HomeMy WebLinkAboutAgenda - 05-16-2000-10rTriangle Transit Authority
Status Report
1997 Phase I Operating Plan
• 16 stations along 34.7 miles of dedicated track with
passing sidings, within existing rail ROW
• Use CSX track from Raleigh to Cary
• Use CSX old track bed and bridges in North Raleigh
Corridor
• 15 Foot Railroad Track Centers
• 16 bridges, including 3 flyovers of existing track
• 54 grade crossings improvements
{
CSX Corridor
__ _ ~~~:.
1997 Phase I
Reeional Rail Capital Estimates
Design
Railroad RG`]V
Station R O W
Bridges & Grading
Track and Signals
Stations and Parking
Maintenance Facility
Rail Vehicles
Project M anagem ent
Additional Contingency
Total
$11,000,000
$10,000,000
$ 4,000,000
$42,000,000
$65,000,000
$19,000,000
$12,000,000
$49,000,000
$16,000,000
$22,000,000
$250,000,000
~ 997 dollars
Project Status
. Included in President's FY 2000 Budget
• Not Recommended in FY 2001 Budget
• FRA Safety Jurisdiction Uncertain
• High Speed Rail Design Conflicts
. NCRR and CSX Right-of-Way Agreements
• Duke Hospital Station Controversy
• Project Cost Estimate Increases
• PE/EIS 12 to 24 Months Delayed
• May. Lose Federal Earmarks due to delays
Southeast High Speed Rail
• During late 1999, the NCDOT Rail Division initiated an '
environmental study in both North Carolina and Virginia for the
Southeast High-Speed Corridor from Washington to Charlotte.
• The FRA has initiated a corridor master plan study from Petersburg
to Charlotte. Study results are expected mid to late 2000.
Improved Intercity Passenger Service
• Considering comments from Railroads, NCDOT and Communities
TTA drafted track plans in late 1998
• In response to TTA's track plans, NCDOT Rail Division initiated
drafting of their own plans for -the TTA project area
• NCDOT Plans plans were delivered in October 1999
. Plans include improving curves and the addition of one new
freightlintercity passenger track in order to increase speeds up to 90
mph within the corridor
• Plans assume the reconnection of the CSX S-line in Virginia to
allow use of the CSX corridor
• Conflicts with TTA's plans
Norfolk Southern Requirements
• 25' separation between TTA and NS tracks
• Avoid relocation of existing freight track, including
using reduced track centers (to 15')
• Protect current and potential customer's industrial
sidings
• Demonstrate that space is left available for one
additional track
CSX Requirements
• 25' separation is an absolute requirement irregardless of
community, environment or cost impacts - in no case
shall this be compromised
• Grade separation of all pedestrian crossings near
proposed stations
• Grade separation of New Hope Church, Millbrook and
Durant
• Grade separation of Public Service Gas company siding
• Use of the NCDOT Downtown Raleigh track alignment
TTA / NCDOT Approach
TTA
NCDOT
• Space for new freight 1 inter-
city passenger track
• Primarily 25ft track centers
• Minimum cost and impacts
• Minimum disruption of
existing tracks
• Passenger train speeds to 65
mph
• Relocates 3.9 miles of
existing tracks
• Space for new freight 1 inter-
citypassenger track
• 2 5 ft track centers
• Least cost for new high speed
and freight tracks
• Fix railroad dispatching and
control problems
• Passenger train speeds up to
90 mph
• Ultimately relocates 21.75
miles of existing tracks
CSX Corridor
FY 2000 Federal Transit Program
Planning and Research
Urban 1 Rural Formula
~6'~~Rail Modernization
iN ew Starts
/Bus
Job Access
Total FY 2000
$65 million
$3,098 million
$973 million
$973- million
$537 million
$75 million
~ 5,6 S 9 m illio n
New Start Process
• Long Range Plan
. Major Investment Study
• Preliminary Engineering and Environme
• FTA Project Gversight Initiated
~~ Project Management Oversight
» Financial Management Oversight
» Financial Capacity Review
• Final Design
. Full Funding Grant Agreement
. ~ onstructi on
• Start Up
ntal Impact Statement
New Starts Report
. Annual Report to Congress Accompanying
President's Budget Recommendations
• Each Project Evaluated and Rated
» Mobility Benefits -Travel Time Savings
» Environmental Benefits -Air Quality and Energy
» Operating Efficiencies -Operating Cost per Passenger Mile
» Cost Effectiveness -Incremental Cost per Incremental Passenger
» Land Use -Transit Supportive Land Use
}> Local Financial Commitment - °/o LocallState
» Stability & Reliability of Capital Financing
» Stability & Reliability of Operating Financing
FY 2001 New Starts Report
Phase I Regional Rail -Durham to North Raleigh
Factor
Mobility Improvements
Environmental Benefits
Operating Efficiencies
Cost Effectiveness
Land Use
Local Financial Commitment
Capital Financing Plan
operating Financing Plan
Ratin
Not Rated
Medium
High
Medium
Medium
61%
Low-Medium
Low-Medium
FFGA
• What is a Full Funding Grant Agreement?
» Establishes project description and maximum federal participation
» Permits Grantee to construct project and to finance construction with grant anticipation bonds
• Requirements for FFGA
0 Record of Decision PROD} issued
0 Completion of Preliminary Engineering
0 Control of Right of Way
0 FTA approved Project Management Plan
0 Rail Fleet Management Plan
0 Consistent with FRAIFTA Joint Policy on Shared Use of Railroads and Transit
Systems
0 Compliance with Americans with Disabilities Act
0 "Recommended" Rating on New Start Criteria required
0 Local Financial Commitment assessment
Phase I Regional Rail
• Uses existing North Carolina Railroad and
CSX railroad right-of-way
• Separate tracks for Regional Rail
• 35 miles, 16 stations
• 13 to 26 self-propelled two car diesel
trainsets
• Service frequency every 7.5 - 15 minutes;
Off-peak every 15 - 30 minutes
Passenger Forecasts
Daily Rail Riders by Alternative
Alternative Total MOS N Ralei h Duke
2005 151VIin Headway 14,500 10,500 2,500 1,500
2 0 0 5 7.5 Min Headway 20,000 15, 000 3,000 2,000
2 0 2 5 151VIi n Headway 18,000 13,000 3,000 2,000
2025 7.51VIin Headway 25,500 19,000 4,000 2,500
Total Construction -Costs by Alternative
Total Minimum
Phase I Operable North
Alternative Cost Segment Raleigh Duke
A
(Baseline) $408 M $306 M $84 M $18 M
B1
(One-Track) $467 M $350 M $99 M $18 M
B2
(Two-track) $597 M $451 M $127 M $19 M
C
(NCDOT Rail) $619 M $441 M $159 M $19 M
Phase I
Financing Plan
Inflated Dollars Share
Federal
New Start $385 m 50%
State Cash
ROW & $193 m 25%
Flexible Federal
Regional
Rental Vehicle -$193 m 25%
Tax and Debt
Comparison of New Start Projects
CitylProject Length of Track Est. Total Capital Cost Per Mile
(miles} Cost millions} millions}
Minneapolis 11:5 $548.60 $47.70
Hiawatha Corridor
Seattle Central Link 23.5 $1,500.00 $63.82
LRT
Newark Rail Link 8.8 $207.70 $23.60
Denver S.E. 19 $882.50 $46.44
Corridor LRT
Raleigh Phase 1 35 $584 - $771 $16.70 - $22.02
Re Tonal Rail
i
Major Steps in Implementing Phase I
• Completion of DEIS by TTA
• FTA Agency Review
(June 2000)
(July -Sept 2000)
• Community Involvement (August -September 2000)
. Formal Review of DEIS (October -November 2000)
• Development of FEIS (November 2000 - Apri12001)
• FTA releases FEIS and issues ROD (August 2001)
. Full Funding Grant Agreement with FTA (March 2002)
• Phase I Construction
» Minimum Operating Section (Ninth Street to Boylan Junction} Opening 2007
» North Raleigh (Boylan Junction to Spring Forest Road} Opening 2009
» Duke Extension Ninth Street to Duke Medical Center} Opening 2009
Critical Issues
• Railroad Right-of-
~ North Carolina Railroad
CSX
Way Agreements
• Railroad Engineering Issues
» Future Freight Capacity
» NCDOT Improved Passenger Services
» Fu#ure Southeast Corridor High Speed Rail
• Environmental Documentation
» Draft EIS October 2000
» FEIS June 2001
» ROD Augus# 2001
Critical Issues
• Financing Plan
30 Year Plan for TTA Bus and Rail
» TTA to Finance Rail Vehicles with COPS
» Sufficient Regional Funds for Phase I Construction and Bus and Rail
Operations
• N~D~T Financing
» NCRR Right-of--Way $30 m
» FY 2000 CMAQ $ 6 m, State Cash $1.3 m
>} FY 2001 CMAQ $ 8 m, State Cash $3.4 m
• FY 2001 North Carolina Budget Proposal to
Include State Full Funding Grant Agreement