HomeMy WebLinkAboutOUTboard Meeting April 26, 2026 ORANGE COUNTY GOVERNMENT
ORANGETRANSPORTATION SERVICES DEPARTMENT ri
COUNTY
NoKm CALIQLLNA PUBLIC TRANSIT
OrangeCounty
ORANGE UNIFIED TRANSPORTATION BOARD
April 20, 2026, 6:30 pm
131 W Margaret Lane, Hillsborough
OUTBoard meetings are held in person and open to the public. Any member of the general public
who wishes to make a public comment can email transportationinput@orangecountync.gov.
All comments will be read to the OUTBoard during the public comment portion of the meeting.
AGENDA
1. Call to Order
2. Consideration of Additions or Changes to Agenda
3. Public Comments
4. Minutes—February 16, 2026
5. Regular OUTBoard Agenda
a. Triangle West Metropolitan Planning Organization (TWTPO) Master Transportation
Plan (MTP) and Air Quality Report
b. Staff Working Group FY27 Draft Annual Work Program
c. Orange County Transportation Priorities for Spot 8.0
6. Staff Reports and Updates
a. Orange County Public Transit
i. Try Transit Week
ii. Conflict of Interest Statements
b. Transportation Planning and Engagement
i. County Bike/Ped Plan
ii. MPO, RRO, and NCDOT
iii. OUTBoard Packets
7. Adjournment -The next meeting— May 18, 2026
It is the policy of Orange County Transportation Services to ensure that no person shall, on the
ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be
denied the benefits of, or be otherwise subjected to discrimination under any program or activity
as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
ORANGE COUNTY—ADVISORY BOARD MEETING MINUTES Outboard I February 16, 2026
ORANGE COUNTY ADVISORY BOARD
MEETING MINUTES
Outboard Advisory Board — February 16, 2026 1 DRAFT— Pending Approval
Meeting Information
Board Name: Outboard Advisory Board
Meeting Date: Monday, February 16, 2026
Meeting Time: 6:30 PM — 1:49 AM EST
Location: Hybrid (In-person &Virtual)
Chair: Michael Hughes
Staff Liaison: Darlene Weaver, Transportation Planning Manager
Minutes Recorded EmmaLea Ange, Transportation Admin Support
By:
Next Meeting: March 16, 2026
Attendance
Board Members
:.. Absent
Gregory Woloszczuk Member ❑p
Roy Schonberg Member ❑p
Jamie Crandell Member ❑✓
Erik Legg Member ❑✓
Art Menius Vice Chair ❑✓
Heidi Perry Member (Virtual) ❑✓
Michael Hughes Chair ❑✓
Sherry Appel Member(Virtual) ❑✓
Gene Owen Member (Virtual) ❑✓
Susan Gladin Member ❑✓
Kaji Rashad Member(Virtual) ❑✓
Joshua Mayo Member ❑✓
Staff&Guests Present
Name RoLe Organization
Sarah Williamson Interim Transportation Director
Darlene Weaver Transportation Planning Manager
Jamael Wiley Transit Operations Manager
Outboard I DRAFT—Pending Approval I Page 1 of 3
ORANGE COUNTY—ADVISORY BOARD MEETING MINUTES Outboard I February 16, 2026
Quorum & Call to Order
Quorum established: ❑ Yes ❑ No Members present: 11 of 12 required for quorum.
Meeting called to order at 6:30 PM by Michael Hughes.
Approval of Previous Minutes
Minutes from the December 15, 2025 meeting were:
• ❑ Approved as presented
• ❑✓ Approved with correction to date reference
• ❑ Deferred to next meeting
Motion to approve:_Art Menius_I Second:_Gregory Woloszczuk_I Vote: - - I ❑Carried ❑
Failed
Public Comment (Non-Agenda Items)
The following individuals provided public comment:
❑� No public comment received.
Agenda Items— Discussion &Action Summary
Agenda Item . . Owner
FY2027 Work Program Update provided; still in Continue Staff Next
development development Meeting
FY2026 Annual Report Reviewed Present to Staff March
accomplishments Commissioners 2026
Pedestrian Projects 5 of 36 selected; funding Follow up with Staff Ongoing
limited NCDOT
Mebane Transit Pilot Service expansion Proceed to public Staff Spring
discussed hearing 2026
Motions &Votes
Motion .
Approve December 2025 minutes Crandell Woloszczuk 10-0-1 Pass
Action Items & Follow-Up
Action Item Responsible Date
Provide meeting materials access Staff Next Meeting
Follow up with NCDOT Staff Ongoing
Clarify board role Chair/Staff Next Meeting
Outboard I DRAFT—Pending Approval I Page 2 of 3
ORANGE COUNTY—ADVISORY BOARD MEETING MINUTES Outboard I February 16, 2026
ResponsibleAction Item Date
Share project updates Staff Next Meeting
Announcements & Next Meeting
Next Meeting: March 16, 2026
Adjournment
Motion to adjourn:_Art Menius_I Second:-Susan Gladin-I Vote: Unanimous/ - -
Meeting adjourned by Michael Hughes.
Certification &Approval
These minutes are a summary record of the meeting proceedings and are DRAFT until formally approved at the next
regular meeting.
Prepared by: Approved by Board Vote:
EmmaLea Ange, Transportation Admin Support
Date:
Date:
Outboard I DRAFT—Pending Approval I Page 3 of 3
•
TRIANGLE WEST
AN Transportation Planning Organization
3 NC Capital Area Metropolitan Planning Organization
AL D STINATION 0
A MET OPOLITAN
TRANSPORTATION
PLAN
-
r
April 2026
i: �:.
IfIHOt
A Metropolitan Planning Organization, or MPO, is a + "
p 9 9
federally mandated and federally funded transportation t Ft
policy-making organization.
J
fir.• :•
It is composed of representatives from local government
x.:
and governmental transportation authorities, such that
staff review technical information and officials vote on
proposed policy. -
h l
I� 5
1�
TRIANGLE WESTCAhAPQ
-
..� Transportation Planning Organization
NC Capital Area Metropolitan planning organization - *
Wake County and parts of a
Durham County, and parts of
Orange County and Chatham
Harnett County, Johnston County, y f'
County
Franklin County, Granville County, and
.�
Chatham County'
•r
*Recently added based on 2020 Census
E
li I
L�
TRIANGLE REGION
1 I ti�
TRIANGLE WEST
Transportation Planning Organization
1 {
I GRANV1LLEf
J
0R G E /
.tIFw] i f
I. 1IiISshorough J' l 4 I Fr.=.I,kI }i
r Wakc }
I Faresr BiwiY !
64
' J Pal;. III
H AT
MOr rIW nlg4rdal r}i'I r� •. ?_'' _ ..
rya .•_". ... .._.... .. .__... _
Ap=x WAKEr e a -
15 } I { 4 A.Irrler �o�ga y -
q y,- rLp � 0 yi�;Yi,
\40 Capital Area Metropolitan Planning Organization
j? 70
} Angler
,I J
r{ 11 ARNETT °
-
� Llllir:gCo� �
f {
} J �
de r i
Capital Area MPD CAMPO Municipalities Durham-Chapel Fill-cwrboro MPO DCHCMPO Municipalities
The Tr*iangle Reg *ion w*i cont*inue to grow. . .
Household Population Employment
All Together Scenario
2020
POPULATION • _ ;
GROWTH GROWTH
= == songs
1 Dat=25 People :a' _ _ _ _T .71 Dot=25 Jobs
I
2055
Qj
o 10 1 dot=25 �ple f � --�; 1 �-'� - -� . 1 Dot=25
��Miles
1
WHAT IS THE TRIANGLE
REGION LONGmTERM PLAN
How many years does the plan cover?
Destination 2055 will cover all fiscally feasible DES MA TION
transportation projects through 2055 that are expected
to use federal funds.
What projects are considered
transportation projects?
All modes of transportation including transit (i.e. bus), bicycle Metropolitan Transportation Plan
and pedestrian, aviation, rail (passenger or freight), and for the Triangle Region
highway (road infrastructure).
DESTINATION •
2055 ,
THE PROCESS
3
VISIONING ALTERNATIVES PREFERRED ADOPTION
ANALYSIS OPTION
Goals and objectives were Existing transportation Fiscal constraint was finalized,
determined here. This step conditions are reviewed, Analyzed fiscal feasibility and modeling data was provided,
informs what performance future issues are assessed, and selected Preferred Option for and the plan underwent air
measures will be tracked, and alternative scenarios are Y like) land use and selection of quality review to determine
guide land use scenarios and projects. projects over time will not harm
project selection. considered. Pro the air quality.
January of Spring of 2025 Fall of Adopted in February 2026
2024 2025
Md
VISIONING : GO THE MTP
;i =0
• Protect the human and natural environment and minimize climate change
• Connect people and places
• Ensure that all people have access to multimodal and affordable
transportation choices
• Manage Congestion and system reliability
• Improve infrastructure condition and resilience
• Ensure equity and participation
• Promote safety, health and well - being
• Stimulate inclusive economic vitality
These goals were approved in 2024, following the first public engagement phase for Destination 2055,
and adopted in February o f2026.
ALTERNATIVES ANALYSIS: PREmTESTING SCENARIOS
AL dw.— .dm& mJL.
A Baseline Scenario ATransit-focused An Equity-focused
that represented the Scenario that aimed to Scenario that aimed to
mi
' adopted previous maximize transit usage y improve
(2050) MTP and served by focusing future T - transportation
as a baseline for growth in transit- outcomes for low-
comparison with other served areas and income and zero-car
scenarios. doubling the amount of households,
transit service. particularly focusing on
job access.
A VMT Growth A Flexible Funding AHighway-focused
Reduction Scenario that Scenario that Scenario that tested
� identified different �� examined different 91 r the results of less-
factors that could • � assumptions regarding � � dense future
reduce the growth of funding constraints development focused
vehicle miles traveled and restrictions, and around highways and a
(VMT) in the region. available funding doubling of the region's
amounts. freeway lane miles.
TERNATIVES.16tilifSIS/SCENARIO PLANNING
Md= ak
For Destination 2055, three (3) Each alternative was comprised of two
alternatives were being analyzed to assumptions for the future:
explore potential alternative futures .
1 . Development Foundation
Each alternative looked at how the future (future growth Patterns)
transportation network would perform if 2• Mobility Investment Foundation
certain investments are made. (transportation projects)
ALTERNATIVES ANALYSIS: PLANS AND TRENDS M
Key Projects:
The Assumption: Major Roadway Investments
• No changes to current patterns of transportation • Complete 540
• g p p • Capacity Improvements: 6-In US-70 East
funding p Y p
• No changes in investment decisions Freeway/Expressway, 1 -85 South 6-In Interstate, 1 -86 North
g -In Interstate, 1 - 1 Expresswayin Durham
• No changes in land use planning policies 6 US 5 50 &
g p g p modernization in h I Hill 1 - H V Lane from EEC t l -
Cape 885 O a e o C o
40, 1 -40 Management Lane from 1 -540 to 15-501 , NC 54
modernization West of Carrboro, US 15-501 Bypass: 6-In or
Adding HOV In , 4-InS Churton St, 4-In Fayetteville St
• New Road Projects: Northern Durham Parkway and SW
Durham Drive
HIGHWAY BUS Major Transit Investments
• Current InterCity Passenger Rail (Only Durham Station)
BRT • BRT Line: Chapel Hill NS BRT Line
RAIL • Bus Lines: short-range plans, count transitplans, and
g p � Y
�I service frequency and hour changes
BIKE & PED DENSITY
ALTERNATIVES
ANALYSIS:
SHARED
:;Ai
The Assumption: Key Projects:
• Increases the intensity and mix of land uses at major employment hubs Major RoadwayInvestments
and travel corridors �
• 2024 Congestion Management Process Projects
• Adds roads and transit along key corridors 1-885 HOV Lane from EEC to 1-40
• Assumes additional transportation funding for transit facilities, transit US-70 East: Parallel collector roadway
services, and a few roadway improvements.
'Requires changes by state partners in addition to actions that can be taken Major Transit Investments
by the MPOs and their local member jurisdictions across the Triangle. • InterCity Passenger Rail (Durham & Hillsborough
Stations)
The Investments: • BRT Lines: Chapel Hill North-South BRT Line,
Durham-Orange BRT Line, Durham Station-RTP
so BRT Line
H GHW Y U S • Bus Lines: Plans and Trends with adjustments
RAIL BRT
d1 d1
BIKE & PED DENSITY
ALTERNATIVES ANALYSIS: ALL TOGETHER
SCENARIO
The Assumption: Key Projects:
• Ambitious alternative
• Includes additional funding/more flexibility in funding Major Roadway Investments
• Focus on improvements to transit, bicycle/pedestrian facilities, and • Same as Alternatives Two, Shared
complete/safe streets Leadership
'Requires changes by state partners in addition to actions that can be Major Transit Investments
taken by the MPOs and their local member jurisdictions across the Triangle. Intercity Rail OCR)
• Regional Commuter Rail (RCR)
The Investments: BRT: All 4 2050 MTP BRT Lines with
adjustments
• Bus Lines: Same as Alternative Two Shared
HIGHWAY BUS Leadership with adjustments
Q Q Q Q
RAIL BRT
cc)0 0 M M M
dfo ill& 011& 41'\L
BIKE & PED DENSITY
FINAL
SCENARIO
INVESTMENTS BY MODE ,
Roadway
Operations and Transit
Maintenance 23.5%
Destination 2055 includes the anticipated 26%
costs (in Millions) of projects and/or
services by type. $7t944
$8t760
Bi cycle and Pedestrian
$12t834 12.5%
Roadway/Comp
lete Street
Reference: Appendix 11 , Table A11.5 38%
TRANSIT:
5,000
Destination 2055 includes the anticipated 41000
costs (in Millions) of projects and/or
services by and the year of expenditure. �
0
31000
c
0 21000
U
i,aoo
0
2026-2035 2036-2045 2046-2055
Reference: Appendix 11 , Table A11.5 Year of Expenditure
TRANSIT: FIXED GUIDEWAY PROJECTS
- Description MTP Horizon Year
2035: Intercity Rail (ICR) service from Downtown Durham through the new RTP station and transit
■ - ■ ' • - • - center to Cary and Raleigh; 2055: Expanded ICR service from the new Hillsborough station and 2035, 2055
• • • transit center to Downtown Durham, the RTP station, Cary and Raleigh, connecting major regional
transit hubs.
Bus Rapid BRT service in Chapel Hill, runnin from Eubanks Road, through the UNC Healthcare complex, and
(BRT)
• • l Hill g g to Southern Village, using a mix o7 dedicated lanes and mixed traffic. 2035
North-South Line
Bus Rapid • BRT service between Durham and Orange counties, operating from Carrboro, Chapel Hill, and the
(BRT) - UNC Healthcare complex to the Duke University and Medical enter area via US 15-501, and
Durham- continuing to Durham Station and NCCU. The BRT line includes segments operating in dedicated 2035
Orange g
_ lanes as well as segments in mixed traffic. g p g
Bus Rapid Transit
(BRT) BRT service from Chapel Hill to Downtown Ralei h via the Research Triangle Park (RTP) and 1 -40.
CombinedRTP mana ed This ali ns the Cha el Hill-RTP BRT with the 1-40 BRT at RTP to create a continuous re ional route.
_
This route includes segments in dedicated lanes, lanes as well as segments in mixed 2055
with ' traffic. g g
VLA
1
:2 CENT SALES SALES TAX VEHICLE REGISTRATION CAPITAL
TAX GROWTH RATE GROWTH RATE INVESTMENT GRANT
ORANGE COUNTY: 2013 ORANGE COUNTY: 2.3-4.5% ORANGE COUNTY: 1.5% Regional Rail, Bus Rapid
DURHAM COUNTY: 2013 DURHAM COUNTY: 2.6-5% DURHAM COUNTY: 1 .5% Transit (BRT), and
Rail/Multimodal Station
projects'
STRATEGIC TRANSPORTATION INVESTMENTS (STI) LAW
Funding Category Revenue Description
Distribution
STI revenues are divided into three (3) Revenue in this category is shared equally over
NCDOT's 14 transportation divisions. Project scores
categories of funding : Division Needs 30 percent are based 50 percent on data and 50 percent on
rankings by local planning organizations and the
• Division Needs NCDOT transportation divisions.
• Regional Impact
• Statewide Mobility
Projects on this level compete within regions made
up of two NCDOT transportation divisions, with
Regional Impact 30 percent funding based on population. Data makes up 70
percent of the project scores in this category. Local
rankings account for the remaining 30 percent.
Statewide Mobility 40 percent Projects in this category are based 100 percent on
data.
TRANSIT: INTERCITY RAIL
borough
4 1 ' 1 M
V!
6*A
D u.rh a
Chapel Hill
Morrisville
�a4r.]I �y--
Ra lel h
North Carolina
State University 4D
TRANSIT: BUS RAPID TRANSIT
M,L Ad
Hillsborough
InterCity Rail Butner-Falls of
reuse Game Land
Durham-Orange
* rha , -
Durham North-South
Chapel Hill North- ;thesda
South
ha l Hill
Chapel Hill-RTP MW
Nei an
Genlee
�*% nor. +
1 #
Morrisville �`•�
y�.����,�� Raleigh
Green Level ,.
North Carolina
State University
TRANSIT.* PERFORMANCE MEASURES
2020 Base 2055 E+C 2055 MTP
0
0-1
The Destination 2055 anticipates transit mode
share to grow from 2.6% in 2020 to 5.1% in 2055 .
0
10 4
0
W
(D
o 3
0
CD •
� 1
a
C)
0
020 Base 20 E +C 2055 MTP
Reference: A end ix 16, Table A16.7b Scenario
pp
TRANSIT: PERFORMANCE MEASURES
40 2020 Base 18 205 E+C 2055 MTP
0. 5
0. 0
The Destination 2055 anticipates per capita
transit ridership to increase from 0.15 to 0.31 by
0.25
2055.
0.20
a
0 0.15
0
0.10 -
0.17
0.0
0.00
2020 Base 2055 E +C 2055 MTP
Reference: A endix 16, Table A16.7b scenario
pp
BICYCLE AND PEDESTRIAN
2/000
The Destination 2055 includes the anticipated
costs (in Millions) of projects and/or services by 1/ 00
and the year of expenditure.
� 21f000
O U 1,00
00
2026- 203 20 6-20 2046-2055
Reference: Appendix 11 , Table A11 .5 Year Of
BICYCLE AND PEDESTRIAN
2020 2026
Chapel Hill Mobility Orange County
and Connectivity Bicycle and
Plan Pedestrian Plan
2008 2021 2023
Orange County Carrboro
Comprehensive Comprehensive Hillsborough
Transportation Plan Bicycle Comprehensive
Element Transportation Plan Sustainability Plan
ROADWAY AND COMPLETE STREETS
41000
The Destination 2055 includes the anticipated
costs (in Millions) for roadways including 31000
Complete Streets projects.
V) Cr000
O
3, 11
U
11000
1,F1
0
0 0-203 03 - 0 5 0 - 0 5
Reference: Appendix 11 , Table A11 .5 Year Of
ROADWAY AND COMPLETE STREETS
From Improvement - .
• - West TPO Border Line Durham/Orange Widening (2 to 4 lanes) 2055
Co. Line
Sparger Rd Orange Grove Rd Widening (4 to 6 lanes) 2035
• ' • US-70 1-40/185 Widening (2 to 4 lanes) 2055
• 1-85 NC 86 Widening (4 to 6 lanes) 2035
• NC 86 Durham County Line Widening (4 to 6 lanes) 2035
• - - • • ' • NC 86 Rogers Rd Modernization 2045
Orange Grove Rd Old Fayetteville Rd Modernization 2045
* Regionally significant project Reference: Appendix 2, Page 125
ROADWAY
AND
COMPLETE
STREETS
Carr '
I
I '
I '
I '
0€€anee�hl• '
$aponl S-D7SA
I
I � ,
I
'I
Interchongeand Grade Separations 246,870,000
I
Lakeview A Jordan Oak
Modernizations 77,8 1,660 Mebane
I us a �
Q.
Ights ood 2CS5 MTP Preferred Scenario Roadway
Projects
t
Eric)I
Now Locations 31,78 ,860 a n �-atQ Triangle estTP� Boundary
a�
I Interchange and Grade Separation
Road Widening 873,674,236 Projects
I ,
I
' Sugar Ridge '
ITS Projects*
Other Road Improvement Projects
� '
( . . . 0 53 i Orange Grove Modernization Projects
va b b New Location Projects
Fiscal Year 2055 Costs
' Rangewob Road Widening Projects
I
Carrb-Gro
I
k
I Lakewa o ds ITS Projects'
� I
k
Reference: Appendix 2, Page 125 rr - -- - - _ _ MGTHV Lane Additions
THANK YOU !
Doug Plachcinski, CFM
Excutive Director
Zil Destination2055NC . com A
<\, Doug. Plachcinski@twtpo.org
7
' , r
r 1
1 �
1
r
Sir 1 14
1 r
•� Id
A -
�L.11
16
r
IF
' 1 1
TRIANGLE WEST
�■ Transportation Planning Organization
IJ Sir 'V -1 �-. 1' _. _ '� ' �� 11� �'_ -•��.
� oqF
ri
Proposed FY27 Investment
Draft FY2027
Transit Work PLan
$ 15 . 3 Million
$ 9 . 48M $ 5 . 84M
Operating Capital
Where Your Investments Are Going
Bus Operations & Service Expansion : 53%
Bus Stops & Transit Centers: 33%
Transit Plan Administration : 6%
Bus & Vehicle Purchases: 3%
Tax District Administration : 3%
Transit Plan Development: 2%
Agency FY27 Funding Requests
Chapel Hill $4,090,487
- GoTriangle $3,365,272
L. Orange County $1 ,615,868
Triangle West TPO $42,867
- -- . _ Tax District Administration $374,841
Total $5,840,961
.y
CapitaL $5 . 84M
Agency FY27 Funding Requests
Carrboro $244,829 for ADD HERE
Chapel Hill $122, 132 for ADD HERE
GoTriangle $5, 174,000 for ADD HERE
Orange County $300,000 for Multi-Agency Transit Plan Development
Total $5,840,961
New Since FY2026 AWP Approvat
FY26 Amendments Out for Public Comment*
• TWTPO: Staffing Study
• OC: Administration Funding to Support Additional SWG Meetings
• CHT: Radio System Replacement
• GoTriangle: Route 800 Improvements
• GoTriangle: TAP Low Wealth Pass
FY27 AWP
• 2.5% growth across operating and capital
• $300,000 for Multi-Agency Transit Plan Development
* Funding model capacity is limited
Annual Work Program Process
SPOT 800
PROCESS
Orange County OUTBoard
April 20, 2026
ACRONYMS & TERMS
SPOT: Strategic Prioritization Office of Transportation
8.0: Prioritization 8.0, the current round of prioritization
TPO: Transportation Planning Organization
MPO: Metropolitan Planning Organization
RPO: Rural Planning Organization
SPOT ID: Identification Number within the Strategic Prioritization Office of Transportation
TIP: Transportation Investments Program/Plan
Project Category: Tiers for project prioritization in the SPOT process. Can be Statewide Mobility,
Regional Impact, or Division Needs.
2
AGENDA
0
QAMIO
49 ■5�
a _
Triangle Area COUNTY
RPD -
f
PARTICIPATION
0 of Durham J
ftfalm WCOFI-- _ 70 Chapel Hill f
Carrboro MPO I
f 70A f • Triangle West TPO
70
' r
• Burlington-Graham MPO
�51
_ I
• Central Pines RPO
i
SA 15
sai
---•--•-.Coun y Boundary p ThangleArea RPD
ORANGE
Burlington Graham MPQ ® City Planning Jurisdiction COUM 7 A .
PI.—nQ-dI�wp twsDepart—
Durham Chapel Hill Carrboro MPO Orange County Planning Jurisdioition al=7rxo=
4
SPOT 8 , 0 PROCESS
Project Scoring Statewide Regional Regional Division Need Division
submittal Window Mobility Impact Local Impact s Local Input Needs
window in (including projects Input Point projects Point projects
SPOT Online Partner Data programmed assignment programmed assignment programmed
Review) Quantitative window window Draft 2028-
scores 2037 STI P
released for released (final
all projects adoption in
Jun 027)
_ _ .
p.
5
SPOT 8 , 0 MODES
• Highway
• Aviation
• BikePed
• Ferry
l�
• Rail
TR
ANgQ
ORANGE COUNTY PROJECTS 1 OF 4
SPOT ID Project Category Route From/Cross Street To Description Specific Improvement
JI& AW Md Type
WEST OF SR 1006 (ORANGE GROVE
H090006-A 1-0305A Statewide Mobility 1-85 SR 1006 Near East of SR 1709 ROAD) IN ORANGE COUNTY TO WEST OF 1 -Widen Existing
Hillsborough SR 1400 (SPARGER ROAD) IN DURHAM Roadway
COUNTY. ADD LANES.
H090366-A U-6067 Statewide Mobility US 15, US 501 1-40 N/A Convert to freeway/expressway per express 8 - Improve Interchange
design.
H140374-F R-5821A Regional Impact NC 54 SR 1006 (Orange SR 1937/1107 (Old Construct operational improvements, incldue 16 - Modernize
Grove Rd) Fayetteville Rd) bicycle/pedestrian accomodations Roadway
H149000-A U-5774A Statewide Mobility NC 54 (Raleigh Road) US 15/501 N/A Improve Interchange 8 - Improve Interchange
SR 1110 (Barbee WEST OF US 15/ US 501 IN ORANGE
H149000-B U-5774B Regional Impact NC 54 West of US 15/ US Chapel Road) in COUNTY TO EAST OF SR 1110 (BARBEE 4 - Upgrade Arterial to
501 in Orange County Durham County CHAPEL ROAD) IN DURHAM COUNTY. Signalized RCI Corridor
UPGRADE ROADWAY CORRIDOR.
H149001-A U-5304A Statewide Mobility US 15, US 501 NC 54/86 (South N/A Improve interchange 8 - Improve Interchange
Columbia Street)
ORANGE COUNTY PROJECTS 2 OF 4
SPOT ID Project Category Route From /Cross Street To Description Specific Impr
A& — Type
H149001-B U-5304B Statewide Mobility US 501, US 15 Sage Road N/A Convert intersection to RCI Concept 10 - Improve
Intersection
7- Upgrade At-grade
H149001-C U-5304E Statewide Mobility US 15, US 501 Manning Drive N/A Construct Interchange Intersection to
Interchange or Grade
Separation
US 15/501, NC 54 SR 1742 (Ephesus Construct operational improvements and add
H149001-D U-5304D Statewide Mobility US 15, US 501 interchange (Raleigh Church Road) sidewalks, sidepaths, and transit 26 - Upgrade Roadway
Road) accommodations.
H150228 1-0305C Regional Impact 1-85 NC-86 N/A NC 86 IN HILLSBOROUGH. UPGRADE 8 - Improve Interchange
INTERCHANGE.
SR 1106 (Orange Grove Dodson Modernize roadway including wider lanes and 16 - Modernize
H185154 Division Needs Road) Mayo Street Crossroads (SR paved shoulders. Includes addition of turn Roadway
1102) lanes at multiple intersections.
8
ORANGE COUNTY PROJECTS 3 OF 4
SPOT ID Project Category Route From /Cross Street To Description Specific Impro
- - - k- Type
Is
Modernize Orange Grove Road between
South Churton Street and New Grady Brown
School Road (SR 1221)to include both
SR-1221 (New pedestrian and bicycle improvements along
H230721 BL-0139 Division Needs SR 1102 (Orange Grove South Churton Street Grady Brown the roadway. The 1-40 bridge would be 16- Modernize
Road) School Road) widened to accommodate both pedestrian and Roadway
bicycle amenities and one additional travel
lane. Create two roundabouts along Orange
Grove Road, one at Eno Mountain Road and
one at Mayo Street.
Modernize Old NC 10 from NC 86 to US 70
Business with NCDOT standard street cross-
section 2B (60' row, 11'travel lanes, with 5'
H230766 Regional Impact Old NC 10 NC 86 US 70 Business paved shoulder), add turn lanes and safety 16 - Modernize
improvements at Lawrence Road (SR-1561) Roadway
New Hope Church Road (SR-1723), University
Station Road (SR-1712), Mt. Harmon Church
Road (SR-1339) and US 70 Business.
Chapel Hill and Carrboro Plan and implement an improved signal
Citywide Signal System system for the Town of Chapel Hill and the 13 - Citywide Signal
H231862 HP-0006 Regional Impact The SPOT Office will Town of Carrboro including transit signal System
provide data for this
proejct ASAP priority.
Weaver Dairy Construct an extension of Purefoy Drive from 5 - Construct Roadway
H250268 Division Needs New Route Purefoy Drive Extension its current terminus to Weaver Dairy Road on New Location
Extension.
9
ORANGE COUNTY PROJECTS 4 OF 4
SPOT ID TIP Project Category Route From/Cross Street To Description Specific Improvement
- N Type
Modernize Dairyland Road (SR 1177)from
Orange Grove Road (SR 1006)to Old NC 86
(SR 1009)with NCDOT standard street cross-
section 2b (60' ROW, 11'travel lines with 5'
H250590 Division Needs SR 1177 (Dairyland Orange Grove Road Old NC 86 (SR paved shoulder), add turn lanes and safety 16- Modernize
Road) (SR 1006) 1009) improvements at Orange Grove Road (SR Roadway
1106), Borland Road (SR 1126), Arthur Minnis
Road (SR 1115) and Dairyland Roads (SR
1177).
Hillsborough Citywide
Signal System The Plan and implement an improved signal 13 - Citywide Signal
H250724 Regional Impact SPOT Office will
provide data for this system for the Town of Hillsborough. System
project ASAP
10
PUBLIC INPUT
• Public meeting after project scores are released
(expected late May).
• Public input used to guide staff in ranking projects within
each MPO and the RPO, across all project categories.
� s
11
SPOT 8 , 0 PROCESS
Project Scoring Statewide Regional Regional Division Need Division
submittal Window Mobility Impact Local Impact s Local Input Needs
window in (including projects Input Point projects Point projects
SPOT Online Partner Data programmed assignment programmed assignment programmed
Review) Quantitative window window Draft 2028-
scores 2037 STI P
released for released (final
all projects adoption in
Jun 027)
_ _ .
p.
12