6.0% 5900 Employee Benefits 4,741,802 5,026,272 5,207,222 3.6% 5930 Staff Development • 27,261 27,261 0.0% 5000 INSTRUCTIONAL SERVICES 24,632,669 27,979,739 30,300,429 8.3% SUPPORT SERVICES 6200 instructional Staff 771,982 254,091 261,714 3.0 %' 6300 Administrative Staff 103,279 70,073 72,876 4.0% 6400 School Admin. 1,657,044 1,851,988 2,000,147 8.0% 6500 Business Support 1,387,136 1,358,208 1,398,054 3.0% 6600 Central Support 89,285 91,438 94,181 3.0% 6900 Employee Benefits 757,445 757,445 780,168 3.0% 6930 Staff Development* 130,529 130,529 6000 SUPPORT SERVICES 4,766,171 4,513,772. 4,738,569 5.0% 7100 Community Services 24,703 27,294 28,113 3.0% State Textbooks 354,532 396,048 410,828 3.7% TOTAL $ 29,778,075 $ 32,916,853 $ 35,477,939 7.8% * State 1999 -00 Budget information is estimated at this time. The summary shown is a Planning allotment and an adjustment will be made d ker the tenth day of school. ** Staff development was made a separate category for the 1998 -99 school year * ** Appendix E contains explanations of expense categories. 2 -11 Summary of Changes State Fund For 1999 -00 * Fifteen new Teacher positions from the State allotment * Three new LEP positions from state allotment v Federal Fund Budget Summary SUMMARY BY PURPOSE CODE 1997 -98 1998-99 1999 -00 ACTUAL BUDGET PROPOSED CHANGE Revenue $1,244,275 $ 2,118,706 $ 2,118,706 0.0% Expenditures*** INSTRUCTIONAL 5100 Regular $ 15,305 $ 67,837 $ 67,837 5200 Special 787,895 695,226 695,226 5400 Co-Curricular - - - 5600 Innovative Programs - - - 5800 Pupil Support . - 421,659 421,659 ' 5910 Employee Benefits 171,500 230,873 230,873 5930 Staff Development 255,877 255,877 5000 INSTRUCTIONAL SERVICE 974,700 1,671,472 1,671,472 0.0% SUPPORT SERVICES 6200 Instructional Staff 190,950. 61,190 61,190 6300 Administrative Staff - 8,630 8,630 6400 School Admin. - - - 6500 Business Support - - - 6600 Central Support - 47,600 47,600 6900 Other Support 3,095 10,436 10,436 6930 Staff Development 108,246 108,245 0.0% 6000 SUPPORT SERVICES 194,045 236,102 236,102 0.0% 7100 Community Services - - OTHER 75,530 211,132 211,132 0.0% TOTAL $ 1� 244,275 . $ 2,118,706 $ 2,1118 7 6 0.0% * Federal 1999 -00 Budget information is estimated at this time. The Federal allocation is dependent on approved federal grants which are submitted and revised throughout the year. ** Staff development was made a sq=M category for the 1998 -99 school year * ** Appendix E contains explanations of expense categories. 2 -13 Y Position Budget Summary For the Local, State and Federal Funds STATED IN FULL -TIME EQUIVALENT POSITIONS TM SUMMARY BY PURPOSE CODE" LOCAL FUND STATE FUND FEDERAL FUND TOTAL TOTAL 1998-99 1999 -00 998-99 1999-00 1998 -9 1999-00 1998 -99 1999 -00 1CHG INSTRUCTIONAL 5100 Regular 158.08 167.08 512.04 531.04 - 670.12 698.12 28.00 5200 Special 128.75 144.25 56.83 56.83 18.50 18.50 204.08 219.58 15.50 5400 Co- Curricular 2.00 2.00 - - - - 2.00 2.00 - 5800 Pupil Support 33.61 44.51 45.16 45.16 10.60 10.60 89.37 100.27 10.90 5000 INSTRUCTIONAL SER 322.44 357.84 614.03 633.03 29.10 29.10 965.57 1,019.97 54.40 SUPPORT SERVICES 6200 Instructional Staff 26.82 28.49 14.00 14.00 - - 40.82 42.49 1.67 6300 Administrative Staff 2.00 2.00 1.00 1.00 - - 3.00 3.00 - 6400 School Admin. 25.67 28.17 45.28 46.78 - 70.95 74.95 4.00 6500 Business Support 94.92 105.92 83.08 83.08 - - 178.00 189.00 11.00 6600 Central Support 12.25 12.25 - 12.25 12.25 - 6000 SUPPORT SERVICES. 161.66 176.83 143.36 144.86 - - 305.02 321.69 16.67 7100 Community Services 0.25 0.25 0.50 0.50 - - 0.75 0.75 - TOTAL 484.35 534.92 757.89 778.39 29.10 29.10 1,271.34 1,342.41 71.07 * State and Federal 1999+A4-00 Budget iaformaticn is admated at this time s• Appendnt E contains aTlaaati ms of expenae categmes. 2 -15 v Summary of Changes Position Budget For 1999 -00 Change in State Fund Budget INCR/ (DECK) • New Classroom Teacher positions (growth in student population) 15:00 * One Teacher Assistant for grades K -3 1.00 * Additional Principal for Mary Scroggs Elementary School 1.00 * School Additional d oval one -half Assistant Princi pal for Mary Scroggs Elementary 0.50 • Three ESL (English as a Second Language) Teacher positions (LEP request) 3.00 TOTAL ADDITIONAL STATE POSITIONS 20.50 Change in Local Fund Budget • One ESL (English as a Second-Language) Teacher position (LEP request) 1.00 • One system level class Preschool Autistic Teacher 1.00 * One -half School Psychologist position 0.50 * Two Special Education Resource Teacher positions 2.00 * One -half Special Education Inclusion Assistant positions 0.50 * Five Technology Technicians 5.00 10.00 OPENING NEW SCHOOLS * Three district maintenance staff 3.00 EAST CHAPEL HILL HIGH ADDITIONS * One Assistant Principal 1.00 * One -half MediaSpeeialist 0.50 * Two Clerical positions 2.00 * Ones -half Theater Manager /Technician 0.50 * Three Custodian 3.00 MARY SCROGGS ELEMENTARY SCHOOL * Ten Teacher support position 10.00 Change in use of position at Scroggs (2.00) * One and one -half Special Education positions 1.50 * One Preschool Teacher (supported by tuition) 1.00 * Two Clerical positions 2.00 • One -half Media Assistant and Ones -half Technician position 1.07 * Three and one-half Teacher Assistants (Exceptional Educe and Preschool) 3.50 * Five Custodian . 5.00 * One new elementary school Principal position added in 1998 -99 (1.00) ' One new elementary school Assistant Principal position added in 1998 -99 (0.50) • One new elementary school Technology Specialist and Media positions (1.00) 29.57 .PREP ACADEMY * Six Teacher position and One Family Specilist position 7.00 * Four Teacher AssistanVTutor positions 4.00 11.00 TOTAL ADDITIONAL LOCAL POSITIONS 50.57 TOTAL NEW POSITIONS 71.07 2 -16' Y Local Recurring Capital Outlay Budget 1998 -1999 1999 -00 PERCENT BUDGET PROPOSED CHANGE CHANGE CATEGORY I PROJECTS Abatement Projects $ 25,000 $ 25;000 - _ 0.0% Site Development 55,000 62,100 7,100 12.9% Renovations 174,000 181,300 7,300 4.2% Floor Covering Replacement 40,000 40,000 - 0.0% Roof Replacements 200,000 190,750 (91250) -4.6% Roof Repairs 70,000. 90,000 20,000 28.6% ,TOTAL CATEGORY I PROJECTS 564,000 589,150 25,150 4.5% CATEGORY II PROJECTS Furniture and Equipment 150,000 160,000 10,000 6.7% Technology Equipment 60,000 60,000 - 0.0% New/Relocated Classroom Furnishings 20,000 20,000 - 0.0% Copier Equipment • 60,000 65,000 5,000 8.3% Child Nutrition Equipment 30,000 30,000 - 0.0% Custodial Equipment 10,000 10,000 0.0% Administrative Equipment 66,500 80,657 14,157 21.3% Print Shop Equipment 5,000 7,500 2,500 50.0% Cafeteria Furniture 5,000 7,500 2,500 50.0% Equipment 12,500 12,500 0.0% TOTAL CATEGORY II PROJECTS 419,000 453,157 34,157 8.2% CATEGORY Ill PROJECTS District Vehicles - 26,000 26,000 - - 0.0% Transportation Vehicles 85,000 88,850 3,850 4.5% TOTAL CATEGORY III PROJECTS 111,000 114,850 3,850 3.5% Contingency Fund 29,000 20,000 (9,000) -31.0% TOTAL RECURRING CAPITAL OUTLAY PROPOSED BUDGET $1,123,600 $1,1,157 $ 54,157 4.8% OTHER CAPITAL CELLULAR TOWER LEASE CAPITAL FUNDS Culbreth Middle School Upgrades 2 -17 $150 Summary of Changes Local Recurring Capital Outlay Budget For 1999 -00 Cellular Tower Lease revenue has been added as an additional source of capital funding and will be used for Culbreth Middle School upgrades in 1999 -00. Other changes are as noted 2 -18 2 -19 Child Nutrition Fund Budget Summary 1997 -98 1996 -99 1999-00 ACTUAL BUDGET PROPOSED CHANGE REVENUE Sales of meals and supplemental sales $ 906,370 $ 865,000 $ 940,000 8.7% Federal reimbursements 506,791 498,000 545,000 9.4% Catering and miscellaneous 276,371 329,645 345,000 4.7% Summer Program 46,016 38,000 48,000 26.3% $ 1,735,548 $ 1,730,645 $ 1,878,000 9.5% OPERATING EXPENSES Food $ 634,552 $ 657,645 $ 725,000 10.2% Salaries, wages and benefits 991,030 939,000 1,009,000 7.5% Supplies 61,012 58,393 61,300 5.0% Miscellaneous 119,042 138,000 - 144,900 5.0% Depreciation 3,000 - 100.0% TOTAL OPERATING EXPENSES $ 1,805,636 $ 1,796,038 $ 1,940,200 8.0% Profit (Loss) Before State support and Marriott Guarantee. $ (70,088) $ (65,393) $ (62,200) Marriott Guarantee 11,180 4,569 0 - 100.0% Director Support from other funds 58,908 60,824 62,648 3.0% NET PROFIT (LOSS) $ _ - -- $ $ 448 2 -19 r '• Summary of Changes Child Nutrition Services Fund For 1999 -00 Changes -in Revenue * Increase in participation * Anticipated rate increase' Changes in Expenses * Increase in wages as mandated by the State * Addition of kitchen staff at Mary Scroggs Elementary School * Increase in food and supply costs 2 -20 M Community Schools Fund Budget Summary 1997 -98 1998 -99 1999-00 Percent ACTUAL BUDGET PROPOSED hC anoe REVENUE After- school program $ 875,675 $ 893,765 $ 956,125 7.0% Summer Camp 146,030 156,200 202,900 29.9% Summer Youth Enrichment 51,475 52,000 46,000 - 11.5% ' District tuition assistance 11,761 11,588 11,761 1.5% Facility rental . 96,714 75,000 90,000 20.0% Fund Balance Appropriated 91,000 93,018 2.2% Total Revenue $1,181,655 $1,279,553 $1,399,804 9.4% OPERATING EXPENSES Salaries, wages and benefits $ 908,351 $1,008,141 $1,071,755 6.3% Supplies 59,301 61,673 92,770 50.4% Food 73,134 74,090 80,008 8.0% Purchased servicestactivities 108,526 135,649 155,271 14.5% Total Expenses $1,149,312 $1,279,553 $1,399,804 9.4% Net Profit (Loss) $ 32,343 $ - $ After- school program enrollment 715 730 780 6.8% 2 -21 v Summary of Changes Community Schools Fund As Compared to 1997 -98 Changes in Revenue * Increased participation Changes in Expenses * Increases in general costs: food, salaries, space sharing, supplies and equipment 2 -22 CHAPEL HILL - CARRBORO CITY SCHOOLS March 4,1989 3.664,905 2.844,953 2,753,464 i CAPITAL INVESTMENT PLAN 1888 - 2008 3,364,001 3,700,021 4,004,782 4,359,543 4,678,740 35,180,811 PRIOR Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TEN•YEAR PROJECT PROJECT TITLE YEARS 1999 -00 2000-01 2001 -02 2002 -03 2003 -04 2004 -05 2005 -06 2006 -07 2007 -08 2006 -09 TOTAL TOTAL 1,851.031 ireeMs ADA R um 138,150 25,000 25,000 25,000 25,000 " 147,592 1 45,386.950 100,000 238.150 Fire/Safely/Security 1 TOTAL 10,196139 3.664,905 2.844,953 2,753,464 2,760,685 3,058,817 3,364,001 3,700,021 4,004,782 4,359,543 4,678,740 35,180,811 AOdelic Faclilies 334,000 785,000 188,387 1,563,464 1,190,000 2,753,464 50,000 1,821,817 1,237,000 3,058,817 181,948 311,696 2,693,782 1,311,000 4,004,782 3,022,323 1,337,220 4,359,543 3.315.470 1,364,000 4.679,740 1,517.031 1,851.031 Energy Efficlemy Im ants - 125,000 245,753 390,000 280,000 " 147,592 1 45,386.950 1.188,345 1,188.345 Fire/Safely/Security 21,800 152,600 81,750 234.350 256.150 Mechanical Systems 720,490 275,000 375,000 110,000 464,079 1,396,525 283,141 2,903,745 3.624,235 Mobile Classrooms 78,480 125,000 1 125,000 203.480 Paybywatift Lots 264,890 375,000 224.900 96,679 .265,000 150,000 307,389 1,418.968 1,683.658 plgnnkq for Future ET15ft 808,146 50,000 81,601 131,601 939,747 Roof 354,563 230,000 354,063 290,763 262,619 418,971 641,800 329,000 2.527,216 2.881,779 TedinolM 4,282.502 750,000 800,000 900,000 900,000 1.000,000 1,000,000 1,200.000 1,200,000 1.300.000 1.300.000 10.350.000 14.632.502 RENOVATION PROJECT !j: CHHS Cultural Arts !88,882 40,000 40.000 1,028.882 CHHS: Doors. Ma Renovation 75,000 46,200 1,885,252 2,098,318 4,104,770 4,104,770 Culbreth: Labs. Gym, AudNodwn 100,000 500,000 1.689,870 2,289,870 2.289.870 E sus Muni Room 67,305 67,305 BVALUEI Estes Fills: Major Renovation 1,500.000 - 1.500.000 Glenwood: M Renovation 500,000 1,000.000 45,000 1.045,000 1.545.000 Phil! :Labs, Doors, Lockers 140,000 1,689,870 1,829,870 XVALUEl Trams atkur Center E ansion 375,000 375.000 375.000 CatrbomAFPG w%Seawe111LinCtr 1,036,287 1,028,175 1,917,053 981.225 4,942,740 4,942,740 Recurring Capital 179,436 I - 179.436 Reserve for Future Profects . 25,000 - 25.000 TOTAL 10,196139 3.664,905 2.844,953 2,753,464 2,760,685 3,058,817 3,364,001 3,700,021 4,004,782 4,359,543 4,678,740 35,180,811 iVALUEI COUNTY SALES TAX BUDGETED IMPACT FEES BOND REVENUES SAVINGS ON CONSTRUCTION BID TOTAL FUNDS AVAILABLE 7.196.139 2,250.000 750.000 10,198,139 1,914,905 750.000 1,000,0 3,064.905 1,677.953 1,167.000 2,844,953 1,563,464 1,190,000 2,753,464 1,547,585 1,213,000 2,760,585 1,821,817 1,237,000 3,058,817 2,104,001 1,260,000 3,364,001 2,415,021 1,285.000 3,700,021 2,693,782 1,311,000 4,004,782 3,022,323 1,337,220 4,359,543 3.315.470 1,364,000 4.679,740 22,076,321 29.272,460 11,364,220 11.364,220 750.000 3.000.000 1,000.000 1.750,000 35,190,811 1 45,386.950 PRIOR Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TEN YEAR PROJECT PROJECT.TITLE YEARS 1999 -W 2000-01 2001 -02 2002 -03 2W -W 2004 -05 2005 -06 2008 -07 2007 -08 2008 -09 TOTAL TOTAL Pn!rLFCTn RIomnon runve -m V Av ARAung GAnwm ftTATP nnUn ANTI IYPA[_T CFFR oinimn QV flrS S"ps Element unds 13,350,000 50,000 (250,000) 13,100.000 East CH 1.1 h Additioond 10,995,840 - 10.995.840 East CH h AdditioFees SBond 804,160 - 004.160 East CH h Additio 3,000,000 750:000) (750.000) 2.250.000 Smith Middle School unds . 5,300.000 11.40 0,000 3.100.000 14,500.000 19.800.000 TOTAL 33,450,000 1 10.400.000 3,100,000 - - - - - - - 13,500,000 48.950.000 CAPITAL INVESTMENT PROJECTS BEING CLOSED OUT Abalement Projects 98,785 - 98.785 CHHS Phase Il 1,645.659 - 1.645.659 East "Il High School 1996 22,777,208 - 22.777,206 Ephesus Reslrooms 75.000 - 75.000 Glenwood Media Center Renovellm 10OA00 - 100.000 McDoWle Elementary School 11.790.904 11.790.904 Phis : Audnodwn 200.000 - 200,000 Rengvattons/Stle Im dor to 1997- 1,236,121 - 1.236,121 Seswell HVAC 244,747 - 244.747 TOTAL PROJECT CLOSINGS 38,16B,424 38,168.424 �5 S � ° Proposed County Budget Forms for Schools Table of Contents Proposed County Budget Forms for Schools Summary 1 "Blue Sheet" 4 Combined Operating Budget Summary Spreadsheet S Local Fund Revenue Projections Spreadsheet 6 Local Fund Budget Summary Spreadsheet 7 Explanations of Changes in Local Fund Budget 9 STATE BUDGET State Fund Revenue Projections Spreadsheet 10 State Fund Budget Summary Spreadsheet 11 Explanations of Changes in State Fund Budget 13 FEDERAL BUDGET Federal Fund Revenue Projections Spreadsheet 14 Federal Fund Budget Summary Spreadsheet 15 Explanations of Changes in Federal Fund Budget 17 SUMMARY OF FULL -'TmE EQUIVALENT POSITIONS 18 SUMMARY OF NEW STAFF RESOURCES 19 DETAILS OF LOCAL SALARY SUPPLEMENTS 21 SUMMARY OF RECURRING CAPITAL BUDGET 22 Proposed County Budget Forms for Schools FY 2000 -01 Form Title Purpose/Description "Blue Sheet" ♦ Format is basically same as prior years ♦ Financial summary of schools local budget ♦ Categorizes by: 1. Base Budget 2. Changes due to student population 3. Start up costs for new facilities 4. Mandates 5. Expansion or New Initiatives Combined Operating Budget Summary Spreadsheet ♦ Summarizes Local Funds, District Tax funds, State Funds & federal funds spreadsheets (see details below) ♦ Calculates each district's total per pupil expenditure Local Fund Revenue Projections Spreadsheet ♦ Provides historical financial data for local revenues and student population #'s ♦ Automatically calculates county's per pupil allocation ♦ Compares previous fiscal years' actual revenues, current fiscal year budget and estimates and upcoming fiscal year district request, superintendent's recommendation and BOE approved Local Fund Budget Summary Spreadsheet ♦ Provides historical financial data for local expenditures ♦ Compares previous fiscal years' actual revenues, current fiscal year budget and estimates and upcoming fiscal year district request, superintendent's recommendation and BOE approved ♦ Provides detail by functions 1. Instructional 2. Support Services 3. Community Services 4. Charter Schools 5. Contingency 6. Other ♦ Bulletized narrative describing changes in local Explanations of Changes in Local Fund Budget funding request Detailed justification and explanation of changes J State Fund Revenue Projections Spreadsheet ♦ Provides historical financial data for state revenues ♦ Compares previous fiscal years' actual revenues, current fiscal year budget and estimates and upcoming fiscal year district request, superintendent's recommendation and BOE State Fund Budget Summary Spreadsheet ♦ Provides historical financial data for state expenditures ♦ Compares previous fiscal years' actual revenues, current fiscal year budget and estimates and upcoming fiscal year district request, superintendent's recommendation and BOE ♦ Provides detail by functions 1. Instructional 2. Support Services 3. Community Services 4. Charter Schools 5. Contingency 6. Other Explanations of Changes in State Fund Budget ♦ Bulletized narrative describing changes in local funding request ♦ Detailed justification and explanation of changes Federal Fund Revenue Projections Spreadsheet ♦ Provides historical financial data for state revenues ♦ Compares previous fiscal years' actual revenues, current fiscal year budget and estimates and upcoming fiscal year district request, superintendent's recommendation and BOE approved ♦ Provides historical financial data for federal Federal Fund Budget Summary Spreadsheet expenditures ♦ Compares previous fiscal years' actual revenues, current fiscal year budget and estimates and upcoming fiscal year district request, superintendent's recommendation and BOE approved ♦ Provides detail by functions 1. Instructional 2. Support Services 3. Community Services 4. Charter Schools 5. Contingency 6. Other Explanations of Changes in Federal Fund Budget ♦ Bulletized narrative describing changes in federal funding ♦ Detailed justification and explanation of changes Z 1 4 Summary of Full-Time Equivalent Positions ♦ Summaries, by funding source, all authorized school district positions ♦ Provides historical data for two previous fiscal years, current fiscal year and upcoming fiscal year (district request, superintendent recommended, BOE approved) Summary of New Staff Resources ♦ Columnar summary of changes in new staff resources ♦ Includes all positions (local, state, federal) ♦ Provides projected cost for each position ♦ Categorizes by 1. Changes due to student population 2. Start up costs for new facilities 3. Mandates 4. Expansion or New Initiatives Details of Local Salary Supplements Summary of Recurring Capital Budget ♦ Columnar summary recurring capital by school or facility ♦ Provides projected cost for capital items ♦ ' Provides funding data for the upcoming fiscal year (district request, superintendent recommended, BOE approved) "Blue Sheet" Current Expense Appropriation FY2000 -01 Per Pupil Alioatiaa Average Daily MembadW Funding 99-00 Approved Miscellaneous Revenue $0 00-01 Recomm so Total lacraae Current Experna so Sales Tax Refunds Identified by Orange County Staff so T-9 new Reeammeoded County funding (Iadudlag DWOU Tax Revenue) 1999 -00 Appr Base Budget (Supported by Ad Valorem Tax t ase Budget (Supported by District Tax Revi otal 1999 -00 Approved Budeet - N pro acted by stue M Wererxe S - Is - Adjustments Appropriated Fund Balance Miscellaneous Revenue tore Decreases Additional Revenues Identified by Orange County Staff Sales Tax Refunds Identified by Orange County Staff Total Revenue Adjustments is - $ - Budget Impact of Additional Students Total Impact of Additional Students Start Up Costs for New or Renovated Facilities Increased recurring costs for school #1 Increased recurring costs for school #2 otal Start Up Costs for New or Renovated Facildes S s - Mandates otal Funding for Mandates s Expansion or New Initiatives Budget Total 2000-01 Local Funding Fage - f Blue Sheet Examde Total Operating Expenses Combined Operating Budget $0 $0 $0 $0 $0 $0 Per Pupil Expenditures Revenues and Expenditures $0 WN101 #DrY10I #DJY101 ADM/ #DIV10I 2000-01 1998 -99 1999 -00 Revenues Budget Actual Budget Estimates District Request Saperin Reeom BOE Approved otal Local Food so So So s0 so otal State Fond s0 So s0 s0 so so otal Fedeni Fund So So so So Sol so Total Revenues so _ SD_ S0 so so So so Total Operating Expenses $0 $0 $0 $0 $0 $0 $0 Per Pupil Expenditures $0 $0 WN101 #DrY10I #DJY101 ADM/ #DIV10I 5 I Local Fund Revenue Projections Pro ected Student Enrollment Budget Actual Budget Estimates District Request Superin Recom BOE Approved tau Number Students Projected by State TOW DPI Estimates) Less: Ow- of- Diurict Tuition Paid Students Plus: Cumrent Charter School Students L"tal Pro ected Student Euroliment 0 0 0 0 0 0 i....1 V......... II UndsN I A.Mnsl I Rndsnf I F.adm.#" I iNaM. # lt.m..af I C... A.. 1>l...— I RAW A,..........1 II Total County Cument E)qmw I MIN - - - - - -- ir. - ■����� Local Fund Budget Summary Summary by Purpose Code _. 1998 -99 1999-00 T- .+....." ...1 11 R.ubef I Actnsl I Ands" I IUMMst" I nistrw A...n.N I Qn-1.. D....... I n...... —.— II -a 1 ".4 � -99 Actual 1999 -00 Budget Estimates 2000.01 District Request Saperin Recom BOE Approved 10 jImprovementofInstruction 6200 Sub -Total Irutrnctional Stag $0 SO $0 $0 $0 $0 6310 Board ofEdacation -16320 Executive Administration 6390 Other Administrative Support 6300 Sub-Total Administrative Staff SO $0 $01 SO $0 $0 6410 Office of the Principal 6400 Sub-Total School Administration I Sol Sol SO $01 Sol 1 Sid 6510 Support Services 6520 Fiscal Services 6540 Operation of Plant 6550 Transportation Support Services 1998 Budget -99 Actual 1999 -00 Budget Estimates 2000.01 District Request Saperin Recom BOE Approved 10 jImprovementofInstruction 6200 Sub -Total Irutrnctional Stag $0 SO $0 $0 $0 $0 6310 Board ofEdacation -16320 Executive Administration 6390 Other Administrative Support 6300 Sub-Total Administrative Staff SO $0 $01 SO $0 $0 6410 Office of the Principal 6400 Sub-Total School Administration I Sol Sol SO $01 Sol 1 Sid 6510 Support Services 6520 Fiscal Services 6540 Operation of Plant 6550 Transportation 6560 Child Nutrition 6570 Internal Serivices 6580 MaintenenceofPlant 6500 Sub-Total Bluheu S rt Sol SO $01 Sol SO $0 6630 Community Relations 6640 iffinnan Resources 6660 Management Information Services 6600 Sob -Total Central Support $0 $0 $0 $0 $0 $0 6900 Employee Benefits 6930 Staff Development 6900 Sub-Total Other Su rt SO 1 $0 $01 SO 1 $0 $0 6000 Total Sn rt Senlees So $0 $0 " $0 SO 7 Local Fund Budget Summary Summary by Purpose Code CemmugM Services 1998 Budget -99 Actual 1999.00 Budget Estimates 200"1 District Request Superin Recom BOB Approved 100 Community Services 7110 Employee Benefits 7100 Commnd Services I SO $0 $0 SO SO SO SO Explanations for Changes in Local Fund Budget Fiscal Year 2000 -01 Changes to Accommodate Student Population Changes Start -Up Costs Associated With New or Renovated Facilities State and Federal Mandates Expanded Programs or New Initiatives State Fund Revenue Projections State Fund Budget Summary Summary by Purpose Code 1998 -99 1999 -00 200"1 3u rt Services 1998 Budget -99 Actual 1999 -00 Budget Estimates 2000 -01 District Request Superin Recomm BOE Approved 6210 jimprovementof1ostruction 6640 human Resomcea 6200 Sub -Total Instrnedonal Staff SO SO SO SO $0 $0 SO 6310 Board of Education 6600 Sub -Toil Central Support Sol SO $0 $0 6320 Executive Administration $0 6390 Other Administrative Support - ■tea- ��■������ SO Sol SO $0 $01 SO SO 6410 Office of flu Principal 6400 Sub -Total School Adminiatratian Sol Sol SO $0 $01 So SO 6510 Support Services 6520 Find Services 6540 Operation of Plant 6550 Transportation 3u rt Services 1998 Budget -99 Actual 1999 -00 Budget Estimates 2000 -01 District Request Superin Recomm BOE Approved 6210 jimprovementof1ostruction 6640 human Resomcea 6200 Sub -Total Instrnedonal Staff SO SO SO SO $0 $0 SO 6310 Board of Education 6600 Sub -Toil Central Support Sol SO $0 $0 6320 Executive Administration $0 6390 Other Administrative Support 6300 Sub -Total Administrative Staff SO Sol SO $0 $01 SO SO 6410 Office of flu Principal 6400 Sub -Total School Adminiatratian Sol Sol SO $0 $01 So SO 6510 Support Services 6520 Find Services 6540 Operation of Plant 6550 Transportation 6560 Child Nutrition 6570 Internal Serivices 6580 MaiatemanxofPlant 6500 Sub -Tow Business Support SO $0 $0 $0 $0 $0 S0 6630 Community Relations 6640 human Resomcea 6660 Management Information Services 6600 Sub -Toil Central Support Sol SO $0 $0 $0 $0 $0 6000 Total Supped Services SO So So I So So a SO State Fund Budget Summary Summary by Purpose Code ComimpM Services 1991699 Budget Actual 19". Budget Estimates 3000 -01 District Request Superk Recomm BOE Approved 100 Community Services 7110 Employee Benefits 7100 Comakft Service$ $0 SO SO SO SO SO SO 199&99 199940 2000 -01 Charter School Funds Budget Actual Budget Frtlmates District Request Superin Recom BOE Approved 00 Charter School Funds i • • • • • • • • • • • • Explanations for Changes in State Fund Budget Fiscal Year 2000 -01 I Federal Fund Revenue Projections s Federal Fund Budget Summary Summary by Purpose Code inetwnwtrnnsl II Undept I Aetnol I Rudest I A.fimatr I Tict.iw. D—..— I a....sa_ n - -..— I n -a . II S ri Services 1993-99 Budget Actual 1999 -00 Budget Estimates 2000-01 District Request Superin Rseem DOE Approved 6210 I 6 640 " Resources 6200 Sub-Total Instructional Staff SO SO SO $0 $0 SO $0 6310 BoardofEducation 6600 Sub -Total Central Support $0 $0 $0 SO 16320 Executive Administration SO 6390 Other Administrative Support 6300 Sub -Total Administrative Stall SO $0 $0 $01 SO $0 SO 6410 Office of the Principal 6400 Sub -Total School Administration I Sol SO $01 Sol Sol So SO 6510 Support Services 6520 Fiscal Services 6540 Operation of Plant 6550 Transportation 6560 Child Nutrition 6570 Intemal Serivices 6580 Mamftence apiant 6500 Sub -Total Badness S rt So $01 Sol SO Sol SO I SO 6630 Community Relations 6 640 " Resources 6660 Management lnforatation Services 6600 Sub -Total Central Support $0 $0 $0 SO I SO 1 $01 SO 6000 Total Support Services SO $0 S0 SO So SO 1 $0 15 Federal Fund Budget Summary Summary by Purpose Code Commool Service 1998A9 Budget Actual 1999 Budget -00 Estimates 2000.01 District Request Superin Recom 100 lCottununity Services 7110 Employee Benefits 7100 Community Services So So SO SO SO $0 s0 BOX Approved Charter School Foods 1998A9 Budget Actual 1999 -00 Budget Estimates 2000.01 District Request Superin Rmsa BOX Approved 00 Chatter School Funds - Contingency Funds 1998.99 Budget Actual 1999 -00 Budget Xstimues 2000,01 District Request Superin Recom BOX Approved =C—tiV9CwY =T-dmk, - Textbooks 7BudgLt Actual 1999 .00 Budget Estimates 2000.01 District Request Superin Recom BOE Approved =T-dmk, s I. Explanations for Changes in Federal Fund Budget Fiscal Year 2000 -01 4 on � 2 k) � k b w� � - 2 |. | | | � |§ ■ j} § |� ! z || � k| § $| |} |7 � |!� || | � �| |} !| ` | � � !� || m a Summary of New Staff Resources School District Fiscal Year 2000 -01 —i Funding Source Full -Time Equivalent Position Title Lt. Description/Justitication Local Cost State Cost Federal Cost Total Cost District Superin Request Recomm BOE Approved Resources to Provide or Current Students (Base) Total Base Positions $O Ell S0 s0 0.000 0.000 0.000 taJfResources to Accommodate Student Population Changes Total Positions for Student Population Changes s0 s0 $O SO 0.000 0.000 0.000 eng or New or Renovated Facilities Total Positions for New or Renovated Facilities $O s0 $O s0 0.000 0.000 0.000 —i Summary of New Staff Resources School District Fiscal Year 2000 -01 ' Funding Source Full -Time Equivalent District Superin BOE Position Title Description/Justification Local Cost State Cost Federal Cost Total Cost Bequest Recomm Approved Staff Resources Related to State and Federal Mandates Total Positions for State and Federal Mandates SO SO SO SO 0.000 0.000 0.000 Staff Resources Related to Expanded Programs or New Initiatives Undertaken by Board o Education Total Positions for Expanded Pr or New Iniatives SO So SO SO 0.000 0.000 0.000 Total New Staff Resources SO SO SO SO 0.000 1 0.000 0.000 Local Salary Supplements Fiscal Year 2000 -01 Chapel Hill - Carrboro Orange County Category Supplement Amount Average Amount Paid Supplement Amount lAverage Amount Paid Teachers 0-4 Years of Experience 5 -9 Years of Experience 10 -14 Years of Experience 15 -19 Years of Experience 20 -24 Years of Experience 25 Years and over Classified Staff Administrators 2� a Summary of Recurring Capital Budget School District Fiscal Year 2000 -01 Category Funding Amount Category 1 - Category 2 - Buildings & Furniture & Category 3 District Superin BOE Capital Item Justification/Description Grounds Equipment Vehicles Request Recomm Approved School Total SO $0 $0 School Total $0 $0 $0 School I Total $0 1 $0 $0 ZZ J Summary of Recurring Capital Budget School District Fiscal Year 2000 -01 Total Recurring Capital $0 $0 $0 Z3 Category Funding Amount Capital Item Justification/Description Category 1- Buildings & Grounds Category 2 - Furniture & Equipment Category 3 Vehicles District Superin Request Recomm BOE Approved School Total $0 $0 $0 School Total $0 $0 $0 Total Recurring Capital $0 $0 $0 Z3 ��� ����� q 53 i ORANGE COUNTY SCHOOLS 1999 -00 CLASSROOMS and CAPACITY CALCULATIONS High School * Orange High School 74 1520 1665 HIGH SCHOOL TOTAL 74 1520 1665 * OVER CAPACITY 0 1 10th Day Enrollment Classrooms Capacity 8/31/99 Elementary Schools * Cameron Park '29 598 601 Central 21 483 436 * Efland Cheeks 30 529 540 Grady Brown 29 575 529 Hillsborough 20 414 398 * New Hope '31 621 622 ELEMENTARY SCHOOL TOTALS 160 3220 3126 Middle Schools A.L. Stanback 47 800 712 * C.W. Stanford 42 722 751 MIDDLE SCHOOL TOTALS 89 1522 1463 High School * Orange High School 74 1520 1665 HIGH SCHOOL TOTAL 74 1520 1665 * OVER CAPACITY 0 1 CHAPEL HILL CARRBORO CITY SCHOOLS 1999 -00 CLASSROOMS and CAPACITY CALCULATIONS Classrooms state Mobile 10th Day K-3 4 - 8 sent contained capacity Classrooms Enrollment Elementary Schools (023) ( @26) (G10) calculation (ew. trom capacQy) 8/3� 1199 Carrboro Elementary 15 8 1 563 1 479 Ephesus_ Elementary 12 6 4 472 7 558 Estes Hills Elementa 11 11 1 549 1 550 FP Graham Elementary 16 7 2 570 2 529 Glenwood Elementary. 11 7 1 445 4 397 - McDou le Elementary 16 8 2 596.. 0 606 _ Scroggs Elementary 25 1 - 510 0 411 Seawell Elementary 16 5 0 498 6 574 ELEMENTARY SCH05L TOTALS 174 12 4203 21 4104 Middle Schools Cuibreth Middle 25 2 670 0 633, McDou le Middle - 27 3 732 2 810 Phillips Middle 26 3 706 0 719 MIDDLE SCHOOL TOTALS 78 8 2108 2 2162 Classrooms - Reg. Voc. Ed, Other High Schools (Q20) (015) (010 -25) Chapel Hill High School 64 9 6 1,520 6 1476 (Phoenix Academy) 2 1166 East Chapel Hill High School 65 8 5 .1,515 HIGH SCHOOL TOTALS 129 17 11 3,035 8 2642 * Scroggs rapacity of 510 is based on 25 classroom at 20 students per room plus one self contained room. Application of state formula equates to a capacity of 609. rt. N w ORANGE COUNTY SCHOOLS ENROLLMENT CLASS /RATIO 1999 -2000 School K 1 2 3 4 5 6 7 8 9 10 11 12 EC S TOTAL Cameron Park 105 90 89 121 90 103 598 Classes 5 4 4 5 4 5 Class Size 21.0 22.5 22.3 24.2 22.5 20.6 Central 50 76 76 77 -78 77 434 Classes 3 4 3 4 4 3 Class Size 16.7 19.0 25.3 19.3 19.5 25.7 Efland- Cheeks 91 75 89 95 103 87 540 Classes 4 4 4 4 4 4 Class Size 22.8 18.8 22.3 23.8 25.8 21.8 Grady Brown 96 73 88 86 105 1 80 528 Classes 4 4 5 4 4 4 Class Size 24.01 18.3 17.6 21.5 26.3 20.0 Hillsborough Elem. 67 69 61 70 . 69 62 398 Classes 3 3 3 3 .31 3 Class Size 22.3 23.0 20.3 .23.3 23.0 20.7 New Hope 84 104 95 117 126 94 620 Classes 5 5 4 5 6 4 Class Size 16.8 20.8 23.8 23.4 21.0 23.5 A.L. Stanback 247 238 223 708 Class Size 25 25 25 C.W. Stanford 231 270 2501 751 Class Size 25 25 25 Orange High 576 445 347 297 Class Size 25 25 25 25 H62 TOTAL 640.6 633.3 652.52 726.4 734 658.2 528 558 523 576 445 347 297 0 CHAPEL HELL CARRBORO CITY SCHOOLS Class Size Calculations: K -5 September 9,1999 r:10e0 crime- Mame�ry Grade Carrboro E Estes FPG GlerWd McDO4e SeaweB Scroggs Class K 23 17 24 23 1s 23 19. 21 K 23 17 25. 24 19 23 21 21 . k 22 17 24 24 20 23 20 k i8 23 22 k/1 21 _22 k/1 21 23 - k/i 21 k/1 21 1st 23 23 24 23 21 22 24 18 1st 23 23 23 24 22 23, 24 17 1st 23 23 21 22 19 i st 24 22 22 17 1 st/2nd 19 2nd is 22 25 .22 23 25 23 •19 2nd 22 20 24 22 24 24 25 20_ 2nd i8 23 25 23 25 26 20 2nd 21 24 25 2nd /3rd 22 24 22 20 19 2ndf3rd 22 3rd 26 23 26 251 24 25 25 19 3rd 25 22 26 241 24 24 21 21 3rd 22 26 24 25 25 21 3rd 23 22 19 20 3rd 25 25 3rd /4th 25 Class size k-3 22.29 4th 21 211 28 26 ' 23 29 22 21 4th 2.1 20 28 26 24r 27 16 20 4th 21 27 27 IM 26 19 22 4th 22 28 28 18 4th /5th 261 25 4th /5th 21 4th /5th 25 4th /5th 27 5th 24 23 25 21 24 27 23 20 5th 24 24 25 17 26 22 24 5th 22. 24 24. 26 27 20 5th" 23` 25 22 27 • 22 5th 23 24 Class size 4-5 23.05 * total 474 537 547 522 391 595 575 417 *- exdudes seif- contained ex ad students. H. Gibbs 9/10/99 Orange County Schools Bond AL Stanback Middle School � $14x000,000. 8115/98 ,' Freeion Trafalgar Trhagk Paving Southern Piping Port city Surmgton Mach. General I Site HVAL Electrical Plumbing Miscellaneous Mlsc Amt. Land $I million 700 thousand Total DATE -Architect Contract Improvement Contract Contrail . Contract Mlscl Technology FumQure t survey, testboar - Tj F 72,219.QO $ 3 4 terhewer $ 108,800.00 $ , 7 . 411= it$ 101,754.051 SON boaring ads. fees. ft. _ _ - 0 r e• Firi�![�Tr�r�iI�l] }l E •IiYa[:M I[ 7 ®E :ylr Tr] E F Ti Gtr 1 E 'ko� !- ►' EARLTA ®y r ® ®� r 0 ®E :Irk ?1?��ili, ��■■� � ® ..L - ® - •� E� :1F`Ly.�tl�lE fF�'(aCrl�'- E1tik��IIE �1fii���]fi;r7E F® : r r iTi ®- •� : c .. � E�Y� ERIE �I'I- ITTI:1ty7 ®E3PLlfiY�E _' ^�rl��iIr7E �>LTii��1 � I F i K -1k XI-rls:lj 1ti14A-Ipl•r:A FIWzJk rroy"A t k) TrTlt:Ici �E3i1[_E1�I��z�7 -F1<� -;:T_E1fi1��lE�Z +lF_� 2=2 LE LA : rTi E )iCl[ k1<' tj- E1tink-V,;ji[rIEMCI. F1 &? EE5ti ��t[�I:T�1TrIr7 Page 1 r .. r F l t t - 3 t � t iy k x+ . r l- 4 . v .. :. .�, v... , .., ... .r.v ^. .. '� � ] ..,.�^..- ��.. . .::'Yx .. ,: -:v -. .S• .. Y. W . f: .i e:. a s•. ,.k `.•S i• w tl �.� S ..,# .r,. }.e '..+.. W. x 'X'.r �•x <.. .� ^'1•>> r NhV ', r' �..••�." b. rYt ' +:f �.. t i ..,e',:t- t•'•^" a - 1ir•�c. +S'rC,-ti� l i � •..C. -�a•. .a ^ .:tik a�i� . •a ,.v. Yx.. +:- :'t .a °S ,. .Z •.y ...� . •r .�:.. �"� .. .a,•, - "b ...•�: .. , .... � .. �... .. t ,Y:. ^r�.; mss+ , t..,� . t' S � Y'J=•; . 'Rd,... �'r!'^ ., F' �'s`�. .,r t r �'� r�•: .fe ,r.+cri .atl:•..�,a; •`st v. x .. -. •. .. ..^�.• , >.. .., 1 :v, •,.: .:. Ae l., ..... ...: ;... - t ^',f'r' r;:.. g "3.: t. •!. "cA`�� ..$i+*a�t t 's•'.... :.'+i,�:,:"^k .F.r•4' t.t Tr' f,.,. �+"•, ,K.`. 0h .,.+ri�t •.:.5 .Ln i:. _7,,,..�w.�. `.,� -, - ,x1� ....x.4 �... C: '� `„'�x t P�i W�;,; �- G �� _!<rTrl ®E 6f/frTrB E'1iTrJiCt� E il`1r:#ArTil intercon n 1 $ 18,128.97 extra WAC S . 840.001. Page 1 r .. r F l t t - 3 t � t iy k x+ . r l- 4 . v .. :. .�, v... , .., ... .r.v ^. .. '� � ] ..,.�^..- ��.. . .::'Yx .. ,: -:v -. .S• .. Y. W . f: .i e:. a s•. ,.k `.•S i• w tl �.� S ..,# .r,. }.e '..+.. W. x 'X'.r �•x <.. .� ^'1•>> r NhV ', r' �..••�." b. rYt ' +:f �.. t i ..,e',:t- t•'•^" a - 1ir•�c. +S'rC,-ti� l i � •..C. -�a•. .a ^ .:tik a�i� . •a ,.v. Yx.. +:- :'t .a °S ,. .Z •.y ...� . •r .�:.. �"� .. .a,•, - "b ...•�: .. , .... � .. �... .. t ,Y:. ^r�.; mss+ , t..,� . t' S � Y'J=•; . 'Rd,... �'r!'^ ., F' �'s`�. .,r t r �'� r�•: .fe ,r.+cri .atl:•..�,a; •`st v. x .. -. •. .. ..^�.• , >.. .., 1 :v, •,.: .:. Ae l., ..... ...: ;... - t ^',f'r' r;:.. g "3.: t. •!. "cA`�� ..$i+*a�t t 's•'.... :.'+i,�:,:"^k .F.r•4' t.t Tr' f,.,. �+"•, ,K.`. 0h .,.+ri�t •.:.5 .Ln i:. _7,,,..�w.�. `.,� -, - ,x1� ....x.4 �... C: '� `„'�x t orange County Schools Bond A.L. Stanback Ulddle School $14,000,000. F...Mn Tn.&Lmr TRnsnls Oeuin.. 12Mdlmrn Pinhm Pnd ON - BuAnotnn Umnh . .8115196 iF] F�iF��kj ►I7E1Q►k� I'�:i►7 ®E1LI kiM�1 ► ►'i► ►► E �i` �1 -® ► c ��. TIM. :: ►: ®�� LML MOLUL, a, ID - ® ® ®� .: � ►'i Off® • FiLr ►IF�kF�f��E���i�, �k3�%��lF SKl[�i'�1�►:1F3i1iF�'Ii� +1E 1:87I�;►lE �:�krS�►,i] :r � F�F' YaffelE3���:�li��E�I- it�T��k��� �® ®ate® r ®® ►a :: ..= E�i%Y� a[� i[��1E�� F��IF RF�IESf�C�I7F� i ►�1[� ►� ► ►� ��® ,�� 1 11 .' . . CHAPEL HILL - CARRBORO CITY SCHOOLS NEW SCHOOL CONSTRUCTION PROJECTS East Chapel Hill HS East Chapel Hill HS McDougle Middle School McDougle Elementary Phase I Phase II Scroggs Elementary Pry: opened 1993 MOW 1996 opened 1896 opened 1999 opened 1999 Latest Estlinates Latest Estimates Burild ng Area 136,221 square feet 98,000 square feet 170,200 square feet 85,748 square feet 90,980 square feel Site (Acres) .2828 acres 11.7 acres 74.8 acres, existing 13.05 saes Breakdown of costs: Land Cosa 900,050 owned 1,850,000 owned donated Site Developrra:nt/Prep 1,894,111 Inc. in construction 432,128 kw. in construction 815,0000 Construction 9,527,177 10,111,800 18,089,416 12,365,400 9,400,000 Purnaurexquipment 345,974 213,993 795.389 360,000 480,000 Technology 850.000 800,000 793,000 170,000 832,500 Siam -Up Cost 200.000 287,674 160,500 300,000 370.000 PlanninglArchilecWlEng. 1,190,570 812,813 1.625,599 864,600 950,000 Sub -total 15.007,882 12,226.280 23,746.032 14,050,000 12,847,500 Rebated Reimbursements/ (40,000) (154,240) (93,934). Sales Tax Refunds PROJECT COST 14,967,882 12,072,040 23,652,098 14.050,000 12,728,000 91099 Elementary School Capacity 600 Students Classrooms and Associated Storage Regular Classrooms (25) Small Project Rooms (Grades 4 & 5) (2) Science Project Room (1) Pre- School Area (1) - Special/Exceptional Children/Speech Language (7 rooms) Art Education and Music Physical Education Media Center Small Group Resource Rooms Administration Student Support Areas Health Counseling Staff Support Area Teachers' Offices/Workrooms Conference Rooms General Conference Room Speech/Language Conference Room Teachers' Lounge/Workarea Itinerant Support Cafeteria/Food Service Miscellaneous /Commons Custodial General Storage Book Storage Student Commons Additional Toilets above those Calculated as part of "Circulation" Subtotal Circulation at 33% of Subtotal Total Square Footage Basic Additions to Basic School Total School Tier A Tier B 34,100 1,200 4,650 39,950 26,400 1,200 3,400 31,000 400 400 1,200 1,200 1,700 1,700 4,800 850 5,650 2,400 450 2,850 5,050 200 5,250 4,200 4,200 1,350 1,350 1,650 300 1,950 1,100 100 1,200 200 100 300 900 900 5,600 1,400 7,000 4,300 300 4,600 500 500 200 200 400 400 1,000 1,000 300 300 41500 200 41,700 1,300 - 1,855 3,155 500. 500 800 800 1,000 1,000 855 855 61,250 1,400 8,955 71,605 20,213 462 2,955 23,630 81,463 1,862 11,910 95,235 L IN Middle School Capacity 700 students Basic Additions to Basic School Tier A Tier B Total School Classrooms and Associated Storage 32,500 2,550 35,050 Regular Classrooms (22) 22,000 300 222,300 Science Classrooms (6) 7,200 7,200 Exceptional Education Classroom (1)/Resource Rooms (4) 3,300 3,300 Student Project Rooms (3) 2,250 2,250 Art Education and Music (Cultural Arts) 9,600 1;130 10,730 Exploratories 91000 1,000 10,000 Foreign Language Classroom 2, OOO 2,000 Career Explorations Lab and Resource Room 1,000 1,000 Applied Technology Lab and Resource Room 3,500 3,500 Consumer Education Lab and Resource Room 1,500 1,500 Computer Lab and Resource Room 1,000 1,000 Video Production Lab 1,000 1,000 Physical Education 12,000 1,200 500 13,700 Media Center 5,640 60 5,700 Parent /Community Center 400 400 Administration 1,800 50 1,850 Student Support Areas 1,000 1,450 2,450 Health 200 500 700 Counseling /Guidance 800 950 1,750 Staff Support Area 3,800 2,000 5,800 Teachers' Offices/Workrooms 31350 1,250 4,600 Conference Rooms (one per grade level) 750 750 Teachers' L,ounge/Workarea 450 450 Cafeteria/Food Service 51240 5,240 Miscellaneous /Commons 3,400 3,600 7,000 ReceivingArea 200 200 Book Storage/Central Supply Storage 1,700 100 1,800 Student Commons 1,500 1,500 Activities Lobby, 500 500 Academic House Centrums (3 01000 sq.ft each) 3,000 3,000 Subtotal 83,980 1,200 12,740 91,920 Circulation at 35% of Subtotal 29,393 420 4,459 34,272 Total Square Footage 113,373 1,6201 175,1991- 132,192 17 R tst 4c Estimated Cost of New Facilities Elementary School Capacity = 600 students Square Footage 95,225 Square Ft. per Student 158.7 Construction Cost Cost Per Square Foot $ 90 $ 8,570,250 Site Acquisition Acres: 16 Average Cost Per Acre: 25,000 $ 400,000 Site Development As a percentage of Construction Cost 10% $ 857,025 Fees As a percentage of Construction Costs and Site Development 10% 942,728 Moveable Equipment As a percentage of Construction Cost 5% $ 428,513 Technology Cost per square foot $ 8.25 $ 785,606 (includes cabling and equipment for voice, video and data distribution systems) Construction Contingency As a percentage of Construction Cost and Site Development .5% $ 471,364 Start-Up Costs Non Personnel One time start-up costs $ 330,000 Total $ 12,785,485 Middle School Capacity =- 700 students Square Footage 132,192 Square Ft. per Student 188.8 Construction Cost Cost Per Square Foot $ 95 $ 12,558,240 Site Acquisition Acres: 22 Average Cost Per Acre 25,000 $ 550,000 Site Development As a percentage of Construction Cost. 10% $ 1,255,824 Fees As a percentage. of Construction Costs and Site Development 10% 1,381,406 Moveable Equipment As a percentage of Construction Cost 5% $ 627,912 Technology Cost per square foot 8.25 $ 1,090,584 (includes cabling and equipment for voice, video and data distribution systems) Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 690,703 Start-Up Costs Non Personnel Start Up - one time $ 350,000 Total $ 18,504,670 R tst Lf 1.0 High School. Construction Standards Appendix A Space Allocation /Square Footage Assignments (1,000 Student Capacity) 1000 student cap acity Square Foota a Total Square Ft From To # rooms From To Classrooms Regular classroom with 5 computers - 850 950 22 18,700 20,900 Science Labs, Prep and Storage Physical Science 1,200 1,200 1 11200 1,200 Biology 1,200 1,200. 2 2,400 2,400 Physics. 1,200 1,200 1 1,200 11200 Earth Science 1,400 1,400 1 1,400 1,400 Chemistry.. 1,500 1,500 1 1,500 1,500 Storage/Prep Rooms (Biology, Chemistry; Physics ) . 250 per 2 labs 2 500 500 Remediation & resource labs 450 , .450 - 11 450 450 Exceptional Children Exceptional Children Self- Contained (8 to 12 snt cap 800 1,200 1 800 1,200 . Exce tional Education Resource Room for Zr: ou s u to 450 450 1 450 450 Arts Education Instrumental Classroom w/ lockers 1,800 2,100 1 1,800 2,100 Vocal Classroom 1,000 1,500 1 1,000 1,500 Instrument storage room 400 600 1 400 600 Music Library 200 200 1 200 200 Instrument Repair 150 150 1 150 150 Office (each) 150 150 1 150 150 Uniform Storage 400 600 1 400 600 Practice Room 55 60 1 55 60 Ensemble Practice Room 150 200 1 150 200 Visual Arts Classroom 1,200 1,500 1 1,200 1,500 Kiln/Clay Storage 40 60 1 40 60 Art Material Storage 80 150 .1 80 150 Theater Arts Classroom 1,800 2,000 1 .1,800 2,000 Theater Arts Auditorium 8 /seat; capacity 1/3 to 1/2 ADM 333 to 500 seats 2,667 4,000 Stage, Storage & Dressing Rooms 3,000 5,000 1 3,000 5,000 Light, Lock Vestibule, Lobby, Concession 800 2,000 1 800 2,000 Dance Classroom (including storage) 1,800 2,000 1 1,800. .2,000 11 High School Construction Standards Appendix A Space Allocation /Square Footage Assignments (1,000 Student Capacity) =-7 -,5 11 7 1000 student cap acity Square Footage Total Square Ft # rooms From To From To Workforce Development Agricultural Education 2,500 3,000 1 2,500 3,000 Business Education 1,200 1,400 1 1,200: 1,400 Family and Consumer Sciences Education Health Occupations 1,400 2,000 2,000 2,500 1 1 1,400 2,000 2,000 2,500 Marketing Education Cincluding store) 1,500 2,000 1 1,500 2,000' Technology Education 1,300 2,200 1 1,306 21200 Trade and Industrial Education 8501 3,000 1 11 850 1 3,000 Media Center Main Room 5 sq ft per ADM 1 5,000 5,000 Support Areas 2,000 2,000 1 2,000 2,000 Video Studio 400 400 1 400 400 Control/Editing 260 260 1 260 260 E ui mentStorage 80 801 80 80 Physcial Education Gymnasium Play Area 2 play courts 62 x 100 court 12,400 12,400 Spectator Seating 400 per 500 per 100 seats 100 seats 4,000 5,000 Gymnasium Dressing, Shower, Storage, Lobby 3,000 3,000 Wrestling (competitive) 3,000 3,000 1 3,000 3,000 Resistive Exercise (weight lifting) 2,000 3,000 1 2,000 3,000 Auxilli Gymnasium recommended for high schools with 1,200. or more students Administration Principal's Office 200 200 1 200 20C Assistant Principal (each) 150 150 2 300 300 Reception Area 400 400 1 400 40C Secretary 150 150 2 300 30C SIMS 9 -12 200 200 1 200 2CC Other Student Services 200 .200 1 200 2CC Workroom/Storage 200 200 1 200 200 Conference Room 200 200 1 200 200 Record Storage 100 100 1 100 10C General Storage 100 100 1 100 1cc 7 High School Construction Standards Appendix A 12 Space Allocation /Square Footage Assignments -(1,000 Student Capacity) 1000 student cap acity Square ootage Total Square Ft From To # rooms From To Student Support Areas Guidance 300 300 1 300 300 Reception/Career Center 400 400 1 400 400 Counselor Office 150 150 3 450 450 Other Student Services 200 200 1 200 200 Health Room & Toilet .200 200 1 200 200 Staff Support Areas. Group Teacher Office /Planning (per teacher) 80 100 45 3,600 4,500 . Special Assistant/Itinerant Teacher Office/Workspace (per 1 80 100 7 . 560 700 Workroom 300 800 1 300 800 Lounge .1001 1,333 1 300 1,333 Cafeteria /Food Service Dining Room Seating Area (square feet per pupil) assumes 3 seatings 14 20 333 4,667 6,667 Serving (20% - 25% of dining area) 933 1,667 Kitchen (assumes 1,500 lunches served for 1,000 ca acity) 1 2,880 2,880 1 1 2,880 2,880 Total Assigned Space 104,172 126,007 Commons /Circulation /Entries /Building Sunnort (45%).1 4A_877 5E,_703 AA R77 Sf, vnl Total Building Area 11-151,049 182,710 II Total Square Feet per Student 151 183 8 y High School Construction Standards Appendix B Space Allocation /Square Footage Assignments (1,500 Student Ca aci 13 1500 student cap acity Square Foots a Total S are Ft From To # rooms From To 9 ■ Classrooms Regular classroom with 5 computers 850 950 40 33,575 37,525 Science Labs, Prep and Storage Physical Science 1,200 1,200 3 3,000 3,000 Biology 1,200 1,200 4 4,200 4,200 Physics 1,200 1,200. 1 . 1,200 1,200 Earth Science 1,400 1,400 1 1,400 1,400 Chemistry. 1,500 1,500 3 3,750 3,750 Storage/Pre `Rooms (Biology, Chemistry ,.Ph cs 250 per 2 labs .41 875 875 Remediation & resource. labs 1 450 450 4 1,8001 1;800 Exceptional Children Exceptional Children Self - Contained (8 to 12 student cap 800 1,200 2 1,600 2,400 Exceptional Education Resource Room (for groups up to 450 450 2 900 900 Arts Education Instrumental Classroom w/ lockers 1,800 2,100 1 1,800 2,100 Vocal Classroom 1,000 1,500 1 1,000 1,500 Instrument storage room 400 600 1 400 600 Music Library 200 200 1 200 200 Instrument Repair 150 150 1 150 150 Office (each) 150 150 1 150 150 Uniform Storage 400 600 1 400 600 Practice Room 55 60 1 55 60 Ensemble Practice Room 150 200 1 150 200 Visual Arts Classroom 1,200 1,500 1 1,200 1,500 Kiln /Clay Storage 40 60 1 40 60 Art Material Storage 80 150 1 80 150 Theater Arts Classroom 1,800 2,000 1 1,800 2,000 Theater Arts Auditorium 8 /seat; capacity 1/3 to 112 ADM 500 to 750 seats 4,000 6,000 Stage, Storage & Dressing Rooms 3,000 5,000 1 3,000 5,000 Light, Lock Vestibule, Lobby, Concession 800 2,000 1 800 2,000 . Dance Classroom (including storage) 1,800 1 2,0001 1 , 1,800 2,000 9 ■ 14 High School Construction Standards Appendix B SpaceAllocationfSquare Footage Assignments (1,500 Student Ca aci 10 1500 student cap ity Square ootage Total Square Ft # rooms From To From To Workforce Development Agricultural Education 2,500 3,000 1 2,500 3,000 Business Education 1,200 1,400 1 , 1,200 1,400 Family and Consumer Sciences Education 1,400 2,000 1 1,400 2,000 Health Occupations 2,000 2,500 1 2,000 2,500 " Marketing Education ('including store). 1,500 2,000 1 1,500 2,0 00 Technology Education :. 1,300 2,200 "1 1,300 2,200 Trade and Industrial Education 8501 3,000: 1 850 3,000 Media Center Main Room 4 sq. ft per ADM 1. 6,000 6,000 Support Areas ,000 2,000 1 2,000 2,000. Video Studio -400 400 1 400 400 Control/Editing 260 260 1 260 260 E ui ment Storage 80 80 1 80 . 80 Physcial Education Gymnasium Play Area 2 play courts 62 x 100 court. 12,400 12,400 Spectator Seating 400 per - 500 pe 100 seats 100 seats 6,000 7,500 Gymnasium Dressing, Shower, Storage, Lobby 4,000 .4,000 Wrestling (competitive) 3,000 3,000 1 3,000 3,000 Resistive Exercise (weight lifting 2,000 3,000 1 2,000 3,000 Auxilliary Gymnasium 6,500 6,500 1 6,500 6,500 Administration Principal's Office 200 200 1 200 200 Assistant Principal (each) 150 150 3 450 450 Reception Area 400 400 1 400 400 Secretary 150 150 2 300 300 SIMS 9 -12 200 200 1 200 20C Other Student Services 200 .200 1 200 20C Workroom/Storage 200 200 1 200. 200 Conference Room 200 200 1 200 200 Record Storage 100 100 1 100 .100 General Srnrave 100 100 1 100 10 Total Building Area Total Square Feet per Student 11 78,004 1 65,634 78,004 211,487 1 251,345 141 168 15 High School Construction Standards Appendix B Space Allocation /Square Footage Assignments�1,500 Student Ca aci 1500 student cap acity . Square Footage Total S uare Ft From To # rooms From To Student Support Areas Guidance 300 300 1 300 300 Recepton/Career Center 400 400 1 400 400 Counselor Office 150 150 5 750 750 Other Student Services 200 200 1 200 200. Health Room & Toilet 200 200 1 200 200 Staff Support Areas Group Teacher Office /Plaaning (per teacher) 80 100 45 3,600 4,500 Special Assistant/Itinerant Teacher Ofiice/Workspace (per 1 80 100 10 800 1,000 Workroom 300 800 2 600 1)600 Lounge 300 1,333 1 300 1,333 Cafeteria /Food Service Dining Room Seating Area (square feet per pupil)..assumes 3 seatings 14 20 5.50 7,700 11,000 Serving (20% - 25% of dining area) 1,540 2,750 Kitchen (assumes 2,000 lunches served for 1,500 capacity) 11 4,398 4,398 1 1 4,398 1 4,398 Total Assigned Space 145,853 173,341 Total Building Area Total Square Feet per Student 11 78,004 1 65,634 78,004 211,487 1 251,345 141 168 High School Construction Standards Appendix C Estimated Cost of New High School .7- f 16 Student Capacity Total Square Footage 1000 1500 Total S uare Ft Total. Square Ft From To From To 151,049 182,710 211,487 251,345 Cost Per Square Foot $110 $20,098',063. $23,263,554 $27,647,943 Acres L16,65,3 5 45 60 Average Cost Per Acre $30,000 $1,500,000 $1,350,000 $1,800,000 As a percentage of Construction Cost 10% $1,661,538 $2,009,806. $2,326,355 $2,764,794 As a percentage of Construction Cost and Site Development 10% $1,827,692 $2,210,787 $2,558,991 $3,041,274 As a percentage of Construction Cost 5% $830,769 $1,004,903 $1,163,178 $1,382,397 Cost Per Square foot $8.2511 $1,246,154 jor voice, video : and data distribution systems) $1,507,355 $1,744,767 $2,073,596 As a percentage of Construction Cost and Site Development 5% $913,846 $1,105,393 $1,279,495 $1,520,637 Non - personnel; one time start-up costs $399,927 $483,754 $559,946 $665,471 11 Total Estimated Cost $24,695 46 $29,920,112 $34,246,330 $40,896,177 12 ®range Countp JRoarb of 41butation A&cbnr , 4d RANDY BRIDGES SUPERINTENDENT ftlzborouab, PC 27278 BOARD MEMBERS 200 EAST KING STREET SUSAN DOVENBARGER, CHAIR HILLSBOROUGH, NC 27279 KEITH COOK, VICE CHAIR TELEPHONE 919 - 7324129 ROBERT H. BATEMAN - FAX: 919 - 732 -8120 RICHARD KENNEDY DAVID KOLBINSKY DELORES SIMPSON BRENDA STEPHENS MEMORANDUM TO: Rod Visser FROM: Randy Bridges RE: Information requested from the 8/24/99 meeting DATE: September 7-, 1999 Please find below the information we discussed last week during our monthly meeting. If you need additional information please let me know. 1. Identify all CIP Projects including supporting information. • As you are aware we have obligated the majority of our CIP to the construction of the new high school. We do have some other projects outside the high school construction, and I have enclosed a copy of the projects and their completion dates. Again, there are no new projects, and the work is ongoing. 2. Status on new elementary and high school. • New Elementary School — This school is scheduled to open August 2000. The site has been cleared and the building pad could go down in a few weeks. You have a cash flow sheet on this project, and there have been no major changes. I have enclosed the sheet on the high school and . the elementary school for your information. • New High School — We have closed on the land purchase, approximately 66 acres across the street from Grady Brown Elementary. Our plan is to open this school August 2002. We will begin clearing the site by selling the timber over the next few months. There have been some preliminary meetings with internal groups about the design and program requirements. This school will be constructed to accommodate 1000 students. 3. The construction cost for A. L. Stanback is included on a separate spreadsheet 4. The construction cost of New Hope Elementary is listed below; however, we are unable to itemize information about the construction cost: • Bond $5,991,000.00 • IBM $1,000,000.00 • Triangle J. Council $ 250,000.00 • Public School Building Fund $2,220,351.00 • Pay As You Go Funds $ 642.158.00 Total $10,103,509.00 t. Qk ThnetableslProgress Reports for Major OCS Capital Projects 9-6-99 Cameron Park Renovation 1997 Bonds $270.000 Completed 1. Dropped Ceilings 2. Replaced Light Fixtures 3. Upgraded HVAC Central Elementary Media Center 1997 Bonds $ 90,000 Will be completed in summer of 99 1. Renovate present space adjacent to the media center for a computer lab & Video station as well as the production and work areas of the media center. 2. Upgrade Carpeting and shelving displays 3. Add New Circulation area C.W. Stanford Refurbishment 1997 Bonds $200,000 CIP Sales Tax $1,640,000 T_ otal_$1.940.000 Project is scheduled for complete summer of 99 1. Installed a gas fired hot water heating system 2. Modified the air condition system 3. Installed new ceiling tiles and ceiling insulation 4. Renovated bathrooms and modified for handicapped accessibility 5. New Furniture & Equipment 6. New Carpet and floor tiles 7. New Thermal windows 8. Restructured offices, media center and special education classrooms 9. Installed cooling system in gymnasium and dressing areas 10. Installed new soffits and gable ends 11. Added addition to the main gym and upgraded the football/soccer field area 12. Upgrade for handicapped accessibly Efland Cheeks Gymnasium 1997 Bonds $85.000 CIP Sales Tax $365.000 Total $450.000 Project is scheduled for completion summer of 99 1. Add Storage for indoor and outdoor physical education equipment 2. Add a small office for the physical education teacher and after school can 3. Complete renovation of the gym area to include air conditioning Grady Brown Renovation 1997 Bonds $100,000 Project scheduled for completion during summer 99 1. Make campus handicapped accessible; add automatic door openers 2. Replace gym floor 3. Additional work for playground NfOy Orange High Renovation 1997 Bonds 1997 Bonds 150.000 CIP Sales Tax 383.000 Total $533.000 1. Tennis courts and gym floors - completed 2. Design for field house and D Wing Basement - In progress 3. Filed House and D Wing and Science Laboratories Scheduled to be complete in 1999 -2000 4. Design for Auditorium - will be completed by 2000 -2001 5. Auditorium Renovations - scheduled to be completed in 2001 -2002 L 8- 3