Loading...
HomeMy WebLinkAboutAgenda - 12-13-1999 - 2ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 13, 1999 SUBJECT: Issues Identified by Chapel Hill - Carrboro City Schools DEPARTMENT: County Manager ATTACHMENT(S): As noted in "Background" section Action Agenda Item No. 2 PUBLIC HEARING: (YIN) No INFORMATION CONTACT: Neil Pedersen, 967 -8211 TELEPHONE NUMBERS: Hillsborough Chapel Hill Durham Mebane 732 -8181 968 -4501 688 -7331 336- 227 -2031 PURPOSE: To discuss issues of concern to the Chapel Hill - Carrboro Board of Education. BACKGROUND: As outlined in an August 21 memo (Attachment 2a) from Superintendent Pedersen, the Chapel Hill - Carrboro Board of Education requested that the following topics be included on the September 15 work session agenda. a) Acquisition of School Sites and Construction of New Schools b) Communities in Schools c) Proposal for School Board Taxing Authority At the most recent monthly meeting between the Superintendents and the County Manager, Superintendent Pedersen indicated that the CHCCS Board had recently adopted a resolution supporting the concept of taxing authority for local school boards (Attachment 2b). d) Capital Project Ordinance Approval — Glenwood Elementary Renovation Included in the approved 1999 -2009 CIP was the Glenwood Elementary School Renovations capital project. The project provides for major renovations at the school including replacement of the HVAC and fire alarm system and upgrades to classrooms, restrooms, windows and cafeteria. The Chapel Carrboro City Schools has requested that the Board of Commissioners approve funding totaling $100,000 for the first phase of the Glenwood Elementary School Renovations Capital Project Ordinance. This phase includes planning, architect and engineering costs. Once this phase is complete and bids received, the school district will ask the Board to approve construction - related costs for the project. At their December 7 meeting, the Board deferred action on this capital project ordinance (Attachment 2c), pending discussion with the CHCCS Board about plans to replace Glenwood Elementary at some point in the future. A copy of the "Preliminary School Facilities Report" recently presented to the CHCCS Board is included as Attachment 2d to provide some context to this discussion. FINANCIAL IMPACT: There is no financial impact tied directly to the discussion at this meeting, other than formal appropriation of funds already planned in the CIP in the Glenwood Elementary School Renovations capital project. However, decisions that may be made by one or more of the elected boards at subsequent meetings are likely to have significant implications for future capital and operating budgets. RECOMMENDATION(S): The Manager recommends that the boards discuss the issues noted and provide direction to staff, as appropriate; further, the Manager recommends if their questions are satisfactorily answered, that the Board adopt the Glenwood Elementary School Renovations capital project ordinance. M + CHAPEL HILL - CARRBORO CITY SCHOOLS Lincoln Center, Merritt Mill Road Chapel Hill, North Carolina 27516 . Telephone: (919) 967 -8211: Neil Q. Pedersen Superintendent TO: Jobn Link, Manager Orange County FROM: Neil G. Pede Superintendent Ann Hwt Assistant Superintendent For lnOucttonel Services Chester Prayer, Assistant Superintendent For Support Services RE: Agenda Items for September 1S" Joint Meeting DATE: August 21, 1999 The Chapel Bill- Canboro City Schools Board of Education is looking forward to the joint meeting next month with the County Commissioners and the Orange County School Board. The Board requests that the following fonr�pto ics be placed on the agenda. They are m priority order for inclusion. ' 1. Acquisition of .school sites and construction � id..- new schools: The Board of Education is eager to move forward with identifying and purchhsmg future sites for new schools. The availability of sites in our district is becoming increasingly limited. It also is necessary to consider a timetable for new school construction and to begin plans for financing new schools. 2. School initiatives that could impact the 2OW01 budget: All parties benefited from tbe'ongoing dliscnssion that preceded the presentation of budgets last spring. This. meeting would be a good opportunity to share an initial list of expected needs that must be addressed in next year's budget. 3. Value engineering: The Board would like to discuss the appropriate role for a value engineer on school projects and the proposed mediation process. 4. Communities in Schools: The Board would like the County Commissioners to consider supporting steps that would pat CS* on a framer financial footing. Thank you for your consideration of these requested topics. Cc: CHCCS Board of Education Randy Bridges - n V CHAPEL HILL- CARRBORO CITY SCHOOL NOV 2 2. 1999 , Lincoln Center, Merritt Mill Road L 0-/ Chapel Hill, North Carolina 27516 -2881 Telephone: (919) 967 -8211 Neil G. Pedersen Ann Y. Hart, Assistant Superintendent Superintendent of Instructional Services Steve Soroggs, Interim Assistant Superintendent Of Support Services TO: John Link, Manager Orange County FROM Neil G. Pedersen Superintendent RE: Resolution in Support of Taxing Authority DATE: November 19, 1999 The enclosed resolution was approved by the Chapel Hill- Carrboro City Board of Education at its meeting last evening. Best wishes for a pleasant Thanksgiving. NGP /asb Resolution ion Support of Taxing Authority WFD REA,S, over 80 % of the boards of education in the United States are fiscally independent; and W + RRAS, North Carolina has a unique mcftd of finding public education by PUcin8 the control of educational policy with Ioaal hoards of education while requiring the BOY erning bodies of local govern unrnts to appropriate funds for educational purposes; and W MREA,S, the existing school funding atra ug mumt in North Carolina omen puts elected members of the board of education at odds with the budgetary and taxing deddonis of anotbw locally elected body elected by the .Same canstituency; and WHMKL4S, the decisions concerning the local needs of an individual school system shad be made by those who are the most kno wledgeatcte about school system needs; and WHEREAS, members of local boards of education are elected to be the educational leaders and decision-makers in their communities and have the legal duty to provide " adequate educational services to all children; and WHMF AS, the North Carolina Suprem Court, under %eadro, has hell that students, in North Carolina have a state constitutional right to a sound basic education; and , aehool boards are not in a position to fulfill their ~on to provide a sound basic fthumbon without the ability m raise necessary finds to provide these educational service; and WHEREAS, over recent years, the North Carolina Gene al Assembly and the State Board of Education have made adnzinistratoaa, teachers and stun tents moue accountable for the tonal progress of all school aged d9ldren in North Carolina, and WHBREAS, until local boards of education are granted tax levying qty, they ca mot reasonably be held accountable if their school systems are not Willing the needs of the children in their districts; TSER�'ORi�, BE IT RBSOLYED that the Chapel Hill- C.arrbaro City Board of Education ruliy requests that the North Carolina General Assembly grant local boards of education the authority to Levy taxes to provide for the locd educational needs of the chddnen they serve. Adopted by the Chapel Bill- Canfioro City . Board of Bducatim this .le day of November in the year 1999. J� i TSER�'ORi�, BE IT RBSOLYED that the Chapel Hill- C.arrbaro City Board of Education ruliy requests that the North Carolina General Assembly grant local boards of education the authority to Levy taxes to provide for the locd educational needs of the chddnen they serve. Adopted by the Chapel Bill- Canfioro City . Board of Bducatim this .le day of November in the year 1999. J� Glenwood Elementary School Major Renovation 7 Chapel Hill - Carrboro City Schools Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds for a major renovation of Glenwood Elementary School that was constructed and opened in 1952,1954, and 1959. This project will be financed with proceeds from the 1997 Local Bond Issue and savings from the Scroggs Elementary School Construction and East Chapel Hill High additions construction projects. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete phase 1 of this project: Section 4. The following amount is appropriated for this project: Through FY 1998 -99 1999 -00 ApproWation Through FY 1999-00 Sales Tax $0 $0 $0 Impact Fees $0 $0 $0 PSBF $0 $0 $0 1992 Bond Funds $0 $0 $0 1997 Bond Funds $0 $100,000 $100,000 Savings on Construction Contracts so so 5D Total Project Funding $0 $1001000 $100,000 Section 4. The following amount is appropriated for this project: Section 5. This ordinance supersedes all previous Glenwood Elementary School Major Renovations Capital Project Ordinances. Section 6. This ordinance shall remain in effect until June 30, 2000. Adopted this 7' day of December, 1999. T roug FY 1998 -99 1999 -00 Appropriation Through FY 1999 -00 Plannin /Arch /En in 0 100,000 100,000 Land /Assoc Fees 0 0 0 Construction 0 0 0 Equipment/Furnishing s 0 0 0 Other 0 0 0 Contingency Q Q 0 Total 0 100,000 100,000 Section 5. This ordinance supersedes all previous Glenwood Elementary School Major Renovations Capital Project Ordinances. Section 6. This ordinance shall remain in effect until June 30, 2000. Adopted this 7' day of December, 1999. CHAPEL HILL - CARRBORO . CITY SCHOOLS Lincoln Center, Merritt Mill Road Chapel Hill, .North Carolina 27516 Telephone: (919) 967 -8211 Neil G. Pedersen Ann Hart, Assistant Superintendent Superintendent For Instructional Services Steve Scroggs, Interim Assistant Superintendent For Support Services TO: Board of Education FROM: Neil G. Pederse Superintendent RE: Preliminary School Facilities Report DATE: November 24, 1999 Attached you will find a document called "Preliminary School Facilities Report." This report represents an important first step in the process of developing a new Facilities Master Plan for the school district. Preparation and adoption of such a plan is one of the Board's objectives for the 1999 -2000 academic year. The report pulls together different sets of population and student enrollment projections and offers a "best guess" of student enrollment, by year and by level (elementary, middle, high school) for the next 25 years. In the early years the vision is clear and reliable. The longer the period of projection, the less reliable the projections become. Still, it is useful to be considering 5, 10, 15, 20, and 25 year probable needs. The conclusion of the report is that we are likely to need several new facilities during this period One or two elementary schools will be needed during the next decade to accommodate growth and the reductions in class size to which the Board already has committed. It also is anticipated that by the year 2025, two elementary schools will need to be replaced because they will be approaching 75 years of age. The district also will need additional capacity for its high school population by 2004. It is suggested in the report that the Board consider securing a site for one or more alternative schools or programs and/or add mobile classrooms to the existing campuses. A third high school does not appear to be warranted at this time. The report also points out the shortcomings of the Lincoln Center facility and suggests that a new facility be sought or built to meet this need. This would allow the Lincoln Center site to be used for an educational purpose, possibly the alternative high school We recommend that the next step in this planning process take place on December 2nd with the creation of a Facilities Master Plan Task Force. We recommend that this Task Force be charged with responsibility for preparing a plan to be presented to the School Board no later than the end of June, 2000. We recommend that the plan be structured along the lines of the attached outline. a We recommend that the composition of the Task Force be as follows, with participation of individuals to be invited and secured by the Superintendent over the next few weeks, so that the Task Force can begin working in January, 2000: • 2 School Board Members (including one who sits on.the Schools/Land Use Council) • A County Commissioner • County Planning Director • Representative of Carrboro Parks and Recreation Commission • Representative of Chapel Hill Parks and Recreation Commission 3 Parents (elementary, middle, high school) • 3 Principals (elementary, middle, high school) • 3 Teachers (elementary, middle, high school) • Representative from Shaping Orange County's Future • Representative from Chapel Hill- Cantoro Chamber of Commerce Board member Roger Waldon will chair the Task Force. The Assistant Superintendent of Support Services and the Facilities Director will provide staff support. Issues to be included, addressed in Long Range Facilities Plan (Report to be Prepared by New Committee, Jan-May 2000) 1. Take Population, enrollment figures from Preliminary Report as a starting point. 2. Consider how to address issue of desired decrease in average class size; consider options for average school size. 3. Consider useful life of existing facilities; recommend if any need to be phased- out. Include discussion of mobile classrooms (31 at present). 4. Consider issue of new sites vs. expansion of existing facilities. 5. Discuss need for administrative facilities. 6. Identify possible sites for new facilities, adding to current list. 7. Consider possibilities for sharing facilities with other public bodies: 8. Consider, summarize costs of expanding, building facilities. 9. Recommend a Long Term Capital Facilities Plan; 25 year planning horizon, with emphasis on the period 2000 -2010. Preliminary School Facilities Report 2000 through 2025 Presented to the Chapel Hill - Carrboro Board of Education December. 2, 1999 This report is the -first step in a process to assess and plan for school facility needs for the Chapel Hill- Carrboro School District in the early part of the next century. Included are historical enrollment data, population and demographic projections, a projection of need for additional school capacity, and a description of the condition and useful life of existing facilities. The next step in this process will be preparation of a Facilities Master Plan. This plan will recommend a facility construction program, for use by the community in anticipating future funding needs and timing. The Plan also will identify potential locations for new facilities. Numerous reports and memoranda were collected and used as the information base for this report. Several of these are briefly described in the narrative that follows, and all are available for review as an Appendix to this report. The contents of this Appendix are listed on the last page, and the individual documents are available in the Superintendent's office. HISTORICAL / PROJECTED POPULATION AND ENROLLMENT Population Growth Map 1 shows an area referred to as the Chapel Hill- Carrboro Urban Services Area. This area has been drawn for land use planning purposes, as part of a Joint Planning Agreement among three jurisdictions: the Town of Chapel Hill, the Town of Carrboro, and Orange County. The planning concept is that, ultimately, Chapel Hill and Carrboro will extend their corporate limits out to, but not beyond, this Urban Services Boundary. Thus the boundary becomes an important feature in long range planning for these communities. Accompanying this boundary is an agreement that urban services (e.g., water and sewer extensions) would not extend beyond the Urban Services Boundary. The boundaries of the Chapel Hill Carrboro School District are shown on Map 2. The area includes the Towns of Chapel Hill and Carrboro (those portions that are located within Orange County), and- surrounding unincorporated areas. Please note that a portion of the Town of 1 ' 1 t� IN `O's -Cr ••� V U J •••• Urban Services Boundary Urban Services Boundary Map 1 2 ,r-b----------------- - - - - -- — - — - — - — - — - k. A L ' C h a t h a m i Y C o u n t y r , Chapel Hill- Carrboro City Schools District Boundary Lines Map 3 C-) O C Pr q Chapel Hill extends into Durham County; this area is not part of the Chapel Hill- Carrboro School District. The two lines (school district boundary and urban services boundary) circumscribe similar, but not identical, areas. The major population center is included in both areas and historical / projected growth of the Urban Services Area is a close approximation of the growth of the school district. (Note that the school district extends farther to the north and west than the urban area, while the urban area extends fiuther east than the school district). For purposes of estimating general population growth.in this report, the description of the Urban Growth Area population is used as a surrogate to estimate historical and projected population growth in the school district. Projected population growth in the urban area is shown on Table 1 and Figure 1. These have been prepared as part of a regional transportation planning project, and are being relied on by area local governments for purposes of anticipating future needs. Student Enrollment Gro wth Growth in student enrollment in the Chapel Hill- Carrboro City . Schools does not necessarily track population growth exactly, although trends will be mirrored. It may be, for example, that if the driving force behind population growth is an influx of families with young children, the rate of growth in student enrollment might exceed the rate.of growth in the general population. Table 2 and Figure 2 show growth in student enrollment over the last 15 years in Chapel Hill - Carrboro City Schools. Data are also shown in component parts of the student population: elementary, middle, and high school. The annual rate of growth in overall student enrollment has been 4.3% over the last decade. In order to project future student enrollment, two methods were employed. The first is a 10 -year projection provided by the consulting firm of Or/Ed Laboratories. (This firm has been employed on three previous occasions to project or provide enrollment data for this school district, and is familiar with the demographics of this area). The combination of good historical data and a short planning horizon (10 years) leads to a reasonably reliable set of year -by -year projections for the short term. These projections show an annual rate of growth in student enrollment of 1.4% over the next decade. The full ORED report is provided here as Attachment 1. The second projection technique is much more general and coarse, with a longer planning horizon. The second set of projections takes the 25 -year projections for general population growth, assumes constant demographic profiles, and yields a projection of student enrollment in 5 -year increments for the next 25 years. While these are less reliable than the first set of projections, they offer a "ballpark" assessment of directions in which we are likely to be moving. This approach yields a 1.2% annual growth in student enrollment over the next 25 years. We also have State projections, prepared by the NC Department of Public Instruction. These figures show annual growth of 1% in student enrollment for the next decade. 4 Table 1: Existing and Projected Population in the Chapel Hill — Carrboro Urban Area Year Population Year Population 1995 60,987 2015 81,318 2000 66,257 2020 85,851 2005 71,522 2025 90,384 2010 76,420 Figure 1: Existing and Projected Population in the Chanel Hill Carrboro Urban Area Source: Draft 2025 Regional Transportation Plan 5 Table 2: Student Enrollment Since 1985 Year Elementary Middle High Exceptional Total 85 -86 2280 1155 1837 78 5350 86 -87 2341 1187 1797 79 5404 87 -88 2505 1145 1718 81 5449 88 -89 2664 1235 1565 98 5562 89 -90 2797 1285 1572 96 5750 90-91 2872 1430 1576 0 ** 6005 91 -92 6054 1519 1636 0 ** 6350 92 -93 3273 1601 1801 0 ** 6822 93 -94 3469 1651 1880 0 ** 7133 94-95 3651 1747 1998 0 ** 7509 95 -96 3838 1886 2087 0 ** 7811 96-97 3850 1%9 2230 0 ** 8049 97 -98 3875 2012 2294 0 ** 8181 98 -99* 4040 2066 2384 0 ** 8490 99-000 1 4167 1 2189 1 2637 0 *• 8893 * Denotes Principal Monthly Report data ** Ex. Ed. Data was kept by grade level starting 90-91 Other data from DPI Annual Report Figure 2: Student Enrollment Since 1985 6 Finally, we have a set of projections that have been prepared by the Orange County Planning Department. These were presented to the School Board on November 18, and project an annual growth.rate of 2.6% over the next decade and a constant addition of 300 students per year over the next 25 years. The full Orange County Report is provided here as Attachment 2. All of these projections are shown in Table 3, and 'Figure 3, so that they can be compared. Tables 3a, 3b, 3c, and 3d show each set of projections broken down by elementary, middle, and high school categories. NEED FOR ADDITIONAL SCHOOL CAPACITY This district is going to need more schools to accommodate the population growth that this area will be experiencing. The projections described above allow us to anticipate what kind of school capacity will need to be added when. What We'll Need The most rigorous and customized methodology of the three sets of projections is found in the OR/ED Laboratory set. These projections have taken into account historical growth rates in student enrollment, along with cohort projections, assumptions about changing demographics and birth rates, and assumptions about general population growth in this area This yields the most reliable 10 -year projection. However, OR/ED Laboratory does not project beyond 10 years. Looking beyond 10 years results in a considerable decline in reliability of the projections. The 25 -year projection that is based on expected general population growth in the Urban Area provides a reasonable extension of the OR/ED 10 -year projections. The reasonableness of this approach is confirmed by general consistency between the Urban Area approach for the first 10 years and the OR/ED projections. Taken together, then, these two data sets offer a "best guess" scenario for growth in student enrollment in the Chapel Hill- Carrboro School District over the next 25 years. Table 4 shows these "best guess" projections, broken out into Elementary, Middle, and High School subsets. For purposes of estimating how many schools we will need to accommodate this expected population, a general rule about optimal sizes of schools is being proposed as follows: Elementary School ------------ 550 students Middle School--------- - - - - -- 650 students High School - - - - - - - - - - - - - - 1500 students The projections that follow do not take into account the School Board's recently adopted plan to lower average class sizes. A discussion of the likely impacts of lowering class sizes on facilities needs appears at the end of this report. 7 Table 3: Projected Total School Enrollment Year OWED Iab Urban Area Method DPI Orange County Planning 99-00 8893 8893 8893 8893 2005 9897 9746 9483 10406 2008 10181 10496* 9595 11242 2015 18,000 11240 13242 2020 1 1987 14742 2025 12734 16242 * Denotes 2010 data Figure 3: Projected Total School Enrollment 8 17,000 - _ DPI O.C.P. Or/Ed urban O.C.P. Urban ' r DPI 18,000 15,000 14,000 13,000 12,000 11,000 10,000 OR/Ed. 8,000 N 8 - _ DPI O.C.P. O.C.P. Urban ' r DPI 8 Table 3a: OR/ED Lab. Projections of Student Enrollment by Grade Level Year Elementary Middle High Total 99 -00 Actual 4167 2189 2637 8893 2000 -01 4177 2256 2749 9182 2001 -02 4217 2362 2812 9391 2002 -03 4219 2433 2914 9566 2003 -04 4247 2464 3032 9743 2004-05 4270 2485 3142 9897 2005-06 4242 2513 3281 10036 2006-07 4263 2526 3330 10119 2007 -08 1 4266 2551 3364 1 10181 2008 -09 4267 2525 3440 10232 Table 3b: Urban Area Method Projections of Student Enrollment by Grade Level Year Elementary Middle Higb Total 99-00 Actual 4167 2189 2637 8893 2004-05 4548 2363 2835 9746 2009 -10 4899 2544 3053 104% 2014 -15 5245 2725 3270 11240 2019 -20 5594 2906 3487 11987 2024 -25 15943 3087 3704 1 12734 Table 3c: DPI Projections of Student Enrollment by Grade Level Year Elementary Middle Iflo Total 99-00 Actual 4167 2189 2637 8893 2000-01 4021 2258 2637 8916 2001 -02 4057 2308 2729 9094 2002 -03 4030 2370 2846 9246 2003 -04 4055 2369 2950 9374 2004-05 4045 2415 3021 9481 2005 -06 4041 2383 3140 9564 2006-07 4011 2431 3141 9583 2007 -08 4001 1 2419 3174 9594 9 Table 3d: Orange County Planning Department Projections of Student Enrollment, by Grade Level Year Elementary Middle High Total 99-00 Actual 4167 2189 2637 8993 2000-01 4104 2162 2654 8920 2001 -02 4251 2234 2723 9208 2002 -03 4398 2306 2804 9508 2003 -04 4545 2378 2902 9825 2004,05 4692 2378 2902 9972 2005 -06 4803 2522 3081 10406 2006-07 ` 4986 2594• 3162 10742 2007 -08 5133 2666 3243 11042 2008 -09 5231 2714 3297 11242 2009 -10 5329 2762 3351 11442 2010.11 5476 2834 3432 11742 2011 -12 5623 2906 3513 12042 2012 -13 5770 2978 3513 12261 2013 -14 5917 3050 3675 12642 2014 -15 6064 3122 3756 12942 2015 -16 6211 3194 3837 13242 2016 -17 6358 3266 3918 13542 2017 -18 6505 3338 3998 13842 2018 -19 6652 3410 4080 14142 2019 -20 6799 3482 4161 14442 2020.21 6946 3554 4242 14742 2021.22 7093 3626 4323 15042 2022 -23 7240 3698 4404 15342 2023 -24 7387 3770 4485 15842 2024 -25 7534 3842 4556 15932 2025 -26 7681 3914 4647 16242 2026 -27 7828 3986 4728 16542 2027 -28 7975 4058 4809 16842 2028 -29 8122 4130 4890 17142 2029 -30 8259 4202 4971 17442 2030.31 8416 4274 5052 17742 10 Table 4: "Best Guess" Total Student Enrollment Projections Year Elemestary Middle High Total 99-00 Actual 4167 2189 2637 8893 2000 -01 4177 2256 2749 9182 2001 -02 4217 2362 2812 9391 2002 -03 4219 2433 2914 9566 2003 -04 4247 2464 3032 9743 2004.05 4270 2485 3142 9897 2005 -06 4242 2513 3281 10036 2006-07 4263 2526, 3330 10119 2007 -08 4266 2551 3364 10181 2008 -09 4267 2525 3440 10232 2014 -15. 5245 2725 3270 11240 2019 -20 5594 2906 3487 11987 2024 -25 5943 3087 3704 12734 Years 2000 through 2009 based on OR/ED projections Years 2014 -15, 2019 -20 and 2024 -25 based on Urban Area Population Projections Table 5: Ages of Existing Facilities Year Built Facility 1950 Lincoln Center 1952 Glenwood Elementary 1957 Carrboro Elementary 1958 Estes Hills Elementary 1960 Frank Porter Graham Elementary 1962 Phillips Middle 1966 Chapel Hill High 1969 Seawell Elementary 1969 Culbreeth Middle 1972 Ephesus Elementary 1994 McDougle Middle 1996 McDougle Elementary 1996 East Chapel Hill High 1999 Scroggs Elementary Taking the data on Table 4, and projecting the numbers of elementary, middle, and high school students we are likely to have in the district by year, and taking the optimum size of each type of .school above, the need for facilities can be estimated. It appears that one additional elementary school is needed as soon as possible. Smith Middle School will accommodate growth in the middle grades: Some additional capacity will be needed for our high schools. This might be accomplished through an alternative school and/or mobile classrooms on our existing campuses. Impact of Reducing Class Size The School Board has adopted a plan to advocate for a series of steps to lower average class sizes throughout the district. The plan calls for the following reductions over the next four years: Year/Reduction 2000 -2001 Reduce Grade 3 from 26 to 23 2001 -2002 Reduce Grade 4 from 26 to 23 2002 -2003 Reduce Grade 5 from 26 to 23 2003 -2004 Reduce Grades 6 -12 from 26 to 25 The ultimate Class size reduction goal will be the following: Grades K-3 15 students Grades 4-5 18 students Grade 6 20 students Grades 7 -9 23 students Grades 10 -12 25 students The projections for needed new facilities described above do not take into consideration the possible impact of reduced class sizes. The near term reductions would necessitate the construction of one new elementary school or its equivalent. If average class sizes can be reduced, there are two possible alternative impacts on facilities. Alternative one would be to aim to keep the optimum number of students for each level of school constant, but to increase the number of classrooms in each type of school. However, it should be noted that most of our elementary schools would be hard pressed to find the space for the constriction of very many classrooms. Alternative two would keep the elementary schools at their present size, thereby necessitating the constriction of a new elementary school Re leg Older Facilities A principle used in planning for school facilities is to assume a life expectancy of 50 years. This district has facilities that are approaching that age no". and some are in a condition where 13 replacement becomes a necessary consideration. Table 5 lists the district's facilities, with the year of initial construction. Three of the district's oldest facilities are in this category: Lincoln Center, built in 1950; Glenwood Elementary, built in 1952; and Estes Elementary, built in 1958. These facilities are not likely to continue to be viable through to the year 2025, and replacement should be folded into consideration. The fourth of the district's facilities built during the 1950's, Carrboro Elementary (1957), is in better condition and may continue to be viable throughout this 25 year planning Period Compounding the age of facilities, Estes and Glenwood Elementary Schools are also constrained by being on small sites. Glenwood is on a 10 -acre, highly constrained site. Estes sits with Phillips Middle School on a 33 -acre site, but 30 acres is approximately what is desirable for a middle school alone. (Culbreth sits on 35 acres, McDougle Middle on 28 acres.) Carrboro Elementary sits on a 20 -acre site. Lincoln Center is both a problem and an opportunity. The problem is that it is a 50 -year old facility with multiple physical problems. It is time to begin planning for a new home for the district's central administrative functions. The opportunity is that Lincoln Center sits on a centrally located 12 -acre site. The possibility of constructing a new administrative building, as a major civic focal point for the community should be discussed. Possibilities include building an administrative facility on the Lincoln Center site, or building elsewhere (freeing up the Lincoln Center site for school use). SUMMARY AND NEXT STEPS The Chapel Hill - Carrboro School District will need additional facilities in the near -term and long -term future to accommodate expected population growth, reduce class size and replace aging structures. The needs may be summarized as follows: • 1— 2 additional elementary schools for growth and reduced class size in the next ten years. • Replacement of two elementary schools between 2010 and 2025. • No immediate plans for another middle school. • Expansion of high school capacity through a combination of mobile classrooms and alternative school settings. • Relocation of the central administration offices. The Chapel Hill - Carrboro School Board has indicated intent to prepare a Facility Master Plan. A task force is to be convened to prepare this plan, which is to include initial discussion of possible sites for new school facilities. A report is expected from the task force by the end of this school year. Prudence and wise planning would suggest beginning to identify and acquire at least some of the 5 sites that will be needed early on in this upcoming decade. 14 15 List of Tables and Figures Table 1, Figure 1: Historical and Projected Population Growth in the Chapel Hill Carrboro Urban Area Table 2, Figure 2: Student Enrollment During Last 15 Years Showing Elementary Middle and High School Enrollment Based on DPI Data Table 3, Figure 3: Four Sets of Projections of Student Enrollment, 2000 -2025 Table 3a: OR/ED Laboratory Projections of Student Enrollment, by Elementary, Middle and High School Table 3b: Urban Area Method Projections of Student Enrollment, by Elemen- tray, Middle and High School Table-3c: State Projections of Student Enrollment, by Elementary, Middle and High School Table 3d: Orange County Planning Department Projections of Student Enroll- ment, by Elementary, Middle and High School Table 4: "Best Guess" Projections of Student Enrollment, by Elementary, Middle and High School Table 5: Ages of Existing Facilities 15 Preliminary School Facilities Report APPENDIX The following documents provide background information and analysis on the topic of school facility needs. • November 18, 1999 School Adequate Public Facilities Report • November 1, 1999 OR/ED Laboratories Annual Update Study, 1999 -2000 • September 29, 1999 Memorandum describing 1995 and 1998 projections • September, 1999 Chapel Hill - Carrboro City Schools Facilities Notebook • August 31, 1999 10`h Day enrollment figures for 1999 -2000 school year •. January 14, 1999 Chapel Hill Data Booklet • December 16, 1998 High School Facility Construction Standards ' • March, 1997 Facilities Guidelines • May, 1996 School Facility Construction Standards • November 12, 1990 Long -Range Facility Plan for the Nineties • December 14, 1987 Long Range School Facilities Plan Attachment One Chapel Hill - Carrboro City Schools Annual Update Study 1999 -2000 November 1,1999 Prepared By: OR/Ed Laboratories Chapel Hill -- Carrb.o'ro City Schools Integrated Planning for School and Community Annual Update Study, 1999 -2000 November 1, 1999 owFeLaswamne, Contents of a standard sou nal update Transmitted with this report are several documents, charts and naps. These parts of a standard update are provided to school systems which have contracted for update sery ices and have undertaken a full IPSAC study within the last five years with annual updates every year since. The components of an update are: a. A seven to lea year system wide cohort survival forecast based on the 2& day enrollments for the present year and be 20n day eamUmeats for the past nve years. This forecast is disaggregated to elementary, middle and high school grades, and grades within each level. The system -wide forecast provides control totals for several of the more specific forecasts discussed below. b. The disaggmgmu m of the demealary, middle and high school forecasts to a set of building -level forecasts. The dlsagpegadon spreadsheets are for technical r &MM only. Mat of the relevant data from these sheds reappears on Use color 60- eftapadly cowl. c. Revisions b the capacities of schools as provided by the school system will tde development of a new color o tof-capacily dram. This don compares apwd with Wreastod cudlmnats Green cells show adequate capacity ad wed edt show inadequate capacity. Yellow is a two -year wansing that a schod is going old of capacity. d. Color coded 1202 maps showing tine above capacity-forecast relationships. Note that a map is generated only when the colors change, thus some maps are for multiple years. The apphcalle years ore clearly shown on the face of the map. e. Segment details and a corresponding 36x36 "dud cad segment' map. The value of this report relates to the exploration of minor boundary changes to relieve overcrowding and is briefly described on the cover abed of the segment detail I Four 2404 demographic naps: student count K -12, race distribution, density of studonts K -12, art! chungc in counts suite the prior update or full IPSAC study g Vcnfiwuon of par recommendations made by us for the location of new schools, if relevant. This is only done d there have been radical shift in demographics that were unsaid paled when the original recommendation was made. Please rote that studies include several components that do not appear in the annual updates. Tbese include a lard use study, attendance boundary studies, tmnbhple scenarios for the location of new schools, =Wu* medings at the dieWs site. sad conthmod support throughout the academic year for All imam related to the IPSAC packsix Ma_ilinLS In most cases, annual updates arc sent in two packages ten to fourteen days apart The first P:mclwge includes all the items listed above, but without segment details and maps. This gives the client school system an opportunity to review and question the material before the relatively high cost of napping is expended by the lab. This process reduces the bmg -term cost of update projects for all clierus. Peadlhee We have an excellent record of completing these projects several days before an agreed -upon dead Inc. We cannot always, however, agree to the deadline desired by the client, especially in the Fall when %%c have many projects open simultaneously. Note also dot there are two causes of project delays that occur on the client's side — providing TIMS data in a timely fashion, and changing the school capacity statistics after the project has been started it Ch We will, of course, fix any errors dash we have made in our work. If the client suspects that a forecast is unreasonable or is considerably different than it was in the immediate prior year, such discrepancies should be brought to our atlention. We will either provide an explanation of sire dif erenccs and/or recheck our work for errors. Plc= understand that a lakes about Duce years of studies (an original study plus one or two updates) before most of the oscillations in building level forecasts settle down. Even than, some attendance areas remain highly unprodictable, especially those that comprise a relatively large number df mobile home parks. C211in Our client school systems want argwhere from three or four copies of this report to one hundred or more. In order to work at a fixed price for update studies we have adopted a "standard package" which includes three collated and stapled copies of the small format report and one set of segment details and reaps. In addition, the best copy of the small format report is also included (unstapled) for local copying- 0 � a R to O O $ CO) V L �Q i t.% 1 Z a N o� -000 1=02i RAM o.- �oSogo� ��gssssgs� °s. s o� �000 �000 ��ga�aass�s�. I'llsea CS ��qqe��� . = 000 �2Sti °o SS 3 7i�3s9 c� oo Si��38g�g��8s� o.- �gg -o0 ;doo �oa$2S2Si3gi383e� g�Q��QQ�qq coo o�� a 5 a N Chapel Hill' Carrboro City Schools KtoS -8to8 9to12 soon I Iwo I I000 r 3500 3261 3330 361 3112 3000 3032 I 2911 i 27 2912 � 19 I 250 i 2500 2199 ��18D —2913- 2626--- 2551- 2363 2270 2152 2132 2000 1500 i. lo00 19W96 199566 199697 1997.00 low-" 1999-00 2000 -01 2001-02 2002-03 200101 2001-05 2005-06 2006-07 200746 2006.( 4267 3110 2525 System Disaggregation Spreadsheet - Page 1 — -- Chapel Hill - Carrboro City Schools — _._. _- 2000 _ _ -_ Midde _ -- - - 4177 2255 - - 42 91 Continued on next page >>> Fi1d DM, Nwmrdw 1 1998 -01 - Tahl _ Elsm 2001 fNidda ! total 2002-03 Elan . Midde _ Hi0 Total _ am Midde mah ITOW Cahortforooaet - -- 4135 21s4 2645 .8944 2749 9181 4217 2350 2812 9380 4219 2433 2914 9566 INoanlind >as >aa> as> sa 104 Z37 10 0.010 _ 95 0.042 64 0.023 199 0.022 1 - O.00D 83 OA36 102 0.038 186 0 02C - Anmnkod% _- »s >sa s>» s »a - - _ -- - '- - 0.010 0.042 0.039 0.026 First Lewl of Disa tion ographkAreas) ggreW ( Ge 199840 19994)0 Allocation of Gain 200001 Midde— High- Told Elam 2001.02 Midda _ Hl�lr Tula) 2002-03 Elan Made Hi Total Berm Midde Elam Midde Told Elam Mld - _ _ . _ _ - LAL-2 , I 89M �%yea2� �__.. _ _4177 ._. - 2255 - - -- - 2749 - - -- 9181 -- -------- _ 4217 2350 2812 8380 4219 Mill 2_914 9566 0- -0 0 0- - -- 0 0 -- -11 0 O 0 0 - -o - — o - -•_ -._ ii _ .__ . 6 .. 0 ._....o - . 6 0 0 0 (Area 5) _ . 0 0 0 0 0 . . _. 0 -b _ 0 ... _ . 0 - 0 0 0 INea6) __ _0 __. 0 0 0 0 . 0 0 O 0 0 0 O ,11,e• 71 , !•. ` - 0 y, 0 0 0 .. 0- 0 0 -' 0 0- _0 O 0 O 0 _ a..b1�. • .. L. .. .:•.' Q .24ri .0 •:i.:i ...'.: 0 +1.000 0 0 0 0 0 0 '- 0 .. 0 0 O 0 L�U�', hw.,• Awl 41MI 2164 2645 8944 1000 1.000 4177 2255 2749 9161 4217 2350 2812 9380 4219 2433 2914 9566 la:.t Ht1•AN(1 0 0 0 0 - -. -. .__ 0 0 0 0 0 0 0 0 0 0 System Disaggregation S llshoot - — — - Paps 2 Chapel MN - Carrboro Schools — FkW a.n. Howmbu 1.1999 - _ - -- _ - — -- 200;3.0!_ Eliin_ -- Middy. _ --. Talai 2004-06 Elam _ Middy 20p6 06 — - Trial 200607 EMm MWda Taw 2007 -W EMm _ 200609 MWdN _ Trial -- _ Ta4d — Elrn MWda EMm MWda Tad 4217 0.007 2464 • -30 0.012 3032 ._.118 0.011 9743 ... 177 0.01! 4270 .. -- _.73 0.006 2485 21 " 0.008 3112 110 "' 0 -096 9M7 154 0.016 54 4242 -27 -0.006 2313 28 3291 139 — o.ON 10037 140 j.0- 1263 m : 2626 _ 13 0.006 3370 ,9 10119 92 000s 4286 3 2561 25 3391 ----28-76 10191 1267 2523 -0.Olo 3i110 —o -at2 10232 — 1 0.01 0.016 0.001 0.010 0.010 0006 0.000 0.006 2003.01 ENm Middy .. Mgt!. Talal_ -_ 12 7 _ _ 2464 _ _3032 _ -9713 000 _ 0 0 __ 0 0 0 —' "o — ii ° °- - _3012 0 0 0 2004.06 2006M 200607 2007-09_ 2006-09 Trial EMm MWda Tod — MWOa _ HWh -- Tad EMm MWda Tad EMm MWOa M Tod Elam MWOa -_ i_ 1270 -- 2195 -- -_ 3142 _Elam 9697 1212 2513 —3291 10037 1283 2526 0 3330 0 __10119 0 4260 2551 3364 10191 127 .2523 3110 10232 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 —_ o 0 0 0 0 _0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T __ 0 0 0 0 0 0 0 0 0 0 0 Til: o 0 0 0 o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ° ° ° = 0 0 0 _ o 0 0 0 0 0 o 12u 0 - - -° - 2$19 - - -° 32e1 — 10037 4161 2526 3330 10119 3110 10x!2 0 2185 0 3112 0 9997 4289 2561 3361 10191 1267 2325 0 - 0 - 0 0 0 0 0 0 0 0 0 0 •�iI � �� �$i�ll � � �r l � Ii1ir1=9I� I �I a YNra f�Ij1 O pmlV m a N{ � P +� YN rOlp V mm a W NI A m II IL'I I i �I!IIII�III ;!� a im, nlsr idi. lid INlm i ii) II II� IIII�II!!IIiIII I IIII fll! OItfLI I 411 � �I 01 I�'�. Y 1 ii:11 O mrl +I ��O N aI YI 01 l I el oil e OI oil r1�gb01 a(�� Ol �lo ml W141. Y1. iv rl ' e I81� I ��i ! � I+ (SI ( I � I ! I I I Isis '�•� O NIO N �%' .p' INI �I IOIO 0,0 I I 0 +! � NISI l Ia! VIO OI O, OI OI OI OINI VI I i�laii �� NI pI i V• +• .r is { I �IiII IIII UIS'vi1 m,oiol IOIOIOIOi�dlYlmlallolIV Ip'�' r Iplai ypp N: i ry O �lu: INTO I Ni NI lai j�$lI TAI l I I �10 OI OIODr I IrI I 101 map ill IeI N1 1v a I�I Ij! Vf0 I I 1 ial ml �1i Vl� l±•i I f I I I I 01 VI y. Qi al=ij 1 0 010 0101e IJI vI OI 'm. N1 IOI Iv' : Il�l�, i +I i. S I41I tOmi J OIOOOION Y•. +• O 8 I 1 eI V I V IIy�y y f. I OIi NIl �!i $ mI l � yy N+ II I Iu0 W1 { O1 I OI II+r I I 11! IlVaI' i IiYxI l I e1 l 0 , ; ; I OI�a1�1l;11yl1�1�alI•,Yi: ; : aN l I I 1 00I0II 1 0 1 NISI �i pI Vli Ni Wi �i �� !N� I �' � I I I ! II I I � ' , ' I ! I I I � ' � i -I ! I ! I SS ! I i I I { ! I• ! ' 'al :A I ' I }� IV: I I am$ {aa Iml O fill 111;:1 air; i O� l OI 010I 1 01 O OIN I l I I I I I � � { � l I i l O rlr, i l tl.I e• 111 I i I i II :V N • ,IN!r 4N�1 I 11' I O; 010 IV VIVr : olol Oi I ai � 1 OI 1 I O,: O.I ' I OII ! O 1 i V I O' " : lap a 1I • + :! •1�ii'T •m • INyINyI b�1� r' •v10 I�' 1 i ' ♦p mN a' '(aJ1 Y' •N�$ lid 1.!,;: NIiA iNl 141. m 15! I t le'e, gym. r•el el ol 91 o'er IN• .plfw O• +,Iri1. 870 870 870 825 858 572 589 597 802 808 812 818 811 732 732 732 809 Chapel Hill - Carrboro City Schools 580 587 Out of Capacity 578 Worksheet 587 581 708 708 708. 719 749 859 879 887 893 701 705 712 O"d Laboratories, November 1999 0 0 732 Ca a Ales 0 Actual 593 801 - Pr ' cted Enrollments .818 822 .816 Na F1999 F2000 F2001 1999 -00 2000 -01 2001 -02 2002 -03 2003 -04 2004 -05 2005 OB 2006 -07 2007 08 2008 -09 Canboro 583 583 583 479 475 471 471 488 � 488 488 468 488 488 Ephesus 472 472 472 559 583 587'. 587 570 572 570 572 .572 572 Estes Hips 549 549 549 548 548 544 544 542 541 543 542 541 541 FPG 570 570 570 533 538 540 540 542 544 542 543 543 544 Glenwood 445 445 445 401 410 419 419 428 431 425 429. 430 430 McDouple Elem 588 598 598 -803 809 815 818 820 823 819 822 823 823 Scropps 510 510 510 420 439 457 458 470 481 488 478 .479 480 Seawell 498 498 498 580 588 592 593 597 owl NCMH K -5 Total Culbreth McDougle Mid Phillips Smith NCMH 6-8 Total CHHS ECHHS NCMH 9-12 Total 8yatan Total 9346 .10076 8 9 93921 9566 8697 1003 101191 11811111111 10232 L� Adequate catty L —J Two -year waminp Out of capacity 870 870 870 825 858 572 589 597 802 808 812 818 811 732 732 732 809 839 543 580 587 572 578 581 587 581 708 708 708. 719 749 859 879 887 893 701 705 712 705 0 0 732 0 0 578 593 801 808 813 .818 822 .816 Na Na Na 12 12 12 12 12 12 12 12 12 12 2106 2108 2840 2186 2286 2362 2433 2484 2468 2813 2826 2681 2826 599 600 800 Na Ns Na 12 12 12 12 12 12 12 12 12 12 4203 4203 4203 4136 4177 4217 421! 4247 4270 4242 4263 4266 4267 870 870 870 825 858 572 589 597 802 808 812 818 811 732 732 732 809 839 543 580 587 572 578 581 587 581 708 708 708. 719 749 859 879 887 893 701 705 712 705 0 0 732 0 0 578 593 801 808 813 .818 822 .816 Na Na Na 12 12 12 12 12 12 12 12 12 12 2106 2108 2840 2186 2286 2362 2433 2484 2468 2813 2826 2681 2826 1520 1520 1520 1477 1503 1519 1544 1574 1801 1838 1848 1857 1878 1515 1515 1515 1158 1234 1282 1358 1447 1529 1833 1870 1885 1752 Na Na Na 12 12 12 12 12 12 12 12 12 ' 12 3038 3038 3036 2646 274! 2612 2814 3032 3142 3261 3330 3364 3440 Attachment Two Orange County Planning Department SAPFO November 18,1999 Prepared By: Orange County TABLE OF CONTENTS (1) SAPFO Definition (2) SAPFO Purpose and Intent (3) Major Policy Issues (a) Level of Service (Capacity) (b) Adequacy Test Timing (c) First Come - First Serve (Housing Allocation) (d) Vesting (e) Certificate Validity Timeframe (f) Interlocal Agreement (4) SAPFO Memorandum of Understanding (5) Hypothetical SAPFO Scenarios (a) Assumptions (b) 1. 2000 -2030 Capacity and New School Projections EMH (Color Graphs) 2. Color Key of Graphs (c) 2000 -2030 Enrollment and Capacity Projections (Tabular Statistics) (d) 2000 -2030 Abridged Version of New School Needs (Table) (6) SAPFO Policy and Implementation Steps g- \Cndgl38pf0ooa411- 18 -994 ITEM (1) DEFINITION SAPFO A school adequate public facilities ordinance ( SAPFO) is a zoning and/or land development regulation with the goal of synchronizing development with the availability of public facilities needed to support that development. The location, amount, type or mix of development is a product of the county and town's comprehensive and zoning plans. The SAPFO does pace growth by affecting the timing of development to ensure that it is matched with the availability of public facilities as noted by a jointly prepared Capital Improvement Plan. CIP - SCHOOLS = NEW CAPACITY = ENROLLMENT = STUDENT GENERATION = HOUSING GROWTH g : \ccaig\sapfoWetine111- 18 -99Wg ITEM (2) ADEQUATE PUBLIC FACILITIES (a) PURPOSE AND INTENT (1) To ensure that Public Facilities needed to support new development meet or exceed the Level of Service standards established herein. (2) To ensure that no applications for development approval are approved which would cause a reduction in the levels of service for any Public Facilities below the Adopted Level of Service established in this Section; (3)'' To ensure that adequate Public Facilities needed to support new development are available concurrent with the impacts of such development; (4) To establish uniform procedures for the review of development applications subject to the standards and requirements of this Section; (5) To facilitate implementation of goals and policies set forth in the Comprehensive Plan and any applicable Area Plan relating to adequacy of Public Facilities and Level of Service standards; and (6) To ensure that all applicable legal standards and criteria are properly incorporated in these procedures and requirements. (b) SECONDARY BENEFITS (1) Provide reasonable student enrollment projections. (2) Regulate student enrollment growth 'spikes.' 43) Act as a school needs projection tool. (4) Create a stronger link between the School Capital Improvement Program (CIP) and facility needs. (5) Assist in identifying growth patterns and attendance zones. (6) Provide short and long -range facility projections so funding sources can be identified in advance. (7) Estimate when new schools need to be built and'come on line.' (8) Permit changes in DPI/rules to be included in long -range capacity figures. (9) Further regional communication and cooperation and information exchange. SAcraiglsapfo\spA11- 18 -991dg ITEM (3) Schools and Land Use Councils NOVEMBER 10, 1999 AGENDA ITEM Abstract: A School Adequate Public Facilities Ordinance (SAPFO) is comprised of various policy elements. At the meeting of October 13, 1999, these elements and possible alternatives were reported at length. The draft ordinance included an attached bolded section where the decisions regarding policy were to be made. The decision outcome of the various elements clearly affect the scope and implementation of the ordinance. The original (Oct. 13) `Policy Questionnaire' noted the approximate 12 areas of decision with comment regarding the alternatives. Based on discussion and comment the primary issues have been reduced to 6 which are*the topic of this agenda The objective of this survey is to give each member an opportunity to evaluate each decision area and make notes for discussion. The decision alternatives are elaborate and I will further explain them at the meeting. If you have questions prior to the meeting please feel free to call my office at 245 -2592. Recommendation: The compilation of the survey can occur at the meeting as we discuss each item to arrive at consensus and provide direction to staff. G Acraig\sluc -5a\ 11- 5 -99\jb AGENDA ITEM #5a SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE (SAPFO) POLICY QUESTIONNAIRE 1. LEVEL OF SERVICE THE LEVEL OF SERVICE THAT WILL BE ACHIEVED AND MAINTAINED FOR THE DEVELOPMENT DESCRIBED IN THE CERTIFICATE. ALT. A 100•h ALT. B 1083% (i.e. 650 students at 600 capacity school) ALT. C 110% ALT.D 11 ALT. X YES; NO INCLUDE DIFFERENT LEVEL OF SERVICE FOR DIFFERENT SCHOOL FACILITIES (I.E., ELEMENTARY, MIDDLE, HIGH) DISCUSSION SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE (SAPFO) SYSTEMS THAT WOULD MAINTAIN A LOG OF THE CAPACITY OF PUBLIC FACILITIES. ( THE LOG WORKS LIKE THE CHECK BOOK, WITH DEPOSITS OF CAPACITY FOR CAPITAL IMPROVEMENTS AND WITHDRAWALS OF CAPACITY FOR EACH IMPROVED DEVELOPMENT.) NO CHECKS (CERTIFICATES OF ADEQUACY) COULD BE WRITTEN UNLESS CAPACITY WAS IN THE BANK RECOMMENDATION G:\cmig \ques \11 -5 -99 \fib 1 2. ADEQUACY TEST TIMING ALT. A TEST AT LAND USE ALT. B TEST AT REZONING ALT. C TEST AT ZONING PERMIT ALT. D TEST AT SUBDMSION ALT. E TEST AT SITE PLAN DISCUSSION A ZONING PERMIT VERIFIES THE USE OF THE LAND AND IT'S DENSITY. IF A SPECIFIC DEVELOPNIENT APPROVAL ACCOMPANIED A REZONING THE "PACKAGE- COULD BE TESTED FOR ADEQUACY. KEEP IN MIND THE NATURE Of THE APPROVAL WHETHER LEGISLATIVE OR QUASI - JUDICIAL WHjCH IN SOME STATES VARY. EXEMPT PLATS WOULD REQUIRE A ZONING PERMIT RECOMMENDATION G: \craig\ques\ 11- 5 -99 \jb 3. FIRST COME-FIRST SERVE RESERVATION ALTERNATIVE THE DIRECTOR AND /OR SCHOOL DISTRICT SHALL PERFORM THE ADEQUACY TEST IN THE FOLLOWING ORDER OF PRIORITY: ALT. A APPLICATIONS FOR FINAL DEVELOPMENT PERMITS SHALL BE TESTED IN THE SAME ORDER AS THE APPLICATIONS WERE RECEIVED , BY THE DIRECTOR OR HIS DESIGNEE. ALT. B APPLICATIONS FOR PRELIMINARY DEVELOPMENT PERMITS SHALL BE TESTED IN THE ORDER THE APPLICATIONS ARE DETERMINED BY THE DIRECTOR TO BE SUBSTANTIALLY COMPLETE AND SUFFICIENT FOR THE ADEQUACY TEST. ALT. C THE DIRECTOR SHALL PERFORM THE ADEQUACY TEST FOR THE EARLIEST APPLICATION REVIEWED AND APPROVED. SUBSEQUENT TESTS WILL BE CONDUCTED IN THE ORDER OF COMPLETION OF REVIEW AND APPROVAL. THE PURPOSE OF THIS SECTION IS TO ENABLE APPLICANTS WHO ARE READY FOR APPROVAL TO RECEIVE THE CERTIFICATE OF ADEQUATE PUBLIC FACILITIES, EVEN IF THEIR APPLICATION WAS SUBMITTED AFTER AN EARLIER APPLICANT. THE OPERATION OF THIS SECTION MAY REQUIRE THE DIRECTOR TO ENCUMBER CAPACITY BEING HELD FOR AN APPLICANT WHO IS UNABLE TO COMPLETE THE REVIEW PROCESS. IT IS THE CITY'S COUNTY'S) INTENT TO TREAT APPLICATIONS ON A " FIRST- COME, FIRST- SERVED" BASIS, BUT TO USE THIS SECTION TO AVOID THE DELAYS IN DEVELOPMENT APPROVAL CAUSED BY APPLICANTS WHO ARE UNABLE TO COMPLETE THE REVIEW PROCESS AS A RESULT OF THEIR OWN ACTION (OR INACTION). THESE ALTERNATIVES ALLOW THE JURISDICTION TO AVOID LONG DELAYS BY APPLICANTS FOR PRELIMINARY DEVELOPMENT WHO MAY NEED TIME TO PERFORM SPECIAL STUDIES AS PART OF THE DEVELOPMENT REVIEW PROCESS. `PROVISIONAL ADEQUACY' DMUZ41NATION WILL NOT CREATE VESTING BUT MAY ASSIST IN THE TIME- SENSITIVE APPROVAL ISSUE. RECOMMENDATION ALTERNATIVE C G: \craig \ques \11- 5 -99 \jb 3 4. VESTING VESTING CAN BE BRIEFLY DEFINED AS A RIGHT A PROPERTY OR PROJECT HAS TO BE SUBJECT TO A CERTAIN SET OF REGULATIONS BASED ON CERTAIN ACTIONS OR APROVAL DATES. ALT. A DEVELOPMENT THAT IS VESTED PRIOR TO THE EFFECTIVE DATE OF THIS ORDINANCE IS EXEMPT FOR THE DEVELOPMENT APPROVAL FOR WHICH VESTED STATUS ACHIEVED BY SUBDIVISION APPROVAL. ALT. B VESTING AT TIME OF SUBDIVISION APPROVAL FOR RESIDENTIAL (MANY . SUBDIVISIONS.ARE EXEMPT AND THEREFORE AN APPROVAL WOULD NOT OCCUR). ALT. C VESTING AT THE TIME OF ZONING PERMIT APPROVAL. ALL EXISTING UNDEVELOPED SUBDMSIONS WOULD BE ISSUES ZONING PERMITS INCLUDING AN ALLOCATION OF UNITS OVER TIME. UNUSED UNITS WOULD LOSE VESTING AFTER SIX YEARS UNLESS CONTROLLED BY OTHER ZONING DOCUMENTS SUCH AS SPECIAL USE APPROVAL WITH LONGER TIME APPROVALS. DISCUSSION THIS ALT. A TAKES A LESS AGGRESSIVE POSITION REGARDING VESTED RIGHTS BY EXEMPTING ANY DEVELOPMENT AFTER IT INITIALLY VESTS. ALSO, VESTING FOR ONE TYPE OF DEVELOPMENT PERMIT DOES NOT AUTOMATICALLY CREATE VESTING FOR SUBSEQUENT PERMITS FOR THE SAME PARCEL. ALT. X RECOMMENDATION C G: \cmig \ques111- 5 -99 \jb 4 m 5. CERTIFICATE VALIDITY ALTERNATIVE A CERTIFICATE OF ADEQUATE OF PUBLIC FACILITIES SHALL BE VALID FOR THE FOLLOWING PERIOD OF THE TIME: ALT. A 6 YEARS ALT. B a YEARS ALT. C 10 YEARS ALT. D FILL IN (SIX YEAR EXPLAINED BELOW) A CERTIFICATE OF ADEQUATE OF PUBLIC FACILITIES ISSUED WITH A FINAL DEVELOPMENT PERMIT SHALL BE VALID FOR THE SAME PERIOD OF TIME AS THE FINAL DEVELOPMENT PERMIT. 1. ADEQUACY MUST BE ACHIEVED NO LATER THAN SIX YEARS FROM THE ISSUANCE OF THE BUILDING PERMIT. 2. A CERTIFICATE OF ADEQUATE OF PUBLIC FACILITIES ISSUED WITH A PRELIMINARY DEVELOPMENT PERMIT SHALL BE VALID FOR THE SAME PERIOD OF TIME AS THE' PRELIMINARY DEVELOPMENT PERMIT. ADEQUACY MUST BE ACHIEVED NO LATER THAN SIX YEARS FROM THE ISSUANCE OF THE PRELIMINARY DEVELOPMENT PERMIT, EXCEPT THAT AN APPLICANT CAN EXTEND THE PERIOD OF TIME BY WHICH ADEQUACY MUST BE ACHIEVED NO LATER THAN SIX YEARS AFTER OCCUPANCY, AND USE OF THE DEVELOPMENT PROVIDED THE APPLICANT PROVIDES A FINANCIAL GUARANTEE TO PAY FOR ANY CAPITAL IMPROVEMENTS, OR PORTION THEREOF, FOR WHICH THE COUNTY IS UNABLE TO OBTAIN OTHER RESOURCES BY THE SIXTH YEAR AFTER THE ISSUANCE OF THE PRELIMINARY DEVELOPMENT PERMIT. DISCUSSION THIS ALTERNATIVE PROVIDES A MORE TAILORED APPROACH TO THE TIMING OF ADEQUACY BY RECOGNIZING THAT PRELIMINARY DEVELOPMENT APPROVALS MAY REQUIRE MORE TIME, AND BY REQUIRING SUCH DEVELOPMENT APPROVALS TO PROVIDE ASSURANCES IF THE TIME HORIZON EXCEEDS THE JURISDICTION'S FOCUSED Pt BLIC INVESTMENT PLAN (OR CAPITAL IMPROVEMENT PROGRAM OR PUBLIC FACILITIES PROGRAM). RECOMMENDATION: G :\craig\ques \11- 5 -99 \jb 5 6. COUNTY AGREEMENTS ALT. A ADD THIS PROVISION ALT. B DELETE THIS PROVISION DISCUSSION SECTION 10 CREATES NO NEW AUTHORITY FOR CITIES TO ENTER INTO AGREEMENTS. IT SHOULD BE OMITTED IF THE CITY DOES NOT INTEND TO USE ANY OF ITS PROVISIONS. ITS PURPOSE IS TO INDICATED THE POTENTIAL INTERGOVERNMENTAL SCOPE OF THE ADEQUACY REQUIREMENT. THE FRAGILITY OF A SAPFO LIES IN THE COMMITMENT OF VARIOIUS ENTITIES PROVIDING DEVELOPMENT APPROVALS AND CIP FUNDING WITHIN A SCHOOL DISTRICT. SINCE THE SAPFO PROGRAM IS COMPREHENSIVE AND CUMULATIVE ALL PARTIES MUST BE COMMITTED TO THEIR ROLE. RECOMMENDATION ALT. A G:\craig\ques\11-5-99\jb 6 -ITEM (4) �oxnxnrnaioFOrmExsT.�rm�ra DRAFT This Memorandum of Undmstanding is-entered into this day, of 1999, by and between the Town of'CWboro, the Town of Chapel Hill, Orange County, mad the .Chapel Hill Cazrboro School District (the "School District" ). WHMMAS, Southern Orange County, which includes the Towns of Chapel Hill and Cazrboro, has for the past decade been experiencing rapid population gm th; and WF]�RRSe, , and �. this rapid growtb, and shat which is anticipated, creates -a 'demand for additional school facilities to accommodate the children who reside within new developments; and WgER.FAS, .the res;=d1btiity for planning for and constricting now school facilities lies primarily with the Chapel Hill Carrboro School Board, with funding provided by the Orange County Board of Commissioners; and VT MEAS, Chapel Hill, Cazrboro, Orange County and "the School District have recognized the need to work •together, to ensure that new growth within 'the- School District occurs at apace that allows Orange County and the School District to provide adequate school facilities to serve the children within such new developments; . NOW, TIEREFORE, the parties to this memorandum hereby agree as follows: 1. The parties will work cooperatively to develop a realistic capital facilities program for the constriction of schools such that, withii three years from the effective date of this Memorandum, no school within the School District is operating at more than of its building capacity. The term "building capacity" as used herein refers to permanent buildings, not mobile units or bailers. The capital facilities program shall Will a projected growth rate agreed upon by the parties, which growth rate may differ from one attendance ;Done to another. 2. The towns and the county will adopt amendments to their respective ordinances, in - substantially the form attached hereto as Exhibit A. to limit the approval of major residential developments within the School District to those that can adequately be served with existing or proposed school facilitieL 3. The School District will establish an administrative process to receive and take action Upon applications for Certificates of Educational Facilities C CEF'sJ submitted by developers who are required by the ordinance attached as Exhibit A to have such certificates before Obtaining development permission from the towns or the county. The School District will issue a CEF for a proposed development if it concludes that, given the number of school age children projected to reside in that development, and considering all of the factors listed immediately below, the number of students projected to attend the Chapel Hill Cairboro elementary school, middle school, and High school that serve the corresponding attendance districts where the DRAFT development site is located will not exceed. of the building capacity of each of those schools. Factors to be considered by the School District in making this determination include the following: a. The number of students attending the elementary school, middle school, and high school that. serve the cosesponding attendance districts where the s developmeal site is located, as well as the building capacity of each of those chools, b. Projected or ongoing const raction of new schools. If the completion of such school construction is necessary for a CEF to be issued for a particular development project, then there must be a reasonable -expectation that such construction will be completed in time to be of benefit to such project A Imasonable expectation" of a proposed completion date _requires, - at the very least, that construction of'a proposed new school has received all necessary govermmmtal approvals and that funding is in .place, or that such approvals and funding appear reasonably certain. C. I.dcely increases in enrollment due to residential growth, including. (i) All single - family residential building lots that have received final plat ; approval but that do not contain a completed dwelling; (n) All single- family residential building lots for which preliminary subdivision plat approval has been granted and all multi- family residential developments for which a site plan has been approved, so long as such approvals have not expired; (iu) All conditional use rezonings and approvals of master land use plans for mixed use or planned unit developments which have a valid CEF, if and to the extent that subdivision preliminary plat or . site plan approvals for portions of such developments have either been approved or applications : for the same have' been submitted to and accepted; . (iv) All developments for which subdivision preliminary plat or site plea approval applications have been submitted but not yet granted, so long as CEF's for such projects have been issued and remain unexpired; d. Lr&dy'changes in attendance district boundaries that may affect the project; e. Any other factors deemed relevant by the School District in determining whether the schools that will serve the proposed project will meet the level of service described herein if the proposed project is constructed. 2 • DRAFT 4. The towns and the co unty. will provide to the School District all information reasonably requested by the School District to assist the District in malting its det=2bntion as to whether the CEP should be issued, including without limitation all won the other parties to this agreement have regarding the matters specified in paragrapba 3.e.(i) through Crv) above, 5. -The School District will use its. best efforts to construct schools in accordance with the capital haties program referenced in paragraph 1 above. 6. Orange County will use its best efforts to provide fire Rending to carry out the capital ' facilities program refer in paragraph labove. 7. •The parties aclmowledge that this Memorandum of U is not inteaded to and does not create legally binding obligation on any of the parties to act in accordance with its provisions. Rather, it constitutes a good pith statement of the hdmt of the parties to cooperate in a manner desigaed to meet the mutual objective of all the parties that the childYm who reside within the School District are able to attend schools that sad* the level of service standards set • forth berefio. ITEM (5a) , Assumptions/Disclaimers: L Present school capacities were assumed fixed at the following rates: A. Elementary 600 students B. Middle 900 students OR 700 students C. High 1200 students 2. Future school construction and capacities were assumed at the following rates A. Elementary 600 students B. Middle 900 students OR 700 students C. High 1200 students 3. Over capacity was gauged at the total capacity of each school level: A. Elementary (E) 108.3% 600 to 650 students B. Middle (Ivn 108.3% 900 to 975 students (700 to 758 students) C. High 108.3% 1200 to 1300 students 4. Flex space required at maximum over capacity of each school level: A. Elementary Two 25 student classes B. Middle Three 25 student classes (Two 29 student classes ?) C. High Four 25 student classes 5. New students were added at a constant rate to the year 2030: A. 300 students per year in CHCSD B. 150 students per year in OCSD 6. New students were distributed to different school levels at constant rates: A. Elementary 490/6 of total new students B. Middle 24% of total new students C. High 27% of total new students New students were distributed equally among all of the elementary, middle and high schools. 7. Shaping Orange County's Future projections assume a constant growth rate of 1.45% per year. 8. High schools are assumed to serve a capacity of 1200 students. If high schools can expand to eventually serve a capacity of 1500 students, new high schools will be required later than these projections show. I Table SC. Projected school enrollments and capacities and the timing of new school construction given a fixed number of students per year for Orange County and Chapel Hill- Carfboro school systems. Middle school capacity s 700 students. Orange County School Capacities and Enrollments, 2000 -2030 300 New Dwelling Units per Ye-w-> 150 New Students per Yea Year" 2000 2001 2001 2002 2002 2003 2003 2004 2004 Capacity Enrollment % Over Capacity Enrollment % Over Cape ' Enrollment % Over Capacity Enrollment % Over Capacity Enrollment % Over Elementary 3820 3200 -16.23 3820 3274 -14.29 3820 3348 - 12.36 3820 3422 - 10.42 3820 3496 -8.48 (with new sdmp 4545 8.14 4803 4692 -2.31 Middle 1522 1499 4.51 1522 1535 0.85 1522 1571 3.22 1522 1607 5.58 1522 1643 7.95 2.56 2108 2234 5.98 2108 2306 9.39 2808 2378 -15.31 2808 2450 New School Needed High 1520 1705 12.17 '1520 1745 14.80 2720 1785 -34.38 2720 1825 -32.90 2720 1865 -31.43 High 3035 2642 -12.95 3035 New School - 10.28 3035 2804 -7.61 3035 2902 - 4.38 IChapel Hill- Carrboro School Capacities and Enrollments, 2000 -2030 600 New Dwelling Units per Year a 300 New Students per Year" 2000 2001 2002 2003 2004 Capacity Enrolment % Over Capacity Enrolment % Over Enrollment % Over Capacity Enrollment % Over Capacity Enrollment % Over Elementary 4203 4104 -2.36 4203 4251 1.14 4203 4398 4.64 4203 4545 8.14 4803 4692 -2.31 New School Needed Middle 2108 2162 2.56 2108 2234 5.98 2108 2306 9.39 2808 2378 -15.31 2808 2450 -12.75 New School Needed High 3035 2642 -12.95 3035 2723 - 10.28 3035 2804 -7.61 3035 2902 - 4.38 3035 3000 -1.15 1 New elementary schools are assumed to enroll 600 students: new middle schools. 700 students: new high schools, 1200 students. 2 Time scensdos assume that a new school is bulk when the capacity for that level of school exceeds 108.3 %. 3 Assuming that 49% of new students are elementary school skxWft, 24% are middle school students and 27% are high school students. H --I M 3 C n Orange County Chapel Hill-Carrboro 2005 Capacity Enrollment % Over Capacity 2006 Enrollment % Over Capacity 2007 Enrollment % Over Capadty 2008 Enrollment % Over Capacity 2009 Enrollment % Over Elementary 3820 3570 - 6.54 2008 3620 3644 4.61 3820 3718 -2.67 3820 3792 -0.73 3820 3866 1.20 Middle 2222 1679 - 24.44 4803 4986 2222 1715 - 22.82 2222 1751 - 21.20 2222 1787 -19.58 2222 1823 -17.96 High 2720 1905 -29.96 2720 1945 -28.49 2720 1985 -27.02 2720 2025 -25.55 2720 2065 -24.08 Chapel Hill-Carrboro 2006 2008 21107 2008 2009 Capacity Enrollment %Over Capacity Enrollment %Over Capacity Enrollment %Over Capacity Enrollment %Over Capacity Enro 0.75 4803 4986 3.81 4803 5133 6.87 4803 5231 8.91 5403 5329 2 llment °k Over Elementary 4803 4839 0.75 4803 4986 3.81 4803 5133 6.87 4803 5231 8.91 5403 5329 New School Needed Middle 2808' 2522 -10.19 2808 2594 -7.62 2808 2666 -5.06 2808 2714 -3.35 2808 2762 -1.64 High 3035 3081 1.52 3035 3162 4.18 3035 3243 6.85 3035 3297 8.63 4235 3351 -20.87 New School Needed 2 Ch"al HUWAnborO 2010 Capacity Enroknott % Over 2011 C49adty Enrolment % Over 2012 Capacity Enrollment % Over 2013. Capacity Enrollment % Over Capacity 2013 Capacity Enrolment % Over 2014 Enrolment % Over Elementary 3820 3940 3.14 3820 . 4014 5.08 3820 4088 7.02 3820 4162 8.95 5403 5770 4420 4236 -4.16 6003 6064 1.02 New School Needed New School Needed Middle 2222 1859 - 16.34 2222 1895 -14.72 2222 1931 - 13.10 2222 1967 -11.48 3.49 2222 2003 -9.86 High 2720 2105 -22.61 2720 2145 -21.14 2720 2185 -19.67 2720 2225 -18.20 2720 2265 -16.73 Ch"al HUWAnborO 3 CWadly 2010 Enrolment % Over 2011 Capacity Enroftedt % Over C 2012 Enrolment % Over 2013 Capacity Enrolment % Over Capacity 2014 EnroWnent % Over Elementary 5403 5476 1.35 5403 5623 4.07 5403 5770 6.79 5403 5917 9.51 6003 6064 1.02 New School Needed Middle 2808 2834 0.93 2808 2906 3.49 2808 2978 6.05 2808 3050 8.62 3508 3122 -11.00 New School Needed High 4235 3432 -18.96 4235 3513 -17.05 4235 3594 -15.14 4235 3675 - 13.22 4235 3756 -11.31 3 4 Orange County Ca Enrollment %Over Capacity Enrollment %Over Capacity Enrollment %Over Ca Enrollment %Over Ca Enrollment %Over Elementary 4420 4310 2016 6003 2016 -0.81 2017 4458 2018 4420 4532 2019 4420 4606 Chapel Hill- Carrboro Ca Enrollment %Over Capacity Enrollment %Over Capacity Enrollment %Over Ca Enrollment %Over Ca Enrollment %Over Elementary 4420 4310 -2.49 6003 4420 4384 -0.81 4420 4458 0.86 4420 4532 2.53 4420 4606 4.21 Middle 2222 2039 - 8.24 2222 2075 .-6.62 2222 2111 -5.00 2222 2147 -3.38 2222 2183 -1.76 High 2720 2305 -15.26 3508 2720 2345 -13.79 2720 2385 -12.32 2720 2425 -10.85 2720 2465 -9.38 Chapel Hill- Carrboro 2016 Ca Enrollment % Over Capacity 2016 Enrollment % Over Capacity 2017 Enrollment % Over Capacity 2018 Enrollment % Over 2019 Capacity Enrollment % Over Elementary 6003 6211 3.46 6003 6358 5.91 6003 6505 8.36 6603 6652 0.74 6603 6799 2.97 New School Needed Middle 3508 3194 -8.95 3508 3266 - 6.90 3508 3338 -4.85 3508 3410 -2.79 3508 3482 -0.74 High 4235 3837 -9.40 4235 3918 -7.49 4235 3999 -5.57 4235 4080 -3.66 4235 4161 -1.75 5 Orange County Chapel HM- Carrboro 2020 Capacity Enrollment % Over 2021 Capacity Enrollment % Over 2022 Capacity Enrollment % Over 2023 Capacity Enrollment % Over 2024 Capacity Enrollment % Over Elementary 4420 4680 5.88 4420 4754 7.56 5020 4828 -3.82 5020 4902 2.35 5020. 4976 -0.88 New School Needed 2021 Middle 2222 2219 -0.14 2222 2255 1.49 2222 2291 3.11 2222 2327. 4.73 2222 2363 6.35 High 2720 2505 -7.90 2720 2545 -6.43 2720 2585 4.96 2720 2625 -3.49 2720 2665 -2.02 Chapel HM- Carrboro 2020 2021 2022 3023 2024 Capacky EnroWnent % Over Capacity Enroliment % Over Ca aci Enrollment % Over Capacky Enrollment % Over Capacity Enrollment % Over Elementary 6603 6946 5.19 6603 7093 7.42 6603 7240 1 9.65 New School Needed 7203 " 7387 2.55 7203 7534 4.60 Middle 3508 3554 1.31 3508 3626 3.36 3508 3698 5.42 3508 3770 7.47 4208 3842 -8.70 New School Needed High 4235 4242 0.17 4235 4323 2.08 4235 4404 3.99 4235 4485 5.90 4235 4566 7.82 New School Needed Orange CoUnty IChapel HHI- Carrboro Elementary 2028 Capadty Enrolkneent % Over 5020 5050 0.60 Capacity 2026 Enrollment 5020 5124 % Over 2.07 Capacity 5020 2027 Enrollment 5198 % Over 3.55 2028 Capacity Enmllmnt 5020 5272 % Over 5.02 Capacity 5020 2029 Enrollment 5346 % Over 6.49 Middle 2222 2399 7.97 2922 2435 - 16.67 2922 2471 -15A3 2922 2507 - 14.20 2922 2543 -12.97 High New School Needed 2720 2705 -0.55 2720 2745 0.92 2720 2785 2.39 2720 2825 3.86 2720 2865 5.33 IChapel HHI- Carrboro Elementary Capacity 7203 2028 Enrollment 7681 % Over 6.64 Capacky 2026 Enrollment % Over 7203 7828 8.68 2027 Capacity Enrollment 7803 7975 % Over 2.20 Capacity 780. .2028 Enrollment 8122 % Over 4.09 Capacity 7603 2029 Enrollment 8269 % Over 5.97 New School Needed Middle 4208 3914 -6.99 4208 3986 -5.28 4208 4058 -3.56 4208 4130 -1.85 4208 4202 -0.14 High 5435 4647 - 14.50 5435 4728 - 13.01 5435 4809 -11.52 5435 4890 -10.03 5435 4971 -8.54 501- 2404 405 1 461H L4•l 4LZ4 9024 OIPPIN POPOON 10042S A" 991 9149 COOL kLWuN13 0m einwrwuu Ndmm 09'9 5062 OZLZ y6lH 4L' L V 6L9Z ZZ6Z orm P"PNN 1oo1*9 m" L6'L OZ49 O909 fimpmumG JOAO % Wa4pju3 Apedwo OCOZ LWnoo o6mO .. 2 ITEM (5d) New Schools Needed In Chapel Hill - Carrboro, 2000 - 2030 Based on a scenario of 300 new students per year Year Elementary Middle High Total Cost 2000 8 3 2 13 25 2001 8 3 2 13 2002 8 3 +1 2 14 2003 ' 8 +1 4 2 15 2004 9 4 2 15 2005 9 4 2 15 2006 9 4 2 15 2007 9 4 2 15 2008 9+1 4 2 +1 17 2009 10 4 3 17 2010 10 4 3 17 2011 10 4 3 17 2012 10 4 3 17 2013 10+1 4 3 18 2014 11 4 3 18 2015 11 4 3 18 2016 11 4 +1 3 19 2017 11 +1 5 3 20 2018 12 5 3 20 2019 12 5 3 20 2020 12 5 3 20 2021 12 5 3 20 2022 12 +1 5 3 21 2023 13 5 3 21 2024 13 5 3 +1 22 2025 13 5 4 22 2026 13 +1 5 4 23 2027 14 5 4 23 2028 14 5 4 23 2029 14 5 +1 4 24 2030 14+1 6 4 25 Total New Schools Needed 12 ITEM (6) SAPFO Policy & Implementation Steps (1) Create consensus of SAPFO concept among all jurisdictions and districts. (2) . Research development activity and school enrollment trends. (3) Examine various SAPFO policy issues (e.g., Level of Service, CIP, Vesting, etc.) (4) Review of SAPFO by attorneys and planning directors for ordinance integrity. (5) Develop SAPFO assumptions and scenarios for presentation purposes. (6) Forward and decide on SAPFO basics noted in a Memorandum of Understanding by all jurisdictions and districts. (7) Discuss the implications of a SAPFO with the general public and development community. (8) Formulate agreed upon enrollment projections and facility needs to be the base of the Capital Improvement Program (CIP). (9) Create drafts of implementing SAPFO for eventual incorporation into local government land development codes. (10) Develop dialogue on CIP planning and financial'feasibility of SAPFO scenarios and match CIP and needs assessment. (11) Present findings of SAPFO implications to general public and development community. (12) Create a computer spreadsheet based SAPFO management system. (13) Verify subdivision and building data and develop base SAPFO program. (14) Adopt interlocal agreements and SAPFO and determine effective date concurrent with adopted CIP. &AOzig\"gfO\ t P \11.184N8 CHAPEL HILL - CARRBORO CITY SCHOOLS Lincoln Center, Merritt Mill Road Chapel Hill, North Carolina 27516 -2881 Neil G. Pedersen Superintendent MEMORANDUM TO: FROM: SUBJECT: DATE: Telephone: (919) 967 -8211 Fax: (919) 933 -4560 Steve Scroggs, Assistant Superintendent for Support Services William J. Mullin, Director of Facilities Management Neil G. Pedersen Bill Mullin Glenwood Elementary School $1.5 Million Renovation Project December 10, 1999 Glenwood Elementary School is located in the southeast section of the school district near the intersection of NC 54 and 15 -501. The property is a 10 acre site on Prestwick Road located behind a commercial shopping center. 54,412 square feet of space exist in buildings constructed in 1952, 1954, 1959, and 1986. Four mobile classrooms are also located on site. In addition to the buildings, a play field exists. The facility has a student capacity of 445 and present enrollment is 408. Prior to the development of the renovation project's scope of work, consulting engineers analyzed the facility and assessed the building's structure and mechanical systems. The structure was determined to be viable provided certain corrections are implemented and future maintenance is performed. The HVAC units were identified as needing upgrading. These recommendations are included in the renovation project's scope of work. Overall, the engineers stated that the facility needs upgrades and maintenance and, with the work performed, can be viable for another 15 to 25 years. The renovation project addresses deficiencies highlighted by the consulting engineers. The $1.5 million project improves the building infrastructure thereby increasing the life expectancy of the facility. The project includes HVAC upgrades, structural repairs, bathroom renovations, window replacements, and cafeteria improvements. Additionally, 10 classrooms are targeted for new lighting, ceilings, and casework. The building fire safety system will also be upgraded. A copy of the project's scope of work and budget is attached. The Board of Education approved this plan on October 21, 1999. The long term viability of Glenwood beyond 15 to 25 years is questionable. Educational program requirements will change. North Carolina Department of Public Instruction school standards are continually undergoing revision and will most certainly be different. Orange County school standards will undoubtedly also be modified. Special education programs already require space and facilities not commonly part of older buildings and present challenges to implement. Future building codes and regulatory requirements will be different. Accessibility issues, indoor air quality requirements, energy efficiency regulations, and technology demands will certainly require modifications to the school. Glenwood's acreage and buildings are limited. Expansion possibilities on the site are also restricted. The facility may not have the flexibility to address future needs. The renovation project is recommended in order to extend the useful life of Glenwood Elementary School for at least another 15 years. The viability of the school beyond that will be determined as future requirements become known. C: Steve Scroggs CHAPEL HILL - CARRBORO CITY SCHOOLS GLENWOOD RENOVATION PROJECT PROJECT TOTAL 1,500,000 Activity Description Estimate 1 HVAC 30 unit ventilators at $9,000 per 270,000 unit plus required patching, connecting, required material 10,000 2 Toilet Rooms 1,000 sf of bathroom area 150,000 in old section of school, work to include new fixtures, partitions, tile, lights, ceilings at $150 per sf 3 Classrooms upgrade remaining classrooms 350,000 to inc.:lighting, ceiling, electrical, millwork, and flooring Approximately, 11,640 sf of classroom space at $30 per sf 4 Cafeteria 2,000 square feet of space 150,000 (seating area only) lighting, ceiling, flooring, HVAC, electrical, data at $75 per sf 6 Windows replacement cost based on recent 200,000 window system installation at Estes Hills Elementary 7 Structural repair /replace mortar, 150,000 subgrade compactions, pointing, expansion joints, foundation drain, 8 Fire Alarm replace existing system with new 50,000 System installation meeting current code requirements 9 Misc. electric, painting, flooring 25,000 10 Professional structural and mechanical 100,000 Fees engineering, architectural 6.6% of project 11 Contingency at 3% 45,000 PROJECT TOTAL 1,500,000