SUBJECT: Informational Reports
DEPARTMENT: County Manager
ATTACHMENT(S):
As noted in "Background"
PUBLIC HEARING: (Y/N)
INFORMATION CONTACT:
John Link or Rod Visser, ext 2300
No
TELEPHONE NUMBERS:
Hillsborough
Chapel Hill
Durham
Mebane
732-8181
968-4501
688-7331
336-227-2031
PURPOSE: To receive information previously requested by the Board of County
Commissioners and other information related to development and administration of the
County's operating budget.
BACKGROUND:
a. Impacts from FY 2002-03 Reductions in County Capital Projects and School Recurring
Capital
During the "Fiscal Outlook" segment of the Board's February 24, 2003 work session,
Commissioners requested information about the impacts of reductions in capital funding for
FY 2002-03 that were necessitated during the last budget cycle by the State's withholding of
reimbursements due to the County for this fiscal year. While the BOCC made it clear that it
could not promise the restoration of any of those reductions, the Board did express interest
in knowing: 1) how school recurring capital money has been spent in recent years; 2)
whether recurring capital funding reductions were causing undue hardship for the schools;
and 3) if the BOCC were able to restore some portion of the reduced funding before the end
of FY 2002-03, what the priorities would be for County and school capital projects. Both
school systems have responded with prioritized lists of possible capital funding restorations.
While capital funding reductions have not generated undue hardships for the County, staff
have prepared a brief paper outlining two projects that the Board might consider if it
determines that some capital funding for 2002-03 can be restored.
Attachment 4A - 4/11/03 OCS Superintendent Memo
Attachment 48 - 4/11/03 CHCCS Superintendent Letter
Attachment 4C - 4/17/03 County Staff Paper
b. Transition Planning -EMS Transport Component
2
Historically, the Rescue Squad has relied on a large number of volunteers in carrying out its
operations. As with many public safety agencies that have historically relied on volunteers, the
Squad has in recent years experienced a decline in the number of volunteers it is able to recruit
and retain. To that end, it has been necessary for the Squad to hire full and part-time staff to
provide EMS transportation services under its contract with the County. This situation, along
with other increases in operational line items, has led to increased expenditures for the Squad.
As a result, during the budget planning process last spring, the Squad requested an increase of
$220,000 in its budget.
The Squad wrote to the BOCC in November 2002 indicating that it would no longer be able to
provide day-to-day coverage for the ambulance transportation component of the County EMS
system. In December 2002, the BOCC approved an extension of the County's agreement with
the Squad through the end of June 2003, with the understanding that County staff and Squad
representatives would collaborate to develop a transition plan for the Squad to relinquish and
the County to assume this function.
Staff have prepared an update for the Board on planning conducted to date that would have the
County assume the EMS transport function as of June 30, 2003. A further report on staffing
and financial impacts is expected to be provided to the BOCC by mid-May, so that necessary
administrative and personnel decisions can be made to effect a smooth transition and change
in service delivery for Orange County EMS clients.
Attachment 4D - 11/12/02 Rescue Squad Letter
Attachment 4E - 4/17/03 Staff Progress Report
c. Public Education/Outreach on Need for Solid Waste Alternative Financing
During work sessions in January and February 2003 regarding the need for and options to
provide alternative revenue sources for the County's solid waste enterprise fund, the BOCC
emphasized the need to educate citizens about why alternative revenue sources are needed
and the common misconception that recycling services are "free". Staff have prepared a report
on efforts to date and those planned to help citizens understand the costs involved with the
County's award-winning recycling programs and the financial underpinnings of the solid waste
system. Staff have also prepared a memo that responds to several Commissioner inquiries
raised during the solid waste segments of those work sessions.
Attachment 4F - 4/15/03 Solid Waste Management Director Memo
Attachment 4G - 4/16/03 Solid Waste Management Director Memo
d. FY 2002-03 Hiring Freeze Update
In response to Commissioner inquiries, staff have prepared a report on the number, types, and
categories of positions that have been reviewed during administration of the hiring freeze policy
that was implemented as part of the County's FY 2002-03 operating budget.
Attachment 4H - 4/15/03 Personnel Director Memo
FINANCIAL IMPACT: As noted in various attachments.
RECOMMENDATION(S): The Manager recommends that the Board receive the reports for
information only at this time.
~ ~-
-.. ;.a;
To: John Link, Orange County Manager
Orange County From: Michael F. Williams, Interim Superintendent~~~ ~ `/P~
Board of
Education Date: April 11, 2003
Subject: Recurring Capital Funding
The purpose of this memo is to respond to your request for information regarding recurring capital
funding as presented in your March 21, 2003, memorandum (copy attached).
Dr. Michael F. Williams
Interim Superintendent 1. For'the last five years, what projects has each district funded with their annual
recurring capital appropriation from the County
Board Members: Attached is a list for each of the fiscal years 1996-97 through 2001-02. Each list contains all of the
Brenda Stephens, Chair capital projects in the Orange County Schools funded by recurring capital outlay. Each list is
Keith Cook, Vice Chair sepazated into four categories: fixed cost projects, school improvement projects, school furniture and
Randy Copeland equipment, and vehicles.
Betty Tom Phelps Davidson
Libbie Hough
Delores Simpson 2• What impact has the reduction of recurring capital in the last two fiscal years had on
Dana Thompson each district's ability to carry out planned projects
In fiscal yeaz 2000-01 we were unable to undertake the following projects: carpet to file replacements
at Central, Stanford, Grady Brown, Cameron Park, New Hope, and Efland Cheeks, driveway curbing,
200 East King Street ~n pamttng, door replacement and shower upgrades at Stanford, and ceiling file replacement at
Hillsborough, NC 27278 Grady Brown.
Telephone: 919-732-8126 ~ fiscal yeaz 2001-02 we were unable to undertake the following projects: hot water heaters and
FAX: 919-732-8120
carpet to file replacement at Central, driveway pazking and curbing, gym painting, and fire alarm and
intercom system upgrades at Stanford, carpet to tle replacement at Grady Brown, column repair at
Stanback, classroom storage cabinets and carpet to file replacement at Cameron Par c
k, arpet to tle
~~°°N~'~ replacement, storeroom constructon, playground equipment and new windows at New Hope, carpet
° to file replacement at Efland Cheeks, carpet to tle replacement, room dividers and new windows at
° Hillsborough, and locker and weight room improvements, new heating and cooling units, soccer field
irrigaton, and media equipment at Orange High.
+s4+
3. Has the reduction caused any undue hardship on the system
The impact of the reductons in recurring capital funding has been, primarily, in the areas of indoor air
quality improvements and safety.
4. 1"f the Board of County Commissioners were to re-instate $351,582 in recurring capital
funding, what specific projects would be undertaken
At its meeting on Apri17, 2003, the Orange County Board of Educaton approved the attached list of
projects which would be funded if recurring capital funding were re-instated. Note that the list
contains many of the items not funded in the two previous fiscal years, 2000-01 and 2001-02. In
additon, the list contains some new safety issues that have.surfaced in the course of this fiscal year.
Thank you for the opportunity to present this infonnaton to the Board of County Commissioners. If
there is a need for clarificaton or additonal informaton, please let me know.
MFW/pmc
Attachments: 7
Copies: Members, Orange County Boazd of Educaton
Dr. Steve Halkiotis, Director of Auxiliary Services
Ms. Sandra Tinsley, Director of Finance
Orange County Schools
"Providing educational opportunities for successful futures. "
"''~•~ 11 • 14MI'I UFtHfYGE CTY MGR
Q~iVGE COUNTY
HILLSBOROUGH
NORTH CAROLINA
?Il~aycr-~.r O~o+~
~11EMORANDUM
TO: Neil Pedersen, Superintendent, CHCGS
Mike Williams, Interim Superintendent, OCS
FROM: John !_ink, County Manager
DATE: March 21, 2003
SUBJECT: FY 2002-03 Recurring Capital unding
N0.976 P.1/1
~rfaGlrFeo~ITSz
p~~~~~_~!~~~~1
~;;~;~_,~~ ~iGE
This memo serves as a formal request for information as we discussed at our most
recent monthly meeting,
Duryng the budget approval process last .tune, the Board of County Commissioners was
faced with many difFicult funding decisions largely attributable to State funding cuts.
While recommended funding for particular items such as County and School capital
items was reduced, the Board expressed its desire to re-assess, during the current
fiscal year, the County's financial status once the State's budget was finalized.
In late February 2003, County stafF provided a fiscal update for the current year to the
Commissioners. One item of particular ini~fest to the Boani was school recurring
capital, and Commissioners asked me to request the following information from the two
school boards;
o For the last flue years, what projects has each distriGt~funded with their annual
recurring ca it~l appropriation from the Gounfy
o What impa~lia~ the reduction pf rsGUmng, Capital in the fast tvvo fiscal years had
on ear,~h district ~ agility to carryout plariri~d projects
o Has the reduction caused ~ny.undue hardship ~n'eithe~ system
.,~ , ~ , ,
The CommissiQherS h~ye also requested that each district identify, in prigrrty order,
specific projects that would be funded if the Board were to re-instate all or a portion of
the reduction in recurring capital that occurred during the budget approval process last
ooz, p3 spring, For Chapel Hiil Carrboro City Schools, the reduction totaled $572,418 and for
Orange County Schools, the reduction equated to $351,582, I want to caution that this
request should in no way be viewed as assurance that any portion of those cuts can be
restored.
In order to include the requested information in Boatd's April 21 budget work session
agenda package, I am requesting that you provide the items outlined above to my office
no later than April 11, 2003. Feel free to call Rod Visser or Donna Dean if you have
questions.
AREA CODE (919) 245-2300 • 688-7331 FAX (919) 644-3004
Fact, 2300
Orange County Schoo/s Recurring Five Year Recap; 4/10/03
FIXED COST 1996-97
Playground Surfacing
Playground Maintenance & Repairs
Restroom Stall Repairs
Asbestos inspection & removal
Bloodborne Pathogens Standard
Chemical Removal
Roof Repairs
Paint Schools
Line Painting
Pest Control
Landscaping
Cafeteria Hoods Inspections
Bleacher/Basketball Goal Maintenance
Fire Alarms Inspections
Turf & Field Maintenance
Turf Equipment
Trim Trees
NCDPI Engineering Services
Elevator Service Agreements 8~ Fire Alarm Monitoring
Copier Lease
Athletic Fields
Wiring Project/Housing Cameron Park
Lower Playground Paving Cameron Park
Gym Floor Replacement Central Elementary
Electrical Circuits & Outlets Central Elementary
Equipment Cabinets Central Elementary
Repair Boundary Fences CW Stanford
Replace Bathroom Tiles Efland Cheeks
Grade & Level Playground Efland Cheeks
Replace Intercom Grady Brown
Water Connection Grady Brown, Hillsborough Elementary
Plumbing Repair/A Wing Orange High
Awning Over Gym Extension Orange High
Dark Room Construction Orange High
Replace Light Fixtures Orange High
Repaint Gymnasium Orange High
Refinish Wood Floors Orange High
Chalkboard Replacement Orange High
Replace Outside Doors Orange High
Security Camera's Orange High
Re-Gravel Stadium Roadeway Orange High School
Fence Visitors Area Stadium Orange High School
Gen Repair & Repave Driveway Orange High School
Erosion Control Cultural Arts Building Orange High School
Reel Mower Repairs Athletic
HVAC Technology
Orange County Schoo/s Recurring Five Year Recap; 4/10/03
Heat Pumps Control Gym Cameron Park
Repave Bus Lot Orange High/CW Stanford
Walk in Cooler (Child Nutrition) Cameron Park
Paint Outside Bus Garage
Bus Garage Repairs
All School Furniture & Equipment Allocation per ADM
New Turf Athletic Equipment Orange High
3/4 Ton Van (Replacement)
2
Orange County Schoo/s Recurring Five Year Recap: 4/10/03
-9
LFIXED COST 1997-98
Playground Surfacing
Playground Maintenance & Repairs
Restroom Stall Repairs
Asbestos inspection & removal
Bloodborne Pathogens Standard
Chemical Removal
Roof Repairs
Paint Schools
Line Painting
Pest Control
Landscaping
Cafeteria Hoods Inspections
Bleacher/Basketball Goat Maintenance
Fire Alarms Inspections
Turf & Field Maintenance
Turf Equipment
Trim Trees
NCDPI Engineering Services
Elevator Service Agreements & Fire Alarm Monitoring
Copier Lease
51 CHOOL IMPROVEMENTS 1997-98
Transition Classrooms
Replace Chalkboards
Replace Sewage Line Cameron Park
Track Restriping Cameron Park
Hand Railing-Breezeway Central Elementary
Replace Kitchen Grease Trap Cameron Park
Fencing Grady Brown
Replace Main Entrance Door Grady Brown
Repair Foundation Grady Brown
Install Safety Post Gym Hillsborough Elementary
Replace Stair Treads Orange High
Install Safety Post Gym Orange High
Add Door Mechanical Room Orange High
Repair/Walls-Floors Men's Room Orange High
Reel Mower Repairs Athletics
Gym Floor Replacement Central Elementary
Mobile Unit Repair Bus Garage
Repair Wind Damage Maintenance Shed
All School Fumiture & Equipment Allocation per ADM
New Classroom Startup Furniture
Air Brake Rivet Machine
Restraining Harness Children with Special Needs
Replace Shop Base Radio
Window Washer Machine
12 Vacumn Machines
3
Orange County Schoo/s Recurring Five Year Recap; 4/10/03
Replace 5 push mowers
Replace 6 Weed Eaters
Mobite Generator
Replace Riding Lawn mower
Replacement Maintenance Vehicle
Bob Cat and accessories
36 Passenger Activity Bus
4
Orange County Schools Recurring Five Year Recap; 4/10/03
FIXED COST 1998-99
Playground Surtacing
Playground Maintenance & Repairs
Restroom Stall Repairs
Asbestos inspection & removal
Bloodbome Pathogens Standard
Chemical Removal
Roof Repairs
Paint Schools
Line Painting
Pest Control
Landscaping
Cafeteria Hoods Inspections
Bleacher/Basketball Goal Maintenance
Fire Alarms Inspections
Turf & Field Maintenance
Turf Equipment
Trim Trees
NCDPI Engineering Services
Elevator Service Agreements & Fire Alarm Monitoring
Copier Lease '
SCHOOL IMPROVEMENTS 1998-99
New Classroom Start up
Canopy at Gym Entrance AL Stanback
White Marker Boards
Canopy Central Elementary
Safety Rail In Front of Elfand Cheeks
Glass Doors for Office New Hope
Orange High School Science Lab/Upgrade
Parking Lot Repairs Transportation
Bumishers/Floors All Schools
Insulation of Heating and Cooling Pipes C.W. Stanford
Burglar Alarm Cameron Park
Door Replacement Cameron Park
Storage Room Central Elementary
TV Studio Central Elementary
Relocate Exit Door Efiand Cheeks
Replacement Gym Heating Grady Brown
Awning Grady Brown
Replace Underground Steam Lines Hillsborough Elementary
Concrete Pad at Dumpsite Hillsborough Elementary
Refinish Gym Floor A.L. Stanback
Concrete Fire Lane Gym A. L. Stanback
Repair Mobile Unit at C.W. Stanford
Refinish Gym Floor C.W. Stanford
Re-Key Orange High
Upgrade Gas Line In Science Lab Orange High
Air Conditioning Support Services
Drainage Support Services
5
Orange County Schools Recurring Five Year Recap: 4/10/03
Heating Covers Support Services
Line for ACT 1000 Program Maintenance
Roof Management System
All School Furniture & Equipment Allocation per ADM
Playground Equipment
Seat Belts, Restraing Harness Children with Special Needs
Sign Replacements
Band Uniforms
Activity Bus
Orange County Schools Recurring Five Year Recap: 4/10/03
-00
FIXED COST 1999-00
Playground Surfacing
Playground Maintenance & Repairs
Restroom Stall Repairs
Asbestos inspection & removal
Bloodbome Pathogens Standard
Chemical Removal
Roof Repairs
Paint Schools
Line Painting
Pest Control
Landscaping
Cafeteria Hoods Inspections
Bleacher/Basketball Goal Maintenance
Fire Alarms Inspections
Turf & Field Maintenance
Turf Equipment
Trim Trees
NCDPI Engineering Services
Elevator Service Agreements & Fire Alarm Monitoring
Copier Lease
SCHOOL IMPROVEMENTS 1999-00
Replace Fire Alarm System Cameron Park
Intercom System Cameron Park
Upgrade Fire Alarm Central Elementary
Ceiling Tile Central Elementary
Heating/Cooling Central Elementary
Chiller 200 Building C.W. Stanford
Cafeteria Hood Fire Protectors C.W. Stanford
Heating/Cooling Efland Cheeks
Heating/Cooling Units Grady Brown
Work Room Vent Hillsborough Elementary
Fencing New Hope
Roll Gate Safety Guard New Hope
Fence Gate New Hope
Mobile Units Lease Orange High, A.L. Stanback
Roofing Transportation Building
Athletic Laundry Supply
SCHOOL FURNITURE ~ EQUIPMENT 1999-00
All School Furniture & Equipment Allocation per ADM
Maintenance Safety Equipment
Vehicle Replacement
Air Conditioning (2) Buses
7
Orange County Schools Recurring Five Year Recap: 4/10/03
2000-01
FIXED COST 2000-01
Playground Surfacing
Playground Maintenance & Repairs
Restroom Stall Repairs
Asbestos inspection & removal
Btoodbome Pathogens Standard
Chemical Removal
Roof Repairs
Paint Schools
Line Painting
Pest Control
Landscaping
Cafeteria Hoods Inspections
Bleacher/Basketball Goal Maintenance
Fire Alarms Inspections
Turf & Field Maintenance
Turf Equipment
Trim Trees
NCDPI Engineering Services
Elevator Service Agreements & Fire Alarm Monitoring
Copier Lease
SCHOOL IMPROVEMENTS 2000-01
Burglar Alarm Central Elementary
Exhaust Vents Restrooms Central Elementary
Safety Railing to Buses Central Elementary
Awning To Buses Central Elementary
Security Cameras A.L. Stanback
Heating/Cooling Units Efland Cheeks
Replacement Doors Cameron Park
Re-Key Buildings Cameron Park
Chiller Replacement C.W. Stanford
Security System C.W. Stanford
Heating/Cooling Units Grady Brown
Gutters Hillsborough Elementary
Mobile Units Lease Orange High, A.L. Stanback, Grady Brown
Parking Lot paving Hillsborough.
Studio Room Hillsborough Elementary
Repair of Natural Gas Line Orange High
Ventilation of Chemistry Room Orange High
Handicap Ramp Support Services
Covered Walk Cafeteria Grady Brown
Concrete Pad for Painting Transportation
Heating/Cooling Efland Cheeks
Cameron Park Roofing
SCHOOL FURNITURE ~ EQUIPMENT 2000-01
All School Furniture $ Equipment Allocation per ADM
Furniture and Equipment for New Classrooms
8
Orange County Schools Recurring Five Year Recap: 4!10/03
VEHICLES 2000-01
Vehicle Replacement
Orange Counfy Schools Recurring Five Year Recap: 4/10/03
~ FIXED COST 2001-02
Playground Surfacing
Playground Maintenance & Repairs
Restroom Stall Repairs
Asbestos inspection & removal
Bloodbome Pathogens Standard
Chemical Removal
Roof Repairs
Paint Schools
Line Painting
Pest Control
Landscaping
Cafeteria Hoods Inspections
Bleacher/Basketball Goal Maintenance
Fire Alarms Inspections
Turf & Field Maintenance
Turf Equipment
Trim Trees
NCDPI Engineering Services
Elevator Service Agreements & Fire Alarm Monitoring
Copier Lease
SCHOOL IMPROVEMENTS 2001-02
Landscaping/Concrete Grady Brown
Drinking Fountain Play Area New Hope
Repair Columns A.L. Stanback
Classroom Storage Cabinets Cameron Park
Awning Cafeteria Door Cameron Park
Security Camera System Cameron park
Curtain Wall Dumpster Pad Cameron Park
Carpet Replacement to Tile Central Elementary
Mobile Units Lease Orange High, A.L. Stanback,Grady Brown
Gym Production Lights Central Elementary
Security System Central Elementary
HVAC Replacement C.W. Stanford
Safety Mats Gym Walls C.W. Stanford
Wresting Mats Gym Floor C.W. Stanford
HVAC Transportation
HVAC Board of Education
Production Lights Efland Cheeks
Security Camera Efland Cheeks
Carpet Replacement to Tile Grady Brown
Gym Lighting Grady Brown
Stair Treads Hillsborough Elementary
Security Camera System Hillsborough Elementary
Security Camera System New Hope
Smoke Doors Orange High School
Lockers for New Dressing Room Orange High
Security Camera System Grady Brown
Water Fountain Central
10
Orange County Schools Recurring Five Year Recap: 4/10/03
SCHOOL FURNITURE & EQUIPMENT 2001-02
Atl School Furniture & Equipment Allocation per ADM
Large Floor Mats Grady Brown
Air Compressors (2) Transportation
Vehicle
A A
Orange County Schools 4/10/03
Recurring Capital Project Priority if Funding Were Re-Instated
Grady Brown Floor Tile 60,000
Cameron Park Floor Tile 40,000
Efland Cheeks Floor Tile 40,000
Central Elementary Floor Tile 40,000
Grady Brown Doors 10,000
CW Stanford Door Replacement 18,000
Efland Cheeks Playground Fence 9,000
Efland Cheeks Bus Parking Lot 28,000
Central Elementary Drive Paving 25,000
New Hope Office Area Window 4,000
Orange High Safety Wall Padding 9,000
Central Elementary Breezeway 7,500
CW Stanford Gym Showerheads 8,000
CW Stanford Bleachers & Concrete Pads 16,000
AL Stanback Bleachers & Concrete Pads 26,000
Repairs to AL Stanback Track 7,500
Restriping AL Stanback Track 9,000
Orange High Bleachers and Concrete Pads 26,000
TOTAL $ 383,000
Chapel Hill-Carrboro City Schools
Lincoln Center, 750 S. Merritt Mill Road
Chapel Hill, North Carolina 27516-2881
The Board of Education
Telephone: (919)967-8211 Ext. 226
FAX: (919) 933-4560
Neil G. Pedersen
Superintendent Valerie Foushee, Chair
Board of Education
April 11, 2003
John Link, Manager
Orange County
200 South Cameron Street
Post Office Box 8181
Hillsborough, North Carolina 27278
Dear Mr. Link,
Included is our response to your March 21, 2003 memorandum requesting information regarding our
recurring capital program. There are two spreadsheets attached for your review.
The first spreadsheet provides documentation on the use of funds from recurring capital for the past five
years. The project descriptors are those used by the county to avoid any confusion. The second
spreadsheet details those projects that have been eliminated or reduced due to the decrease in funding.
This list also places those projects in priority order that we would like to complete.
The projects listed in bold are particularly important to the district and have a major impact on the safety,
health and environment that our students and staff study and work in. The boiler at Chapel Hill High School
is not only inefficient but also difficult to maintain. Constant problems result in learning environments that
are cold and damp. Funding for this project now would allow for summer replacement. The carpet removal
and file replacement at Frank Porter Graham is an issue of indoor air quality. Our funding has paid for
remediation of ducts, air handling units, and mold and mildew removal. Funding for the carpet project would
complete our efforts there. Finally, several of our schools are not equipped with hot water in the classrooms.
As hand washing becomes more critical in the fight against childhood illness, having hot water should be
considered a sanitation issue.
While these projects would be our priority, other items on the list deserve consideration. Our aging fleet of
maintenance vehicles is becoming increasingly expensive to operate. Constant repairs are hampering our
efforts to provide quick responses to school maintenance requests. You will also note the need to replace
refrigerator units at our older schools. The average age of these units exceeds 35 years and maintenance is
becoming more difficult and expensive.
We hope this is an adequate response to your request and will be happy to provide any additional
information that you may require.
Sincerely,
~~
Neil Pede n
Cc: S ve Scroggs
~od Visser
CHAPEL HILL-CARRBORO CITY SCHOOLS
RECURRING CAPITAL - 5 YEAR FUNDING ANALYSIS
CATEGORY I PROJECTS 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003
Abatement
25,000
25,000
30,000
30,000
_
Site Development 55,000 62,100 75
000
, 100,000 70,000
Playgrounds
75, 000 45, 000
Renovations 174,000 181,300 225,000 275,000 202,690
Flooring 40,000 40,000
50, 000
75, 000
25, 000
Roofing 270,000 280,750 260 000
240,000
110,000
CATEGORY II PROJECTS
Furniture/Equip.-Schools
Technology Equip.
Classroom Furniture
Copier Equip.
Child Nutrition Equ.
Cafeteria Furniture
Cultutral Arts Equipment
Custodial Equip.
Administrative Equip.
Support Services Equipment
Print Shop Equip.
Vocational Ed. Equipment
CATEGORY III PROJECTS
District Vehicles
Transportation Veh.
Contingency
TOTALS
150,000 160,000 160, 000 160,000
60,000 60,000 70,000 150,638
20, 000 20, 000 20, 000 20, 000
60,000 65,000 65,000 65,000
30, 000 30, 000 35, 000 35, 000
5, 000 7, 500 10, 000 10, 000
10, 000
66, 500
5,000
12,500
10, 000
80, 657
12,500
7, 500
10, 000
80, 638
12, 500
7, 500
10, 000
12,500
7, 500
26,000 26,000 30,000 33,910
85,000 88,850 90,000 32,601
29,000 20,000 25,000 20,000
1,123,000 1,177,157 1,255,638 1,352,149
109, 035
85, 000
15,000
25, 000
7, 500
5,500
7, 500
55, 000
3, 000
3, 500
5, 000
773.725
CHAPEL HILL-CARRBORO CITY SCHOOLS
Differed Capital Projects due to decreased Recurring Capital funding.
Projects are listed in priority order with cost estimates.
PROJECT
ESTIMATE
Chapel Hill High School -replace 1967 boiler
100,000
FP Graham -Primary Bld replace carpet with the in
classrooms 70,000
Phillips MS -replaced damaged windows
51,500
Carrboro Elementary School -hot water in classrooms
Ephesus Elementary School -hot water in classrooms 20,000
Estes Hills Elementary School -hot water in classrooms 18,500
Seawell Elementary School -hot water in classrooms
36,000
Maintenance Vehicles
72, 000
FP Graham -replace walk-in refrigerator/freezer
15, 000
Chapel Hill High School -replace refrigerator/freezer
25,000
Phillips MS -replace refrigerator/freezer
18, 000
McDougle Campus -intercom system
56, 000
McDougle MS -electric for stadium scoreboard
15, 000
Carrboro Elementary -replace refrigerator/freezer
18, 000
Phillips MS - water to baseball field
28, 000
Estes Hills Elementary School -canopy lighting
18, 000
Maintenance Equipment
17, 000
ECHHS-paint bathrooms and locker rooms
CHHS-paint classrooms and hallways 18,000
Phillips MS -classroom painting 25,000
Scroggs -paint halls and stairwells 12,000
10, 000
~m~ ~ ~
Prepared 4/17/03
ORANGE COUNTY CANDIDATES FOR POSSIBLE RESTORATION OF
FY 2002-03 CAPITAL FUNDING
Staff have identified the following two projects as priority candidates for capital
funding restoration, should the BOCC determine that such funding can be
provided during FY 2002-03. If not, staff proposes to address these two needs
with operating budget and/or capital funds early in FY 2003-04.
1. 129 East King Street: Drainage around and under building
During the renovation of the Purchasing Office at 129 East King Street, the
Inspections Department noted improvements that were to be made to the area
around and underneath the building to provide better drainage. The building is
situated such that a significant amount of stormwater run off flows under the
building to an unpiped stormwater connection located under the 129 building.
The inspector was concerned that over time the foundation and the support
system of the building could be compromised if left in its current condition.
Further, the lack of drainage at the rear of the building causes water to run under
the roll up door into the warehouse area during periods of heavy rain or long
periods of rain. County Engineer Paul Thames has devised a plan to collect and
route the water into the storm sewer. The job is somewhat challenging since the
County owns no property to the sides of the building. Due to the significant
amount of manual work that will be required to complete the excavation and
concrete work, particularly underneath the building, the cost is estimated
between $50,000--$55,000.
2. Old Courthouse: Exterior Wood Repairs
Last spring, Commissioners allocated funds to complete clock and clock tower
repairs at the Old Courthouse. The County, in partnership with the Town of
Hillsborough, is in the process of having the clock restored. Staff has also
identified a need to repair and paint the exterior wooden surfaces located near
the roofline and on the clock tower. (It would be preferable to coordinate the
painting project with the reinstallation of the clock to save costs because
scaffolding would be required to complete both projects.) The anticipated cost to
complete the painting project is $45,000 to $50,000.
[volunteers Since 1968 /~ac-~,,me,~l`
ORANGE EMS AND RESCUE SQUAD
261 South Churton Street Hillsborough North Carolina 27278
202 Roberson Street Carrboro North Carolina 27510
12 November 2002
Dear Orange County Board of Commissioners,
In continuing discussions between Orange EMS and Rescue, Inc. (OEMSRS) and staff of Orange County, it has
become apparent that the ability to provide coverage for the EMS transport component has become increasingly
more difficult under the current configuration. Thus, OEMSRS supports a change in the process in order to address
the matter for the continued high quality of EMS services to the citizens or Orange County.
The Board of Directors of Orange EMS and Rescue, Inc. desires to transition the primary responsibility for staffing
the EMS transport component from OEMSRS to Orange County. This transition should take place over a mutually
agreeable timeframe, with the schedule and operational issues to be discussed between OEMSRS and Orange
County forthwith.
Over the course of this transition, OEMSRS feels it imperative to consider the following issues as they pertain to the
employees, volunteer members of OEMSRS, and other services OEMSRS currently provides citizens of Orange
County:
We fully support the conversion of the current OEMSRS paid staff to that of Orange County employees.
This will maintain the services of qualified staff experienced in the Orange County system, and would most
readily perpetuate the current structure of the 1RV system.
We further feel it essential to preserve a relationship between OEMSRS and Orange County to continue the
involvement of volunteer members of OEMSRS for such purposes as providing EMT personnel on
transport units (staffing ambulances, third person or additional ambulances) and during times of need
(natural disasters or emergencies), to provide coverage for the increasing demand for EMS Special Events
in Orange County, and to foster a learning environment for EMS and other health care related professions.
We consider the Rescue services that OEMSRS provides essential to the overall ability of emergency
services response to a variety of incidents in Orange County. We desire the County to recognize and
acknowledge this and support the continued provision of Rescue services by OEMSRS now and in the
future.
We appreciate your time and consideration in this matter and look forward to a smooth transition, for the sake of
Orange County, OEMSRS, and the citizens we serve. Please contact me if you have any questions or concerns.
Respectfully,
Matthew B. Dean
Chairperson, Board of Directors, Orange EMS and Rescue, lnc.
Cc: John M. Link, Jr., County Manager
Nick Waters, Director, Department of Emergency Management Services
1 ! fGtChY°rcr~~ t. f L.~.
Prepared 4/17/03
Emergency Transportation Transition
From Orange County Rescue Squad to Emergency Management
Progress Report
In North Carolina, counties are mandated to provide, or ensure the provision of,
appropriate Emergency Medical Services (EMS) to those in need of such services.
EMS includes medical assessment, necessary stabilizing treatment, and ambulance
transportation. Not all patients require every component of EMS, but each county must
ensure that all components are available to its citizens. Throughout the state, there are
many different models for providing this service.
Orange County has three primary functional areas for EMS:
• Emergency assessment and treatment
• Emergency transport
• Convalescent (non-emergency) transport
Over the past few years, the County has periodically evaluated how it provides
emergency and convalescent patient care and made various changes in how it delivers
these services to patients. For example, in 1994, the Board of County Commissioners
elected to privatize non-emergency transportation by granting non-exclusive franchises
to two private corporations.
The most significant change in the system occurred in 1996 when the County
implemented the award winning Initial Response Paramedic Program. This service
delivery model provides for paramedic response on every medical emergency call
received by the County's 911 Center. The responding paramedic, who is a County
employee, assesses the patient's needs and, if necessary, treats the illness or injuries.
When medically necessary, Orange EMS & Rescue Squad (OEMSRS) staff provides
emergency transportation in accordance with an existing contract between the Squad
and the County.
The existing contract provides for the Rescue Squad to staff ambulances and provide
space in squad stations to house the County's ambulances. Squad staff is comprised of
a mixture of non-paid volunteer, part-time paid, and full-time paid personnel. As
compensation for providing staff and housing ambulances, the County pays the Squad
a monthly stipend. It is also important to note that in addition to the stipend, Orange
County purchases and maintains ambulances and emergency response equipment and
supplies for the Squad to use.
In recent years, the Squad has faced challenges with regard to staffing and
volunteerism. Examples of the challenges include a decline in the number of volunteers
that it has been able to recruit and retain along with a decrease in the amount of time
2
that volunteers are able to contribute. To that end, the Squad has been forced to
increase the number of paid personnel to adequately provide emergency transporation
services in order to comply with its contract with the County. As a result, the Squad's
cost of providing emergency transportation services has increased significantly over the
past several years.
Within the last year, the Squad's Board of Directors has evaluated the organization's
health and concluded that it is in the best interest of the Squad to stop providing
emergency transportation. In essence, the Squad requested in a November 2002 letter
to the BOCC that the County take over the transportation component of emergency
medical services through a structured transition away from Squad-provided service.
Upon receipt of the Squad's letter, County staff began evaluating various service
delivery options. In order to be consistent with the County's 1995 EMS strategic plan,
specific areas were explored and analyzed:
• Quality of patient care including customer service and patient satisfaction
• Compliance with County EMS protocol, policies, and procedures
• Management of resources
• Fiscal impact
• Response time
Staff analyzed three basic service delivery models to identify which one would best fit
Orange County's EMS strategic plan. The models are described below:
• Option A Mixture of paid and volunteer County and Squad personnel.
Option B Privatization of the emergency transport function -much the way the non-
emergency transport function was privatized in 1994.
• Option C Transition the transportation function and associated staffing from a
squad-provided service to a County staffed one.
Following further discussions with Squad representatives, Option A no longer appears
to be a viable option. Option B, privatization, offers some benefits such as the lowest
per-unit dollar cost, because of economies of scale. Overall, staff found Option B weak
in most of the areas analyzed. For example, experience with the County's non-
emergency transportation service cause concern. The current non-emergency
providers have been unable to provide timely convalescent services in some instances.
3
EMS has also received complaints from patients regarding their interactions with non-
County convalescent transportation providers.
Option C appears to offer substantial benefits when compared to the first two options.
Transitioning all emergency medical functions to a single agency offers broad-ranging
benefits to Orange County citizens and visitors including:
• Assurance that emergency transportation services will be staffed and available for
emergency response.
• Unified management structure circumvents potential misunderstandings between
field personnel who previously had different supervisors and different policies and
procedures.
• Implementation of a career ladder that enables basic-level EMTs to broaden their
knowledge base through on-the-job training and move to the level of response
paramedic. The absence of such an internal career ladder has been repeatedly
identified as a stumbling block to effective recruitment and retention, both by the
Squad and the County.
• Comprehensive unified training efforts would enhance the ability of EMS to respond
effectively in routine situations as well as in extraordinary ones.
• Creation of a single chain of command would potentially improve operations during
major incidents and disasters.
• Better utilizes staff during special operations. Duties of employees can be easily
flexed to meet the workload demands throughout the county, whether that demand
is in EMS, Aging, or the Health Department.
• Provides much improved opportunities for leveraged functions, particularly in the
public health and education duties of EMS.
• Offers a pool of consistently trained knowledgeable homeland security responders in
the event of any terrorist incident.
Next Steps
To date, several meetings have been held with key County departments and Squad
leaders to craft a transition plan that benefits the County while at the same time offers
current Rescue Squad employees an opportunity to grow. Working groups have been
established to examine specific components of the transition plan, and work is
proceeding. The major components of the transition plan include staffing/training,
equipment/facilities, and rescue services.
4
• County Personnel staff is collaborating with Squad representatives to develop a
recommended process for a smooth transition of squad employees.
• County Budget staff is exploring various staffing patterns and considering other
expenses related to the transition to develop specific cost analyses and projections.
• County Purchasing/Central Services staff is evaluating options for securing suitable
ambulance basing locations around the county.
At this point, the tentative date for the transition to occur is June 30, 2003. This
approach ties the transition to the County's fiscal year and provides the Squad-to-
County employees with health insurance coverage effective July 1, 2003. In the next
few weeks County staff and Squad personnel will complete their analysis of the
transition.
As the Board may recall from the successful Solid Waste transition from the Town of
Chapel Hill to Orange County in April 2000, it is necessary to complete the transition
review and decision making process with sufficient lead time in advance of the actual
transition effective date to allow for necessary employee transition activities, such as
staffing, communications, benefits enrollment, payroll processing, and so forth. To this
end, staff's plan is to bring transition matters to the Board of Commissioners in stages
as outlined below to provide for the necessary consideration, approvals and lead time to
meet a possible June 30 effective date.
Stage Target Time
1. Present the transition proposal, including fiscal analysis, to the By May 13,
Board for the Board's discussion and direction to staff. If the 2003
Board's direction is to proceed with the transition based on a June
30 effective date, then staff would proceed with the next steps
below.
2. Present to the Board the proposed employee pay and benefits By May 20,
administration for Rescue Squad employees transferring to Orange 2003
County for the Board's consideration and decision, including
approval to establish positions and implement the proposed pay
and benefits administration for employees.
3. Implement the Rescue Squad transition to Orange County By June 26,
Emergency Management with adoption of the 2003-04 budget. 2003
MEMORANDUM
To: John Link, County Manager
From: Gayle Wilson, Solid Waste Management Director
Subject: Alternative Finance Education Efforts
Date: April 15, 2003
The Solid Waste Management staff and SWAB members have undertaken some efforts
over the past two months at educating the public and local elected officials about
alternative financing in Orange County.
Highlights of those efforts to date include:
• Presentation to Board of Orange County Commissioners: February 26 (Sassaman and
Wilson, Jeff Hughes, power point),
• Presentation to the Carrboro Board of Aldermen March 17 (Sassaman and Wilson,
power point),
• Presentation to the Chapel Hill Town Council March 24 (Sassaman, question and
answer, with planned future followup),
• Presentation to Hillsborough Board of Aldermen April 14(Sassaman and Wilson)
• Newspaper articles in Chapel Hill News March 5, Watching Our Wasteline,
reprinted in News of Orange March 19, Editorial Chapel Hill Herald on the
necessity of solid waste fees, 2 news articles in Chapel Hill Herald:
• March Radio interviews: WCHL 1360AM, Muriel Williman (education and outreach
staff), WUNC Gayle Wilson
• Web information: The following is now posted on the Orange County Web Site,
Under the Solid Waste Department page: "What's New" there is a brief directing the
reader to the following items: Report from SWAB to BOCC (February 24, 2003
(revised), Memorandum from SWAB to BOCC on financing March 25, 2003 and
Power Point Presentation on Solid Waste financing given to Carrboro Board of
Aldermen and Hillsborough Board of Alderman and submitted for presentation to
Chapel Hill Town Council, and
~ Front Page article in Waste Matters, County-wide newsletter published Apri12003.
Upcoming, scheduled further outreach includes the following:
• Inclusion of brief in Lake Ellen Homeowners Association Annual newsletter,
scheduled for publication in June, 2003,
• Submitted for inclusion in 24 Chapel Hill HOA newsletters newsletters,
• Article to be included in Chapel Hill Carrboro Chamber of Commerce monthly'niche'
publication Business Today that is inserted into Chapel Hill Herald and distributed to
Chamber members for May,
• Article to be included in Orange/Hillsborough Chamber of Commerce publication in
May and posted on their.web site,
• Article in Weaver Street Market's monthly newsletter in May (circa 25,000),
• Briefing to Chapel Hi1UCarrboro Chamber's monthly May meeting of governmental
affairs committee, and
• Development of article for insertion in June issue of "Trash Talk" a quarterly
publication of the Triangle Regional. Solid Waste Planners Committee, inserted into
4,000 landfill and private waste hauler bills sent throughout the Triangle.
Unscheduled but planned outreach *:
• Editors' Meeting
• Paid Advertisements
* Once the BOCC indicates its financing preferences we will move to a more substantive discussion of the
preferred financing mechanism. Some education/outreach options/venues are pending based on future
BOCC guidance/direction.
1)~1p,i ' ` ~ ~'
MEMORANDUM
To: John Link, County Manager
From: Gayle Wilson, Solid Waste Director
Subject: Questions Raised By BOCC -February 26, 2003
Date: April 16, 2003
The following questions were raised by the Board of County Commissioners at their February 26,
2003 work session. Solid Waste departmental staff have developed the following responses:
1. [Would we] allow other counties to partner [with us in the M1ZF/WTS]?
Implementation of the recommended Comprehensive Prepaid Solid Waste Services Fee does not
preclude in any way the potential for partnering with other jurisdictions regarding the development of
a Materials Recovery Facility, Transfer Station or other facility. Each partnering opportunity should
be evaluated based on the specific costs/benefits of the suggested project. As partnering opportunities
arise the SWAB would be available to assist the BOCC in evaluating pros and con's of the
prospective partnering arrangement.
2. How much will governments pay [for tip fees if we maintain status quo]?
Based on FY 2001/2002 billing records, county jurisdictions paid tipping fees as follows:
• Chapel Hill - $911,639
• Carrboro - $327,506
• Orange County - $483,937
• Hillsborough - $124,583 (Hillsborough franchised its commercial collections since FY 01/02
so the estimate provided is for FY 2002/2003 YTD residential billing, annualized.)
Future year fees charges to the towns would be similar to or more than those provided above for
2001/2002. While the per capita volume of waste disposed of in the landfill (or through a future
waste transfer station) would decrease, increases in population and in disposal costs could offset that
per capita disposal volume and thus increased costs to the jurisdictions maybe anticipated.
3. (In writing) why is it good to eliminate the (mixed solid waste) tipping fee.
Tipping fee revenue paid to the Solid Waste Enterprise Fund provides the funding for county disposal
operations as well as the vast majority of financing for the county's extensive recycling and waste
reduction operations. The enterprise fund receives no direct appropriation from the General Fund and
has operated essentially as aself-funding governmental business for the past 30 years. Over that
period tipping fees have risen due to general economic conditions, greatly expanded environmental
regulations, an interest in and dedication to waste reduction resulting in the implementation of a
number of successful recycling and toxicity reduction programs that have made local waste
management programs among the most respected in the state.
As a consequence of increasing costs, program expansions and unequalled success in the state in
reducing per capita waste disposal, tipping fee revenue resulting from landfill disposal has declined
and is no longer a reliable source of funding for the local solid waste management system. Therefore,
we believe continuing a financial system that is based on the quantity of waste disposed would be
unwise if there are other financial models available. Simply raising the fees to compensate for the
diminishing quantities of waste is not practical because our fees are already 2"d highest in the state
and waste haulers will simply shift wastes to other, lower cost landfills.
Elimination of the present tipping fee system will result in benefits to all of the stakeholders
associated with the solid waste operations in as much as it will remove the reliance on disposal to
provide a stable, equitable, and flexible source of funding to maintain a high quality integrated solid
waste management system. According to the SWAB recommendation, tipping fees would continue
for construction and demolition waste as well as for vegetative wastes (although vegetative wastes are
actually recycled and not disposed).
Citizens
Citizens would benefit by virtue of some increase in equity associated with afee-based financing for
waste services;
• All potential users (taxpayers and non-taxpayers) would share in the costs of available county-
provided services based on the level of service available to the user - i.e., level of recycling
services, availability of disposal facilities, and availability of hazardous waste, yard waste,
electronics, and C&D disposaUrecycling opportunities.
• Those for whom the facilities are presently available are those who will pay the appropriate
fees. Thus, the pending costs for closure of the landfill, anticipated to occur in 2009, will be
collected between now and 2009 by accrual of a Landfill Closure Reserve Fund.
• Individual jurisdictions would be free to provide "fee relief' for any citizen groups or not-for-
profit entities within their jurisdiction.
• Citizens (primarily in the unincorporated areas) who use private refuse collection services
should see their monthly cost significantly reduced.
Individual Jurisdictions
Individual jurisdictions are responsible for collection and transportation of solid waste generated
within their boundaries. At present, in addition to the costs of collection, individual jurisdictions also
pay significant tipping. fees, as described in item 1 above, for disposal of solid waste. The SWAB
recommendation would eliminate mixed waste tipping fee expenses (as illustrated in #2 above) for
the Towns and County because of the prepaid fees, and individual jurisdictions would be in a position
2
to lower their tax rates proportionally, if so desired. Individual jurisdictions would no longer have to
assess taxes required to pay tip fees, although some .level of tip fees would remain, such as for C&D
(which governments seldom deliver) and yard waste.
Towns would still be free to implement PAYT systems to recover some or all collection costs.
Solid Waste Enterprise
The single most important core element of funding solid waste management is the stable and
predictable financing of the solid waste system. Prepayment for a bundle of services that would
include operation of landfill and other elements of our system including recycling system, HHW
collection, administrative aspects, will stabilize the funding of the Solid Waste Enterprise.
While it maybe argued that elimination of the tipping fees and institution of a comprehensive service
fee to cover both solid waste disposal and recycling may remove any incentive for recycling, it is
noted that there is, at present, no specific incentive for recycling, except for the four "E's" -Ease,
Ethics, Expectations, and Education, yet Orange County leads the state in its per capita volume of
waste diverted to recycling. There is reason to believe that with increased availability of even more
recycling options, as well as aggressive education and program outreach, our levels of recycling will
continue to grow.
The comprehensive prepaid fee coupled with the also recommended franchising of local haulers will
create a legally permissible economic flow control as waste haulers have no incentive to go
elsewhere. Presently, haulers that deliver their Orange County waste to outside facilities do not
contribute their share of funding for non-disposal services.
Private Haulers
With the mixed solid waste collected within the county having the disposal fee prepaid, hauler fees
would presumably be charging customers only for collection, making private waste collection
significantly more competitive and resulting in a substantial lowering of fees for hauling waste. Many
large private haulers, with access to a dedicated (self owned) landfill have a competitive advantage
that discourages smaller operators, will no longer have a competitive advantage. This should
encourage competition for waste hauling services from local entrepreneurs who no longer have to
compete for disposal space, resulting in lower costs (from competition) for those who avail
themselves of commercial services. Indeed, this may well cause the individual jurisdictions to
reconsider whether or not they may well turn over commercial and even residential collection to a
franchise operation.
4. Private haulers -how do they adjust their fees?
Private haulers will need to adjust their fees to be competitive. Since those large haulers with owned
or otherwise captive disposal facilities will no longer have a competitive advantage, additional
smaller haulers will be able to compete. Also see #3 above.
ORANGE C~LJNTY
o o
NORTH CAROLINA
CELEB12ATiN (: 250 YEABS
t
~L.V'1Y1~~i 7~ ~
Orange County Personnel Department
208 South Cameron Street
Post Office Box 8181
Hillsborough, NC 27278
Elaine Holmes
Director
Tel (919) 245-2550
Fax (919) 644-3009
www.co.orange.nc.us
MEMORANDUM
April 15, 2003
TO: Orange County Board of Commissioners
John Link, County Manager
FROM: Elaine Holmes, Personnel Director
SUBJECT: Hiring Freeze Update
This is to update you on the status and experience to date with the hiring freeze
implemented for fiscal year 2002-03. Effective with the adoption of the 2002-03, the
Board of Commissioners adopted a hiring freeze effective July 1, 2002 through June 30,
2003.
The hiring freeze applies to non-critical permanent positions openings funded from the
County's general fund. It provides that anon-critical opening may not be filled for six
months following the separation date of the previous incumbent. The Board provided that
critical openings required to provide essential services such as those related to related
public safety, health and protective services and others as designed by the Manager could
be filled.
The Board instituted the hiring freeze as a cost savings measure for 2002-03. The
projected cost savings from the freeze was about $740,000.
During the period from July 1, 2002 through April 7, 2003, there have been 76 job
openings. Of these:
• 37 openings were in positions designated as critical such as Deputy Sheriff,
Paramedic, Telecommunicatorand Child Protective Services Social Worker and not
affected by the freeze
• 28 openings were non-critical openings and were frozen. Of these, 9 presently are
frozen and are in the following departments.
/ Economic Development - 1
/ Personnel - 1
/ Planning - 1
/ Public Works - 3
An Equal Opportunity/Affirmative Action Employer
-2-
/ Social Services - 3
• 11 openings were in non-critical positions but were designated as critical after the
department head's request and Manager's review. These fell in the following
departments:
/ Child Support - 2
/ Planning - 2
/ Public Works - 2
/ Recreation and Parks - 1
/ Social Services - 4
As to the cost savings, the Budget Office has been tracking this. Budget calculates
that through the end of February the County has realized about $584,000 in cost savings
and that the County is on track to achieve the projected $740,000 in cost savings for this
fiscal year.
We appreciate the department heads and their staff who've worked cooperatively and
creatively in support of the cost savings objective.
Please let me know if you have any questions.