Loading...
HomeMy WebLinkAboutAgenda - 10-18-2005-9c:••-• • ffiefife, Hill, • ACTION AGENDA ITEM ABSTRACT Meeting Date: October 18, 2005 Action Agenda Item No. q - C, SUBJECT: Orange County Soccer Center Site Plan Revision /Electrical Easements DEPARTMENT: Planning and Inspections ATTACHMENTS: Resolution Sample Easement Form 10/13/05 ERCD Memo on Proposed Power Line Easement Site Plan PUBLIC HEARING: (Y /N) No INFORMATION CONTACT: Craig Benedict, Planning Director, 245- 2575 PURPOSE: 1) To consider revision of the concept plan site plan approval for the proposed Orange County Soccer Center (OCSC) in order to allow Duke Power Company to install sub feeder distribution power lines aboveground in the Buckhorn Area EDD and 2) to consider granting Duke Power Company easements on the OCSC property, the aboveground one of which to be generally parallel to the western property line, to allow for installation of aboveground sub feeder distribution lines. BACKGROUND: On June 23, 2004, the Board of County Commissioners approved a Special Use Permit for Middle School #3 located in the Economic Development District along West Ten Road in Efland. Also reviewed at the same time, in concept, was the proposed OCSC, located adjacent to the school on its eastern boundary. The OCSC does not require a SUP. However, a joint review of the two projects was performed in order to realize cost savings on the rough grading contract and to allow for the site plan design to incorporate shared facilities (parking, access, etc.) for the two projects. Until recently, development of the two sites has moved along according to projected plans and schedules. However, discussions regarding installation of underground electrical service to the sites have required the participation of both the Orange County School Board and the BOCC. The Economic Development District (EDD) Manual Performance and Construction Standards specify that 'all permanent utility lines must be installed underground' [page 2.4.29]. The stated purpose of the standards is 'to minimize the adverse impacts of construction related activities and to promote a uniform, neat, and clean appearance throughout the Economic Development Districts' [page 2.4.27]. Duke Power has proposed installation of aboveground sub feeder distribution lines to save the Orange County Schools money in the construction of OCS Middle School #3. The sub feeder will enhance the safety in the service area and promote connectivity. The Middle School and the OCSC then will install underground lines to their respective facilities in accordance with EDD guidelines. The County Manager, on behalf of Orange County, has requested that the site plan be approved with the installation of aboveground sub feeder distribution lines on the OCSC property and to include a provision that the lines are to be precisely located at the time that the easement to Duke Power is granted. The Board will recall that there are vernal pools at the northwestern quadrant of the OCSC property and that there is a tree line between the OCSC property and the school property that was saved in negotiations with NCDOT when NCDOT required the Old Highway #10 intersection with the access road to be relocated. There are also landscaping issues that may be affected by this power easement and the power poles, lines and other facilities. As prescribed by the EDD manual, the Board of Commissioners must approve the site plan with regard to the overhead power lines. The EDD Manual does not give this authority to the Planning Director. The justification for the request is that the new distribution line would create an electric loop in the service area promoting a better and safer service system. Another justification for the revision is to avoid environmentally sensitive areas (vernal pools) at the northern end of the OCSC site, which could be adversely impacted by the construction of underground utilities at that location, The County can, with the Board's approval, work with Duke Power at a later date to determine if some or all of the overhead facilities can be moved underground in the future. REQUEST: 1) The Board is requested to make a decision with regard to allowing the sub feeder distribution lines to be installed aboveground in the EDD, with the understanding that all other lines will be underground. 2) If the Board votes to allow the sub feeder distributions lines to be installed aboveground, then the Board will need to approve the easements; to give direction to the County Manager and the County Attorney with respect to the location of the easements on the OCSC property; and, to authorize the County Manager and the County Attorney to finalize the precise location of the easements and to authorize the recordation of the easement document. It should be noted that based on a request, the Environment & Resource Conservation Department has reviewed the proposed power line easement and has provided a memorandum which is attached. RECOMMENDATION: The Administration recommends APPROVAL of the attached Resolution. ORANGE COUNTY BOARD OF COMMISSIONERS Resolution authorizing aboveground sub feeder distribution lines and underground service lines and related facilities on County -owned Soccer Center property located on West Ten Road east of, and adjacent to, the Middle School #3 and authorizing the County Manager and County Attorney to negotiate with Duke Power Company to place the easements WHEREAS, the Orange County Board of Commissioners approved, on June 23, 2004, both a Special Use Permit for the Orange County Middle School #3 and a concept plan for the proposed Orange County Soccer Center; and WHEREAS, both properties and associated facilities are located within the Buckhorn Economic Development District (EDD), a zoning district with specific development standards; and WHEREAS, Duke Power Company has notified Orange County that it will require a 30 -foot easement on the soccer center property in order to locate an aboveground sub feeder distribution line intended to serve the Buckhorn EDD; and WHEREAS, the Buckhorn EDD specifies that all utility lines shall be located underground as a part of zoning approval for specific developments; and WHEREAS, the EDD Manual does not specify whether or not sub feeder distribution lines installed by a North Carolina public utility for serving a wide area are subject to the underground requirement; and WHEREAS, the Planning Director is not authorized to approve any aboveground electric utility as a part of a specific development approval; and WHEREAS, only the Board of County Commissioners may approve granting of easements on County -owned property for utility lines and authorize installation of aboveground lines; and WHEREAS, Duke Power Company will be asked to provide the County with a map of the proposed location of the sub feeder distribution easements that shows the least impact on existing trees and environmentally - sensitive areas on the northern end of the soccer center property; and WHEREAS, Duke Power Company will be asked to provide the County with a list of appropriate tree and shrub species that may be installed within the easements and will be asked to provide assurances that landscaping and other improvements such as sidewalks, entrance drives and parking installed by the S County will not be cut, destroyed, or removed without County Manager approval in writing; NOW, THEREFORE, BE IT RESOLVED, that the Board of Commissioners of Orange County, North Carolina hereby authorizes the County Manager and County Attorney to negotiate, consistent with the recitals herein, the placement of utility easements and to cause a survey of the physical location where structures and power lines on the Soccer Center property will be located prior to beginning any work toward installation of aboveground sub feeder distribution lines and underground service and related facilities to provide electrical service to the Soccer Center and Orange County Middle School #3; and BE IT FURTHER RESOLVED that the aboveground easement shall be located to minimize impact on existing vegetation along West Ten Road and along the common property line of Orange County Middle School #3 and the Soccer Center by placing the 30 -foot easement at a sufficient distance from existing and scheduled trees to alleviate the potential damage to the lines by fallen trees; and BE IT FURTHER RESOLVED that the impact to the environmentally sensitive areas (vernal pools, wetlands) located at the northern end of the Soccer Center property be minimized by placing support structures in locations that will allow lines to span sensitive areas to avoid disturbing and driving across them when constructing the support structures, power lines and other facilities and when maintaining the support structures, power lines and other facilities. WR No, 619042 Resp. 5342 Project SIP Drawn By: Jerry Payne Project Description: Overhead and underground primary for school on West Ten Road STATE OF NORTH CAROLINA COUNTY OF Orange Return Address: Duke Energy Corporation Attn: Jerry Payne 1205 N Church St Burlington, NC 27217 RIGHT OF WAY AGREEMENT N KNOW ALL MEN BY THESE PRESENTS, That Orange Countv hereinafter called "Grantor' (whether one or more), in consideration of the sum of One Dollar ($1.00) and other good and valuable considerations, does hereby grant unto DUKE ENERGY CORPORATION, and its successors and assigns, subsidiaries and divisions, hereinafter called "Grantee," the perpetual right, privilege and easement to go in and upon that certain land of Grantor (hereinafter "premises ") situated in said County and State, property described as: Deed Book 200 MESME MI and over and across said premises within a right- of-way strip (check applicable): ® having a width of 15 feet on each side of a centerline determined by the centerline of the electrical facilities as installed, to construct, maintain and operate with poles, crossarms, wires, guys, anchors, cables, transformers and other apparatus and appliances, overhead lines for the purpose of transporting electricity and for the communications purposes of the Grantee and regulated telephone utilities. The following rights are also granted to Grantee: to enter said premises to inspect said lines, to perform maintenance and repairs, and to make alterations and additions thereto, to remove from the right -of -way strip, now or at any time in the future, trees, structures or other obstructions that may endanger the proper maintenance and operation of said lines and trees of any species that Grantee determines will grow at maturity to a height that will endanger the proper maintenance and operation of said lines; to trim or remove and to keep trimmed or remove dead, diseased, weak or leaning trees or limbs outside of the right -of -way strip which, in the opinion of the Grantee, might interfere with or fall upon the electric or communications facilities within the right -of -way strip; and to install guy wires and anchors extending beyond the limits of the right -of -way strip. N having a width of 10 feet on each side of a centerline determined by the centerline of the electrical facilities as installed, to construct, maintain and operate underground lines and conduits with other apparatus and appliances, either above ground or below ground, to include transformers and service connections, for the purpose of transporting electricity and for the communications purposes of Grantee and its licensees. The following rights are also granted to Grantee: to enter said premises to inspect said lines, to perform maintenance and repairs, and to make alterations and additions thereto; and to clear the land within the right -of -way strip and to keep it clear of trees, structures or other obstructions; and to clear that land outside the right -of -way strip within ten feet of the service door of any transformer or cabinet located within the right -of -way strip and to keep the area within ten feet of said door clear of trees, structures or other obstructions. All underground facilities are to be installed in accordance with the provisions of Grantee's Underground Distribution Installment Plan, NCUC Docket E -7, Sub 552, receipt of a copy of which is acknowledged by Grantor. This right -of -way is given to permit the construction of facilities presently proposed.. Facilities at other locations and future extensions of presently constructed facilities are not permitted by this agreement. The foregoing notwithstanding, Grantee may relocate its facilities and right -of -way strip over the premises to conform to any future highway or street relocation, widening or improvement, I IN WITNESS WHEREOF, this instrument is executed on this day of GRANTOR 0 12111 —19 Title: STATE OF NORTH CAROLINA COUNTY OF I, a Notary Public for above County and State, do certify that personally came before me this day and acknowledged that he /she is of , a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its Witness my hand and official seal, this day of My Commission Expires: Notary Public Affix (Notary or Corporation) Seal The foregoing certificate(s) of is /are certified to be correct. This day of , A.D., CLERK OF COURT FOR COUNTY By Deputy/Assistant -Clerk of Court. 4.1.7.2 North Carolina Examples 4.1.7,2.1 NC — Corporate IN WITNESS WHEREOF, this instrument is executed on this STATE OF NORTH CAROLINA COUNTY OF day of GCS 911 By: (sionature ofsignatorv) Name: (printed or typed name ofsionatoM --Title: (posifion4if1e) I,. /name of Notary Public) a Notary Public for above County and Slate, do certify that (name ofsanatoM personally came before me this day and acknowledged that s/he is loosifionMe) of /corporation name) , a (state ofinoomomtion) corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in Its name by its /positioMille) Witness my hand and official seal, this day of , My Commission Expires (Nofarysionafum) Notary Public Affix (Notary or Corporation) Seal The foregoing certificate(s) of is/are certified to be coned This _ day of , A. D„ CLERK OF COURT FOR COUNTY By Deputy/Assistant-Clerk of Court Duke Power ER 4.1 -16 Power Delivery Standards D04CGR12 Distribution Rights -Of -Way 03/11/2004 M COUNTY OF ORANGE ENVIRONMENT AND RESOURCE CONSERVATION DEPARTMENT MEMORANDUM To: Board of Commissioners John Link, County Manager From: David Stancil, Environment and Resource Conservation Director Rich Shaw, Land Conservation Manager Date: October 13, 2005 Re: Proposed Power Line Easement for the OCS Middle School #3 and West Ten Soccer Center The Environment and Resource Conservation Department (ERCD) was asked to evaluate the proposed alignment of a 30- foot -wide easement for the installation and maintenance of overhead power lines to service the new OCS Middle School and West Ten Soccer Center, The general alignment of the easement, as we understand it, would run from the I -85/40 right -of -way located north of the school /park complex, then south along the property boundary that separates the Middle School and the Soccer Park, and across West Ten Road to an existing power line. The following is a preliminary evaluation of the proposed easement alignment based on information from ERCD's comprehensive resource database, a biological inventory of the Middle School site by Solidago Associates (March 2004), information from the Planning and Inspections Department, and an October 12 site visit by ERCD staff. Summary of Findings 1) The West Ten Soccer Center tract was clear -cut of all trees in 2002. A small area of hardwood trees (oaks and hickory) remains in the far northwest corner, adjacent to the Middle School tract and I- 85/40. The southern two- thirds of the property has been cleared and graded for construction of future soccer park facilities. The northern third of the property ("future park expansion" on site plan) is in the early stages of forest regeneration with young sweet gum and red maple trees growing throughout. We would recommend that the proposed easement be routed around the forested area located in the far northwest corner of the Soccer Center property rather than cutting the easement through the forest and along the property boundary. There are mature oaks and hickories in this area that retain conservation value [See #1 on attached map.] Environment and Resource Conservation PO Box 8181 / 306 -A Revere Road Hillsborough, NC 27278 (919) 245 -2590 2) The Soccer Center tract drains to a low -lying area (approx..1 acre) in the northwest corner of the property adjacent to and including part of the oak /hickory stand, which holds water during wet periods. This seasonal wetland, or verna/pool, no longer provides the same quality of habitat for plants and animals as the vernal pools that are still protected by tree cover on the adjacent Middle School tract2. Nevertheless, the habitat could be restored if surrounding vegetation regenerates. The proposed easement would cross through a 100- foot -wide section of the vernal pool. We would recommend that the power line poles be located outside of the vernal pool area, and that trucks avoid crossing this low -lying area both during construction and future maintenance of the power line. [ #2 on attached map] 3) The proposed easement would run parallel to the tree line that forms the eastern boundary of the Middle School property. The trees are 50 -60' tall hardwoods (poplar, oak, hickory), and are generally straight and densely spaced, from growing in the middle of what was once a large forested area. The distance from the tree line to the curb of the new park entrance roadway is approximately 40 feet. We recommend that the proposed easement be located within the 40 -foot grass strip located west of the park entrance road, and that any future trimming and cutting of trees needed to protect the power line be performed in consultation with Orange County. [ #3 on attached map] Enclosures cc: Geof Gledhill ' Vernal pools are seasonally Flooded landscape depressions that support distinctive (and many times rare) plant and animal species adapted to periodic or continuous inundation during the wet season, and the absence of ponded water or wet soil during the dry season. Amphibians breed primarily in vernal pools because the pools are temporary and cannot support fish, the major predator to amphibian larvae. Z Direct sunlight causes the pools to dry faster, reducing the chance that larval amphibians will emerge as adults. Environment and Resource Conservation PQ Box 8181 / 306 -A Revere Road Hillsborough, NC 27278 (919) 245 -2590 l �N 9pyr r / 5ff 9s l eft z 0 0 9p i ed� x'[ c FF n i a e N P o a O I I I , II i , I.9 Cg F53 B) vA3 �co° o g � E ff a µ N ia o° F � H COBLEY REDFOOT ZACK it P i R £ Fs fe. o_e]Y ek C(J a 6�E C y 1 l r C� R X89 €a e i ry Main ffffF O f H� f 6 - ORANGE COUNTY MIDDLE SCHOOL M) AND yl�ll��l�l ,,Rg%N SOCCER CENTER ORW4ECOVNiY 1100.TICYl01➢1A I I I , II i , I.9 Cg F53 B) vA3 �co° o g � E ff a µ N ia o° F � H COBLEY REDFOOT ZACK it i i C y 1 l r � Co ry R f — I I I , II i , I.9 Cg F53 B) vA3 �co° o g � E ff a µ N ia o° F � H COBLEY REDFOOT ZACK it