HomeMy WebLinkAboutAgenda - 12-04-2000-9e ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 4, 2000 Action Agen a Item No. _~ SUBJECT: Cha el Hill-Carrboro Cit Schools Elements School # 9 Plannin Funds DEPARTMENT: County Manager/Budget PUBLIC HEARING: (Y/N) No ATTACHMENT(S): CHCCS Explanation of Request for Planning Fees Elementary School #9 Project Schedule Elementary School #9 Capital Project Ordinance Smith Middle School Capital Project Ordinance INFORMATION CONTACT: Neil Pedersen, 967-$211 Rod, Visser, ext 2300 Donna Dean, ext 2151 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider approving a request from the Chapel Hill-Carrboro City Schools (CHCCS) to appropriate funds for initial planning and design expenses associated with the construction of a new elementary school. BACKGROUND: Earlier this Fall, CHCCS requested that the County Commissioners approve the appropriation of approximately $573,000 in capital funds associated with the contemplated construction of a new elementary school. The County's adopted school construction standards call for a new elementary school to have a designed student capacity of 600. CHCCS estimates a preliminary project budget of approximately $13.7 million. CHCCS provided an explanation in the attached document of haw the requested planning funds would be used. That explanation reflects that CHCCS plans to construct Elementary School #9 at the donated Meadowmont site. On November 21, 2000, the Board formally approved a "Policy on Planning and Funding School Capital Projects". As defined in that policy, Level 2 capital projects such as the construction of a new school involve the Commissioners' approval of project funding in four phases: • Concept/Pre-Planning Phase --includes preliminary programming and design work that would result in conceptual drawings and preliminary cost estimates. • Planning Phase -includes siting the facility, construction of infrastructure, and preparation of construction documents in preparation for bidding process. • Design and Construction Phase -includes final design, facility construction and purchase of equipment, furnishings, technology, and one-time startup items. • f=inal Accounting Phase - provides a reconciliation of actual project expenditures with approved budget. The CHCCS project schedule, as summarized in the table below, indicates that $107,184 will be needed far schematic design of the new school, which would be part of the "conceptJpre- planning phase" of the project. The balance of the $573,000 funding request would be expended in subsequent phases of the project. Accordingly, staff recommends that the Board appropriate $107,184 for the CHCCS Elementary School #9 project now, and entertain a separate request for "planning phase" funds at the appropriate point several months from now. Phase Concept/Pre-Planning Phase Schematic Design Total Cancept/Pre-Planning Phase Planning Phase Design Development Town Approval Process Construction Documents Total Planning Phase Total CHCCS Funding Request CHCCS Funding Request $107,184 $107,184 $142,911 $97,000 $225,367 $465,278 $572,462 In keeping with the recently adapted policy, the Commissioners should appoint a BOCC representative to work directly with the Board of Education as it sites the new school. The Commissioner representative would share information regarding the progress of talks and negotiations of the site with other, members of the Board of Commissioners. FINANCIAL IMPACT: CHCCS has proposed that a portion of the requested planning funds appropriation be covered through estimated savings of $338,000 from the Smith Middle School construction project.. The Budget Director has prepared the attached capital project ordinance that will appropriate $107,184 in Smith Middle School project savings to fund the schematic design for Elementary School #9. RECOMMENDATION(S): The Manager recommends that the Board approve the expenditure of up to $107,184 in concept/pre-planning phase funds for Elementary School #9; adopt the attached CHCCS Elementary School #9 Capital Project Ordinance; and appoint one Commissioner to serve as the BOCC liaison with the Chapel Hill-Carrboro Board of Education for the Elementary School #9 project. 3 Chapel Hill-Carrboro City Schools Elementary School #9 Explanation of Request for Planning Fees - $573,000 The attached exhibit illustrates an aggressive schedule to open Elementary School #9 in August 2003. The schedule is dependent upon the following: • use of the donated Meadowmont school site property • commencement of planning services in December 2000 • securing full project funding in November 2001 The requested $573,000 will enable the project to proceed through the various planning, design, and review phases. It is anticipated that full project funding will be available in November 2001 and support construction-activities through ~ ~- project completion in August 2003. Use of the donated school site at Meadowmont is important because the property has been surveyed, inspected, and is available. A great deal of information is already known about the property, surrounding areas, and development requirements. The property had been studied as a possible middle school site in 1997 and identified as an elementary school site in.the district's 2000 Long Range Facilities Task Force Report. Proceeding with this property enables schematic planning to begin in December as the schedule indicates.' Commencement of planning in December is dependent upon securing project planning funds. Schematic planning begins with a complete examination and review of the educational program's specifications. Planning encompasses a thorough review of possible building aitematives to maximize the available property and identify structures that best meet the educational program and conform to the site's topographical characteristics. Preliminary drawings are produced to illustrate the project's components. During this Schematic Design phase of work, civil engineers work closely with architects and evaluate the scope of land disturbance and how to minimize its impact. A preliminary project cast estimate is developed. The Department of Public Instruction's School Planning Division reviews plans at this stage. At the conclusion of the Schematic Design phase, plan reviews will be conducted with the School Board and County Commissioners. School Board review is routine at this stage of the project, however, in response to the county's new capital planning policy, County Commissioner review is also planned at this early project concept and planning period. After reviews by the School Board and County Commissioners, the design plans will be further refined. Building construction details and site work will be developed. During the Design Development process, drawings are produced to fix the size and characteristics of the project. Building elevations are produced depicting the various areas of the project. The building structure is established, 4 finishing details are selected, mechanical, electrical and plumbing systems are chosen, and site development decisions are finalized. With this information in hand, a second more detailed budget review takes place. Additionally, at this point in the schedule, application will be filed with the Town of Chapel Hill to- begin the process to secure a Special Use Permit. Appropriate Town review comments, provided during various presentations to Tawn boards and commissions, are incorporated into the plans. The Department of Public Instruction's School Planning Division and the State Department of Insurance also review school construction plans and their comments are addressed at this stage of the project. When the school design is developed to a level reflecting the direction received from the numerous review bodies, the project enters into the Construction Document phase. In this phase of work, the building plans and. specifications are completed and a finished set of construction documents is produced, Another budget analysis occurs. The Department of Public Instruction's School Planning Division provides its certification of compliance and the State Department of Insurance attests to the compliance to building codes. The finished plans and specifications incorporate the level of specificity required by contractors to develop construction bid estimates. The plans and specifications become part of the construction contract documents and are used by the contractors to build the facility. Prior to the bid phase, the School Board and Commissioners again review the plans. This second review by the County Commissioners would conform to the new capital planning policy and meet the requirement of design and construction review and approval prior to the bidding phase of activity. After bids are received and analysis is completed, a recommendation is presented to the School Board and County Commissioners. If approved, construction contracts can be signed and the project enters the construction phase. overall, this process reflects an aggressive approach to develop a schedule that results in Elementary School #9 opening at the earliest possible time. The schedule indicates the funds required to complete the various stages of planning activity and to develop the plans to the paint when full project funding is expected. Additionally, the schedule allocates time for review by the School Board and County Commissioners as the process unfolds and the project is developed. VJ J 0 V N ~_ U O ~, ~ ~ O ~ m ~ ~ O ~ _ a~ U N ~a = H a g U W ~ g 9 Q O N ` IL e s d ~ a O N O O N a 0 5 g ~ S b c > a ~ m x O N C 0 N ~ o s o°° N z ~ m ~ m ~ ~ m 8 m ~ = ~ •~ E a o C y a m ~° o m m ~ a ~ m ~ N '~ r U O m ~ O` ~ m N C ~ ~ C m N 3 ~ V a 0 ~ ~ m Q ~ 16 Q v m u e m Q v e O c p ~ c ~ p e v, •y m p C7 .o ~ w m m O O ? ro v O O 7 ~ v ` b ~ O v y V C F U U ~ m tl7 U U ti ~ N C. m m V Q H I+~ ~ r O 1~ W ~ t!) d Qf U ~ M n ~ ~ ( j,) (~ p1 O cD N t p ~ _ ~ ~ 4 ~ ~ N co ~ 4 tC~ Y ~ m ~ ~ N N ~ ~ ti 0. ~ r r~i ~ Elerr~entary School #9 Construction Chapel Hill-Carrbo~ro City Schools Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 1 S9 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds to construct Elementary School #9 for the Chapel Hill Carrboro City Schools. Funding far the project comes from savings from the Smith Middle School Construction Project. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: roug 1999-00 FY 2000-01 roug 2000-01 Sales Tax $0 $0 $0 Im act Fees $0 $0 $0 PSBF $0 $0 $0 Bond Funds $0 $0 $0 raps er om riu Middle School Ca ital $0 $107 184 $107,184 Total Pro'ect Fundin $0 $107,184 $107,184 Section ~. The following is appropriated for this project: roug 1999-00 FY 2000-01 roug 2000-01 Conce t/Pre-Plannin $0 $107,184 $107 184 Plannin $0 $0 $0 Desi nand Construction $0 $0 $0 E ui znent/Furnishin s $0 $0 $0 Technolo $0 $0 $0 Contin enc $0 $0 $0 Total $0 $107,184 $107,184 Section 5. This Ordinance, originally adopted December 4, 2000, shall remain in effect until June 30, 2001. Adopted this fourth day of December 2000. Smith Middle School Construction/K-12 Campus Chapel Hill-Carrbaro City Schools Capital Project Ordinance Be it ordained by the Orange County Boazd of County Commissioners that pursuant to Section 13.2 of Chapter 1.59 of the General Statutes of North Carolina, the following capital project is hereby adopted. Section 1. The project authorized provides funds to construct Smith Middle School, co-located on the Seawell Elementary School and Chapel Hill High School campus. This project will be financed with proceeds from the 1997 bond referendum and impact fees. Section 2. The officers of the County aze hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: roug 1999-00 - A ro riation roug 2000-01 Sales Tax $0 $0 $0 Im act Fees $0 $0 $0 PSBF $0 $0 $0 1997 Bond Funds $16 731,721 $0 $16 731,721 Total Fundin $16,731,721 $0 $16,731,721 Section 4. The following amount is appropriated for this project: roug 1999-00 A ro riation roug 2000-01 Plannin /Arch/En in $1,505,000 $0 $1,505,000 Land/Assoc Fees $22,600 $0 $22,600 Site Develo ment $2,061 197 $0 $2,061,197 Construction $12,779 924 $0 $12,779,924 eawe ementary Pla round Construction $97,000 $0 $97,000 Athletic Field U rades $47,000 $0 $47,000 E ui ment/Furnishin s $0 $0 $0 Technalo $0 $0 $0 Contin enc $219,000 _ $0 $219,000 Total Costs $lfi 731 721 $0 $16,731,721 Section 5. The following amount is transferred from this project: roug roug 1999-00 A ro riation 2000-01 rans er to ementary c o0 #9 $0 $107,184 $107,184 Section 6. The following amount remains appropriated for this project: Pro'ect Bud et Less: Transfer Remainin Bud et mgt i e c o0 Construction $16,731,721 $107,184 $16,624,537 Smith Middle School Capital Project Ordinance $ Page 2 Section 7. This ordinance supersedes all previous Smith Middle School Capital Project Ordinances. Section $. .This Ordinance shall remain in effect from July 1, 1998 until June 30, 2001. Adopted this fourth day of December 2000.