STATE OF NORTH CAROLINA
COUNTY OF ORANGE
MEMORANDUM OF AGREEMENT
BETWEEN THE TOWN OF HILLSBOROUGH
AND THE COUNTY OF ORANGE REGARDING
PLANNING FOR FAIRVIEW PARK AND CAMPUS
THIS AGREEMENT, made and entered into between the Town of Hillsborough, North
Carolina, a North Carolina municipal corporation, xxx Churton Street, Hillsborough, North
Carolina 27278 (hereinafter referred to as the "Town"), and the County of Orange, a North
Carolina municipal corporation, 200 South Cameron Street, Hillsborough, North Carolina 27278
(hereinafter referred to as the "County"), for the joint development of a park and public facility
campus.
WITNESSETH
WHEREAS, the parties to this agreement are public bodies, politic and corporate, under the laws
of the State of North Carolina; and
WHEREAS, the parties are vested with the power and authority to own and improve real estate
for recreational and other public purposes; and
WHEREAS, the Fairview area of Hillsborough has a designated park site that was established as
part of the Community Revitalization effort funded through Community Development block
Grants in the 1980s, and identified in both the County and Town Comprehensive Plans; and
WHEREAS, a Phase I of Fairview Park on the County-owned portion of the park site have been
constructed by the County, including a playground and playing field; and
WHEREAS, the 2001 Park and Open Space Bond for Orange County included $850,000 for
planning and construction of Phase II of the park; and
WHEREAS, the Town and County both own property including and in the immediate vicinity of
the existing park totaling 92 acres; and
WHEREAS, the Town and County recognize the mutual benefit and interest of the parties
hereto, and to the public generally, in the construction of park and community facilities on these
same properties; and
WHEREAS, it is recognized by both parties that there are limitations imposed by safety
considerations caused by the site's previous use for waste-disposal purposes, as addressed in part
by a geo-technical report ("need title") in 1999; and
Draft 4/23/03
WHEREAS, the parties recognize the mutual benefit in the County's acting as the lead entity in
the construction and financing of Phase II facilities of the park, to be built with funds from the
2001 bond amount of $850,000; and
WHEREAS, the laws of the State of North Carolina provide that the parties hereto may contract
and agree, each with the other, for the joint use of facilities for the stated public purposes; and
WHEREAS, the parties hereto agree to allow the future construction and use of all of the three
properties identified on the map in Attachment 1 to be designed, developed and programmed for
public activity as one unit meeting mutual needs; and
WHEREAS, the funding for additional facilities at the Park and Campus (beyond the $850,000
currently appropriated by the County for Phase II of the park) will be addressed by the County
and Town in amutually-agreeable fashion at a later date:
NOW, THEREFORE, in consideration of the foregoing and of the mutual promises and
obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the
parties agree as follows:
1. PROCESS FOR PLANNING AND DESIGN OF PARK AND CAMPUS
The process for planning and designing the Fairview Park and Campus will encompass the
land currently owned by both the Town and County in the immediate vicinity of the existing
Fairview Park (as shown in the map in Attachment 1). Together these parcels represent
approximately 92 acres. The Planning for Fairview Park and Campus will also consider and
address, to the extent possible, the interests of both the Town and County to locate additional,
non-park facilities on the property as part of a larger Public Campus.
The County and Town will appoint, as soon as practical, a Fairview Park and Campus Master
Plan Committee to develop recommendations for the design and use of the site. The
Committee shall be appointed by approval of both County and Town Boards of
Commissioners, and shall consist of the following membership and charge:
A. CHARGE to the Master Plan Committee:
Develop a Master Plan for the Fairview Park and Campus property, within the framework
of any operating guidelines or other instructions as offered by the Boards, to include the
following:
1. A physical map design for the property, including all proposed buildings, playing
fields, roads, parking, other facilities, amenities, infrastructure locations,
vegetative cover, hydrology and other components that are commonly included in
park or public facility campus concept plan.
2. A written report outlining the proposed uses, the design rationale, description of
work group process, natural and cultural features of the site, means of soliciting
community input, the potential future phases, and construction cost estimates.
Draft 4/23/03
The report should also include a phasing plan, showing how the park and other
public facilities could be developed over time in acost-efficient fashion.
3. The report should address and recognize the limitations imposed by safety
considerations caused by the site's previous use for waste-disposal purposes, as
addressed inpart by a geo-technical report prepared in 1999 ("Report of
Geotechnical Evaluation, Closed Hillsborough Landfill Site, July 19, 2000").
Further recommendations maybe needed to address phased remediation of
portions of the site.
4. The Master Plan should address co-location of existing and future public facilities
and the park, and provide fora "seamless transition " between public facilities
and park functions wherever possible.
5. The Committee should review the "old" 1988 Fairview Park Concept Plan as part
of the Master Plan and determine its validity, if any.
6. The operation and maintenance responsibilities of the park are addressed in
subsection below.
2. EXPECTATIONS OF MASTER PLAN FINAL PRODUCT /MEMBERSHIP OF
MASTER PLAN COMMITTEE
Product: A Master Plan report and map, as described above, by August, 2004
Timeframe for Product: November 2003 -August, 2004
Proposed Timetable of Activities*
Master Plan Work Group appointed September, 2003
Work Group begins work November, 2003
Interim re ort to Board of Coun Commissioners March, 2004
Work Group completes Master Plan August, 2004
Board of County Commissioners/TowYBnard of September-October, 2004
Commissioners review and approve Master Plan
Town Board of Commissioners review and approval of October-December, 2004
lan
site
p
Develo bids and bid project January-March, 2005
Construction of Phase I (Park) March-September 2005
Final Steps: Once completed, the Master Plan will be submitted to both Boards of
Commissioners for approval. The Boards may either approve the Plan, remand it back for
further work, or decide not to pursue the Plan
Proposed Membership of Master Plan Committee:
- xx Orange County Commissioners
Draft 4/23/03
- xx Hillsborough Town Commissioners
- 1 member, Hillsborough Parks and Recreation Commission
- 1 member, Orange County Recreation and Parks Advisory Council
- Approximately 6 community citizens
Staff assistance to the Committee would be provided jointly by Orange County and the Town
Coun
of Hillsborough, including the County and Town Managers (or their designees), County
Open Space Design Specialist, County Recreation and Parks Management Director,
Environment and Resource Conservation Director, Town and County Planning Directors,
and other staff members as shall be deemed necessary.
Operating principles for the Master Plan Committee should include the following:
1. The Committee should review and consider the 1988 Concept Plan and determine its
validity and usefulness
2. The Committee should consider impacts on the County Public Works Facility and
vicinity in developing the Master Plan, incorporating these existing facilities into the
scheme of the new plan as far as practical.
3. The Committee is asked to address and site the following specific facilities as part of
the Master Plan:
- TBA
- TBA
- TBA
4. The Committee should not address or site the following facilities as part of the Master
Plan:
- TBA
- TBA
- TBA
3. PROCESS FOR CONSTRUCTION OPERATION AND MAINTENANCE AND
PROGRAMMING OF SITE
Issues To Be Addressed in this Section
1. The park and facility construction process -describe roles and responsibilities
2. Operation & Maintenance of the park (and facilities) -County park? Town
annual contribution?
3. Programming
4. How to fund additional facilities in Master Plan beyond the County's $850, 000
for phase II of park? Process for deciding how to embark on next phases, joint
agreement, etc
5. CASUALTY AND LIABILITY INSURANCE: It is understood and agreed by and
between the parties hereto that each party shall carry such casualty and liability insurance as
will protect its interests in said facilities, and protect itself in the event of injury to persons or
Draft 4/23/03
property involved in the use of said premises by said party. Each party shall furnish to the
other party upon demand, satisfactory evidence of insurance.
6. INDEMNITY: Each party hereto shall, to the extent allowed by law, indemnify and hold
harmless and defend the other parties, their agents and employees from any claims, cost,
expense, liability, action or judgement, including attorney's fees, arising out of or related to
any personal injury, death or property damage with respect to its use of the premises, except
to the extent the same are caused by the negligence or misconduct of another party or parties.
7. USE BY OTHER PARTIES: ????
8. AMENDMENTS: This agreement may be amended by mutual written agreement of the
Town and County.
9. TERM: This agreement shall exist and continue for a period of twenty (20) years, beginning
September 1, 2003 and ending August 31, 2023. Provided however, that the parties will
review this Agreement on or about September 1, 2006 and every five (5) years thereafter, to
determine whether the Agreement is operating in a manner that is satisfactory to the parties.
In-depth review...re-negotiation provisions
10. GOVERNMENTAL APPROVALS: Nothing in this Agreement shall be construed as
waiving, modifying or grating any local government permits or approvals which may be
necessary for the development and/or construction of any facilities or improvements in the
Town. The County is responsible for seeking and obtaining such local government approvals
as maybe necessary for the work.
11. ENTIRE AGREEMENT: This Agreement constitutes the entire Agreement of the parties
hereto.
Draft 4/23/03
IN WITNESS WHEREOF, the parties to this Agreement have duly and validly approved it and
caused it to be executed in their behalf by the undersigned agents.
This, the 1st day of September, 2003.
TOWN OF HILLSBOROUGH
Joe Phelps, Mayor
Attest: Town Clerk
Approved as to form and authorization:
Town Attorney
COUNTY OF ORANGE
Margaret W. Brown, Chair
Orange County Commissioners
Attest: Donna Baker, Clerk to the Board
Approved as to Form and authorization:
County Attorney
This Agreement has been pre-audited in the manner required by the Local
Government Budget and Fiscal Control Act.
Finance Director
~.~ ' -~
f
Fairview Park
Orange County - 42 acres
~ Town of Hillsborough - 25 acres
~ Orange County Public Works - 26 acres
n'~ "Streets
Parcel Boundary
~~ :: Hillsborough Town Limiits
Vicinity Map r..a. w..
s
N
~..r~.
~. •.,
0 300 600 Feet Cotmty of Orange
Environment & Resource
Conservation DepartrneiN
Marts 27 ~ 2b03
M Jones