MEMORANDUM OF UNDERSTANDING MOU
,. o0p�
Between
Orange County
And
City of Mebane
I . PURPOSE AND SCOPE
The purpose of this MOU is to clearly identify the roles and responsibilities of each party
related to the proposed West Ten Road Waterline Connector Project ( "the project" ) .
In particular, this MOU is intended to :
1 . Define the roles and delineate the roles and responsibilities of each party.
2 . Outline communication , financial , and other expectations of the parties until the
project is completed and turned over to the City of Mebane .
Il . PARTIES
The parties of this MOU are Orange County, North Carolina ( " the County " ) and the City of
Mebane ( " Mebane ") .
III . BACKGROUND
The project consists of the design and installation of approximately 1 , 750 linear feet of 12 -
inch diameter ductile iron pipe ( DIP ) public water line . The project is located along the
southern shoulder of West Ten Road between Buchanan Drive and Buckhorn Industrial
Parkway in the Cheeks Township of Orange County. The project provides a critical 12 - inch
water line loop between two dead end sections of existing 12 - inch water line currently
owned and operated by Mebane . Once complete , the induced public water system looping
provides increased fire flow and water transmission line redundancy to the western portion
of Orange County, including the Gravelly Hill Middle School site and the designated Efland -
Buckhorn Economic Development District ( EDD ) . An indirect benefit of the project is
improved insurance ratings of local residences and businesses and enhanced
interconnection potential with Orange Alamance Water System ( OAWS ) and existing
infrastructure in the Buckhorn and Perry Hills communities .
Mebane is managing the project and will assume ownership , operation , and maintenance
of the project once the project is constructed , inspected , and certified . The
engineering /design phase of the project is complete ; however, the necessary permits for
construction have not yet been obtained and construction bids have not yet been received .
Mebane intends to formally advertise and solicit for competitive construction bids in April
2026 . Construction is expected to take approximately six ( 6 ) months , weather permitting ,
with an estimated substantial completion in November/December 2026 . Mebane is
managing the construction administration of the project . The County shall have no
responsibility or obligation to design , administer, construct , operate , or maintain the project .
Orange County and Mebane mutually wish to fund this public utility improvement project via
a cost-share Memorandum of Understanding . The estimated total cost of the project is
$ 944 , 750 , inclusive of engineering design ( $ 80 , 000 ) , construction ( $ 809 , 750 ) , and
construction administration ( $ 55 , 000 ) . Per the MOU , Orange County will cover 50 %
(estimated at $472 , 375 ) of the total project cost and Mebane will cover 50 % (estimated at
$ 472 , 375 ) of the total project cost . Orange County' s maximum total project cost shall not
exceed the Board of County Commissioners FY 2024 -25 CIP approved amount of
$ 500 , 000 , without additional Board approval .
IV . IT IS MUTUALLY UNDERSTOOD AND AGREED BY AND BETWEEN THE
PARTIES THAT:
1 . Both the County and Mebane shall be responsible for half ( 50 % ) of the total project
cost outlined in the attached cost estimate . Orange County ' s maximum total project
cost shall not exceed the Board of County Commissioners FY 2024 -25 CIP approved
amount of $ 500 , 000 , without additional Board approval . Mebane shall contract with
a qualified and competitively solicited contractor to construct the project and shall
manage the impending construction contract as such .
2 . The terms of this MOU shall begin on the date of execution and shall expire upon
Mebane ' s final inspection /certification and acceptance of the project .
3 . The parties shall at all times remain in compliance with all applicable local , state , and
federal laws , rules , and regulations , including , but not limited to , all state and federal
non -discrimination laws , policies , and rules .
4 . Modifications of this MOU must be in writing and approved by both parties .
5 . This MOU and any exhibits and amendments attached hereto , and any documents
incorporated specifically by reference , represent the entire agreement between the
parties and supersede all prior oral and written statements or agreements .
6 . The County and Mebane shall be responsible for providing coordination and access
to their respective properties/facilities/records and shall provide all documentation as
requested by the impending construction contractor to complete the project .
7 . Upon Mebane ' s final inspection/certification and acceptance of the project , the
County shall reimburse Mebane within 30 days of the County 's receipt of the
Page 2of3
associated invoicing by Mebane and Mebane ' s verification of its acceptance of the
project .
Parties indicate agreement with this MOU by their signatures :
* ORANGE COUNTY CITY OF MEBANE
By : By :
Name : Name :
Title : 6 sS%te�%L rs Title :
Date : Lt art Date :
*Orange County routing sheet shall also be attached for all other parties within Orange
County to sign .