Loading...
HomeMy WebLinkAboutAgenda - 06-27-2002 - 8n i ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 27, 2002 Action Agenda Item No. $-� SUBJECT: Bid Award: Construction of Recycling Facilities at Landfill DEPARTMENT: Solid Waste PUBLIC HEARING: (YIN) No Management/Purchasing ATTACHMENT(S): INFORMATION CONTACT: Bid Tabulations Gayle Wilson, 968-2885 Summary of changes Pam Jones, 245-2652 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider awarding a bid for construction of recycling facilities at the Orange County Landfill. BACKGROUND: On December 11, 2001, the Board adopted the Regulated Recyclable Materials Ordinance (RRMO). That action represented the culmination of the vision of the BOCC-appointed Construction and Demolition (C&D) Recycling Task Force that met from late 1999 through mid-2000 and presented its report and recommendations to the BOCC in August 2000. The ordinance and its related personnel, equipment and facilities have been the subject of several discussions by the Board. The adoption of the RRMO necessitates the acquisition of equipment to manage and haul the materials to market, new personnel to operate the equipment, to inspect the incoming loads for compliance, for education and enforcement, and to issue permits and licenses. The ordinance also necessitates the construction of C&D recycling facilities at the landfill, which were included in the Facilities Master Plan adopted by the Board on October 1, 2001. On June 11, 2002, the Board authorized the creation of three new positions and authorized the purchase of five major pieces of equipment (a Road Tractor was not included and must be rebid due to the vendor withdrawing the bid). The necessary facilities include: • Construction of a covered cardboard/drywall receiving/loading station • Construction of a scrap metal/white goods receiving/loading station • Shifting the existing yard waste/mulching area to the north and incorporating a clean wood waste recycling area, and construction of a four bay mulch/compost storage bunker a • Construction of an electronics storage building (combined with the C&D recycling construction project for reasons of economy) Eight general contractors contacted the County for plans for this project and attended the pre- bid conference on June 3, 2002. The bid opening was scheduled for 3:00 PM June 10, 2002, however,,only two responses were received. Pursuant to State bidding laws, which require a minimum of three bids for the first solicitation, the bids were not opened on June 10, 2002. The project was re-advertised and a new bid opening was scheduled for June 20, 2002. Three bidders responded, with Van Thomas Contractor, Inc., Siler City, NC submitting the lowest bid that was responsive in an amount of$607,648.70. Since this amount exceeded the funding identified by the Landfill staff for this project, the bid was negotiated downward with the low bidder. Through a variety of deletions and/or modifications, the bid price was reduced by $132,648.70 to $475,000. A summary of the changes as submitted by Landfill staff is attached. FINANCIAL IMPACT: Funds for facilities construction are available in the Solid Waste enterprise fund. No General Fund money will be utilized-for this project. An additional $23,750 (5%) will be appropriated as a project contingency. Staff proposes to budget funding for this project by adding a resulting total of$498,750 to the amount included in the Manager's Recommended Budget for the Solid Waste Management Department in the FY 2002-03 budget ordinance, which is scheduled for adoption by the Board elsewhere on this June 27, 2002 meeting agenda. RECOMMENDATION(S): The Manager recommends that the Board: 1) award the bid for the solid waste recycling facilities to Van Thomas Contracting, Inc., Siler City, NC in the amount of$475,000, contingent upon approval of the 2002-2003 Solid Waste Management Enterprise Fund budget; 2) authorize the Chair to sign a contract, contingent upon attorney and staff review; and 3) authorize the Manager to approve change orders within total available project funding of $498,750. BID TABULATION Name of Bid: ORANGE COUNTY MULCH STORAGE AND RECYCLING FACILITIES Bid Deadline: 10:00 A.M.. June 20, 2002 Bidder Lump Sum Base Bid Corrected Lump Sum addition errors Van Thomas Contractor, Inc. $609,000 $6079648.75 .1 Siler City) (recommend award) H.M. Kern Corporation Greensboro $656,350 $6580350.15 3 Patriot Builders, Inc. (Hillsborough) $622,617 $622,696.40 2 CN 1 Summary of Changes: Recycling Facilities Bid ITEM DESCRIPTION COST $ Van Thomas Van Thomas Deducts REVISED 1 Mobilizationldemobilization 1463440.5 136,539.8 90900.70 2 ti d En a. 6900 61000 0.00 3 Fence 150 150 0.00 4 er exist. Drain 2,200 2,200 0.0 5 Inlet 1,30 1 ,300 0.0 6 halt 80,27 60,030 20,240.0 7 re ate under Asphalt 25,12 19,62 5,500.00 8 ravel Roads 69964 69,646.00 9 Guard Rail 3,341 .20 31341 .2( 0.00 10 Concrete curb 71250 7,25 0.00 11 Com acted soil 24,512 243512.00 12 Rock removal Ij984 13984 0.00 13 Reve elation 150 150.00 14 Electrical 19s925 19j929 0.00 15 Compactor & containers 18235 18,359 0.00 16 3attefy building 39,000 369300 23700.00 17 Mice paper facili ty 14,000 143000 0.0 18 Metal & White gGods 54300 541000 0.00 19 ardboard & Drprall 441000 44100 0.00 20 olored Mulch Facility 509000 50,00 0.00 0.00 OTAL 6079648.70 475900 132,648.70