Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2026-088-E-Planning Dept-Schnabel Engineering South-Contract Amendment #3 Geotechnical Support and Revised Milestone Tasks Professional Engineering Services for the Lake Orange Intake
Revised 01/24 NORTH CAROLINA CONTRACT AMENDMENT #3 ORANGE COUNTY THIS CONTRACT AMENDMENT (“Amendment”) is made and entered into this 11th day of March 2026 by and between ORANGE COUNTY (hereinafter referred to as “County”) and Schnabel Engineering South, P.C (hereinafter referred to as “Provider”). WITNESSETH: THAT WHEREAS, the County and Provider entered into a contract dated November 1, 2024, with an internal designation of 2024-674 (hereinafter the “Original Agreement”), for the provision of services for Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and WHEREAS, the County and Provider entered into a contract amendment dated February 28, 2025, with an internal designation of 2025-094 (hereinafter “Contract Amendment 1”), for the provision of a no-cost time extension for Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and WHEREAS, the County and Provider entered into a contract amendment dated January 16, 2026, with an internal designation of 2026-027 (hereinafter “Contract Amendment 2”), for the provision of a no-cost time extension for Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to amend the Original Agreement as follows: 1. Section 3(a)(ii) is replaced in its entirety with the following: The Basic Services will be performed by the Provider in accordance with the following schedule: (Insert milestones task list, dates and fees. If milestones are not established mark N/A under Milestone Task 1.) Milestone Task 1. Kickoff and Field Investigations Milestone Date Milestone Fee March 31, 2025 $48,000 2. Alternatives Analysis April 30, 2025 $48,000 3. 60% Design June 30, 2025 $48,000 4. Geotechnical Support and Report (See Attachment A for Task 4 scope) 5. 95% Design May 8, 2026 May 22, 2026 $36,100 $48,000 6. 100% Design and Permitting 7. Bidding and Award July 17, 2026 January 13, 2027 $48,000 $48,000 ALL DATES ABOVE ASSUME A NOVEMBER 1, 2024 NOTICE TO PROCEED. Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 Revised 01/24 2. Section 4(a) is replaced in its entirely with the following: Term. The term of this Agreement shall be from March 11, 2026 to January 31, 2027. 3. Section 5(a) is replaced in its entirely with the following: Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services satisfactorily (as determined by the County) performed pursuant to this Agreement. The maximum amount payable for Basic Services is THREE HUNDRED TWENTY FOUR THOUSAND ONE HUNDRED AND 00/100 Dollars ($324,100). In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of the disputed portion of the amount stated on an invoice until the parties resolve the dispute. Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. Payments will be made as Project milestones as set out in Section 3(a)(ii) are achieved up to the corresponding milestone fee. (For example, Provider may invoice for the amount listed as the milestone fee corresponding to the first milestone task upon County’s acknowledgement of the satisfactory completion of Task one. Upon the County’s acknowledgement that the second Task has been satisfactorily completed Provider may invoice for that corresponding milestone fee.) Milestone fees shall be the maximum amount payable for its corresponding milestone task which shall not be altered except by written amendment. 4. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent it is not inconsistent with this Amendment. In the event there is a conflict between the terms of the Original Agreement and the terms of this Amendment, this Amendment shall control. IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above written. ORANGE COUNTY PROVIDER ______________________________ __________________________________ Gerald C. Robblee, P.E. (Principal) County Manager Schabel Engineering South, PC Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 Revised 01/24 ORANGE COUNTY—INTERNAL USE ONLY ______________________________________________________________________________ Finance Information Vendor Name: Schnabel Engineering South, P.C. Vendor Contact Person: Gerald C. Robblee, P.E. Phone: 336-274-9456 Address: 11A Oak Branch Drive City Greensboro State: NC Zip: 27407 Department: Planning Amount: $36,100 Purpose: Contract Amendment #3: Geotechnical Support and Revised Milestone Tasks - Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project Budget Code(s): 61370035-870000-10074 (CIP - PROF. SERVICES) Vendor # 61518 Vendor Status with NCSOS: Active Vendor is a BOCC consultant: Yes No Contract Details Contract Type: New Amendment (Original Contract: 2024-674) (Most Recent Amendment 2025-094) Effective Date January 16, 2026 End Date December 31, 2026 Notice Date (Notice Purpose ) Award Approved by Board (Agenda Date: October 1, 2024); Made or Administered by Signature Authority - BOCC Express Delegation (Agenda Date: October 1, 2024) - Policy 9.4: Under $5,000; Service Under $90,000; Construction Under $250,000 - Budget Policy Section XV (Capital Improvement Project: ) Bidding Informal Bidding ($30k-$90k); Formal RFP ($90k+); Other (<$30k); Exception(# ) Department Affirmation This agreement is approved as to technical form and content and I as Department Director affirmatively state work on this project has not been initiated prior to execution of the agreement. This agreement is approved as to technical form and content. Services related to this agreement have already begun or been completed. Description of the nature of the emergency condition that was addressed: Department Director’s Signature ________________________________________ Date: ________ Information Technologies This agreement has been reviewed and is approved as to information technology content and specifications: Office of the Chief Information Officer___________________________________ Date: ________ Inapplicable because no hardware/software purchases or related services Risk Management This agreement is approved for sufficiency of insurance standards, specifications, and requirements: Office of the Risk Management Officer___________________________________ Date: _________ Financial Services This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act: Office of the Chief Financial Officer ____________________________________ Date: _________ Legal Services This agreement is approved as to legal form and sufficiency: Office of the County Attorney __________________________________________Date: ________ Clerk to the Board All Docusign contracts must be copied to the Clerk upon completion: occlerkdocs@orangecountync.gov The following signature block is for hard copies only and is not required for Docusign contracts: Received for record retention: Office of the Clerk to the Board __________________________________________Date:_________ Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 3/16/2026 3/16/2026 3/16/2026 3/16/2026 February 18, 2026 Christopher J. Sandt, PE County Engineer Orange County Planning and Inspections Department 131 W. Margaret Lane (P.O. Box 8181) Hillsborough, NC 27278 Subject: Revised Proposal for Coordination, Observation, and Reporting for the Geotechnical Exploration for Lake Orange Dam Intake Tower Rehabilitation/Replacement, Orange County, North Carolina (Schnabel Reference 24P21018.00) Dear Mr. Sandt: SCHNABEL ENGINEERING SOUTH, P.C. (Schnabel) is pleased to submit this proposal to provide coordination, observation, and review of a geotechnical exploration program for the Intake Tower at Lake Orange Dam. It is our understanding the geotechnical subsurface exploration will be performed by Catawba Valley Engineering and Testing (CVET), under separate contract to the County. The services proposed by CVET include a geotechnical exploration program to better characterize the subsurface conditions (depth to rock and stiffness of overburden soils) around the existing intake tower to aid in the design of a temporary cofferdam for the construction of the replacement intake tower. The drilling will also include a boring in the dam crest to provide soils data for the evaluation of construction loads on the dam and to install an open-standpipe piezometer with a flush-mount cover that is rated for traffic loads. 1.0 PROJECT DESCRIPTION AND BACKGROUND Lake Orange Dam (ORANG-005, NC-00773) is located in Cedar Grove, North Carolina, and impounds the East Fork of the Eno River. The dam and reservoir are owned and maintained by Orange County, and the reservoir is used primarily for public water supply and water management within the East Fork of Eno River. A secondary use of the reservoir is private recreation. The dam is regulated by North Carolina Department of Environmental Quality (NCDEQ) Dam Safety as a medium-size, high hazard structure. The existing intake tower is in poor condition and Schnabel performed an alternatives analysis to evaluate the merits of rehabilitating the existing tower and gates or replacing the existing tower and gates. Orange County selected replacing the existing tower and Schnabel is under contract to perform design services for the new tower. 2.0 SCOPE OF SERVICES Our scope of services for the geotechnical exploration are divided into three tasks. These services will be performed under the supervision of a Professional Engineer or Geologist registered in North Carolina. Attachment A - Scope of Work for Revised Task 4 (Contract Amendment 3)Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 Orange County Lake Orange Intake Tower Replacement Geotechnical Exploration Coordination, Observation, and Reporting 24P21018.00 / February 18, 2026 Page 2 Schnabel Engineering South, P.C. Task 1 – Planning and Coordination Schnabel will work with the County to develop and review the scope of the geotechnical exploration to be performed by CVET. We will also assist the County with the development of a specification for drilling and sampling for the work by CVET. We have assumed CVET will contact the appropriate public utility location service (NC 811) and coordinate with the County to mark their private utilities on the project site at least 72 hours before any drilling occurs. Task 2 – Geotechnical Exploration Observation The geotechnical investigation is anticipated to include four borings performed around the existing intake tower from a barge and one boring in the crest of the dam. The proposed depths and sampling frequencies for each boring to be performed by CVET are summarized in Table 1. Table 1: Summary of Test Boring Drilling, Sampling and Testing Boring ID General Location Approx. Ground Surface (Elev., feet) Approx. Soil & Rock Drilling Linear Footage Approx. Termination (Elev., feet) Proposed Sampling, In-situ Testing and Termination Criteria B-01 15-ft Upstream, 15-ft left of Intake Tower 597 12 5 580 5-foot interval SPTs Terminate Boring 5-ft into Rock. B-02 15-ft Upstream, 15-ft right of Intake Tower 597 13 5 579 5-foot interval SPTs Terminate Boring 5-ft into Rock. B-03 15-ft to the left of Downstream left corner of Intake Tower and 5-ft Upstream of Dam 606 22 5 579 5-foot interval SPTs Terminate Boring 5-ft into Rock. B-04 15-ft to the right of Downstream right corner of Intake Tower and 8-ft Upstream of Dam 606 22 5 579 5-foot interval SPTs Terminate Boring 5-ft into Rock. B-5 20-ft to the right of Principal Spillway Conduit Alignment, located on the Dam Crest 618 40 0 578 5-foot interval SPTs Terminate Boring at refusal or at proposed depth, whichever occurs first. Install 2-inch PVC Open- Standpipe piezometer with flush-mount cover. Notes: SPTs = Standard Penetration Tests in soil, Ground Surface and Termination Elevations estimated based on Bathymetric Survey performed by Pennoni in January 2025. Schnabel proposes to have one staff member on-site during the geotechnical explorations. We have assumed drilling will take seven days to complete not including time to move between borings. The staff member’s responsibilities will include observing drilling operations, and collecting and describing soil and rock samples, and confirming test boing locations with a submeter accurate Trimble GPS. Boring Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 Orange County Lake Orange Intake Tower Replacement Geotechnical Exploration Coordination, Observation, and Reporting 24P21018.00 / February 18, 2026 Page 3 Schnabel Engineering South, P.C. elevations will be estimated based on the reservoir elevation at the time of drilling and the depth to the mud line. It is our understanding that CVET will perform the laboratory testing of samples collected during the subsurface investigation. Schnabel will assist CVET with selecting which samples will be tested and assigning the laboratory testing. It is anticipated that the soil testing will generally consist of moisture content, gradations, and plasticity testing. The actual quantities and type of tests will be determined based on the findings and obtained samples from the geotechnical exploration. Task 3 – Geotechnical Data Report This task includes the preparation of a Geotechnical Data Report (GDR) to summarize results and key findings from the efforts performed under this scope of services and the geotechnical exploration by CVET. Detailed quality control/quality assurance review of the field and laboratory test data will be performed to support the development of the GDR. The report will include descriptions of the site and regional geology, findings of the geotechnical exploration program, soil laboratory test results, and supporting tables and figures. 3.0 ASSUMPTIONS AND EXCLUSIONS The following assumptions apply to the scope of services described herein. • CVET will complete the geotechnical exploration in seven to ten days of field work. • Work will be generally performed between the hours of 7:00 AM and 5:00 PM. • The field exploration will include up to 7 days of drilling, grouting, and observation well installation. • The scope of services herein will be performed as additional services under the agreement executed for our previous scope of services on November 1, 2024, and amended February 28, 2025. 4.0 TENTATIVE SCHEDULE Upon Notice to Proceed (NTP), Schnabel will begin coordination with the County and CVET. A kick-off meeting with all parties to discuss and review the drilling plan and scope of work will be performed one to two weeks prior to mobilization to the site. Schnabel will coordinate coverage of the geotechnical exploration with CVET and the County. It is our understanding the geotechnical exploration work will be voted on at the March 5, 2026 County Commissioners’ Meeting, and the work, if approved, is expected to begin approximately two weeks following this meeting. It is our understanding that the geotechnical exploration and laboratory testing is planned to be completed by April 24, 2026. Schnabel will begin preparation of the GDR following the field work, but the laboratory testing will need to be completed prior to finalizing the document. As such, it is anticipated that the report will be submitted to Orange County within two weeks of receiving the laboratory test results. In total, the scope of services described herein is anticipated to be completed within three (3) months from NTP. Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 Orange County Lake Orange Intake Tower Replacement Geotechnical Exploration Coordination, Observation, and Reporting 24P21018.00 / February 18, 2026 Page 4 Schnabel Engineering South, P.C. Currently the schedule for the design of the replacement intake tower has the following milestones remaining: • 95% Design Submittal • 100% Design and Permitting Submittal • Bidding and Award Since the data gathered in the geotechnical subsurface investigation described herein may impact the design of the intake tower replacement design, we recommend revising the deadlines for the remaining milestones as outlined below. Milestone Duration Deadline Receive Geotechnical Information N/A April 24, 2026 Geotechnical Data Report 14 days May 8, 2026 95% Design Submittal 14 days May 22, 2026 100% Design and Permitting Submittal 56 days July 17, 2026 Bidding and Award 180 days January 13, 2027 5.0 FEES AND PAYMENT Our lump sum fees to perform the scope defined herein are provided in the following table. Our current Schedule of Personnel Fees is included as Attachment 3. The fees were estimated for the specific scope of services detailed herein. The fees for work requested beyond the scope of services provided herein will be based on our current unit prices at the time the work is authorized. Task Lump Sum Fees Schnabel Labor Expenses Task Total Task 1 – Planning and Coordination $ 3,700 - $ 3,700 Task 2 – Geotechnical Exploration Observation (7 days) $ 19,200 $ 1,100 $ 20,300 Task 3 – Geotechnical Data Report $ 12,100 - $ 12,100 Total Fee: $ 35,000 $ 1,100 $ 36,100 Invoices will be submitted in accordance with the existing contract between Schnabel and Orange County approved on November 1, 2024. If CVET’s actual proposed schedule requires more than seven days of field observations, our fee for Task 2 will need to be revised. 6.0 CLOSING We appreciate the opportunity to submit our proposal for these services and are looking forward to working with you on this project. Please contact us if you have any questions regarding this proposal. Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 Orange County Lake Orange Intake Tower Replacement Geotechnical Exploration Coordination, Observation, and Reporting 24P21018.00 / February 18, 2026 Page 5 Schnabel Engineering South, P.C. Sincerely, SCHNABEL ENGINEERING SOUTH, P.C. Samuel Kees, PE Associate SKK:GCR Attachments: (1) Schedule of Personnel Fees Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 DAMS AND RESERVOIRS (EASTERN UNITED STATES) Effective until December 31, 2026 Senior Consultant $375.00/hr Principal 343.00/hr Senior Associate 311.00/hr Associate 277.00/hr Senior Engineer/Scientist 234.00/hr Project Engineer/Scientist 203.00/hr Construction Resident Engineer/Resident Project Representative Senior Staff Engineer/Scientist/Technologist 203.00/hr 179.00/hr Staff Engineer/Scientist/Technologist 155.00/hr Senior Technician II/Construction Resident Technician (see note 4) 147.00/hr Senior Technician I (see note 4) 124.00/hr Technician III (see note 4) 110.00/hr Technician II (see note 4) 90.00/hr Technician I (see note 4) 80.00/hr Senior CAD Designer CAD Designer III 179.00/hr 165.00/hr CAD Designer II 150.00/hr CAD Designer I 126.00/hr Clerical/Admin 96.00/hr NOTES: 1. Personnel fees will be based upon the actual hours charged times the appropriate hourly rate. 2.Travel by auto to and from jobs will be charged at the current IRS prevailing rate, plus a markup of 15% to cover handling, insurance and overhead. Travel by air or rail, lodging and meal expenses for personnel in the field will be billed at cost plus a 15% markup. 3. Per Diem rates for out-of-town or overnight travel will be in accordance with U.S. General Services Administration rates published on website www.GSA.gov for the area in which the project is located. 4. Overtime for Technicians is time for work on Saturday, Sunday and federal holidays, time in excess of 8 hours per day, and time between the hours of 7:00 P.M. and 7:00 A.M. A surcharge of $15/hr is added to the above rate for overtime. 5. Subcontractors and other non-labor project expenses are marked up 15% to cover the cost of handling, insurance and overhead. DBU East-2026 SCHEDULE OF PERSONNEL FEES – GREENSBORO, NORTH CAROLINA Docusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? INSR ADDL SUBR LTR INSD WVD PRODUCER CONTACT NAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY)(MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person)$OWNED SCHEDULED BODILY INJURY (Per accident)$AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH-STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 6/27/2025 (703) 827-2277 (703) 827-2279 25674 Schnabel Engineering, LLC Schnabel Engineering South, PC 11-A Oak Branch Dr Greensboro, NC 27407 19038 24319 A 1,000,000 P-630-2Y493523 7/1/2025 7/1/2026 300,000 5,000 1,000,000 2,000,000 2,000,000 1,000,000A 810-2Y384459 7/1/2025 7/1/2026 10,000,000A CUP-2Y554397 7/1/2025 7/1/2026 10,000,000 10,000 B UB-2Y489964 7/1/2025 7/1/2026 1,000,000 N 1,000,000 1,000,000 C Professional Liab.03147536 7/1/2025 Per Claim 1,000,000 C Professional Liab.03147536 7/1/2025 7/1/2026 Aggregate 1,000,000 RE: Lake Orange Intake Tower Rehabilitation Replacement Project, Orange County, North Carolina (Schnabel Reference 24210018.00P) Orange County, its officers, agents and employees are included as additional insured with respect to General Liability, Automobile Liability and Umbrella Liability when required by written contract. General Liability, Automobile Liability and Umbrella Liability are primary and non-contributory over any existing insurance and limited to liability arising out of the operations of the named insured and when required by written contract. General Liability, Automobile Liability, Umbrella Liability and Workers Compensation policies include a waiver of subrogation in favor of the additional insureds where permissible by state law and when required by written contract. Umbrella Liability coverage sits excess over General Liability, Automobile Liability and Employers Liability SEE ATTACHED ACORD 101 Orange County 300 West Tryon Street P O Box 8181 Hillsborough, NC 27278 SCHNENG-01 KSUTTON Ames & Gough 8300 Greensboro Drive Suite 980 McLean, VA 22102 admin@amesgough.com Travelers Property Casualty Company of America, A++, XV Travelers Casualty and Surety Company A++. XV Allied World Surplus Lines Insurance Co. A+ XV X 7/1/2026 X X X X X X X Docusign Envelope ID: 021C6470-B14B-4CA1-B638-425BDA523E1FDocusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2 FORM NUMBER: EFFECTIVE DATE: The ACORD name and logo are registered marks of ACORD ADDITIONAL REMARKS ADDITIONAL REMARKS SCHEDULE FORM TITLE: Page of THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01) AGENCY CUSTOMER ID: LOC #: AGENCY NAMED INSURED POLICY NUMBER CARRIER NAIC CODE © 2008 ACORD CORPORATION. All rights reserved. Ames & Gough SCHNENG-01 SEE PAGE 1 1 SEE PAGE 1 ACORD 25 Certificate of Liability Insurance 1 SEE P 1 Schnabel Engineering, LLC Schnabel Engineering South, PC 11-A Oak Branch Dr Greensboro, NC 27407 SEE PAGE 1 KSUTTON 1 Description of Operations/Locations/Vehicles: coverage. 30-day Notice of Cancellation will be issued for the General Liability, Automobile Liability, Umbrella Liability, Workers Compensation and Professional Liability policies in accordance with policy terms and conditions. Docusign Envelope ID: 021C6470-B14B-4CA1-B638-425BDA523E1FDocusign Envelope ID: 64C8DD46-2EE5-445D-9F2E-C6215945E8C2