HomeMy WebLinkAboutAgenda - 06-29-2000-8wORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: June 29, 2000
Action Agenda
Item No. ~ - ~
SUBJECT: RFP Award of Professional Services for Design of the Whiffed and Northern
Center HVAC Systems and the Electrical System Renovation at Court Street
DEPARTMENT: Purchasing ~ Central Services PUBLIC HEARING: (Y/N) No
And Public Works
ATTACHMENT(S):
Northem Human Services Center Capital
Project Ordinance
INFORMATION CONTACT:
Pam Jones 245-2G52,
Donna Dean 245-2151
Wilbert McAdoo 245-2625
2. Whiffed Human Services Center Capital TELEPHONE NUMBERS:
Project Ordinance Hillsborough 732-8181
3. Proposal Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To consider awarding a proposal and approving a contract with Robson ~ Woese,
Inc. for:
1) Feasibility study to determine the most economically efficient HVAC system, with strong
focus on the life cycle cost to be designed for the Whiffed Human Services Center and the
Northern Human Services Center; and
2) To design the resulting systems for the two facilities, produce specifications and drawings to
support the bid process and to provide construction administration services throughout the
project; and
3) To design, produce specifications and drawings for the bidding procedure and to provide
construction administration for upgrades to the electrical services in the Court Street Annex.
BACKGROUND: Heating, Ventilation and Air Conditioning systems at the Whiffed and
Northern Human Services Centers have been targeted for replacement for several years. The
Board authorized the sale of two-thirds bonds earlier this year with which to fund the work.
Pursuant to the information shared with the Board in February, staff is recommending that the
HVAC design work be done in two stages. The first stage would have the consultant
conducting a feasibility study for both the Whiffed and Northem Center. Staff would ask them to
compare no fewer than three systems based on energy costs, ease of maintenance
controlability, and initial cost. This work would be performed over the summer and the options
presented to the Board in early Fall 2000.
Upon receipt of direction by the Board as to the preferred system, the engineer would then
.embark upon the design process. A project completion timetable will be presented to the Board
at such time a recommended system is selected.
Of the two proposals received, Robson ~ Woese, Inc., Durham, NC submitted the proposal that
best meets the needs of this project. Their experience includes work similar to what must be
done at Whiffed in particular. It is also helpful to have the engineer in close proximity of the
work site. Travel costs are minimized and their immediate availability to respond to issues that
may arise during construction is of great benefit. The recommended award amount is not to
exceed $269,270. The attached proposal reflects additional costs for the Norkhern Human
Services Feasibility Study ($7,000) and the creation of current condition "as built" drawings
($4,000). The engineer has agreed #o include this $11,000 worth of work in the basic services
agreement. The final agreement will reflect anot-to-exceed amount of $269,270.
Presuming the Board's approval of this work, the Engineer would be released to immediately
begin the feasibility work. Priority focus would be directed toward accomplishing the work at
Whiffed.
As the Board may recall from the February presentation, analysis of the long-term use of the
Northem Human Services Center is currently underway through a task force lead by
Commissioners Brown and Halkiotis. Recommendations regarding that facility are
contemplated in the Fall 2000.
The final component of the work addresses deficiencies in the electrical service at the Court
Street Annex. Much of the wiring is original to the building. The service is past capacity with
the increased loads imposed by technology used in the building. In addition, the service needs
to be upgraded in general to meet existing electrical codes. It is anticipated that approved
funds will support the installation of new energy efficient lighting and a fire alarm system in the
building. The design of such is included in the scope of work of the designer's basic services,
however, the actual work will be bid as an alternate so it can be easily identified in the event of
budget deficit.
FINANCIAL IMPACT: $15,000 is included in the approved Court Street Annex Capital Project
to cant' out the electrical upgrade at the Court Street Annex. Funds for the feasibility studies
and design work at Northem and Whiffed Human Services Centers are included in the attached
capital project ordinances. Proceeds from the recent two-thirds net debt reduction bonds
provide the funding for work at the Northem and Whiffed Centers.
RECOMMENDATION(S): The Manager recommends that the Board award the proposal and
approve a contract with Robson ~ Woese, Inc., contingent upon attorney and staff review for
the following work:
1) Feasibility study to determine the most economically efficient HVAC system to be designed
for the Whiffed Human Services Center and the Northern Human Services Center; and
2) To design the resulting systems for the two facilities, produce specifications and drawings to
support the bid process and to provide construction administration services throughout the
project; and
3) To design, produce specifications and drawings for the bidding procedure and to provide
construction administration for upgrades to the electrical services in the Court Street Annex;
and
4) Authorize the Chair to sign on behalf of the Board; and
5) Approve the attached capital project ordinances for Northern Human Services Center and
Whiffed Human Services Center.
Northern Human Services Center Project
Capital Project Ordinance
Project Number 61-600
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2
of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted.
Section 1. The project authorized provides funds for major renovations, including roof repair and septic and HVAC
systems upgrades, at the Northern Human Services Center. Financing far the project includes proceeds from the
County's portion of the one-half cent sales taxes and the two-thirds net debt reduction bonds issued in May
2000.
Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein.
Section 3. The following revenue is anticipated to complete this project:
oug
1998-99
l~ Y 1999-00 oug
1999-00
es ax ,
et t
Reduction Bond
Fl~nds
$0
$63,568
$63,568
vate acement
rant s
er
ota un g
Section 4. The following amount is appropriated for this project:
0
199$-99
FY 1999-00 oug
1999-00
u mg
esign
onstructton
eptic ystem ,
er ,
0 oats
Section 5'. This ordinance supersedes all previous Northern Human Services Center Capital Project Ordinances for Orange
County.
Section 6. This ordinance shall remain in effect from July 1, 1998 until June 30, 2001
Adopted this 29~' day of June 2000.
Whitted Human Services Center
Capital Project Ordinance
Project Number 6/-601
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2
of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted.
Section 1. The project authorized provides funds for major renovations and parking improvements at the Richard E.
Whitted Human Services Center. Financing for this project includes proceeds from the County's portion of the
one half cent sales taxes, a Department of Social Services State grant and a portion of the two-thirds net debt
reduction bond issued in May 2000.
Section 2. The offtcers of the County are hereby directed to proceed with the project within the budget contained herein.
Section 3. The following revenue is anticipated to complete this project:
oug - oug
es ax
et t
Reduction Bond
Funds
$0
$190,702
$190,702
vote acetnent
rant s
er
ota un tng ,
Section 4. A portion of the available funds for this project have been transferred to the Sheriff Office Renovation Capital
Project and to the New Courthouse Renovation Capital Project. The following amendment is anticipated to
complete this transfer:
Through FY 1997-98 FY 199&99 Through FY 199$-99
Transfer to Sherrif s Office
Renovation Project (1994-
95) $75,000 $0 $75,000
Transfer to New
Courthouse Renovation
Project (149a-95) $30,000 $0 $30,000
Total Funding $lOS,000 $0 $lOS,000
Section 5. The following amount remains appropriated far this project:
oug oug
ut mg
sign
onstructton
er
ata osts ,
Section 6. This ordinance supersedes all previous Whiffed Human Services Center Capital Project Ordinances.
Section 7. This ordinance shall remain in effect from July 1, 1998 until June 30, 2001.
Adopted this 29`~ day of June, 2000.
Moses Carey, Jr., Chair
6q
~~ ROBSON & WOESE INC. CONSULTING ENGINEERS
SYRACUSE ROCHESTER BUFFALO RALEIGH/DURHAM
June 12, 2000
David E. Gannett
Orange County Purchasing Agent
132 East King Street
PO Box 8181
Hillsborough, NC 27278
RIB 8067 Electrical it~ Mechanical Englneeriny Servicaa
County at Orar-Se
RaW No. 40043
Dear Mr. Gannett:
We are pleased to respond to your request for prnfe~ional engineering design services for the
referenced projects.
PROJECT DESCRIPTION
The projects consist of analysis and design services for.
1. Replacement of the HVAC system at the Rk:hard E. Whiffed Human Services (57.300 SF) and
Central Recreation (19,000 SF), 300 West Tyros Stnest, Hi3sborough, NC
2. New HVAC system at The I~brthem Center (34.550 SF),, Hwy. 88 North. Hilsbaraugh. NC
3. Electrical design service's at the two~storied Court Street Annex Buldirrg (11.3338 SFj, 109 Court
Street. H®sbororrgh, NC to inducts the fo3owing:
• New Eleartcal Service to supplsmerrt the uradequate elec~rioal service at the print of use. This
rimy require providing additional a outlets in spaces and new Eledric~l Panels on each
floor.
• Replacement of ~np ligittirtg with enorgy elYidvnt .
• Upgrading of the Present Fire Alarm System.
SCOPE OF SERVICES
Robson S Woese, Inc. wiA comply with the requirernerlts of the RFP referenced above. We understand
Robson & Woese, Inc. scope of services for the three buildings to be as fallaws:
• Study/Report with life Cyde Analysis and Probable Construction Budgets for Richard E. Whiffed
Human Services building only
• Schematic /Design Development
• Construction Docurrtertts
• Shop Drawhtg Review
• Pr+e-rAnstnldion CCrderenCe
• Constnldiar Adrt~stration prtsida Olfice)
• Construction AdRrinistration (1 meeRing Per two weeks)
• On-site wnstn+dion observation (1 per two weeks)
• Final Punch (1 per trade)
• Review of the dosing of the prged
• As•Buiti Drawings (contractor prepared. drafted by Robson b Woese, Irrc.)
The lighting and fire alarm modification design for Court Street Annex witl be issued as an alternate.
F~la¢+e CenY,~r • 1908 HigFnrvey 54 • Suiee~ 10DC • DurF~em. NC 27713
[B'I $) ~9 ~13~ • Fex (9'I eJ 3B1 X91 B • rtrp=\\www.robeorrvvooee.avm
MECHANICAL, ELECTRICAL end FIRE PROTECTION ENGINEERING
R09SON Qe WOESE INC.
Mr. David E. Canndl
June 1Z, Z000
Page Y
RFiNR lI067 Elrctrical S Mechankal Engineering Services
Carnty of OrarrSe
R3W t+lo. X0043
DELIVERABLES
• Life Cycle Report with recantrnendations and Probable ConsWdion Budgets (3 espies)
A single packagt! Construction Document consisting of the following far Richard E. Whined Numan
Resource Building, Centrnl Recreation Building Replak~ment of WVAC System, The Northam Center New
HVAC System b Court Street Annex Building Elech'ical Design Senrhs:
• SdrematkJDegign Development design .
• Tum-key laid package infamalion including:
• Ab trout-end doaarrerrts, such as General Conditions, Supgemental General Corrditiorrs, Bonding
requirements, eta conforming to Orange County requirements
We wiB assist your office in Negotiation of Bids if required.
OUT OF SCOPE SERVICES
Our fee is based on the above listed Projed Desaiptiarr and Scope of Services. Not included are arty
beyond those stated above, including but limited to, the following:
• Systems and equipment testing
Printing of documents for bid. distttbution to the oontradors and pemrit purposes
• Elecdlcal metering and testing
Indoor air qualky monkoring and testing
• Wortc associated with hazardous materials. Survey, identification and management of design for
removal of hazardous materials
• Any code compliance requirements other than the codes assodated with the new NVAC system
On-site day-today won obsetvaiion beyond that noted in Scope of Services
• Systems Corntrrissionirrg
r permitting.
PRt]JECT SCHEDULE
We are prepared to begin wortk upon receipt of your written authorization and. acceptance of our proposal.
We arrtidpate completing our wok in accordance with the agreed sctredule with your oifioe and Robson S
Woese, Ina The tentative schedrde below would begin upon our ~Pt of the Notice to Proceed.
Draft Life Cycle Study Repot Week a
ReWew of Repoli Week 11
Final Report Week 14
8
ROBSON do WOESE INC.
Mr. Dwld tc. CannW
Jung 1x, 2000
Page 3
RFP/ 5007 t:lwctriad 3 Mechanlal Englnertrirp servkes
cQUnty of ornp.
Itaw iVo. ~
Design Services for t~le~LiVAG 5~tem
SchematicJDD Submission Week 13
Revisions Week 16
CD Submission Week 22
CD Review Week 28
Review Comedions and Advertisement for Bids Week 28
Bidding Week 32
Award of Contrail and Notice to Bidders Week 3B
Construilion Week 88
Closing week 72
FEE FOR SERVICES
Our fee fir the scope of services wiN be a lump sum fee of 7rMO FIurl~sd Six>~I-Nine 7lrousand 7'Mro
Hundred Seventy Dollars (i~,Z70.oo1.
We recarnrnend that one feasibility study be done for the Richard W. Whiffed human Resource Building.
and use this study as a model for the other buildings. h you desire a feasibility study for The Northam
Center as well, as noted in the RFP, please add an additional lump sum fee of Seven Thousand Dollars
(~T.000.00) to the fee Ysted above.
Our understanding is that tyre Richard E V1Rrtited Firxrran Re~sOwce Bur~rg is being renovated
continuously without "as-butt' drawings. The fee quoted above does not indude Held measurements for
creating 'as-butt' aondifions. AppriaramatelY ephly (8~ man•hours will bs required to develop 'as-hula"
partitions Of the buildings. rr you prefer us t0 develop "as-bu18' conditlorrs, the add8ional cross will be
64,000.00.
The Fees viii be payable ~ follows:
Feasibility Study (Tor Richard E. tMnitt•d Banding onWy):
• 612,320 at Draft Subrnissiorl (estimated total fee for the study is x15,400.00)
• 63,080.00 at Final Subm~ion of the report.
(If The Northam is irliladed in the study. the fees wiN be adjusted at fire same proportion as
Rldrard E 1Mrllfsd 8uidirg.)
Design Phase:
35% of the total fee at Shcemign Development Submission
2096 of the total fee at 5096 Bid DOarrrrerrt Phase
2596 ~ the total fee at 100% ~d Ooatrnerrt Phase
1596 of the total fee at 5096 Consavcdon Adrrninistration Phase
5% of the total fee at Closing
R0980N d, WOESE INC.
Mr. DwW E. Canrrell
JYM 11,1000
Pape
REPO OOe7 Elwtl'r~#I 8 Meehanloal Err0lnMrtng Servkas
County of Orarpf
R3W IVa. X0003
If the project is terminated prior to bl4dlnp. Robson b Wbese. Ina wit neCeive payment for that portion of
the work which has been completed prior to project teRrrinadon.
REIMBURSABLES
Our fee does not inducts costs that are outside of the Scope of Work and Deliverables as describe above.
If duAng the design phase outside professional assistance. such as Slrudural t~ineerin0~ ArdMedure.
Code Consultant. etc, is required, the Cost Of such assiscarwe will be reimbursable. We wiN seek prior
approval of your oirrce for any adddartal Costs. These items wit be bled id 1.1 times the cost in addAion
to our Scope of Services Fee as described above.
PAYMENT TO ROB$ON b YYOESE~ lNC.
Robson b Woese. Inc. will be paid monthly for services. For biNrtgs which certain unpaid beyond 90
days interest wit be changed.
GENERAL CONDITIONS FOR PROFESSIDNAL SERVICES
Ronson S Woase. Inc. will provide services in aa:ordance with the General Conditions for Professional
Services endoeed.
ACCEPTANCE
We appreciate this opportunity to submit our response to your RFP and strongly believe this project will
be the beginning of a mutually satlsfyirq professional relationship between County of Orange, North
Carolina and Robson b Woese; Ina We have provided thw proposal in compliance with the RFP
raquirertrents. V1M teal the aelec'bon of the Oesigrrer should be based on their a~aierroe and abily m
deliver the defined Scope of WCrk whhin budget and on tints. and we belieMe we do that best. VIle have
inducted intormatian about Robson b Woese. Inc. and a. short fist of projed~ >p estabtlsh the strengtft of
our sbdy~even year~dd fimt. the e~eriise and services we provide. and the quallpcabons of our
prindpals and our team rrternbers. All critical ,phases of this project will bs performed in our Durtram
Office.
k
lU
ROBSON Qi WOESE INC.
Mr. David E CanrraY
Jung 1~ Z000
Page 6
RFPi 6067 ~laatrtaal ~ Mach~nkal Enpln~tn~ Services
Courtly aT O~anp~
R3W Na. d00it3
ff the preceding is satisfactory, please have an authorized otTicer sign the ~dassd copy and Tatum to us.
If you have any questions or require additional irtfor~mation, please contact us.
Very truly !roars.
RO ~ WOESE, INC.
~ou, ~°~j
Apan Baru. P.E.
F~gineerirrg Manager
rk
Enc. GCPS
cc: P. French
W. Pisano