HomeMy WebLinkAboutAgenda - 09-12-2000-2ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 12, 2000
Action Agenda
Item No.
SUBJECT: Oran a Alamance Utili S stem Re ort
DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) No
ATTACHMENT_(S): INFORMATION CONTACT:
County Engineer's report County Engineer, ext 2303
(Under Separate Cover) TELEPHONE NUMBERS:
O/A Corporate Bylaws Hillsborough 732-$181
O/A Articles of Incorporation Chapel Hill 968-4501
O/A Amended Articles .of Incorporation Durham 688-7331
O/A Orange County Service Area Map Mebane 336-227-2031
PURPOSE: To provide the BOCC with general information as to the Orange-Alamance
Water System to provide, to the extent possible, answers to specific questions posed by
Commissioner Jacobs.
BACKGROUND: The Orange-Alamance Water System is anon-profit rural membership
corporation that is classified under North Carolina health/environmental health statutes as a
public water supply utility. It was officially incorporated in September 1965 and became
operational in August 1968. In its 32 years of operation, the system has grown from its original
100,000 gallon per day (gpd) demand from 360 customers in Orange and Alamance Counties to
a system which currently serves 3600 commercial, industrial, institutional and residential
customers (approximately 1200 in Orange County, 2400 in Alamance County) with an average
water consumption of 1.0 million gallons per day.
The terms of the Eno River Capacity Use Agreement limit Orange-Alamance to a Stage I raw
water withdrawal of 820,000 gallons per day during periods of low flow, which typically occur for
approximately six months of the year. On several occasions, one lasting for as long as a month,
Orange-Alamance has been limited to withdrawals as low as 700,000 gallons per day. Orange-
Alamance makes up the difference between its Eno River allocations and its actual water
demand by means of purchases of treated water from other water systems and/or by the use of
well water from its single operational high-capacity drinking water well. Another high capacity
drinking water well is due to become operational in the very near future.
Orange-Alamance faces a number of challenges in its effort to meet the ever-increasing water
demand of its growing customer base. Although it has transferred some of its larger customers
to other water systems, it probably needs to upgrade the equipment in its water plant and its
water demand often exceeds its treatment capacity. Furthermore, the water supply currently
available to Orange-Alamance is often insufficient to meet to its existing demand.
Orange-Alamance is working to improve its water supply situation, primarily by developing
ground water wells and by entering into water supply contracts with other water utilities.
However, under any circumstance or strategy currently under discussion, it is unlikely that the
Orange-Alamance will be able to accommodate the projected 250,000 gpd water demand
resulting from the build-aut of Efland-Cheeks community and the Buckhorn Road Economic
Development District.
Orange-Alamance and its customers have an important part in dealing with many of the issues
related to the development and evolution of the Efland-Cheeks community. The BOCC has
developed an overarching Efland goal which consists of a number of critical components,
including: 1) addressing how water and sewer utility service necessary to develop the Buckhorn
Road EDD can be provided; 2) defining a realistic and appropriate utility service area for the
Efland-Cheeks community; 3) initiating a small area planning process for the Efland-Cheeks
community; 4) creating and adapting a master plan for the Efland sewer system and expanding
the sewer system; and 5) entering into a joint planning relationship with the City of Mebane.
Consideration and evaluation of Orange-Alamance's role in: a) continuing to provide water
service in the Efland-Cheeks community; b) providing water service to the as-yet unnerved and
developing portions of the community; and c) providing water service to the Buckhorn Raad
Economic Development District are essential elements of the process. The BOCC's review and
discussion of the issues either outlined or implied by the contents of the attached report
represents an important initial step in addressing and further delineating the Efland goal.
FINANCIAL IMPACT: Not applicable.
RECOMMENDATION(S): The Manager recommends that the Board accept the report and
attached material as information.
3
MEMORANDUM
TO: County Commissioners
COPIES: John Link, County Manager
Geof Gledhill, County Attorney
Craig Benedict, Planning Director
FROM: Paul Thames, PE, County Engineer
DATE: September 8, 2000
SLTSJECT: Orange-Alamance Water System, capacity and background issues
ATTACHMENTS: Articles of Incorporation, Amended Articles of Incorporations, Bylaws,
map of waterlines in Orange County
This report is intended to provide general background information on the Orange-Alamance
Water System in terms of its history and organization as well as information on the system's
existing ar current water supply capacity. Furthermore, this report will attempt to address the
twelve specific questions posed by Commissioner Jacobs (see Attachment "A"). Information
contained in this report is based on conversations between the County Engineer and Orange-
Alamance staff and NC Public Water Supply Branch staff and on documents such as the Articles
of Incorporation far and Bylaws of the Orange-Alamance Water System.
General
The Orange Alamance Water System is a perpetual non-profit rural membership corporation that
is classified under North Carolina health/environmental health statutes as a public water supply
utility. It was officially incorporated in September, 1965 and began operation in August 1968.
The system's original 100,000 gallon per day (gpd) demand from 360 customers in Orange and
Alamance Counties was met by way of purchase of treated water from the City of Mebane,
supplied by way of an interconnection between the two distribution systems. Orange-
Alamance's own 1.0 million gallon per day (mgd) capacity water treatment plant on the Eno
River began operation in June 1969. The creation of the Orange-Alamance system was
originally the concept of Wiley B. Perry, one of the founding members of the board of directors.
According to newspaper accounts of the day, Mr. Perry was trying to acquire water utility service
for his Perry Hills subdivision development. He found that it was neazly as easy to obtain
Farmers Home loans and grants to build an entire water system as it was to acquire funding for
an extension of utility service from the Town of Mebane water system.
4
The Orange-Alamance water system currently employs 12 individuals (5 water plant operators, 3
distribution system operators and 4 administrative personnel). In accordance with the provisions
of its Articles of Incorporation, Revisions to the Articles of Tncorporation and Bylaws, the
operation of the corporation is currently overseen by a nine member board of directors (although
12 are provided for in the Articles of Incorporation and Bylaws) which meets an a monthly basis
with an occasional special meeting. Every custamer of the system is required to~ purchase one
share of the corporation (less than $400) and every custamer is, at least in theory, a voting
member of the Corporation. No individual can hold more than one corporate shaze or has more
than one vote. The corporation holds an annual noticed meeting of all the members, although in
recent years this meeting has not been well attended by the general membership. Although
Board of Directors meetings aze not noticed, any member may attend a board meeting. Any
member or even anon-member may petition the Board of Directors to consider an item of
business {for example, the Board must approve any non-residential or multi-service request
exceeding two taps). The Bylaws authorize the Boazd of Directors to set the operational rules,
regulations and procedures by which the utility operates (including service extension and tap-on
policies). Special meetings may be called by a petition often percent of the members ar by
action of the Board of Directors. No Orange-Alamance meeting is a public meeting, insofar as
public meeting statutes are concerned, and meetings are not noticed to the general public.
Directors of Orange Alamance are nominated and elected by vote on by the members of the
corporation. In recent years, as a consequence of inactivity by the general corporate
membership, directors have been nominated and elected primarily by the sitting Board of
Directors. Officers of the corporation (president, vice-president, secretary and treasurer) aze
members of the corporation and the Board of Directors and are nominated and elected by the
Board of Directors. Directors may be removed by the vote of a majority of members of the
corporation present at the meeting in which the removal is an item of business. The members
present at any particulaz meeting of the members constitute a quorum at the meeting of the
members. The removal process is initiated by a petition of charges against the director, signed
by ten percent of the members of the corporation or by a member of the board of directors.
There are no provisions in the Articles of Incorporation or Bylaws for dissolution of the
corporation ar the Board of Directors or joining the corporation with another utility or other such
entity. There is a single reference in the Bylaws to a dissolution of the Corporation in terms of
disbursement of the Corporation's remaining assets. The Boazd of Directors may sell 'the
corporation, mast likely as a "going concern", either voluntarily ar otherwise. It is also possible
that the assets of the corporation Gould be sold with no plan to continue operation of the utility.
That is an event that is unlikely to occur except in situations of "forced" where creditors,
bankruptcy court, or state court in receivership action could cause the corporation to be
dissolved.
There are no guidelines in the Articles or Incorporation or the Bylaws of Orange-Alamance
specifying or outlining haw system expansions to serve existing ar new development will be
evaluated for approval, except as noted above, that the Baazd of Directors may. make such
evaluations and decisions. As a public water supply utility, Orange-Alamance is ruled by the
same set of state drinking water standazds, regulations and statutes (applicable to water supply,
z
S
water treatment, quality control testing practices, design and construction of infrastructure, etc.)
that govern other public water utilities such as those operated by OWASA, other water utility
districts and authorities, municipalities and other local governmental units.
The primary regulatory authority over Orange-Alamance is the Public Water Supply Branch of
the NC Division of Environmental Health. The water supply branch requires that Orange-
Alamance conduct and report daily water tests, approves the use of wells in the system and
approves and permits the design of distribution system extension, plant modifications, etc. In the
event that quality control testing shows evidence of water contamination, the Water Supply
Branch may work with the Orange County Health Department to issue any notices necessary for
boiling or curtailing the use of water.
Orange-Alamance is also subject to a lesser degree of'regulatory oversight by the NC Division of
Water Resources. This agency deals with surface water supply issues related to interbasin
transfers and water supply planning (the interrelation of water supply with water demand).
Water Resources, through the water supply plan process and coordination with the Public Water
Supply Branch, could conceivably compel Orange-Alamance to adopt a moratorium on new
water customers in the event that water demand approaches or exceeds system supply capacity.
Through its enforcement of interbasin transfer statutes, Water Resources could regulate Orange-
Alamance's interbasin transfer of water from the Eno and Neuse River basins to the Haw and
Cape Fear River basins, if the interbasin transfer were to increase to a level exceeding the 2.0
mgd regulatory trigger point. As Orange-Alamance's current interbasin transfer does not exceed
800,000 gpd, it is unlikely that such an increase would occur in the foreseeable future.
Orange-Alamance is not subject to regulation by either the NC Utilities Commission or Orange
County. It is not required to seek Orange County's approval or input when extending its water
lines or serving any subdivision within the County's jurisdiction. Orange-Alamance has been
invited to Orange County Planning Department staff development review meetings dealing with
development projects where Orange-Alamance service extensions are contemplated Orange-
Alamance representatives have attended one such meeting, the one in which the large
(+/_ 250 unit) McGowan Creek subdivision was discussed. However, there is generally no
coordination or discussion between Orange Alamance and the Planning Department with regard
to service extensions. Planning staff typically learn about proposed service extensions when
developers submit plans with those extensions indicated. The Planning department does require
that developers of subdivisions that are proposed for water service from Orange-Alamance
provide a letter from Orange-Alamance certifying its intent to provide service. With recent
larger scale development projects proposing the extension of water service from Orange-
Alamance, the Planning Department has required that developers demonstrate that Orange-
Alamance can provide an adequate level of water service. Orange-Alamance does work closely
with Orange County, to the benefit of the County, to coordinate providing sewer services to
those entities and households within the joint service areas of the Efland sewer system and the
Orange-Alamance Water System. Orange-Alamance provides the billing and collection services
for the sewer system and enforces payment requirements by curtailing water service to any
customer whose sewer bill is unpaid.
Infrastructure
The Orange-Alamance system can be basically described as consisting of: 1) its original 1.0
mgd water treatment plant, which is located at the northwest quadrant of the intersection of the
Eno River and US Hwy 70 west of Hillsborough and east of Efland; 2) a 12" diameter water
main trunk line extending west along Hwy 70 from the plant to a point just east of Mebane city
limit, then north and west through and across the northern end of Mebane, then south along the
west side of Mebane and crossing the interstate at Trollinger Road to NC 119, then continuing
south along NC 119 through Hawfields and across NC 54 to Swepsanville; 3) one 300,000
gallon elevated water tank in Orange County (on Hwy 70 adjacent to the Hancor Plant) and one
300,000 gallon and two 100,000 elevated water tanks in Alamance County (US 70 west of
Mebane; NC 119 and Swepsonville); and 4) a number of smaller diameter water mains and lines,
from 2" to 8" in diameter serving azeas in both Orange and Alamance Counties that are outlying
from the route of the primary 12" diameter trunk main. Furthermore, Orange Alamance awns
and operates or will operate two ground water wells, each with a rated capacity significantly in
excess of 100,000 gpd, one located on the grounds of the treatment plant in Orange County and
one at the elevated water tank on NC 119 in Alamance County (the Alamance well has not yet
been put in service but will be very soon). Water from the well at the treatment plant is currently
run through the treatment plant before it enters the distribution system. Water from the well at
the elevated water tank will be chlorinated and discharged directly into the distribution system.
Orange Alamance also owns an approximately 30 acre site on NC 54 in Alamance County just
east of Swepsonville where Haw Creek flows under NC 54. The original plan for this site was as
a location for a raw water intake on Haw Creek and a water treatment plant. However, during the
state's drinking water watershed classification process during the early and mid 1990's, Orange-
Alamance (at the behest of Mebane and Graham) officially abandoned this property as a raw
water intake site and petitioned the Environmental Management Commission to declassify the
Haw Creek watershed as a water supply watershed.
In Orange-Alamance's Orange County service azea (shown on the attached map), most of the
customers lie in the US Hwy 70 corridor bounded by I-85 on the south and Lebanon Road on the
north. However, there are about 20 customers in the area near the intersection of Mount Willing
Road and West Ten Road south of I-8S and perhaps 40 customers on the north side of Lebanon
Road in areas neaz the intersections of Lebanon Raad and Frazer Road and Lebanon Raad and
Brookhallow Road. Customers in both Orange and Alamance Counties that are not adjacent to
the 12" main are served from the network of smaller diameter, often dead-end, mains. While the
Orange-Alamance. distribution network does contain f re hydrants (primarily along the trunk
main), the system is not generally designed to provide fire protection. It certainly could oat be
expected to meet fire protection standards far water pressure or flow in azeas not adjacent to the
12" trunk line. Although there aze oat widespread or frequent problems ar complaints with low
water flow or low water pressure on the Orange-Alamance distribution system, customers
located at the ends of long segments of small diameter water mains may occasionally suffer from
conditions of low flow or pressure. This would be particulazly true during periods of high
demand at the upstream portions (nearest the trunk mains) of small diameter water lines.
4
Current O eration and Demand
Today, the Orange-Alamance water system has a water demand. that averages approximately 1.0
mgd and that often exceeds that demand during the traditionally high demand periods (the hot
and/or dry weather July to November). Its customer base contains approximately 3600
industrial, commercial, institutional and residential customers, of which 1200 are in Orange
County and 2400 aze in Alamance County. Orange-Alamance does not keep records that
specifically provide an accounting for water use/demand an a by-county basis. However, in the
early 1990's, a disruption (of several weeks duration) of the primary water supply main at a paint
just inside Orange County (at the Alamance County line, cutting offthe Alamance County
portion of the service area) reduced Orange-Alamance's water production and withdrawals from
the Eno River by approximately 75%. It is probable that approximately three quarters of
Orange-Alamance's current water production continues to be an interbasin transfer that serves a
significant portion of the water demand of east-central Alamance County.
Demand for water from the Orange-Alamance Water System continues to grow. Historical
records indicate that Orange-Alamance's customer base is typically increased by approximately
100 new customers (primarily residential) each year. These customers generate an annual
increase in water demand of approximately 20,000 gpd. At least somewhat alleviating
increasing demands from some sectors, Orange-Alamance has transferred (in 1999) its lazgest
water customer, the GKN manufacturing facility, to the Town of Mebane water utility. There
has also been some discussion between Orange-Alamance and the Town of Haw River about the
possibility of the Town absorbing some of Orange-Alamance's residential customers into its
customer base. Orange-Alamance's largest remaining customer is the Cortina textile plant,
which consumes in excess of 100,000 gpd, and is located in Swepsonville. In the past year,
Orange-Alamance has agreed to provide water service to some proposed new subdivisions in
Orange County such as the Richmond Hills subdivision (projected demand approximately 5500.
gpd) and the Ashwick subdivision (projected demand approximately 10,000 gpd), while rejecting
others such as the McGowan Creek subdivision (projected demand approximately 50,000 gpd).
While it is clear that Orange-Alamance is not taking on new high demand large-scale residential
developments or non-residential customers, it is not cleaz what criteria its board of directors
utilizes to approve or disapprove the providing of service to smaller residential developments or
businesses.
Orange-Alamance is limited to a Stage I withdrawal of 820,000 gpd under the terms of the Ena
River Capacity Use Agreement. As the water level iri Lake Orange decreases, Orange-
Alamance's Eno River allocation may decrease to as little as 370,000 gpd under the most severe
droughtllow flow conditions. During the last twelve years, Orange-Alamance's allocation has
been reduced to 700,000 gpd on several occasions, once for nearly a month. For as much as six
months per yeaz, it must rely on water from its wells and purchases of treated water from
Hillsborough, or from Durham wheeled through Hillsborough, ar from Mebane to make up any
shortfall between its Eno River allocation and well yield and the water demand of its customers.
In the past (though not recently), Orange-Alamance has experienced operational or other
difficulties in acquiring sufficient water supplies from Hillsborough and Mebane to meet its
water demand, leading it to exceed its Eno River withdrawal restrictions. Given that its average
S
demand is 1.0 mgd and the capacity of its treatment plant is 1.0 mgd, Orange Alamance will
from this point forward have to rely on its wells and water purchases to meet its demand even
during those times when it is not impacted by low flow conditions in the Eno River.
Conclusions
There are a number of challenges that now face Orange-Alamance. Included in these is the
probability that it soon needs to upgrade the equipment in its water treatment plant and that it
faces a demand that often exceeds the treatment capacity of its Eno River plant. However, the
mast serious issue that Orange-Alamance faces is a water supply that is insufficient to meet its
growing demand. While Orange-Alamance has reduced demand by transferring some of its
largest customers to other water systems and may continue to shift whole developments to other
water utilities, it continues to gain small developments and individual customers. Same of the
shortfall in its surface water supply and treatment capacity may be made up by the use of is
ground water wells. However, even though initial indications are that these wells .yield high
quality water and relatively high capacity (in excess of 100,000 gpd each) for this area, the
quality and capacity of the wells have not been subject to the prolonged stress of constant use.
Given the restrictions placed on Eno withdrawals by the Capacity Use Agreement, expanding
the treatment capacity of the existing plant will not provide a solution for water supply
shortages. Likewise, building another water treatment plant may not be a viable option since
Orange-Alamance relinquished state and local protection far the Haw Creek watershed and its
ability to develop a raw water intake there. Orange-Alamance does continue to seek guaranteed
long-term treated and/or raw water sales agreements with other local jurisdictions with excess
water treatment and supply capacity. However, it is unlikely that any jurisdiction will commit to
an agreement that requires it to continue selling water to Orange-Alamance once its own surplus
capacity has been expended.
While Orange-Alamance does have serious water supply issues, in recent history it has not been
subject to any regulatory sanction by the agencies that oversee its operations. Orange-Alamance
continues to work with the Division of Water Resources to~complete the development of its
Water Supply Plan. However, it is certainly conceivable that Water Resources and the Water
Supply Branch could eventually impose a moratorium on new customers should Orange
Alamance fail to secure guaranteed water supply sources that would serve to meet the system's
demand in all but short term emergency situations.
It is conceivable that commercial and residential build-out of the Efland-Cheeks community
alone could create an additional water demand of 250,000 gpd. Under any circumstance or
strategy currently under discussion, it is unlikely that the Orange-Alamance water system will be
able to accommodate the water demand of the build-out vfEflond-Cheeks community or the
Buckhom Raad Economic Development District.
If I may provide additional information or answer questions, please advise.
6
9
Attachment "A" -Specific questions posed by Commissioner Jacobs
1. How was Orange-Alamance created, and within what parameters does it operate ?
2. What outside oversight is there of Orange-Alamance operations ?
3. What is the regulatory history of Orange-Alamance 7
4. Ys there an environmental danger in interbasin transfer of water ?
S. Is there coordination with the Orange County Planning Department in extending
lines ?
6. What is the standard process by which customers secure water service, and how are exception
decided ?
7. Who appoints the Orange-Alamance board of directors ?
S. Are there water pressure problems an any hydrants or other parts of the system 7
9. By what mechanisms are public concerns addressed by the Orange-Alamance board ?
10. Are Orange-Alamance board meetings public, and are they properly noticed ?
11. ,What are the utility's assets ?
12. How might the Orange-Alamance Water System be reconfigured to coordinate operations with
other existing entities ?