Loading...
HomeMy WebLinkAboutAgenda - 04-04-2000-8cORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 4, 2000 SUBJECT: Bricewood Acres Subdivision - Preliminary Plan DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1) Resolution of Approval 2) Application 3) Vicinity Map 4) Agency Comments 5) Fiscal Impact Analysis 6) Draft 3 -1 -00 Planning Board Minutes 7) Preliminary Plan Action Agenda Item No. S -G PUBLIC HEARING: (Y /N) u INFORMATION CONTACT: Eddie Kirk Extension 2582 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968-4501 Durham 688 -7331 Mebane (336)227 -2031 PURPOSE: Consideration of the Preliminary Plan for Bricewood Acres Subdivision. BACKGROUND: Request - Preliminary__Plan Applicant: Joe Phelps • Subdivision follows the conventional plan. Open Space: 0 Acres; 0 %. • 15 single - family lots on 27.04 acres (including rights -of way) Average lot size — 1.63 ac. • Fourteen (14.49) acres in the critical area (U- ENO -CA): max. density = 1du /2 ac.; • Twelve (12.55) acres in the balance of the watershed: max. density = 1 du/ .92 ac. Location The property is located off the south side of Governor Scott Road east of Mill Creek Road in Cedar Grove Township. Existing and Proposed Conditions Existing: • Current zoning ,is Agricultural Residential (AR). • The property is located in the Upper Eno protected watershed. Physical Features: • There is one intermittent stream in the southwestern portion of the property. • The site is entirely wooded with mixed hardwoods and pines. Adjacent Land Use: • Properties to the south and east are wooded. • Properties to the north and west are developed in single family residential lots. z Proposed: Roads: • Access is from Gov. Scott Road (SR 1351). • Proposed public streets to be constructed to NCDOT standards. • Proposed public right -of -way connection to the southern property line. Water - Sewer: • Water will be from individual wells. • Health Department verified that each lot contains suitable soils to locate a septic system. Agency Comments: • Comments attached from NCDOT, Environmental Health, and Emergency Management. Development Process, Schedule, and Action Planning Board: • First Action: Concept Plan approved by the Planning Board October 6, 1999 with the three following conditions: 1. The Intersection and road alignment on the Preliminary Plan shall meet NCDOT standards. 2. A publicly dedicated right -of -way should be provided to the southern property line to allow for future interconnectivity of public roads (in accordance with County policy). 3. With the Preliminary Plat, submit a plat indicating areas for on -site infiltration of storm water that demonstrates compliance with Article 6.23.3a of the Orange County Zoning Ordinance. • Preliminary Plan addresses all conditions of approval of the Concept Plan. • Second Action: Planning Board unanimously recommended Preliminary Plan approval March 1, 2000. • Third Action: Board of County Commissioners to consider the Preliminary Plan Options: 1. The Board shall consider the application within a reasonable amount of time. 2. During deliberations and consideration of the application the Board may defer consideration at any point to pursue additional analysis and review. 3. If Preliminary Plan is approved by the County Commissioners the applicant shall have one (1) year to prepare and file a Final Plat or to request a one -year extension from the Planning Director. FINANCIAL IMPACT: Fiscal Impact Analysis included as an attachment. RECOMMENDATION(S): Planning Staff Approval, in accordance with the attached Resolution of Approval. Planning Board Unanimous Approval, in accordance with the attached Resolution of Approval. Administration Approval, in accordance with the attached Resolution of Approval. 3 RESOLUTION OF THE ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS Date April 4. 2000 Name of Subdivision Bricewood Acres Owner /Applicant Joe Phelps The Board of County Commissioners hereby approves Bricewood Acres subdivision preliminary plat, dated November 28, 1999, containing 15 lots, subject to the fulfillment of requirements specified herein. Dustin Drive and McCray Lane shall be irrevocably dedicated to the general public and be constructed to standards of the North Carolina Department of Transportation. The approval of this resolution authorizes and directs the Orange County Manager to accept for Orange County and on behalf of the public generally, the offer of dedication of Dustin Drive, and McCray Lane. This acceptance by Orange County of the dedication to the general public of Dustin Drive, and McCray Lane shall be without maintenance responsibility. These roads shall be maintained by the owner /applicant until such time as they are accepted for maintenance by the North Carolina Department of Transportation or some other governmental body. Before the Final Plat of Bricewood Acres Subdivision can be recorded: A. Sewage Disposal and Water Supply 1. Each residential lot shall contain an adequate area for septic disposal, and repair area, approved by the Orange County Division of Environmental Health. 2. Disclosure that the septic system location may restrict the size and location of improvements shall be included in a document describing development restrictions to be recorded concurrently with the Final Plat. The document shall also disclose that information regarding the tentative location of septic systems is available from the Orange County Health Department, Division of Environmental Health. 0 B. Roads and Access Dustin Drive and McCray Lane shall be constructed to standards of the North Carolina Department of Transportation, within a 50' right -of -way, and the construction shall be inspected and approved by NCDOT. •g A letter of credit or escrow agreement or other security shall be submitted to secure construction of Dustin Drive, and McCray Lane to the standards of the North Carolina Department of Transportation. An estimate of the construction cost must be prepared by a certified/licensed engineer or grading contractor and submitted to the Planning and Inspections Department. The financial guarantee must reflect 110% of that estimate and be issued by an accredited financial institution licensed to do business in North Carolina. The document describing development restrictions to be recorded with the Final Plat shall state that the financial guarantee will not be released until the road construction has been inspected and approved by NCDOT. 2. An erosion control plan for construction of the roads shall be submitted by the applicant to the Orange County Erosion Control Division for review and approval. 3. Approved street name signs shall be erected at the intersection of streets as required in Section IV- B- 3-c -12 of the Orange County Subdivision Regulations. Evidence shall be submitted by the applicant that the sign is in place, or a copy of the receipt for purchase of the sign shall be submitted to the Planning Department. 4. All lots shall access onto the new subdivision roads. No driveways shall be permitted within 50' of a street intersection. 5. A 50 foot public right -of -way designated as tract C shall be provided to the southern property line with 20' temporary construction easements as indicated on the Preliminary Plan. 6. All streets shall have 5 foot utility easements on each side of the right -of -way. 7. The applicant shall request the posted speed limit on Gov. Scott Road to be lowered to 45 -mph as recommended by NCDOT prior to Planning Department signatures on the final plat. C. Land Use Buffers and Landscaping 1. Landscaping shall be installed or preserved as indicated on the approved landscape plan, and must be inspected and approved by the Planning and Inspections Department. 2. Provisions for protection of existing trees as shown on the approved landscape plan shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. D. Drainage 1. Locate drainage easements as required following review and approval of the Erosion Control Plan. 2. Drainage culverts shall be sized and located as required by NCDOT and the Orange County Erosion Control Officer. 3. A stream buffer shall be provided as indicated on the preliminary plan. E. Parkland 1. Cash in the amount of $6,370.00 shall be paid to Orange County as payment in lieu of parkland dedication. F. Miscellaneous 1. The Final Plat shall contain a title block and vicinity map in accordance with Section V -D -2 and V -D -3 of the Orange County Subdivision Regulations. 2. The following easements shall be shown on the plat: a. drainage easements as required by D.1. above. 3. Minimum building setbacks shall be as indicated on the Preliminary Plan. The setback requirements shall be stated on the plat, and in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. 4. Sign easement location to be shown on final plat. Sign shall be landscaped, and if lighted, at a wattage to avoid casting light on adjacent properties. G. Certifications 1. A Certificate of Survey and Accuracy signed by a Professional Land Surveyor shall be notarized on the face of the Final Plat. 2. A Certificate of Declaration and Maintenance in the form provided in Section V -D -6 -b of the Orange County Subdivision Regulations signed by the landowner and. developer shall be on the face of the plat and included in a document describing development restrictions to be recorded concurrently with the Final Plat. 3. The North Carolina Department of Transportation shall certify that Dustin Drive and McCray Lane have been constructed to State standards or that construction, plans have been approved. 4. A Certificate of Approval signed by the Orange County Planning and Inspections Department. Signature of Applicant Clerk to the Board R I, accept the above listed conditions of subdivision approval, and acknowledge that each must be met prior to recordation of the final plat. Applicant/ Owner Date APPLICATION FOR PRELIMINARY PLAN APPROVAL-. - MAJOR SUBDIVISION s/93 ORANGE COUNTY DATE: i PLEASE TYPE OR PRINT (INK ONLY) SUBDIVISION NAME: LOCATION: OWNER /DEVELOPER: ADDRESS: ZZG S ��ri TELEPHONE NO.: , -70— -26 Z i AGENT /CONTACT: TELEPHONE NO.: A. s. SUMMARY INFORMATION: Orange County Tax Map Block Lot(s)� Township C��T� Zoning District(s): �d - v Total Number of Acres: Z . Q v Phases: Total Number of Lots: J:nj Average Lot Size: Minimum Lolt Size: Z Number/Type of Structures: (existing) _ r6.� _ (proposed) // Lineal Feet in Streets: /L 90 Acres in Open Space: Water Supply: Public Ispecify) Community Individual Wastewater Disposal: Public (specify) Community Individual School District: Fre•District: Ey'f General Land Uses in Area: A P Critical Areas: stream /draina aw. V °T. flood prone areas watershed (specify) historic sites other (explain) Is the property to be subdivided currently under 'farm use value taxation'? Yea_ No_. If 'yes", Please contact the Orange County Tax Office. Subdivision of the property may require payment of deferred taxes under 'farm use value taxation -. All plats must be submitted on sheet no smaller than one inch equals two- hundred feet 0 200') and no larger than one inch equals twenty feat (t' •-20'1 and must contain the fol)owing'infonnation: subdivision name ""`� zoning of tract and adjacent. name & address of ownerls) properties name of subdivider , / building setback lines by notation ✓ (if other than owner) than owner) name or typical lot layout e of surveyor, engineer, landscape architect or architect, location and width of existing and 0 address. registration d and seal proposed easements (drainage, a) N M o/� (�) Preliminary Plan utilities, roads. ate.) existing. proposed and adjoining �.V scale. north arrow rights-w dimensions H data Wtcludinp revision dates) and street names and state road CUw township tax. map -block -lot numbers. Lineal feet of road •' I k7 ,� Parent Parcel Identification I centerlines and approximate 0) deed book and page / of property aeraags of new street rights-of- a� to be subdivided ' boundary � , way existing and proposed utilities. CL m described yAth bearings inducing type, sizes. hydrant. vE c., ' and distances total '11 valves, manholes 0 soraags of the tract and N jy ^g proposed kerbs, ae m acreage of lots, including and excluding area within rights -of- gutters and culverts, inducing U N W i ~ I "� ` sizes and grades r : , d location elliys. n { control corner and width 6f sidewalks, bike lanes, transit systems, and bus stops (please complete reverse side) 5. Auxiliary documents, in draft form, prepared in accordance with Seetion•Vlaf -this Ordinance which assure completion and /or maintenance of improvements required by this Ordinance. Such documents may include, but not be limited to, a private road maintenance *Cra:ment, and articles of incorporation and restrictive covenants pertaining to a homeowner's association. These documents may be required as necessary as evidence that the ordinance requirements are being.met. 8. Fee - 4 00 plus $5,00 per lot 0 fee for preliminary and final plat). 7• It Ake subdivision contains 10 lots or more the following information shall be submittad with the • app�i�on: a.: Number of years to buildout. Z. b• Numlaer of houses to be built during each year to buildout. '1,6 C. Average price of houses including lots for each year to buildout. 111` 1 101000 applicant, here y certify that the foredoing application is complete and accurate. AP UCANT'S S GNA E O NER'S SIGN. DATE ft DATE FEES: Amount .`7111571d n..- v.:a !I- — /G A,- _ - _ / 0 .9 /I C' u proposed lot lines with dimensions lot & block numbers tYp�cal street cross - sections and Phasing lines intersection details including design and width "-' topography at ten foot (10) of travelway.and shoulders intervals water bodies, streams, floodway s� ^.;,:.• _ •• horizontal alignment and general curve N ✓ and flcodplains data (public roads) {"^ centerline radius on ? steam buffers location and size -of parcels all proposed streets permanent ccu dedicated for public use, features S' uch as buildings, cemeteries, E w recreational use or reserved in historic Ile landmarks ^1 a / -0 L., V common, with purpose noted impervious ad I of nn g W surface data (if located adjoining property owners. s, If 4J ar �,G ::� ^"� � in water supply watershed) vicinity map showing general subdivided, subdivision plat name, plat book &page number, W location of subdivision with streets and perimeter lot numbers, vCL to and reran identified by State road AA AA location and size of lots of •q ✓ • �,,,,� number end name landscaping and buffer restricted development potential can requirements township, and notation on plat regarding same corporate and extra• territorial planning jurisdiction lines ,. {a:.. stormwrter detention an� /or which cross the property retention sites and undisturbed areas for infiltration purposes (if located in water supply watershed) C. OTHER SUBMITTAL REQUIREMENTS 1. Twenty -five (25) coping of the preliminary plat. 2. One full size copy of an Orange County Tax pencil). map (with tax parcels involved clearly marked in 3. Where municipal or OWASA sewer is not available, a co the Preliminary Plat indicating Health Department soils analysis a copy Y /denial pproval t for each lot shown thereon, 4• Where a private road is proposed a written statement by the applicant or his/her authorized representative which sets forth the justification for a private road (see Section Orange County Subdivision Regulations). IV- 8-3-d -1 of the 5. Auxiliary documents, in draft form, prepared in accordance with Seetion•Vlaf -this Ordinance which assure completion and /or maintenance of improvements required by this Ordinance. Such documents may include, but not be limited to, a private road maintenance *Cra:ment, and articles of incorporation and restrictive covenants pertaining to a homeowner's association. These documents may be required as necessary as evidence that the ordinance requirements are being.met. 8. Fee - 4 00 plus $5,00 per lot 0 fee for preliminary and final plat). 7• It Ake subdivision contains 10 lots or more the following information shall be submittad with the • app�i�on: a.: Number of years to buildout. Z. b• Numlaer of houses to be built during each year to buildout. '1,6 C. Average price of houses including lots for each year to buildout. 111` 1 101000 applicant, here y certify that the foredoing application is complete and accurate. AP UCANT'S S GNA E O NER'S SIGN. DATE ft DATE FEES: Amount .`7111571d n..- v.:a !I- — /G A,- _ - _ / 0 .9 /I C' 9 �e�oeee� Lu v u 4V 9 �I {INi s �s 1 = O« 71 all ll! � mooxo�rs� � X04 add •' � � �fh 84 6 w Map- EA V411�v A2 w lQ O� 4 g Ila Jo sP 1�► - - - _ Po op i ' 1 I r. 44 AN TUM LN! - V NEYARD DR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVERNOR 16 September 1999 ORANGE COUNTY Robert Davis Orange County Planning Department 306F Revere Road Hillsborough, NC 27278 919 732 8181 Ext. 2595 Subject: Proposed Bricewood Subdivision on SR 1351 (Governor Scott Road) Dear Mr. Davis: David McCoy SB=WAn Per your request, a review of the- above mentioned subject has been completed by the NCDOT Graham District. Attached for your files are a copy of the revised plans and a list of our comments and recommendations for'the subject. We respectfully request that you provide a copy of this letter and any necessary referenced documents to the owner /developer so they may be fully informed. If you have any questions or comments, please contact Mr. Michael Venable, Assistant District Engineer, at (336) 570 -6833. Attachment TJD/MSV /msv Yours very truly, Tommy . J Dyer, E� . P. DISTRICT ENGINEER P. O. Boa 766 Graham NC 27253-0766 11 12 NCDOT REVIEW NOTES FOR DHR Bricewood Subdivision on SR 13S1 (Governor Scott Road)) 16 September 1999 COMN ENTS & REQUIREMENTS: 1. Prior to construction of any new access or alteration of any existing access within the right of way, the developer /owner is required to secure a permit with this office. It is the responsibility of the owner /developer to obtain a permit. , . 2. The owner /developer should dedicate 10' x 70' Sight Triangles at each proposed intersection. Please refer to the attached figure regarding the minimum design. Please note that the subject site has a limited 400' to 420' of sight distance. Normally, the minimal sight distance for 55 -mph speed zone is 550'; therefore, we recommend the developer provide additional safety improvements and/or the posted speed limit is lowered to 45 -mph. 3. We are concerned with the existing lake and how the owner is proposing to develop the roadway and the lot. No part of the lake or dam is permitted within the right of way. 4. The proposed 50' right of way is an acceptable design; however, it has been our experience that the owner /developer will have trouble maintaining the typical ditch section in the small right of ways. In addition, we have received complaints from the local utility companies about the limited workspace. Therefore, we recommend the owner /developer provide a 60' right of way or some type of an additional easement along the roadway. 5. Prior to any construction, the owner.'developer will need to submit their final plans for review. The. final plans should include the horizontal and vertical alignment information, a typical section, drainage facilities, vicinity map, and the number of lots with the proposed driveway location. 6. The owner /developer should be aware of General Statute 136 - 102.2, in which new roads are not eligible for the State Maintenance system unless certain requirements are met. An explanation of these requirements can be found on pages 13,14 and 15 of the current (January 1999) NCDOT Subdivision Roads Manual Particular attention should be placed on items 2 (petition for addition), 5 and 7 (occupied housing requirement), 11, 12, and 13. 13 - - t r - - -• r I Y ��►j����►i�• +Ei► :fir• - .� ������� ;�e��� ��esor�i r���oi . • w 50' RW e - rL 20.00' FIRST 100' STATION - PAST ROAD TAPER = R/W WIDENING ' CL" ! !•- 10' x 70' ' 10' x 70' SIGHT TRIANGLE _ 1 �— S(GHT TRIANGLE EDGE OF PAVEMENT o EDGE OF PAVEMENT EDGE OF PAVEMENT - E)pSTING ROAD � IrL '- EDGE OF PAVEMENT - R/W TYPICAL - ROAD CONNECTION STOP CONDITION FIG D7D1 7 -94 1• v s 15 Grange Tountli �Ieaft4 Repartumnt 4 Timothy I. lw& Choir Rosemary L. Summers, MPH, DrPH gr� Cm„,�Gazn=, V,= Mai o ` Orange Cou*uy Board of Health Health D' t Orange County Board of Health. 306-C Revere Road, P.O. Box 8181 HiUsborough, NC 27278 w v .o_orunee.nc -e,nc.us/-cmnae/envh1 or MNA 4�..... Environmental Health Division Ron Holdway, Division Director Phony (919) 73Tr8181, x2360 FAM (919)644- Betty Borland Barbara Patterson Chapel Hill Durham Mebao Administrative Assistant Office Assistant (919) 9684501 (919) 68&7331 (919) 22' BRICEWOOD ACRES TMBL: 2.40..15 MAP DATED NOVEMBER 28, 1999 PROPOSED LOT AVAILABLE SYSTEM TYPES. PUMP REQ? COMMEN CONVENTIONAL INNOVATIVE ALTERNATIVE 1 x x x NO 2 X X X NO 3 X X X NO 4 X X x NO 5 x X, X NO 6 X X x NO 7 X X X YES 8 X X X NO 9 X x X YES 10 X X X YES 11 x X X NO 12 x x X NO 13 X X X YES 14 X X X NO 15 X X x NO !�1 9 -1 -1 Communications 24 Hour Warning point 919 -732 -8161 •933 -2600 24 -Hour Fax Machine 919 -967 -9026 Ir Orange County Emergency Management P.O. Box 8181 Hillsborough North Carolina 27278 see of e >r � January 20, 2000 TO: Eddie Kirk, Planning Department, FROM: Mike Tapp, Deputy Director/Fire Marshal /6t;r' RE: Bricewood Acres Subdivision Emergency Medical Services 1~ire Marshal Disaster Response Hazardous Materials 919 -644- 3030. 968 -2050 Administrative Fax Machine 919- 968 -4066 We have reviewed the Bricewood Acres Subdivision and find the plan acceptable. As with all new requested subdivisions, additional stating for 9 -1 -1, EMS and Fire will have to be taken into consideration. Please send us a final plat, if approved, for distribution Please feel free to contact us if you need additional information. 17 FISCAL IMPACT ANALYSIS FOR WINDFALL RESIDENTIAL SERVICE STANDARD APPROACH Prepared by The Orange County Planning Department February, 2000 PROJECT DESCRIPTION Bricewood Acres subdivision contains 15 buildable lots and is located in Cedar Grove Township. The lots are accessed by new public roads which will intersect with Gov. Scott Road. The current zoning is AR - Agricultural Residential. The average lot size is approximately 1.63 acres. Lots will be served by wells and individual septic systems. Project build -out is estimated at two years. Housing units will be constructed, beginning in 2000, with .completion of the project scheduled for 2001. Units will consist of detached single - family homes, and the applicant estimates the average sales price to be $120,000, including the lot. METHODOLOGY Fiscal impact analysis is a projection of the direct, current, public costs and revenues associated with residential and non residential growth in the jurisdiction in which the growth is taking place. Fiscal impact analysis considers only direct impact in that it projects only the primary costs that will be incurred and the immediate revenues that will be generated. It calculates the financial effect of a planned development -or new subdivision by considering the current costs and revenues such a development would generate if it were completed and occupied today. Fiscal impact analysis does not consider the private costs of public action. It is concerned only with public (governmental) costs and revenues. The method used in preparing the fiscal impact analysis is the Service Standard Approach. While only gross expenditures by service category are derived from the Per Capita Method, the Service Standard method determines the total number of additional employees by service function that will be required as a result of growth. This method employs average county government costs per person, average school costs per pupil, an employee to population ratio, and average operating expenses per employee for each service category and school district. The number of new employees are projected and multiplied times the average operating expenses (includes personnel, operating and capital costs) per employee. These average costs are then weighed against per capita and per pupil revenues to project the total net fiscal impact of the development. 18 TABLE OF CONTENTS SERVICE STANDARD APPROACH PROJECT FISCAL IMPACT ANALYSIS Section 1 - Project Data Project Name, Township, School District Beginning Year, Ending Year, Inflation Characteristics of Households Construction Schedule/Cost Data Section 2 - Local Government and School District Data Budget Year Per Capita Revenues Per Capita Expenditures Per Student Expenditures School District Per Employee Expenditures Employees Per 1000 Population County Per Employee Expenditure Other Data Other Model Constants School District Data Section 3 - Demographic Projections Based On Project Data Total Housing Total Population School Children Additional County Employees Total School District Additional Employees Section 4 - Projected Net Fiscal Impact on County Tax Base Revenues Expenditures Net Fiscal Impact Section 5 - Projected Net Fiscal Impact on School District Revenues ..Expenditures. Net Fiscal Impact Section 6 - Summary of Projected Impacts Additional Housing Additional Population Additional School Children Tax Base County Govemment.Balance School District Balance Total Net Fiscal Impact Section 7 - Summary of Projected Public School Capacity Impacts 19 EXPLANATION OF TERMS AND DATA SOURCES SECTION 1 - PROJECT DATA Project data includes information about the specific development project. Much, if not all, of the information is supplied by the applicant. Data inputs include: Project Name: Name of the project. Township: Township in which the project is located. School District: School district in which the project is located. Beginning Year: The first year of the project in which dwelling units are completed and occupied. Ending Year: The last year in which dwelling units are completed and occupied. The template is set to calculate fiscal impacts for a ten -year period. Inflation Rate: Unless an inflation rate is entered, the template will calculate fiscal impacts based on constant dollars. Since the inflation rate changes frequently, the Finance Department must be contacted for the most recent figure. Persons/Household: The estimated average number of personsthousehold (dwelling unit) . based on 1990 Census data and studies of the number of students per household for the school district in which the project is located. The most recent studies include A Study of Housing Characteristics and Student Generation Rates for Orange County, N.C. (1995) and Technical Report: Calculation of Propordonate Share Impact Fees for Financing Public School Capital Needs, Orange County, N.C. (1996). Children/Household: The estimated average number of school age children/household (dwelling unit) based on studies of the number of students per household for the school district in which the project is located. The most recent study is A Study of Housing Characteristics and Student Generation Rates for Orange County, N. C. (1995). % Non - Elderly: N.C. General Statutes permit an $11,000 exemption to the elderly and disabled who meet certain income criteria. In the event that elderly units are part of the project, the percentage of eligible non -elderly units is entered. The tax base will automatically be adjusted to reflect the exemption. Number of Homes: The number of dwelling units to be constructed in the project in each year. 21 Average Sales Price: The average sales price of all dwelling units based on the number and sales price of dwelling unit types to be constructed in each year. SECTION 2 - LOCAL GOVERNMENT AND SCHOOL DISTRICT DATA Local government data includes information regarding expenditures required to provide County services and revenues received based on the approved Orange County budget for the fiscal year in which the project is considered for approval. All information derived from the approved budget remains constant throughout a fiscal year (July -June) and is changed only with the approval of a new budget. Local government revenue and expenditure information is compiled on a per capita (per person) basis. Per capita figures are derived by dividing the total expenditures for a particular service function or revenue source by the estimated population of Orange County for the year in which the project is considered for approval. Populations estimates are prepared by the Planning Department. Data inputs include the following: Budget Year: The current fiscal year, i.e., 1996 -97. Per Capita Revenues: The sources of revenue by major category are as follows: Taxes - Other Than Property: Revenues from taxes other than property taxes include those from sales and use taxes, franchise taxes, and animal taxes. Intergovernmental Aid: Revenues from this source, in the form of categorical aid or shared -tax revenues, are provided through State and federal assistance programs. Service Charges: Service (or user) charges support numerous functions and are charged to those who voluntarily receive governmental services or use governmental facilities. Miscellaneous: Miscellaneous revenues include interest earnings on investments, proceeds from license and permit fees, and all other revenues. Per Capita Expenditures: Expenditures by major category are as follows: General Government: Services related to the legislative, administrative, financial, and legal functions of government. , Public Safety: Law enforcement services and emergency medical services. Public Works: Efforts related to the maintenance of County -owned property and the provision of sanitation (solid waste disposal) services. 21 Human Services: Departments responsible for the provision of health, social, and recreation - related services. Education: Orange County supports two school units, the Orange County school system and the Chapel Hill - Carrboro school system. This category includes appropriations made to the designated school system for Recurring Capital items. Recurring Capital funds are used for general maintenance, purchase of new equipment/furnishings and vehicle maintenance. Non - Departmental: Contributions to agencies providing cultural and social services outside the formal structure of county government. Other expenditures include equipment replacement and contingency funds. Although there are no employees generated by this category, it has been included as an operating expenditure. It will be included in Section 4, 'Total Annual County Expenditure." These expenditures will be calculated on a per capita basis as opposed to a per employee basis. Per.Student Expenditures: Information regarding expenditures required to provide educational services and revenues received are based on the approved school system budgets for the fiscal year in which the project is considered for approval. AII: information derived from the approved budgets remains constant throughout a fiscal year (July -June) and is changed only with the approval of new budgets. Expenditure information is compiled on a per student basis for County Government Current Expense, School District and State appropriations. County Government Current Expense funds are used for general operation purposes including Instruction and Support Services. Federal revenues and expenditures and other local revenues such as Fund Balance have not been included since they are not directly growth related. Per student figures are derived by dividing the total appropriation for educational purposes from a particular source by the estimated number of students to be enrolled in the applicable school system for the year in which the project is considered for approval. Student enrollments are obtained from the approved school system budgets. County Government: Expenditures in this category are based on appropriations to the school systems by Orange County for Current Expense. The minimum level of per student appropriation is determined by the State Board of Education. School District: Expenditures in this category are unique to the Chapel Hill - Carrboro school system and are based on the level of expenditures possible through assessment of a supplementary school tax. State: Expenditures in this category are based on appropriations from the State Board of Education. School District Per Employee Expenditure: Expenditures per employee based on County, School- District and State appropriations, and the total number of school district employees. Employees Per 1000 Population: The number of employees in a particular service category per 1000 population. County Per Employee Expenditure: The average operating and capital expenses per employee in a particular service category. Total expenses in each category includes personnel, operating and capital costs. 2, Other Data: County Government Tax Rate: The County tax rate per $100 of assessed valuation. Since the per capita method focuses only on operating expenditures, the tax rate is reduced by an amount equal to the debt service payments from property taxes for capital projects. School District Tax Rate: The supplementary tax assessed on behalf of the Chapel Hill- Carrboro school system. Assessment Ratio: The ratio of market (sales) value to assessed value based on information supplied by the Tax Office. The assessment ratio is used to convert market value to assessed value for the purpose of computing the tax base. Other Model Constants Elderly Exemption: For projects developed partially or exclusively for elderly (65 and older) or disabled individuals whose annual income does not exceed $12,000, afv $11,000 tax exemption is used in projecting the tax base. School District Employees Per Student: The number of employees per student in a specific school district. SECTION 3 - DEMOGRAPHIC PROJECTIONS BASED ON PROJECT DATA Demographic projections provide information about the number of new residents and school children anticipated in Orange County resulting from project development. Projections also provide the number of additional employees required per service function and school district as a result of the new development. Total Housing Units: The cumulative total of new housing units added each year by project development. Total Population: The total population added each year by a project derived by multiplying the: number of homes to be constructed by the dumber of persons per household (see._Section .1). School Population: The total number of school children added each year by a project derived by multiplying the number of homes constructed by the number of children per household (see Section 1). Additional County Employees: The number of additional employees required per service category based on project. development. Total: Total of all additional county employees required based on project development. 4," School District Additional Employees: The number of additional employees required per school district based on the project development. SECTION 4 - PROJECTED NET FISCAL IMPACT ON COUNTY Tax Base: The tax base represents the increase in assessed property value expected each year resulting from project development. The values shown are in $1,000's and are derived from a formula which includes the number and sales price of homes, and the assessment ratio. Where applicable, the percentage of non - elderly units and elderly exemption are also used. Revenues: All revenues are derived from a formula which multiplies the per capita revenues (Section 2) times the projected population (Section 3). The exception to this is the property tax which multiplies the tax base times the county government tax rate. Expenditures: All expenditures are derived from a formula which multiplies the per employee expenditure (Section 2) times the number of additional employees (Section 3). .. Net Fiscal Impact: The net balance is the difference between projected expenditures and projected revenues. A negative net balance indicates that it costs Orange County more to provide services to a project than it receives in revenues. A positive net balance indicates that more revenues are received than it costs to serve a project. Positive net balances in one project may thus be used to offset negative balances in another. SECTION 5 - PROJECTED NET FISCAL IMPACT ON SCHOOL DISTRICT Revenues: The County contribution is derived by transferring education expenditures by County government (Section 4). Revenues derived from the school district tax are derived by multiplying the school district tax times the tax base. State revenues are derived by multiplying the per student expenditure figure times the total projected number of school children (Section 3). Expenditures: Expenditures are derived from a formula which multiplies each per student expenditure (Section 2) times the total projected number of school children (Section 3) and adding the results. Net Fiscal Impact: The net balance is the difference between projected expenditures and projected revenues. A negative net balance indicates that it costs the school system more to provide educational services for children in a project than it receives in revenues. A positive net balance indicates that more revenues are received than it costs to serve a project. Positive net balances in one project may thus be used to offset negative balances in another. SECTION 6 - SUMMARY OF PROJECTED IMPACTS 24 25 SECTION 7 - SUMMARY OF PROJECTED PUBLIC SCHOOL CAPACITY IMPACTS Ending Year Children/House: HOME SALES DATA: ENTER "'I" BESIDE APPLICABLE SCHOOL DISTRICT BELOW. Number of Sales Price 26 20 0. vim• •Y�ti v1y 1 \1y ■ rI11f1• -1 14 11..1\ 1 11V % I vV IWI. yV1 Iw/w!b Ld1V 11 \IV 1 11\ WWI 11%0" r1\w/YL-V 1 IV I w/ W" LOCATED TO GENERATE STUDENT DISTRIBUTION BY SCHOOL TYPE. School District: School Attendance: Middle School 1' cCrTinu'3 -1 nr_er rrnV=01d = ?JT AMn Cr unni nuerrai[`_T neTe r COUNTY POPULATION: 2 1058' SCHOOL DISTRICT EMPLOYMENT: COUNTY PER CAPITA REVENUES ($1: Miscellaneous COUNTY PER CAPITA EXPENDITURES Public Safety Human Services SCHOOL DISTRICT PER STUDENT EXPENDITURES ($): School District scnooi District POSITIONS PER STUDENT REVENUES PER CAPITA 9007481 85.0 1738939 16.4 EXPENDITURE PER CAPITA 7274334 68.6 17112641 161.6 3163481 29.8 EXPENDITURE PER EMPLOYE 7274334 50887.21 17112641 64803.4 EXPENDITURE PER STUDENT 0 O.f 0 O.L TAX DATA: ENTER APPLICABLE ASSESSMENT RATIO AND ELDERLY EXEMPTION: School District Tax Rate ($) 0.0000 Per $100 Assessed Valuation Elderly Exemption 0 $11,000 Where Applicable CFf_TIAM 4 - nOMAf'90ADUld% nn^ le^" %L10 15 AC•0n nIkl nine% er.%� ...�. SECTION A - PROJECTED FISCAL IMPACT OF PROJECT ON COUNTY GOVERNMENT SECTION 5 - PROJECTED FISCAL IMPACT OF PROJECT ON SCHOOL DISTRICT il 30 SECTION 6 - SUMMARY OF PROJECTED DEMOGRAPHICIFISCAL IMPACTS 31 SECTION 7 - SUMMARY OF PROJECTED PUBLIC SCHOOL CAPACITY IMPACTS SCHOOL DISTRICT DATA: School District: School Attendance: SCHOOL CHILDREN Elementary 3 3 Middle 1 1 High School 1 1 TOTAL 5 5 COUNTY EMPLOYEES 0.20 0.20 SCHOOL EMPLOYEES 0.29 0.29 TAX BASE ($1000) 1821. 1913 COUNTY BUDGET ($) Revenues 21508 22596 Expenditures 22660 23807 BALANCE -1153 -1211 SCHOOL DISTRICT BUDGET ($) Revenues', 28536 29981 Expenditures 2853$ 29981 BALANCE 0 0 COMBINED BUDGETS ($) Revenues 50044 52577 Expenditures 51196 53788 BALANCE - -1153 -1211 SECTION 7 - SUMMARY OF PROJECTED PUBLIC SCHOOL CAPACITY IMPACTS SCHOOL DISTRICT DATA: School District: School Attendance: YEAR SCHO Middle School 32 17 20( 0 YEAR 2000 2001 2002 2003 20( PROJECTED ENROLLMENT Elementary 2825 2825 Middle 1241 1241 High School 1458 1458 TOTAL 5524 55x4 YEAR PROJI 201 DRAFT 3 -1 -00 PLANNING BOARD MINUTES 33 Strayhorn said that the people in the subdivision would prefer it to be a private subdivision with as few access points as possible. He said that the one house in the open space would have a significant bearing on whether the field would stay farmed. 5 MOTION: Katz moved acceptance of the Concept Plan for Creek Wood subdivision as 6 presented without the condition of the stub out. Seconded by McAdams. 7 VOTE: Unanimous. 8 9 Barrows made reference to something that she did not see before. She said that under "Landscape Notes" 10 there are exceptions. She is concerned about items b and d that speak to looking at trees that are aged. 11 She thinks an expert should be consulted about these kinds of decisions about trees and forestry. 12 13 Benedict said that there is someone on the staff that has a degree in Landscape Architecture. 14 15 b. Preliminary Plans 16 (1) Bricewood Acres 17 (Cedar Grove Township - 15 Lots) 18 . 19 Eddie Kirk made the presentation. BACKGROUND: Request - Preliminary Plan Applicant: Joe Phelps • Subdivision follows the conventional plan. • 15 single- family lots on 27.04 acres (including rights -of way) Average lot size —1.63 ac. • Fourteen (14.49) acres in the critical area (U- ENO -CA): max. density =1 du/2 ac.; • Twelve (12.55) acres in the balance of the watershed: max. density =1 du/ .92 ac. Location The property is located off the south side of Governor Scott Road east of Mill Creek Road in Cedar Grove Townsh Existing and Proposed Conditions Existing: • Current zoning is Agricultural Residential (AR). • The property is located in the Upper Eno protected watershed. Physical Features: • There is one intermittent stream in the southwestern portion of the property. • The site is entirely wooded with mixed hardwoods and pines. Adjacent Land Use: • Properties to the south and east are wooded. • Properties to the north and west are developed in single family residential lots. Proposed: Roads: • Access is.fm Gov. Scott Road (SR 1351). • Proposed•public streets to be constructed to NCDOT standards. • Proposed public right -of -way connection to the southern property line. Water - Sewer: • Water will be from individual wells. • Health Department verified that each lot contains suitable soils to locate a septic system. Agency Comments: • Comments attached from NCDOT, Environmental Health, and Emergency Management. Development Process Schedule and Action Planning Board: • First Action: Concept Plan approved by the Planning Board October 6,1999 with the three following conditions: 34 1. The Intersection and road alignment on the Preliminary Plan shall meet NCDOT standards. 2. A publicly dedicated right -of- -way should be provided to the southern property line to allow for future interconnectivity of public roads (in accordance with County policy). 3.With the Preliminary Plat, submit a plat indicating areas for on -site infiltration of storm wate demonstrates compliance with Article 6.23.3a of the Orange County Zoning Ordinance. • Second Action: 1, Action within forty-five (45) days of this meeting; 2. Or within such further time consented to in writing by the applicant. 3. If the Planning Board fails to prepare its recommendation to the Board of Commissioners ,% the specified time period, approval recommended without conditions. • Preliminary Plan addresses all conditions of approval of the Concept Plan. FINANCIAL IMPACT: Fiscal Impact Analysis included as an attachment. RECOMMENDATION(S): Planning Staff Approval, in accordance with the attached Resolution of Approval. Kirk made reference to item B6 in the resolution and said that all streets shall have five -foot utility easements on each side of the right -of -way. Also, item 7 says that the posted speed limit on Governor Scott Road should be reduced to 45 miles per hour. He said that if the County Commissioners approve this.resolution as written, then they would be recommending to NCDOT that the speed limit be reduced. 7 Barrows asked about lots seven and eight and said that there was a significant stream buffer. She was told 8 that Environmental Health has assured that two lots can go on this area. 9 10 Steve Yuhasz said that he was concerned that lot eight was a little tight. He said that there was some 11 additional room on lots nine and ten that could give lot eight a little more room. 12 13 MOTION: Holtkamp moved approval of the Preliminary Plan for Bricewood Acres. 14 Seconded by Katz. 15 16 Chair Allison made reference to page 50 and that NCDOT recommended a 60 -foot right -of -way, and in 17 some places there is going to be a 50 -foot right -of -way. He asked Yuhasz how he proposed to deal with 18 this. 19 20 Yuhasz said that an additional 5 -foot utility easement would be added on each side of the 50 -foot right -of- 21 way. 22 23 Benedict said that even though the Fiscal Impact Analysis does need some updating from 1997, it does 24 show that there is negative impact. There is a net loss between the expenditures for County public 25 services and the revenue that comes forth from the subdivision. 26 27 VOTE: Unanimous. 28 29 AGENDA ITEM 11: ITEM FROM JPA PUBLIC HEARING 2/21/00 30 31 Benedict gave an update on the Greene Tract. The Commissioners met last night to discuss the Greene 32 Tract, and the original proposal that came forward was a zoning for 169 acres. In the interlocal 33 agreement, it said that only 60 acres had to be assigned. The decision last night was to determine the 34 most appropriate 60 acres. The County Commissioners did not have enough information last night to 35 make a decision on what was the most appropriate 60 acres. The County Commissioners made a motion 36 to not have the rezoning a part of the interlocal agreement before the County takes over solid waste