Loading...
HomeMy WebLinkAboutAgenda - 08-28-2000-1~~ ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD PUBLIC HEARING AGENDA ITEM ABSTRACT Meeting Date: August 28, 2000 Action Agenda Item No. SUBJECT: Stream Buffer Zoning Ordinance Amendments DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) YES ATTACHMENT(S): INFORMATION CONTACT: Proposed Ordinance Robert P. Davis, Planner III Ext. 2580 Craig Benedict, Director Ext 2592 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 9fi8-4501 Durham fi$8-7331 Mebane 336-227-2031 PURPOSE: To receive public comment on the proposed Stream Buffer Amendments in the Zoning Ordinance BACKGROUND: Request • Amend the Stream Buffer and related sections in the Zoning Ordinance • Provides clearer and language to users to help calculate stream buffers consistently • Adds new definition in Zoning Ordinance for Usable Lot Area • Limits portions of lots that can be encumbered by stream buffers, easements, water bodies, etc. • Adds a new provision for stream buffers outside Watershed Protection Overlay Districts • .Establishes minimum 30-foot (each side) stream buffers for perennial (blue line) and intermittent (dashed blue.line) streams Location Amendments will apply to the entirety of Orange County lying outside the municipalities and their extraterritorial jurisdictions, if any. Develo ment Process Schedule and Action • Public Hearing On August 28, 2000 • Refer amendment to the Planning Board for a recommendation back to the Board of County Commissioners no sooner than October 3, 2000 RECOMMENDATION(S): Plannin Staff Recommendation: Approval of the proposed amendments as given in the attached documents. Administration Recommendation: Refer proposed amendments to the Planning Board for a recommendation to be returned to the Board of Commissioners no sooner than October 3, 2000. Public Hearing Ordinance An Ordinance Amending the Zoning Ordinance of Orange County Section 1: Amend Article 22 DEFINITIONS by creating a new definition as follows: Lot, Usable -The portion of a zoning lot unencumbered by stream buffers, conservation easements, drainage easements, public and private rights-of-way, access easements, utility easements. This definition also includes areas in lots affected by steep slopes, (i.e. greater than 15%), wildlife corridors, ponds, lakes and streams. Section 2: Amend Section 6.23.7a and Article 22 DEFINITIONS of Stream Buffer to clarify that the stream buffer is not to be included within the floodplain. Stream Buffer - a stream buffer is an area of land adjacent to perennial and intermittent streams, or identified floodplains, which, except as permitted in Article 6.23.7 of this Ordinance, must remain undisturbed in its natural state. Perennial streams are shown as solid blue lines and intermittent streams as broken lines on the USGS Quadrangle maps. Section 3: (page 6-41 -Zoning Ordinance) 6.23.7d. Calculatin the Width of Stream Buffer d. Calculating Width of Stream Buffer Those streams identified by the Federal Emergency Management Agency (FEMA) maps to have floodplains shall have stream buffers calculated from the outside edges of the floodplain. 1) How to Calculate Slo e a. Draw awe 250' length perpendicular lines, at 100- foot horizontal intervals along the entire length of the outside edges of the stream, ts~e~, or the outer edge of the FEMA floodplain, whichever is greater. b. Determine the elevation at either the stream itself (1) or the outer edge of the FEMA floodplain, whichever is highest, and at the point 250' from the stream or FEMA floodplain, whichever is applicable, along the perpendicular line (2). c. Subtract (1) from (2). d. Divide c. by 250. e: Multiply d. by 100. f. Perform this calculation for both sides of the stream or floodplain. Hereafter, the number derived in e. will be referred to as "slope value". (~~~3 ~. ~,j ~i Public Hearing Ordinance Section 4: Amend Detailed Table of Contents Section 6.24 to read as follows: . Stream Buffers Outside of Watershed Protection Overlay Districts Section 5: .Amend new. Section 6.24 to include a minimum stream buffer for areas outside of Orange County Watershed Protection Overlay Districts to read as follows: In areas not identified on the Official Zoning Atlas as Watershed Protection Overlay Districts, a stream buffer a minimum of 30 feet in width shall be established along both sides of perennial streams and intermittent streams, or along the FEMA identified floodplains, whichever is greater. Perennial streams are those streams shown as solid blue lines, and intermittent streams are those streams shown as broken blue lines on the USGS Quadrangle maps for Orange County. Section 6: Amend Detailed Table of Contents Section 6.25 to read as ,follows: Minimum Usable Lot Area for Lots on Ground Absorption Wastewater Systems ' Section 7: Amend the new Section 6.25 to set minimum usable lot area when Ground Absorption Wastewater Systems are used to read as follows: The usable lot for parcels between 40,000 square feet and 1.99 acres in size shall be either 30,000 square feet or 40% of the total zoning lot, whichever is greater. Zoning lots two acres and greater shall have a minimum usable lot area of at least 40,000 square feet. Section 8: This ordinance shall be effective upon its adoption. (Signature) Clerk,.Board of County Commissioners (Signature) Chair, Orange County Commissioners f Date and Seal