HomeMy WebLinkAboutAgenda - 06-29-2000-8zORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 29, 2000 Action Agenda Item No. , ~-Z •SUBJECT: Bid Award--Oran a Count Landfill Phase 4 Construction - Geos nthetics DEPARTMENT: Purchasing and PUBLIC HEARING: (Y/N) No Landfill ATTACHMENT(S): INFORMATION CONTACT: Pam Jones, 245-2652 Bid Tabulation Ga le Wilson, 96$-2$$5 Engineer's Letter TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham fi88-7331 Mebane 336-227-2031 PURPOSE: To consider awarding a bid for Phase 4 Construction - Geosynthetics at the Orange County Landfill. BACKGROUND: Two years ago the construction of Phase 3 of the Orange County Landfill was completed. It is time to commence construction of the final cell of the lined landfill. Phase 4 construction will create an estimated $00,000 cubic yards of space, which represents approximately four years of additional capacity. The Landfill staff will perform all grading and hauling and will install the leachate collection piping. However, the geosynthetic liner must be purchased from, and installed by, a third party. Weather permitting, the work should be begun in mid-July and finished by the end of August 2000. Draper Aden Associates of Richmond, Virginia created detailed plans and specifications that address the County's needs. The bid was advertised and bids were sought from thirteen vendors. Four responsive bidders responded to the June 14 bid call. A tabulation is attached. Also attached is a letter from William Hase of Draper Aden Associates recommending the low bidder Clary Hood, Inc of Kissimmee, Florida at a cost delivered and installed of $346,000. The installation of the three layer liner and all work done on Phase 4 Construction will be inspected by the Solid Waste Section of the North Carolina Department of Environment and Natural Resources. FINANCIAL IMPACT: If approved by the Board, the total cost of the liner purchase and installation would be $346,000. This cost is significantly lower than what was originally anticipated. When considering the other aspects of this project -the purchase of leachate piping, the quality assurance contract approved by the Board at the June 6 meeting, the rental of specialized heavy equipment, and other associated project expenses -the cell 4 construction project is likely to cost several hundred thousand dollars less than the $$45,800 that was appropriated in FY 1999-00 for this purpose. 2 RECOMM'ENDATION(S): The Manager recommends that the Board award the bid to Clary Haad, Inc., of Kissimmee, Florida in the amount of $346,OQ0; authorize the Purchasing Director to execute the necessary paperwork; and authorize the Manager to execute change orders as may be necessary during the course of the installation, to the extent project funds are available for this work. 2p Bm T~su~~ax ox~xG~ ~Giox~ r.~-rtnF~ PHA9~ ~ Co1KSTRIICTIQN - GEO6YNT.E~1`ICS aID D~,~: auxa x~, ~a ffinddar~ I.am S1[m H~ Bid B~oeipt a~ Addatdum #1 •Hi~ Seca Qa~ttan Sts~ui Ud~-tt~, Fo1 m S*.,~4~: ~r ;r`y ~e ~+al~~- `~ ~ 3.~ ~oo•ao ~ ~ c.~ ~ C~~ ~.~/ ~ 3YG oao.v~ ~ .~ ~ ~ 5 ~,w. f ,~` ~ 9 0~. G a !~' ~ r~ ~ :: - Draper Aden Associates F:f~s:inrtring + 5urvayin,, • EmircJnmantal S~nicas >;JrJn ~-ilia Pori; Drive RirhJtlnnd, ti'irginia ?~?18 i R~1.1) 26.E-~32t1 • Fax f B(~ ~ ?F4-R'7} duald'd:ea.c~iti + «u•u•.~iad.rom Ms. Pamela J. Jones County of Orange Director of Purchasing and Central Services 132 East King Street Hillsbamugh, North Carolina 27278 June 16, 2000 Re: Orange Regional Landfill Phase 4 Bid Review DAA #6216-43 Dear Ms. Jones: We have reviewed the four bids received and opened on June 14, 2000 for the geosynthetic construction of the Phase 4 disposal cell at the Orange Regional Landfill. Based on our review, we have the fallowing comments and recommendations. 1. The apparent order of bids received were: Clary Hood, Inc., -Environmental Division $346,000.00 Synthetics Liner Specialists d/b/a Reynolds, Inc. $432,500.00 Plastic Fusion Fabricators, Inc. $450,479.00 Serrot International, Inc. $457,946.60 2. The bid received from Plastic Fusion Fabricators did not include the Minority and Women Business Utilization Commitment form. This form was required W be submitted with the bid in order to be considered responsive. Therefore, we recommend that the bid from Plastic Fusion Fabricators be considered non-responsive. 3, The bids received from Clary Hood, Synthetic Liner Specialists, and Serrat International appear to be responsive. 4. T'l~;e firm Clary Hood, Inc. listed limited experience on landfil! construction projects. However, their key personnel have extensive landfill construction experience_ Several of the key personnel were involved with the construction of Phases 1 aid 2 at the Orange Regional Landfill in 1995. Draper Aden. Associates has experience working an municipal landfill construction with the key personnel for additional projects in Cleveland and Surry Counties, North Carolina, Nattaway County, Virginia, aad in the City .of Petersburg, Virginia, Based on our previous experiences, and the referenced projects listed by Clary Hood in .thew bid submittal, it is out opinion that Clary Hood is qualified to perform the work: 3 Hlack.hure. L'irainia • $ichmnnd. ~'~reinin + R:~leiah/n~orham. `nrlh f :.rnlinA 4 Ms. Pamela J. Jones June l fi, 2000 Page 2 5. Since the bid received from Clary Haad was significantly iawer than the second apparent law bid, we contacted Clary Hood and discussed the project requirements. It does not appear that any elements of the geasynthetics construction were missed. The bid appears to be carnplete. fi. Based on our review, it is out opinion that Clary Hood, inc. is the lowest responsive qualified bidder. We recorntnend that the County award the bid to Clary Hood, Inc, If you have any questions, please do not hesitate to tali. Sincerely, DRAPER ADEN ASSOCIATES William G. Hose cc: Michael J. Meagher, Orange County Solid Waste Edward Hullos, Draper Aden