ACTION AGENDA ITEM ABSTRACT
Meeting Date : June 16 , 2026
Action Agenda
Item No . 84
SUBJECT : Approval of a Natural Resources Conservation Service ( NRCS ) Emergency
Watershed Protection ( EWP ) Grant Award — Lake Orange Spillway Channel
Repairs , and Approval of Budget Amendment # 12 - C
DEPARTMENT : Planning and Inspections
ATTACHMENT ( S ) : INFORMATION CONTACT .
1 . Notice of Award — Natural Resources Christopher Sandt , County
Conservation Service ( NRCS ) Emergency Engineer, 919-245 -2583
Watershed Protection ( EWP ) Grant Cy Stober , Planning Director , 919 -
2 . YearAo - Date Budget Summary 245 -2592
PURPOSE : To approve a Notice of Award of federal funds via a U . S . Department of Agriculture
( USDA ) National Resources Conservation Service ( NRCS ) Emergency Watershed Protection
( EWP ) grant for the design and construction of repairs to the Lake Orange emergency spillway
channel ( hereafter the " project" ) , and to approve proposed Budget Amendment # 12- C .
BACKGROUND : Orange County owns and operates Lake Orange . Lake Orange is a 150 -acre
public water supply reservoir constructed in the late 1960s with County bond funds for use as a
public water supply source via the installation of a high - hazard earthen berm and concrete
spillway/channel across the East Fork of the Eno River within the Falls Lake watershed ( Neuse
River Basin ) . As documented in legal agreements , the primary uses of Lake Orange are public
water supply and maintenance of minimum dry weather flows in the East Fork Eno River and
secondary uses include flood control and limited recreational activities .
On July 6 , 2025 , Tropical Storm Chantal caused acute structural damage to the Lake Orange
emergency spillway channel and a portion of the East Fork Eno River located immediately
downstream of the emergency spillway channel . During the storm , Lake Orange Road (a North
Carolina Department of Transportation ( NCDOT ) public right-of-way) was completely washed out
at the river crossing and Orange County residents were temporarily unable to access their
properties and homes for several days . The bridge crossing was replaced by NCDOT in late
2025 , but the riverbanks along approximately 200 linear feet of the East Fork Eno River located
between Lake Orange Road and the emergency spillway channel remain damaged to date .
Current conditions include damaged chain link security fencing along the Lake Orange emergency
spillway channel , significant scouring/removal of earth and large trees along the riverbanks , and
deposition of natural and manmade debris within the East Fork Eno River . The hydraulic
efficiency of the emergency spillway channel is compromised , and this condition may hinder the
channel ' s ability to safely pass the water flows generated from significant rain events .
Additionally , the damaged riverbanks continue to erode during regular rain events causing local
water quality degradation within the Eno River.
2
The project is needed to maintain Orange County' s regulatory and legal agreements with the
North Carolina Department of Environmental Quality ( NCDEQ ) , the Town of Hillsborough ,
Orange-Alamance Water , Inc . , and other parties to protect public water supply , ensure
appropriate flood control and minimum water releases , and ensure the long -term protection of
human life and property along the East Fork Eno River . The project is also needed to address an
imminent hazard of unstable riverbanks , damaged security fencing , and hydraulic restrictions to
emergency water releases from Lake Orange during heavy rain events due to accumulated
debris/trees within the spillway channel . The project is located entirely within the East Fork Eno
River' s 100 -year floodplain .
On August 5 , 2025 , Orange County staff submitted a financial assistance request to the EWP
grant program . Assistance was requested for funding the solicitation of qualified designers and
contractors to repair the unstable stream banks , repair the security fencing , and remove and
properly dispose of the accumulated debris/trees from the 100 -year floodplain . On December 19 ,
2025 , Orange County was notified by NRCS of a preliminary award . Orange County staff
subsequently submitted all of the required application paperwork to NRCS , and on April 27 , 2026 ,
Orange County received a formal Notice of Award for the project (see Attachment 1 ) .
Orange County financial policy requires the Board to formally accept grant funds prior to
expenditure . As such , staff is requesting that the Board approve the acceptance of these grant
funds for the purpose of designing , permitting , and constructing the necessary repairs to the Lake
Orange spillway channel . Staff anticipates that the grant funds will provide approximately two -
thirds of the total project cost ; therefore the grant funds are a vital financing component .
Budget Amendment # 12 -C recognizes $ 127 , 613 in grant revenue and redirects $91 , 125 of the
Hillsborough National Pollutant Discharge Elimination System ( NPDES ) in matching grant funds
in the Multi -Year Grant Fund to cover the cost of these services and creates the following grant
project ordinance for a total appropriation of $ 218 , 738 .
NRCS Grant ($218, 738) - Project # 71063
Revenues for this project :
Current FY 2025-26 FY 2025-26
FY 2025-26 Amendment Revised
Grant Revenue $ 0 $ 127 , 613 $ 127 , 613
NPDES Grant Match $0 $91 , 125 $ 91 , 125
Total Project Funding $0 $ 218 , 738 $ 218 , 738
Appropriated for this project :
Current FY 2025-26 FY 2025-26
FY 2025-26 Amendment Revised
Project Expenditures $0 $ 218 , 738 $ 2183738
Total Costs $ 0 $ 2183738 $2183738
3
NPDES Grant (-$91, 125) - Project # 71060
Revenues for this project :
Current FY 2025-26 FY 2025-26
FY 2025-26 Amendment Revised
Grant Revenue $488 , 150 ($ 911125 ) $397 , 025
Total Project Funding $ 488 , 150 ($ 913125) $ 397 , 025
Appropriated for this project :
Current FY 2025-26 FY 2025-26
FY 2025-26 Amendment Revised
Project Expenditures $488 , 150 ($911125 ) $397 , 025
Total Costs $488 , 150 ($ 91 , 125) $3977025
FINANCIAL IMPACT . The approval of Budget Amendment # 12 -C adds $ 127 , 613 in budget
authority in the Multi -Year Grant Fund , outside of the General Fund .
ALIGNMENT WITH STRATEGIC PLAN : This item supports :
• GOAL 1 : ENVIRONMENTAL PROTECTION AND CLIMATE ACTION
OBJECTIVE 6 . Protect water supply/watersheds .
RECOMMENDATION (S ) : The Manager recommends that the Board accept the award of funds
from the USDA NRCS , authorize the Chair to execute the related Agreement , and approve Budget
Amendment # 12 -C .