SUBJECT: Request for Funding -Concept Plan for Southern Community Park
DEPARTMENT: ERCD, Recreation and Parks PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
May 4 Letter from Mayor Waldorf
1997 Parks Bond Update
May 31 Letter from Town Manager
INFORMATION CONTACT:
Dave Stancil, 245-2590
Bob Jones, 245-2661
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 9fi$~501
Durham 6$$-7331
Mebane 336-227-2031
PURPOSE: To consider a request from the Town of Chapel Hill for use of County park bonds
toward development of a new concept plan for Southem Community Park in Chapel Hill.
BACKGROUND: On May 9, a letter from Chapel Hill Mayor Rosemary Waldorf was received
providing additional information on a previous request for use of County parks bond funds
toward the development of a concept plan for the Town's planned Southem Community Park.
As noted in the letter, a previous plan for the Southem Community Park was developed in 1990.
The Town feels that the current plan is no longer workable, due to road realignment and
changes in the surrounding land uses in Southem Village. The Town does not anticipate having
any of its 1996 bond funds available for this project, and has asked that the Board consider
allocating a portion of the $1 million dedicated for Southem Community Park facility
development (part of the 1997 County parks bond) toward developing a new concept plan.
As noted in a May 31 follow-up letter from Town Manager Cal Horton, the estimated cost of the
concept plan is $40-50,000. The County has previously distributed $105,000 to the Town for
lighting and irrigation at the soccer field at this park.
The total cost of the Southem. Community Park is estimated at around $5 million. The Town
does not have other funds designated for development of the park, and is proposing that the
remaining bond funds for this project (minus approximately 20% for contingency and
architect/permit costs) go toward construction of Phase I of the park - an estimated $675,000.
FINANCIAL IMPACT: According to Town staff, a general estimate of cost for the concept plan
is $40-50,000, and this amount is requested at this time. The next phase after the concept plan
would involve construction drawings, architect fees, permits, grading plans and construction
administration for facility development. These activities are expected to total 10% of what would
be the remaining $845,000 allocated for this project in the 1997 County bond, and another 10%
is anticipated for project contingencies.
RECOMMENDATION(S): The Manager recommends that the Board appropriate up to $50,000
to the Town for development of the concept plan, with the understanding that the remaining
$845,000 of the designated $1 million from the bond will be used toward constructing the first
phase of the park; as described in the May 31 letter from Town Manager Cal Horton to County
Manager John Link.
2a
~-`~~ ~=.
L _._ ..
.. .+ ~~~~
Town o~ CxAPiz, Hunt, '~ ~ ~~,~ `~ ~ 9 ?~11+"
i~ ~ ~~~;
306 NoRrx COLUIvIDIA Sir ~ •- ---~ V'
CxAP~. Hiza., Naxzx CAROravA 27516
OFFICE OF TF~ MAYOR
Moses Carey, Chair
Board of Orange County Commissioners
Box 81$1
Hillsborough, NC 27278
(919) 968-2714
May 4, 2000 FAX 919-967-8406
Dear Moses:
This is a follow-up to my earlier letter regazding passible use of a portion of the 1997 Orange
County pazk bonds for the planning of the Southern Community park in Chapel Hill,
This letter addresses the amount of Chapel Hill bond money available to us, a quick history of
Chapel Hill's thinking about this property, and a detailed description of how a concept plan can
lead to immediate construction of Phase T of the park.
The Town Council is pleased that the Board of County Commissioners has designated $1 million
for the Southern Community Pazk, particulazly as county bonds aze currently the only available
source of funding for its development. However, we cannot use those funds for beginning
construction because we~do not yet have a master plan. The Chapel Hill Town Council requests
that the Board~of Commissioners reconsider funding the planning stage of this project, so that we
could use the remaining funds to build the first phase of the pazk
Some History
As you may know, there was a previous plan for the Southern Community Park On May 29,
1990 the Chapel Hill Town Council unanimously (7-0) adopted the master plan for the proposed
Southern Community Park The plan included a ~ mix of active and passive recreation
opportunities, with athletic playing fields, a community center, walking trails, a pond, and a pazk
and ride lot. The plea also included a realignment of Dogwood Acres Drive, which cuts through
the property and creates a dangerous intersection with US 15-501. Jn May 1990, the Council
also authorized the permitting process for the Southern Community Pazk.
On March 25, 1991 the Chapel Hill Town Council reviewed the Special Use Permit application
for the project. The item was presented immediately following a discouraging fiscal report from
the Manager; 1991 was the beginning of the eazly 1990s recession. At that time, staff estimated
the project cost, excluding the park and ride lot, to be $5,275,000. After discussion, the Council
unanimously (8-0) adopted a resolution directing the Manager to bring back to the Council a
2
special use permit for the pazk and ride lot portion of the design only and to restructure the
remainder of the site's plan to expedite siting of athletic f elds. The Council minutes note that
implicit in the resolution is that funds would not be expended for Dogwood Acres Drive
realignment.
Details an Chapel Hill Bond Funds
In November 1996 Town of Chapel Hill citizens voted to approve a bond referendum for .$13.5
million, which included $5 million far pazks and recreation improvements. The remainder of the
bond was allocated: $3 million for open space purchase, $3 million far streets and sidewalks, $2
million for public safety, and $500,000 for public buildings. _
The majority of the $5 million for pazks and recreation has been expended on what is now
Hamestead Park. $3,259,000 has been spent on the park's infrastructure and existing amenities,
including 2~saftball,~a.;eba11 fields, 2 rectaz:gu:ar~~athl~ti.c fields, a,5katebaazd park; a Harting cage
facility, playground, picnic shelter, and walking trails. We estimate $1,31'6,000 of the 1996 bond
funds will be available for whatever aquatic%ommunity center is eventually built at Homestead
Pazk. The Northside Gymnasium facility located at the Hargraves Center was completed with the
remaining $425,000.
The Situation Today
Since the southern park's original plan was developed there have been several changes that affect
the site:
• The pazk and ride lot, which was originally programmed far the park site, was built
on land adjacent to the pazk on Southern Village property.
• The Scruggs Elementary School was built. As a part of that project, the Tawn traded
about 6 acres of land with the school system. In addition to the land trade, the Town
has also donated about G acres of the park site for the school's playing field. ]n
exchange, the Town will receive partial use of the school's athletic field.
• The County Baazd of Commissioners approved using up to $105,000 from the $1
million of 1997 bond proceeds for Southern Community Pazk to light and irrigate the
field, and purchase benches and refitse grid recycling containers, 'That project is
almost complete now; and we expect the Schools to request the funding before this
fiscal year is over.
• NCDOT's imminent widening of US 15-501 eliminates the need to realign Dogwood
Acres Drive, because the intersection of the two roadways will be reworked. The 15-
501 widening project is scheduled to begin this fall. The state will bear that
significant expense.
These changes have so significantly impacted the site that a new planning process is needed. In
addition, we want the residents in southern Chapel Hill, who maw are asking that this park be
developed, to participate and influence the pazk's design.
Once planning funding for the Southern Community Pazk is secured, we anticipate modeling its
conceptual plan process on that of the Homestead Pazk Aquatic/Community Center. The Council
solicited applications for both neighbor and at-lazge representatives on the Conceptual Plan
4
3
Committee, in addition to requesting representation from specific boazds and commissions,
including the Board of County Commissioners. The Homestead Park Aquatic/Community Center
Conceptual Plan Committee's charge is to work with staff and a consultant to seek community
input for the project and to ultimately develop both an interim and a final report to Council.
Because of the early Council involvement, we aze confident this process will lead to a completed
project.
Overall, we have used the conceptual plan process with great success. Conceptual plan
development allows us to study the land in broad terms in the most cost effective manner. It
involves neighbors, at-large citizens, advisory baazd members, and members of directly affected
groups. Finally, the process allows elected officials to review the project in their role as
"owners" rather than as "regulators" and to have their input included throughout the planning
.process. Once the Council approves the conceptual plan, more detailed drawings are prepared,
funding established and contracts let..Tnere need be no delays. .
Conceptual plans have led to several successful projects including Homestead Park, Northside
Gymnasium, Battle Branch Trail, and both phases of the Bolin Creek Trail. We used the
approved conceptual plan of the Dry Creek Trail to secure three sepazate grants, and that project
is being .implemented segment by segment. The concept plan for the Booker Creek Linear Pazk is
the basis of several potential grant applications. Conceptual plans also give us leverage in our
dealings with developers and organizations such as NCDOT.
We believe that a conceptual plan for the Southern Community Park is the most cost effective
way to plan for development of the site. It would permit everyone to share his or her concerns,
reveal problems azeas early in the process, establish cost estimates, and allow elected officials to
give cleaz direction for development of the site. Once the Council adopts a plan, we would be
able to use the rema;,,;ng County band funds and other resources as they aze available to begin
incremental implementation of the plan.
I trust this addresses concerns raised by the Boazd of Commissioners. Thank you for your
willingness to help meet the park aad recreation needs in southern Orange County. We look
forward to your response.
Sincerely,
oS ~P w~
Mayor Rosemary aldorf
C: Chapel Hill Town Council
Report on_the Parks Bond and Other Parks~Related Proiects
Fror the period November 1997 to the present
A, 1997 Parks Bond -Status Report
1. Facilities Development - $3.0 million
(Bond included $1 million for Homestead Pazk in Chapel Hi11, $1 million for Southern
Community Park in Chapel Hill, $500,000 for Efland-Cheeks Community Pazk, $500,000
undesignated)
Spent or AQpropriated.From,Bond To Date
• $757,690: Efland-Cheeks Community Park (Phase I)
• $105,000: To Town of Chapel Hill for Southern Community Pazk (lights, bleachers
and irrigation for soccer field)
• $145,000: To Town of Chapel Hill for Homestead Community Park (utility building
for. skateboard park and batting cage)
• ..$75,000: To match Town of Carrboro funds for enhancement of fields at Smith
Middle School
• No other facility development bond money has been requested for authorized
projects (remainder of Homestead Park, Southern Park)
Total Facilities Bond spent/appropriated to date - $1,082,690
As of current date, $1,917,310 remaining ($167,310 undesignated)
2. Parkland Acquisition - $3.0 million
• $110,774 for Cedaz Grove Patk (Northern Human Services Center)
As of current date, $2,889,226 remaining
See Lands Legacy Interim Aeon P/an fog Przvposed Parkland Banking
Programs
B, Other Park-Related Pro"ects
1. Little River Regional Park and Natural Area (option) - $88,000 to $132,000 total
County cost (projected from combination of sources)
2. "McGowan Creek Preserve" (Duke property) - $157,000 total County cast (1/2 from
ERC fund and % from SchooUPazk Reserve accumulated interest)
3. ltiverwalk Park in Hillsborough -- agreed to use of County-awned lands along Eno
River adjacent to County campus for park area.
ppEL
G`
~ ! ~~
s
TOWN OF CHAPEL HILL
May 31, 2000
John Link, County Manager
Orange County
P.O. Box 8181
klillsl~orougkr, NC 27278
Dear Mr. Link:
I understand that the County Commissioners are scheduled to consider our request £ar plarmin~;
funds for the Southern Community Park project. X hope the following information will be useful
in your discussions.
Sometime in early 2001, we would like to begin work on a conceptual plan for the Southern.
Community Park site. The conceptual planning process is our way of exploring the potential of
the property and providing, to our elected officials, options fox development. 1'hesc plans
usually include a site analysis, development optaions, cost estimates, and recommendations that
are used by the Council prior to their taking any formal action related to development of a park
site. It is at this stage that the public is very involved in the planning process. We solicit ideas
and camrnents from citizens at large, neighbors, and interest groups-
We estimate that a conceptual plan far this site would cost approximately $40,000 - 50,000,
Based on the costs of developing Homestead Fark, rve estimate that Southern Community Park
would cost approximately $5 million to build, excluding the cost of arty buildings. The County
has $895,000 remaining of the $1 million in 1997 Parks bond that was earmarked for the
Southern Commtmuty Park. If the Commissioners authorize the expenditure of funds for
development of a conceptual plan, we estimate that about $845,000 would remain. We typically
reserve about 104/0 of each budget for architects fees, permits, and other necessary miscellaneous
costs and another 10% for project contingency. This would leave about $675,000 for
construction of a Phase I project on the site. We would reconvnend that one product of the
conceptual plan be options for the first phase of developmenrt.
30b N. Columbia Street, Chapel Hill, NC 27516 (919) 968-2700
__ ___~r,_~_ _:..L......,_~.m ....,.e F.4X /9191967106 GTE Eschax~e (919) 682-8636
6
john Link
Page 2
7
Unfortunately, the Town currently has no fux~.ds that can be allocated to this pmject. Over the
past four years, we have constructed a major new park„ a new gymnasiwn, arld a major
greenway. We have expended over $6 million for these projects and continue to face additional
costs for, projects that are in the planning process. Comrx~itmeats for these other projects, which
potentially benefit all County citizezas, have taken away our ability to contribute more than staff
time for the Southern Community Pazk. While this situation could change, i da not foresee ar~y
funds becoming available in the immediate future.
I hope that this information is useful. Lf you require additional information please da not hesitate
to contact me.
Sincerely,
W. Calvin Horton
Town Manager