Loading...
HomeMy WebLinkAboutAgenda - 11-19-2002-8hORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 19, 2002 Action Agenda Item No. ~_ SUBJECT: Housin Rehabilitation Contract Award DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (YIN) No ATTACHMENT(S): INFORMATION CONTACT: Tara L. Fikes, ext. 2490 Bid Results Work Specifications TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To award one housing rehabilitation contract for the CDBG Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. Additionally, all contractors participating in the County's Rehabilitation Program are required to utilize current deconstruction and material recycling methods during the repair process. Sealed bids were solicited from participating contractors on October 1, 2002. Bid results are attached. William Long Construction Company submitted the lowest bid respectively. FINANCIAL IMPACT: The Scattered Site CDBG Program provides funding for this program. RECOMMENDATION(S): The Manager recommends awarding the following housing rehabilitation contract: Dwelling Unit Bid Amount Contractor 246 Harper Street, Hillsborough $19,295 William Long Construction 2 RESULTS OF BID OPENING OWNER: Vera Watts APPLICATION NUMBER: p,DDRESS: 246 Harper Street COST ESTIMATE:_$19,400 Hillsborough, NC 27278 PERCENTAGE OF BID OVER UNDER 1%_ CHECK ONE:JOB BID X JOB NEGOTIATED COMPANY 1. William Long Construction Co. 2. Taylor Home Improvements Tara L. Fikes 3. Triple J Construction $21,230 4. Diamond Builders $23,744 5. 6. BID OPENED BY: Roxanne Reynolds TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: October 16, 2002 WITNESSED BY: David Saconn ****************************************************************** Lowest Acceptable Bid: $19,295 Negotiated Amount: N/A Contractor: William Long Construction Co. NAME _3761 Phillips Chapel Rd.; Haw River, NC ADDRESS 336-376-0170 TELEPHONE NUMBER COMMENTS: Submitted by: Bid Approval Date _ Proceed Order Issued BID AMOUNT $19,295 519.807 Date 11-05-2002 COST ESTIMATE 3 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR 246 HARPER STREET FOR VERA WATTS PHONE: 732-7279 DATE: 7/10/02 BY: DAVID SACONN REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS; GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS: TT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO TIIE HOMEOWNER AND ORANGE COUNTY HOUSING REHABIIITATION PROGRAM. 4 Vera Watts 246 Harper St. Hillsborough, NC 27278 7// 10/02 EXTERIOR: 1. Cover all door and window frames with white coil stock. 2. Repair the rotten siding ,window and door frames before installation of vinyl and coil stock. Remove the rotten siding and install %2" plywood. 3. Install 1/4 inch foam insulation and D-5 vinyl siding on the entire house. 4. Cover all eves, facias, rakes and overhangs with white coil stock. 5. Install vented soffit in all overhangs. Cut 4" x 10" section out on the back overhangs to allow air flow. Cut the sections out every 3 feet. 6. Install continuous aluminum gutters and downspouts. Install the existing splash blocks under each downspout. 7. Install two (2) automatic foundation vents that are missing. 8. Install soffit on the base overhang of the dining/laundry room. 9. Paint the two (2) crawlspace doors and jamb. Scrap and prepare for paint. Paint the doors and jambs with semigloss latex paint. Paint shall cover completely. Trim down the doors so they will close properly. 10. Paint the foundation with masonry paint. Remove all loose and chipping paint. Fill any large holes and cracks with mortar before painting. Apply two (2) coats of masonry paint. Paint shall cover completely. 11. Install the missing shingles on the back section of the roof. 12. Install a shingle type ridge vent. Cut out a 3 inch section of roof at the peak and install the ridge vent in both ridges. 13. Install a new screen in the side storm door. 14. Install a new storm door lock on the front and side storm doors. 15. Install a pressure treated handrail on both sides of the side porch steps. 5 Vera Watts 246 Harper St. Hillsborough, NC 27278 7/ 10/02 WINDOWS: 1. Install vinyl insulated replacement windows with screen and trim. The windows shall at least one openable sash. Paint any necessary trim on the interior. 2. Install a vinyl picture window in the living room. Paint any necessary trim on the interior. INSULATION: 1. Install R-19 insulation in the crawlspace. 2. Add insulation to the attic to achieve an R-30 rating. INTERIOR: LIVING ROOM: 1. Remove the existing carpet and pad. 2. Prepare the walls and ceiling for paint. Fill and sand all holes and cracks with sheetrock filler. Paint the ceiling and walls with flat latex paint. The paint shall cover completely. Paint the doors, trim and baseboard with semigloss latex paint. 3. Remove the masonry thimble in the rear living room wall. Install matching sheetrock. Tape and finish smooth. Page 2 6 Vera Watts 246 Harper St. Hillsborough, NC 27278 7/ 10/02 LIVING ROOM: 5. Install new carpet and pad. The carpet to cost not less than $ 14 yd. Install metal trim at all door openings. KITCHEN: Page 3 Wash down the walls and ceiling with a mild cleaner. Remove any grease present on the walls and ceiling. Prepare the walls and ceiling for paint. Remove any loose paint. Fill all holes and cracks with sheetrock filler or caulk. Paint the ceiling with flat latex paint. Paint the walls, trim, doors and cabinets with semigloss latex paint. Prime any areas as necessary. All paint shall cover completely. 2. Remove the pieced 2"bed molding. Install new 2" bed molding. 3. Remove the shoe molding. Install 1/4 inch lauan plywood and prepare for vinyl. The vinyl to cost not less than $ 14 yd. Install metal trim as necessary. Install new shoe molding. Prime and paint the shoe molding. Paint the shoe molding with semigloss latex paint. Paint shall cover completely. DINING ROOM /LAUNDRY ROOM: Prepare the ceiling for paint. Scrap all loose and chipping paint. Fill all holes with sheetrock filler. Fill all cracks with latex caulk. Paint the ceiling with flat latex paint. Paint the doors, trim and baseboard with semigloss latex paint. All paint shall cover completely. - 2. Install a wide door viewer and keyed deadbolt on the side door. Key the lockset and deadbolt alike. Remove the shoe molding. Install '/4 inch lauan plywood and prepare for vinyl. Install a new vinyl floor. The vinyl to cost not less than $ 14 yd. Tnstall metal trim at the door openings. Vera Watts Page 4 246 Harper St. Hillsborough, NC 27278 7/ 10/02 BATHROOM: 1. Remove the tub, commode and sink/vanity. Save the sink/vanity for reinstallation. 2. Remove the damaged shower surround. Remove the wall covering to the studs. 3. Repair the damaged subfloor around the commode flange. Install matching plywood. 4. Install a new exhaust fan in the ceiling. Vent the exhaust through the boxing overhangs. Install an exhaust flapper in the boxing. 5. Install MR sheetrock on the walls and ceiling. Finish the sheetrock smooth. 6. Insta113 1/4 inch baseboard around the bathroom. 7. Paint the walls and ceiling with semigloss latex paint. Paint the door, trim and baseboard with semigloss latex paint. 8. Install '/4 inch lauan plywood and prepare for vinyl. Install a new vinyl floor. The vinyl to cost not less than $ 14 yd. Install metal trim at the door openings. Install new shoe molding. Prime and paint the molding with semigloss latex paint. Paint shall cover completely. 9. Install a base door bumper behind the door. 10. Reinstall the existing medicine cabinet & mirror. 11. Repair the leaking bathroom faucet. Install a faucet repair kit. 12. Trim the bottom of the bath door so it will not rub on the new vinyl floor. 8 Vera Watts Page 5 246 Harper St. Hillsborough, NC 27278 7/ 10/02 BATHROOM PLUMBING: 1. Install a two (2)- piece molded tub/shower unit. The unit shall have toiletry shelves, acrylic grab bars, slip- resistant textured bottom. 2. Install new plumbing for a handheld shower. Install a combination tub/shower washerless faucet and new hand held shower. Install two (2) wall clips for the hand held shower. The first clip shall go where a normal shower head would go. The 2°d clip shall go about waist high. 3. Install a new p-trap and drain line assembly for the new tub/shower. 4. Install a new transfer seat to provide easy access to the tub. 5. Install a new handicap commode. Install a new supply line and cutoff. 6. Reinstall the sink/vanity. Install a new p-trap, supply lines and cutoffs. 7. Install an accessory kit. The kit should include two towel bars, tumble holder, paper holder and soap dish. BEDROOM # 1 Prepare the walls and ceiling for paint. Scrap and remove all loose paint. Prime all bare wood, sheetrock and ceiling material. Fill all holes with sheetrock filler. Caulk all cracks and joints with latex caulk. Paint the walls and ceiling with flat latex paint. Paint the doors, trim and baseboard with semigloss latex paint. All paint shall cover completely. 9 Vera Watts 246 Harper St. Hillsborough, NC 27278 7/10/02 BEDROOM # 1: 2. Install a new base door bumper behind the bedroom door. 3. Remove the existing carpet and pad. Install new carpet and pad. The carpet to cost not less than $ 14 yd. Install metal trim at the door openings. Trim the door bottoms as necessary. BEDROOM # 2: 1. Install a new 1 3/8 inch bedroom door. Install a new privacy lockset. 2. Prepare the walls and ceiling for paint. Scrap and remove all loose paint. Prime all bare wood, sheetrock and ceiling tiles. Fill all holes with sheetrock filler. Caulk all cracks and joints with latex caulk. Paint the walls and ceiling with flat latex paint. Paint the doors, trim and baseboard with semigloss latex paint. All paint shall cover completely. 3. Install a base door bumper behind the door. HALLWAY: 1. Prepare the walls and ceiling for paint. Scrap and remove all loose paint. Fill all holes and caulk all cracks before painting. Paint the walls and ceiling with flat latex paint. Paint the trim, baseboard with semigloss latex paint. The paint shall cover completely. Page 6 10 Vera Watts 246 Harper St. Hillsborough, NC 27278 7/ 10/02 ELECTRICAL: 1. Install new light switches and plates throughout the entire house. 2. Install two (2) GFI receptacles in the kitchen. 3. Install a GFI circuit and receptacle in the bathroom. 4. Install a new light fixture on the bathroom wall. 5. Install electric smoke detectot~s in all bedrooms and one in the hallway. A total of three (3) smoke detectors. 6. Install Arc- Fault Circuit interrupter protection breakers on all sleeping rooms circuits. 7. Install a service light controlled by a switch in the attic and- crawlspace. 8. Upgrade the electrical panel to a 150 amps. Remove the existing 100 amp panel box located in the kitchen. Install a new 150 amp. breaker panel box .Install new breakers. MISCELLANEOUS: 1. Attach the galvanized heat duct to the wood siding with 11/2 inch galvanized screws. Caulk the three sides with clear silicone caulk. Page 7 11 Vera Watts 246 Harper St. Hillsborough, NC 27278 7/ 10/02 TERMITE TREATMENT: Provide a termite inspection and treatment. Page 8 TOTAL LABOR AND MATERIAL r _< ~ Z N ~ D m ~~< m 2~ ~m~ _ '~D-1 ~~~ N V N v ~~/H r ~ ._... ~ Z >r, ~ n a m ~` z ~ _ o ~ o -~ ~ ~ W ~ ~ ~. V'~ 2 ~' ~~ ~_ o +N ~ ~ O N 0 N 'x P` --~ 0 z z D C z 0 ZI