Loading...
HomeMy WebLinkAboutPB Agenda Packet 3-4-26 1 ORANGE COUNTY PLANNING DEPARTMENT 131 W. MARGARET LANE, SUITE 201 HILLSBOROUGH, NORTH CAROLINA 27278 f 17 52 Am Q Cato AGENDA ORANGE COUNTY PLANNING BOARD WHITTED MEETING FACILITY 300 WEST TRYON STREET, SECOND FLOOR I-IILLSBOROUGH, NORTH CAROLINA 27278 Wednesday, March 4, 2026 Regular Meeting — 7:00 pm No. Page(s) Agenda Item 1. CALL TO ORDER 2. INFORMATIONAL ITEMS 4 - 5 a. Planning Calendar for March and April APPROVAL OF MINUTES 3 6 December 3, 2025 ORC Notes 7 - 14 February 4, 2026 Regular Meeting Minutes 15 February 4, 2026 ORC Notes 4. CONSIDERATION OF ADDITIONS TO AGENDA 5. PUBLIC CHARGE Introduction to the Public Charge The Board of County Commissioners, under the authority of North Carolina General Statute, appoints the Orange County Planning Board (OCPB)to uphold the written land development laws of the County. The general purpose of OCPB is to guide and accomplish coordinated and harmonious development. OCPB shall do so in a manner which considers the present and future needs of its residents and businesses through efficient and responsive process that contributes to and promotes the health, safety, and welfare of the overall County. The OCPB will make every effort to uphold a vision of responsive governance and quality public services during our deliberations, decisions, and recommendations. Public Charge The Planning Board pledges its respect to all present. The Board asks those attending this meeting to conduct themselves in a respectful, courteous manner toward each other, County staff, and Board members. At any time should a member of the Board or the public fail to observe this charge, the Chair will take steps to restore order and decorum. Should it become impossible to restore order and continue the meeting, the Chair will recess the meeting until such time that a genuine commitment to this public charge is observed. The Planning Board asks that all electronic devices such as cell phones, pagers, and computers should please be turned off or set to silent/vibrate. Please be kind to everyone. 2 No. Page(s) Agenda Item 6. CHAIR COMMENTS 7. 16 - 59 LAND USE PLAN 2050 -To respond to a request for information made by the Planning Board at its December 2025 meeting. (The memo associated with this item was emailed to Planning Board members on February 18 with a request to review the information and come prepared to the March 4 meeting with any questions and/or items for discussion.) Presenter: Tom Altieri, Senior Planner — Long-Range Planning & Administration H. ADJOURNMENT Sign up to receive a notification when Planning Board agendas are posted Interested persons can sign up at https://www.orangecountync.gov/list.aspx to receive a notification when agendas are posted. (Scroll down to the "Agenda Center" category and choose Planning Board). Monthly Planning & Inspections Newsletter Sign up at https://www.orangecountync.gov/list.aspx?ListlD=408 to receive the monthly communication on happenings in the Planning & Inspections Department. Written Comments Interested persons who cannot attend the meeting in-person are invited to submit written comments on agenda items to the Planning Board via email at planningboard orangecountync.gov no later than 3:00 p.m. on the afternoon of the meeting. Please include in the Subject line of the email the title of the agenda item your comment pertains to. Emails sent to this address are viewable on Google Groups: https://groups.googIe.com/g/ocplanningboard Written comments can also be dropped off at the Planning Department's offices at 131 W. Margaret Lane, 2nd floor, Hillsborough, NC during normal business hours (8:00 a.m. to 5:00 p.m. Monday through Friday). Written comments will be scanned and sent by staff to the email address indicated above. Review Process The Planning Board is an appointed volunteer advisory board which makes recommendations to the Board of County Commissioners (the elected officials). The Board of County Commissioners holds a formal public hearing and makes decisions. Section 2.8 of the County's Unified Development Ordinance contains a flowchart depicting the review process for rezoning and text amendment applications. 3 Planning Board Member Potential Conflict of Interest It is the duty of every Board member to avoid both conflicts of interest and appearances of conflict. Board members having any conflicts of interest or appearances of conflict with respect to matters before the Board should identify the conflict or appearance of conflict and refrain from undue participation in the matter involved. As a reminder, NC General Statute § 160D-109 establishes the following standard: Members of appointed boards shall not vote on any advisory or legislative decision regarding a development regulation where the outcome of the matter being considered is reasonably likely to have a direct, substantial, and readily identifiable financial impact on the member. An appointed board member shall not vote on any zoning amendment if the landowner of the property subject to a rezoning petition or the applicant for a text amendment is a person with whom the member has a close familial, business, or other associational relationship. If any Planning Board member has any concern about a possible conflict related to an agenda item, please notify Planning staff and get in touch directly with a member of the County Attorney's staff before the meeting time to determine whether a conflict exists— and if so, how best to handle the potential conflict. 4 March • Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 Planning Board BOCC Meeting Business 7:00 pm* Meeting 7:00 pm Whitted Bldg. Whitted Bldg. 8 9 10 11 12 13 14 BOCC Work Session 7:00 pm Southern Human Sery Ctr. 15 16 17 18 19 20 21 BOCC Business Joint Meeting Meeting w Mebane 7:00 PM 7:00 pm Southern Human Sery Whitted Bldg. Ctr. 22 23 24 25 26 27 28 Legislative Breakfast 8:30 am Whitted Bldg. 29 30 31 Notes: * Planning Board member attendance required Planning Board meetings are held at Whitted Human Services Building - Donna S. Baker Meeting Room 2nd floor 300 West Tryon Street Hillsborough, NC 27278 5 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 Planning Board Meeting 7:00 pm* HOLIDAY Whitted Bldg. 5 6 7 8 9 10 11 BOCC Board of Business Adjustment Meeting 7:00 pm 7:00 pm Whitted Bldg. Whitted Bldg. 12 13 14 15 16 17 18 BOCC Work Budget Work Session 7:00 pm Session—CIP 7:00 pm Southern Human Sery Whitted Bldg. Ctr. 19 20 21 22 23 24 25 BOCC Business Meeting 7:00 pm Southern Human Sery Ctr. 26 27 28 29 30 Joint Meeting w School Boards 7:00 pm Whitted Bldg. Notes: * Planning Board member attendance required Planning Board meetings are held at Whitted Human Services Building - Donna S. Baker Meeting Room (2nd floor) 300 West Tryon Street Hillsborough, NC 27278 6 1 SUMMARY NOTES 2 ORANGE COUNTY PLANNING BOARD 3 DECEMBER 3,2025 4 ORDINANCE REVIEW COMMITTEE 5 6 7 NOTE: A QUORUM IS NOT REQUIRED FOR ORDINANCE REVIEW COMMITTEE MEETINGS. 8 9 MEMBERS PRESENT: Lamar Proctor(Chair) Cheeks Township, Chris Johnston (Vice-Chair) Hillsborough Township, 10 Statler Gilfillen, Eno Township Representative; Meg Millard, Little River Township Representative; Venkat Yendapalli, 11 Cedar Grove Township Representative; Jonah Garson,At-Large Representative;Whitney Watson,At-Large 12 Representative; Delores Bailey,At-Large Representative. 13 14 STAFF PRESENT: Cy Stober, Planning & Inspections Director; Perdita Holtz, Deputy Director—Long Range Planning 15 &Administration; Jack Moran, Planner 1 16 17 AGENDA ITEM 1: CALL TO ORDER 18 Meeting began at 7:59 PM. 19 20 AGENDA ITEM 2: UNIFIED DEVELOPMENT ORDINANCE(UDO)TEXT AMENDMENT—OMNIBUS AMENDMENT PACKAGE-To 21 review Planning Director-initiated amendments to the LIDO that include a variety of topics such as error 22 corrections, incorporation of recent changes in State laws, internal inconsistencies, addressing existing 23 school needs, and better serving the public interest. 24 PRESENTER: Cy Stober, Planning & Inspections Director 25 26 Cy Stober gave a presentation on the proposed LIDO text amendments. 27 28 The board discussed newly imposed rules that would apply to the UNC school systems properties and how it affects 29 other entities in the county. 30 31 The board discussed the changing ordinance for Erosion Control Waivers and how it affects the permitting process. 32 33 The board discussed zoning changes related to Orange County Schools and how it would affect future Planning 34 Board agenda items. 35 36 The board discussed the proposed landscaping amendment changes and how they would affect development in the 37 county.The board entertained the idea that the current landscaping standards were not meeting their intended 38 purpose and Meg Millard and Delores Bailey emphasized the importance of preserving and planting trees in new 39 developments in the county. 40 41 AGENDA ITEM 4: ADJOURNMENT 42 The meeting adjourned at 8:49 PM. 43 7 DRAFT 1 MEETING MINUTES 2 ORANGE COUNTY PLANNING BOARD 3 FEBRUARY 4,2026 4 REGULAR MEETING 5 6 MEMBERS PRESENT: Chris Johnston (Vice-Chair) Hillsborough Township, Statler Gilfillen, Eno Township 7 Representative; Meg Millard, Little River Township Representative; Venkat Yendapalli, 8 Cedar Grove Township Representative; Jonah Garson, At-Large Representative; Whitney 9 Watson, At-Large Representative; Delores Bailey, At-Large Representative; Charity Kirk, 10 At-Large Representative 11 12 MEMBERS ABSENT: Lamar Proctor(Chair) Cheeks Township, Beth Bronson, At-Large Representative. 13 14 STAFF PRESENT: Cy Stober, Planning & Inspections Director; Perdita Holtz, Deputy Director—Long Range 15 Planning &Administration; Taylor Perschau, Current Planning Manager; Jack Moran, 16 Planner 1 17 18 OTHERS PRESENT: None 19 20 AGENDA ITEM 1: CALL TO ORDER AND ROLL CALL 21 22 The meeting began at 7:02 PM 23 24 Chris Johnston: Number one call to order. Hey, everyone. We're now calling this meeting to order. 25 26 AGENDA ITEM 2: ELECTION OF CHAIR AND VICE CHAIR 27 28 Chris Johnston: Item number two election of chair and vice chair for 2026 along with term expiration dates 29 and reappointment eligibility, there's a mouthful, by a member. 30 31 Charity Kirk: Didn't we just do this? 32 33 Chris Johnston: It does certainly feel like we did this very recently, but it was last year wasn't it? Time how 34 does it work? 35 36 Statler Gilfillen: So, who wants to be chair? 37 38 Chris Johnston: So, if you look at item number 4 in your agenda packet, we have a list of Orange County 39 Planning Board Membership and term information with a list of everyone who is currently 40 up for renewal. Delores is actually eligible for reappointment, but not seeking 41 reappointment. So that is a loss for our board there, and then myself and Jonah are up 42 for reappointment and are seeking. We have two vacant appointment slots so friends 43 anyone who wants to come and be a part of this wonderful group. 44 45 Cy Stober: Mr. Chair, I just want to state that reappointments are entirely a discretionary matter of the 46 commissioners. We're just electing a chair and a vice chair this evening. 47 48 Chris Johnston: Right, yes. Oh yeah. That's a good clarification, yes, no, so we're not reappointing 49 anyone I'm just saying that we have two open positions so get the word out. So, we need 8 DRAFT 50 a chair and a vice chair, and the person who I would think would want to continue being 51 chair is not here yet. 52 53 Charity Kirk: Do you know if he wants to continue? 54 55 Chris Johnston: I don't know anything. Again, figurehead, so— 56 57 Charity Kirk: Cy, do you know if he wants to continue? 58 59 Cy Stober: I haven't heard him object. I do know that his— 60 61 Chris Johnston: Schedule. 62 63 Cy Stober: His regular job keeps him quite busy, but he has a great attendance record and seems to 64 be, from all the conversations he and I have had, kind of feeling like he's getting into his 65 comfort zone as chair. You didn't ask for my opinion but that is it. 66 67 Chris Johnston: Does anyone else want to be chair and will fight him in the parking lot for it? Okay, does 68 anyone want to nominate anyone? 69 70 Jonah Garson: I would like to nominate our current chair. 71 72 Chris Johnston: Okay. Any seconds? 73 74 Statler Gilfillen: I'll second that. 75 76 Chris Johnston: Okay, Statler. Anyone else want to be nominated or have ideas for nomination. 77 78 Statler GiIfillen: I have a question. 79 80 Chris Johnston: Yes. 81 82 Statler GiIfillen: Okay, I've seconded it. If for some reason, he decides he doesn't want the position after 83 we would say approve him, he can step down, and we can do this again, then, right? 84 85 Chris Johnston: Yeah, I believe so, yeah, great. Hearing no other nominations, I will go ahead and take 86 the vote for nomination for Lamar to continue as board chair. All those in favor?All those 87 opposed? 88 89 MOTION BY Jonah Garson to nominate Lamar Proctor as Chair. Seconded by Statler GiIfillen. 90 91 MOTION PASSED UNANIMOUSLY 92 93 Chris Johnston: That it is unanimous. So, all right, excellent. Vice chair? I believe that is currently me, uh, 94 I'm happy to continue, but if anyone else would like to take a shot at the opportunity, that 95 is perfectly fine as well. 96 97 Charity Kirk: I nominate you. 98 99 Chris Johnston: Okay. 9 DRAFT 100 101 Statler Gilfillen: I second that. 102 103 Chris Johnston: Great, so we have a nomination and a second. Are there any other nominations? Okay, 104 hearing none, we'll take the vote for Vice Chair for Chris Johnston. All those in favor? 105 Okay. All those opposed? 106 107 MOTION BY Charity Kirk to nominate Chris Johnston as Vice-Chair. Seconded by Statler Gilfillen. 108 109 MOTION PASSED UNANIMOUSLY 110 111 Chris Johnston: All right that is unanimous. Thank you so much. All right, so we are all set with item 112 number two, which is election of vice chair and chair. 113 114 AGENDA ITEM 3: INFORMATIONAL ITEMS 115 116 Chris Johnston: Now we are moving on to item three, informational items, planning calendar for February 117 or March, so if you take a look at item number 5 on the packet, we have tonight's meeting. 118 We have a BOCC work session at the Southern Human Services Center on February 10, 119 February 11, there is a board of adjustments 7:00 p.m. here at the Whitted and on the 120 17th, we have a BOCC business meeting at 7:00 here at the Whitted as well. 121 122 Cy Stober: There will be no BOA meeting. It was just canceled for a lack of business. 123 124 Chris Johnston: All right. Thank you for the clarification. And then point of order, do I need to read March 125 or are we good just saying and there's also March? 126 127 Cy Stober: We don't need to read March. 128 129 Chris Johnston: We don't need to read March, okay, all right, wonderful. Thank you. Lamar reads the 130 whole thing. That is the calendar as it is written. We will move on to item number 4, 131 approval of minutes. 132 133 AGENDA ITEM 4: APPROVAL OF MINUTES 134 135 Chris Johnston: So, if you look at page 7, there begins the minutes from the previous meetings. Does 136 anyone have any questions, comments, or concerns in regard to the minutes as written? 137 138 Statler Gilfillen: I move that we approve the minutes. 139 140 Chris Johnston: Do I have a second? 141 142 Charity Kirk: I second. 143 144 Chris Johnston: Excellent, we have a second, all those in favor say aye. 145 146 MOTION BY Statler Gilfillen to approve the December 3, 2025, regular meeting minutes. Seconded by Charity 147 Kirk 148 149 MOTION PASSED UNANIMOUSLY 10 DRAFT 150 151 Chris Johnston: Perfect, so it is unanimous. The minutes have been approved. 152 153 AGENDA ITEM 5: CONSIDERATION OF ADDITIONS To AGENDA 154 155 AGENDA ITEM 6: PUBLIC CHARGE 156 157 AGENDA ITEM 7: CHAIR COMMENTS 158 159 Chris Johnston: All right next consideration of additions to the agenda. Does anyone have anything that 160 they'd like to add to tonight's agenda? Great, hearing nothing, we will go ahead and take 161 the agenda as it is. There is no public tonight, so I am going to, in my role of board chair, 162 skip over that component. I don't have any comments other than Lamar is missed in this 163 particular meeting. 164 165 AGENDA ITEM 8: ZONING ATLAS AMENDMENT OVERLAY DISTRICT-TO REVIEW AND MAKE A RECOMMENDATION TO 166 THE BOCC ON A COUNTY-INITIATED ZONING ATLAS AMENDMENT TO AMEND THE JORDAN LAKE 167 UNPROTECTED WATERSHED OVERLAY DISTRICT AND UNIVERSITY LAKE PROTECTED WATERSHED 168 OVERLAY DISTRICT BOUNDARY LINE ON ONE UNADDRESSED—19.4 ACRE PARCEL(PIN:9851-43- 169 3215)OFF DODSON'S CROSSROADS IN BINGHAM TOWNSHIP. THIS ITEM IS SCHEDULED FOR 170 BOCC PUBLIC HEARING ON MARCH 5,2026. 171 172 Taylor Perschau: Taylor Perschau, current planning and zoning manager. I will be presenting a watershed 173 protection overlay amendment application, so it is a zoning atlas amendment, you have 174 seen a couple of these before, but I will do a little bit of process, and then dive into the 175 details. The address of the project being affected is actually an unaddressed parcel at the 176 moment off of Dodson's Crossroads at the intersection of Dodson's and Arden Estate 177 Court, which is a newly established private road. So, watershed protection overlay 178 districts are a component of a zoning atlas. They are adopted as an overlay. They are a 179 component of the Orange County's delegated stormwater management program. We 180 have tiers of watershed protection. We have critical and protected water supply 181 watersheds that are regulated by this overlay district because they are adopted as a 182 zoning layer. Any change to the watershed boundaries requires a change to the zoning 183 map. When we're talking about watersheds, it's explicitly where does water fall in relation 184 to water supplies. The closer you get to a water supply, the more protective the measures 185 are going to be around those, specifically in regard to how much built-upon area and how 186 much residential density can be established in those areas. So, as a part of Orange 187 County's stormwater management program, this is a two-step process. We're in step 2 188 where we're initiating a zoning atlas amendment that will go to the Board of County 189 Commissioners so I won't go to the details of zoning atlas, you're used to that, but 190 because it is part of our delegated program, the step one, which has already happened is 191 also a component different from other zoning amendments. First what happens is a 192 boundary line discrepancy is identified, that is what Orange County has mapped in our 193 overall topography, the contours. A surveyor goes out on site and finds that field work 194 doesn't match our current map, so how do we correct the map. We're going to rely on the 195 survey work for what the ridge line actually is telling us where the water falls between 196 those watersheds. So, the property owner and their surveyor identified a discrepancy. 197 They informed planning staff. Planning staff before this meeting has notified the Board of 198 County Commissioners of the discrepancy and the work that is required to amend it, and 199 county staff has also worked with the NC Environmental Management Commission. Both 11 DRAFT 200 of those bodies have acknowledged and have no issues with this proposed amendment, 201 so now we are in step two with no objection from the BOCC or EMC. Planning staff 202 initiated the zoning atlas amendment to update our maps to accurately reflect the ridge 203 line surveyed on site. So again, this is an unaddressed parcel off Dodson's Crossroads in 204 the Bingham Township where amending the watershed boundary between the University 205 Lake protected and the Jordan Lake unprotected, but in my previous slide you will have 206 noted that only the protected and critical are the ones that have regulations explicit to 207 impervious surface and residential density maximums, so we are going to be talking 208 specifically about amending the protected boundary. Current zoning is Rural Buffer. 209 Surrounding zoning is Rural Buffer and Agricultural Residential and on the north side of 210 the property, the property is outlined in black on this slide. On the north is the Jordan 211 Lake unprotected watershed. On the south is the University Lake protected. To the west, 212 southwest you have Cane Creek protected. You'll see this map a couple times, but the 213 black is the property line, the red is the proposed new watershed boundary. The survey 214 work was done on the subject parcel here that's outlined in black. It was also done on this 215 easternmost parcel. There was some property exchange between these two parcels, 216 which is why there was survey work across the two. And then the blue dash line is how it 217 is currently mapped, so we are strictly modifying the University Lake protected watershed 218 boundary line. It's going to end in removing about 4 acres from the University Lake 219 protected and those 4 acres are now going to be in Jordan Lake unprotected, so no 220 change to the underlying zoning. This is the survey that identified that again this dash line 221 up here is what Orange County mapping currently reflects and the survey work identifies 222 the ridge line to the south. So as required under the zoning atlas amendment 2.8.5, the 223 planning director is asked to make an analysis of the application. We offer the following, 224 that the application is complete in accordance with the requirements of 2.8.3. Staff review 225 did include consideration of how the request relates to the comprehensive plan. You'll 226 see that in the staff report available in the packet. We did notify properties within 1,000 227 feet. Staff received multiple phone calls, which we were able to answer all the questions 228 and have no public in attendance tonight. Similarly, the property has been posted. 229 Mailings and postings happened January 21, so as with all zoning atlas amendments, the 230 Planning Board is asked to make a recommendation to the Board of County 231 Commissioners; either an approval, denial, approval with conditions or ask for more time 232 and so after tonight, this item would be scheduled for an April Board of County 233 Commissioners meeting. That's about all I have for you. What questions do you have on 234 the topic. 235 236 Chris Johnston: Okay, let's start at the end. Do we have any questions, Statler. 237 238 Statler Gilfillen: No, I could make a motion we approve this. 239 240 Chris Johnston: Well hold on we want to make sure if we have any questions so we're going to go down 241 the line real quick. 242 243 Statler Gilfillen: I have no questions. 244 245 Charity Kirk: So, this is prior to an actual land survey and now a land survey has been done, so what 246 would happen if we say no? 247 12 DRAFT 248 Taylor Perschau: We would have a zoning atlas that is inaccurate. Currently there is an error in the zoning 249 atlas. So, if it wasn't adopted the error would remain and the zoning atlas would be 250 inconsistent with on the ground ridge line. 251 252 Charity Kirk: Yeah. 253 254 Taylor Perschau: So, it affects how planning staff reviews the impervious surface for this particular property. 255 256 Charity Kirk: Right. 257 258 Taylor Perschau: And part of why this is coming about now is the property is, there are three separate 259 applications for subdivisions that have been applied from an original parent tract. So, 260 they're in the process and they're trying to figure out where houses can be sited and what 261 their impervious surface constraints are. 262 263 Charity Kirk: Why would we want to say no? 264 265 Taylor Perschau: I don't have a good reason. 266 267 Charity Kirk: Okay, thank you. That's it. 268 269 Taylor Perschau: Yes. 270 271 Statler Gilfillen: If I am understanding what you are saying, this is a procedural issue where the original 272 way it was laid out is no longer in consistency or corrected to the current standards and 273 that you are asking us basically to bring this up to the current standards. 274 275 Taylor Perschau: Yes, the request is to get mapping to be accurate with the topography found on site, yes. 276 277 Chris Johnston: You good Charity? 278 279 Charity Kirk: Yes. 280 281 Cy Stober: And for what's it worth to play this out in the regulatory framework. This is different from 282 most other zoning cases in that because the EMC has recognized the watershed 283 boundary and because we are a delegated program by the state and these watershed 284 boundaries are assigned to us by the state, the appeal would go directly to the 285 Environmental Management Commission. It would not go to our Board of Adjustment, 286 and they've already recognized this boundary, so it's a bit of cart and horse, but I do think 287 this is the appropriate way, and this is what the state DEQ has directed us to do. This 288 process and this procedure of recognizing the new surveyed ridge line boundary and 289 following up with our locally applied zoning even though this is zoning that reflects state 290 watershed protections. It is cart and horse depending on how you look at it, but this is the 291 path forward that the state has laid out to us. 292 293 Charity Kirk: So, it would be kind of ridiculous if we said no? 294 295 Cy Stober: You could say that. 296 297 Chris Johnston: Whitney? 13 DRAFT 298 299 Whitney Watson: No. 300 301 Chris Johnston: Meg? 302 303 Meg Millard: I just, I know that this is following the topography and everything, but this does then 304 maybe give them 4 more acres that they can develop. Is that right? Because it's in a less 305 protected watershed. 306 307 Taylor Perschau: So, they could develop it regardless. They could develop it according to the zoning. They 308 could develop it according to the University Lake protected. 309 310 Meg Millard: Right but they, in the denser way they could develop it, slightly. 311 312 Taylor Perschau: There's a lot there. I don't think it's fair to say a lot more densely. 313 314 Meg Millard: Okay. I mean there's only so dense you can get in that area, I know. 315 316 Taylor Perschau: Right, so there is an existing application on file where this property is proposed for four 317 lots. The smallest of which is 3.5 acres. The zoning would allow them to go down to 2 318 acres. University Lake does have a 1 per 5-acre residential maximum. With or without 319 this, I think they could still get four lots. 320 321 Meg Millard: Okay. 322 323 Chris Johnston: Are you good now? 324 325 Delores Bailey: Just really quick, did you say the owner saw it first? 326 327 Taylor Perschau: No, the surveyor found it. So, the owners commissioned survey work in March of 2024 328 and that's when it was identified for the first time, March of'24, and then in September of 329 '24, they recorded it in at the Register of Deeds to make it an official registered document. 330 Since then, the Board of County Commissioners and the EMC at the state level have both 331 had that survey as reference for their consideration as to whether this amendment is a 332 county initiated that came out of March 2025 authorization from the Board of County 333 Commissioners. 334 335 Chris Johnston: Okay, Jonah? Okay, any final follow up questions. I will look to entertain a motion. 336 337 Statler Gilfillen: I suggest a motion that we approve this. 338 339 Meg Millard: Second. 340 341 Chris Johnston: Okay, so I have a motion to approve the amendment as written. And a second from Meg. 342 Is there anything else I need to add? Cy? No, wonderful. Great. So we will go ahead and 343 have a vote. All those in favor say aye. 344 345 MOTION BY Statler Gilfillen to approved. Seconded by Meg Millard. 346 347 MOTION PASSED UNANIMOUSLY 14 DRAFT 348 349 Chris Johnston: Aye. Seems to be unanimous. 350 351 Taylor Perschau: Thank you. 352 353 Chris Johnston: Great, so I believe that is it for the evening for our Planning Board agenda, so let's see 354 here. I do think we adjourn at this point, right. We have an ORC after this, but we still 355 have to adjourn the meeting to close it out. So, I have a motion for adjournment? 356 357 AGENDA ITEM 4: ADJOURNMENT 358 359 Statler Gilfillen: I'll so move. 360 361 Chris Johnston: Statler, second. Meg, thank you. Okay. We are adjourned. 362 363 MOTION BY Statler Gilfillen to adjourn the meeting. Seconded by Meg Millard. 364 365 MOTION PASSED UNANIMOUSLY 15 1 SUMMARY NOTES 2 ORANGE COUNTY PLANNING BOARD 3 FEBRUARY 4,2026 4 ORDINANCE REVIEW COMMITTEE 5 6 7 NOTE: A QUORUM IS NOT REQUIRED FOR ORDINANCE REVIEW COMMITTEE MEETINGS. 8 9 MEMBERS PRESENT: Lamar Proctor(Chair) Cheeks Township, Chris Johnston (Vice-Chair) Hillsborough Township, 10 Statler Gilfillen, Eno Township Representative; Meg Millard, Little River Township Representative; Venkat Yendapalli, 11 Cedar Grove Township Representative; Jonah Garson,At-Large Representative;Whitney Watson,At-Large 12 Representative; Delores Bailey,At-Large Representative; Charity Kirk,At-Large Representative. 13 14 STAFF PRESENT: Cy Stober, Planning & Inspections Director; Perdita Holtz, Deputy Director—Long Range Planning 15 &Administration;Taylor Perschau, Current Planning Manager; Jack Moran, Planner 1 16 17 AGENDA ITEM 1: CALL TO ORDER 18 Meeting began at 7:21 PM. 19 20 AGENDA ITEM 2: UNIFIED DEVELOPMENT ORDINANCE(UDO)TEXT AMENDMENT—SUBDIVISION REGULATIONS-To 21 review Planning Director-initiated amendments to the LIDO pertaining to subdivision review processes and 22 classifications. 23 PRESENTER: Cy Stober, Planning & Inspections Director 24 25 Cy Stober gave a presentation on the proposed UDO text amendments. 26 27 The board reviewed previously proposed text amendments and how they relate to the new proposed package. 28 29 The board discussed their role in the subdivision approval process,weighing the importance of public involvement. 30 31 The board discussed the current subdivision ordinance and how it applied to development within the county, 32 specifically section 7.2.3 in relation to multiple subdivisions from a single parent tract. 33 34 The board discussed potentially changing the lot threshold which would trigger Planning Board involvement and 35 review, specifically whether the Board should review more or fewer subdivision applications. 36 37 The board requested clarity from planning staff regarding public notification and neighborhood information meetings 38 within the subdivision approval process. 39 40 The board requested a review of the approved major subdivisions from the previous five years. 41 42 The board reviewed the associated proposed changes to articles 2 and 3 of the Orange County LIDO 43 44 AGENDA ITEM 4: ADJOURNMENT 45 The meeting adjourned at 9:21 PM. 46 16 �1 ORANGE COUNTY NORTH CAROLINA PLANNING and INSPECTIONS Cy Stober,AICP,Director I cstober@orangecountync.gov 1131 W.Margaret Lane,Hillsborough,NC 27278 919.245•2575 MEMORANDUM DATE: February 18, 2026 TO: Orange County Planning Board FROM: Tom Altieri, Senior Planner, Planning and Inspections RE: Land Use Plan 2050 — Update on Planning Process ATTACHMENTS: A: Meeting notes from Nov 14, Retreat 1 B: Meeting notes from Nov 21, Retreat 2 Request for Background Information Presented to Board of County Commissioners (BOCC): At the December Planning Board meeting, Planning Board members requested information that was received by the BOCC at its retreats held in November of last year. Planning Board members were invited to attend the retreats to hear the presentations and a few members were able to attend the daytime meetings. The specific subject matter mentioned by Planning Board members included: • Community Septic and Wastewater Treatment; • Groundwater Resources; and • Conservation Subdivisions. On December 29, 2025 Cy Stober, Planning Director, emailed links to all of the fall 2025 work sessions and retreats to the Planning Board. Following are links to the agenda materials for the two retreats (which included the materials the Planning Board specifically requested), as well as an audio recording of Retreat 1 and video recording of Retreat 2. Please review the subject matter of your interest and come prepared to the March 4 meeting with any questions and/or items for discussion. Planning staff will answer questions at the meeting but will not present the information that was provided by subject matter experts. If needed, Planning staff will follow-up after the meeting as well. November 14, 2025, Retreat 1 Community Septic System & Community Well Packet BOCC Retreat 1 Audio November 21, 2025, Retreat 2 Conservation Subdivision Packet BOCC Retreat 2 Video A representative from Clarion Associates attended the retreats to hear the presentations, BOCC discussions, and take notes of main points. Attachments A and B 17 are provided as supplemental but may be helpful as a summary of presentation, including some graphics, and discussion highlights from the Consultant's perspective. Next Steps: A third BOCC retreat has been scheduled for Saturday, March 21 for the Board to continue receiving background information. Remaining agenda item topics include: 1) the economics of housing supply and demand and, 2) roundtable discussion of housing among the Home Builders Association of Durham, Orange, and Chatham Counties; local Chambers of Commerce; Habitat for Humanity; several other organizations; and the BOCC. Following the conclusion of presentations, the BOCC has been asked by Clarion Associates and Planning staff to identify any changes to the preliminary draft Land Use Plan 2050 that may be needed prior to its release for public review during Community Engagement Window (CEW) #3. CEW #3 was scheduled to occur between May - July of 2025. The last public engagement meeting held for the LUP 2050 project occurred, during CEW #2, on October 15, 2024. Contract Amendment #4 will need to be prepared and approved by the BOCC prior to Clarion's initiation of any work editing the preliminary draft LUP 2050, scheduling engagement meetings, preparing engagement materials, and coordinating with County staff for public notice prior to the launch of engagement. Planning staff will continue to keep the Planning Board apprised as more is known about the project schedule and next steps. Additional information about the project, including e-mail sign-up for project updates, are available on the project website: https://www.orangecountylanduseplan.com. Completed project deliverables, including Fact Book; outreach summaries; and more, are also available on the project website: https://www.orangecountylanduseplan.com/resources Why does Orange County Need to Update its Land Use Plan? - In North Carolina, local governments that apply "...zoning regulations... shall adopt and reasonably maintain a comprehensive plan or land-use plan (G.S. 160D-501(a)). This statute requires that zoning regulations are "in accordance with a comprehensive plan" and requires that local governments make statements of consistency when making rezoning decisions on a development application. The existing Orange County Comprehensive Plan was adopted in November 2008. Please feel free to contact Tom Altieri, Senior Planner, with any questions at land useplan(a_orangecountync.gov; taltieri(a_orangecountync.gov or 919-245-2579. 18 Attachment A Summary Notes Community Wastewater Systems Tony Whitaker, PE, presented slides describing onsite wastewater systems. He is a professional engineer in NC and a principal in a private consulting firm. He is also a current member of the Orange County Board of Health. General Definitions • Onsite Wastewater System: A treatment system located on or near the property that generates the wastewater being treated, and which disperses the effluent to the soil for final treatment. • Community Wastewater System: A single onsite system that serves more than one residential or commercial property. Ownership Options • Private: Individual property owner, property owner association, mobile home park owner, business or non-profit entity, regulated water company • Public: Local government, state government, public utility(e.g., OWASA), sanitary district Regulatory Authority • Subsurface dispersal o Department of Health and Human Services (DHHS) ■ Has authority over these systems, reviews system designs o Local Health Department(LHD) ■ Issues permits, provides inspections and enforcement o Engineered Option Permit (EOP) ■ Private engineer designs the system and issues permits (effectively regulatory functions are shifted to the private sector) ■ This is a relatively new option, but very popular • Surface dispersal or discharge to the surface o Department of Environmental Quality(DEQ) ■ Has authority over these systems ■ No formal relationship with local health departments, but does provide notice to local health department when permit is issued 19 Location of Wastewater Systems • Septic systems do not need to be downhill of wells, but it is important that they do not flow into groundwater. • Horizontal separation of wells and drainfields is important to ensure that wastewater does not affect well water. • Can use testing wells to examine current water quality(and potential impacts from septic system). • Safety regulations, such as requiring a monitoring system, could be added to the UDO at a later date. • Dispersal fields generally do not last as long if they contain trees Community vs. Individual Systems W11 & R,- Z. • Community systems are larger and more complex • Common elements of community systems are owned by the HOA and located on HOA land • Subject to higher design standards (due to size and complexity, not due to common ownership) • Operated professionally with more robust monitoring, inspections, and reporting • Package plants can be anysize—from an individual home to hundreds. Sequencing of Building Homes and Wastewater Systems 1. System permitted for construction 2. Building permits can be issued as soon as the system is permitted 20 Treatment Soils • Soil used for dispersal must be able to absorb and treat effluent, appropriately Located, and sufficient in area. o Such soil is in limited supply in Orange County • Enhanced treatment or dispersal types can be used for lower-quality soils, but some soils are not usable at all • Soils suitable for septic are also often suitable for farming, so there is a tradeoff to consider Effluent Standards Standards Acronyms: Standards for Effluent Quality • DSE: Domestic Strength Effluent Septic Tank g Effluent I<------------ Advanced Pre-Treatment ---------->I standard • NSF/ANSI 40: IM3WIMIMIM National Sanitation BOD_5:350 mg/1 CBOD: 15 CBOD:10 Foundation/ TSS: 100 mg/1 TSS:15 T55:10 American National TKN: 100 mg/1 NH3:10 NH3: 10 Standards Institute 7to 15 x better than D5E • TS-I: Treatment Standard I • TS-II: Treatment Standards II • RCW: Reclaimed Water Wastewater Constituents of Concern Acronyms: • BOD-5, CBOD: Biological Oxygen Demand • NH3, TKN, TN: Nitrogen Compounds, Ammonia • TSS: Total Suspended Solids 21 More intensive treatment(TS-1 or TS-11)is required for package treatment systems than for basic onsite systems (DSE). • Package systems discharge to ditch/stream, so the water does not go through the soil for extra cleaning, but the higher effluent standards more than make up for that • Advanced pre-treatment can filter out heavy metals (usually with a fabric or heavy textile material that can be removed for cleaning and disposal) • Advanced pre-treatment generally does not address PFAS • Package treatment systems don't necessarily produce drinking-quality water, but it gets close to those standards • Package plants are highly regulated and monitoring is required Why use advanced pre-treatment? • Overcome a limiting site condition • Increase system capacity System Costs • Community systems tend to be more expensive on a per-lot basis, but there are cost savings compared to advanced pre-treatment for individual systems • The table below shows a per-lot basis; compact locations drive per-lot costs down (due to the amount of infrastructure required to transfer the water to the common Location) • The table below shows a range of Comparison of Treatment Methods estimates for Basic Septic Tank Soil wastewater systems onsite Prima Dispersal Dis rsalinto Final Treatment Soil Treatment in Orange County, System DSE DSE based on the Advanced Septic Tank Soil industry contacts of on5lte Primary ji, P Advanced Pre- Dispersal into Final Treatment Treatment Soil 0 Treatment Mr.Tony Whittaker System DSE TS-1orTS-II TS-1orTS-II (presenter) Package Septic Tank Treatment Primary Advanced Pre- * Discharge to System Treatmerrt Treatment Ditch/Stream DSE TS-1 or TS-11 22 Estimated Installation and Maintenance Costs Installation, Not Monitoring and Maintenance and System Description Including Design Testing, Annually Repairs,Annually lu Conventional system $9,000-$12,000 - $100-$200 E a� a, = With pump $16,000-$20,000 - $300-$400 E m 0 Innovative system $25,000-$50,000 $0-$1,000 $300-$400 a� c a With Advanced Pre- Treatment $45,000-$75,000 $750-$1,500 $300-$400 0 Without Advanced c Pre-Treatment $20,000-$40,000 $200-$300 $300-$400 E � �o .5 With Advanced Pre- N Treatment $40,000-$60,000 $300-$500 $400-$600 Operational Monitoring Community Wastewater Systems have more monitoring and more stringent requirements than individual systems. The management and inspection characteristics of each system type are shown in the table below. 23 NC DHHS Onsite Wastewater System Types OrangeInspection Inspection System Example Frequency-By Frequency-By Classification Characteristics Mgmt. Entity M. . Type I Composting Toilet Owner None None e Single family with a' a Type II Owner None None Q, conventional dispersal ` oSome types of non- is U Type III conventional dispersal Owner 5 years if a pump 5 years if a pump bfi'NtLe r ! LPP dispersal,shared Certified Operator or Annually or Semi- _ Type IV 5 or 3 years w elements,etc. Public Mgmt. Entity annually I +a V I i = 65E a 3000 gpd,AP¢ Certified Operator or = I TypeV Annually-Weekly Annually I - 3000 gpd,etc. Public Mgmt. Entity Type VI AP>3000 gpd Certified Operator or I Monthly Daily Semi-annually Public Mgmt. Entity Any Community System will be classified as Type IV,V or VI. System Failures and Repairs Components and Solutions • The most expensive components to replace are also the most durable; these would mostly not be expected to be replaced. • None of the system components are proprietary or hard to obtain • What happens when something fails?That depends: o Is the failure known by the property owner? o Is the problem discovered early or late? o Is it a matter of normal maintenance/repair, or something more serious? o Is correction optional, or mandatory? o Is the owner motivated to fix it? o Are funds available to fix it? • What happens when a dispersal field fails? o Sometimes a dispersal field benefits from resting/taking time off, for biological and chemical reasons. It is a good practice to have multiple zones to alternate between active use and rest. So if a dispersal field fails and the repair field is used, and then the repair field is used, it is possible to use the original dispersal field again. o If solids get into the lines, that failure cannot be recovered. • If something in a community system goes wrong, who bears liability and responsibility? 24 o The HOA. They hire companies that provide wastewater system maintenance services. • How does flooding impact wastewater systems? o Dispersal fields do not work as well when they're soaking wet from rainfall. ■ Can address this by requiring additional storage capacity in the tanks (they can hold water back for a day or two when it's really wet, then disperse it later) o Systems are at risk when in floodplains. Note that floodplains are dynamic— think beyond regulatory maps when considering flood risk to systems. ■ Keep systems outside of floodplains and near-term future floodplains o Orange County regulates wastewater beyond state rules, and has historically been a leader in the state in wastewater regulation. Keeping stormwater regulations that prevent water intrusion into wastewater systems would help to protect against the effects of intense rainfall events. o These risks exist both for individual and community wastewater systems • Wastewater systems can have progressive failure and remain unnoticed for years. This is less likely in community systems due to increased monitoring requirements. Replacement ❑urability for Materials System Long-Term Readily Relative Cost Component Service Available? to Replace Tanks HIGH YES $$$ Filters MEDIUM YES $ Pumps MEDIUM YES $ Controls& MEDIUM YES $$ Alarms Advanced Pre- HIGH YES $$$ Treatment Units Dispersal Field MED-HIGH YES Repair Field) $$$ Piney Mountain Neighborhood Example • Neighborhood with community wastewater system was permitted by the NC DEHNR—DEM (pre-DEQ); OC Health Dept had no role in approving wastewater treatment design • Major defects were identified sixyears later by OC Health Dept during permit renewal; the dispersal field and repair field were not suitable due to inadequate soils and poor dispersal design. 25 • Property owners were angry at the County because they couldn't get permits to build their homes anymore. Eventually resolved via OWASA& Durham Cooperation. • The major subdivision procedures currently in the UDO would prevent this problem from happening again, as County staff evaluate and assess the soils in the areas intended to be used for dispersal.These requirements could be strengthened even more (Whitaker has some ideas for such changes) • With state-level changes in the authority of local governments, some health departments are not sure if they are allowed to comment on proposed development.Whitaker believes that they still have the ability to comment and assess, but not to approve/reject, which is up to the BOCC. The County Attorney should weigh in on that. Advantages and Disadvantages of Community Systems Advantages and disadvantages of community wastewater systems over individual systems, for both developers and for the County, are shown in the tables below. Community System Advantages 0 3 Advantages O u° X X 1. More effective use of limited soil resources X X 2. Better neighborhood design with clustered lots X X 3. Supports a higher lot yield,within limits X 4. HOA control and responsibility X 5. Requires professional operational management X 5. Can provide much better effluent quality(if AP is used) X 7. Common maintenance not subject to family budget choices X 8. Opportunity for BOCC to influence system characteristics 26 Community System Disadvantages qJ r_ Disadvantages v o o u x 1. Higher costs may work against attainable housing goals x 2. System problems and costs affect all property owners x x 3. Some maintenance costs are still incurred by household x x 4. HOA control and responsibility x 5. Can be a higher installation cost,on a per-lot basis x 6. Developer bears costs of design and most of installation Disadvantage#3 elaboration: smaller, less robust HOAs may not be able to do the management required (find a professional to do the repairs, collect money, stay on top of repair needs) Reflections 1. The regulatory environment for onsite wastewater systems doesn't differentiate between Individual and Community ownership status. 2. Community wastewater systems are inherently unique and customized. 3. Any Community system requires professional operational management. 4. The Engineered Option Permit (EOP) process shifts significant regulatory functions to the private sector. S. Current Orange County UDO procedures for Major Subdivision should prevent a repeat of the"fatal flaw" in the Piney Mountain community system. 6. Community systems present opportunities for the BOCC to shape wastewater system characteristics in ways not typically available for Individual systems. Policy Considerations • Assess the level of confidence in: o Available technology o Current and future NC regulatory framework o Practitioners in the industry • Assess Orange County's ability to assure good practices related to design and operation: o UDO text o SUP conditions 27 o Conditional Zoning conditions o Development Agreement per NCGS 160D o HOA documents—maintenance fund, surety o Administrative procedures • Legal and administrative reviews needed • If community systems are desirable for Orange County, consider if they should be: o Incentivized o Permitted in limited areas, or more broadly o Permitted only with specific conditions or standards Community Wells CJ Cornett, PG presented slides describing community wells. He has experience in geotechnical geology and environmental and hydrogeologic consulting at Applied Resource Management(ARM). ARM does well drilling, design, modeling, and remediation work. Water-table AOesion well well What is a Well? Land surface n Potentiometric • Definition: a pit or � ; z _ _.— _'• surface.l . o'a o Copillar " N UNCONFINED SAND Y -Z hole sunk into the > > - - fringe o AQUIFER earth to reach water Water table t- screen - a • Uses: O Extraction of z CONFINING _-_-_ _-_- --- - - No BED - - - - - - CLAY resources (like W S water, oil, or minerals), F cotvFINED LIMESTONES Ohoole -1 = -1 a AQUIFER contaminants, and information Heath, 1983. Basic Ground-Water Hydrology o Injection for water, heat, or treatments for contaminants o Monitoring o Drinkingwater What is a Public Supply Well? • Well supplying water to greater than 15 residences • Installed to higher standards (water quality and yield testing for sustainability)than private water wells 28 • Managed by individuals or companies that maintain Drinking Water Operator Certifications through DEQ Public Supply Well Siting • Where to get adequate yield: o Siting is based on topographic and lithographic trends, site geology, regional well trends, and pollutant setbacks. o Different rock types offer different yields o No matter the data you collect,you don't know until you drill. Often need to drill multiple wells to find one with suitable yield (about a gallon per minute per residence) • Regulatory requirements o Setbacks from potential sources of pollution ■ 100 feet away from sanitary sewage disposal systems, buildings, surface water, and other similar pollution sources ■ 200+feet away from more intense potential sources of pollution o A PG or PE must submit a sealed letter to NC DEQ certifying setbacks due diligence o Note: private wells only require 50'separation from septic systems, while public wells require 100'separation • Land use implications: o One public well can supply 49 private residences, which minimizes the land use impacts of wells and allows for more space for other uses (such as septic disposal, open space, or denser neighborhood construction) o In theory, a larger cluster of homes with one community well and lots of open space with potential for second or third wells is more resilient than homes spread farther apart each with their own well/ • Impacts on surrounding wells: o A single community well that serves 40 homes will have less of an impact on surrounding wells than 40 individual wells. Community wells have timers, maximum use, and state monitoring Public Supply Well Drilling • Drilling requires space for drill cuttings (sediment); lots of air pushes everything out at a high velocity Public Supply Well Yield and Water Quality Testing • Downhole video surveys are used to supplement well testing 29 • Yield o Drawdown testing ■ A 24-hour drawdown test is used to determine a sustainable yield for the well(gallons per minute) • Wells are meant to be run 12 hours per day; 24 hours is used to strain test. ■ Weather can affect the drawdown, but at a general, regional level (supply is for a much greater distance than you might expect) ■ Seasonal changes in drawdown results are mostly due to the demand for watering lawns—in the short term, this is more immediately apparent than the impact of rain or drought ■ A long-term regional dewatering study would be helpful to ensure sustainability of water supply • Orange County has 13 wells that they monitor where data is collected 24 hours per day(Orange County WellNet). The County also monitors on the Eno River and in the Falls Lake and Jordan Lake watersheds. ■ If a drawdown test is found to interfere with another well, it's not a valid drawdown test o How much yield is needed? ■ Up to the discretion of the manager of the site; lots of design and management to understand what type of well is right for your system. ■ A good rule of thumb is one gallon per minute per residence ■ Generally much more use in the mornings and the evenings • Quality o Water quality samples are collected during drawdown testing and tested for contaminants o Quality testing results advising on filtration requirements o A significantly larger sample spread is used for public supply wells than for private wells, and standards are more strict o In Orange County, pretty much every well will have iron and manganese and will need to filter for those. Usually filtering for these is not complicated o PFAS are generally from local contaminants o Radiological problems are common constituents that preclude development of a community well because it can be cost-prohibitive ■ Constituent= naturally appears in water supply ■ Contaminant= comes from somewhere else 30 o NC 02L standards are for groundwater, W-4 standards are for surface waters (did not specify this in personal notes, expert clarification would be helpful) Contaminant NC 02L Standard' W-4 Turbi¢Ity None e%teblShed. 0 3 tm. Calcium None established. 18.2 mglL Chloride 250 mg/L x5 mtyL Fluoride 2 mg& 4.100 mglL Iron 0.3 IT9L <0.06 mglL Magnesium None established_ $.90 mglL Manganese 0.05 mg& <0.010 mQ& Sodium None established. 9.04 not Sulfate(NW) 250 mot E5 m9t AC4ty None established. 10 m9/L Zinc 1 MA 0.0?0 ITVIL Color PtCo 15 units <5 un" Total Hardness None established. t38 m9IL pH 6.5-t3.5 units 7.5 units Alkatinity None established. 103 m I TDS S00 mglL 142 mglL Total Cokform 1 per 100 mL Present per 100 mL E. Cali None established. Absenl Na Toluene 0.6 1 nxyL 0.0406 mVL Uranium 15 pCVL 068 pCtIL Radiologieals EPA Standard' W-4 Gross Alpha 15 pCVL ND POOL Combined Radium 5 pCWL c 1 0 pCVL Radium 226 Summed tar combined lCWL ND pCVL Radium n8 Radium value. pCVL FID pCVL Gross Seta 50 PC& 4.5 pCVL •tSA NCAC o2L.0202 GROUNDWATEM puALiTY STANOAROS,https:Ndt q.m.govldon mwOslne•stdc-roundwater-021�= 'NepholomauicTur6idiryLinot- =RadronudrdrsFkk,EPA.hops:Irrwww.apa.govldwrr�inFohadianuc4dts ruA •This taWe pro%idrs a botF ow+alrw of significant consIOLw ts.RoFN to tFk Full laboratorq rrpW For planning and f"Off r*mVions. Final Construction and Permitting • Final well drilling and testing report o Summarizes geology and well construction o Certifies construction meets 15A NCAC 02C standards o Certifies yield testing results o Provides water quality samples for State review and filtration design • Next steps 31 o Distribution system engineer designs water distribution o Review by utility operator o NC DEQ final permitting after distribution design o Construction Well Drilling Costs • Expenses vary significantly per well • Drill costs influenced by depth, surface casing, diameter requirements, and site access • Maintenance costs include pump replacement, well cleaning, and water quality monitoring Long-Term Well Health • Well lifespans generally range 30-50 years, but may be extended with proper maintenance—cleaning reduces the strain on filtration systems, and not running the well too much (it's not meant to run 24 hours per day) prolongs its lifespan • It is difficult to build a new well after the old one expires, especially if there are homes all around • Redundancy is recommended—have another site available! • Regional groundwater trends may impact well lifespans beyond the control of operators (water mining, contamination, anthropogenic forcings) Commissioner Questions Questions Commissioners previously asked that relate to these topics, alongside additional questions asked during this part of the meeting. • How do the types of rocks matter for water supply to wells? o Types of rock matters to a great degree, but that is part of the whole for each site. Rock types vary from site to site and some rock types may be better in one region due to local deformations as opposed to other regions where they remain minimally altered. o Bedford: some community oppose diabase rock, claiming it is more likely to deplete other wells in the area. Is that accurate? ■ Diabase rock does allow for more breakdown and weathering—can be a channel, or a means to take out water ■ However: Any well runs the risk of drawing down another well. Utilities and project professionals can advise if drawdown is a substantial 32 concern. The farther apart the wells are, the less likely they are to influence each other • What is the impact of a well if it is near the headwaters of a stream? o Since the creeks are usually a few feet deep, and community wells are around 55 feet deep, it is unlikely that it would be taking water from the stream. o Surface water is transported away from the site; wells use deeper water that is recharged farther from the site o If groundwater is feeding a spring, and you tap into the groundwater ahead of that spring,you may affect the spring. Community wells are less likely to do that kind of thing than a private residence well. • Do wells have an effect on the water table's pressure? o Community wells in crystalline rock(like in Orange County)would generally not have an effect on the water table or the aquifer • Can any portion of our county be predictable or not for water supply/aquifer? o Yes and no. Every well is different. We can use the information at our disposal to reduce the risk or randomness in drilling, but there will always be risk. • Can wells be tested ahead of approval for zoning change or building? o Yes, and they should be.This work can be completed prior to any development on a property. No development work should be undertaken without ensuring that well water(or another water source) can sustain the development. • What are the most common human impacts on well yield? o Usually irrigation-related (especially for landscaping) o Otherwise,just the regular consumption and use of water • Impacting other wells? o All wells run the risk of impacting other wells, community or private. Community wells are typically focused on due to the higher demand they require with more residences connected. However, the increased efficiency of operators and distribution systems with the higher scruple of regulatory agencies means they are also generally maintained and monitored to a higher degree than private wells. 0 24-hour drawdown tests performed on community wells area great opportunity to monitor nearby wells for fracture interconnectivity. • Costs to drill? o This can vary widely, but the major expenses in drilling are the surface casing, well diameter, and depth requirements. 33 o Wells with 100'or more surface casing become very expensive due to specialty equipment holding the borehole stable during casing installation and the expense of larger piping materials for the casing. o Deeper wells are more expensive as greater depths frequently correlate with Longer drill times. Footage prices increase with depth which coincides with those longer drill times. o Access to sites across difficult terrain and strict regulations on sedimentation during drilling can also increase prices. • Costs to maintain? o General maintenance is outside the scope of our work, but most operators will replace some of the mechanical equipment like pumps and motors in time. Should not have to replace very frequently if properly maintained. o Mineral build-up may also require well maintenance, but this can be reduced if the well is monitored and regulated appropriately. • Reliability? Failure Rates? o The strict requirements of NC DEQ help provide confidence that at the end of drawdown testing with water quality results, you have a final idea of long- term sustainability. However, any aquifer is subject to change with continued human or natural forces acting on it. o Aquifer change versus well change will vary per well. • In face of climate change? o This is going to be a site-specific discussion, but most wells in the Piedmont are going to be influenced by immediate anthropogenic forcings to a greater degree than global scale climate change. 34 Attachment B Summary Notes Conservation Subdivisions Presentation by Randall Arendt. Conservation Subdivision Density • Conservation i • ' . 9 4 ' r ' subdivisions are density - MMIMM neutral: same lot count, but with significant open space. Smaller Lots does not mean - higher density. • Below: Bucks County, PA outside PA that �'r ; , 1&6 struggles with affordable housing �, 4� � Fjold,.Stream Corridor.andan Mature Woodlds Protected_ • some worry that these !"yfm�eNelopmert ` I small lots will devalue their homes—in fact, it �-a a�a a•iay�0� a■ ��a will improve property values. • Expensive homes example on small lots—Westwood Commons CSD north of Detroit • Neighbor was opposed to the small lot houses next door to devalue his home—after he saw them built, he joined the neighborhood with a new driveway from his back yard to the new cul-de-sac with the pricey homes, improving his own property values • Attractive upload open space in a CSD compensates for the smaller lot sizes, as they do in golf course development—described as"golf course developments without the golf course"with neighborhood greens instead of putting greens, greenway instead of fairways • CSDs can provide a variety of housing types and price points • Example: Battle Road Farm in Lincoln, MA, 12 homes (40% affordable) located on 24 acres at 5 du/ac, with 59% open space 35 • Upland = non-riparian, non flood prone, etc. Comparison to flexible developments • CSD typically protects 50-65% of the land, much more than either clustering or flexible development • Shortcomings of flexible developments were his primary motivation in creating the superior CSD approach 30 years ago • CSDs protect _ 4 _ _ 1 a 4 0 at least 50% of the unconstrained i • Land, PLUS all ' of the wetlands, floodplains, a �' and steep slopes • Flexible developments are allowed to include all of r these { unbuildable Land types plus t _ *4,A ''=' ` ' "wet pond" stormwater basins in meeting their minimum open space requirements • Yield plans: critically important step showing how many lots could realistically be Located on the parcel, given its constraints. Not based on total acreage o Honest reckoning of how many lots you can get o The need to require yield plans is illustrated below—not only were there many acres of undevelopable wetlands, but also parts of the property that probably could not be accessed on the other side of the two streams • A big drawback to Flexible Development is that—in allowing developers to count unbuildable land as part of their required minimum open space—they can satisfy much of that requirement with wetlands, steep slopes and floodplains—thereby allowing them to locate house lots on farmland and other resources needing protection 36 To better protect more of the developable land (such as farmland) in the rural areas, and in the Rural Buffer, the County might consider upgrading Flexible Developments with the better CSD standards, OR Replacing the Flexible Development provisions with those for Conservation Subdivision Design. In Arendt's professional opinion: the Rural Buffer zoning is still too rigid-even with "Flexible Development"-- and does not allow the greater flexibility of CSD, which would enable new developments at the desired overall two-acre density to conserve much more land,with smaller lots. Importance of CSDs • CSDs can help achieve a number of important goals, including o Environmental Resource Protection o Climate Resilience o Farmland Conservation o Housing Attainability o More and Better Wastewater Option • Wastewater treatment can be provided in a variety of different ways with Conservation Subdivision Design: o On-lot individual septic drain fields o Off-lot individual septic drain fields o Off-lot shared drain field • CSD enables lots to avoid borderline-soils and for on-lot drain fields to be located entirely on soils that are better-drained and more suitable Better soils x4 �� p 4 - - - KC't F 1 margin all 1 y b 1 A . �1 "�.. �_ +'����� �"'4 •f k, Irk Thirteen twa-and-one.hall acre lots Thirteen one-acre lots Six orr marginal soil AH on betler sail 37 • CSD approach is well suited to individual off lot septic-serving smaller lots that enable substantial open space to be preserved o Madison,WI • • if off lot septic drain fields need to be located on the better farmland soil,the house lots could be located on other nearby soils,thereby minimizing farmland Lots • Better to spend $150 every three years by HOA to avoid clogging of drain field, Leading to expensive repair • HOA plays key role in maintenance-usually a discount to handle all of the homes at once Question from Hamilton: • Can the farms still use the land where the drain fields are? o Answer: generally o Septic drain fields only cover about 2000 sq ft. even for a 20 lot subdivision- you may lose an acre. o Would add a fence so the cows or tractors don't go into the drain field. o Can't put heavy equipment on a drain field o Use that farmland sparingly 38 Springifield in SE PA-Chester County example: r septic fieide wel houses w e rrreiq�pw -- pond Woe s farnly yy = 0 S tar po Gels town rxxi e Io#s o ZOO 400 goo FEET • These are shared wells, shared septics, not many units Acres Saved with CSD Figures below about 15 years old 39 35 Acres Saved with CSD Towns and Townships Westborough, MA 448 acres Westford, MA i acres Hamburg i , MI 750 acres Hopkinton, ` a Counties Cherokee County, • 1,374 acres Waukesha County, Wl 1,670 acres Hanover ! ' 5,550 acres County,Calvert • cres San Luis Obispo County, ` 9,000 acres NationwideEstimate: • CSDs have been created in many states in different regions of the country, including the Northeast, the MidAtlantic, the South, the Midwest, the Rockies, the West Coast, and across Canada. Such as Maine, Massachusetts, CT, PA, MD, VA, KY, NC, GA, FL, TX, OH, IL, WI, MN, CO, CA, and Washington State. Ownership of CSD Open Space • Homeowner Associations o Need to be automatically opted into the HOA o Pay your back dues with interest when you go to sell your house if you are not part of the HOA • Land trusts—conservation easement in perpetuity • Counties or municipalities o Management plan submitted to the county for review—who is responsible for what and what frequency 40 Permanent Protection of the Open Space • Through conservation easements held by: o Land trusts o Counties or municipalities o State or federal agencies • National examples o Bucks County—horse pasture o Walkers County, Wisconsin— playground o Chester County, PA —orchard o MN —Community supported agriculture and deer bred for antlers o Llama farm o Allen, TX —Tree farm o Others: Bluebird houses, llama farms,vineyards,viewshed protection 0 1982 South Brodrick—community gardens came in 10 years later, soccer fields, public wellfield for public water ■ 1982—didn't know all the uses would be fulfilled to keep open space. o Developer—Ron Sietmant,Wisconsin—trails o Blairbyfarm in Brunswick, ME—saved blueberry plants in the middle o Other locations - Hanover county, VA; Brunswick County, maine Site Visits • Essential first step with applicants and abutters to discover and evaluate special site features • Site visits are essential because reviewing a paper plan without walking the property is like hiring a person on the basis of a resume only and with no in person interview • Site visits are informal outdoor work sessions • Conducted by PB members and sometimes by BOCC members too, advertised in the usual manner, at which no decisions are made • It's extremely difficult for officials to really understand a property simply by looking at a two-dimensional abstraction, like a paper map. Everyone benefits when they see the land three-dimensionally, in person. • Prefer abutters to be involved from the beginning and it doesn't build resentment 41 Recommendations • Recommend that codes require that sketch plans be created by landscape architects or by physical planners, not by engineers, whose training is mostly in streets and stormwater o Only two schools left in the country that require design with planning o Davidson, NC—planners that they hire are architects or landscape architects for many years o Believe that's the best profession for the sketch plans o Let designers do the designing and engineers do the engineering • Opposers o Abutters—upfront experiences during informal site visits where they can ask questions and sometimes provide useful information/context for the area o Example of historic preservation—civil war road—greenway has added value with history Four Step Design Process • Contained in the regulations • Identify potential conservation areas • Locate house sites • Connect homes with streets (engineer) • Darw in the lot lines (eingeers) Orange County example in book Before: 42 43 d U ■ w ■■ 1 ■fioadplain lop Ar •hydrio soils ■ •shalbw soils ■moderato to steep ■ slopes • Flow r,r� R SPI�M1B s un ■ ■2 r �pil[ei5YiI1B Road 6 90G�S�Ov Yield plan: steep slopes(>25%) m floodplaln hydric sous shallow soils•— 1L.. ,ti { Rohsef sulltE Road t fl 9011 eo0 Lr—L=Feet 44 I Z -potential development areas— 1 9 � G conservatior ti Rur[ N 1 o w+nR S p r l n S s c 0 Y n 9r� hcusA Sites• • conservation are Hun Flawirl8 5pr�"gs cabin 45 roads House spas m w o ` I trails 6 ■ ` Conservation area • Air ■ice r � ■ a, • f a • • Run wi s spring Fri ng .Sy rf nB cabin R�"rsvl;le pOdti -ED y�30D��6a0 z l�.i IJ �Faet rneadow tulure toad extension w p v' r atone trails 9 wall *v ■ meadow r tedbuds ~ f stone wall i a/ 16 r goo orchard- a * Run loweRB ;rtgs spring and 5 pringhcu s9 Gahlfl meadows historic site Rohrersvilte Road L o atan soo z° LJ LJ 7 Feet 46 meadow � 1GU w � pores m .raw o alone wall field wa \ moderate siopes redbuds wild"a corridor stone wall mea orchard Rrrn spring and plow+ng Sr,iri85 springhouse cabin historic site meadow Rorirersvllle Road v svo evv Rural CSD Examples • Illustrate more and better options for water supply and sewage disposal • When farms become smaller—become more productive in types of products (high value crops, fruit, vegetables) o Peach orchard instead of row crops • Example: Fields at Cold Harbor, Hanover County, VA o Individual on lot wells and individual on lot septic systems at a five acre overall density(25 one acre lots on 120 acres) Conservation Subdivisions with Shared Wells and Shared Septic • Example: Indian Walk, Buckingham Twp, PA o Individual on lot wells and shared central septic drain field 0 50 acres with ten lots (20,000 to 30,000 SF), about 90% open space • Canterbury, Buckingham Twp, PA 0 16 small starter homes with'/a acre lots of 17 acres o About 75% open space, shared well, and community septic drain field • Ringfield, Chadds Ford Township, Delaware County, PA o Shared wells and shared septic drainfields 0 38 dwellings on 76 acres including 6 attached townhouse units 0 74% open space, 56 acres 47 bwn drntl'f '�Du.��.`y. .wW,..,�•�V�~�_,.} :::......;... ,.. .. :: o _..-....�:...ter�. ....-.-,'�.,x,.._....«,........,1_.s..-.,,+.mow...-r.�....c...a....._r-.� . .w..�._........ . . D tpp 200 Q00 FEET Conservation Subdivisions with Off-Lot Individual Septic • Strathmore Farm, Madison, CT o 24 homes on 29 acres o .2 acre density o Condos on lots of 10,000 to 12000 SF "[Conservation subdivisions]are what you can do when you free yourself from the shackles of zoning"-Randall Arendt Conservation Subdivisions with Community Septic in the Protected Open Space • Partridgeberry Place, Ipswich, MA 0 20 lots at 8500 SF on 37 acres o Nearly 2 acres per dwelling unit density o Shared septic drain field and public water • **Recommends single loaded streets-ratio of street length to houses is not excessive o Double the density and put all the houses on one side of the road 48 o Don't usually design it that way—loading houses on one side of the road maximizes the open space Multiple Shared Septic Systems and Shared Wells on Utility Easements in Open Space Public Water Supply • Not necessarily advocating for this in the rural area • But this would be a great fit between rural buffer and Carrboro/Chapel Hill—in between • Long Hill Farm, Guilford, CT 0 55 condo lots of 5000 each plus 35 attached units in a large barn-like building 0 90 dwellings on 50 acres o Density: 1.8 acres per dwelling o About 65% open space o Developer was beloved Conservation Subdivisions with Community Well and Community Septic • The Ponds at Woodward, Kennet Township, Chester County, PA 0 57 homes on 120 acres, 2 acre density 0 24 townhouse units plus 33 half acre lots o About 70% open space o One well and one septic—don't really advise this. Like to spread out the utilities. Community Septic and Public Water • Weathersone CSD,West Vincent Twp, Chester County PA 0 273 dwellings on 300 acres o Preserved 65% of developable land o 195 acres of farmland and woods o Mixed uses, including county library branch o Others include daycare—fit well into comp plan and zoning • PA: drip and sprawy irrigation works well into ponds but wouldn't necessarily recommend that here • Mixed use—rental apartments above properties • The Fields of St. Croix, Lake Elmo, MN o Community well plus constructed wetland sewage treatment system 0 113 homes on 247 acres 49 0 2.5 acre density 0 60% open space o Prairie preservation Areas with Public Water and Public Sewer CSD becomes OSD: Open Space Development(24-40%preserved land) • Farmview, Lower Makefield Twp, Bucks County, PA 0 310 homes on 310 buildable acres o With 108 acres of unbuildable land conserved o Density of 1 dwelling per buildable acre o Designed by landscape architect o Total 208 acres land preserved—140 farmland acres, 68 acres woodland o Farmers formed a corporation to preserve the land—been farmed for a long time o Designed by Michael Staduhs, RLA, for Realen Homes • Summerfield, borough of Everson, PA o 318 homes on 137 acres o Houses from the highway, and back up to a horse pasture o Density of 2.3 dwellings per acre o Variety of housing types—single family to5du/building o Use mix with shops, offices, and a commercial equestrian facility o Roughly 33% open space o Mennonite church (religious developer) 50 neighborhood corner store Route 23 post office village p townhuses day care .:' con wTI rn'#jr bk� a office and \� � employment �y centers main street twins I� I- I pond estate houses viliage / 0 single houses • People that live there have first dibs on having a horse there; a lot of the horses are boarded from people in the surrounding area; backyards overlook horse pastures 51 t= _ - . --- - _ :,gas t;7 -. > • :..:;,.; -ry�z-..�,�:�°''... • Battle Road Farm, Lincoln MA o Example IF orange county builds into rural buffer 0 120 dwellings on 24 acres, 5 du/ac gross 0 40% affordable-48units o 60% are senior and market rate 0 59% permanent open space o Layout id designed like a golf course development but without the golf course o Connected farmhouse design to be able to walk to farm o Outside—can't tell if it's affordable, senior, or market rate—blended together o Varying density • Cottages on Greene, East Greenwich, RI o Example of ensuring that affordable units blend with market rate units, require that they often share the esame two, three, or four family building Question from Portie-Ascott • Clarified if Summerfield was on public water • Can you get affordable units on only public water?— o Answer is only on community well 52 o Lot cheaper than extending sewer line and a lot of people don't want sewer Line extended (plus impact to growth if that's extended) o Yes can have affordable housing on community well and community septic f o Pretty high density example • Single family detached townhouses can also be located along streets or can surround a "green"(cottage clusters) • Poplar Gardens, North Boulder, CO 0 100% affordable cottages 0 14 dwellings on 1.4 acres (10 du/ac) o **add minimum width of 30 feet for central greens and plant trees! • An excellent way of ensuring that affordable units blend with market-rate units is to require that they often share the same two-,three-, or four-family building 53 �r •'J. Ip -} y t 1 } r a� y+r { ,� Y e k •yy} hot Y +7j �= t hL + R } 4.4, I'd .7 • _ y 0- Ail I IL ��-.fie,.} � � �;�,•'. _` }�}+ k� � j3 ;�+f�Js��`' ,I;f_', f� N�`[� ��"'yy"'���+'��rY= -; F� � L� +i'aa.. +i �a* �•. • Bungalow Courts: aka pocket neighborhoods or cottage clusters o With detached townhouses o Higher density infillwith central open space o Either on shared septics and wells, with public water/sewer Question from McKee: asked how they define affordable? 0 Percent of AMI 54 Final Recommendations • Because CSD is not explicitly discussed in the 2030 Comp Plan, the 2050 Plan needs to include it, for the Rural Area and the Rural Buffer. • In the meantime, a guidance document to support this approach would be very helpful, besides updating the UDO. Summary • CSD protects more land than Flexible Subdivisions, Can be designed to minimize farmland loss, Can utilize various wastewater options, Is compatible with"Attainable Housing", and Is very applicable to the Rural Buffer. • Recommendation: *** ensure that affordable units blend with market rate units is to require that they often share the same two, three or four family building Question from Carter • Question: laid out the four steps in the design process.Where are those four steps embedded in the planning process? Plan, UDO? o Can allude to them in the comp plan. But specifics are always in the UDO. o NC model ordinance for conservation design - randall sent to staff. • Open space requirement-plan? UDO? o Doesn't hurt to include in guidance document. But what really counts is the ordinance language • Agricultural management- how does that work and how does that work in terms of management and ownership? o County planning in PA and NY its advisory, Ohio west its regulatory o MD its regulatory? o Lower Mayfield township farming corporation- bucks county, PA, advisory ■ Township had rules ■ Township put ordinance-owner of open space maybe abcde options, probably didn't even think of a farmland corporation ■ Not one individual owner- kind of like a co0op o Most examples are owned and managed by HOAs ■ should be a permanent easement on that plan 55 • Stober: clarification that our ordinance that the flexible subdivisions layout was updated 1 year ago. In the process of putting together 94 pages of amendments— better enable flexible developments and encourage them. Conventional layout is only used administratively by staff as a futile step in the pre-application. Additional cost burden to applicant and is another cost obstacle. • Present time—exists in the ordinance. Doesn't usually go past Cy's desk. Arendt is proposing a much more public exercise. Some of the last zoning hearings had questions about what is the actual buildable land versus not buildable Recommendations, Continued • Recommendation: ***update the plan and UDO to randall arendt definition to preserve 50%of BUILDABLE land, not just all land CSDs protect at least 50% of ed PLUS all of w 7 contrast,plains, and steep slopes. In Flexibleare allowcd to include ALL of these unbuildable land types plus "wet pond" stormwater basins in meeting their minimum open space requirements. Question from Fowler: where should we put CSDs? • Up to us. • Leon county, FL surrounding Tallahassee—wanted conservation subdivisions within X number of miles of the water line and sewer lines, not the far end of the rural areas 56 • Other counties have said anywhere • Arendt can't advise on the location • Might want to take a gradual approach—conservation subdivision in one part of the county before adding elsewhere. • **advises to get rid of flexible development! o Can't build there anyway—why give them density credit for that? o Stober: riparian buffer—50 feet from the edge of bank at the state level. Depending on the soil, we have 65 or 80 feet buffers. Additional reservoir setbacks separate from riparian. Also flood plain buffer. o Arendt: riparian buffer will push the development back. Good conservation plan will not push the development close to sensitive resources. Question Portie Ascott: Repeat about development soil sample • In an area with septic systems, developer will come in with yield plan and it might Look good on paper but the critical question is—all those imaginary lots perk? • Tricky • Rather than having the developer on do a lot pick on each lot, planning department would direct ed to do a countywide septic map, look for wet soils and vegetation, • Stober:Yield plan is the only thing that is different—no preliminary eval of the soils o We require a comprehensive soil suitability analysis and septic locations o Administrative approval by staff or by hearing—required by all • Arendt—discussing that this would be much earlier Question from McKee: • Small lot developments on subdivisions—how would anyone be willing to buy land without doing a perk on at least 50% of the projected lots. Not just if its going to perk —what type of system Question from Carter: Orange Country has a reputation for being difficult to work with. 10% requirement for perking—how would this impact working relationship? • Arendt: these lots don't get into critical areas for flood, riparian, slopes, etc.just Lines on paper and don't know more about perks o Count it as a compliment—don't want to have development like the unnamed neighboring counties • McKee: provides for a better outcome in the long run but is quite difficult and quite onerous to work with 57 o Arendt: soil tests in Maine-don't do a perk test.What works better is to dig a hole and look at the soil texture and color-can see water table modeling. Haven't dug a hole and poured water into it. maybe costs $1000 to evaluate in ME, under$1000 for backhoe, so for under$2k can figure out if yield plan is realistic or just blowing smoke and isn't just lines on paper • Policy perspective- put this up front in the process **Legal:what rights do we have to demand what of HOAs in regard to septic and general land ownership.Will need that info in the future. Question from Fowler: affordable homes option. How did they make that happen? • Short answer: state requirements • Arendt: battle road farm in Lincoln. Under the gun from the state to require affordable housing. Had a town meeting to buy some land -bought 24 acres. Put out RFP for Boston area to submit proposals for affordable development (40%) in a realistic but preliminary way. Look like England style o Bill Ron-architect, came up with the plan o Drivers seat of the development o Not waiting for a developer to come in "If you want to accomplish affordable housing goals,go buy the land." Randall Arendt • Develop bought the land from the town • Cy can send case study example Note from Greene: local regulation-cannot impose regulations to require affordable housing • OC provides AH through subsidies to AH nonprofits • Could buy the land • Could also incentivize developers to work with AH developers Note from Hamilton: Didn't like that flexible subdivision and conservation subdivision were being interchangeable. • Clarified for her what this means 58 • Question: goals of a conservation subdivisions.When we are thinking about our Land use plan, and where we want things to be—preserve farmland. May look different than if we are looking for housing attainability. • Arendt: sunset provision. Could adopt an ordinance provision that is in effect for a certain time frame unless renewed. Allows flexibility. • Public access to land. How does that work with HOA? o Arendt—model ordinance for NC.There is a provision for an optional density bonus to make the trails publicly accessible. Can make it legal and post a sign with rules.To get that sign,you get a SMALL density bonus o In most cases, the public uses it anyway. Usually by someone that lives nearby. As long as someone doesn't abuse it, no one really notices or recognizes who that person is. Could be the person that lives behind the subdivision. Informally uses the trails. Question from Portie Ascott: could have conservation subdivision all over the county if we want.Thinking about the housing gap that we have—number of housing units of all different types over the next five years that we need. Housing for all is a goal for the county from the strategic plan. Heard that conservation subdivision could go in the rural areas? • Yes, that is where its typically done. Not saying its necessarily right for you but can be done. That's how it usually works in VA. • **wouldn't allow flexible development—old idea that should be replaced. Carter: if we envision that we want to have some areas of additional density with proximity to current water and sewer but not necessarily used right away. Delores Bailey, Planning Board • Subdivisions with community wells and sewer systems • How are orange county soils be prepared for that kind of massive development • For the ones shared with us—designs were simple to do from the designs he showed us • Septic system multiple 4-5 times • Not a community system serving 20 or more homes • One hole in the ground can serve up to 49 homes as a maximum in NC ? • Three wells—could do more and spread them out • Depending on the geology,you can get a different yield from a well based on Location 59 Jane, Planning board • Enforcement—question o HOAs—seen some plans that have natural areas, trails, etc. and not a plan for how those will be maintained. How is that put in place for maintenance Longterm? o Answer: one cardinal rule is to not make it too complicated. Might be an acre or two that they mow every 10 days in the growing season. Trails every spring, a work crew of neighbors needs to trim back the branch and clear the path. Bridge, every ten years replace. o Don't like private roads- requires quite a lot of private money put into the account every year so that by the time you need to repave that road, you have a huge account with enough to draw from. People just don't do it. lien authority unless you pay our dues in arrears. Don't make it too complicated! o Avoid private road situation o Someone in the family will really enjoy the benefits and will be willing to volunteer to help o Community comes together and has a picnic and a work day every year on the same day to build community and maintain the space o Activity that binds them but isn't too onerous