HomeMy WebLinkAboutAgenda - 09-26-2005-1ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 26, 2005 Action Agenda Item No. 1 SUBJECT: County /OCS /CHCCS Matters DEPARTMENT: Manager /Budget/CHCCS /OCS PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT: As listed in "Background" John Link or Rod Visser, 245 -2300; Donna Dean, 245 -2151 Neil Pedersen, 967 -8211 Shirley Carraway, 732 -8126 PURPOSE: To discuss various issues with policy and /or financial implications that are of current interest to the Orange County Commissioners, Orange County Board of Education, and /or Chapel Hill - Carrboro Board of Education. BACKGROUND: At the September 1, 2005 meeting of the Collaboration Work Group, members agreed to structure the meeting for this September 26 joint work session around the following agenda items: a. Discussion /Policy Issues 1. School Construction Standards In May 1996, the Board of Commissioners adopted school construction standards for elementary and middle schools in Orange County, High School construction standards were approved in April 1999. Two separate School Facilities Task Forces that convened in 2000 and in 2002 identified a number of issues related to both sets of standards that required clarification and or updating (e.g. baseline estimates of per square foot cost, an appropriate inflation factor, percentage of project budget that should be set aside for contingency, etc). Since that time, CHCCS High School #3 has been designed as an 800 student high school, expandable to accommodate 1200 students (existing high school standards contemplate 1000 student capacity, expandable to 1500). The Collaboration Work Group has discussed options for how to address needed updates to existing Orange County school construction standards and are soliciting input from elected colleagues to help guide the Group's process. Attachment 1 -a -1 -a May 1996 Elementary/Middle School Construction Standards Attachment 1-a- 1-b April 1999 High School Construction Standards 2. School Capacitv Calculations The governing boards of the County, school systems, and municipalities completed agreements in 2003 related to a School Adequate Public Facilities Ordinance ( SAPFO). The SAPFO machinery includes a process that is initiated each year to certify student membership and capacity at the elementary, middle, and high school levels in each school system, based on actual student membership as of November 15 (a copy of the Memorandum of Agreement describing this process is attached for reference). Those figures are used as the basis for updating 10 year student membership projection, based on an agreed -upon set of membership forecasting models. The resulting projections of student membership vs. anticipated capacity then shape both school systems 10 year Capital Investment Plans (CIPs) and identify the timing by which new school space will need to be available to accommodate projected growth in the number of students. During the past several years, the State of North Carolina has enacted legislation that effectively reduces the standard ratio of students per teacher in grades K -3. A mandatory reduction in class size immediately creates an impact on available classroom space, and can lead to the need to construct additional new elementary schools or new school space earlier than would have been necessary absent the State's action. The issues of how to calculate available elementary school seats and how to address the resulting implications for SAPFO machinery and school CIPs have been discussed during the past two SAPFO cycles without clear resolution being reached. All governing boards have agreed that it would be highly desirable to achieve resolution on this issue prior to the beginning of the next SAPFO planning cycle on November 15, 2005. CHCCS has provided some background information from the North Carolina Department of Public Instruction related to statewide implementation of the class size reductions. This work session provides the governing boards an opportunity to discuss class size and building capacity implications and to provide input to the Collaboration Work Group as it works to resolve this matter. Attachment 1 -a -2 -a Schools Adequate Public Facilities Memorandum of Agreement Attachment 1 -a -2 -b 9122105 CHCCS Superintendent Memo Attachment 1 -a -2 -c NCDPI Tables — K -3 Class Size Averages for 2004 -05 Attachment 1 -a -2 -d 9122105 CHCCS Superintendent E -Mail 3, Cross - District Collaboration The two school systems have been working during the past two years on a series of initiatives to share resources and enhance program offerings across district boundaries. A summary of progress on various efforts to date is provided for review and discussion by the governing boards. An update on work done for both school systems and the County by the Robert Segal CPA firm on expense reduction and revenue enhancement opportunities is likewise attached. Attachment 1 -a -3 -a 9120105 Collaboration Status Report Attachment 1 -a -3 -b 9126105 Segal CPA Letter 4. New School Construction Progress Reports OCS and CHCCS, respectively, will provide updates to all elected officials regarding the two schools currently under construction — OCS Middle School #3 and CHCCS High School #3. Attachment 1 -a -4 Middle School #3 Update b. Informational Reports Staff have compiled background information related to the following topics and will respond to questions regarding these from elected officials, 1. Implications of State Lottery for Orange County's School Construction Funding The attached materials compiled by the Association of County Commissioners reflect five year estimates of State lottery proceeds that would be earmarked towards school construction or debt service, with about $2.6 million projected for Orange County for the first full year of lottery operation in 2006 -07. Attachment 1 -b -1 9101105 NCACC E -News Update— Estimated Lottery Proceeds for School Construction 2, loth Day Student Membership The accompanying tables reflect student membership for both school systems as of the 10th day in academic year 2005 -06. Attachment 1 -b -2 -a Table - OCS 10th Day Membership Attachment 1 -b -2 -b Table - CHCCS 101h Day Membership 3. 2005 -06 Adopted School Budgets The accompanying materials reflect the 2005 -06 budgets adopted by the two school systems, including federal, state and local dollars, and a recap of how increases in local dollars were allocated by the school boards among specific items identified in their 2005 -06 budget requests to the Board of Commissioners, Attachment 1 -b -3 -a Table - CHCCS Budget Summary FY 2005 -06 Attachment 1 -b -3 -b Table — OCS Budget Summary FY 2005 -06 Attachment 1 -b -3 -c 9120105 OCS Superintendent Letter re: 2005 -06 Budget Narrative FINANCIAL IMPACT: There is no financial impact tied directly to the discussion at this meeting. However, decisions that the school boards and BOCC will make at subsequent meetings are likely to have significant implications for future capital and operating budgets, RECOMMENDATION(S): The Manager recommends that the boards discuss the issues noted and provide direction to staff, as appropriate. 2,� 3oC /r /7Na School Construction Standards Background In early 1995 the Board of County Commissioners appointed an eight member work group to develop school construction standards for new facilities built in the Orange County School and Chapel Hill /Carrboro City School districts. The School Facility Construction Standards Work Group included two representatives from the Board of County Commissioners, two representatives from each of the two School Boards, and two parent representatives: Orange County Board of Commissioners Moses Carey Stephen Halkiotis Chapel Hill /Carrboro City School Board Mary Bushnell Nick Didow Orange County School Board Susan Dovenbarger Larry Haverland Parent Representatives Bill Boyarsky Dick Snow The Board of County Commissioners adopted in May 1996 school standards for elementary and middle schools. These construction standards are outlined in this report. Elementary School The total square footage of the Basic School, as outlined in this section of the report, is 83,160 square feet. There are two tiers added to the Basic School Tier A provides additional storage space for use of the facility for afterschool programs. The additional storage space is 1,400 square feet with 46?-5quare feet for circulation, bringing the total for Tier A to 1,862 additional square feet Tier B includes space identified by the School Systems as desirable for an elementary school_ Tier B adds 13,240 square feet with approximately 5,920 square feet for storage, 1,000 square feet for a Student Commons area and the balance primarily for additional teacher workspace and conference rooms 1. Capacity The capacity of the elementary school is 600 students. 2. School Sites The elementary school site is based on the NC Public School Facility Standards which requires an elementary school to have a minimum of ten usable acres plus one usable acre Page 1 per each 100 average daily membership (ADM). The minimum school site for a 600 student elementary school is 16 acres Consideration is to be given to community use of the facility and recreational facilities which could possibly increase the size of the school site. 3. Classrooms and Associated Storage A. Regular Classrooms Basic School - 26,400 sq. ft. Tier A - Add 1,200 sq. ft. Tier B - Add 3,800 sq. ft. Classrooms are based on the following number of students: • Kindergarten through Third Grade •. 23 students per classroom • Fourth and Fifth Grades - 26 students per classroom Local Basic Standard NC Public School Facility (Sq. Ft) Standards (Sq. Ft). Kindergarten (4 rooms) 1,200 1,200 Grades I - 3 (13 rooms) 1,200 1,000 - 1,200 Grades 4 - 5 (8 rooms) 1,000 850 -1,000 Total square footage for regular classrooms in the Basic School is 26,400 square feet. Tier A includes 1,200 square feet for additional storage in the classroom which would allow classrooms to be used for afterschool programs. Other storage space for afterschool programs is included in the multi- purpose /physical education section of this report. Additional classroom storage is included in Tier B. The total amount of additional storage space is 3,400 square feet. Small project rooms for grades 4 and 5 are also included in this tier, adding 400 square feet. B. Pre - School Area Basic School -1,700 sq. ft. Classroom size for children ages three and four is recommended by the State to be 1,200 to 1,400 square feet. The standards adopted by the Board of County Commissioners includes 1,700 square feet for this area. C. Special /Exceptional Children Basic School - 4,800 sq. ft. Speech /Language Tier B - Add 850 sq. ft. Programs for exceptional children vary greatly, depending on local factors. Tire State suggests a minimum of 100 square feet be provided for each student Page 2 The adopted standards include the following space for the Basic School for special /exceptional speech/language education: Academically Gifted Classroom 900 Speeclr/Laagmage Rooms 500 Learning Disabilities Classroom 2 rooms at 500 sq ft. each PIA Classroom 1,200 BEH 1,200 Additional space included in Tier B includes: storage for the Learning /Disabilities classroom (200 square feet) and for the speech/language classrooms (100 square feet). Offices for the Speech/Languages teacher are included in this tier adding .300 square feet to the school An office area totaling 250 square feet is included for the Leaning Disabilities program. 4. Art Education and Music Basic School - 2,400 sq. ft. Tier B - Add 450 sq. ft. The following table compares the local adopted standards for a Basic School with the Standards established by the State Department of Public Instruction: Local Basic NC Public School Facility Stanrards (Sq. Ft) Standards (Sq. Ft). • General Music 1,000 850- 1,000 • Music Library 200 • Music Office 0 150 Art Room 1,400 1,000 - 1,400 Creative Movement in multipurpose room 1,800 - 2,000 Tier B includes 450 additional square feet for art storage (250 square feet) and music storage (200 square feet). 5. Physical Education Basic School 5,050 sq. ft. Tier A - Add 200 sq. ft. In addition to the space outlined in the table below, the NC Public School Facility Standards state that K -6 indoor physical education areas should also include additional square footage for an office, storage and toilets for boys and for girls. Page 3 6. 7 Local Basic NC Public School Facility Standards (Sq. Ft) Standards (Sq. Ft). maltipmposc/Inrloor 3,600 3,600 PE PE Storage 200 included in standards but amount of required space not specified Stage 800 included in standards but amount of required space not specified Stage Storage 450 Tier A includes additional storage space totaling 200 square feet for afterschool storage. Media Center Basic School - 4,200 sq. ft. The State provides that the school's media center should be located on the ground floor, be a single story and be convenient to all learning areas of the school. The capacity of the center should be 10% of the membership of the school (60 students.) The following table compares the State Public School Facility Standards with the local adopted standards. Local Basic NC Public School Facility Standards (Sq. Ft) Standards (Sq. Ft). Main Room 3,000 2,400 to 3,600 Support Areas 1,200 1,200 Computer Room not included 850-1,000 Video Production Room not included 300 Equipment Storage see storage _- 80 A computer room is not included in the Basic School since technology is integrated into the classrooms and space is provided in each classroom for computers. Small Group/Resource Rooms Basic School - 1,350 sq. ft. The State Standards require that one or more small group classrooms be provided for remediation, conferences, guidance, testing, etc for groups of up twelve individuals. Local Basic Standards NC Public School Facility Standards Rennediatiou 3 rooms at 450 sq. ft each at least one room at 450 sq. ft. /Resource Labs Page 4 8. Administration Basic School - 1,650 sq. ft. Tier B - Add 300 sq. ft. The following table compares the State Standards to the local adopted construction standards. Local Basic Standards NC Public School Facility (Sq. Ft) Standards (Sq. Ft). Principal's Office 200 200 Assistant Principal 150 150 sq. ft pet office Reception Area 400 400 Secretary 150 150 SIMS K-5 150 120 Workrooni/Storage 200 200 Conference Roont 200 200 Record Storage 100 100 General Storage 100 100 Tier B includes larger room sizes for the principal's office (50 square feet), for the reception area (100 square feet), a Iarger conference room (50 square feet) and additional storage above the State guidelines (100 square feet). 9. Student Support Areas Basic School -1,100 sq. ft. Tier B - Add 100 sq. ft. This general area includes counseling rooms, guidance rooms, and health services. The State suggests that schools with more than one guidance counselor will need additional space. Local Basic NC Public School Facility Standards (Sq. Ft) Standards (Sq. Ft). Guidance Roonts/Faniily 400 450 Specialists Counselor Office 300 150 each office Other Student Services 200 200 Health Room 200 200 Tier B includes an office for the Health function (100 square feet). Page 5 10. Staff Support Areas Basic School - 5,600 sq. ft. Tier B - Add 2,400 sq. ft. The State recommends that combined or shared space for teacher's offices /workspace be provided. There should be at least one centralized workroom that houses equipment such as the copy machine, duplicator, specialized computers, etc. The size of the lounge area is determined by the building plan and faculty size. The lounge should provide limited kitchen facilities. Local Basic NC Public School Facility Standards Standards (Sq. Ft). Teachers' The State requires that for grades K -3, Workrooms: 100 to 125 square feet be provided for teacher offices /workspace. For grades 4 and above, 80 to 100 square feet per teacher is required. • Ifindergarten 300 • Grades 1,2,3 900 • Grades 4,5 600 Additional Teacher 500 Workspace/Offrces Teachers' 1,000 required but size varies Louuge/Workarea Itinerant Support 300 300 Tier B includes additional workrooms for the kindergarten level (300 square feet), one conference room per grade level (1,500 square feet), a general conference room (200 square feet) and a speech/language conference room (400 square feet). 11. Cafeteria /Food Service Basic School - 4,500 sq. ft. Tier B - Add 200 sq. ft. The State uses a formula for determining the appropriate size for the dining room and kitchen area. The dining area should provide between I2 and 14 square feet per pupil dining Based on three seatings, the size of the dining room should be at least 2,400 square feet and 2,800 square feet. The kitchen space is based on the number of meals served. A kitchen preparing 500 meals should be at least 1,518 square feet.. A kitchen Page 6 preparing 750 meals should be at least 1,938 square feet. The adopted standards include a dining area of 2,400 square feet and a kitchen/serving area of 2,100 Tier B includes additional storage for tables and chairs totaling 200 square feet. 12. Miscellaneous /Commons Basic School - 13,00 sq. ft. Tier B - Add 1,855 sq. ft. This area includes miscellaneous space such as additional storage, book storage and School Commons area. In addition, this area includes additional toilets which are required by the State Facility Standards but are calculated as part of the overall circulation multiplier which is applied to the total square footage (see next section). Local Basic Standards NC Public School Facility (Sq. Fi) Standards (Sq. Ft). Boolr Storage 800 800 Tier B includes a Commons area (1,000 sq ft.) and toilets which are calculated over and above the circulation factor of .33 percent. 13. Circulation A multiplier of 33 percent is included for space such as storage, mechanical rooms, hallways, toilets, walls, etc. The multiplier is applied to the total square footage of the Basic School plus each additional level. 14. Cost Per Square Foot For planning purposes, building costs are calculated based on $90 per square foot for construction. Middle School The total square footage of the Basic School, as outlined in this section of the report, is approximately 113,400 square feet. There are two added to the Basic School... Tier A includes increased space for the afterschool programs, increasing the square footage by a total of 1,620 square feet The remaining tier includes nearly 17,200 square feet of which a large portion is for special project rooms, additional commons space and additional teacher workspace Page 7 1. Capacity 2. 3. The capacity of the middle school is 700 students School Sites The middle school site is based on the NC Public School Facility Standards which requires that a middle school have a minimum of 15 usable acres plus one usable acre per each 100 average daily membership (ADM). Therefore the minimum school site for a 700 student middle school is 22 usable acres. Classrooms and Associated Storage Basic School - 32,500 sq. ft. Tier B - Add 2,550 sq. ft. The Basic School includes classrooms at the upper end of the range provided by the State Department of Public Instruction. The larger classrooms allow technology to be integrated into the classrooms Regular Classrooms are based on 1,000 square feet per classroom, science classrooms and Exceptional Education Classrooms are each 1,200 square feet per classroom., The Resource Rooms for Exceptional Education include two small rooms at 450 square feet each and two larger rooms at 600 square feet each.. Local Basic Standards (Sq. NCPublic School F1) Facility Standards (Sq. Regular Classrooms (22) 22,000 18,700 - 22,000 Science Classrooms (6) 7,200 6,000 - 7,200 Exceptional Education 1,200 100 sq. ft. per student Classroom Exceptional Education 2,100 450 sq ft per room Resource Roonas (4) Total square footage for regular classrooms, science classrooms and exceptional education classrooms and resource rooms in the Basic School is 32,500 square feet_ Included in Tier B for the middle school is 300 square feet additional storage. In addition three 750 square feet student project rooms (one for each grade level) provides space for students to work on special projects Page 8 4. Art Education /Music /Creative Movement and Theater Arts Basic School •. 9,600 sq. ft. Tier B - Add 1,130 sq. ft. The following table compares the Local basic standards for a Basic School with the Standards established by the State Department of Public Instruction. Note that the Stage is to be built as part of the cafeteria. A separate auditorium is not included in the Basic School The State Standards provides that, if programming allows, the instrument and vocal music rooms can be combined. Local Basic Standards NC Pnnblic School Facilio, (So. F6 Standards (So. Ft). • Instrument Music 1,500 1,000 to 1,200 • Vocal Music 1,200 1,000 to 1,200 • Electronic Music not included in Tier A 0 • Practice Roonis not included in Tier A 0 • Instrument Storage included as part of Should be provided but space circulation/classroom amount not specified Visual Arts Room 1,500 1,200 to 1,500 Creative Movement 1,800 4,000 (includes stage) Theater Arts 1,800 1,800 to 2,000 Stage and Stage Storage 1,800 4,000 includes lobby Tier B includes one large practice room (200 square feet) one small practice room (80 square feet), wardrobe storage (450 square feet) and one electronic music room (400 square feet). If an auditorium was added, additional square footage would be required. 5. Physical Education Basic School 12,000 sq. ft. Tier A •• Add 1,200 sq. ft. Tier B - Add 500 sq. ft. The State standards for physical education do not specify the amount of square footage for physical education. The Standards do require a minimum court area for the gymnasium of least 42 feet by 74 feet with six feet on each side of the court and eight feet on each end of the court for safety. The gymnasium should include dressing and shower areas, offices and some storage, Assembly and spectator use may require increased size. Page 9 L.ockerRooms (2) Offrce Weight room Storage Health Classroom Local Basic Standards NC Public School Facility Standards 7,200 2,400 see note above to be provided although space not defined 500 900 not required for a middle school 100 required but amount not specified 900 Tier A provides additional space that would allow after school use This includes a multi- purpose room (900 sq. ft.) plus additional storage (300 sq. ft.). Included in Tier B is a larger gymnasium (300 sq. ft ) and additional storage (200 sq. ft..) 6. Media Center Basic School - 5,640 sq. ft. Tier B - Add 60 sq ft. The State provides that the school's media center be located on the ground floor, be a single story and be convenient to all learning areas of the school. The capacity of the center should be 10% of the membership of the school (70 students ). The following table compares the State Public School Facility Standards with the local adopted standards. Local Basic Standards (Sq. WorkroontlOffrce 600 Storage: • Periodical 200 • Audio Visual 90 Audio Visual Equipment 250 Conference Room 200 Professional Library 200 Telecommunications Room 100 NC Public School Facility Standards (Sq. Ft). 2,800 to 4,200 Total support area is 1,880 Tier B includes additional storage for periodicals (50 square feet) and for audio visual (10 square feet). Page 10 7. Parent /Community Center Tier B - 400 sq. ft. 0 Space identified by the Schools dedicated for use by parents and the community is included in Tier B. The State does not require this space. Administration Basic School -1,800 sq. ft. Tier B - Add 50 sq. ft. The following table shows the space included in the Basic School for Central Offices /Administration: Local Basic NC Public Sc /tool Standards (Sq. Ft) Facility Standards (Sq. Principal's Office 200 200 Assistant Principal (2) 300 150 sq. ft.. each Reception Area 300 400 Clerical 200 150 SIMS K -S 150 120 WorkroondStorage/Mailroonn 250 200 Conference Roonn 200 200 Record Storage 200 100 Tier B includes additional space for clerical /office management staff (50 sq. ft ). 9. Student Support Areas Basic School -1,000 sq. ft. Tier B - Add 1,450 sq. ft. This general area includes counseling rooms, guidance /family specialists rooms, and health services. The State standards state that schools with more than one guidance counselor will need additional space. Guidance RooinslFan! Specialists • Counselors Of • Other Of 11ces • Conference Room Health Room Local Basic NC Public School Facility Standards (Sq. Ft) Standards (Sq. Ft). Page 11 450 150 each counselor 150 varies 200 varies 200 200 Tier B includes a Peer Advisor /Conflict Mediator's Room (200 sq ft.), counselors' offices larger than the 150 square feet required (150 sq ft.), a reception/waiting area (100 sq. ft.), additional group counseling area (250 sq. ft), additional testing /conference area (I00 sq. ft ), offices for psychologist, social worker and speech therapist (150 sq. ft.), an office for the nurse (150 sq ft.), and additional health space including additional space for a cot area, reception area and toilet in the health suite (350 sq ft) One toilet is required but is included in the overall circulation of the building. 10. Staff Support Areas Basic School - 3,800 sq. ft. Tier B - Add 2,000 sq. ft. The State recommends that combined or shared space for teacher's offices/workspace be provided There should be at least one centralized workroom that houses equipment such as the copy machine, duplicator, specialized computers, eta The size of the lounge area is determined by the building plan and faculty size. The lounge should provide limited kitchen facilities. Included in the Basic School is one workspace for each grade (450 sq. ft. each) and a teacher's lounge (450 sq. ft). Tier A includes additional workspace for teachers, including offices and conference rooms. Tier B includes additional conference rooms and teacher workspace. Note that the square footage for Tiers I and 3 are based on the space identified for the professional staff for the elementary school.. Local Basic NC Public School Facility Standards Standards (Sq. Ft). Teachers' Workrooms: 1,350 For grades 4 and above, 80 to 100 square feet per teacher is required. Teachers' 450 required but size varies according to the Lounge/Workarea facility and other additional space. Tier A includes additional offices and workspace for teachers totaling 2,000 square feet. Tier B includes additional workrooms, offices and conference space. 11. Cafeteria /Food Service Basic School - 5,240 sq. ft. Tire State uses a formula for detennining the appropriate size for the dining room and kitchen area The dining area should provide between 12 and 14 square feet per pupil dining. Based on three Beatings, the size of the dining room should be at a minimum 2,400 square feet to 2,800 square feet. The kitchen space is based on the number of meals Page 12 served. A kitchen preparing 750 meals should be at least 1,938 square feet. The Local basic standards for the Basic School includes a dining area of 3,300 square feet and a kitchen/serving area of 1,940 square feet. 12. Miscellaneous /Commons Basic School - 3,400 sq. ft. Tier B - Add 1,855 sq. ft. This area includes miscellaneous space such as additional storage, receiving area, book storage and School Commons area. Local Basic Standards NC Public School Facility (Sq. Ft) Standards (Sq. Ft). Custodial /Book 900 Storage Book Storage 800 Student Commons 1,500 1,500 Tier B includes a larger activities lobby (500 sq ft.) and three academic house centrums at 1,000 square feet each (total 3,500 sq.. ft.). 13. Circulation A multiplier of .35 percent is included for space such as storage, mechanical rooms, hallways, toilets, walls, etc. The multiplier is applied to the total square footage of the Basic School plus each additional level. A larger circulation factor than the factor used for an elementary school is necessary for a middle school due to the more complex nature of the facility (laboratories, additional plumbing, etc,) and additional space needed for the hallways (student lockers) 14. Cost Per Square Foot For planning purposes a cost of $95 per square foot for construction is to be used Other Facility Considerations Technology Technology for new school construction projects should include funds for the installation of cabling network within the school. The network should be designed to accommodate voice, data and video educational requirements. Realizing that specifics for the technology infrastructure Page 13 may differ depending upon user needs a cost allowance as suggested by the Department of Public Instruction of $1.75 per building square foot should be used. Equipment such as computers, file servers, printers, telephones, copiers, facsimiles, and video recorders should also be included in the budget. For planning purposes, an estimate of $4.00 per square foot is to be used Energy Efficiencies An approved industry standard that measures energy use is the British Thermal Unit (BTU). Electric and natural gas consumption can easily be converted into BTUs and comparative analysis can be developed. Today's energy efficient schools should operate in the range of 40,000 to 50,000 BTU per square foot. This range allows for computer equipment in classrooms and after hour use of facilities. If an energy usage target is established for construction of new schools, the planners have the flexibility of specifying the mix of mechanical systems, chillers, daylighting techniques, roofing systems, insulation, energy management systems, etc to achieve the agreed upon energy goal. An integral part of the equipment specification process includes the development of life cycle cost analysis data regarding the proposed equipment. The energy BTU goal and life cycle cost analysis should be a required amendment in the contract between the school system and architect/engineer. Other recommendations in this area include: (I)all classrooms should have exterior exposure with windows; and (2) heating and cooling systems should be easily interchangeable. Site Issues The property size of new schools should at a minimum follow established recommendations from the Department of Public Instruction These are: Elementary School 10 usable acres plus I usable acre per 100 students Middle School 15 usable acres plus I usable acre per 100 students High School 30 usable acres plus 1 usable acre per 100 students School systems should actively pursue partnering agreements with tine towns and the County Parks and Recreation Departments, private developers, and businesses in an effort to maximize shared facilities. Other site considerations include: 1. Landscaping and buffers should be included in all school plans. 1 Athletic fields at the high school and middle school level should be equipped with irrigation systems. At a minimum, irrigation should be installed on the primary Page 14 event field. Additionally, water should be available for plants and grass in the immediate vicinity of the buildings. i. Covered walkways should be provided at the student drop. off areas, main entrances, and bus loading areas 4 Adequate parking for staff and visitors should be provided. The following minimum recommendations are made regarding the size of parking facilities at new schools: Capacity Parking Spaces Elementary School 600 100 Middle School 700 120 Materials Construction materials should be selected based on low maintenance and high durability The life cycle of each new school is a minimum of 50 years, Page 15 Elementary School Capacity 600 Students 16 Basic Additions to Basic School Total School Tier A Tier B Classrooms and Associated Storage 34,100 1,20D 4,650 39,950 Regular Classrooms (25) 26,400 1,200 3,400 31,000 Small Project Rooms (Grades 4 & 5) (2) 400 400 Science Project Room (1) 1,200 1,200 Pre- School Area (1) 1,700 1,700 Special /Exceptional Children /Speech Language (7 rooms) 4,800 850 5,650 Art Education and Music 2,400 450 2,850 Physical Education 5,050 200 5,250 Media Center 4,200 4,200 Small Group Resource Rooms 1,350 1,350 Administration 1,650 300 1,950 Student Support Areas 1,100 100 1,200 Health 200 100 300 Counseling 900 900 Staff Support Area 5,600 1,400 7,OOD Teachers' Offices/Workrooms 4,300 300 4,600 Conference Rooms 500 500 General Conference Room 200 200 Speech /Language Conference Room 400 400 Teachers' L:ounge/Workarea 1,000 1,000 Itinerant Support 300 300 Cafeteria /Food Service 4,500 200 4,700 Miscellaneous /Commons 1,300 - 1,855 3,155 Custodial General Storage 500 500 Book Storage 800 800 Student Commons 1,000 1,000 Additional Toilets above those Calculated as part of "Circulation" 855 855 Subtotal 61,250 1,400 8,955 71,605 Circulation at 33% of Subtotal 20,213 462 2,955 23,630 Total Square rootage 81,463 1,862 11,910 95,235 16 Middle School Capacity 700 students 17 Basic Additions to Basic School Tier A Tier B Total School Classrooms and Associated Storage 32,500 2,550 35,050 Regular Classrooms (22) 22,000 300 22,300 Science Classrooms (6) 7,200 7.200 Exceptional Education Classroom (1) /Resource Rooms (4) .9,300 3,300 Student Project Rooms (3) 2,250 2,250 Art Education and Music (Cultural Arts) 9,600 1,130 10,730 Exploratories 9,000 1,000 10,000 Foreign Language Classroom 2,000 2,000 Career Explorations Lab and Resource Room 1,000 1,000 Applied Technology lab and Resource Room 3,500 3,500 Consumer Education Lab and Resource Room 1,500 1,500 Computer Lab and Resource Room 1,000 1,000 Video Production Lab 1,000 1,000 Physical Education 12,000 1,200 Soo 13,700 Media Center 5,640 60 5,700 Parent /Community Center 400 400 Administration 1,800 50 1,850 Student Support Areas 1,000 1,450 2,450 Health 2000 500 700 Counseling /Guidance 800 950 1,750 Staff Support Area 3,800 2,000 5,800 Teachers' Offices /Wotkrooms 3,350 1,250 4,600 Conference Rooms (one per grade level) 750 750 Teachers' Lounge /Workarea 450 450 Cafeteria /food Service 5,240 5,240 Miscellaneous /Commons 3,400 3,600 7,000 Receiving Area 200 200 Book Storage /Central Supply Storage 1,700 100 1,800 Student Commons 1,500 1,500 Activities Lobby 500 500 Academic House Centrums (3 @1000 sq ft each) 3,000 3,000 Suhtoral 83,980 1,200 12,740 97,920 Circulation at 35% of Subtotal 29,393 420 4,459 34,272 Total Square rootage 113,373 11 1,620 17,199 132,192 17 Estimated Cost of New Facilities Elementary School Capacity = 600 students Square Footage 95,225 Square Ft per Student 1587 Construction Cost Cost Per Square Foot $ 90 $ 8,570,250 Site Acquisition Acres: 16 Average Cost Per Acre: 25,000 $ 400,000 Site Development As a percentage of Construction Cost l0% S 857,025 Fees As a percentage of Construction Costs and Site Development 10% 942,728 Moveable Equipment As a percentage of Construction Cost 5% $ 428,513 Technology Cost per square foot $ 8 25 $ '785,606 (includes cabling and equipment for voice, video and data distribution systems) Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 471,364 Start -Up Costs Non Personnel One time start -up costs Non Personnel Start Up - one time $ 330,000 350,000 Total $ 12,785,485 Middle School Capacity = 700 students Square Footage 132,192 Square Ft. per Student 188, 8 Construction Cost Cost Per Square Foot $ 95 $ 12,558,240 Site Acquisition Acres: 22 Average Cost Per Acre 25,000 $ 550,000 Site Development As a percentage of Construction Cost 10% $ 1,255,824 Fees As a percentage of Construction Costs and Site Development 10% 1,381,406 Moveable Equipment As a percentage of Construction Cost 5% $ 627,912 Technology Cost per square foot $ 8 25 $ 1,090,584 (inchtdes cabling and equipment for voice, video and data distribution systems) Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 690,703 Start - -Up Costs Non Personnel Start Up - one time $ 350,000 Total $ 18,504,670 R E Orange County, North Carolina Approved April 20, 1999 Table of Contents Background Capacity_ School Sites Interior Building Space Allocations Classroom Standards Media Center Standards Physical Education Strout Administration Standards Student Support Areas Standards Staff Support Areas Standards Cafeteria/Food Service Stauda Commons /Circulation /Entries /Building Support Standards Cost per Square Foot Other Facility Considerations Technology Infrastructure Energy Efficiencies Materials Appendices Approved 4120199 1 1 1 2 3 3 3 4 4 4 4 5 5 5 5 Appendix A — Space Allocation /Square Footage Assignments (1,000 Student Capacity) 6 Appendix B - Space Allocation /Square Footage Assignments (1,500 Student Capacity) 9 Appendix C— Estimated Cost of New High School I2 Appendix D — Energy Efficiency in Public Schools 13 ra High School Construction Standards Background Approved 4120199 In September 1997, the Orange County Board of County Commissioners convened a High School Construction Standards Task Force. This six - member task force included two representatives from the Board of County Commissioners and two representatives from each of the two School Boards, Orange County Board of County Commissioners Moses Carey Stephen Halkiotis Chapel Hill- Carrboro City School Board Elizabeth Carter Ken Touw Orange County School Board Susan Dovenbarger Rick Kennedy In developing standards for future high school construction in Orange County, the task force used North Carolina Department of Public Instruction (DPI) guidelines for a "typical high school'; space profiles for East Chapel Hill High School; and information developed by Orange County Schools staff members. The task force paid particular attention to: • The ability to expand a new high school's capacity from 1,000 children to 1,500; • Location of a new high school; • Energy efficiency standards and day lighting; and, • Cost control and construction management, The task force agreed that the DPI guidelines were reasonable standards to use at the local level. Appendices A and B include square footage standards as outlined by the State, modified to reflect local needs as reconunended by the task force, DPI guidelines are viewed by the State as minimum space requirements, and in many functional areas, Orange County standards allow for more space to provide greater flexibility to meet the educational specifications that will be developed for any new high school's program of instruction. Capacity The capacity of the Orange County standard high school is 1,000 students with the ability to expand to 1,500 students in future years as necessary, School Sites The March 1998 North Carolina Public School Facilities Guidelines report recommends a high school site have a minimum of thirty usable acres plus one usable acre per each 100 average daily membership (students). The minimum school site for a 1,000 - student high school is forty acres, and for a 1,500 - student high school, it is forty -five acres. 3 Approved 4120199 Minimum acreage refers to usable land, land that can be developed. Additional acreage should be considered to account for areas that cannot be built upon, such as steep slopes, wetlands, rights -of -way, easements, setbacks, buffers, or poor soils. Another reason to consider additional acreage is the need to meet requirements imposed by local ordinances. Restrictions governing the ratio of land that can be disturbed within a development and the permitted amount of impervious surface will affect the ultimate size of the site. In addition, acreage for on -site parking needs should also be considered. Spaces should be provided for all staff, itinerant specialists, and visitors. Parking should be provided for one -third or more of the student population. Community use of the facility and physical education fields could possibly increase the size of the school site. For example, if a stadium and spectator parking are anticipated, an additional area often acres or more may be necessary. The expanding number of high school athletic teams is another reason for a larger school site. In addition to football and soccer teams, athletic facilities may also be required for lacrosse and field hockey teams. The Orange County high school standard profile cites a range of 40 -60 acres, to accommodate the potential acreage additions that may be necessary because of specific site topography, configuration, or athletic facilities. Interior Building Space Allocations 1. Classroom Standards The Orange County standards are within the ranges provided by the State Department of Public Instruction and provide for technology to be integrated into the classrooms. Square footage for regular classrooms allows for five computers and ranges from 850 to 950 square feet per classroom. Square footage for other classrooms - science, exceptional children, arts education, and workforce development - is based on the function that each serves. The narrative below provides additional information not detailed in the Appendices. Remediation and Resource Labs - One or more small - group classrooms should be provided for remediation, conferencing, guidance, and testing for groups up to twelve. Some smaller rooms may also be needed in addition to the 450 square foot rooms to allow for smaller group activities. Orange County standards provide for 900 -1,800 square feet for this function, depending on the design capacity of the high school. Exceptional Education - Programs for exceptional children vary depending on local factors which may result in spaces that are larger than the DPI minimum guidelines. Additional support spaces may be necessary for exceptional education purposes depending upon the program. Specialized spaces, such as cooking areas, toilets, bath/shower rooms, laundries, observation rooms, and special equipment to accommodate certain disabilities may be required. Orange County standards provide for 1,250 -3,300 square feet for this function, depending on the design capacity of the high school. Instrumental and Vocal Classrooms - The State Department of Public Instruction facility guidelines indicate that their square footage guidelines for both the Instrumental Classroom and the Vocal Classroom/Music Library may be small. Some references recommend 10 -18 square feet per singer for Vocal Rooms (more if choreographed) and 25 -35 square feet per student for Instrumental Rooms. 4 Approved 4120199 Class sizes for these programs are often large; 40 -80 students or more is not unusual. The Orange County standards provide for a range of 2,800 -3,600 square feet for these classrooms. Dance Classroom - Dressing rooms and access to showers for dance students are desirable in high schools. If located adjacent to the gymnasium locker rooms, this space can be combined. 1,800 -2,000 square feet are included in the Orange County standards for this function. Workforce Development - Facilities for high school Workforce Development programs are often large, extensively equipped, and more expensive than regular classrooms because of their similarity to industry. Square footage included in the appendix indicates the guidelines as outlined by DPI. A basic high school vocational education program must offer at least three of the workforce development programs. Many high schools offer all seven programs including agricultural, health occupations, business, family and consumer sciences, marketing, technology, and trade and industrial. The number and types of laboratories depend on local factors. More than one laboratory for a program such as family and consumer sciences education may be necessary in larger schools. Another factor to consider is the co -use of the darkroom of a school. A larger -than- standard darkroom with additional storage could serve art and science programs as well as workforce development programs. The Orange County high school standards assume that all seven programs may be provided. Space is allocated for each, with the total ranging from 10,750 to 16,100 square feet. 2. Media Center Standards The capacity for the media center of the school should be ten percent of the average daily membership of the school. State guidelines recommend that the media center be located on the ground floor, be single story, and convenient to all learning areas of the school. Minimum support areas include offices, work/production rooms, conference rooms, periodical storage, audiovisual equipment storage, and spaces for professional collections. State guidelines recommend that the media center's location should not preclude future expansion of the facility. Orange County standards provide for 7,740 to 8,740 square feet for this function, depending on the design capacity of the high school. 3. Physical Education Standards The State square footage guidelines for high school physical education facilities vary. Orange County gymnasium standards include space for two play courts, spectator seating, dressing, and shower areas, storage, and a lobby. Showers should be available for both physical education and athletic programs. In addition to the main gymnasium, Orange County standards provide for an auxiliary gym of 6,500 square feet in the 1,500 student profile, in keeping with DPI recommendations to incorporate this space for high schools with 1,200 or more students. 4. Administration Standards The size of the Central Office will vary according to staffing. Partition construction should allow for flexibility of recommended space. Orange County high school standards provide for a range of 2,200- 2,350 square feet for administration. W Approved 4120199 5. Student Support Areas Standards The State provides space guidelines for smaller high schools with one guidance counselor. Larger schools require additional counselor offices, and 3 or 5 offices are included in the 1,000 and 1,500 student Orange County high school profiles, respectively. The reception area may need to be expanded to handle the number of students who may use catalogs and other materials in the guidance center. Areas designated for other student services may house social workers, psychologists, or other health professionals. Overall student support space ranges from 1,550 to 1,850 square feet. 6. Staff Support Areas Standards DPI recommends combined or shared office and workspace areas for teachers. This provides for more efficient and flexible use of offices and workspaces. Guidelines state that efficiency can be significantly enhanced by providing teacher office /planning areas in an area separate from but near to the classroom. By providing a separate space for planning, telephoning, and other work, classrooms are available for all periods of the day. In addition, workspace should be provided for instructional, lab, and clerical teacher assistants. One office /workspace per projected itinerant teacher plus an appropriate number for volunteers and student teachers is recommended. One or more centralized workroom(s) is /are recommended for copy machines, specialized computers, and other equipment and supplies that are not typically located in teacher offices /workspaces. Faculty size and building layout will detennine the size and number of lounges. It is recommended that limited kitchenette facilities be included in each lounge. Orange County standard profiles provide for a range from 4,760 to 8,433 square feet for staff support space, depending on the school's design capacity. 7. Cafeteria /Food Service Standards The minimum guidelines for nutrition facilities are based on a traditional program that includes full - service kitchen and seating to accommodate the entire student body in shifts. Dining room area may be reduced for schools with open lunch policies, although this is not assumed in Orange County standards. The dining area size is determined by dividing the number of participating children by the number of seatings multiplied by the square footage per pupil (size = ADM / number of seatings x square foot per pupil). For the Orange County standards, three seatings are assumed for the 1,000 - student high school while four seatings are assumed for the 1,500- student school. 8. Commons /Circulation /Entries /Building Support Standards This area includes corridors, stairs, school commons areas, entries, mechanical areas, and storage. Corridors receive a high volume of traffic during class changes. Wide, generous corridors of 12 feet significantly enhance safety and security. Commons, not corridors, should be designed as the social center for students. Location and design of commons areas are more important than size. Bus rider entries and automobile rider entries should receive equal attention. DPI square footage guidelines for building support areas vary from school to school. For Orange County standards, a larger allowance for circulation and building support is provided at the high school level than at the elementary (33 %) or middle school (35 %) level. The high school profile allows 45% of other building square footage for these functions. 0 Approved 4120199 Cost per Square Foot $110 per square foot for construction is the 1998 assumed cost of high school construction. Prevailing market factors, inflationary impacts, and the use of alternative design such as the unitary systems approach should be factored in, as appropriate for future high school planning. Other Facility Considerations 1. Technology Infrastructure The State Department of Public hnstruction encourages school systems to install up -to -date technology infrastructure for use by all students, faculty, and staff.. When funds are not available for the installation of complete systems, the State recommends that school systems provide empty conduits and cable trays. In addition, space should also be allocated for local and wide area networks, file servers and other equipment. Wiring closets may be replaced with filler -optic cable. This may be a more cost efficient manner to provide connectivity. For planning purposes, the Department of Public Instruction suggests a cost allowance for technology infrastructure of $8.25 per building square footage. This is consistent with the construction standards adopted for elementary and middle schools in Orange County, 2. Energy Efficiencies During the planning process, special attention should be given to creating fiscally sound energy efficiencies. Ways to achieve this include: • Choosing efficient lighting systems and energy management controls, • Considering solar orientation, earth integration, and plantings and landscaping in siting the facility, • Selecting energy efficient heating, ventilation, and air conditioning systems; and • Exploring solar energy including day lighting and passive solar heating. Life cycle cost analyses should be used when choosing energy systems. Appendix D provides further detail as presented by the County Engineer to the High School Construction Standards Task Force. 3. Materials Construction materials should be selected based on low maintenance and high durability. The presumed life cycle of each new high school is a minimum of fifty years. VA Approved 4120199 High School Construction Standards Appendix A Space A 11ccatkWSquam FooW A ssignnB& (1,000 Student Capacity) 1000 student capacity Square Footage Total Square Ft From To # rooms From To Classrooms Regular classroom with 5 computers 850 950 22 18,700 20,900 Sub Tow1 1 18,7001 20,900 Sce7x Labs, Prep and Storage _ Physical Science 1,200 1,200 1 1,200 _1,200 Biology 1,200 1,200 _ 2 2,400 2,400 Physics 1,200 1,200 1 1,200 1,200 Earth Science 1,400 1,400 1 1,400 1,400 Chemistry 1,500 1,500 1 1,500 1,500 Storage /Prep Rooms (Biology, Chemistry, Physics) 250 per 2 labs 2 500 500 Sub Total 8,200 8,200 Remediation & resource labs 4501 450 1 450 450 Suh,Total 450 450 Excepdoraal Children Exceptional Children Self- Contained (8 to 12 student ca aci ) 800 1,200 1 800 1,200 Exceptional Education Resource Room (for groups up to 12 450 450 1 450 450 Sit &Total 1,250 1,650 Ait Ecbication Instrumental Classroom w/ lockers 1,800 2,100 1 1,800 2,100 Vocal Classroom 1,000 1,500 1 1,000 1,500 Instrument storage room 400 600 1 400 600 Music Library 200 200 1 200 200 Instrument Repair 150 150 1 150 150 Office (each) 150 150 1 150 150 Uniform Storage 400 600 1 400 600 Practice Room 55 60 1 55 60 Ensemble Practice Room 150 200 1 150 200 Visual Arts Classroom 1,200 1,500 1 1,200 1,500 Kiln/ClayStorage 40 60 1 40 60 Art Material Storage 80 150 1 80 150 Theater Arts Classroom 1,8001 2,000 1 1,800 2,000 Theater Arts Auditorium 8 /seat; capacity 1/3 to 1/2 ADM 333 to 500 seats 2,667 4,000 Stage, Storage & Dressing Rooms 3,000 5,000 1 3,000 5,000 Light, Lock Vestibule, Lobby, Concession 8001 2,000 1 800 2,000 Dance Classroom (including storage) 1,8001 2,000 1 1,800 2,000 StrbTotal 15,692 22,270 Approved 4120199 High School Construction Standards Appendix A SpaceAllocatwn /SgteareFootageAssi 1,000 Student Capacity) 1000 student ca aci Square Footage Total Square Ft From To e rooms From To Workfrntr Dez4ffrru -.. -..- -.- - Agricukrral Education 2,500 3,000 1 2,500 3,000 Business Education 11200 1,400 1 1,200 1,400 Family and Consumer Sciences Education 1,400 2,000 1 1,400 2,000 Health Occupations 2,000 2,500 1 2,000 2,500 Marketing Education (including store) 1,500 2,000 1 1,500 2,000 TechnologyEducation 1,300 2,200 1 11300 2,200 Trade and Industrial Education 850 .3,000 1 850 3,000 Sub, Total 10,750 16,100 Media Center 5 sq ft per ADM --- 1 5,000 5,000 Main Room 2,000 2,000 1 2,000 2,000 Support Areas 400 400 1 400 400 Video Studio Control/Editing 260 260 1 -1-80-80 260 260 Equipment Storage 80 80 Sub,Tota! 7,740 _ 7,740 Physical Education Gymnasium Play Area 2 play courts 62 x 100 coon 12,400 12,400 Spectator Seating 400 per 500 per 4,000 5,000 100 seats 100 seats Gymnasium Dressing, Shower, Storage, Lobby 3,000 3,000 Wrestling (competitive) 3,000 3,000 1 .3,000 3,000 Resistive Exercise (weight lifting) 2,000 3,000 1 2,000 3,000 recommended for high schools with 1,200 or more students Auxiliary Gymnasium SI!IrTOWI 24,400 26,400 Administration Principal's Office 200 200 1 200 200 Assistant Principal (each) 150 150 2 .300 300 Reception Area 400 400 1 400 400'. Secretary 150 150 2 300 300 SIMS 9 -12 200 200 1 200 200 Other Student Services 200 200 1 200 200 Workroom/Storage 200 200 1 200 200 Conference Room 200 200 1 200 200 Record Storage 100 100 1 100 100 General Storage 100 100 1 loor 100 Sub, Taal 2,200 2,200 Approved 4120199 High School Construction Standards Appendix A S azAllorutimVS uaiFoota Ass' 1,000 Sta&d Ca aci 1000 student ca paci� Square Footage Total Square Ft From To # rooms From To Student Support Areas Guidance 300 300 1 300 300 Reception/ Career Center 400 400 1 400 400 Counselor Office 150 150 3 450 450 Other Student Services 200 200 1 200 200 Health Room & Toilet 2001 200 1 200 200 Sr 1yTom 1,550 1,550 Staff Support Areas Group Teacher Office /Planning (per teacher) 100 45 .3,600 4,500 Special Assistant/ Itinerant Teacher Office /Workspace (per 100 7 560 700 teacher) Workroom 800 1 300 800 Lounge 1,.333 1 300 Srub,Tatal 4,760 Cafeteria /Food Service Dining Room Seating Area (square feet per' pupil) assumes 3 [-7T:5 20 .33.3 4,667 I seatings Serving (20% - 25% of dining area) 933 Kitchen (assumes 1,5001unches served for' 1,000 capacity) 2,880 1 2,880 , Sub,Tota) 8,480 11,213 TourlAssigraiSperce 104,172 126,007 Commons /Circulation /Entries /Building Support (45 %) 6,703 46,877 56,703 Total Building Area 151,049 ? 182,710 Total Squar Fe t per Student 1511 183 E Approved 4120199 High School Construction Standards Appendix B Space Alloratio n/SgtiamFootageAssignnrn rtr (1,500 Studea Capacity 1500 student capacity Square Footage Total Square Ft From To k rooms From To Classrooms Regular classroom with 5 computers 850 950 40 33,575 37,525 Suh,Tawa 33,575 37,525 Science Labs, Pzrp and Storage Physical Science 1,200 1,200 3 3,000 3,000 Biology 1,200 1,200 4 4,200 4,200 Physics 1,200 1,200 1 1,200 1,200 Earth Science 1,400 1,400 1 1,400 1,400 Chemistry 1,500 1,500 3 3,750 3,750 Storage /Prep Rooms (Biology, Chemistry, Physics) 250 per 2 labs 4 875 875 SulrTotal 14,425 14,425 Remediation & resource labs 4501 4501 4 1,800 1,800 SztlyTaal 1,800 1,800 Exceptional C ddmn Exceptional Children Self-Contained (8 to 12 student ca aci 800 1,)00 2 1,600 2,400 Exceptional Education Resource Room (for groups up to 12 450 450 2 900 900 Sub,Total 2,500 3,300 A its Education Instrumental Classroom w/ lockers 1,800 2,100 1 1,800 2,100 Vocal Classroom 1,000 1,500 1 1,000 1,500 Instrument storage room 400 600 1 400 600 Music Library 200 200 1 200 200 Instrument Repair 150 150 1 150 150 _ Office (each) 150 150 1 150 150 Uniform Storage 400 600 1 400 600 Practice Room 55 60 1 55 60 Ensemble Practice Room 150 200 1 150 200 Visual Arts Classroom 1,200 1,500 1 1,200 1,500 Kiln/ Clay Storage 40 60 1 40 60 Arc Material Storage 80 150 1 80 150 Theater Arts Classroom 1,800 2,000 1 1,800 2,000 _ Theater Arts Auditorium 8 /seat; capacity 1/3 to 1/2 ADM 500 to 750 seats 4,000 6,000 Stage, Storage & Dressing Rooms 3,000 5,000 1 3,000 5,000 _ Light, Lock Vestibule, Lobby, Concession 800 2,000 1 800 2,000 Dance Classroom (including storage) 1,800 2,000 1 1,800 2,000 SulrTotal 17,025 24,270 Approved 4120199 High School Construction Standards Appendix 8 Space AMxation /SEareFootageAssi'nnz?rus 1,500 Stzrderrr Ca achy) 1500 student capacity Square Footage I Total Square Ft From I To N rooms From - To Wakfrnte Dewlopmvrt Agricultural Education 2,500 3,000 1 2,500 _ 3,000 Business Education 1,200 1,400 1 1,200 1,400 Familyand C onsumer Sciences Education 1,400 2,000 1 1,400 2,000 Health Occupations 2,000 2,500 1 2,000 2,500 Ma keting Education (including store) 1,500 2,000 1 1,500 2,000 TechnologyEducation 1,300 2,200 1 1,300 2,200 Trade and Industrial Education 850 3,000 1 850 3,000 Sub,Total 1 10,750 16,100 Media Center Main Room 4 sq ft per ADM 1 6,000 6,000 Support Areas 2,000 2,000 1 2,000 2,000 Video Studio 400 400 1 400 400 Control/Editing 260 260 1 260 260 Equipment Storage Sub,Total 80 80 1 80 8,740 80', 8,740 Physical Education Gymnasium Play Area 2 play courts 62 x 100 court 12,400 12,400 Spectator Seating 400 per 100 seats 500 per 100 seats 6,000 7,500 Gymnasium Dressing, Shower, Storage, Lobby 4,000 4,000 Wrestling (competitive) 3,000 3,000 1 3,000 3,000 Resistive Exercise (weight lifting) 2,000 3,0001 1 2,000 3,000 Auxiliary Gymnasium _ 6,500 6,5001 11 6,5001 6,500 SI&Total 33,900 36,400 Administration Principal's Office 200 200 1 200 200 Assistant Principal (each) 150 150 3 450 450 Reception Area 400 400 1 400 400 Secretary 150 150 2 300 300 SIMS 9 -12 200 200 1 200 200 Other Student Services 200 200 1 200 200 Workroom/Storage 200 200 1 200 200 Conference Room 200 200 1 200 200 Record Storage 100 100 1 100 100 General Storage 100 100 1 100 100 Sub -Total 2,350 2,3501 12 Approved 4120199 High School Construction Standards Appendix B StaceAllocatiays tare FootageAssig�v nts (1,500 RMckrrr Ca aci — 1500 student ca aci Square Footage Total Squ are Ft From To rooms From To Student Support Areas Guidance 300 300 1 300 300 Reception/C.areer Center 400 400 1 400 400 Counselor Office 150 150 5 750 750 Other Student Services 200 200 1 200 200 Health Room &Toilet 200 200 1 200 200 SrrlrTatal 1,850 1,850 St<1ff Support Areas Group Teacher Office / Planning (per teacher) 80 100 45 3,600 4,500 Special Assistant /Itinerant Teacher Office / Workspace (per 80 100 10 800 1,000 teacher) Workroom 300 800 2 600 1,600 Lounge 300 1,333 1 300 1,333 Sub,Tb" 5,300 8,433 Cafeteria /Food Service Dining Room Seating Area (square feet per pupil) assumes .3 14 20 550 7,700 11,000 seatin s Serving (20% - 25% of d Wing area 1,540 2,750 Kitchen (assumes 2,000 lunches served for 1,500 capacity 4,398 4,398 1 4,398 4,398 StrizTotal 1.3,638 18,148 Total A ssignai Space 145,853 173,.341 Commons /Circulation /Entries /Building Support (45 0/.) 65,634 78,004 65,634 78,004 Total Building Area 211,487 251,345 Total Sq wr F &-t per Surclein 141 168 13 High School Construction Standards Appendix C Estimated Cost of New High School Student Capacity Approved 4120199 Total Square Footage 1000 1500 Total Square Ft Total Square Ft From To From T To 151,049 182,710 211,487 251,345 Cost Per Square Foot $110 $16,615,381 $20,098,063 $23,263,554 $27,647,943 Acres 40 50 45 60 Average Cost Per Acre $30,000 $1,200,000 $1,500,000 $1,350,000 $1,800,000 As a percentage of Construction Cost 10% $1,661,538 $2,009,806 $2,326,355 $2,764,794 As a percentage of Construction Cost and Site Development 10% $1,827,692 $2,210,787 $2,558,991 $3,041,274 As a percentage of Construction Cost 5% $830,769 $1,004,903 $1,163,178 $1,382,397. Cost Per Square foot $8,25 $1,246,154 lent for voice, video and data distribution systems) $1,507,355 $1,744,767 $2,073,596 As a percentage of Construction Cost and Site Develo ment 5% $913,846 $1,105,393 $1,279,495 $1,520,637 Non - personnel; one time start -up costs $399,927 $483,754 $559,946 $665,477 Total Estimated Cost $24,695,346 $29,920,112 $34,246,330 $40,896,177 14 Energy Efficiency in Public Schools Appendix D Overview Approved 4120199 The following outline of technologies, strategies, tools, and issues does not represent any new concepts for school construction standards and financing policy makers. Rather, the emphasis here is to present those concepts in a single simple document that indicates that creating fiscally sound energy efficiencies and achieving real savings in energy and energy technology expenditures are a matter of planning and balance. Energy Savings Tools and Strategies Energy Efficient Lighting - efficient lighting types (fluorescent, metal halide, high pressure and Lighting Design sodium), proper lighting levels, lighting controls (occupancy sensors, level controls, etc.), task lighting, multi -stage lighting, etc. • Energy Management Controls - Thermostats, HVAC setback controls, etc. • Siting - solar orientation, earth integration, plantings /landscaping Energy Efficient Heating, Ventilation - High efficiency motors, fuel selection, system design, and Air Conditioning zoning, thermal storage, heat reuse, natural convection • Building Shell - color, thermal mass, insulation, location of windows, window glazing (diffusion, high transmittance, etc.) interior and exterior reflectance, ceiling height • Solar Energy - daylighting and passive solar heating Important terms and concepts for developing energy savings strategies Electrical Energy cost components - Peak demand charge, time of day rates, usage costs • Energy use goal - The lowest target for or limit of a building's energy use (in British Thermal Units [BTU's] per square foot per year) => Town of Chapel Hill Energy Ordinance sets goal at 30% less than NC State Building Code requirements US Department of Energy Building Energy Performance Standards range from 36,000 BTU's per square foot per year for elementary schools to 50,000 BTU's per square foot per year for high school gymnasiums • Energy use budget - The upper limit of building's energy use in BTU's per square foot per year Life cycle cost analysis - The annualized cost of installing or constructing, operating and maintaining any component or feature of building over its useful life or some portion thereof deemed appropriate in analysis 15 SCHOOLS ADEQUATE PUBLIC FACILITIES MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding is entered into this day of , 200_, by and between the Town of Hillsborough, the Orange County Board of Education and Orange County (the "School District'). WHEREAS, the portion of Orange County, served by the Orange County School System has for the past decade been experiencing rapid growth in population; and WHEREAS, this growth, and that which is anticipated, creates a demand for additional school facilities to accommodate the children who reside within new developments; and WHEREAS, the responsibility for planning for and constructing new school facilities lies primarily with the Orange County School Board, with funding provided by Orange County; and WHEREAS, Orange County, Hillsborough, and the Orange County School District, have recognized the need to work together to ensure that new growth within the School District occurs at a pace that allows Orange County and the School District to provide adequate school facilities to serve the children within such new developments; WHEREAS, the parties have worked cooperatively and developed a system wherein school facilities are currently adequate to meet the needs of the citizens of the county and will continue to maintain a Capital h-rvestment Plan (CIP) that is financially feasible and synchronized with historical growth patterns; NOW, THEREFORE, the parties to this Memorandum hereby agree as follows: Section 1. The parties will work cooperatively to develop a realistic Capital Improvement Plan for the construction of schools such that, from the effective date of this Memorandum, school membership within each school level (i.e. elementary, middle or high) does not exceed the following: Elementary School 105% of Building Capacity Middle School 107% of Building Capacity High School 110% of Building Capacity a. For purposes of this Memorandum, the tens "school membership" means the actual number of students attending school as of November 15 of each year. The figure is determined by considering the number of students emolled (i.e. registered, regardless of whether a student is no longer attending school) and making adjustments for withdrawals, dropouts, deaths, retentions and promotions. Students who are merely absent from class on the date membership is determined as a result of sickness or some other temporary reason are included in school membership figures. Each HADEPTS \SCHOOLS \S A P F OApproved Docs \apprMOUOCS062303 doc year the School District shall transmit its school membership to the parties to this agreement no later than five (5) school days after November 15. Within fifteen (15) school days after receiving the school membership calculations from the School District, the Board of County Commissioners shall approve the School District's school membership calculations. b. For purposes of this Memorandum, "building capacity" will be determined by reference to State guidelines and the School District guidelines (consistent with CIP School Construction Guidelines /policies developed by the School District and the Board of County Commissioners) and will be determined by a joint action of the School Board and the Orange County Board of Commissioners. As used herein the term "building capacity" refers to permanent buildings. Mobile classrooms and other temporary student accommodating classroom spaces are not permanent buildings and may not be counted in determining the school districts building capacity. The School District shall transmit its building capacity to the parties to this agreement no later than five (5) school days after November 15. Within fifteen (15) school days after receiving the building capacity calculations from the School District, the Board of County Commissioners shall approve the School District's building capacity calculations. C, Prior to the adoption of the ordinances referenced in Section 2, the parties shall reach agreement on the following: (i) A Capital Improvement Program (CIP) that will achieve the objectives of this Memorandum; (ii) A projected growth rate for student membership within the School District's three school levels during the ten year life of the CIP; (iii) A methodology for determining the projected growth rate for student membership; and (iv) The number of students at each level expected to be generated by each new housing type (i.e., the "student generation rate"). d. After the adoption of the ordinances referenced in Section 2, the Orange County Board of Commissioners may change the projected student membership growth rate, the methodology used to determine this rate, or the student generation rate if the Board concludes that such a change is necessary to predict growth more accurately. Before malting any such change, the Board shall receive and consider the recommendation of a staff committee consisting of the planning directors of the Town(s) and the County and a representative of the School District appointed by the Superintendent. The committee shall provide, in a timely manner, a copy of its recommendation to the governing boards of the other parties to this memorandum at the time it provides such recommendation to the Board of Commissioners and the Board of Commissioners shall provide an opportunity for those governing Boards to comment on the HADEPTS \SCHOOLS \S A P F O\Approved Docs \apprMOUOCS062303 doc Z recommendation. In making its recommendation, the committee shall consider the following, and in making its determination, the Board of Commissioners shall consider the following: (i) The accuracy of the methodology and projected growth rate then in use in projecting school membership for the current school year; (ii) The accuracy of the student generation rate then in use in predicting the number of students at each level actually generated by each new housing type; (iii) Approval of and issuance of CAPS for residential developments that, individually or collectively, are of sufficient magnitude to alter the previously agreed upon school membership growth projections; or (iv) Other trends and factors tending to alter the previously agreed upon projected growth rates. If any such change is made in the projected growth rate, the methodology for determining this rate, or the student generation rate, the Orange County Board of Commissioners shall inform the other parties to this Memorandum prior to February ls` in any year in which such change is intended to become effective what change was made and why it was necessary. e. The Orange County Board of Commissioners shall provide a copy of the updated CIP to each of the parties to the Memorandum as soon as it is revised, annually or otherwise, Section 2. The towns and the county will adopt amendments to their respective ordinances, conceptually similar to that attached hereto as Exhibit A, to coordinate the approval of residential developments within the School District with the adequacy of existing and proposed school facilities. Section 3. The following process shall be followed by the School District to receive and take action upon applications for Certificates of Adequacy of Public School Facilities ( "CAPS ") submitted by persons who are required by an implementing ordinance conceptually similar to that attached as Exhibit A to have such certificates before the development permission they have received from the town or county becomes effective. a. On November 15 \h of each year, the School District shall calculate the building capacity of each school level and the school membership of each school level as of November 15`h of that year. Also on November 15 °1 of each year, the School District shall calculate the projected building capacity for each school level and the projected school membership for each school level as of November 15 "' in each of the following ten years. These calculations shall be made in accordance with the provisions of HADEPTS \SCHOOIS\S A P F DApproved Docs \apprMOUOCS062303 doc 3 Section La and Section l.b. and also in accordance with the remaining provisions of this section. b. On November 15 °i of the year in which the calculation above is made, the school building capacity numbers and the school membership numbers as of November 15'h of that year, are known figures (i.e. not projections). The twelve month period beginning on November 15 °i of the year in which the calculation is made and ending on November 14 °i of the following year is referred to as the "base year." C. Projections of school building capacity as of November 15'h in each of the ten years following the base year shall be derived from the following: (i) A calculation of the existing building capacity within each school level; (ii) The anticipated opening date of schools under construction; (iii) The anticipated opening date of schools on the ten -year CIP for which funding has been committed by the Board of Commissioners as a result of an approved bond issue, an approved installment purchase agreement, or otherwise; and (iv) The anticipated closing dates of any schools within the School District. d. In the first year in which the ordinance adopted pursuant to this Memorandum becomes effective, school membership figures as of November 15 °i in each of the succeeding ten years shall initially be assumed to be the same school membership figures as are determined for the base year. As CAPS are issued during the base year, school membership figures for the base year and succeeding years shall be modified to reflect the additional students from the developments for which CAPS are issued. e. On each November 15 °i following the first year in which the ordinance adopted pursuant to this Memorandum becomes effective, school membership figures as of November 15°i in each of the succeeding ten years shall be determined by adding to the school membership figures for the base year the number of students projected to be added to the schools in each successive year by developments for which CAPS have been issued in accordance with this section. f When an application for a CAPS is submitted, the School District shall determine the impact on school membership for each school level as of November 15 °i in each year of the period -during which the development is expected to be adding new students to the school system as the result of such new construction. In making this determination, the School District shall rely upon the figures established under Section I of this Memorandum as to the number of students at each level expected to be generated by each housing type, and data furnished by the applicable planning department as to the expected rate at which new dwellings within developments similar in size and type to the proposed development are HADEPTS \SCHOOLS \S A P F O\Approved Docs \apprMOUOCS062303 doc 4 likely to be occupied. Notwithstanding the foregoing, if, upon request of the applicant, the planning ,jurisdiction approving the development imposes enforceable conditions upon the development (such as a phasing schedule) to limit the rate at which new dwellings within the development are expected to be occupied, then the School District shall take such limitations into account in determining the impact of the development on school membership. g, The School District shall determine the amount of available capacity in each school level as of November 15`h in the base year and each November 15 °i of the succeeding ten years by subtracting from the building capacity numbers for each of those years the student membership numbers for each of those years. The results shall then be compared with the number of students expected to be added to each school level as of November 15 °i in each year (as determined in accordance with subsection 3.f above). The School District shall make that information known to the parties to this agreement within 15 days of the comparison. If the School District detenmines that the projected remaining capacity of each school level is sufficient to accommodate the proposed development without exceeding the building capacity levels set forth in Section 1 of this Memorandum then the School District shall issue the CAPS. If the School District determines that the projected capacity of each school level is not sufficient to accommodate the proposed development without exceeding the building capacity levels set forth in Section 1, then the School District shall deny the CAPS. If a CAPS is denied, the applicant may seek approval from the appropriate planning, jurisdiction of such modifications to the development as will allow for the issuance of a CAPS, and then reapply for a CAPS. h. The School District shall issue CAPS on a "first come first served" basis, according to the date a completed application for a CAPS is received. If projected building capacity is not available and an application for a CAPS is therefore denied, the development retains its priority in line based upon the CAPS application date. Section 4. A CAPS issued in connection with approval of a subdivision preliminary plat, minor subdivision final plat, site plan, or conditional or special use permit shall expire automatically upon the expiration of such plat, plan, or permit approval. Section 5. The towns and the county will provide to the School District all information reasonably requested by the School District to assist the District in making its determination as to whether the CAPS should be issued. Section 6. The School District will use its best efforts to construct new schools and permanent expansions or additions to existing schools in accordance with the CIP. Section 7. Orange County will use its best efforts to provide the funding to carry out the Capital hnprovement Plan referenced in Section 1 above. HADEPTS \SCHOOLS \S A P F O\Approved Docs \apprMOUOCS062303 doc Section 8. hr recognition of the fact that some new development will have a negligible impact on school capacity, a CAPS shall not be required under the following circumstances: a, For residential developments restricted by law and /or covenant for a period of at least thirty years to housing for the elderly and /or adult care living and/or adult special needs; b, For residential developments restricted for a period of at least thirty years to dormitory housing for university students. If the use of a development restricted as provided above changes, then before a permit authorizing such change of use becomes effective, a CAPS must be issued just as if the development were being constructed initially, Section 9. The parties acknowledge that this Memorandum of Understanding is not intended to and does not create legally binding obligations on any of the parties to act in accordance with its provisions. Rather, it constitutes a good faith statement of the intent of the parties to cooperate in a mariner designed to meet the mutual objective of all the parties that the children who reside within the School District are able to attend school levels that satisfy the level of service standards set forth herein, The Town of Hillsborough intends to remain committed to the MOU only as long as Orange County continues to execute the CIP as agreed in the MOU. If the Hillsborough Board of Commissioners finds Orange County is no longer in compliance with the CIP as outlined in the MOU, the Town of Hillsborough will no longer consider itself bound by this MOU and may consider repealing the Ordinance referenced in Section 2 of this MOU. This the day of 20_ SEAL Attest Town Clerk SEAL Attest: Secretary WDEPTS \SCHOOLS \S A P F D\Approved Docs \apprM0U0CS062303 doc TOWN OF HILLSBOROUGH in Mayor ORANGE COUNTY BOARD OF EDUCATION Chair ORANGE COUNTY SEAL UN Attest: Clerk to the Board of Commissioners Isg:orangccounty \mou for oc bd ofeduc cb version with geg chgs clean doc H:\DEPTS \SCHOOLS \S A P F OtApproved Docs \apprMOUOCS062303 doc Chair, Board of Commissioners i r ; Ir „� J') I" LAPEL HILL ARRBoko CITY SCHOOLS TO: John Link Orange County Manager FROM: Neil G. Pedersen Superintendent RE: Compliance with Class Size Requirements for Grades K -3 DATE: September 22, 2005 As requested at our last collaboration meeting, I obtained a report from the Department of Public Instruction that shows the average class size for each grade level in Grades K -3 for 2004 -05 in North Carolina. Districts are required by law to have an average of 21 or fewer students in each grade level. As you can see, there are only a few districts that have a grade level that exceeds this average. Districts are complying with this standard. I've also attached a portion of an email sent to me by Alexis Schauss, Chief, Information Analysis and Reporting for NCDPI. As she indicates, compliance with the average class size in grades K -3 is not a major problem across the state. In fact, you can see from the report that CHCCS has some of the highest averages across the state. The penalty for willful noncompliance with this law is the withholding of the superintendent's salary, I would reiterate that all school districts are required by law to meet these standards and that it is in the best interest of our students to do so. It should be clear that building capacities based on a 23:1 ratio are out -dated and need to be adjusted. Cc: CHCCS Board of Education Shirley Carraway 1_incoln Cenler. 750 S Merritt Mill Road ^ Chapel Hill. NO 27516 -2878 - (919) 967 -8211 - www chccs k12.nc us K -3 Class Size Averages for 2004 -2005 Typical Classes n Jr � LEA Kindergarten First Grade Second Grade Third Grade 010 Alamance- Burlington 15 14 16 13 020 Alexander County 18 18 19 21 030 Alleghany County 18 18 16 17 040 Anson County 16 16 17 16 050 Ashe County 18 19 18 18 060 Avery County 15 18 19 19 070 Beaufort County 18 19 17 17 080 Bettie County 16 16 17 18 090 Bladen County 17 17 15 17 100 Brunswick County 18 18 19 19 110 Buncombe County 19 19 19 19 111 Asheville City 17 15 17 16 120 Burke County 18 14 13 13 130 Cabarrus Comity 19 19 19 20 132 Katmapolis City 19 16 19 17 140 Caldwell County 18 19 18 18 150 Camden County 17 21 19 18 160 Carteret County 16 18 17 18 170 Caswell Comity 19 17 17 17 180 Catawba County 17 20 19 18 181 Hickory City 18 19 18 19 182 Newton - Conover 16 20 18 19 190 Chatham County 20 18 19 20 200 Cherokee County 16 17 17 17 210 Edenton/Chowan 18 19 21 13 220 Clay County 19 19 21 21 230 Cleveland County 17 18 18 17 240 Columbus County 18 18 19 17 241 Whiteville City 20 18 17 N/A 250 Craven County 19 18 18 19 260 Cumberland County 17 18 18 18 270 Currr ituck County 16 18 18 18 280 Dare County 16 16 17 17 NCDPI Division of School Business Information Analysis and Reporting September 19, 2005 K -3 Class Size Averages for 2004 -2005 Typical Classes LEA Kindergarten First Grade Second Grade Third Grade 290 Davidson County 19 20 19 20 291 Lexington City 17 19 18 16 292 Thomasville City 18 19 18 17 300 Davie County 18 19 20 19 310 Duplin County 20 18 18 17 320 Durham County 20 18 19 20 330 Edgecombe County 19 20 21 20 340 Forsyth County 18 18 18 17 350 Franklin County 17 17 18 17 360 Gaston County 19 20 19 19 370 Gates County 17 16 19 16 380 Graham County 21 18 17 17 390 Granville County 19 19 19 19 400 Greene County 19 19 16 21 410 Guilford County 17 17 17 19 420 Halifax County 18 17 17 18 421 Roanoke Rapids City 18 19 19 22 422 Weldon City 16 17 22 20 430 Harnett County 19 20 18 19 440 Haywood County 18 17 18 17 450 Henderson County 18 20 19 19 460 Hertford County 17 16 15 17 470 Hoke County 20 19 19 21 480 Hyde County 10 11 10 12 490 Iredell- Statesville 18 18 18 19 491 Mooresville City 20 20 19 21 500 Jackson County 19 18 18 18 510 Johnston County 18 18 19 18 520 .Jones County 16 15 14 15 530 Lee County 21 20 21 22 540 Lenoir County 18 19 18 18 550 Lincoln County 18 17 17 17 560 Macon County 16 18 18 18 570 Madison County 19 17 16 19 580 Martin County 16 16 16 18 590 Mcdowell County 17 18 18 19 600 Mecklenburg County 19 19 19 20 NCDPI Division of School Business Information Analysis and Reporting September 19, 2005 K -3 Class Size Averages for 2004 -2005 Typical Classes LEA Kindergarten First Grade Second Grade Third Grade 610 Mitchell County 15 15 14 15 620 Montgomery County 18 17 18 20 630 Moore County 19 19 19 20 640 Nash -Rocky Mount 18 18 18 18 650 New Hanover County 18 19 19 19 660 Northampton County 17 17 15 16 670 Onslow County 19 18 18 19 680 Orange County 18 18 18 18 681 Chapel Hill -Car born 18 20 19 21 690 Pamlico County 15 17 15 18 700 Pasquotank County 18 18 17 19 710 Pender County 18 20 19 17 720 Perquimans County 20 17 18 18 730 Person County 16 19 18 18 740 Pitt County 18 19 19 19 750 Polk County 18 17 16 18 760 Randolph County 19 20 19 20 761 Asheboro City 20 18 17 18 770 Richmond County 18 19 20 19 780 Robeson County 19 19 20 20 790 Rockingham County 19 18 19 19 800 Rowan - Salisbury 18 19 18 20 810 Rutherford County 18 20 18 19 820 Sampson County 18 16 17 17 821 Clinton City 20 19 20 20 830 Scotland County 16 16 16 16 840 Stanly County 17 17 17 17 850 Stokes County 18 19 19 18 860 Surry County 18 20 19 20 861 Elkin City 18 17 16 17 862 Mount Airy City 16 16 16 19 870 Swain County 16 16 18 12 880 Transylvania County 20 21 18 17 890 Tyrrell County 15 18 16 16 900 Union County 18 17 17 19 910 Vance County 17 16 17 15 920 Wake County 20 20 20 20 930 Warren County 17 19 18 17 940 Washington County 16 16 17 15 NCDPI Division of School Business Information Analysis and Reporting September 19, 2005 K -3 Class Size Averages for 2004 -2005 Typical Classes LEA Kindergarten First Grade Second Grade Third Grade 950 Watauga County 18 17 19 19 960 Wayne County 19 19 19 20 970 Wilkes County 18 19 19 19 980 Wilson County 20 19 20 21 990 Yadkin County 16 18 17 18 995 Yancey County 18 21 21 20 NCDPI Division of School Business Information Analysis and Reporting September 19, 2005 Rod Visser From: "Neil G Pedersen" <npedersen @chccs.k12 nc.us> To: <jlink @co orange nc us >, <rvisser @co,orange ncus >, "Steve Scroggs" <sscroggs @chccs.k12 nc us >, <nick_didow @unc edu >, <jamezetta @juno com >, <phemminger @bellsouth net >, <mkelley @metasyn com >, <bstuckey @nc rr com >, <easechrest @aol.com >, <1iz3651 @earthlink.net >, <edward a sechrest @lmco com> Date: 09/22/2005 14:42:52 Subject: Fwd: Re: Clarification requested The attachments and e-mail below reference the issue of class size. This information was requested for the joint meeting on Sept 26th - Neil Original Message Wednesday, September 21, 2005 1:30:13 PM Message From: "Alexis Schauss" <ASchauss @dpi state ,nc.us> Subject: Re: Clarification requested To: Neil G Pedersen Attachments: K- 3CIassSize 2005.xls 27K As to the consequences As you are aware there is no waiver option for the LEA average for the grade. For those LEAs that were over, the LEA was notified and told to rearrange their classes to comply with the law. The data I have provided to you was pulled from the end of the second month (School Activity Report) and therefore will not reflect the corrections made. Last year, due to the legislation being passed late, not all LEAs were able to comply with the 3rd grade class size reduction until mid way through the first semester. In addition, some LEAs experienced unexpected increases in students that had not been accounted for in their initial allotments and therefore they are waiting for the 1 st month allotment adjustment before they could hire additional teachers In the event that the LEA does not act, State Board of Education is notified and if it is deemed that the LEA is willfully neglecting to comply with the law, the Superintendents salary is frozen. In the past, the LEA -wide average has not been as much as a problem as the individual class size maximum Alexis Schauss Chief, Information Analysis and Reporting NCDPI All e -mail correspondence to and from this address is subject to the North Carolina Public Records Law, which may result in monitoring and disclosure to third parties, including law enforcement. All email correspondence to and from this address is subject to the North Carolina Public Records Law, which may result in monitoring and disclosure to third parties, including law enforcement. Chapel Hill - Carrboro City Schools Orange County Schools Collaboration Status Report September 20, 2005 1. Professional Development When possible, staff members from one district are invited to participate in the other's professional development opportunities. During the past year, the two districts have shared in the following programs: • Breaking Ranks II: Strategies for Leading High School Reform workshop at OCS • Teacher /Staff Assistance Team Training • Suicide Prevention Training in both districts • Student Services Workshop at CHCCS • 504 Training at OCS • Gang Awareness Training at CHCCS • Bullying Prevention Training with Horatio Sanchez for Student Services staff at OCS • Healthy Children and the Learning Process with Pat Cooper for Student Services staff at OCS • High Five Partnership The High Five Partnership, which includes the Chapel Hill - Carrboro, Orange, Durham, Johnston, and Wake districts, offers the greatest potential for collaborative professional development. This group offered one program open to high school teachers last spring, and this fall held a five - district Convocation for high school teachers, 2. Dual Enrollment Programs • Middle College High School at Durham Technical Community College The Chapel Hill - Carrboro City, Durham Public, and Orange County school systems, working with Durham Technical Community College, opened the Middle College High School at Durham Technical Community College in the fall of 2005. Middle College expands opportunities for academically capable juniors and seniors to earn a high school diploma and receive credit toward a post - secondary certificate, diploma, or associate's degree. The program is beginning its first year with 7 juniors from CHCCS, 8 from OCS, and 23 from DPS, and will be open to juniors and seniors next year, Students in this program will take all their core and elective courses on the campus of DTCC. • Medical Sciences Program The districts are working with Durham Technical Community College to expand the Medical Sciences Program. 3 Inter- district Academic Programs Superintendents met last spring and developed a plan for identifying opportunities to share students. Staff conducted a survey in both districts to measure interest in inter - district academic programs and initially found it to be high. Next, they looked at courses with available space and contacted students who had expressed an interest in those courses to see if they were still interested; many indicated that they were not. During the registration process, guidance counselors from one district contacted the remaining students from the other district to register them for the classes. At that point, all of the students declined. There were a number of reasons for this outcome. Most of the students indicated that while they liked the idea of being able to take courses in the other district, when it came time to commit to doing so, they realized there were logistical problems with transportation, jobs, athletics, and other after - school activities. Social issues were also a factor: in order to take a class in the other district, students would have to commit to being at the other school for at least half a day, and in the case of IB, they would have to enroll at Cedar Ridge. 4 New Paradigm for School Resource Officers Currently, there are multiple arrangements among the two school districts, Orange County, and the Towns of Chapel Hill and Carrbom to fund SROs. OCS contributes $180,000 toward its officers, with Sheriff Pendergrass supporting the district in a significant way. OCS is concerned about how long he will be able to continue his support. The Town of Carrboro pays for officers; Chapel Hill does not. Staff from both districts met with law enforcement representatives and the county manager and staff to review the possibility of the county assuming responsibility for providing SROs for the schools. They discussed the possibility of a special tax to fund resources of common interest, such as SROs, or to have the Board of County Commissioners press for either the Towns or the State to fully fund SROs. No resolution has been reached. 5 After School Programming • Both districts have assessed programs to determine costs. • The collaborative four -year grant for the middle school after - school programs, which are free to students, has ended. • Both districts are presently designating funds from local allotments to meet after - school programming needs. • This is the final year for the collaborative grant for the MiCASA Program. • Site directors hold collaborative planning meetings. • Representatives from both school districts have monthly planning and financial meetings. • Districts collaborate to have one countywide coordinator for the middle school after - school programs and the MiCASA Program. 6 Working Relationship — Ensuring that communication is open, healthy, and trusting Last year, CHCCS extended an invitation to OCS to attend their college fair, This year, the two school districts are working together to have one countywide college fair, which is scheduled for September 29, The two districts are collaborating with Juvenile Justice to reduce the dropout and suspension rates, 7 Early Childhood Programs • Planning is scheduled for 2005 -2006, 8. Middle School Athletic Conference Several joint meetings were held to discuss this issue, A proposal was developed to realign the conference into two divisions. The proposal was approved by the boards of Chapel Hill- Carrboro, Orange, and Person. Board members from both Chapel Hill- Carrboro and Orange had expressed concern about travel distances and late evenings for middle school student - athletes who competed with teams from Person County, Person County was equally concerned about the possibility of their being excluded from the conference. A proposal was developed to realign the conference into two divisions. The four CHCCS middle schools will form one division and will play each other twice in most sports. The two Orange middle schools and the two Person middle schools will form a division and will also play each other twice. Each school will play the schools in the other division once, thereby reducing travel time, 9 New Paradigm for Funding • See "School Resource Officers" above. 10 Alternative School Programming • Scheduled to begin discussion during this school year. r y 5 0 v 4) M M r tA v 0 FL ga � -C -2 < u \ \) � . - c u - ol 0 a 0 Do- u u . -22!m6a..25�--.�625 —P �� , , - -6 'a .= 'D 0 - e 'o �o5 DO cm u u 0 «§ 0 E C, E m v ri o 0 0 —0 D E 0 0 a "2 0 0 0 0, 0 o.r,-a E 'Ec ? m 0 Ll 0 a 2 0 o E 6 m o a 0 W FL ga u \ \) ol 0 a 0 Do- u 6 K =o -mo s NN 'o s c¢ o V .c° s° o o o a m o c 3 � m `o o o o o 'c .L '= N C C N �N o C E n o o E Ep 0 u m e :a W ~ 'v E rn h� m m m- c U:E $ y r¢ — o m Z = ° — '3 O N —°o m. ° p_ h r .Q. 'C t •p r, m u a o ° ° v °' a. m e m u m s m O o o o m u °u " V tL m F> z Cj d v U r s°.. w 3 .n oR u�J d p tj V d C m O d ° o .n m x "i •u u c a o a� m m p N N > r O W �O N 0 �c .Q .�JU ., �� P ZO ' UU V V, O O CIO) .r-.q veOPq Cis U rzi 0 0 U C%1 0 U N cri O 11 Over 100 colleges and universities! Smith Center Chapel Hill, North Carolina Here's your chance to get all the information you need to choose a college. Open to all students and parents in Orange County Schools and Chapel Hill- Carrboro City Schools. If you have questions, contact your school guidance office. Robert S. Segal, CPA PA 1912 Eastchester Drive, Suite 206 High Point, NC 27265 September 26, 2005 Mr. Moses Carey, Jr., Chairman Orange County Board of County Commissioners P.O. Box 8181 Hillsborough, NC 27278 Dear Mr. Carey: Robert S. Segal, CPA PA is pleased to report its progress on the collaboration project involving Chapel Hill - Carrboro City Schools, Orange County Schools and Orange County. Since our last update, progress has been slowed due to the audits each organization experiences every summer. The organizations have concentrated their efforts completing their audits in order to make the time deadlines required by the State of North Carolina. The following is an update: Chapel Hill- Carrboro City Schools (CHCCS) Telecommunication expenses We have reviewed the telecommunications expenses and have prepared a preliminary recommendation on how CHCCS could save approximately $67,000 per year net of Universal Service Fund /e -rate discounts and related costs. CHCCS is currently in the middle of a major infrastructure upgrade. CHCCS is working with BellSouth and the University of North Carolina (UNC) to implement a plan to connect to UNC in July 2005 for internet access at a reduced annual cost. CHCCS did not initiate switching telecommunications services as we recommended because they were in the middle of this upgrade. Once the upgrade is complete, CHCCS is willing to review the recommendations and implement any suggested cost saving strategies. CHCCS IT shared that its long -range plan is to implement Voice Over Internet Protocol (VOIP). They currently have implemented the Cisco VOIP solution in two schools and several office locations. VOIP has a large up front capital cost that may be offset by future reduced monthly phone costs, IT did not share with us a vendor's projection of costs or projected savings for VOIP. Therefore, we are unable to evaluate this computation of savings. Further, we speculate that the IT /vendor projection of savings is not reduced by E -rate funding. IT has not needed to invest in VOIP equipment during the past year and has not needed to consider alternative providers of telephony or VOIP equipment. Based on our suggestion, IT will consider alternative vendor solutions for any future VOIP implementation. While we were reviewing the paid invoices, we found $2,295.00 of monthly service that was incorrectly billed and we worked with CHCCS to obtain a refund. CHCCS personnel worked with the vendor to obtain a credit of $31,833.86 on the March 2005 invoice. In addition, certain invoices included taxes from which CHCCS could be exempt. After we informed CHCCS personnel of the error, CHCCS contacted a previous consultant who said they had requested the telecommunications vendor to remove the taxes from the invoices. The previous consultant is reported to be working with the telecommunication vendor to have the taxation stopped; however the taxes were still on the June 2005 invoices. North Carolina Sales and Use Tax Additional refund requests were mailed April 8, 2005 to the NC Department of Revenue for the following periods and amounts: 2001 -2002 $ 72,279.88 2002 -2003 $176,731.57 2003 -2004 $ 40,750.12 Total $289 761.57 The State is taking about nine months to process sales and use tax refunds. Cash Management We reviewed various cash management alternatives and recommended a new account approved by the State of North Carolina that has a higher interest rate. Additional Old New Ave Daily Interest Month Rate Rate Balance Income Jan 2005 2.05% 2.59% $ -0- $ -0- Feb 2005 2.29% 2.85% $2,964,286 $ 1,377.13 Mar 2005 2.38% 2.95% $5,006,473 $ 2,423.68 Apr 2005 2.55% 2.75% $5,019,032 $ 838.82 May 2005 218% 2.98% $5,009,733 $ 845.07 Jun 2005 2.81% 3.01% $4,154,374 $ <70.41> The Bank has removed the compensating balance requirement of $1,200,000 from the primary account and as a result CHCCS is now earning the federal funds rate less 20 basis points on the amount: Natural Gas Two schools use enough natural gas to qualify to purchase natural gas from suppliers other than the local distributor. The local distributor has confirmed that CHCCS could save money by implementing this recommendation. Based on natural gas usage during the period November 2003 to October 2004, the projected annual saving would be $7,000.00. CHCCS has approved this recommendation which took effect January 1, 2005. For the six months ended June 30, 2005, the savings were $1,996.99. State Gas Tax We found one small account with a fuel company for the purchase of gasoline and diesel. The account was not charged federal gas tax, but the account was charged state gas tax. CHCCS is not required to pay state gas tax. Refund claims in the amount of $2,200.00 have been filed through September 2004, Orange County Schools (OCS) Universal Service Fund /e -rate For the past seven years, OCS has been eligible to receive these funds from the federal government to offset the costs of telecommunications, Internet access and certain equipment. During the summer of 2004, the e -rate coordinator left OCS and we have been asked to prepare and manage the e -rate application process for the 2005 -2006 school year. The application process runs from November 2004 to February 2005. Our review of the previous a -rate application notes that it was very well done and appears to include substantially all of the funding possibilities. Funding applications for 2005 -2006 were filed for approximately the same amount of funding as in 2004 -2005. Additional Month Balance Rate Interest Income Jan 2005 $1,200,000 2.05% $2,08932 Feb 2005 $1,200,000 2.30% $2,117.26 Mar2005 $1,200,000 2.38% $2,425.64 Apr2005 $1,200,000 2.75% $2,515.07 May 2005 $1,200,000 2.98% $2,83726 Jun 2005 $1,200,000 3.01% $2,769.86 Note: This is less than we projected for two reasons: 1. The interest rate at the Bank has risen faster than the rate for the new account, 2. CHCCS could possibly move additional money to the new account. Natural Gas Two schools use enough natural gas to qualify to purchase natural gas from suppliers other than the local distributor. The local distributor has confirmed that CHCCS could save money by implementing this recommendation. Based on natural gas usage during the period November 2003 to October 2004, the projected annual saving would be $7,000.00. CHCCS has approved this recommendation which took effect January 1, 2005. For the six months ended June 30, 2005, the savings were $1,996.99. State Gas Tax We found one small account with a fuel company for the purchase of gasoline and diesel. The account was not charged federal gas tax, but the account was charged state gas tax. CHCCS is not required to pay state gas tax. Refund claims in the amount of $2,200.00 have been filed through September 2004, Orange County Schools (OCS) Universal Service Fund /e -rate For the past seven years, OCS has been eligible to receive these funds from the federal government to offset the costs of telecommunications, Internet access and certain equipment. During the summer of 2004, the e -rate coordinator left OCS and we have been asked to prepare and manage the e -rate application process for the 2005 -2006 school year. The application process runs from November 2004 to February 2005. Our review of the previous a -rate application notes that it was very well done and appears to include substantially all of the funding possibilities. Funding applications for 2005 -2006 were filed for approximately the same amount of funding as in 2004 -2005. Cash Management We reviewed various cash management alternatives and recommended a new account approved by the State of North Carolina that has a higher interest rate. Additional Old New Ave Daily Interest Month Rate Rate Balance Income Jan 2005 1.59% 2.59% $1,477,928 $ 485.89 Feb 2005 1,85% 2,85% $1,478,414 $ 1,134.13 Mar2005 1.95% 2,95% $1,479,548 $ 1,256.60 Apr2005 135% 2,75% $1,480,804 $ 1,217.10 May 2005 1.98% 2,98% $1,482,021 $ 1,258.70 Jun 2005 1.78% 2.78% $1,482,280 $ 1,219.13 Note: This is less than we projected for following reasons: 1, The interest rate at the Bank has risen faster than the rate for the new account, and 2. The Bank is still paying the federal funds rate less 50 basis points (CHCCS is less 20 basis points), North Carolina Sales and Use Tax We have received the data file from OCS and we are waiting for the annual audit to be completed so we can finish the sales tax review. Orange County government North Carolina Sales and Use Tax To date, the reallocation project has found approximately $700,000 of additional sales and use tax at various non - profit organizations in Orange County, The County will receive approximately 62% of that amount with the municipalities receiving the balance. Amended returns have been submitted to the NC Department of Revenue, but have not been processed. Telecommunications expenses We have made a recommendation to reduce telecommunication expenses by approximately $90,000 annually and management has expressed its desire to proceed with approximately $72,000. Progress is being made to implement the recommendation. To conclude, the project has run its course and the recommendations have been made to the organizations, Some recommendations have been implemented, others partially implemented and others declined. In general, we believe the effort has been successful identifying opportunities, On behalf of Robert S. Segal, CPA PA, thank you for this opportunity. If you have any questions or comments, do not hesitate to contact me. Sincerely, Robert S. Segal, CPA President Cc: Dr. Shirley Caraway, Superintendent Orange County Schools Dr, Neil Pedersen, Superintendent Chapel Hill - Carrboro City Schools Mr. John Link, Manager Orange County Orange County Schools Middle School #3 Update The Orange County School System broke ground on the new middle school site #3 on November 30, 2004, The project was bid in two parts: (1) Early Sitework Package, with bids opened October 12, 2004; and (2) Building Construction Package, with bids opened December 7, 2004. The Pre - Construction Conference was conducted on February 14, 2005; the project managers and field superintendents for each contractor on the project attended this meeting. Additionally at this meeting, the Notice to Proceed was given to J.H. Allen, the general contractor for the Building Construction Phase of the project. J.H, Allen mobilized and began work on March 28, 2005, which was approximately six weeks after they received the Notice to Proceed; weather was responsible for the delay. The Orange County Board of Education receives periodic updates, the last update being given on September 19, 2005, At that time the following was reported: • Steel erection is complete for the entire school. • Slab on grade poured in Gymnasium, Cafeteria, Auditorium, and C & D Wings. • Completed installation of site water lines. • Installed a `dry hydrant' piped into the pond (for fire protection). • Completed grading of revised east entrance drive and road widening. • Began installation of stone base on east entrance and rear parking lots. • No accidents have occurred on the site since the project began. /pmc9 /05 NCACC Page 1 of 5 r l , NCACC P.O. Box 1488 Raleigh. NC 27602 -1488 Tel: (919) 715 -2893 Fax: is 19) 733 -1065 E -mail: ncacc @ngacc_org NCACC E -News Updates Sept. 14, 2005 National conference to address children exposed to Meth abuse Children living in dangerous drug environments are at higher risk for a variety of problems as they grow up. These problems often lead to them repeating the cycle of drug abuse and poverty. The National Alliance for Drug Endangered Children is sponsoring a conference Oct. 3 -5 in Washington, D.C., to heighten awareness for these often - forgotten victims of drug abuse. The Drug Endangered Children program is a multi - disciplinary approach that involves law enforcement, child welfare, medical professionals and prosecutors to rescue, defend, shelter and support children exposed to methamphetamine. One of NACo President Bill Hansell's major initiatives is combating the rising abuse of methamphetamine, The Meth Epi0pptic in America, a report recently released by NACo, generated substantial national publicity and contains information from two surveys: The Criminal Effect of Meth on Communities and the Impact of Meth on Children. For more information about the conference, including a downloadable registration form and accommodations information, Click on the link below: www.nationaldgq _ org RC onference/conference.htm NCACC to host educational workshops on Debt Setoff Program The North Carolina Association of County Commissioners will host a series of educational workshops on the Debt -5etoff Program beginning next week The program is jointly administered by the NCACC and the N.0 League of Municipalities and allows participating local governments to submit outstanding debts to the N.C. Department of Revenue in an effort to offset those debts with debtors who are due to receive state income tax refunds. Since the program's inception in 2001, more than $15 million has been returned to local governments in North Carolina. Gaston County has received more than $1 million in 2005 alone, and Wake County and Cleveland County have recovered almost $1 million apiece since joining the program. For more information about the training programs, click on the link below: www.ncacc_org /debtsetoffws 0905. him) Sept. 1, 2005 Estimated lottery proceeds for school construction The NCACC Board of Directors considered the lottery issue at its Feb 23, 2005, meeting and voted to support local option lotteries with a substantial portion of the proceeds to be dedicated to local school construction. We are pleased that the http:// www .ncace.org /e- newsupdates.html 9/23/2005 NCACC Page 2 of 5 General Assembly has recognized the need for additional school construction funding - the Association's third highest legislative priority - and has pledged substantial lottery proceeds for school capital projects. Please note that the county allocation mechanism was devised solely by the General Assembly. Please find below the distribution method for the lottery's net revenues and an estimate of lottery proceeds for school construction by county. Our many thanks to the General Assembly's fiscal research staff for providing these projections Please note that the projections are based on current effective tax rates and ADM counts Net revenues (after expenses and prizes) from lottery receipts distributed as follows: 1. 5 percent to lottery reserve fund until fund reaches $50 million 2. Remaining net revenue distributed as follows: 0 50 percent to support early grade class size reduction (1:18) and academic pre- kindergarten for at -dsk 4 year olds 0 40 percent to Public School Building Capital Fund 0 10 percent to fund college and university scholarships Public School Building Capital Fund lottery monies allocated as follows: 1. 65 percent allocated to counties on an average daily membership (ADM) basis 2. 35 percent allocated to counties whose effective tax rate is greater than the state average effective tax rate o County effective tax rate = actual county tax rate x 3 -year weighted average of county sales /assessment ratio *Allocation mechanism devised solely by General Assembly. Public School Building Capital Fund lottery monies to be used as follows: 1. School construction projects, including renovation and repair 2. School construction indebtedness incurred on or after Jan, 1, 2003 3, No county matching funds required 4, Funds cannot be used for school technology needs Distribution of Projected Lottery Proceeds for School Construction Method: 65 percent by ADM, 35 percent by ADM to counties with above State Avg Effective Tax Rate Total $161,500,000 $158,080,000 $174,860,000 $186,960,000 $196,320,000 Distribution: County FY 2006 -07 Alamance $1,663,971 Alexander 442,361 Allegheny 118,351 Anson 648,387 Ashe 247,051 Avery 178,600 Beaufort 554,810 Bartle 496,864 Bladen 853,781 Brunswick 853,525 Buncombe 2,247,910 Burke 1,116,520 http:// www .ncacc,org/e- newsupdates.html FY 2007 -08 FY 2008 -09 FY 2009 -10 FY 2010 -11 $1,628,734 $1,801,623 $1,926,292 $2,022,730 432,994 478,955 512,098 537,736 115,845 128,142 137,009 143,868 634,656 702,024 750,603 788,181 241,819 267,488 285,998 300,316 174,818 193,375 206,756 217,107 543,062 600,707 642,275 674,430 486,342 537,967 575,193 603,990 835,701 924,409 988,377 1,037,859 835,450 924,132 988,081 1,037,548 2,200,307 2,433,867 2,602,286 2,732,568 1,092,876 1,208, 883 1,292,536 1,357,245 9/2.3/2005 NCACC Cabarrus Caldwell Camden Carteret Caswell Catawba Chatham Cherokee Chowan Clay Cleveland Columbus Craven Cumberland Currituck Dare Davidson Davie Duplin Durham Edgecombe Forsyth Franklin Gaston Gates Graham Granville Greene Guilford Halifax Harnett Haywood Henderson Hertford Hoke Hyde Iredell Jackson Johnston Jones Lee Lenoir Lincoln Macon Madison Martin 2,146,575 998,475 265,647 629,240 256,709 1,874,536 574,357 281,238 360,775 100,951 1,319,725 1,433,900 1,120,046 7,772,032 316,805 381,269 1,945,286 490,499 1,327,196 4,569,426 1,130,113 7,277,097 1,185,617 4,759,238 289,392 94,206 1,291,134 470,448 10,118,927 1,363,111 2,534,481 604,405 973,563 524,467 1,035,430 96,612 1,876,989 279,935 4,077,905 203,762 1,374,538 1,463,730 1,731,306 321,557 203,819 659,369 Page 3 of 5 2,101,118 2,324,150 2,484,977 2,609,385 977,331 1,081,073 1,155,882 1,213,750 260,022 287,623 307,526 322,922 615,915 681,294 728,438 764,906 251,273 277,945 297,179 312,056 1,834,840 2,029,606 2,170,051 2,278,693 562,194 621,870 664,903 698,190 275,282 304,503 325,574 341,874 353,135 390,620 417,651 438,560 98,813 109,302 116,866 122,717 1,291,778 1,428,899 1,527,776 1,604,263 1,403, 536 1,552,519 1,659,951 1,743,055 1,096, 327 1,212, 701 1,296,618 1,361,532 7,607,447 8,414,969 8,997,269 9,447,710 310,096 343,012 366,748 385,109 373,195 412,810 441,375 463,472 1,904,092 2,106,209 2,251,955 2,364,697 480,112 531,075 567,825 596,252 1,299,091 1,436,988 1,536,425 1,613, 345 4,472,662 4,947,430 5,289,783 5,554,611 1,106,181 1,223,601 1,308,272 1,373,770 7,122,994 7,879,091 8,424,310 8,846,066 1,160,510 1,283,696 1,372,526 1,441, 240 4,658,454 5,152,943 5,509,518 5,785,347 283,264 313,332 335,014 351,786 92,211 101,999 109,057 114,517 1,263, 792 1,397,942 1,494,677 1,569,507 460,485 509,365 544,612 571,878 9,904,644 10,956,010 11,714,146 12,300,605 1,334, 245 1,475, 873 1,578,001 1,657,002 2,480,809 2,744,144 2,934,034 3,080,924 591,605 654,404 699,687 734,716 952,946 1,054,100 1,127,042 1,183,467 513,361 567,854 607,148 637,545 1,013,503 1,121,085 1,198,662 1,258,672 94,567 104,605 111,843 117,442 1,837,241 2,032,262 2,172,890 2,281,674 274,007 303,092 324,066 340,290 3,991,549 4,415,247 4,720,775 4,957,116 199,447 220,618 235,884 247,693 1,345,430 1,488,246 1,591,230 1,670,894 1,432,733 1,584,816 1,694,483 1,779, 316 1,694,644 1,874,528 2,004,242 2,104,583 314,748 348,158 372,250 390,886 199,503 220,680 235,950 247,763 645,406 713,915 763,316 801,531 http: / /www.ncace,orgie- newsupdates.html 9/23/2005 NCACC McDowell 502,533 Mecklenburg 18,250,398 Mitchell 176,377 Montgomery 345,933 Moore 922,666 Nash 2,718,356 New 3,555,515 Hanover Northampton 471,190 Onslow 3,351,011 Orange 2,617,143 Pamlico 247,542 Pasquotank 886,875 Pander 558,260 Perquimans 131,152 Person 867,731 Pitt 3,263,452 Polk 189,408 Randolph 1,768,525 Richmond 1,228,210 Robeson 3,625,118 Rockingham 2,172,221 Rowan 3,083,732 Rutherford 767,828 Sampson 1,684,262 Scotland 1,009,459 Stanly 744,065 Stokes 560,023 Surry 1,767,369 Swain 138,281 Transylvania 294,805 Tyrrell 95,870 Union 2,330,924 Vance 1,201,348 Wake 9,151,996 Warren 457,685 Washington 314,770 Watauga 349,075 Wayne 2,862,310 Wilkes 776,873 Wilson 1,862,794 Yadkin 471,336 Yancey 197,610 TOTALS $161,500,C http://www.ncace.org/e-newsupdates.html 491,892 17,863,919 172,642 338,607 903,127 2,660,791 3,480,222 461,211 3,280,049 2,561,721 242,299 868,094 546,438 128,375 849,355 3,194,343 185,397 1,731,074 1,202,200 3,548,351 2,126,221 3,018,429 751,568 1,648,595 988,082 728,309 548,164 1,729,943 135,353 288,562 93,840 2,281,564 1,175,908 8,958,189 447,993 308,104 341,683 2,801,696 760,421 1,823,347 461,355 193,425 00 $158,080,0 544,105 19,760,152 190,968 374,550 998,993 2,943,230 3,849,643 510,169 3,628,222 2,833,645 268,019 960,242 604,442 142,002 939,513 3,533,419 205,077 1,914,826 1,329,812 3,925,004 2,351,917 3,338,832 831,346 1,823,591 1,092,966 805,618 606,350 1,913,574 149,720 319,193 103,801 2,523,749 1,300,729 9,909,090 495,546 340,809 377,952 3,099,093 841,139 2,016,893 510,327 213,957 00 $174,860,C Page 4 of 5 581,756 610,882 21,127,520 22,185,252 204,183 214,405 400,468 420,517 1,068,121 1,121,596 3,146,897 3,304,444 4,116,032 4,322,097 545,471 572,780 3,879,289 4,073,502 3,029,728 3,181,409 286,566 300,912 1,026,689 1,078,069 646,268 678,623 151,828 159,429 1,004,526 1,054,817 3,777,925 3,967,064 219,268 230,245 2,047,328 2,149,826 1,421,833 1,493,016 4,196,607 4,406,707 2,514,666 2,640,560 3,569,873 3,748,596 888,873 933,374 1,949,781 2,047,395 1,168,597 1,227,102 861,365 904,489 648,309 680,766 2,045,990 2,148,421 160,081 168,095 341,281 358,366 110,984 116,540 2,698,388 2,833,480 1,390,737 1,460,363 10,594,782 11,125,201 529,837 556,363 364,392 382,635 404,106 424,337 3,313,545 3,479,435 899,344 944,369 2,156,458 2,264,420 545,641 572,958 228,763 240,215 00 $186,960,000 $196,320,000 9/23/2005 NCACC Page 5 of 5 Aug. 23, 2005 Medicare Part D: Strategies for counties who are plan sponsors Do you cover active employees age 65 or older on your county health plan? How about retirees age 65 and older? If you do, you might want to take advantage of tax - free money payable to your county for providing these benefits. Below is what you need to know: One of the least talked about beneficiaries of the new Medicare Part D offering are the health plan sponsors (counties) providing retiree prescription drug benefits or covering active employees age 65 and older for their health care and medications, These counties providing this coverage have a unique opportunity to reduce their future retiree prescription drug liability by 20 percent or more as a result of government subsidies offered under Medicare Part D provisions. There are several options that county governments may exercise as it relates to these subsidies. The NCACC recommends that counties who currently cover retirees explore the Primary Employer Subsidy (Option 1) approach, Counties who wish to exercise the Primary Employer Subsidy must take four steps by Sept. 30, 2005, one of which is an actuarial study. The cost of the study could range anywhere from $3,000 to $5,000, depending on the size of your county and other factors. • Click here for more information, RMP to hold four Regional Advisory Committee meetings in September During the month of September, the Association's Risk Management Pools will hold four Regional Advisory Committee meetings. These meetings are open to all counties and county entities. Please send your RSVP to Amy Kunkle at the Raleigh office indicating which meeting you wish to attend. The Regional Advisory Committee meetings offer the Association a chance to meet with members to learn about their risk management needs, gain feedback about the Pools and learn how the Pools can improve their services to members Members attending these meetings set the agenda and discuss topics that are of interest to them, Along with your RSVP, please let us know what topics you wish to discuss, Each meeting begins at 9:30 a.m. with networking opportunities and light refreshments, Formal sessions will run from 10 a.m - 2 p.m. Lunch will be provided. The four meeting dates and locations are: • Sept. 8 — Alamance County Youth Services Building (in downtown Graham) • Sept, 20 — Scotland County Administrative Conference Room • Sept. 22 — Beaufort County Economic Development Center • Sept 29 — Henderson County Administration Building Commissioners Meeting Room • Click here for more information. http:// www .ncacc.org/e- newsupdates.html 9/23/2005 � I 7 0 m N N m a v a a c p o m � o m a 'ta r M r v v m q 0 o m j nm N D F�'SmE c m M rn M m N r m - �n O � ttN N CN 1 0 m in a C9allo o o c U a 0 u a r O M M �o Z= 0M Z a V N GO ° N :0 v u u � m O . c 2 o N N E2 .2 6 m s ��C d C L v N 0 -6 c c, a� c o E a❑ a '° w C3 n4 z u o c _ •p O m m N �.Z iEi p a a o OJ N i '. N N N H N .. U N Z 'p � •° i7j, (91 ml p a O .0 cu N OO V = n v °m m N Nm O C D c N � c S a r •o a d' v a N O O N m m o v U 9 a C N C7 O m •°p m u� p LL N V L- a m m n a�a Y m o a a a p a a L N m d m 1 N o U m p= m w aa E E - a . O .°m c U U W( S Z n h- G U l- m n U m h U) 12 N N W1 N W m N n O N O N `E j O c ° m Z ° 2 O O N > u C 9 N C N ' S c Ir, o 6 a uai Y p1 c d o u u 0 u N a m a Z r u o U � U U a C ❑ L Q O E o EL N d U W Q e1' N Q N N W W W Vl W 10 Id N � a m 3 H � a ° a a U W L +L+ V c m a � F- U" L a C N L_ a W V V [1 L a T N N N N W �+ y 'no U a E m O OO S� a X °2 W Q vi N N O c U C-0 10 L v r r W i(D :3 Z,, VJ U m rn m rn rn °° rn m W o m ° m n CL W 0 a a c v U m °m m m m rn W oR o N � a G D a° c r ai dl W V W N W N W N rn O � Q rn Wj r N N W1 N W m N n O N O N `E j O c ° m Z ° 2 O O > > u C 9 N C N ' S c Ir, o 6 Y p1 c d o u u 0 u Z r u o U Chapel H116Coebom City Schools 09RGre5 Chapel Hill Carrboro City Schools Budget Summary FY 2005 -06 Total School Fundinq From All Sources n arison „f 1 ,r ni par Punil Avorane Daily Membership and Current Expense Equivalen It Total Revenue Budget Local Current Expense Appropriation $2,796 $30,372,967 Proceeds from Special District Tax $1,286 $13,973,118 State Appropriation $4,314 $46,860,122 Federal Appropriation $438 $4,757,736 Other: $216 52,344,757 : Average Dally Membership` Current Expense Appropriation F School Funding from All Sources $9,050 $98,308,700 n arison „f 1 ,r ni par Punil Avorane Daily Membership and Current Expense (1) CHCCS also receives additional operating funds from the special district tax. • As projected by State DPI (2) Proceeds from District Tax for fiscal year 2005 -06 assumes a revenue neutral tax rate of 17.2 cents per $100 valuation for the Manager's Recommended budget. The Board of County Commissioner approved special district tax rate is 10.34 cents for fiscal year 2005 -06.. Total Local Funds Total Per Pupil General Fund Proceeds from the Received by CHCCS Equivalent (Including Par Pupil Allocation (General Fund Only)... Average Dally Membership` Current Expense Appropriation CHCCS Spacial District Tax p1 (General Fund and Special District Taxes) General Fund and Special District Taxes) 04 -05 BOCC Approved Appropriation $2,623 10,986 528,816,278 $12,940.547 $41,756,825 $3,801 05 -06 District Requested Appro riation $2,893 10,863 $31,426659 $13,328.763 $44,755,422 54,120 05 -06 Manager Recommended Approved Appropriation $2,718 10,863 $29,525,634 $13,333,124 $42,856,758 53,945 05 -06 BOCC Approved Appropriation S2,796 10,663 530,372,967 S13,973,114 1 $44,346,081 54.002 Total Requested Increase Current Expense $270 123 $31,426,659 $388,216 Total Recommended Increase Current Expense $95 123 $709,356 $392,577 Total Approved Increase Current Expense $173 (123) $1,556,689 $1,032,567 (1) CHCCS also receives additional operating funds from the special district tax. • As projected by State DPI (2) Proceeds from District Tax for fiscal year 2005 -06 assumes a revenue neutral tax rate of 17.2 cents per $100 valuation for the Manager's Recommended budget. The Board of County Commissioner approved special district tax rate is 10.34 cents for fiscal year 2005 -06.. Chnpol Hil4conhoo, Cily Schools Local Revenue 09avos Other Local Revenue Additional Prior Year Revenue from Special District Tax 2005 -06 75,000 2004.05 BOE 75,000 Fines & Forfeitures 300,000 300,000 Approved 350,000 Miscellaneous Revenue 170,434 164,617 Budget BOE Manager BOIS Approved 100,000 700,000 Requested Recommended Budget Property Tax Revenue General Fund Budget (Supported by Ad Valorem Tax Revenue) 28,816,278 31,426,659 29,525,634 30,372,967 District Tax Revenue 12,940,547 13,328,763 13,333,124 13,973,116 State inventory Tax 70,000 70,000 70,000 Total Property Tax Revenue $ 41,756,825 $ 44,755,422 $ 42,858,758 $ 44,346,085 54,769 Carol Woods Contribution incl. In mist. revenue Incl. in mist. revenu Property Tax Revenue Increase from 2004 -05 $ 2,998,597 $ 1,101,933 $ 2,589,260 Other Local Revenue Additional Prior Year Revenue from Special District Tax 75,000 75,000 75,000 75,000 Fines & Forfeitures 300,000 300,000 300,000 350,000 Miscellaneous Revenue 170,434 164,617 164,617 169,988 Indirect Costs 100,000 100,000 700,000 100,000 Investment Income 45,000 45,000 45,000 60,000 340,000 355,000 355,000 355,000 Tuition State inventory Tax 70,000 70,000 70,000 0 ABC Revenue 52,040 52,040 52,040 54,769 Carol Woods Contribution incl. In mist. revenue Incl. in mist. revenu incl, in mist, revenue 0 Sales Tax Refunds 180,000 180,000 180,000 180,000 Total Local Revenue Adjustments $ 1,332,474 $ 1,341,657 $ 1,341,657 $ 1,344,757 Appropriated Fund Balance 1,140,736 1,000,000 1,000,000 1,000,000 Total Local Revenues (including Appropriated Fund Balance) $ 44,230,035 $ 47,097,079 $ 45,200,415 $ 46,690,842 2.460.807 Chopol Hill- Carrhom City Schools CHCCS Local Expenditure Request os1wV5 NOTE: Asterisk (') denotes requested items related to Educational Excellence, Collaboration intiatives 2005 -06 2005 -06 Manager BOE Approved Manager BIDE Approved State Mandates BCE Requested Recommended Budget ase (CHCCS BOE requested 3% Across the Board (including benefits]; Managers 0 0 640,071 ation reflects current le Is( roposai of 2.5% Increase 960,107 Utilities due to Storm Water fees and rate Increases ance Increase 660 local) paid staff from $3,432 per emplo ee to 53,775) FStateRefirement 226,380 130,000 344,520 Employer Match Increase 282,459 Total Funding for Mandates * 172.39 Other Em to ee Benefits: to kee pace with Increased in number of employees 2005 -06 Manager BOE Approved Continuation of Current Services (Including Growth [V.5M.dia BOE Requested Recommended Budget arial osItion (or Chapel Hill Hi 2h School 37,032 0 0 Specialist for ECHHS 29,018 Utilities due to Storm Water fees and rate Increases 130,000 130,000 and covers McDougie Middle School SRO not funded by Town of Carrboro)' 227,394 * 172.39 Other Em to ee Benefits: to kee pace with Increased in number of employees 125,000 125,000 Pre -K Program Salaries and Benefits - underbudgeted' 149,350 * 149,35 After School Program Support - increase matching funds for 21st Century grant and replacement of * 76.70 declining external grant support for middle school afterschool programs' 76,700 f Pa y4 Sala Increase 50,000 50,000 99,041 i Inflationary Increase to Utilities - Electricit 5%), Tele hones (5%) and Natural Gas 117%) 201,824 15,656 Per Pupil Allocaitons Due to Enrollment Increase 15,656 Total Continuation of Current Services (Including Growth) $ 1,041,974 $ 616,141 18 19 20 21 22 2: 21 2! 21 21 21 21 09afi,05 Ctmpol HIIbCmrboro City Schools Budget Impact of Charter Schools 2005.06 BOE Requested Manager Recommended BOE Approved Budget BOE Approved Replacement of Mid -Year Budget Reductions BOE Requested Replace Charter School Funding (With regard to Manager's Recommendation, charter school students included In total ADM) Total Impact of Charter Schools 140,000 $ 140,000 0 $ - 140,000 $ 140,000 30 at 32 33 34 3' X 32 it X 4( 4' 4: 4. 4 4 2005 -06 or New Initiatives Budget (Considered "Expected BOE Approved Manager BOE Approved Replacement of Mid -Year Budget Reductions BOE Requested Recommended Budget [Transportation 75,000 Sevin s: Discontinuation of Local Budget Subsidy to Child Nutrition Services Replace Maintenance Mechanic 39,403 144,042 39,403 Replace Staff Development Funding 85,000 50,000 55,000 Re lace 5% Reduction to School instructional Supplies 40,180 75,000 40,180 Total Continuation of Current Services (Including Growth) $ 164,583 $ - $ 134,583 30 at 32 33 34 3' X 32 it X 4( 4' 4: 4. 4 4 2005 -06 or New Initiatives Budget (Considered "Expected BOE Approved Manager BOE Approved pansion New Costs" by CHCCS) BOE Requested Recommended Budget [Transportation 75,000 Sevin s: Discontinuation of Local Budget Subsidy to Child Nutrition Services 75,000 School Reform Piannin 144,042 Sevin s from Custodial Services Contract 50,000 for New Initiatives' 50,000 Total Budget Reductions /Reallocations e College Expenses' 75,000 Total 2005 -06 Local Expenditure Increases 75,000 $ 970,380 84,000 04,000 Student Assessments stem Leadership Academy (High Five) 50,000 50,000 1 Total Expansion or New Initiatives Budget $ 334,000 334,000 Manager BOE Approved Savings /Program Changes BOE Requested Recommended Budget Sevin s: Discontinuation of Local Budget Subsidy to Child Nutrition Services 0 0 144,042 Sevin s from Custodial Services Contract 0 $ - 0 $ - 88,925 $ (232,967) Total Budget Reductions /Reallocations Total 2005 -06 Local Expenditure Increases $ 2,867,044 $ 970,380 $ 2,460,807 Orange County schoais Ma,05 Orange County Schools Budget Summary FY 2005 -06 Total School Funding From All Sources / 100'jI sr14r, — I — cr,mnnrienn of I ncal Per Pupil. Average Daily Membership and Current Expense Per Pupil Equivalent Total Revenue Budget Local Current Expense Appropriatioi $2,796 $19,608,329 Proceeds from Special District Tax $o - State Appropriation $4,590 32,189,914 Federal Appropriation $375 2,628,696 Other: Local Revenues $464 3,253,315 Other: $17,920,336 Total School Funding from All Sources $8,225 $57,680,256 / 100'jI sr14r, — I — cr,mnnrienn of I ncal Per Pupil. Average Daily Membership and Current Expense General Fund Current Average Daily Expense Per Pupil Allocation Membership* Appropriation 04 -05 BOCC Approved Appropriation $2,623 6,832 $17,920,336 05 -06 District Requested Aperopriatio n $3,022 7,013 $21,192,516 05 -06 Manager Recommended Approved Appropriation $2,718 7,013 $19,061,334 05 -06 BOCC Approved Appropriation $2,796 7,013 $19,608,329 Total Requested Increase Current Expense (General Fund Only) $399 181 $3,272,180 ded ase Total Recommen Incre Current Expense (General Fund Only) $95 181 $1,140,998 Total Approved Increase Current Expense (General Fund Only) $173 1 181 51,687,993 A B C 19 5 r U V U FA Orange County Schools Local Revenue 09/26/05 Other Local Revenue Additional Prior Year Revenue from Special District To 2005 -06 0 0 0 Fines 8 Forfeitures BOE 182,000 2004 -05 BOE Approved BOE Manager Approved 35,000 Budget Requested Recommended Budget Property Tax Revenue General Fund Budget (Supported by Ad Valorem Tax 225,000 Investment Income 100,000 100,000 Revenue) 17,920,336 21,192,516 19,061,334 19,608,329 District Tax Revenue Total Property Tax Revenue 0 S 17,920,336 0 S 21,192,516 0 5 19,061,334 0 $ 19,608,329 130,000 140,000 Smart Start 22,543 Property Tax Revenue Increase from 2004 -05 $ 3,272,180 $ 1,140,998 $ 1,687,993 Other Local Revenue Additional Prior Year Revenue from Special District To 0 0 0 0 Fines 8 Forfeitures 182,000 182,000 182,000 233,231 Miscellaneous Revenue 45,100 35,000 35,000 71,500 Indirect Costs 125,000 125,000 125,000 225,000 Investment Income 100,000 100,000 100,000 115,000 Tuition 16,500 16,500 16,500 20,000 More At Four Grant 130,000 130,000 130,000 140,000 Smart Start 22,543 22,543 22,543 20,000 Head Start 120,000 120,000 120,000 130,000 ABC Revenue 31,568 27,292 27,292 31,568 Contributions and Donations 65,000 65,000 65,000 65,000 Medicaid Reimbursements 110,000 110,000 110,000 110,000 Textbooks 386,646 374,708 374,708 397,081 Count Reimbursement for School Nurses 94,076 94,076 94,076 185,807 County Reimbursement for Social Worker 39,861 39,861 39,861 41,157 Transfer from Community Schools 400,000 340,125 340,125 200,000 Transfer from Child Nutrition 0 0 0 200,000 Sales Tax Refunds 270,000 270,000 270,000 342,000 Total Local (Non - Property Tax) Revenue Adjustments Total Local (Non - Property Tax) Revenues $ 2,138,294 $ 20,058,630 $ 2,052,105 $ 23,244,621 $ 2,052,105 $ 21,113,439 $ 2,527,344 $ 22,135,673 Appropriated Fund Balance 1,724,609 410,616 410,616 757,778 Total Local Revenues (including Appropriated Fund Balance) $ 21,783,239 $ 23,655,237 $ 21,524,055 $ 22,893,451 G 111(1919 1 2 3 4 n n Orange Gounly Schools 09/2 05 nr-Q I nenl FvnPnrlihire Reauest NOTE: Asterisk (') denotes requested items related to Educational Excellence, Collaboration initiatives Mandates R 2005 -06 BOE M Manager A Approved Salary Increase (OCS BOE requested 3% Across the Board [including benefits]; Manager's Recommendation reflects current legislative proposal of 2.5% increase) 5 529,134 4 440,945 5 550,501 Health insurance increase 8 85,828 8 85,828 7 78,962 2005 -06 4 ,e fE ,t 2, 2' 2; 2. 2 21 2i 2 2 2 3 3 3 3 3 2005.06 Continuation of Current Services (Including BOE Manager Approved Growth) Requested Recommendation Budget included in included ir continuation budget continuatio from fiscal year 2004- budget from fsca Continuation Budget (Funded from Fund Balance in FY 2004 -05) 1,400,182 05 year 2004 -0 Total Continuation of Current Services (Including Growth) $ 1,400,182 S S 2005 -06 onager Approved FFFExpanskon or New Initiatives Budget Requested Recommendation Budget Freshman Academy (Funding for high school teachers) 223,720 * 111,86 Reading Re mediation Teacher (3 ositions)' 167,790 * 167,79 Math /Science Specialist (1 position funded for 12 months ) 66,361 * 66,361 Language Arts /Social Studies Specialist or Literacy Specialist (1 position funded for 66,361 * 20,00 Elementary Science Teacher (1 position) 55,930 0 * Psychologist (.8 FTE ) ' 44,744 Social Worker (1.5 FTE)' 83,895 * 83,89 Carpenter/Painter 0 FTE) 35,643 35,643 i Plumber (1 FTE ) 35,643 0 Criminal Records Check 5,800 0 i NC Wise Coordinator 55,930 0 Increase Tenured Teachers Supplements (1% at 15 years of service; 2% at 20 years 1 of service; 3% at 25 ears of service) 85,254 0 3 AP Exams' 15,000 i Summer Sizzle 5,000 5,000 , Graduation Facilit Rental 8,000 8,000 3 Textbooks 50,000 0 , International Baccalaureate Coordinator (1/2 time ) ' 27,965 s Middle College Support Staff (25 % 31,250 31,25 s Middle College Technology (25% ) 31,250 * 37,25 , Middle College Transportation 62,500 * 62,50 e High Five Staff Development Project' 25,000 * 25,000 s Grade 6 Transition/Academy Program Costs' 10,000 * 10,000 o Hi h Schools Band Instruments and Uniforms (50% to OHS and 50% to CRHS) 1 50,000 50,000 2005 -06 onager Approved FFFExpanskon or New Initiatives Budget Requested Recommendation Budget Freshman Academy (Funding for high school teachers) 223,720 * 111,86 Reading Re mediation Teacher (3 ositions)' 167,790 * 167,79 Math /Science Specialist (1 position funded for 12 months ) 66,361 * 66,361 Language Arts /Social Studies Specialist or Literacy Specialist (1 position funded for 66,361 * 20,00 Elementary Science Teacher (1 position) 55,930 0 * Psychologist (.8 FTE ) ' 44,744 Social Worker (1.5 FTE)' 83,895 * 83,89 Carpenter/Painter 0 FTE) 35,643 35,643 i Plumber (1 FTE ) 35,643 0 Criminal Records Check 5,800 0 i NC Wise Coordinator 55,930 0 Increase Tenured Teachers Supplements (1% at 15 years of service; 2% at 20 years 1 of service; 3% at 25 ears of service) 85,254 0 3 AP Exams' 15,000 i Summer Sizzle 5,000 5,000 , Graduation Facilit Rental 8,000 8,000 3 Textbooks 50,000 0 , International Baccalaureate Coordinator (1/2 time ) ' 27,965 s Middle College Support Staff (25 % 31,250 31,25 s Middle College Technology (25% ) 31,250 * 37,25 , Middle College Transportation 62,500 * 62,50 e High Five Staff Development Project' 25,000 * 25,000 s Grade 6 Transition/Academy Program Costs' 10,000 * 10,000 o Hi h Schools Band Instruments and Uniforms (50% to OHS and 50% to CRHS) 1 50,000 50,000 09/26/05 CA, Stanford and Central Elementary After School Program 44,000 Transportation Fuel and Repair Parts 20,000 50,000 Total Expansion or New Initiatives Budget $ 1,307,036 $ 664,225 $ 758,549 Savings/Program Changes 2005.06 BOE Requested Manager Recommendation Approved Budget Human Resources Position (12 months savings (20,000) (20,000) (20,000) Janitorial Privatization (OHS) (30,000) (30,000) (30,000) Reduction in Continuation Budget (funded from fund balance 04 -05) 0 0 (152,000) Reduction in Current Expense Budget 0 0 (75,800 Total Budget Reductions /Reallocations $ (50,000) $ (50,000) $ (277,800) Total 2005 -06 Local Expenditure Increases $ 3,272,180 $ 1,140,998 $ 1,110,212 4 h ""T, Orange couutp 6cbooW o 200 (East Elting gitreet , J�ittsboraugb, .QC 27278 Xgg1 Dr. Shirley Carraway (919) 732 -8126 Telephone Superintendent (919) 732 -8120 Fax www.orangeAl2.nc.us September 20, 2005 Mr, Moses Carey, Jr., Chain Orange County Board of County Commissioners P.O. Box 8181 Hillsborough, NC 27278 Dear Mr. Carey, Attached is a copy of the Orange County Schools' 2005 -2006 budget narrative. This document will be distributed to parents and community members to ensure they are aware of the initiatives for the system for this school year and the manner in which those initiatives were funded. We will be glad to respond to any questions you might have. Sincerely, sc Shirley �arraway, EdD Superintendent /pmc cc: Mr. John Link, County Manager Orange County Board of Education Orange County Schools 200 East King Street Hillsborough, NC 27278 Dr. Shirley Carraway (919) 732 -8126 Telephone Superintendent (919) 732 -8120 Fax www.orange.kl2.nc.us September 20, 2005 Dear Parents and Community Members: After a budget deliberation process that began last December, the Orange County Board of Education has adopted its budget for the 2005 -2006 school year. A delayed state budget and the need to trim the local budget because of the funding shortfall caused the process to extend into September. The district's original budget proposal, presented to the Board of County Commissioners (BOCC) on June 9, was developed from the Orange County Schools' long -range Strategic Plan, the recommendations of the Middle School Task Force and the preliminary recommendations of the High School Task Force, and was reinforced by the findings of the BOCC- commissioned Educational Excellence Workgroup. The requests fell into four categories: literacy development and support; dropout prevention; increasing student enrollment and performance in challenging coursework; and high quality teacher recruitment, development, and retention — all critical needs identified by these committees composed of community members and staff. While the Board of Education requested $3,272,180 from the BOCC to meet these needs, the Commissioners appropriated $1,687,993. The district then began the task of selecting what to cut, although this task could not be completed until the state budget was adopted and we knew where state shortfalls would occur. This year, required state budget reductions, called "discretionary cuts" because school districts can choose which budget items to cut, amounted to $216,000 for Orange County Schools. In the past, these discretionary cuts came at the same time that districts received extra teaching positions to comply with state - mandated "class -size reduction." Because Orange County Schools was already in compliance with state class -size regulations, the district was able to return the money for those extra positions to meet its discretionary cuts. This year, because there are no "extra" positions in the state budget, the district had to pull from existing funds to return $216,000 to the state. Once the Board of Education knew the state and local budget picture, they began to work on how to remain solvent while meeting the community- supported budget requests. In the end, the Board decided that our district must continue to move forward. Acting on the philosophy that Orange County Schools needs to provide an education that is appropriate for every child — right now and not just at some vague time in the future — the Board tapped the system's fund balance to pay for the most significant needs. They did not take this step lightly. To minimize the effect on the fund balance, administrators scoured the Continuation Budget, line item by line item, to trim expenditures that had been previously allotted, resulting in a savings of $152,000. Other cost - saving measures, including the privatization of,janitorial services at Orange High School and the implementation of the Energy Education conservation program, demonstrate how committed the district is to managing its resources efficiently and effectively. In addition, the two enterprise programs, Child Nutrition and School Community Relations, contributed a total of $400,000 toward meeting the 2005 -2006 budget requirements. On September 6, having implemented these cost - saving and cost - cutting measures, the Board of Education adopted a budget that included the following new items: • 2 High School Counselors These positions, one for each high school, support the Freshman Academy, a program put into place to help reduce the dropout rate and support students as they make the transition into high school. This addition also means that we will now have one counselor for each grade level. • 3 Reading Remediation Teachers Our testing data show that reading proficiency begins to decrease as students enter middle school, where texts become increasingly challenging. These Reading Remediation positions will support our students at the two middle schools and at Orange High School. (Cedar Ridge already has a Reading Remediation teacher.) • 1 Math/Science Specialist Our elementary schools do an excellent job of helping students reach grade -level proficiency. Those students who are minimally proficient, however, often have a difficult time maintaining proficiency when they reach middle school because of inadequate support at this level. A math /science curriculum specialist will provide support for classroom teachers through demonstration lessons, current research on best practices, and curriculum alignment between grade levels and schools. • 1/3 Literacy Specialist As texts become increasingly difficult through the grades, students who are not confident readers struggle to keep up, Having a literacy specialist allows us to provide continued literacy support, especially in helping classroom teachers promote literacy in their content areas. The rest of this position was funded through federal programs. • 1.5 Social Workers This addition will allow us to address the growing needs of our student population. In an arrangement with the Department of Social Services, the district may be able to "match" this 1.5 positions to give us 3 positions, which would provide for one social worker per school. • 1 Carpenter/Painter This position in included because the district has added additional facilities without increasing the staff to maintain them. • Middle College Program This program, which allows students to complete coursework for high school graduation while taking community college courses, is a collaboration with Durham Public Schools, Chapel Hill- Carrboro Schools, and Durham Technical Community College. It provides another option for our high school students and helps to address the dropout rate. • High Five High Five is a collaborative effort among five school districts and five Triangle businesses to improve our high schools, with the businesses funding the program at $500,000 per year for five years. This budget item supplements the cost of High Five's essential staff development opportunities for teachers and administrators in our district, opportunities we would not be able to afford on our own. • Grade 6 Transition Academy One of our most significant academic challenges occurs as students make the transition into a new school level — at the sixth grade and at the ninth grade. In 2004 -2005, our district implemented the first phase of a 91h grade transition program to support students as they make the adjustment to high school. The 6h grade program will allow us to offer similar support at the middle school level. • High School Band Program Research clearly shows that students who are involved in school activities have better grades and better attendance. Our band programs offer an opportunity for students to explore their musical interests and talents, while making connections that support their academic success. It also increases the likelihood that participating students will remain in school, thus reducing the dropout rate. Our high school bands are in critical need of instruments and equipment to support their expanding programs, • Transportation Fuel and Repair Costs With fuel at unprecedented prices, the district must supplement the allotment provided by the state. The Board of Education deliberated over this budget for many months, trying to ensure that the district was doing everything it could to spend money wisely. And, while the Board realizes that it must conserve its fund balance to open the new middle school and equalize programs in the existing middle schools, it is also unwavering in its belief that we must take care of the students we have today. Every day we do not move forward is a day we fall further behind. On behalf of the Board of Education and the students of Orange County Schools, I would like to thank all the parents, staff, and community members for their support during the long budget process. Sincerely, Shirley t- raway, Ed.D V Superintendent