HomeMy WebLinkAboutAgenda - 05-20-2003-8rORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
CONSENT AGENDA ITEM ABSTRACT
Meeting Date: May 20, 2003
Action Agenda
Item No. ~" J'~
~~ ~n IC~`T. C~ro~m rl~ecifiratinn AmPndrrlP.rltS
DEPARTMENT: Planning & Inspections PUBLIC HEARING: (YIN) No
ATTACHMENT(S):
Proposed Ordinance
Planning Board Minutes April 2, 2003
Public Hearing Mnts. Feb. 24, 2003
Ordinance Review Min. April 2, 2003
Keith Feather Letter
Handouts
GIS Sample Maps
INFORMATION CONTACT:
p. 5 Craig Benedict, Director, ext. 2592
p. 8 Robert P. Davis, Planner II,I ext. 2580
p. 13 Reynolds Ivins, EC Supvr., ext. 2456
p. 16 TELEPHONE NUMBERS:
p. 21 Hillsborough 732-8181
p. 22 Chapel HiIN 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To close the Public Hearing and to make a decision regarding the proposed
Stream Classification Amendments to the Zoning Ordinance.
BACKGROUND: The North Carolina Division of Water Quality (DWQ) in the Department of
Environment and Natural Resources is the agency responsible for statewide regulatory
programs in groundwater and surface water protection. The DWQ mission is to preserve,
protect and enhance North Carolina's water and groundwater resources through quality
monitoring programs, efficient permitting, responsible management, fair and effective
enforcement and excellence in public service. This charge is carried out through resources at
both the state and local levels. The statewide watershed protection program is an example of
state and local government regulatory powers.
The County's watershed protection program requires stream buffers be established and
enforced along all solid and intermittent blue line streams as identified on the United States
Geological Survey (USGS) topographic maps. Presently, stream buffers within Orange
County's zoning jurisdiction are only required along streams identified on USGS topographic
maps. The USGS maps do not protect all water features that are important to water quality.
The DWQ estimates that streams represented on USGS topographic maps underestimate the
actual presence of streams by approximately 25%. These underrepresented types of streams,
which have a high level of impact on water quality, are not protected at all under the County
zoning stream buffer regulations. Another major shortcoming of the sole use of USGS maps is
that the streams, which are identified on the maps, are based on aerial photography with no
field verification. This lack of field verifications by the USGS creates problems, acknowledged
by the DWQ, with regard to enforcement of the stream buffer regulations on a lot-by-lot basis.
Three common problems encountered include, but are not limited to, disputes as to whether a
USGS stream actually exists, disputes as to whether the location of :said USGS stream is as
shown on the map and disputes concerning whether the floodplain is properly mapped based
on the inaccurate location of a USGS stream.
The State's original decision to require the use of USGS maps at the time the watershed
protection rules were adopted was due to the fact that the USGS maps were available
throughout the state while better maps, such as the Soil Survey, were not. Orange County
adopted the USGS maps `by reference', as did other jurisdictions throughout the State. Due to
the `by reference' adoption of the USGS maps the County's ability to `relocate' the stream is not
available and the procedure for correcting an inaccurate stream location on a USGS map at the
Federal level is lengthy and expensive. Furthermore, the correction of one inaccurate stream
on a USGS map does not necessarily mean that inaccuracies for other streams on the same
map are corrected. There are better methods than the use of static maps to protect stream
quality and watersheds, the two most notable being DWQ certification of local governmental
personnel and delegated authority.
Orange County now has staff members trained in identifying surface water features that have a
direct impact on water quality. Prior to receiving delegated authority for enforcement of the
Neuse River Buffer rules from DWQ, each member of the Orange County Erosion Control staff
received 50 hours of field training and classroom testing under the Surface Water Identification
Training and Certification (SWITC) program. House Bill 1257 mandated the SWITC
certification program to be taught by DWQ staff. This training, which is intended to ensure the
enforcement of rules enacted by the N.C. Environmental Management Commission, is deemed
sufficient by DWQ for stream identification use and establishing buffers per state-mandated
watershed protection rules. The stream identification checklist that County staff uses to identify
streams was developed by DWQ.
This proposed amendment will allow usage of available, existing methods to protect streams by
broadening language in the zoning ordinance that would allow, in addition to the USGS maps,
the use of the Soil Survey of Orange County and field identification of water features by County
staff. By using these three methods of water feature identification in combination with each
other, virtually all streams that affect water quality will be protected. Another derived benefit is
that the availability of County staff to do field determinations of streams will provide a service to
property owners, more accurate and without cost, that will help them maintain a high quality of
stream preservation.
Maps showing the difference between the USGS maps and Soil Survey will be presented at the
Planning Board meeting. While the new GIS maps are being updated with the soil survey
streams, staff will use the soil survey maps as they currently are for Neuse River Buffer Rules.
Issues at the Public Hearing (February 24, 2003)
• Question regarding these amendments and applicability to Bona Fide Farming activities
• Zoning does not apply to bona fide farming activities per State Statutes. Forestry
activities are also exempt to the extent they fall under the same bona fide farming
provision. However, if a portion of a farm exempt tract were proposed for
development in the future (e.g. subdivision, non farm-related home occupation, etc),
zoning ordinance provisions, which include stream buffers, would apply to the
development proposal.
Question regarding impacts of these rules on Orange County citizens
• The Neuse River Basin Rules (North Carolina Administrative Code 15A NCAC
026.0100 & .0200) currently in effect in the Neuse River Basin require 50-foot stream
buffers along identified streams (USGS, soil survey, field verified streams).
• These proposed stream classification amendments would require that the same type
of streams as those listed above have either 65-foot or 80-foot stream buffers. The
buffer is dependent on the slope of the land over a 250-foc-t area adjacent to the
stream. The 65-foot buffer applies to situations where the slope is 7.5 percent or less.
The 85-foot buffer applies where the adjacent slope exceeds 7.5 percent. In rare
instances would the buffer exceed 65 feet along soil survey streams due primarily to
the minimally sloped areas that usually exist near the headwaters of streams.
• There have not been major disputes regarding the enforcement of the Neuse River
Basin rules and we would not anticipate an inordinate number of complaints as a
result of these ordinance amendments.
• These amendments do not `create' streams where none exist. These amendments
require that steams that exist or have characteristics of streams be buffered in
accordance with the County's stream buffer ordinance.
• The variance procedure currently existing in Section 6.23.,,11 of the zoning ordinance
for reduction of stream buffers will be fully applicable in situations where relief from the
strict enforcement of the ordinance would be needed to prevent a complete taking of
property.
Process
1) Public Hearing held on February 24, 2003. Referred to Planning Board for recommendation
to return to BOCC no sooner than May 20, 2003
2) Ordinance Review Committee reviewed amendments on April 2, 2003
• Referred amendments to Planning Board with no recommendation
3) Planning Board voted 9-0 to recommend approval of the amendments
• Issues discussed
• Vesting of existing structures
• The same procedure in the zoning ordinance now is to be used for vesting.
• Variance procedures to avoid complete takings of property
• These rules exceed the State minimums, so the County could grant a complete
variance on soil survey streams and not violate the State Watershed Rules.
• Restoration of piped or destroyed soil survey streams
• This may be a possibility on new projects or revisions to existing property, within
reasonable limits.
• Devaluation of property in general
• This argument was used when the original Watershed Rules went into effect. No
evidence has been presented proving that property values, in general, plummeted
as a result of the watershed protection rules.
4) BOCC to make decision no sooner than May 20, 2003
4
FINANCIAL IMPACT: There is no public financial impact with this decision.
RECOMMENDATION: Administration recommends APPROVAL of the proposed
amendments.
Planning Board recommends APPROVAL of the proposed
amendments.
Planning Staff recommends APPROVAL of the proposed
amendments.
Ordinance as Recommended by Administration
An Ordinance Amending the Zoning Ordinance
Of Orange County
Be it ordained by the Board of Commissioners of Orange County that the Orange
County Zoning Ordinance is hereby amended as follows:
Section 1. Amend Article 22 definition for Stream Buffer to read as follows:
Stream Buffer--A stream buffer is an area of land adjacent to a
streams or a FEMA-identified floodplains,
whichever is greater, which, except as permitted in Article 6.23.7 of this
Ordinance, must remain undisturbed in its natural state. °D°'~°*a*
Streams are identified as by any of the following means: 1)
shown as solid blue lines a~ or as broken blue lines on the USGS
Quadrangle maps, 2) shown as a water feature in the Orange
County Soil Survey, or 3) a water feature identified by a field
determination of County staff trained in surface water
identification through the North Carolina Division of Water Quality
(NCDWQZ. Stream buffers shall extend around the perimeter of all
other water belies-features if any portion of the stream buffer touches
the water bedy feature. Disputes pertaining to water feature
identification decisions by County staff shall be filed directly to
the NCDWQ. Stream buffers for Soil Survey streams shall be
calculated using Method A only.
Section 2. Amend Stream Buffers definition in Article 6.23.7definition to read as
follows:
a) Definition---See Article 22 Stream Buffer
Section 3. Amend Article 22 to add a new definition for Water Feature to read as
follows:
Water Feature-A prominent aspect or characteristic of a
geographic area that exhibits verifiable evidence of a presence of
water in the soil. Examples of water features include, but are not
limited to, perennial and intermittent streams, lakes, ponds,
reservoirs, springs, artesian wells, irrigation wells, marshes or
swamps, wetlands, and natural drainage ditches (non-ephemeral).
Section 4: Amend Section 6.23.10 APPLICABILITY to react as follows:
a) Existing Development
For the purpose of determining compliance with or applicability of
Article 6.23 of this Ordinance, existing development is defined as a
residential or non-residential structure which:
Ordinance as Recommended by Administration 6
1) was constructed prior to January 1, 1994 (October 19, 1999,
with respect to the October 19, 1999 amendments related to the
CANE-CA and CANE-PW districts; and September 19, 2001
with respect to the Stream Buffer/Usable Lot amendments; and
May 20, 2003 with respect to the Stream Classification
Amendments), or
2) was constructed in accordance with a valid building permit
issued prior to January 1, 1994 (October 19, 1999, with respect
to the October 19, 1999 amendments related to the CANE-CA
and CANE-PW districts and September 1!~, 2001 with respect to
the Stream Buffer/Usable Lot amendments; and May 20, 2003
with respect to the Stream Classification Amendments) or
3) was included as part of a Site Specific Development Plan
approved by the Board of Commissioners prior to January 1,
1994 (October 19, 1999 with respect to the October 19, 1999
amendments related to the CANE-CA and CANE-PW districts
and September 19, 2001 with respect to the Stream
Buffer/Usable Lot amendments and May 20, 2003 with
respect to the Stream Classification Amendments); or
4) had otherwise established a vested right under North Carolina
Zoning law prior to January 1, 1994 (October 19, 1999 with
respect to the October 19, 1999 amendments related to the
CANE-CA and CANE-PW districts and September 19, 2001
with respect to the Stream Buffer/Usable Lot amendments
and May 20, 2003 with respect to the Stream Classification
Amendments).
Existing development is hereby deemed to be conforming with
respect to requirements of Article 6.23 of this Ordinance. Periodic
updates to FEMA maps may affect structures located within the
floodplain of specific streams. The zoning ordinance text
amendments dated September 19, 2001 and May 20, 2003 only
affect the Stream Buffer section of the ordinance and are not meant
to supersede any FEMA regulations or requirements.
Section 5. Amend Article 6.24.1 Additional Requirements for Lots Outside of
Watershed Protection Areas to read as follows:
In areas not identified on the Official Zoning Atlas as Watershed
Protection Overlay Districts, a stream buffer a minimum of 50 feet in
width shall be established along both sides of streams s#ewr~ identified
as by any of the following means: 1) shown as solid blue lines afld or
as broken blue lines on the USGS Quadrangle maps, 2) shown as a
water feature in the Orange County Soil Survey, or 3) a water
feature identified by a field determination of County staff trained in
Ordinance as Recommended by Administration
surface water identification through the North Carolina Division of
Water Quality (NCDWQ~. Stream buffers shall extend around the
perimeter of all other water +es-features if any portion of the stream
buffer of a stream touches the water y
feature. Disputes pertaining to water feature decisions by County
staff shall be filed directly to the NCDWQ. Stream buffers for Soil
Survey streams shall be calculated using Method A only.
Section 6. That this ordinance be placed in the book of published ordinances.
Section 7. This ordinance is effective upon its adoption.
NOW THEREFORE BE IT RESOLVED by the Board of Orange County
Commissioners that this ordinance entitled "An Ordinance: Amending the Zoning
Ordinance of Orange County" be adopted.
Upon motion of Commissioner
Commissioner
seconded by
the foregoing ordinance was adopted
this day of , 2003.
I, Donna S. Baker, Clerk to the Board of Commissioners for Orange County, DO
HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of
said Board at a meeting held on _, LUU;s as relates in any
way to the adoption of the foregoing and that said proceedings are recorded in the
minutes of the said Board.
WITNESS my hand and the seal of said County, this day of
.2003.
SEAL
Clerk to the Board of Commissioners
8
MINUTES
ORANGE COUNTY PLANNING BOARD
APRIL Z, 2003
REGULAR MEETING 7:30-9:30 P.M.
MEMBERS PRESENT: Jay Bryan, Chapel Hill at Large; Nicole Gooding;-Ray, Chapel Hill at
Large; Craufurd Goodwin, Hillsborough Representative; Dr. Barry Kat:~, Chapel Hill at Large;
Sam Lasris, Chapel Hill at Large; Rachel Preston, Eno Representative; :E~enee Price, Chapel Hill
at Large; Noah Ranells, Bingham at Large; Hunter Schofield, Cedar Grove Representative;
Maria Tadd, Bingham Representative; Theodore Triebel, Little River Representative
MEMBERS ABSENT: Howard McAdams, Cheeks Representative
STAFF PRESENT: Craig Benedict, Orange County Planning Director; Robert Davis, Current
Planning Supervisor, Planner III; Tom Altieri, Comprehensive Planning Supervisor, Planner III;
David Lentzer, Planner II; Carla Thames, Planner I; Tom King, Planner II
PUBLIC REPRESENTATION: Keith Feather
AGENDA ITEM ##1: CALL TO ORDER AND ROLL CALL
Chair Nicole Gooding-Ray called the meeting to order.
AGENDA ITEM ##2: INFORMATIONAL ITEMS
a. April Calendar
b. Next Meeting Scheduled -Wednesday, May 7, 2003 in the Food Lab
c. JPA Public Hearing -
Gooding-Ray: Wednesday, Apri19 at SCHSC. Please e-mail a reminder to everyone if the
meeting is held.
d. No Board of Adjustment Public Hearing in April.
e. Copy of Goals as submitted by Chair of Planning Board for BOCC retreat
Gooding-Ray: The list looks incomplete. Craig and I can work together to get the corrected
version.
AGENDA ITEM #4: APPROVAL OF MINUTES
January 22, 2003
MOTION was made by Rachel Preston to accept the minutes. Seconded by Noah Ranells.
VOTE: Unanimous
March 6, 2003
MOTION was made by Jay Bryan to accept the minutes with minor changes on Pages 85 and 86
of agenda packet.
Seconded by Barry Katz.
VOTE: Unanimous
8
9
Price: Concerned about the type of contact that is going to be made to inform of violations.
Gooding-Ray: There are safety issues to consider. There are places we: wouldn't want to send
people. I've been bitten by a dog and threaten with bodily harm.
MOTION was made by Barry Katz to change the civil penalties in the Subdivision section up to
$500.00, which will accrue daily. Craufurd Goodwin seconded.
Friendly Amendment: Nicole Gooding-Ray made a motion that people who maybe illiterate
will have the option for the request to be in writing.
VOTE: Unanimous
.~~ c. Stream Classification and Buffer Amendments
Presenter: Robert Davis, Planner III
PURPOSE: To make a recommendation to the Board of County Commissioners regarding the
proposed Stream Classification and Buffer Amendments to the Zoning Ordinance.
BACKGROUND: The North Carolina Division of Water Quality (DV'1Q) in the Department of
Environment and Natural Resources is the agency responsible for statewide regulatory programs
in groundwater and surface water protection. The DWQ mission is to ;preserve, protect and
enhance North Carolina's water and groundwater resources through quality monitoring programs,
efficient permitting, responsible management, fair and effective enforcement and excellence in
public service. This charge is carried out through resources at both the; state and local levels.
The statewide watershed protection program is an example of state anci local government
regulatory powers.
The County's watershed protection program requires stream buffers bf; established and enforced
along all solid and intermittent blue line streams as identified on the United States Geological
Survey (USGS) topographic maps. Presently, stream buffers within Orange County's zoning
jurisdiction are only required along streams identified on USGS topographic maps. The USGS
maps do not protect all water features that are important to water quality. The DWQ estimates
that streams represented on USGS topographic maps underestimate the actual presence of
streams by approximately 25%. These underrepresented types of streams, which have a high
level of impact on water quality, are not protected at all under the County zoning stream buffer
regulations. Another major shortcoming of the sole use of USGS maps is that the streams, which
are identified on the maps, are based on aerial photography with no fif;ld verification. This lack
of field verifications by the USGS creates problems, acknowledged by the DWQ, with regard to
enforcement of the stream buffer regulations on a lot-by-lot basis.
Three common problems encountered include, but are not limited to, disputes as to whether a
USGS stream actually exists, disputes as to whether the location of said USGS stream is as
shown on the map and disputes concerning whether the floodplain is properly mapped based on
the inaccurate location of a USGS stream.
10
The State's original decision to require the use of USGS maps at the time the watershed
protection rules were adopted was due to the fact that the USGS maps were available throughout
the state while better maps, such as the Soil Survey, were not. Orange (:ounty adopted the
USGS maps `by reference', as did other jurisdictions throughout the State. Due to the `by
reference' adoption of the USGS maps the County's ability to `relocate'' the stream is not
available and the procedure for correcting an inaccurate stream location. on a USGS map at the
Federal level is lengthy and expensive. Furthermore, the correction of one inaccurate stream on
a USGS map does not necessarily mean that inaccuracies for other streams on the same map are
corrected. There are better methods than the use of static maps to protect stream quality and
watersheds, the two most notable being DWQ certification of local governmental personnel and
delegated authority.
Orange County now has staff members trained in identifying surface water features that have a
direct impact on water quality. Prior to receiving delegated authority for enforcement of the
Neuse River Buffer rules from DWQ, each member of the Orange County Erosion Control staff
received 50 hours of field training and classroom testing under the Surface Water Identification
Training and Certification (SWITC) program. House Bill 1257 mandated the SWITC
certification program to be taught by DWQ staff. This training, which is intended to ensure the
enforcement of rules enacted by the N.C. Environmental Management Commission, is deemed
sufficient by DWQ for stream identification use and establishing buffers per state-mandated
watershed protection rules. The stream identification checklist that County staff uses to identify
streams was developed by DWQ.
This proposed amendment will allow usage of available, existing methods to protect streams by
broadening language in the zoning ordinance that would allow, in addition to the USGS maps,
the use of the Soil Survey of Orange County and field identification o:f'water features by County
staff. By using these three methods of water feature identification in combination with each
other, virtually all streams that affect water quality will be protected..Another derived benefit is
that the availability of County staff to do field determinations of streams will provide a service to
property owners, more accurate and without cost, that will help them maintain a high quality of
stream preservation.
Maps showing the difference between the USGS maps and Soil Survey will be presented at the
Planning Board meeting.
Issues at the Public Hearing (February 24, 2003)
• Question regarding these amendments and applicability to Bona Fide Farming activities
• Zoning does not apply to bona fide farming activities per State Statutes. Forestry activities
are also exempt to the extent they fall under the same bona fide farming provision.
However, if a portion of a farm exempt tract were proposed. for development in the
future (e.g. subdivision, non farm-related home occupation, etc), zoning ordinance
provisions, which include stream buffers, would apply to the development proposal.
• Question regarding impacts of these rules on Orange County citizens
• The Neuse River Basin Rules (North Carolina Administrative Code 15A NCAC 02B.0100 &
.0200) currently in effect in the Neuse River Basin require :SO-foot stream buffers
along identified streams (USGS, soil survey, field verified streams).
11
These proposed stream classification amendments would require that. the same type of streams
as those listed above have either 65-foot or 80-foot stream buffers. The buffer is
dependent on the slope of the land over a 250 area adjacent to the stream. The 65-foot
buffer is for situations where the slope is 7.5 percent or less. 'The 85-foot buffer is for
situations where the adjacent slope exceeds 7.5 percent. It is unlikely that the buffer
would exceed 65 feet due to the minimal slope that normally exists near the
headwaters of streams.
• There have not been major disputes regarding the enforcement of the Neuse River Basin rules
and we would not anticipate an inordinate number of complaints as a result of these
ordinance amendments.
• These amendments do not `create' streams where none exist. These amendments require that
steams that exist or have characteristics of streams be buffered in accordance with the
County's stream buffer ordinance.
Process
1) Public Hearing held on February 24, 2003. Referred to Planning Board for recommendation
to return to BOCC no sooner than May 20, 2003
2) Ordinance Review Committee to review amendments Apri12, 2003
3) Planning Board to make recommendation to BOCC
4) BOCC to make decision no sooner that May 20, 2003
FINANCIAL IMPACT: There is no public financial impact with this decision.
RECOMMENDATION: Planning Staff recommends APPROVAL of the proposed
amendments.
Davis: Made Staff presentation.
Issues discussed:
1) Vesting of existing structure
2) Variance Procedures to avoid complete taking of property.
Ranells: Does this rule cover situations that might arise where there i:; an existing pipe and
through some construction and development there is an opportunity to recover that stream. Will
this ordinance capture that opportunity?
Benedict: If the project comes for our review again by way of subdivision or building permit or
special use permit request, we can reevaluate the site and asked that it be returned to our existing
standard.
Davis: This would not apply unless someone comes in for development like any other rule.
Gooding-Ray: Will you update the FEMA Flood Plain maps now?
12
Benedict: Orange County was supposed to have been done in November 2001 and was delayed.
Keith Feather (Public): I am in the process of building a minor subdivision. Under the current
ordinance, I am required to have a stream buffer on anon-existent stream but until the new
ordinance is accepted, the current law will require me to buffer a stream that doesn't exist.
MOTION was made by Barry Katz to approve the proposed amendments. Rachel Preston
seconded.
VOTE: Unanimous
ISSUES FOR THE NEXT MEETING
1. E-mail reminder of the JPA Hearing on Apri19, 2003 -Craig Benedict
2. Talk to Nicole regarding training - Craig N. Benedict
3. Get info regarding Board of Adjustment member (Howard McAdams). Renee Price would
like to attend.
4. Goals - Craig N. Benedict & Nicole Gooding-Ray
5. Name tags to be made
Benedict: Training will be discussed next month.
Gooding-Ray: I would like to review the agenda before the meeting.
AGENDA ITEM #11: ADJOURNMENT
MOTION was made for Adjournment by Barry Katz and seconded by Craufurd Goodwin.
VOTE: Unanimous
Meeting adjourned at 9:45 P.M.
Nicole Gooding-Ray, Chair
Tina L. Owen, Minutes Preparer
13
APPROVED 4115!2003 MINUTES
ORANGE COUNTY BOARD OF COMMISSIONERS
AN D
ORANGE COUNTY PLANNING BOARD
JOINT PUBLIC HEARING AGENDA
February 24, 2003
The Orange County Board of CommissionersFebruae 024n2003 at 7 301p m in h e F Gordon
joint session for a public hearing on Monday, rY
Battle Courtroom in Hillsborough, North Carolina.
COUNTY COMMISSIONERS PRESENT: Chair Margaret W. Brown, Moses Carey, Jr.,
Alice M. Gordon, Stephen H. Halkiotis and Barry Jacobs
COUNTY ATTORNEY PRESENT: Geoffrey Gledhill and S. Sean Borhanian
COUNTY STAFF PRESENT: Counand Clerg to the Boa dI Donria SS Baker (A~ o her staff
Managers Rod Visser and Gwen Harvey
members will be identified appropriately below)
PLANNING BOARD MEMBERS PRES ebel Rachel IP~eston, H ward M Adams, Mariaay
Bryan, Barry Katz, Craufurd Goodwin, Ted Tr ,
Tadd, and Renee Price
PLANNING BOARD MEMBERS ABSENT: Vice-Chair Hunter Schofield
NOTE: ALL DOCUMENTS REF FRRE N THE CLERK'S O F CE. ARE IN THE
PERMANENT AGENDA
A. OPENING REMARKS FROM THE CHAIR osed to be addressed at the meeting last
Chair Brown said that some items that were supp
week (February 17th) ~ould be delayed. Item 9-a regarding the school systems merger will be
delayed until March 5 . Also, items 5-a a5d 6-a will be addressed March 5th. The closed
session will also be addressed on March
B. PUBLIC CHARGE-
The Chair dispensed with the reading of the public charge.
C. PUBLIC HEARING ITEMS
Planning- Board Chair Nicole Gooding-Ray chaired these items.
1.Orange County Zoning Ordinance Text Amendments
Verbatim Minutes from audiotape of the Text Amendment regarding Outdoor Lighting.
Nicole Gooding-Ray, Chair, Orange County Planning Board:
°The first item on the agenda is an Orange County Zoning Ordinance Text Amendment
regarding Outdoor Lighting and we are going to hear a presentation from staff."
14
b. Amend Article 6.23.7 Stream Buffers and Article 22 Definitions to
broaden the methods for identification of streams that require stream
buffers. The specific change is to include a provision allowing use of the
Soil Survey of Orange County and field identification by County staff to
identify streams subject to stream buffers. Anew definition for Water
Feature is added as a part of the amendment.
Craig Benedict made this presentation. He said that this is a change from the existing
zoning code that talks about the identif uingestionnis to increase theaopportunfees to idelntify streams
Geologic Survey maps (USGS). The s gg
with two additional methods. The first method is to use the Orange County Soil Survey maps. The
Department of Water Quality has also put together a certification program where people can
identify streams or identify that something is not a stream based on a list of criteria. The
recommendation is to add this provision to the zoning code so that where subdivisions are
analyzed, they can take into consideration all of the aspects of a stream. It has also been a goal of
Orange County to protect the headwaters because 85% of all areas drained in the County are
headwaters. An implication of this provision is that there will be additional stream miles that will be
protected.
Commissioner Jacobs asked if Mr. Feathers has seen a copy of this and Planner Robert
Davis said that he was aware of it.
Commissioner Gordon would like to have an estimate of the impact of this provision. She
wants to protect streams as much as possible, but she wonders what the impact would be on
people's properties since so much of Oran~emC ent might be in this classification.
There were no Planning Board c
Public Comment
There was no one signed up to speak to this item, but Chair Gooding-Ray asked if anyone
would like to speak.
Robert Nichols, a retired dairy farmer, said that he went to the Planning Department today
to ask about this provision. He said that Craig Benedict said in the presentation that the stream
buffer would be from 130-170 feet. On his property this would take about 37 acres of his 175
acres. He would like to know what he can and cannot do with this property. He asked if he could
harvest the timber.
Craig Benedict said that if his property is a bona fide farm and forestry operations is what is
planned for the property, then he would be following forestry regulations as sanctioned by the State
and it would not fall under these zoning regulations. Bona fide farms are exempt from zoning
regulations.
Robert Nichols made reference to article 6.23.7 in the zoning ordinance and asked w a
this refers to.
Craig Benedict said that article 6.23.7 gives a definition of blue line streams and it offers
how to determine stream buffers.
Chair Gooding-Ray made reference to 6.23.7 and read, "A stream buffer is an area of land
adjacent to a stream or a FEMA identified flood plain, whichever is greater, except as permitted in
article 6.23.7.° She asked about the exception. Robert Davis said that the exceptions would be
utilities, private road crossings, etc.
Robert Nichols made reference to rainwater and said that this does not address rainwater.
He said that there would be no financial cost to the public for this, but that he would have a large
financial cost to take out 37 acres. He asked why his land could not be grandfathered.
Chair Brown said that this. provision would not apply to bond fide farms.
Commissioner Jacobs said that we should make it clear that i:his does not apply to bona
fide farms.
15
County Attorney Geoff Gledhill said that no County zoning regulations apply to bona fide
farming operations.
Commissioner Halkiotis noted that 17 years ago he and Commissioner Carey had t e
opportunity to protect Mr. Nichols'rdtaC rol na Mach eery Act tax collector went after them as
manufacturing units under the No
John Link said that the staff should respond to Commissioner Cordon's comment about full
disclosure and that they pursue due diligence about the impacts on citizens. Under Section 2,
where it says, "The stream buffer shall extend around the perimeter of all water bodies including
ponds and lakes." He said that theree ndthis will el'minate the poss bility. fThistcou d affect small
of land and they want to build a hous
landowners.
A motion was made by Commissioner Jacobs, seconded by Commissioner Carey o
receive the Planning Staff's Recommendation and to refer the proposed amendment and to
refer the proposed amendment to the Planning Board for a recommendation to be returned to
the BOCC no.later than May 20, 2003.
VOTE: UNANIMOUS
c. Amend Article 23 (Enforcement) to streamline the citation
procedure for zoning violations, to establish procedural
guidelines for violation notifications, to allow the Zoning Officer
to process civil penalties. An increase in the civil penalty from
$100.00 to $500.00 per violation is also a part of the amendment.
2. Orange County Subdivision Regulations Text Amendments
a. Amend Section VII (Legal Status Provision), Sub-section VII-E
(Penalties for Violation), to identify the citation procedure for
violations, and establish procedural guidelines for violation
notification, to allow the Planning Director to make assessments
for civil penalties, and increases the civil penalty from $50.00 to
$500.00 per violation.
Craig Benedict said that within this ordinance is how the County identifies with recurring
violations and how to provide notices. The County still plans to have personal delivery with
registered and certified mail. Civil penalties are suggested to increase from $100 to $500 per
day. Presently the demand for payment occurs from the County Commissioners. The
recommendation is that the demand for payment occurs with the staff and the courts. The
definition of a violation and a violator has been enhanced. The attorney's office has worked
closely with the zoning staff to examine the ways to bring violations to a faster conclusion that is
fair with full notification and disclosure. He showed a procedural chart of the process of civil
penalties. He said that presently there is a backlog of zoning compliance issues because they
do not proceed past a certain point and there is no expeditious manner to bring them to a
conclusion.
John Link assured the Board that before the matters are carried to court that the person
involved will know exactly what is involved.
Commissioner Jacobs made reference to 23.2.2 and said that the person can be given
notice in person or by certified mail. He would like to be assured that there is a personal
documented visit first. He made reference to 23.2.3 and read, "a notice of violation is not
required where a notice of the same violation has been issued to the same violator at the same
16
MINUTES
ORANGE COUNTY PLANNING BOARD
APRIL 2, 2003
ORDINANCE REVIEW 6:00-7:30 P.M.
ORDINANCE REVIEW MEMBERS PRESENT : Nicole Gooding-Ray, Chapel Hill at Large; Hunter
Schofield, Cedar Grove Representative
PLANNING BOARD MEMBERS PRESENT: Jay Bryan, Chapel Hill at Large; Craufurd Goodwin,
Hillsborough Representative; Dr. Barry Katz, Chapel Hill at Large; Rachel Preston, Eno
Representative; Noah Ranells, Bingham at Large; Theodore Triebel, Little River Representative
STAFF PRESENT (ORDINANCE REVIEW): Craig Benedict, Orange County Planning Director;
Robert Davis, Current Planning Supervisor, Planner III; Tom Altieri, Comprehensive Planning
Supervisor, Planner III; David Lentzer, Planner II; Carla Thames, Planner I; Tom King, Planner II
AGENDA ITEM #1: APPROVAL OF MINUTES
a. December 18, 2002 -Ordinance Review
MOTION was made by Hunter Schofield to accept the minutes. Seconded by Nicole Gooding-
Ray.
VOTE: Consensus
AGENDA ITEM #2: ITEMS HEARD AT THE FEBRUARY 24, 2003 PUBLIC HEARING
a. Outdoor Lighting Standards Text Amendments
Presenter: Carla Thames
PURPOSE: To provide a recommendation to the Board of County Commissioners regarding
Outdoor Lighting Standards.
BACKGROUND:
Presently, the Orange County Zoning Ordinance does not have any oul:door lighting standards for
new or existing development. Generally, the lighting information that the County reviews has
been submitted as part of the site plan approval, limiting oversight to those projects requesting a
construction authorization. As development and population numbers increase in the County an
effective lighting standards ordinance that reflects community values c;an be an important
component in helping to maintain a high quality of life.
On occasion, the Planning Department receives complaints that specific lights exceed the
brightness necessary to accomplish a particular task. Without clear standards, enforcement
action is limited. In these cases, persuasion is the chief enforcement tool and generally has a low
rate of success.
More recently, there have been concerns about the general loss of darkness during the nighttime
hours. `Light Pollution', the common term for sky glow, adversely affects astronomical
17
Gooding-Ray: There was concern about the amount of the civil penalties at the Public Hearing.
The County Commissioners expressed a concern about individuals having an opportunity to
come before them. Why does the extension of time limit have to be in writing? There are quite
a few members in the community that can't write. If you could ask therm for the information
over the phone I believe that would be better.
Davis: I'm not sure that would be the best avenue since the document would be posted several
different places.
King: We could develop a simple form with the technical information already completed and
they could sign it.
c. Stream Classification Text Amendments
PURPOSE: To make a recommendation to the Board of County Commissioners regarding the
proposed Stream Classification and Buffer Amendments to the Zoning Ordinance.
BACKGROUND: The North Carolina Division of Water Quality (DV'JQ) in the Department of
Environment and Natural Resources is the agency responsible for statewide regulatory programs
in groundwater and surface water protection. The DWQ mission is to preserve, protect and
enhance North Carolina's water and groundwater resources through quality monitoring programs,
efficient permitting, responsible management, fair and effective enforcement and excellence in
public service. This charge is carried out through resources at both the state and local levels.
The statewide watershed protection program is an example of state and local government
regulatory powers.
The County's watershed protection program requires stream buffers be; established and enforced
along all solid and intermittent blue line streams as identified on the iJnited States Geological
Survey (USGS) topographic maps. Presently, stream buffers within Grange County's zoning
jurisdiction are only required along streams identified on USGS topographic maps. The USGS
maps do not protect all water features that are important to water quality. The DWQ estimates
that streams represented on USGS topographic maps underestimate thE; actual presence of
streams by approximately 25%. These underrepresented types of streams, which have a high
level of impact on water quality, are not protected at all under the County zoning stream buffer
regulations. Another major shortcoming of the sole use of USGS maps is that the streams, which
are identified on the maps, are based on aerial photography with no field verification. This lack
of field verifications by the USGS creates problems, acknowledged by the DWQ, with regard to
enforcement of the stream buffer regulations on a lot-by-lot basis.
Three common problems encountered include, but are not limited to, disputes as to whether a
USGS stream actually exists, disputes as to whether the location of said USGS stream is as
shown on the map and disputes concerning whether the floodplain is properly mapped based on
the inaccurate location of a USGS stream.
18
The State's original decision to require the use of USGS maps at the time the watershed
protection rules were adopted was due to the fact that the USGS maps were available throughout
the state while better maps, such as the Soil Survey, were not. Orange County adopted the
USGS maps `by reference', as did other jurisdictions throughout the State. Due to the `by
reference' adoption of the USGS maps the County's ability to `relocate' the stream is not
available and the procedure for correcting an inaccurate stream location on a USGS map at the
Federal level is lengthy and expensive. Furthermore, the correction of one inaccurate stream on
a USGS map does not necessarily mean that inaccuracies for other strearris on the same map are
corrected. There are better methods than the use of static maps to prot~;ct stream quality and
watersheds, the two most notable being DWQ certification of local governmental personnel and
delegated authority.
Orange County now has staff members trained in identifying surface water features that have a
direct impact on water quality. Prior to receiving delegated authority for enforcement of the
Neuse River Buffer rules from DWQ, each member of the Orange County Erosion Control staff
received 50 hours of field training and classroom testing under the Surface Water Identification
Training and Certification (SWITC) program. House Bill 1257 mandated the SWITC
certification program to be taught by DWQ staff. This training, which. is intended to ensure the
enforcement of rules enacted by the N.C. Environmental Management Commission, is deemed
sufficient by DWQ for stream identification use and establishing buffers per state-mandated
watershed protection rules. The stream identification checklist that County staff uses to identify
streams was developed by DWQ.
This proposed amendment will allow usage of available, existing methods to protect streams by
broadening language in the zoning ordinance that would allow, in addition to the USGS maps,
the use of the Soil Survey of Orange County and field identification of'water features by County
staff. By using these three methods of water feature identification in combination with each
other, virtually all streams that affect water quality will be protected. Another derived benefit is
that the availability of County staff to do field determinations of streams will provide a service to
property owners, more accurate and without cost, that will help them maintain a high quality of
stream preservation.
Maps showing the difference between the USGS maps and Soil Survey will be presented at the
Planning Board meeting.
Issues at the Public Hearing (February 24, 2003)
• Question regarding these amendments and applicability to Bonn Fide Farming activities
• Zoning does not apply to bona fide farming activities per State Statutes. Forestry
activities are also exempt to the extent they fall under the same bona fide farming
provision. However, if a portion of a farm exempt tract were proposed for
development in the future (e.g. subdivision, non farm-related home occupation, etc),
zoning ordinance provisions, which include stream buffers, would apply to the
development proposal.
• Question regarding impacts of these rules on Orange County cil:izens
19
The Neuse River Basin Rules (North Carolina Administrative Code 15A NCAC
02B.0100 & .0200) currently in effect in the Neuse River Basin require 50-foot stream
buffers along identified streams (USGS, soil survey, field verified streams).
These proposed stream classification amendments would require that the same type of
streams as those listed above have either 65-foot or 80-foot stream buffers. The buffer
is dependent on the slope of the land over a 250 area adjacent to the stream. The 65-
foot buffer is for situations where the slope is 7.5 percent or less. The 85-foot buffer is
for situations where the adjacent slope exceeds 7.5 percent. It is unlikely that the
buffer would exceed 65 feet due to the minimal slope that normally exists near the
headwaters of streams.
• There have not been major disputes regarding the enforcement of the Neuse River
Basin rules and we would not anticipate an inordinate number of complaints as a result
of these ordinance amendments.
• These amendments do not `create' streams where none exist. These amendments
require that steams that exist or have characteristics of streams be buffered in
accordance with the County's stream buffer ordinance.
Process
1) Public Hearing held on February 24, 2003. Referred to Planning Board for recommendation
to return to BOCC no sooner than May 20, 2003
2) Ordinance Review Committee to review amendments Apri12, 2003
3) Planning Board to make recommendation to BOCC
4) BOCC to make decision no sooner that May 20, 2003
FINANCIAL IMPACT: There is no public financial impact with this decision.
RECOMMENDATION: Planning Staff recommends APPROVAL of the proposed
amendments.
Davis presented the staff report.
Davis: The County enforces stream buffers under the State Watershed Rules, which basically
state that buffering is required along streams, intermittent and solid line. We know streams in
the County that are not reflected on the USGS maps. This amendment will allow Erosion
Control staff, which has been certified by the State, to identify the strearris using the soil survey
maps on site, field identification, as well as using the USGS map. Staff proposes to apply the
County buffer standard to soil survey streams. In most cases those streams are on the ground but
are not protected now. The impact to property owners is that there will be streams that actually
exist that will be buffered, the benefit is that you do not have streams eliminated or piped or
graded over that aren't protected right now. If the slope is 7.5% you apply a 65-foot stream
buffer and if it's greater than or equal to 7.5%, you apply an 80-foot stream buffer. This
ordinance provides relief where there is an inaccurate map showing a stream that does not exist.
Triebel: This zoning does not apply to bonafide farming land?
Davis: No.
,~
20
Benedict: If one came in for a subdivision we would protect those strez~ms. Existing private lots
are not affected.
Ranells: Agricultural is exempt, is that existing and future use? It's not a situation where
existing uses are okay, new uses or not.
Gooding-Ray: New farms would be exempt.
Ordinance Review was adjourned at 7:30 P.M.
Nicole Gooding-Ray, Chair
Tina L. Owen, Minutes Preparer
21
03/13/03
Mr. Keith A. Feather
3017 Hwy 70A East
Hillsborough, NC 27278
Mr. Robert P. Davis
Orange County Planning Board
P.O. Box 8181
Hillsborough, NC 27278
Dear Mr. Davis:
I regret my inability to attend the public hearing on February 24~' during which stream classification and
buffer amendments were under discussion. As a landowner in Orange County who would be directly
affected by the proposed ordinance, I would like to state my concerns here so thhat they may be conveyed to
the Planning Board and County Commissioners, who, as I understand, will ultimately decide on the matter.
My situation is as follows. I own 23 acres approximately three miles east of Hillsborough, just south of
Highway 70, this property being held in my family since 1964. I am currently in the process of a minor
subdivision, and on one of the proposed lots the USGS map indicates a stream. where, in fact, there is none.
County staff has visited the site and to my knowledge agree that there is not a stream, or creek, or channel
or any other indication of surface water, intermittent or perennial, at this location. Nonetheless, the current
Orange County planning rules require that I have a stream buffer surveyed and. placed on the final plat
simply because the USGS map incorrectly illustrates a stream as being there.
Given the established fact that USGS maps are often in error, I think it prudent that the County allow itself
the flexibility to ascertain the actual existence of these water features utilizing its own trained staff. This
would relieve landowners of the illogical burden of creating stream buffers for non-existent streams and
water features. Of equal, or greater importance, the proposed ordinance would also allow the County to
protect bona fide streams and water features that erroneously do not appear on the static USGS maps. This
ordinance, then, would have the effect of freeing landowners of unnecessary rE;straints, unintended bathe
existing ordinances, while allowing the County to more effectively fulfill its goal of protecting the
County's watershed under its existing protection program.
In light of these considerations, Iimplore the County government to adopt the proposed ordinance.
Sincerely Yours,
-,
Keith A. Feather
February 24, 2003 Public Hearing;
Stream Classification Amendments
CURRENT STREAMS PROTECTED
• Only those streams identified on USGS 7.5-Minute Quadrangle
Topographic Maps (underestimate stream lengths by 25%)
• Solid blue line streams
• Intermittent blue line streams
• Current Stream Buffers in State Classified Watersheds
• 65 feet from top of bank or floodplain edge (7.5%~ or less slope)
• 80 feet from top of bank or floodplain edge (greater than 7.5% slope)
• Current Stream Buffers not in State Classified Watersheds
• 50 feet from top of bank or floodplain edge
PROPOSED STREAMS TO PROTECT
• USGS solid and intermittent blue line streams (same)
• Orange County Soil Survey identified streams
• Field Verification by Erosion Control staff (only when a
challenge is lodged disputing the stream location as identified
on maps)
22
February 24, 2003 Public Hearin;
IMPLICATIONS
• Increases the total stream miles protected
• Stream Protection at the Headwaters
• Water quality most sensitive at headwaters
• Flow regime for higher order streams is most affected by what
happens at the headwaters
• Approximately 85 % of the land area in a watershed drains
within the vicinity of the headwaters
GRANDFATHER OPTIONS
OUt_ion 1: Grandfather all lots of record lots, all existing
structures and all projects with valid Preliminary Plan
approval as of date of ordinance adoption.
Option 2: No grandfather provision with all appeals processed
through the Board of Adjustment
• Board of Adjustment, under State rules, can reduce buffers
on these type of streams completely
• BOCC can set parameters in the ordinance limiting the
amount of stream buffer reduction that the Board of
Adjustment has authority to approve.
23
L'1
Andytle and maPP~B b9 ~' BBB (Peb 1~l, 2004)
ck.~ cc~wy r a: hrp«Nai.
NOTY A Ntlly~ YP~ s+e dat~rnihrd by ~~Y ~~*D a P~ M Ms
ralrtiMd ad wruYg nA00 frt radFS tr+»r'rda. katlan
Qi~ rye wHNn Ms wlw+drd Mridd h srpk mrn
~s
Totd Mopped Stmm~ lagths
(k 10.8 sq. mtk wmpls m+enj
- U565 shrair = approx. M mils
- SaN S~rvaY •hren =approx. 6l mIM
NOTE L uscs,,...aa,alea taoe uscs s.o-.len. *av~vl~ v~ eapa.
SeiM xlraena er rheas ahsrar an Oronpa GeaMy ~ ~'~N ~•
NOTE 2: ArialyW wryls era dehnaNrd by rondsdp wMatNg a paixt M fM
aaRraalyd aid aaaaauiy >1POO fret rodNr frae 1hs orders bratkn
ONy ers oMNn Me rahraMsd YsYdsd M ssspM and
2000 0 2000 4000 Feet
Upper Eno Watershed
Mapped Streams Analysis
I~range County NC
February 2003
Andyaia and mappitag by WP 9ugg (Peb 1'6 4005)
Orange Canmty Planntrf6 k InapaYae
~1(
Total Mopped Strcam Lengths
(in 10.4 sq. mile sample or•sa)
- U565 strums = ogmox. 37 miles W E
- Shc Survry streams = approx. 59 miles
NOTE L U565 strooms token from U565 7.5-minute topographic quad maps. S
Soils strums arc ihox shown on Orange CauMy Sal SurKy maps. v
NOTE 2: Analysis aompk area dstamined by randomly selecting a point in the
watershed and measuring 11,000 fut radius from }hc random loutian.
o,uy area witiun the watershed included in sample area. 2000 0 2000 4000 Feet
Malysis and mapping by W P Sugg (Feb 14, 2004)
Orange County Planning & Inspections
~~
Totd Mappad StKmn Lagths
(in 13.5 sq. la(le w~lpls ona)
uses n"ne. _ ~. v, mri..
-Sell Su'vay eheaee = apP'o+~. 60 Mles
NO'iE a uses rr..e. ~ fine uses ~.o-~nwen. teoey'ephte we+ ~
5eile ekeaee en ~hees dieew ew o'sga t.o+y seH srrn wep.•
NOTE ~ Mdyr4 wlgls area dshiwiud M radaJy wNetNg a oMet M eha
..r..tie.ia..r~rYg nano f«r.adwr H.e «,. n.d.e lea.rfa.
Qiy area rNNn Mu ~elerehW Yclud~a In replsann
2000 0 2000 4000 Feet
Cane Creek Watershed
Mapped Streams Analysis
Orange County NC
February 2003
AiulyW and mapping b9 NIP BBB Q'eb 14, 7D04)
Orange Coanty >~g ~