Loading...
HomeMy WebLinkAboutAgenda 05-05-2026; 8-k - Resolution Amending the 2025 Eno-Haw Regional Hazard Mitigation Plan 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 5, 2026 Action Agenda Item No. 8-k SUBJECT: Resolution Amending the 2025 Eno-Haw Regional Hazard Mitigation Plan DEPARTMENT: Emergency Services ATTACHMENT(S): INFORMATION CONTACT: 1. Amendment Resolution with Kirby Saunders, Emergency Services Attachment A (Amended Actions Director, 919-245-6100 in Yellow Highlight) Ian Fowler, Assistant Chief of 2. Letter of Support from OWASA Emergency Management, 919-245- 6100 PURPOSE: To adopt a resolution approving an amendment to the 2025 Eno-Haw Regional Hazard Mitigation Plan. BACKGROUND: In 2025, the Orange County Board of Commissioners formally adopted the 2025 Eno-Haw Regional Hazard Mitigation Plan. The Plan identifies both natural and human- caused threats and hazards facing our community and outlines strategies to reduce the impacts of future disasters. The proposed amendment to the 2025 plan stems from Chantal After Action Review (AAR) items, and a local emergency responder meeting on flooding issues hosted by the Orange Water and Sewer Authority (OWASA). The meeting included representatives from the Town of Carrboro, Orange County, OWASA, North Carolina Emergency Management (NCEM), and the North Carolina Department of Environmental Quality (NCDEQ) to discuss ongoing and emerging flood risks within the Morgan Creek watershed. A key outcome of that discussion was the recognition of a need to evaluate potential mitigation strategies in and around Morgan Creek, including the vicinity of the University Lake Dam. The proposed amendment (shown in yellow highlight on Attachment A to the resolution) is intended to address the Morgan Creek corridor more comprehensively, with the dam included as one of several potential mitigation components. Given that the dam is located within the Carrboro extra-territorial jurisdiction (ETJ), it was determined that an update to the County's Mitigation Action Plan would be appropriate. It was further recognized that downstream flood impacts were within the Town of Carrboro. As such, the Town has approved an amendment that similarly addresses Morgan Creek. This coordinated approach is intended to support interlocal alignment and strengthen eligibility for future federal and state funding opportunities. 2 FINANCIAL IMPACT: There are no financial impacts associated with consideration of the resolution. ALIGNMENT WITH STRATEGIC PLAN: This item supports: • GOAL 1: ENVIRONMENTAL PROTECTION AND CLIMATE ACTION OBJECTIVE 3. Improve educational opportunities for County staff and community members on climate action and available resources to advance climate action projects. OBJECTIVE 6. Protect water supply/watersheds. • GOAL 2: HEALTHY COMMUNITY OBJECTIVE 6. Provide sustainable, equitable, and high-quality community safety and emergency services in order to meet the community's evolving needs. RECOMMENDATION(S): The Manager recommends that the Board approve and authorize the Chair to sign the attached resolution adopting the amendment to the Eno-Haw Regional Mitigation Plan. 3 RES-2026-032 Attachment 1 ORANGE COUNTY BOARD OF COMMISSIONERS RESOLUTION 2025 Eno Haw Regional Hazard Mitigation Plan Amendment WHEREAS, Orange County is vulnerable to an array of natural hazards that can cause loss of life and damage to public and private property; and WHEREAS, Orange County desires to seek ways to mitigate situations that may aggravate such circumstances; and WHEREAS, Orange County has identified the need to evaluate and implement planning, engineering, operational, and mitigation measures along Morgan Creek to reduce downstream flood risk and enhance system resilience, including exploring the potential for University Lake Dam to be utilized as part of a broader strategy while evaluating alternative approaches; and WHEREAS, we, the Orange County Board of Commissioners, formally adopted the Eno Haw Regional Hazard Mitigation Plan in 2025; NOW, THEREFORE, BE IT RESOLVED, by the Orange County Board of Commissioners, the following: 1. Adopts Amendment One, Attachment A, to the Eno Haw Regional Hazard Mitigation Plan. 2. Agrees to incorporate the key elements of this amendment into Orange County's mitigation action plan in the next update of the Eno Haw Regional Hazard Mitigation Plan. BE IT FURTHER RESOLVED by the Orange County Board of Commissioners that this resolution shall take effect immediately upon its adoption. Approved this 5t" Day of May, 2026. Jean Hamilton, Chair Orange County Board of Commissioners 4 Table Error!No text of specified style in document-1-Mitigation Action Plan,Orange County Goal& Action Hazard(s) Objective Lead Agency/ Potential Funding Implementation 2025 # Action Description Addressed Addressed Priority Department Source Timeline Status 2025 Implementation Status Comments Prevention P-1 Incorporate relevant HMP priorities into All Hazards 1.1 Medium Orange County General Fund 2025-2030 Carried This action has been revised to incorporate priorities into the drafted 2050 Land Use Plan for adoption; Planning and (existing staffsalaries) Forward drafted 2050 Land Use Plan.Implementation ofthe 2030 in the meantime,continue Inspections Comprehensive Plan is ongoing. implementation of the Orange County Department 2030 Comprehensive Plan. P-2 Continue participation in the Community Flooding, 1.1 High Orange County General Fund Ongoing Carried The CPS re-certification period runsfrom August 1st to August 1st Pating System(CPS)and annual Hurricane& Planning and (existing staffsalaries) Forward for each fiscal year. Staffworks with CPS every July to submit our recertification in order to increase public Tropical Storm Inspections annual CPS recertification application. Orange County's 2024 safety,reduce property damage,avoid Department CPS rating was a score of Class 6,which qualifies our constituents economic loss,and allow for a decrease for a 20%discount in FEMA flood insurance premiums. Staff in flood insurance premiums for Orange hopes to maintain our relatively high CPS score for FY25,with County residents. potential eventual score increase(perhaps to Class 5),once staff is able to procure Certified Floodplain Manager(CFM)status. P-3 Continue to enforce floodplain Flooding, 1.2 High Orange County General Fund Ongoing Carried Orange County underwent a successful Floodplain Management regulations through the county's Special Hurricane& Planning and (existing staffsalaries) Forward program(NFIP)audit by the NC Department of Public Safety Flood Hazard Area(SFHA)Overlay Tropical Storm Inspections (NCDPS)in June 2023. Current feedback from NCDPS is that the District contained within the Orange Department program is in full compliance;with only a few minor deficiencies County Unified Development Ordinance noted,ofwhich staff is aware of and actively working to address and continue training efforts for the into FY25. Staff hopes to procure Certified Floodplain Manager Certified Floodplain Manager(CFM). (CFM)status in FY25. P-4 Continue to collaborate and support All Hazards 3.2 Medium Orange County General Fund 2025-2030 Carried Orange County remains committed to supporting municipal municipal mitigation strategies Emergency Services (existing staffsalaries) Forward mitigation strategies.Orange County Emergency Management is assisting UNC Chapel Hill with a generator project funded through the Hazard Mitigation Grant Program(HMGP)from Hurricane Florence.Additionally,Orange County Emergency Management is supporting the Town of Carrboro in applying for HMGP funding for a property acquisition related toflood damage from Hurricane Helene. P-5 Climate Action Plan All Hazards 2.1 High Orange County General Fund 2023-2032 New The Orange County Climate Action Plan was adopted in Sustainability (existing staffsalaries), November 2023 and is currently in implementation.The plan CIP,Federal and State addresses climate mitigation strategies as well as resilience and grants adaptation. P-6 Continue to develop,review,update,and All Hazards 3.1 Medium OWASA,Orange CIP and Operating 2025-2030 Carried Moving into FY25,Orange County continues to coordinate with implement recommendations in local County Planning and Budgets Forward City of Mebane and Town of Hillsborough and commit active and regional plans to improve the Inspections County CIP funds for relevant public water/sewer system reliability,redundancy,and resiliency of Department extensions,where applicable. Currently,the County has no active water resources(water,wastewater, public water/sewer extension projects in the queue with reclaimed water). remaining public utilities(i.e.,City of Durham,OAWS,OWASA) that are geographically capable of serving County constituents. OWASA remains committed to ensuring the reliability, redundancy,and resiliency of the water resources that sustain the water supplyfor our customers and community Eno-Haw WSP Regional Hazard Mitigation Plan April 2025 Pagel 5 Goal& Action Hazard(s) Objective Lead Agency/ Potential Funding Implementation 2025 # Action Description Addressed Addressed Priority Department Source Timeline Status 2025 Implementation Status Comments P-7 Home weatherization for low-to-Medium Excessive Heat, 4.2 Medium Orange County General Fund 2025-2030 New income residents. Severe Winter Housing Department, (existing staffsalaries), Weather Orange County Home grants Preservation Coalition P-8 Tree giveaway program. Excessive Heat 4.2,2.1 Medium Orange County General Fund 2025-2030 New Sustainability (existing staffsalaries), grants P-9 Create or Update Community Wildfire Wildfire 3.2 Medium County Emergency Grant funds 2025-2030 New Protection Plans in each fire district. Management, Fire Departments, NC Forest Service Property Protection PP-1 Continue enforcement ofthe North All Hazards 1.2 High Orange County General Fund 2025-2030 Carried Currently operating under the 2018 edition ofthe NC State Carolina State Building Code. Planning and (existing staffsalaries) Forward Building Codes and 2017 edition ofthe National Electrical Code. Inspections The updated codes were adopted in 2025 with implementation Department occurring in 2026 or later. PP-2 Continue participation in the National Flooding, 1.2 High Orange County General Fund Ongoing Carried Orange County underwent a successful Floodplain Management Flood Insurance Program(NFIP)to Hurricane& Planning and (existing staffsalaries) Forward program(NFIP)audit by the NC Department of Public Safety reduce the impact ofa future flood Tropical Storm Inspections (NCDPS)in June 2023. Current feedback from NCDPS is that the event,mitigate effects of flooding,and Department program is in full compliance;with only a few minor deficiencies allow citizens to be eligible for affordable noted,of which staff is aware of and actively working to address flood insurance. into FY25. Staff hopes to procure Certified Floodplain Manager (CFM)status in FY25. Orange County's 2024 CPS rating was a score of Class 6,which qualifies our constituents for a 20%discount in FEMA flood insurance premiums. Staff hopes to maintain our relatively high CPS score for FY25,with potential eventual score increase (perhaps to Class 5),once staff is able to procure CFM status. PP-3 Identify potential flood hazards of critical Flooding, 4.2 High OWASA CIP and Operating 2025-2030 Carried OWASA is developing a Climate Action Plan in 2025 to identify infrastructure and mitigation measures Hurricane& Budgets Forward vulnerabilities and outline mitigation measures to address the to address. Tropical Storm highest climate risks,including flood hazards of critical infrastructure. PP-4 Explore expanding situational awareness All Hazards 2.2 Medium Emergency Services, General Fund 2025-2030 Carried Orange County has collaborated with NC Dam Safetyto assess tools and strategies for increased OWASA (existing staffsalaries) Forward local stream and dam gauges.To enhance situational awareness, monitoring of local hazards such as CONTRAIL access has been granted to all fire chiefs with dam installation of additional stream gauges gauges in theirjurisdiction. PP-5 Pursue the acquisition and/or elevation Flooding 4.2 Medium Orange County Local,State grants, 2025-2030 New of flood prone properties,including Planning and Federal grants repetitive loss properties and Inspections substantially damages properties. Department Eno-Haw WSP Regional Hazard Mitigation Plan April 2025 Page 2 6 Coal& Action Hazard(s) Objective Lead Agency/ Potential Funding Implementation 2025 # Action Description Addressed Addressed Priority Department Source Timeline Status 2025 Implementation Status Comments Natural Resource Protection NRP-1 Strive to ensure future development Flooding, 1.1 High Orange County General Fund Ongoing Carried Moving into FY25,Orange County's ongoing stance(as defined in occurs in a manner that protects Hurricane& Planning and (existing staffsalaries) Forward the UDO)is no new development within the SFHA,barring floodplains,streams,wetlands,and other Tropical Storm Inspections extraneous/rare circumstances in which a property owner has natural features which work to reduce Department fullyjustifed that there are no feasible alternatives for by-right flood hazard susceptibility and continue development. Substantial improvements to existing structures to enforce existing regulations pertaining within the SFHA are permitted;however,any/all construction to stormwater management and erosion (new construction and/or or substantial improvements)will control standards contained within the continue to require complete floodproofing per FEMA standards. Orange County Unified Development Staffwill continue to require No-Rise studies for any fill within the Ordinance. SFHA,and staff will continue to process CLOMR/LOMR applications per regulatory requirements. Structural Projects SP-1 Explore the possibility of retrofitting All Hazards 4.2 Medium Emergency Services, Unified hazard 2025-2030 Carried Orange Countywill continueto identify opportunities to protect critical facilities to harden against high Asset Management Mitigation Assistance Forward critical facilities from wind and lightning. winds and lightning. (UHMA) SP-2 Conduct a cost-benefit review during the All Hazards 4.2 Medium Emergency Services, Unified hazard 2025-2030 Carried This is being completed on a case-by-case basis with each new planning and design phase of Asset Management Mitigation Assistance Forward facility and major retrofit. construction of new government owned (UHMA) facilities or critical facilities to determine the feasibility of equipping the facility with back-up generators,lightening protection,high wind protection,and/or 361 compliant tornado shelters. SP-3 Continue to identify and explore All Hazards 4.2 Medium Emergency Services, Unified hazard 2025-2030 Carried Orange County,in partnership with the Central Pines Regional possibility of improving or retrofitting Asset Management, Mitigation Assistance Forward Council,is applying for a grant to assess generator specifications existing critical facilities with on site OWASA (UHMA) for existing County facilities and estimate associated costs. energy generation. SP-4 Implement drainage improvement Flooding 4.2 Medium Emergency Services, State g ra nts,U H MA 2025-2030 New projects to reduce flood risk. Planning and grants,other federal Inspections grants Department Eno-Haw WSP Regional Hazard Mitigation Plan April 2025 Page 3 7 Coal& Action Hazard(s) Objective Lead Agency/ Potential Funding Implementation 2025 # Action Description Addressed Addressed Priority Department Source Timeline Status 2025 Implementation Status Comments SP-5 Evaluate and implement planning, Flooding, 4.2 High Emergency Services Local,State grants, 2026-2030 New engineering,operational,and mitigation Hurricane& Federal grants measures along Morgan Creek to reduce Tropical Storm downstream flood risk and enhance system resilience,including exploring the potential for University Lake Dam to be utilized as part of a broader strategy while evaluating alternative approaches. Conduct hydrologic and hydraulic analyses using current rainfall data and develop updated flood inundation mapping to inform decision-making. Based on these findings,design and prioritize mitigation actions and upgrade monitoring and instrumentation systems to support real-time situational awareness and response. Emergency Services ES-1 Engage with regional stakeholders in All Hazards 3.2 Medium Emergency Services General Fund 2025-2030 Carried Orange County continues to provide ASIM training to comprehensive emergency response (existing staffsalaries) Forward onboarding EMS personnel and others upon request.Emergency planning including Complex Services initially began the application process for an Assistance Coordinated Terror Attack response and to Firefighters Grant(AFG)to fund mass casualty incident(MCI) Mass Casualty Incident response equipment and training but has instead incorporated it into the planning. 2023-2024 budget.Additionally,Orange County Emergency Services is in the initial planning phase of developing a comprehensive MCI plan.Following the 2019 Regional Complex Coordinated Terrorist Attack(CCTA)Plan,Orange County,in partnership with Durham and Wake counties,hosted a series of trainings to strengthen identified capabilities. ES-2 Continue to provide warming/cooling Excessive Heat, 2.2 Medium Emergency Services General Fund 2025-2030 New centers during extreme temperatures. Severe Winter (existing staffsalaries) Weather ES-3 Explore a box fan giveaway program for Excessive Heat 2.1,2.2 Medium Orange County Social General Fund 2025-2030 New residents without central air Services/Aging (existing staffsalaries) conditioning. ES-4 Develop a comprehensive Emergency All Hazards 3.1 High Emergency Services State grants,UHMA 2025-2027 New Operations Plan update with integration grants,other federal of all three municipal Emergency grants Operations Plans. ES-5 Develop a Cou ntywide Tactical All Hazards 3.1 Medium Emergency Services General Funds 2025-2030 New Interoperable Communications Plan, (existing staffsalaries) addressing both voice communication and data. Eno-Haw WSP Regional Hazard Mitigation Plan April 2025 Page 4 8 Coal& Action Hazard(s) Objective Lead Agency/ Potential Funding Implementation 2025 # Action Description Addressed Addressed Priority Department Source Timeline Status 2025 Implementation Status Comments ES-6 Improve situational awareness and All Hazards 3.1 Medium Emergency Services General Funds 2025-2030 New interagency coordination during hazard (existing staffsalaries) events by using mobile geospatial tools that support real-time data sharing, location tracking,and operational overlays that can support both public safety and non-public safety assets. Public Education&Awareness PEA-1 Provide education and outreach to All Hazards 2.1 Medium Emergency Services General Fund 2025-2030 Carried Orange County continues to host and sponsor Community Orange County residents in multiple (existing staffsalaries) Forward Emergency Response Team(CERT)training,offering two CERT languages before,during,and after a basic training courses annually and meeting regularlywith the hazardous weather event and maintain a CERT Council.Orange County Emergency Services partners with linkto the Eno-Haw Regional Hazard Orange County Cooperative Extension to host an annual Mitigation Plan on Orange County's summer camp that enhancesyouth resilience to hazards. Website. Additionally,Orange County Emergency Management collaborates with NCEM to host the Emergency Management Experience,an all-girls summer camp focused on careers in emergency management and first response. Orange County remains committed to public education on hazard risks and has developed a multilingual repository of preparedness information.In 2024,the County updated the Ready Orange website to support easy translation into multiple languages and to clearly communicate hazard information and preparedness measures.Emergency Management continues to leverage social media and other platforms to educate residents about natural hazards,including the creation of multilingual preparedness graphics for targeted outreach and social media use.Efforts are ongoing to ensure all communications,especially OC Alert notifications,use plain language for accessibility and clarity. PEA-2 Engage in regional events,activities,and All Hazards 3.2 Medium Emergency Services General Fund 2025-2030 Carried Orange County actively participates in local and regional training opportunities related to natural (existing staffsalaries) Forward exercises.In 2023,Orange County Emergency Services partnered hazards in order to improve with OWASAto conduct a dam failure tabletop exercise. communication,enhance,partnerships, Currently,Emergency Services is engaged in a Threat and Hazard and improve planning efforts with other Identification and Risk Assessment(THIRA)to identify capability local jurisdictions. gaps related to various hazards.Additionally,in 2021,Orange County hosted a full-scale active shooter exercise at UNC Hillsborough PEA-3 Provide staff support and information on Flood, 2.1 Medium Orange County General Fund 2025-2030 Carried Updated information was posted in 2024 at Floodplain Orange County's website to provide Hurricane and Planning and (existing staffsalaries) Forward Protection I Orange County,NC.Information also available on education and assistance to residents Tropical Storm Inspections httos://www.orangecountvnc.gov/3427/Floods experiencing floodplain,stormwater,and Department erosion control issues. Eno-Haw WSP Regional Hazard Mitigation Plan April 2025 Page 5 9 Coal& Action Hazard(s) Objective Lead Agency/ Potential Funding Implementation 2025 # Action Description L Addressed Addressed Priority Department Source Timeline Status 202S Implementation Status Comments PEA-4 Continue to support strategies identified All Hazards 3.2 Medium Orange County Multiple 2023-2050 New Information on the Climate Action Plan and current progress can in Orange County's Climate Action Plan Sustainability, be found at httos://www.orangecountync.ciov/3096/Climate-Action-Plan PEA-5 Provide utility bill assistance to income Excessive Heat, 3.2 Medium Orange County General Fund 2025-2030 New eligible residents. Winter Housing (existingstaffsalaries) Weather PEA-6 Conduct periodic heat mapping to Excessive Heat 3.2 Medium Orange County General Fund 2025-2030 New understand which partsofOrange Sustainability, (existingstaffsalaries) County are most vulnerable to excessive heat. PEA-7 Develop and begin implementing a Excessive Heat 2.2 Medium Orange County General Fund 2025-2030 New countywide Heat Action Plan. Sustainability, (existingstaffsalaries) Emergency Services Eno-Haw WSP Regional Hazard Mitigation Plan April 2025 Page 6 10 Orange Water and Sewer Authority OWASAOur community's trusted partner for dean-water and environmental protection Subject: Support for Amendment to the Eno Haw Hazard Mitigation Plan to Include Morgan Creek Flood Management Study Dear Orange County Board of Commissioners, On behalf of the Board of Directors of the Orange Water and Sewer Authority(OWASA), I am writing to express our support for the proposed amendment(attached)to the Eno Haw Hazard Mitigation Plan to include a comprehensive flood management study that potentially incorporates OWASA's University Lake Dam as part of a broader strategy. As the operator of critical water supply infrastructure, including University Lake Dam, OWASA recognizes the essential role that coordinated, data-driven flood mitigation and planning plays in protecting public safety, maintaining reliable water service, and safeguarding downstream communities, homes, and assets. Incorporating the dam, among other strategies, into a county-led flood management study represents a proactive and necessary step toward enhancing regional resilience. Aflood management study that evaluates planning, engineering, operational, and mitigation measures along Morgan Creek to reduce downstream flood risk and enhance system resilience, including exploring the potential for University Lake Dam to be utilized as part of a broader strategy while evaluating alternative approaches will provide important insights into flood risk reduction opportunities.This effort will also support coordination among local, state, and regional partners during both routine operations and emergency response situations. Our hope is that, based on the findings from this study, mitigation activities can be prioritized to strengthen the county's ability to identify and prioritize flood risk reduction strategies and support the needs of multiple jurisdictions, stakeholders and community members. We appreciate the County's leadership in advancing hazard mitigation planning and strongly encourage the formal adoption of this amendment(attached). Please feel free to contact Todd Taylor, OWASA's Executive Director, at ttaylor@owasa.org, if you have any questions or require additional information. Sincerely, Michael Hughes, PE Chair, Board of Directors Orange Water and Sewer Authority