SUBJECT: Hi h School Financin Plan and Resolution -Oran a Count Schools
DEPARTMENT: Finance PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Proposed Timetable for Public Offering
Resolution Authorizing Staff to Proceed
Public Hearing Notice
5/30/00 Memo from OCS Superintendent
INFORMATION CONTACT:
Ken Chavious, ext 2453
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To consider a plan and process far financing a new high school in the Orange
County School District and adoption of resolution authorizing staff to proceed.
BACKGROUND: Current Capital Plans include the construction of a new faigh school in the
Orange County School District at an estimated cost of $25 million. The Bond Referendum
approved by the voters in November 1997 included $12.5 million in bond funds for this project. .
During the bond referendum planning process, the Orange County School Board committed to
funding the remainder of the project from their pay-as-you-go funds in the form of an installment
purchase financing. Before it would approve the inclusion of the high school project in the bond
package, the North Carolina Local Government Commission (LGC) required a letter from the
County Manager and School Superintendent reinforcing the plans to have all other financing in
place prior to issuing the bonds. The High School Project is underway and securing financing
approval from the LGC far the non-bond portion of the project is now necessary. The amount
requested for financing by the School Board is $13.5 million, which exceeds the original amount
by $1 million.
The County Manager received a memorandum from the Orange Gounty School Superintendent
on May 30, 2000, providing information on the high school project. The memorandum is
attached to this abstract. The Orange County Board of Education took official action on May
29, 2000 that increased the proposed funding for the high school from $25 million to $27.9
million. Sources for the additional funds proposed are outlined in the memorandum and include
adding $1 million to the amount to be provided by installment purchase . The Superintendent
will be available at this June 6 meeting to discuss the proposal in more detail, if the Board so
desires.
Counsel and is attached. The County's recent $40 million bond sale and the proposed amount
of the high school financing places the County above the $10 million threshold for "bank
qualification". This means that a private placement financing would have significantly higher
interest rates than the County normally receives on "bank qualified" installment purchases. In
addition, rising interest rates make taxable and other non-bank qualified financings less
attractive. The LGC has recommended that County staff pursue a public offering in the form of
Certificates of Participation (COPs). While this type of financing is more complicated and time
consuming, the interest rates are lower and the overall costs to the County would be
significantly less. The timetable mentioned above is for the issuance of COPS and Bab Jessup,
the County's Bond Counsel, will be on hand to discuss in detail the process. Similar to private
placement financing, the issuance of COPs also requires a public hearing. The proposed
timetable has established June 29, 2000 as the date for that public hearing.
FINANCIAL IMPACT: There is no impact resulting from actions taken by the Board at this
meeting. However, if the Board approves an underwriting proposal and installment purchase
contract, semi annual debt payments will be required. Funding for annual debt service will be
provided by Orange County Schools out of their pay-as-you-go allocations in the ten year
Capital Investments Plan.
RECOMMENDATION{S): The Manager recommends that the Board authorize staff to proceed
with the financing by adoption of the Resolution; establish the public hearing date for June 29,
2000; and instruct the Clerk to publish the hearing notice by June 16, 2000.
3
Orange County, North Carolina
Proposed Financing for New Orange County High School
Proposed_Timetable for a„Public Offering
ent
1. Preliminary conference between County
and LGC staff to discuss general terms
of issue and financing alternatives
2. County Board makes preliminary
determination to proceed with f nancing
and authorizes public hearing for a
particular amount of financing and a
particular hearing date
3. County sends out RFPs for investment
bankers
4. Underwriting proposals due back to
County; County staff makes informal
selection of underwriter
5. Publish notice of public hearing
Time
As soon as possible
BOCC meeting of 6/6
Promptly after 6/6 BOCC meeting
By 6/16
By 6/16 for hearing on 6/29
6. County School Board adopts resolution 6/19 school board meeting (prior to
requesting financing for project and County's public hearing)
approving, in principle, property transfer
to County
7. County Board holds public hearing;
adapts resolution making "findings"
required by LGC guidelines, formally
selecting underwriter and authorizing
staff to proceed with financing process
8. County completes and files
LGC application
At 6/29 BOCC meeting
Promptly after 6/29 BOCC meeting
4
9. Parties work on financing documents, Between 6/29 preliminary Board
usually including a working group approval and LGC approval date
meeting at LGC for review of financing
plan and draft Official Statement
10. County provides for creating nonprofit
f nancing corporation by selecting board
members and providing for preparation
of necessary paperwork (including
articles of incorporation and bylaws) and
an organizational meeting of the
nonprofit's board
Prior to LGC approval date is
preferred; certainly must be done
prior to distribution of official
statement
11. LGC approves financing
12. School Board adopts resolution
providing final approval of property
transfer and financing documents that
affect School Board
LGC meeting in August (probably
August 1)
First August school board meeting
13. School Board conveys property to Any time after preceding step; must
County be done prior to or coincident with
closing on financing
14. Nonprofit board adopts resolution
providing final approval of financing
documents that affect nonprofit
Between LGC approval and mailing
official statement; generally preferred
if prior to final BOCC action (maybe
combined with organization meeting
referenced in step 10)
15. County and underwriter put OS in final
form
16. County Board adopts final resolution to
approve substantially final documents.
and financing terms
Between LGC approval and final
BOCC action
$/15 BOCC meeting (as soon as
convenient after LGC approval and
construction bids are in hand, and
documents have been substantially
agreed upon by County and
underwriter)
5
17. County and underwriter mail. official
statement to prospective investors
Promptly after final
County Board action
1$. Offering/sale period
19. School Board takes construction
bids on project
Usually the two-week period after
mailing the official statement
Prior to COPS sale date, to insure that
amount financed is adequate
20. COPS sale date; underwriter and County 8/29 (a single day agreed to in
agree on final interest rates advance by County and underwriter,
generally about two weeks after
mailing of official statement)
21. Closing
9/12 (usually about two weeks after
sale date)
6
Resolution making certain findings of fact and authorizing staff work for a
proposed installment financing for the planned new Urange County high school
WHEREAS, Orange County has previously approved in principle a plan to finance
a portion of the construction costs far a new high school far the Orange County school
district through an installment financing contract, as authorized under Section 160A-20 of
the North Carolina General Statutes;
WHEREAS, the Board of Commissioners has been advised by the Finance
Officer, after consultation with school board representatives, that installment financing
for project construction costs will be required in an amount not to exceed $13,500,000,
and the Board has determined now to proceed with the installment financing;
WHEREAS, under the guidelines of the North Carolina Local Government
Commission (the "LGC"}, this governing body must make certain findings of fact to
support the County's application for the LGC's approval of the County's proposed
financing arrangements for the project;
NOW, THEREFORE, BE IT RESOLVED that the Board of Commissioners of
Orange County, North Carolina, makes the fallowing findings of fact:
1. The proposed project is necessary and appropriate far the County under all the
circumstances. The County accepts the determination in this regard initially made by the
Orange County School Board.
2. The proposed installment financing is preferable to a band issue far the same
purpose. The County's long-range capital improvement plan for the County schools has
contemplated an installment financing for a portion of this project's cast for same time,
and the Board has determined that. the ,capital improvement plan represents the preferred
program for combining the various types of financing available to the County in light of
the various capital needs facing the County: The Board notes that approximately one-half
of the project's cost will be paid for from proceeds of general obligation bonds approved
by the County's voters in November, 1997: The County has no ability to issue non-voted
general obligation bands for this project, and this project will produce na revenues that
could be used to support aself-liquidating financing.
3. The sums to fall due under the contract are adequate and not excessive for the
proposed purpose. The County will obtain competitive proposals for the financing now to
be approved and the County expects that ,its high credit rating will enable, it to obtain
favorable financing terms. In addition, general obligation bond proceeds will pay
approximately one-half of ,the project's construction cost, and County pay-as-you-go
capital funds will pay additional project costs.
4. The Finance Officer has confirmed to the Board at this meeting that (a) the
County's debt management procedures and policies are sound and in compliance with law
7
and (b) the County is not in default under any of its debt service obligations.
5. There will be no increases in taxes necessary to meet debt obligations under
the proposed financing arrangements. The County expects that interest rates to be payable
by the County an the proposed financing, and the expected term of the financing, will
allow the County to repay the financing within current resources.
6. The County Attorney is of the opinion that the proposed project is authorized
by law and is a purpose for which public funds of the County may be expended pursuant
to the Constitution and laws of North Carolina.
BE IT FURTHER RESOLVED that the Finance Officer and all other County
officers and employees are authorized and directed to proceed with the installment
financing contemplated by this resolution and as described to the Board, and to take all
such further action as they may consider necessary or desirable in that connection.
BE IT FURTHER RESDLVED that the Finance Officer is specifically authorized
and directed to provide for the filing of an application to the LGC .for its required
approval of the project and the proposed financing arrangements.
BE IT FURTHER RESOLVED that the Clerk to this Baard is authorized and
directed to provide far the publication of a notice of public hearing on the proposed
financing, in the farm and manner prescribed by statute, with the hearing to be held at the
Board's meeting on June 29, 2000.
BE IT FURTHER RESOLVED that this Baard's determination to proceed with
an installment financing shall be subject to the Board's further consideration in light of
any public comment received at the public hearing.
8
Notice of Public Hearing -
Financing by grange County
n C o
Take notice that the Board of Commissioners of Orange County, North Carolina,
will hall a public hearing on V4~ednesday, June 29, 2000, at 7:30 p.m. (ar as soon
thereafter as the matter may be heard). The purpose of the hearing will be to take public
comment concerning a proposal far the County to finance. an amount not to exceed
$ l 4,000,000 far the construction of a new high school for the Orange County schoal
district.
The proposed financing would be secured by a lien on the new high school (and
the associated land} and the County's pmmise to repay the financing, but, there would be
na recourse against the County yr its property (other than the high schoal and the
associated .land) if there were a default on the financing. The County's entering into the
financing is subject to obtaining approval from the North Carolina Local Government
Commission and final approval from the Board of Commissioners.
The hearing will be held in the in the meeting room of the County's Southern
Human Services Center, 2501 Homestead Road, Chapel Hill, North Carolina,
All interested persons will be heard. The County's plans are subject to change
based on the comments received at the public hearing and the Board's subsequent
discussion and consideration.
Persons wishing to make written comments in advance of the hearing or wishing
more information concerning the subject of the hearing may contact Kenneth T.
Chavivus, Orange County Finance Officer; 208 South Cameron St., Hillsborough, NG
27278 (telephone 732-8181).
®rattge wurttp ~aar~ of ~D-utatiart
. RANDY BRIDGES, SUPERINTENDENT 9
~trr~~IdTDUQ~, ~~ 27278 -
BOARD MEMBERS 200 EAST KING STREET
SUSAN FIALKIOTIS, CHAIR HILLSBOROUGH
NC 27278
KEITH COOK, VICE CHAIR ,
TELEPHONE: 819-732-812fi
ROBERT H. GATEMAN FAX: 919-732-8120
RICHARD KENNEDY
DAVID KOLGINSKY
DELORE5 51MPSON
BRENDA 5TEPHEN5
MEMORANDUM
TO: John Link
FROM: Randy Bridges ~
RE: Funding for the New High School
DATE: May 30, 2000
The Orange County Board of Education rnet on May 29, 2000 to discuss the construction
costs of the new high school scheduled to open in August 2002. As you are aware, this
project received $12.5 million from the November 1997 bond passage, and by installment
purchase the Orange County Board of Education is responsible for matching that amount.
We were very concerned in 1997 as to whether $25 million would be enough to construct
this school. As we are now well into the process, our concerns were valid.
The Orange County Board of Education unanimously approved requesting from the
County Commissioners approval to increase the $12.5 million dollazs to $13.5 million to
complete this project. The projected cost of the high school at this time is $27,992,650.
Listed below is how we intend to capture the additional funding:
$1,000,000 Additional Irstallmer.± Purchase
197,650 . Funding from the sale of timber from the site
250,000 CIP Technology
245,000 Building Deletions
1,300,000 Pathways Elementary Savings
$2,992,650 Total
T am listing below selected items we have encountered since the project began which
have increased the overall cost of the school:
10
John Link -2- May 30, 2000
• The original budget was based on 199b prices. Assuming a very conservative
inflation factor of 3%, the budget based on 2000 costs would be $28,137,720. Based
on 5%, the budget would be $30,387,656.
• The Board of Education originally proposed that the size of the high school would be
based on 1000 students and a core capacity of 1200 students. Based on the
recommendations of the Construction Standards Committee, the core capacity was
changed from 1200 to 1500 students thaC increased the square footage by 10.64%.
The Construction Standards Committee recommended a 1997 budget of $29,920,112
fora 1000 student high school.
• The original budget did not anticipate lighting the baseball field, softball field, tennis
courts, or practice fields----the approximate cost $310,000.
• The original budget did not include the cost of water and sewer----estimated cost
approximately $850,000.
• The original cost did not include the recommendation by the North Carolina
Department of Transportation for the widening of Orange Grove Road and Grady
Brown Road----estimated cost approximately $250,000.
• The original cast did not anticipate a thermal ice storage system---estimated cost
approximately $150,000.
If you have questions, please feel free to call. We look forward to meeting with you and
the Commissioners on June 6`h to discuss this request.
/ha
cc: Orange County Board of Education