HomeMy WebLinkAboutAgenda - 05-20-2003-8sORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 20, 2003
Action Agenda
Item No. ~_
SUBJECT: Whitted Human Services Center Renovation -Authorization to Contract for
Environmental Remediation Services
DEPARTMENT: Public Works/Purchasing
& Central Services
ATTACHMENT(S):
5/16/03 Public Works Director Memos
WHSC Building Diagram
PUBLIC HEARING: (Y/N) No
INFORMATION CONTACT:
Wilbert McAdoo, ext 2625
Pam Jones, 2650
TELEPHONE NUMBERS:
Hillsborough
Chapel Hill
Durham
Mebane
732-8181
968-4501
688-7331
336-227-2031
PURPOSE: To authorize the Manager and staff to approve change orders and execute
additional contracts necessary to carry out the Whitted Human Serviices Center renovation
project.
BACKGROUND: The renovation project at the Whitted Human Services Center (WHSC) has
progressed well since September 2002, with work substantially completed in the "B" Building
and the Central Recreation Building. Employees and equipment from the "A" Building began
relocating in early May so that renovation work in that section of WHSC could begin. Several
hidden problems requiring an expanded scope of work for the project were discovered at the
outset of the contractor's work, as described in the accompanying memorandum from the
County's Public Works Director.
Staff requests that the Board authorize the Purchasing Director and Public Works Director to
negotiate and approve a contract with Wildlife Nuisance Control, Inc. to carry out the
environmental remediation work necessary. That would allow the main WHSC contractor,
Environmental Air Systems, Inc. to re-engage and complete the Whitted Center HVAC
replacement project in an expeditious manner so as to minimize the disruption to employees
and citizens who receive services from County departments housed at the Whiffed Center.
Additionally, staff recommends that the Board authorize the Manager to approve any additional
change orders, not to exceed an additional $100,000, that may became necessary during the
period of time the BOCC does not meet from the end of June through mid-August 2003.
Should any additional change orders become necessary (for example, if any other hidden
problems should be discovered), staff would provide the BOCC with written reports on their
nature and scope upon the Manager's approval of such change orders.
2
FINANCIAL IMPACT: The overall project funding for the Whitted Human Services Center
renovation is just under $3 million. Staff proposes that the contract with Wildlife Nuisance
Control, and any subsequent Manager-authorized change orders up to $100,000 be funded by
reallocating already budgeted funds from subsequent phases of the WHSC project (e.g.
painting and floor coverings). Staff will use other unencumbered operating budget resources or
any savings that can be achieved in the scope of the overall WHSC renovation project to
complete those subsequent project elements.
RECOMMENDATION(S): The Manager recommends that the Board:
1) authorize the Purchasing Director and Public Works Director to negotiate and execute a
contract and any related documents with Wildlife Nuisance Control, Inc. in the
approximate amount of $50,000, to carry out environmental remediation work essential
to completion of the Whitted Human Services Center renovation project;
2) authorize the Purchasing Director and Public Works Director to negotiate an appropriate
reduction in the contract with Environmental Air Systems, Inc. to reflect a credit to the
County for any of their contracted work that will instead be carried out by Wildlife
Nuisance Control, Inc.; and
3) authorize the Manager to approve and staff to execute any WHSC project change
orders, not to exceed a cumulative total of $100,000, that may become necessary
through August 19, 2003.
3
DATE: 05/16/03
TO: County Commissioners
John Link, County Manager
FROM: Wilbert. McAdoo, Public Works Director
RE: Environmental Remediation in Whitted `A' Building
Over the past several years, periodic reports of bats entering or being present in the Whitted
`A' building have been reported by building occupants. Public Works staff, in conjunction with
Animal Control staff, responded to these reports to ensure the safe removal of the bats. It was
eventually determined that a colony of bats were in the attic space above the main Library.
While bats are very beneficial in terms of insect control, especially mosquitoes, their presence
within buildings is typically considered undesirable for both aesthetic and health concerns, as
well as general fear of bats by many people.
Public Works staff met with several animal control and abatement contractors and also
undertook research to become more knowledgeable concerning bat roosting habits, their
ability to enter structures, techniques for removal and exclusion, etc. It was determined that
the bats were exploiting several voids between the brick and flashing around the wood Hailers
used to hold roof gutters at the roofline on the rear of the `A' building.
At the time of roof replacement on the Whitted Building, design work included repair and/or
replacement of any cornice moldings, drip edges, flashings, etc. which may have allowed
access by bats (It is reported that bats can enter spaces as small as '/" by '/2"). In addition,
Public Works staff installed fine wire mesh over existing attic vents that may have been large
enough to allow entry by bats and at the end of rafter tails inside the attic. It was believed that
the majority, if not all points of entry, had been eliminated during the course of the re-roofing
and associated work.
In anticipation of work to be completed in the `A' building, Public Works contracted with
Associated Industrial Services in January 2003 for complete abatement of accumulated bat
guano from the attic space above the Library. The attic space above the second floor corridor
was also cleaned at that time. The scope of work included complete removal of all fiberglass
batt insulation and accumulated bat droppings, complete cleanup of the floor joist cavities, and
treatment of all exposed wood and plaster in the attic space with a biocide in order to eliminate
any potential microbial contamination.
During the recent reoccupancy of the `B' building, Environmental Air Systems and their
subcontractors transitioned to the `A' building. Demolition work began May 8, 2003 in the main
portion of the Library, with removal of the existing acoustical the ceiling and grid work, light
fixtures and ductwork. At this time, it was determined that some dead bats and bat droppings
were present in the space between the original plaster ceiling and the acoustic the ceiling
system. Work was stopped in the `A' building on Monday May 12, 2003 to allow further
investigations regarding the scope of bat infiltration and contamination. The contractor raised
concerns because the demolition work, which required the removal of the acoustical ceiling
tile, creates dust and can cause material to become air borne. The acoustical ceiling the has
served as a barrier and the materials were not previously disturbed, which meant they were
not air borne and did not create the same problems as occur during construction.
It has been determined that bats had previously gained entry to the space (through holes in the
plaster ceiling) above the ceilings throughout the rest of the `A' building (basement, first and
second floors). Past conversations with bat removal experts suggest that these bats likely
became separated from the colony that existed in the attic, were unable to find their way back,
and died in these spaces. There is no indication that bats roosted permanently in these
spaces; however, the presence of dead bats and some bat droppings creates concerns for
worker safety during the removal of ceiling systems, lighting, and HVAC system components.
Bats are potential carriers of rabies and bat guano can contain spores of a fungus called
histoplasma capsulatum, which can cause histoplasmosis, an infectious disease, if inhaled in
sufficient quantity. In addition, a small number of live bats have regained entry to the Library
attic, indicating that further exclusion work is necessary.
Public Works staff contacted Associated Industrial Services of Raleigh and Wildlife Nuisance
Control of Burlington and Greesboro to discuss options for remaining cleanup and abatement
throughout the remainder of the `A' building. The proposal from Wildlife Nuisance Control also
included identifying remaining points of entry by bats and permanent exclusion.
NEXT STEPS
Completion of the abatement and cleanup work is not optional, and will have to be completed
in order to allow completion of the HVAC and related work and eventual re-occupancy by
County staff.
The price quotation obtained from Wildlife Nuisance Control ($50,000) is substantially lower
than that received by Associated Industrial Services ($79,420), and in addition includes the bat
entry exclusion work. The $50,000 quote includes a portion of the demolition work that is a
part of Environmental Air System's contract. As a result, Orange County will receive a credit
for a portion of the demolition work. The consulting engineer and contractor are now
attempting to determine the amount of the credit.
Public Works is recommending acceptance of the quotation by Wildlife Nuisance Control, and
that authorization to proceed be issued as soon as possible so that work by the HVAC and
related contractors is not further delayed. The contractors have limited work on the exterior of
the `A' building and in the mechanical room that can be completed, but there is a high risk that
they may have to pull off of the job site if the abatement and cleanup issue cannot be resolved
in a timely manner. Remobilization of each contractor would likely incur additional costs to the
County.
LO
_DATE: 0:5/16/03
TO: County Commi signers
John Link, County. Manager
FROM: Wilbert Mcadoo, Public Works Director
RE: Richard E Whitted Human Services Renovations/ Update
BACKGROUND
The Richard E. Whitted Human Services Center, a former high school, was acquired by the
County from the Orange County school system in approximately 1975. Renovation plans were
developed in 1978 to facilitate use primarily as office space, and health clinic areas. The
recreation building was primarily maintained for recreation related activities, with establishment
of a small suite of offices. Minor additional modifications have taken place over the years,
primarily through subdivision of larger areas to create more private office space. The heating
ventilation and air conditioning (HVAC) system installed at that time was primarily designed to
minimize energy demand by severely limiting the intake of outside air which would require
cooling during the hot summer months and heating during the cold winter months. Few
changes had been made to the Whitted Human Services Center since the original renovations.
In 2002, the Board of County Commissioners approved replacement of the HVAC system in
the Richard E. Whitted Human Services Center, including the Central Recreation building. The
project included removal of all existing acoustic the ceiling systems and lighting in conjunction
with the HVAC replacement. In addition, new floor coverings and paint are being installed
while spaces are vacated for the renovations. Additional extensive renovations were
undertaken by the Health Department in the clinic areas to improve service delivery to the
public.
The bid from Environmental Air Systems of Greensboro, NC was accepted and work was
initiated in August 2002.
C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 1 Printed: 05/16/03
Work was phased as follows for completion:
1. Central Recreation Building
2. Boiler replacement
3. Richard E. Whiffed `B' Building (Health, DSS)
4. Replacement of cooling tower with chiller
5. Richard E. Whiffed `A' Building (Library, DSS, Housing & CD, etc.)
INTRODUCTION
Central Recreation staff were temporarily relocated to space in the basement of the Whiffed `A'
building, following relocation of Department on Aging staff to existing DOA facilities, and OPT
staff to a modular office building located at the Public Works complex.
The scope of work in the Central Recreation building included replacement of the existing
HVAC system, as well as air conditioning the gymnasium, which had previously been
unconditioned space. All existing acoustic the ceilings and lights were replaced, and some
additional lighting was installed, especially on the building exterior. Also included was removal
of all asbestos composition floor the (ACT) throughout the building. Lobby and corridor areas
and Activity Area 3 were replaced with rubber floor tile. Activity Area 1 was replaced with
linoleum the and the office areas were replaced with carpet tile. All areas were painted
including the entire gymnasium.
Simultaneously with Recreation Building renovations, the boiler located in the mechanical
room (`A' building basement), was replaced and brought on-line in November 2000.
Work in the Central Recreation Building was completed, and the building reoccupied in
December 2002.
During the renovations in the `B' building, Health Department staff were relocated to areas in
the `A' building basement, a modular health clinic building on the site of the deconstructed
former Orange Industries building, leased dental clinic and offices and other remote locations.
C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 2 Printed: 05/16/03
DSS staff were primarily relocated to the `A' building basement and Southern Human Services
Center.
The scope of work for the `B' building included replacement of the existing HVAC system,
replacement of acoustic the ceilings and lights, painting and replacement of data lines on all
three floors. On the First and Second floors, wood tongue and groove flooring was refinished
in several office areas, while rubber the was installed in corridors. Rubber floor the and sheet
vinyl designed for medical facilities was installed throughout the basement level (clinic area).
In addition, the Health Department incorporated significant modifications to the clinic area,
including creation of new exam rooms and offices and improvements in others. Installation of
anew high-density file system for DSS was also incorporated into the renovation project.
Simultaneously with `B' building renovations, the cooling tower was replaced with a new chiller
for provision of cooled air throughout the complex. The new chiller was brought on-line in April
2003 and is providing cooling for the Recreation and `B' buildings.
Work in the `B' Building has also now been completed with the exception of minor "punchlist"
items, with Health and DSS reoccupying the building in the first weeks of May 2003.
The scope of work for the `B' building renovations had to be expanded once ceilings were
removed and non-compliant items (structural and fire code related) were exposed. Other
changes were identified by the Inspections department and the fire marshal related to modern
fire code, life safety and Americans with Disabilities Act (ADA) compliance (fire doors,
handrails in stairwells, etc.). The cost of these repairs was approximately $100, 000.
CURRENT STATUS
The contractors have moved operations to the `A' building as it was vacated. Health
Department administrative staff were returned from the `A' building and other remote locations
to their permanent offices in the `B' building. Clinic staff have been returned from the modular
clinic to the renovated `B' building clinic. Dental clinic staff will return to the `B' building the
week of May 19. DSS staff have been returned from the `A' building. In addition, DSS staff
C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 3 Printed: 05/16/03
9
normally located in the `A' building have "doubled up" in `B' building offices, including several
offices "on loan" from the Health Department while `A' building renavations are completed, and
others have been temporarily relocated to the Southern Human Services Center. A temporary
"mini Library" has been established in the modular building on the former Orange Industries
building site, with the majority of books having been placed in storage during this phase of the
renovations. Housing and Community Development staff have also been stationed in the
modular building.
As in the `B' building, the scope of work includes replacement of the entire HVAC system,
acoustic the ceilings and lights, installation of new data lines, replacement of flooring and
painting.
As acoustical the ceiling was removed in REWHS A Building, the contractor discovered hidden
conditions which requires additional repairs. These conditions include the removal of load
bearing support walls, columns and structural members. The majority of these conditions
originate from the 1978 renovation project. Additionally there are some fire code/life safety
issues that must be addressed. Public Works is working with the inspections department, the
fire marshal and the consulting engineer to determine the scope of the repairs and the
associated cost.
C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 4 Printed: 05/16/03
'o
-~ _~
W
J
U
tf~
W
W
tJ)
Z
Q
D
W
F
W
G~
L1C
TQ
i
.~
t~
~'
H
U
O
b
~'
.b
Z.,
3
a
w
H
3
0
Q
3
v