HomeMy WebLinkAboutAgenda - 06-17-2003-10a11 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 17, 2003 Action Agenda Item No. ~~- - SUBJECT• Chapel Hill Township Park and Educational Campus -Status Report DEPARTMENT: Environment and Resource PUBLIC HEARING: (Y/N) No Conservation ATTACHMENT(S): 1) Timeline of Activities 2) Master Plan Map INFORMATION CONTACT: David Stancil, 245-2590 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To receive a status report on the Chapel Hill Township Park and Educational Campus project. BACKGROUND: From September 30, 2002 to May 22, 2003, the 23-member Chapel Hill Township Park and Educational Campus (CHATPEC) Work Group has been meeting to create a proposed Master Plan for the 193-acre County-owned site near the intersection of Eubanks Road and Old 86. On May 22, the Work Group held its final meeting and made several minor revisions to the draft Master Plan map. Work Group members were allowed to submit proposed revisions to the Master Plan report document through May 27, and these are being compiled by staff and will be shared with the co-chairs for final review and decisions on inclusion. Proposed park phasing and the creation of cost estimates have not yet been prepared. A full and complete report is slated to be presented to the Board in August. In the interim, a revised Master Plan map has been prepared by Design Specialist Kimberly Siran. The Master Plan design adheres to the Board's adopted Preliminary Concept Plan, and contains a 96-acre park with a balance of low-impact and active recreation. While the majority of the land area in the park is left in a natural state of proposed for low-impact recreation, the active recreation portion of the park features a wide variety of playing fields and activities, and if built would constitute the largest active recreation node in the County. Six playing fields have been designed, along with a variety of court sports, a senior activities 2 area, picnic shelters and other amenities. Several meadow areas, in keeping with the Olmsteadian vision for the park, are also proposed for flexible open space uses. The proposed Educational Campus on the northernmost 76 acres features a co-located elementary and middle school with associated facilities. A separate pod in the campus has not been designed in detail, and could feature a second elementary school or other school facility, to be determined at a later date. A 21-acre area that was designated as "Potential School Site" contains an archaeological site of some significance, and the Master Plan proposes only a tentative trail section in this area pending further research. After the Board considers the Master Plan and approves the next steps of the project, staff plans to submit the first phase of the project to the Town of Carrboro to begin the Town's approval process. Preliminary discussions along these lines are already underway. FINANCIAL IMPACT: None associated with this status report. Funding for phase I of the park was included in the 2001 bond in the amount of $1.2 million. The Work Group has discussed, briefly, the possibility of requesting Soccer Superfund appropriations to help build additional facilities in Phase I. RECOMMENDATION(S): The Manager recommends that the Board receive this report as information at this time, providing any needed direction to staff about the next steps for the project. Timeline of CHATPEC Project Activities September 30 Initial Meeting, review of Work Group mission and charge and pre- concept lan Throughout Site visits of the property by Work Group members October October 29 Approval of ground rules, sharing of site visit observations, review of staff's "Challenges and Opportunities" report (with detailed site information and maps) November 12 Continued discussion of Challenges and Opportunities report, process for remainder of proj ect, further site visits. Town/County parks advisory boards asked to identify and r ort back on community needs December Meeting cancelled due to ice storm. Work continues of detailed too aphic survey and cultural/archaeological surveys of site February 13 Report on community needs as identified by County/Town advisory boards. Review of draft Master List of potential site facilities (for future discussion) March 13 Presentations on Joint Planning Area, Carrboro Northern Transition Area Study and OWASA utility plans. "Dot-voting exercise" conducted to identify potential facilities to be excluded from master list (non-preferential exercise). Review of proposal to create subcommittees. Pictures from Wilmington park/campus shared. March 27 Preferential cumulative voting dot exercise conducted. Subcommittee process reviewed. Initial subcommittee breakout sessions held, with reporting back from both groups April 10 Work Group breaks into subcommittees -Parks Subcommittee begins design charette; Educational Campus Subcommittee reviews infrastructure issues and Carrboro plan requirements. Group reconvenes to share work and information Apri130 Preliminary archaeological findings shared with Work Group (rhyolite quarry). Both subcommittees continue with charette designs (Educational Campus begins charette, Township Park continues). Grou reconvenes to share work and information. May 8 Biological Resource evaluation shared with Work Group (already incorporated into designs). Draft Concept Plan shared with Township Park Subcommittee, Educational Campus Subcommittee continues charette and comes up with conceptual plan. May 22 Draft Master Plan Map and Report presented to Work Group, based on previous discussions and plans. Phasing of facilities discussed. 10 meetings in 6 months (no meetings December-January)