HomeMy WebLinkAboutAgenda - 05-05-2003-absORANGE COUNTY BOARD OF COMMISSIONERS
HILLSBOROUGH BOARD OF COMMISSIONERS
JOINT MEETING
AGENDA ITEM ABSTRACT
Meeting Date: May 5, 2003
SUBJECT: Joint Meetina Discussion Items
DEPARTMENT: County Manager/Planning PUBLIC HEARING: (Y/N)
ERCD/Purchasing/Engineer/
Recreation & Parks
No
ATTACHMENT(S):
As noted in "Background" section
INFORMATION CONTACT:
Greg Wilder, ext 2300; Craig Benedict, ext
2592; Margaret Hauth, 732-2170; Dave
Stancil, ext 2590; Pam Jones, ext 2650;
Paul Thames, ext 2303; Lori Taft, ext 2673
TELEPHONE NUMBERS:
Hillsborough
Chapel Hill
Durham
Mebane
732-8181
968-4501
688-7331
336-227-2031
PURPOSE: To discuss topics of mutual interest between the governing boards of Orange
County and the Town of Hillsborough.
BACKGROUND:
1. Joint Orange County/Town of Hillsborough Orange Grove Road Access
Management Study -Next Steps
The Joint Orange County/Town of Hillsborough Orange Grove Road Access Management
Study was authorized by the Town of Hillsborough and Orange County at their last joint meeting
in March, 2002. The report was unanimously approved by the work group in December, 2002.
Orange County Commissioners heard the report at the March 24, 2003 meeting and are ready
to approve the report, after discussion with the Town of Hillsborough at this joint meeting.
When both boards approve this report, both jurisdictions, as well as North Carolina Department
of Transportation, will incorporate the recommendations into their regulations and review. This
will ensure that as development occurs in certain high growth areas, proper transportation
planning will occur (including, but not limited to: right of way dedication; roadway improvements;
sidewalk and bicycle improvements; signalization; public transportation aspects; and proper
access management techniques to enhance traffic flow and safety).
Attachment 1-Joint Orange Grove Road Transportation Group Recommendations
2. Orange County Comprehensive Plan Land Use Element -Evaluation of
Urban/Rural Transitions
On March 25, 2003, the County held a Joint Work Session between the Comprehensive Plan
Land Use Committee, Board of County Commissioners, and a few members of the Planning
Board to discuss growth management tools and community outreach. The discussion focused
on the challenge of defining a clear pattern of land use residential density and demarcating rural
and urban uses and design. Simultaneous with community outreach efforts in the rural sections
of the County, Orange County would like to solicit municipal input. Therefore, Orange County is
asking for the Town's cooperation in examining the critical area surrounding Hillsborough. We
can discuss previous studies of this area, and discuss the growth management tools that the
County is considering. Although the critical area referred to above lies within Orange County's
planning jurisdiction, Orange County recognizes the areas where rural and urban land uses
meet as critical planning areas and anticipates a mutual interest in cooperative planning for this
area.
No Attachments
3. Schools Adequate Public Facilities Ordinance (SAPFO) -Next Steps
The Memorandum of Understanding (MOU) and Schools APFO have been approved by the
majority of all the partners that are party to the Orange County School District and Chapel Hill-
Carrboro School Districts. The Chapel Hill-Carrboro School Districts partners will be proposing
changes, similar to the Orange County School District, that temporarily suspend the Schools
APFO adequacy test until new capacity is added (for CHCCS, at the High School level; for
OCS, at the Middle School level). With these changes, the Schools APFO could be adopted by
all jurisdictions in May and June with implementation thereafter.
Regarding the Orange County School District, since long term capacity is available at the
Elementary and High School level and the Middle School adequacy test is suspended, then
Schools APFO would not have a direct effect on new development. However, the Schools
APFO and Certificate of Adequate Public Schools (CAPS) system does offer an important
growth management tool to local government to monitor the pace of development through
project phasing and greatly assist in the collection of information and capital planning used in
providing school public services and maintaining the high standards of education in the District.
Information is attached that responds to Hillsborough's inquiry regarding the potential impact, if
any, (pursuant to the Town of Hillsborough's request through the Schools and Land Use
Councils) from the City of Durham and Mebane which, at this time, are not parties to the
agreement.
Attachment 3 -Report on the Effect of the City of Durham and City of Mebane on
Schools APFO
4. Orange County/Hillsborough Courtesy Review
Provided for Board discussion is the revised Courtesy Review Agreement, including the
"Reservation of Utility Capacity for Review Purposes", that can become part of the submittal
processing schedule for projects with Orange County planning jurisdiction and Town of
Hillsborough water and sewer service area.
Attachment 4a -Reservation of Utility Capacity for Review Purposes Checklist
Attachment 4b -Utility Options Matrix
Attachment 4c -- Revised Agreement
5. Eno River Capacity Use Agreement
The Eno River Capacity Use Agreement has operated with very little modification in operational
procedures over the fourteen years since it was initially created. However, there is a least some
sentiment to revise both the Capacity Use Agreement and the Orange County and Hillsborough
Water Use/Drought Management Ordinances to reflect changing conditions such as the
availability of water from Hillsborough's West Fork Reservoir, the use of large quantities of
water from upstream -turf farm -users, and the dissatisfaction of property owners around
Lake Orange with the aesthetic and recreational consequences of the drastic season draw
down of the water level in Lake Orange. Copies of Hillsborough's draft or suggested Water
Use Restriction Stages modifications as well as a comparison between the existing and
proposed water restrictions are attached.
The County will be proposing land use changes in the Upper Eno Basin that will improve water
quality. This is consistent with the Upper Neuse River Basin Association goals of addressing
water quality from both environmental and potable water resource aspects. The County would
like support from Hillsborough in the achievement of these goals.
Attachment 5a -Suggested Water Restriction Stages
Attachment 5b -Table -Hillsborough Water Restrictions Comparison
6. Building and Erosion Control/Stormwater Service Agreement
Orange County and Town of Hillsborough have informally agreed over the years (1979 and
1981) that the County will perform Building and Erosion Control services for the Town of
Hillsborough within their town limits and Extraterritorial Jurisdiction. The regulatory and
responsibility realms have dramatically changed over the years and preliminary discussions
have begun between both administration staffs to formalize the agreements. In addition, as the
County considers enhanced options in building, erosion control, stormwater and Neuse River
Rule areas, it would be a benefit to our joint customers to know if all of the rules are the same
or if some are excluded.
A draft agreement was forwarded from the Planning and Inspections Department to the Town of
Hillsborough for review. Adoption of such an agreement will clarify services and associated
regulations and, as important, assist in the planning of personnel, operating and capital needs
to be able to provide the level and scope of review and inspection in a growing community.
Administration and legal staffs can further review the agreement and distribute for review an
updated draft in the near future.
No Attachments
7. Private Projects Updates
a) Waterstone -Next Steps
The Town of Hillsborough Planning staff will provide information as appropriate at the meeting.
No Attachments
b) Preserve -Next Steps
County staff has met on occasion with the owner and others to discuss development of this site
during the past 3 months, most recently on April 30, 2003. So far, the only plan that Orange
County Planning has seen on this 465 acres property is one prepared by Jerry Turner and
Associates, dated September 3, 2002 (enclosed in the information packet sent to the
Hillsborough Board). This plan does not adhere to the concept of open space connectivity nor
to the concept of borrowed open space. We have informed the Landscape Architect of this and
he is working on a revision. Also, the perimeter 100 foot building setback buffer required
around flexible development subdivisions is to be shown on a revised plan. Water/sewer issues
are not yet resolved. The Courtesy Agreement with Hillsborough will set the procedures that will
need to be followed.
Attachment 7b -Landowner's Information Packet (under separate cover)
c) Corbinton Commons -Next Steps
The Town of Hillsborough Planning staff will provide information as appropriate at the meeting.
No Attachments
d) Meadowview -Next Steps
The Town of Hillsborough Planning staff will provide information as appropriate at the meeting.
No Attachments
8. Public Projects
a) Fairview Park -Next Steps
A work group of Town and County officials and staff has been meeting to further evaluate the
Fairview Park opportunities. Last fall, at a joint meeting of the two boards, it was agreed that
this project (which would be funded with $850,000 from the 2001 Parks and Open Space bond)
would be considered as a master plan for all 92 acres of County and Town-owned land (42-acre
County park site, 25-acre Town lands, 25-acre Public Works site).
The Work Group has met on two occasions since that time, and conducted a site tour. A draft
Memorandum of Understanding has been created for review by the Town and County as the
precursor to developing a Master Plan, and a draft staff evaluation of the properties was
recently presented. Unanswered question remain about the practical use of some portions of
the site formerly used as landfill areas, while other portions of the site appear to offer more
opportunities. The Managers and Public Works Directors will soon be meeting to discuss the
possibility of co-locating public works facilities at the site.
Attachment 8a-1 Draft Memorandum of Understanding
Attachment 8a-2 Draft Staff Evaluation
b) Potential Cates Creek Corridor
The County's ERCD staff was asked recently by elected officials working on Fairview Park if an
evaluation of potential conservation and recreation trail opportunities along the Cates Creek
corridor could be conducted. Cates Creek, a tributary of the Eno River south of Hillsborough,
begins in a wooded area just north of the intersection of Old NC 86 and I-40 and flows
northeast under I-85 and US 70 Business to the Eno.
There are many current and proposed developments adjacent to the stream corridor that may
present opportunities for joint Town and County consideration. Some of the notable locations
and projects alongside Cates Creek include the proposed Waterstone development, Hampton
Pointe, the Millstone Office Park (and the namesake old mill and dam site on Cates Creek),
Beckett's Ridge, and the proposed asphalt plant site (Valley Forge Rd.).
Some of the known natural and cultural features in the corridor include two identified Natural
Heritage sites (listed in the 1988 Inventory of Natural Areas and Wildlife Habitat), as well as the
above-mentioned old mill and dam site located at the end of Millstone Drive. Cates Creek
enters the Eno River on conservation land owned by Classical American Homes (Ayr Mount).
Staff will provide a Cates Creek Area Map at the meeting.
No Attachments
c) Justice Facilities
As was reported to the Town Commissioners during a joint work session on November 21,
2002, the County will appoint three planning committees to design the proposed Phase I,
Justice Facility Expansion. Responsibility for the three committees is as follows:
• Architect selection;
• Exterior design, including the building, the area designated as "River Park" and the
siting of the proposed Farmer's Market.
• Interior building design.
The Committees will be appointed by June 30, 2003. The appointment of the groups was
originally planned for January 2003, however, workload constraints associated with the
implementation of the County's new business system software have precluded that action.
Additional meetings with judicial officials to clarify the programming that is expected for the
building will be carried out within the next few weeks. This program definition will be translated
into a request for proposal for professional design services and the selection process begun by
Fall 2003. A recommendation by the selection group to the Board of Commissioners is
anticipated prior to the end of the calendar year 2003.
No Attachments
6
d) Durham Tech Satellite Campus -Next Steps
County Commissioners, along with the two Durham Technical Community College Board of
Trustees who live in Orange County, are responsible for the site selection of the proposed
DTCC satellite campus. Several potential areas that meet criteria established by the Board of
Commissioners and the Feasibility Study Task Force have been identified and will be presented
to the site selection group before June 30, 2003. The site acquisition process must be
completed by Fall 2004.
No Attachments
e) NCDOT Work -Churton Street New Signalization System
North Carolina Department of Transportation is completing the new traffic signalization system
along Churton Street from Oakdale to US 70 Bypass. The new traffic lights are connected to in-
ground roadway `loops' that detect the amount and frequency of traffic around intersections.
This information is monitored by a central computer system and adjustments can be made to
improve traffic flow during the various times of the year. This type of system, if coupled with a
traffic access management system (i.e. regulating driveway openings, etc.) can reduce traffic
congestion.
No Attachments
fl Hazard Mitigation Program
On July 30, 2002, Orange County submitted a full Hazard Mitigation Plan and resolutions of
joint plan adoption from the towns of Hillsborough and Carrboro to the North Carolina
Department of Emergency Management. State Mitigation Planner Nathan Slaughter reviewed
the plan and addressed sections where more information was needed to meet FEMA Region IV
Minimum Standards. Since that review, FEMA has made some adjustments to the Minimum
Standards, requiring additional modification of the plan. The final plan must be approved by
November 1, 2004 in order to receive federal and state mitigation funds.
No Attachments
9. Other Business
No Attachments
FINANCIAL IMPACT: There is no direct financial impact associated with discussion of these
topics. There are no action items requiring formal Board decisions.
RECOMMENDATION(S): The Manager recommends that the Boards discuss the topics listed
and provide appropriate direction to the respective staffs.