Loading...
HomeMy WebLinkAboutAgenda - 09-02-2003-6c2ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 2, 2003 SUBJECT: Northern Human Services Center Park at Cedar Grove Action Age a Item No. .. - DEPARTMENT: Manager's Office, ERCD, PUBLIC HEARING: (YIN) No Recreation and Parks ATTACHMENT INFORMATION CONTACT: 1) Park Master Plan Process David Stancil, 245-2590 2) Draft Park Preliminary Concept Plan Lori Taft, 245-2660 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To receive a presentation and review plans for the creation of a Park Master Plan for the Northern (Human Services Center) Park at Cedar Grove. BACKGROUND: In June 2001, the Board received a report entitled "Northern Human Services Center -Future Use Plan." As a result of this report, funds were appropriated in the 2001 Parks and Open Space bond for the creation of a park at the 48-acre site, which is located on NC 86 seven miles north of Hillsborough. During the same timeframe, a BOCC Task Force comprised of Commissioners Brown and Halkiotis continued working with staff to develop plans for upgrades to the Northern Human Services Center building and wastewater system. On May 6, 2003 the Board authorized the purchase of 12.2 acres of land across from the Center for upgrades to the wastewater system and other future uses (to be determined). On June 3 of this year, the Board considered and adopted a proposed process for the Northern Park. As a part of that review, the Board asked that information be presented after the summer break regarding: • A timetable of activities for the Park Master Plan (based on the June 3 action) • The draft Preliminary Concept Plan for the park • An update on proposed upgrades to the Center and wastewater system 2 The Master Plan process for Northern Park will utilize a "community meeting" approach to the park design, where Board members Brown and Halkiotis and staff will work with citizens and other interested parties at a series of community meetings to develop a Park Master Plan for the Board's review. The Master Plan is expected to be complete by December 2003. The Board may also wish to consider adopting the Preliminary Concept Plan for the park, as called for in the adopted process. As used in previous projects, this Preliminary Plan helps provide guiding parameters for the park design. The Preliminary Concept Plan identifies general areas for categories of uses, which is used in the Master Plan process to refine and guide project details. FINANCIAL IMPACT: Funds for construction of the Northern Park were included in the November 2001 Parks and Open Space bond in the amount of $1,200,000. Of that amount, $200,000 is currently available (appropriated in FY 2002-03). The Board's September 2002 CIP/Bond Sales Timetable anticipated the remaining funds to be allocated with $500,000 in both FY 2003-04 and FY 2004-05. Approximately $32,000 of this amount has been expended to date for a topographic and natural resource survey of the property (approved by the BOCC on August 19) needed for park design as well as work associated with the wastewater treatment system required for building facility improvements. RECOMMENDATION(S): The Manager recommends that the Board: 1) Review the information provided and provide feedback as desired, and 2) Adopt a Preliminary Concept Plan for the Park, with revisions as deemed appropriate, to be used in the Master Plan process. Master Plan Process Northern Human Services Center Park Adopted June 3, 2003 4 A. Site Information Size: 48 acres (including existing buildings and fields), with an additional 12.2 acres located across NC b'6. Location: Co-located with Northern Human Services Center, seven miles north of Hillsborough on NC 86 in Cedar Grove Township Status: Existing Northern Human Services Center and one ballfield and playground on original 8 acres. County acquired additional 40 acres in 1998. Draft Preliminary Concept Plan for park included in Northern Human Services center report of 2001. Funding: $1,200,000 Source: 2001 Parks Bond (200,000 appropriated in .FY 02-03) B. Proposed Timetable of Actions moailiea to relcecc di ~i va rsv~,~, aau~,c~wc~ ~ 1 Board approves charge and rocess, June 3, 2003 Topographic and culturaUarchaeological surveys August-October, 2003 a roved and conducted Board reviews timetable and adopts August 28, 2003 Preliminary Concept Plan Staff develops base maps and site analysis July-October, 2003 (O ortunities and Constraints Anal sis) Initial Community Meeting -Base Maps and October, 2003 Opportunities and Constraints Analysis (preceded by notices and public service announcements) Second Community Meeting -Community November, 2003 Interests for the Park Third Community Meeting -Design Charette November 2003 Fourth Community Meeting -Community Early December, 2003 Forum /final lan revisions Master Plan recommendations completed December 31, 2003 Board of Commissioners reviews and approves January-February 2004 Master Plan, instructs staff to develop construction documents and drawings Site plan submitted to Planning Department, March-Apri:L, 2004 construction drawings re ared Develop bid documents, solicit bids May, 2004 BOCC a roves contract for construction Ma -June 2004 Construction of Park July 2004-August 2006 ' ~ I1. 5 C. Rationale for Process Development of the Master Plan for this park will involve planning for both active and low-impact recreation opportunities at the site. Special attention and consideration will be given to coordination with plans for the adjoining Northern Human Services center, to ensure compatibility of proposed uses with the planned improvements to the Center. D. Description of Design Process The park design would be accomplished via a series of four community meetings held over three months. Citizens in the community will be invited to participate in the process by attending meetings and participating in the design. Notice about the community meetings will be publicized through mailings, public service announcements and notices placed in stores and community centers. The Open Space Design Specialist will be responsible for the actual site design, working with the County Manager (or designee), ERC Director and Recreation and Parks Director -with the Planning Director, County Engineer, Purchasing Director and Land Conservation Manager also asked to participate as available or needed. The end-product of this process will be a Master :Plan for the park, along with a brief written report, to be prepared by the end of December 2003. 6 E. Guiding Principles In addition to the charge, the Master Plan process shall use the following Guiding Principles: • Any proposed substantive modifications to the Preliminary Concept Plan should be conveyed to the Board of Commissioners as soon as practical for approval • The facilities to be designed and built should recognize the co- loration with the Northern Human Services Center, working in concert with future plans for the center and sharing infrastructure where possible • The park should, to the degree possible, promote apedestrian- friendly environment and discourage unnecessary automobile traffic or parking areas • The protection of important stream corridors and natural areas should be a foremost consideration, and facilities should be designed in concert with the natural surroundings wherever possible. Grading and alteration of the natural landscape should be minimized • Generally, all portions of the site not identified for playing fields or other active recreation facilities should adhere to "Olmsteadian" park and open space design principles, promoting open spaces, meadows, and fields that may flexibly be used for a variety of public leisure purposes • Open spaces, including trails, should be developed with a vision for both an internal and potential future external network, with leisure and pedestrian movement between the Northern Human Services Center and the park addressed internally, and linkage to any nearby residential areas considered externally • The plan should promote xeriscaping (native vegetation and minimal water use) within the entire site • The Work Group should hold at least one community forum or open house to present draft recommendations, prior to submittal of the Committee report • Additional basic operating principles may be developed