Loading...
HomeMy WebLinkAboutOUTBoard Minutes - February 17 and March 17 2025 ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty AGENDA ORANGE UNIFIED TRANSPORTATION BOARD April 21, 2025, 6:30 pm 131 W Margaret Ln, Hillsborough, NC 27278 OUTBoard meetings are held in person and open to the public.Any member of the general public who wishes to make public comment should attend or email Orange County Transportation Director Nishith Trivedi at ntrivedi@orangecountync.gov. All comments will be read to the OUTBoard during the public comment portion of the meeting. 1. Call to Order 2. Consideration of Additions or Changes to Agenda 3. Public Comments 4. Minutes— February 17, 2025, and March 17, 2026 5. Regular OUTBoard Agenda a. 2009 Farmland Protection Plan i. Action: Provide comments b. Policy and Procedure Update i. Action: Recommend approval c. Orange County Bike/Ped Plan Update i. Action: Provide comments d. DAC Memo V2.5 i. Action: Provide comments 6. Staff Report/Updates a. MPO, RPO, and NCDOT 7. Adjournment -The next meeting— May 19, 2025 It is the policy of Orange County Transportation Services to ensure that no person shall, on the ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987. 600 Hwy 86 N • Hillsborough, North Carolina 27278 Phone (919)245-2008 • Fax (919)732-2137 orangecountync.gov/transportation ORANGE UNIFIED TRANSPORTATION BOARD MEETING MINUTES Monday February 171h, 2025, 6:30 pm 131 W. Margaret Lane, Hillsborough, NC 27278 1 Attendance: Members Present 2 Micheal Hughes At Large 3 Jamie Crandell Eno Township 4 Art Menius Little River Township 5 Gregory Woloszczuk At Large 6 Gene Owen At Large 7 Sherry Appel At Large 8 Roy Schonberg Chapel Hill Township 9 Erik Legg At Large 10 Joshua Mayo At Large 11 Chloe Pankratz Youth Delegate 12 Darlene Weaver Orange County Staff 13 Nishith Trivedi Orange County Staff 14 15 AGENDA ITEM 1:CALL TO ORDER 16 The meeting was called to order and the roll was taken. 17 18 AGENDA ITEM 2: CONSIDERATIONS OF ADDITIONS TO AGENDA 19 No considerations to the agenda. 20 21 Micheal H. (Chair) apologized for missing the previous meeting due to a work-related crisis. He proposed a 22 20-minute briefing for the next meeting regarding updates to the 2009 Farmland Protection Plan that he has 23 been involved in. 24 25 AGENDA ITEM 3. PUBLIC COMMENTS 26 No public comments 27 28 AGENDA ITEM 4. MINUTES—January 20th, 2025 29 Motion:Art M.with noted changes on attendance 30 Second: Gregory W. 31 Approval: Unanimously 32 33 AGENDA ITEM 5. OUTBOARD AGENDA 34 35 a. 2019 Efland—Buckhorn—Mebane Access Management Plan Update 36 Nishith T. presented a status update comparing projected traffic volumes from the 2019 plan with current 37 development impacts.To date, only 25,000 of the projected 175,000 trips/day are being generated. 38 Discussion included: 39 • Truck traffic increases due to warehouse/industrial development. 40 • The need to consider freight in transportation planning. 41 • Potential public engagement to reassess the plan. 42 • Correction of wording in action items and project dates to reflect the 2025 timeline. 43 44 Outcome: No action taken at this time; monitoring will continue. A follow-up presentation and potential 45 public engagement were discussed. 46 47 b. Orange County Safe Routes to School—Steering Committee 48 Nish T. presented a potential plan to begin implementing the adopted 2024 Safe Routes To School Plan, 49 focusing on the Steering Committee. He requested feedback on forming it addressing composition like 50 school staff, parents,youth,and other stakeholders.The importance of Parent Teacher Association(PTA) 51 involvement was highlighted; Nishith to reach out to each school's PTA. Concerns were raised about 52 managing committee size and expectations. Discussion acknowledged cultural barriers to 53 walking/biking to school and the need for public champions. Nish T. confirmed he will serve in a 54 facilitative role in creating the Steering Committee while seeking champions as recommended in the 55 plan. It was discussed that the best people to serve as "champion" would be a parent as school 56 administrators are already overwhelmed with their current job tasks. 57 58 Outcome: No motion required. Input will continue to be gathered and revisited in future meetings. 59 60 c. Non-STIP Project Updates 61 Nish T. shared a cleaned-up list of active non-STIP transportation projects. Discussion focused on 62 obligating IIJA and Bipartisan Infrastructure Law funds amid federal funding uncertainties. Projects 63 prioritized for obligation include road maintenance, transit improvements, and spot safety upgrades. 64 Agencies are working to secure funds in contracts to protect them from potential rescissions. 65 66 AGENDA ITEM 6. STAFF REPORT/UPDATES 67 a. MPO, RPO, and NCDOT 68 Nish provided updates on key projects. Current DOT projects are proceeding as scheduled. Specific 69 bridge replacements and wildlife crossing accommodations were noted, particularly near the US 70 70 corridor. 71 72 AGENDA ITEM 8:ADJOURNMENT 73 OUTBoard meeting was adjourned.The next meeting is scheduled for March 17, 2025. ORANGE UNIFIED TRANSPORTATION BOARD MEETING MINUTES Monday March 171h, 2025, 6:30 pm 131 W. Margaret Lane, Hillsborough, NC 27278 1 Attendance: Members Present 2 Micheal Hughes At Large 3 Jamie Crandell Eno Township 4 Art Menius Little River Township 5 Gregory Woloszczuk At Large 6 Gene Owen At Large 7 Sherry Appel At Large 8 Roy Schonberg Chapel Hill Township 9 Erik Legg At Large 10 Joshua Mayo At Large 11 Heidi Perry At Large 12 Amy Cole At Large 13 Susan Gladin Hillsborough Township 14 Chloe Pankratz Youth Delegate 15 Darlene Weaver Orange County Staff 16 Nishith Trivedi Orange County Staff 17 Emmal-ea Ange Orange County Staff 18 19 AGENDA ITEM 1: CALL TO ORDER 20 The meeting was called to order at 6:30pm and the roll was taken. 21 22 AGENDA ITEM 2: CONSIDERATIONS OF ADDITIONS TO AGENDA 23 No considerations to the agenda. 24 25 AGENDA ITEM 3. PUBLIC COMMENTS 26 No public comments- No members of the public were present. Discussion noted the need to increase 27 public engagement at future meetings. 28 29 AGENDA ITEM 4. MINUTES—February 17th,2025 30 Approval of the February 17th meeting minutes was deferred. Nish T. is still reviewing them and will present 31 them at the next meeting. 32 33 AGENDA ITEM 5. OUTBOARD AGENDA 34 35 a. Orange County Transportation Priorities for Spot 8.0 36 Nish T. provided an overview of the Strategic Prioritization of Transportation (SPOT 8) process and 37 reviewed the list of potential projects for OUTBoard consideration. He noted that there are currentlythree 38 State Transportation Improvement Programs (STIPs) in place: the existing approved STIP, which is 39 undergoing amendments;a new draft STIP anticipated for approval in June;and SPOT 8,which will initiate 40 the next STIP cycle. In light of recent developments regarding federal funding reductions and the 41 uncertainty surrounding future transportation authorization legislation, staff advised caution in 42 assuming that projects submitted through SPOT 8 will receive funding in the upcoming STIP. 43 44 OUTBoard members expressed support for the majority of staff and Transportation Advisory Services 45 recommendations,with the following modifications: 46 • The US 70 Improvements project should be revised from a widening with multimodal 47 accommodations to a modernization project with multimodal accommodations. 48 0 The NC 86 project should not be included in SPOT 8 at this time; instead, a comprehensive 49 multimodal corridor study should be conducted to identify appropriate improvements. 50 0 The NC 54 project should not be submitted for SPOT 8 consideration. 51 52 Nish T. stated that he will present the Department, TAS, and OUTBoard recommendations to the Board 53 of County Commissioners at their April meeting and will forward the Board's decision to the appropriate 54 regional partners for further action. 55 56 Motion:Joshua Mayo 57 Second: Sherry Apple 58 Unanimous 59 60 b. Transportation DAC Memo V 2.5 61 Nish T.presented the revised template and frameworkfor a multimodal assess memo to be used in future 62 development reviews.This tool: 63 9 Replaces traditional traffic impact analyses with comprehensive multimodal assessments. 64 9 Integrates data from crash records, travel demand models, census data, and local transportation 65 plans. 66 • Aims to improve developer accountability and coordinate improvements through DOT 67 encroachment agreements. 68 0 Staff may pursue adding a developer fee for these assessments in the future. 69 70 Feedback&Discussion: 71 0 Members supported the approach and emphasized the importance of public transparency. 72 0 Suggestions included adding example test cases and clearly identifying threshold criteria. 73 0 Sherry Appel recommended ensuring the analysis documents be publicly accessible and advised on 74 setting developer fees realistically. 75 76 Outcome: deferred until the April meeting when updated examples will be presented. 77 78 AGENDA ITEM 6. STAFF REPORT/UPDATES 79 a. MPO, RPO, and NCDOT 80 Nish provided updates on key projects. Draft STIP and TIP documents indicate increased project costs; 81 updated lists were shared for review.A request was made to include the correct name for CW Stanford Middle 82 School, now renamed to Orange Middle School. Request made for an update on the community engagement 83 process for the Bike & Pedestrian Plan to be included on the next agenda. Several board members noted 84 concern over federal funding uncertainty—suggested inviting DOT or MPO staff to speak on the issue at a 85 future meeting. 86 87 AGENDA ITEM 8:ADJOURNMENT 88 OUTBoard meeting was adjourned.The next meeting is scheduled for April 21 st, 2025. � ORANGE COUNTY GOVERNMENT ORA E L TRANSPORTATION SERVICES DEPARTMENT No rH CARQLLNA Ora"g; �m utt 8, Item 5.a. Subject: Agricultural Viability and Farmland Stewardship Plan Attachment: Draft Agricultural Viability and Farmland Stewardship Plan PURPOSE: To provide comments on the Agricultural Viability and Farmland Stewardship Plan. BACKGROUND:The Agricultural Viability and Farmland Stewardship Plan supports Orange County's Strategic Priorities of Environmental Protection and Climate Action by promoting sustainable agriculture and local food systems. It addresses key challenges such as farmland conversion, economic pressures on farming, climate impacts, and an aging farmer population. Despite these issues, Orange County has significant assets: fertile land, a strong community of passionate and emerging farmers, and public support for local, sustainable food. • The Plan outlines a vision for a thriving agricultural future through three main goals: • Enhance farm viability and protect farmland through strategic land use planning and supportive resources. • Inform and engage the public and policymakers to strengthen support for local agriculture. • Support farmers' livelihoods with education, infrastructure, and financial assistance. By leveraging existing strengths and implementing targeted recommendations, Orange County aims to preserve farmland, support its farming community, and build a resilient local food system. FINANCIAL IMPACT: No financial impact currently. ALIGNMENT WITH STRATEGIC PLAN: • GOAL 4: MULTI-MODAL TRANSPORTATION • OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. • OBJECTIVE 3.Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. • OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. ACTION: Recommend comments on Agricultural Viability and Farmland Stewardship Plan (Attachment 1). 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation DRAFT/March 27, 2026 Agricultural Viability and Farmland Stewardship Plan for Orange County, NC 2025-2029 DRAFT Orange County Agricultural Preservation Board (APB) APB Farmland Stewardship Subcommittee Orange County Cooperative Extension 1 DRAFT/March 27,2026 Table of Contents Executive Summary Page 3 1 . Overview Page 7 2. Importance of a Robust Local Agriculture Page 8 3. Challenges to Agriculture in Orange County Page 10 4. Opportunities for Agriculture in Orange County Page 16 5. Goals for Agriculture in Orange County Page 19 6. Recommendations and Priority Actions Page 22 7. Potential Sources of Funding Page 36 8. References Page 38 Appendix 1 . Summary of 2023 Orange County Farmer and Page 41 Landowner Survey Appendix 2. Recommendations for Criteria for Identifying Farmland for Protection in Orange County Page 48 Appendix 3. Recommendations for Framework for Revisions and Additions to the Unified Development Ordinance to Strengthen Farmland Protection Page 51 2 DRAFT/March 27,2026 Executive Summary Agricultural land use and farming practices are fundamental determinants of how Orange County---and the rest of the world---meet the most pressing challenges of our time: climate change, environmental degradation, and population-wide poor health related to overreliance on food produced within a globalized, industrial system. Indeed, the Orange County Strategic Plan 2025-2029 advances development and support of sustainable agriculture and local food systems as important means of achieving the County's top Strategic Priorities of Environmental Protection and Climate Action. This Agricultural Viability and Farmland Stewardship Plan was developed to support the County in achieving these Strategic Priorities. It describes recent trends in agriculture and farmland loss, challenges to and opportunities for farming enterprises, vision and goals for agriculture, and recommendations for enhancing agricultural viability and stewarding farmland in Orange County. The main challenges to agriculture in Orange County-farmland conversion to development and poor economic viability of agriculture-are longstanding and have intensified in recent years. They interrelate with additional challenges including the impact of climate extremes on farming and the aging of the farming population. These challenges are not insurmountable, particularly in the context of the opportunities: • Orange County soils, climate, and water resources can support agriculture now and into the future. • Orange County has strong and growing communities of small, diversified farms and new and beginning farmers. • Established Orange County farmers are passionate about their work and want to keep their land in farming. • Orange County citizens value agriculture and recognize its benefits to the County, and community members seek food grown sustainably and locally. • Local food hubs have operational expertise and capacities to manage the aggregation, distribution, and marketing of products from small-to-medium-size farms to support them in reaching larger markets. Building on its assets and strengths, Orange County can minimize continued farmland loss and foster a thriving agricultural community that supports a robust local food system. The following three Goals and associated Recommendations and Actions will help the County to realize this vision. Implementation of the Recommendations will help make Orange County a place where • Farm viability is enhanced, and farmland is maintained and stewarded for agricultural uses through judicious land use planning and educational, logistical, and financial support. • Citizens and decision-makers have the information and resources they need to support local agriculture and the farming community. • Farmers are supported in their livelihoods with educational, financial, and infrastructural resources. 3 DRAFT/March 27,2026 GOAL 1: Plan FOR Agriculture: Elevate farmland stewardship to being a central consideration in land use planning and decisions. Continued farmland loss can be mitigated through proven land use planning approaches such as compact development, minimization of sprawl, strengthened development in areas where development has already occurred, and permanent protection of farmland and open space. GOAL 1 RECOMMENDATIONS: 1) Assess, document, and communicate the status of agriculture in Orange County. a) Assess farmland conversion trends in the County on a biennial basis through GIS mapping. b) Conduct a biennial County-wide agricultural census. c) Complete an Economic Impact Assessment of agriculture in the County. d) Complete a new Cost of Community Services study of agriculture in the County. e) Communicate farmland conversion trends, County agricultural census results, and economic data in the biennially updated Agricultural Viability and Farmland Stewardship Plan and on a County agriculture web page/website. 2) Elevate agriculture to a primary use in land use planning, regulations, and policy. a) On the Planning Board, include an Agricultural Preservation Board member. On the Agricultural Preservation Board, include a Planning Board member. b) Adopt the Agricultural Viability and Farmland Stewardship Plan as a reference in or a component of the 2050 Comprehensive Plan. c) Adopt a Prioritization Method to identify and target farmland for conservation in coordination with existing Lands Legacy prioritization criteria. d) Adopt modifications and additions to the Unified Development Ordinance (UDO) and to County policies to elevate agriculture to a primary use in land use regulations and policy. GOAL 2: Conserve Farmland Through Direct Measures: Promote the benefits of and strengthen opportunities for farmers to use direct measures to conserve their farmland. The most effective means of protecting farmland are direct measures: namely permanent agricultural conservation easements and transition plans or estate plans that provide for continuing operation of farms when owners retire or die. GOAL 2 RECOMMENDATIONS: 3) Increase the rate at which Lands Legacy Program conservation easements are granted. a) Increase the funds available for County purchase of Lands Legacy Program conservation easements. b) Identify and implement additional frameworks for County collaboration with non-County conservation organizations (e.g., Triangle Land Conservancy, Eno River Foundation) to secure easements. Explore the possibility of reactivating the Orange County Conservation Alliance. 4) Use the VAD/EVAD (Voluntary Agricultural District/Enhanced Voluntary Agricultural District) program as a steppingstone to permanent Lands Legacy Program conservation easements. a) Intensify VAD/EVAD recruiting efforts through direct mail, County website, direct outreach, and Agricultural Preservation Board member engagement. 4 DRAFT/March 27,2026 b) Encourage farmers in the VAD/EVAD program to participate in a conservation easement workshop, and incentivize enrollment. c) Fund complimentary easement-related legal and financial consulting for VAD/EVAD landowners considering putting their land in a conservation easement. 5) Provide farmers with education and resources on transition planning and farmland conservation. a) Fund complimentary transition planning consulting to VAD/EVAD landowners and farmer-landowners holding Lands Legacy Program conservation easements. b) Convene an annual Transition Planning/Estate Planning summit for County farmer- landowners. c) Educate owners of forestland about the benefits to the environment and the climate of conserving forestland and the financial benefits of managed forestland. d) Conduct a County-wide outreach program to better understand farmer and landowner perspectives on transition plans to support customized approaches to transition planning and conservation. 6) Establish an Agricultural Viability and Farmland Stewardship coordinator role in the County. a) Define the duties of the coordinator role. b) Assign the position a place in the County organizational structure and allocate funding for it. GOAL 3: Enhance the Economic Viability of Agriculture by: • Providing new business opportunities for farmers through market development, education, diversification, and cooperation; and • Increasing local demand for Orange County farm products by increasing awareness of their value and benefits. Enhancing the economic viability of agriculture in the County entails agricultural development that facilitates productivity as well as market development that increases demand for local agricultural products. GOAL 3 RECOMMENDATIONS: 7) Expand educational opportunities in agriculture and agricultural business development. a) Offer both new- and established-farmer-targeted coursework and bootcamp with curriculum to include business development, agritourism, crop production, livestock management, marketing. 8) Support farmers in expanding and diversifying their businesses through agritourism. a) Form a County Agritourism Networking Group for peer-to-peer agritourism education and support. b) Incorporate an agritourism module into the new and beginning farmer education program (Priority Action 7a). 5 DRAFT/March 27,2026 9) Support farmers in efforts to expand into wholesale markets. a) Educate farmers about the benefits of, and provide funding for, their GAP certification. b) Fund and implement a farm-to-school pilot program to get food from Orange County farmers into Orange County Public Schools. c) Provide opportunities for aggregation, sale, and distribution of Orange County farm products to County and NC-wide markets through collaboration with a local food aggregator/distributor. Food hubs can aggregate, store, and distribute products from multiple farmers to achieve and distribute wholesale quantities that individual small farmers cannot achieve on their own. d) In collaboration with the NC Department of Agriculture and in consultation with Tri-COG FEEDS (Food Ecosystem Economic Development Strategy), conduct a feasibility study for a regional market and aggregation/distribution center in the vicinity of 1-40/I-85. 10)Provide citizens and decision-makers with information and education on agriculture in Orange County and with opportunities to engage with the farming community. a) Update the Agricultural Viability and Farmland Stewardship Plan biennially. Discuss the biennial update at a Board of County Commissioners meeting dedicated to agricultural viability in the County. b) Publicize and communicate about Orange County agriculture through an Agriculture web page or website, social media, and other electronic means. c) Convene a periodic agricultural festival for the public. d) Expand the County Farm-to-Table event to reach more children. 11)Offer financial incentives for agriculture and agricultural development in the County. a) Broaden eligibility criteria for Agricultural Economic Development grants to include agricultural support entities (e.g., NC FarmLink, Farmer Foodshare), and allow flexibility in awarding grant funds across three categories of recipient (new farmers, established farmers, agricultural support entities). b) Fund new-farmer-startup grants and develop tax credits to assist qualified new farmers with purchase of farmland. c) Identify and establish property tax incentives to support farm sustainability. d) Conduct a multi-County pilot program to reduce the acreage requirement of the Present Use Value Program to 1 acre. Potential funding sources include • Deferred Taxes from Farmland Coming Out of the Present Use Value Program Properties in the Present Use Value program coming out of agricultural use are subject to deferred taxes with accrued interest, immediately due and payable, for the year of disqualification and the three previous years. Revenue generated from these tax dollars could be directed to an Agricultural Trust Fund. Similar successful programs are currently operating in Cabarrus County, Chatham County, Lee County, and Wake County. • Land Transfer Tax North Carolina counties have the ability, granted by the North Carolina General Assembly, to levy a tax on the sale of real property. For Orange County, the tax can amount to 0.4% of the sale price of real estate levied in the year of the sale. To be implemented, the tax must be approved by a majority vote of citizens. • Grants from entities including the Agricultural Development and Farmland Preservation Trust Fund, Golden Leaf, the North Carolina Tobacco Trust Fund, and the Orange County Farm Bureau. 6 DRAFT/March 27,2026 1 . Overview Orange County citizens and decision-makers recognize the economic, environmental, and cultural benefits of sustainable agriculture and the necessity of a robust local farming community. The goal of Promoting Sustainable Agriculture is included in the Orange County Strategic Plan 2025-2029 as a primary means of achieving the County's top Strategic Priorities of Environmental Protection and Climate Action: The County will "incentivize and promote sustainable agriculture and local food systems development through supportive policy, funding, farmland protection, and educational outreach" (Orange County, 2024). This Agricultural Viability and Farmland Stewardship Plan was developed to support the County in incentivizing and promoting sustainable agriculture and local food systems development. The Plan describes recent trends in agriculture and farmland loss, challenges to and opportunities for continued farming, vision and goals for agriculture, and recommendations for maintaining farmland and supporting a viable farming community in Orange County. The Plan meets content guidelines outlined in the North Carolina General Statutes (§ 106-744) for preferential eligibility for NC Agricultural Development and Farmland Preservation Trust Fund monies supporting agricultural viability and conservation projects (NC General Statutes, 2024). This Plan updates the County's Agricultural Development and Farmland Protection Plan issued in 2009. It is intended to be a dynamic plan that is updated and reissued biennially to address the needs and challenges associated with a rapidly evolving agricultural landscape. Actions recommended in the Plan are intended to be implemented over the next 5 years from 2025 to 2029 in keeping with the timeframe of the County's Strategic Plan. 7 DRAFT/March 27,2026 2. Importance of a Robust Local Agriculture Agricultural land use and farming practices are fundamental determinants of how Orange County---and the rest of the world---meet the most pressing challenges of our time: climate change, environmental degradation, and population-wide poor health related to overreliance on food produced within a globalized, industrial system (Walinga, 2009). Poorly managed farmland and unsound agricultural practices can exacerbate these challenges. Conversely, well stewarded farmland and sustainable farming practices can stabilize and restore the environment, mitigate climate change, and support resilient local and regional foodsheds (Pretty, 2008; Naresh, 2023). Sustainable agriculture preserves and restores habitats, maintains wildlife corridors, protects watersheds, enhances soil health, improves water quality, and sequesters carbon. Besides conferring these environmental and climate benefits, sustainable agriculture is the bedrock of local food systems development (Chao, 2024; MacFall, 2015)--- essential for addressing the threats to the global food supply posed by weather extremes, political instability, and biological threats such as pandemics. Partly because of their impact on natural resources, the environment, and climate, agricultural land use and practices also underpin local, regional, and global economies. There is no economy without a healthy environment and people, a climate that supports life and good livelihood, and an accessible, nutritious food supply. "Agriculture is not crop production as popular belief holds- it's the production of food and fiber from the world's land and waters. Without agriculture, it is not possible to have a city, stockmarket, banks, university, church, or army. Agriculture is the foundation of civilization and any stable economy." -Allan Savory A comprehensive assessment of the economic impact of agriculture in Orange County has not recently been undertaken. According to the 2022 US Census of Agriculture, cash receipts for agricultural products sold in Orange County exceeded $41 .9 million in 2022, and agriculture employed approximately 1% of people (approximately 1500 people) in the County (USDA, 2023; Agricultural Census, 2022). According to the North Carolina Forestry Service, Orange County forest landowners took in an estimated stumpage harvest value of $1 .7 million in 2022 (North Carolina Forestry Service, 2022). The estimated economic contribution of forestry output to the County's economy was $189 million, and forestry employed 652 people. This Plan proposes an Economic Impact Study to better quantify the current impact of agriculture in the County. 8 DRAFT/March 27,2026 The economic impact of agriculture on the local economy exceeds that suggested by the values quoted above because of the linkages of agricultural production with other economic sectors (Walden, 2014; Agricultural Trade Multipliers, 2024). For example, agriculture economically impacts local suppliers as well as local consumer industries. In a study using 2017 data, each $1 of output produced using North Carolina-grown inputs was estimated to generate $1 .7 to $19.1 (depending on the input) of new spending in the state (NC State University, 2019). A similar multiplier effect likely applies at the level of the County. In addition to contributing directly to the local economy, farmland compared with developed land saves the County money in expenditures associated with community services. Across numerous studies (WeConservePA, 2024), agriculture costs less in services than it raises in revenue. In a 2006 study conducted by the American Farmland Trust (Renkow, 2006), for every $1 of revenue raised by a farm, forest, or open space, Orange County spent only 72 cents on services. In contrast, for every $1 in revenue raised by residential development, Orange County spent $1 .24 on services. To obtain updated Cost of Community Services statistics, a new Cost of Community Services Study is proposed in this Plan. Orange County decision-makers recognize the economic, environmental, and cultural benefits of sustainable agriculture and the necessity of a robust local farming community. The goal of Promoting Sustainable Agriculture is included in the Orange County Strategic Plan 2025-2029 as a primary means of achieving the County's top Strategic Priorities of Environmental Protection and Climate Action (Orange County, 2024). Orange County seeks to "incentivize and promote sustainable agriculture and local food systems development through supportive policy, funding, farmland protection, and educational outreach"in support of its top 2025-2029 Strategic Priorities of Environmental Protection and Climate Action. 9 DRAFT/March 27,2026 3. Challenges to Agriculture in Orange County The necessity of maintaining a robust local agriculture notwithstanding, agriculture in the County is imperiled. The main challenges to agriculture in Orange County are farmland conversion to development and poor economic viability of farming. These challenges, which Orange County shares with the state and the nation (Freedgood, 2020), are longstanding and have intensified in recent years (Orange County, 2009). They interrelate with additional challenges including the impact of climate extremes on farming and the aging of the farming population. Challenge: Orange County is losing its farmland to development. With excellent agricultural soils and gently rolling terrain, Orange County lies in the heart of the Piedmont of North Carolina, an agricultural state with a preponderance of Nationally Significant farmland, defined as that best suited for long-term, intensive production of crops (Freedgood, 2020). Approximately three-fourths of the County's land area comprises Prime Farmland or Farmland of Statewide Importance (Orange County, 2009). Prime Farmland is defined by the US Code of Federal Regulations as land that "has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops, and is also available for these uses" (US Code of Federal Regulations, 2024). Farmland of Statewide Importance is defined as lands that are generally "nearly prime farmland and that economically produce high yields of crops when treated and managed according to acceptable farming methods" (US Code of Federal Regulations, 2024). From the 1750s through the 1950s, most of Orange County's land was in farms (Orange County, 2009). With population growth and the addition of new residents in the 1960s and 1970s, acreage in farms declined steadily and dramatically---a trend that continues to this day. The significant, continued loss of farmland constitutes a threat to food security and agricultural security in the County. • According to US Census of Agriculture data based on farmer/producer self-reports, approximately 146,000 of the County's 255,000 total acres was in farms in 1959. Acreage in farms decreased to 71 ,010 by 2002 and to 53,068 by 2022 coincident with accelerating population growth (Agricultural Census, 2022). • Consistent with the census data, a satellite-imagery-based study undertaken by the Farmland Stewardship Subcommittee of the Agricultural Preservation Board in collaboration with the Orange County Planning Department demonstrates a dramatic decrease in County land devoted to crops (excluding grassland and forestland) from 21 ,610 acres 10 DRAFT/March 27,2026 in 2017 to 8821 acres in 2022 (Figure 1 ). During this period, acres in development increased from 33,526 to 40,812. Figure 1. Land in crops in northern and southern Orange County, 2017-2022. The data are based on land cover as assessed by satellite imagery and land categorizations delineated by the US Department of Agriculture National Agricultural Statistics Service Cropland Data Layer. Grassland and forestland are excluded. Acres 25,000 20,000 15,000 10,000 5,000 5,299 0 2017 2018 2019 2020 2021 ■ North ■South *Grassland and forestland excluded The high rate of farmland loss reflected in the satellite-imagery data and the Census aligns with Orange County farmer/landowner perceptions. In a 2023 Orange County Farmer and Landowner Survey conducted by the Farmland Stewardship Subcommittee, respondents overwhelmingly considered the most important threat to farming in Orange County to be farmland conversion to development (Appendix 1 for summary). They described low-density residential development, in particular, as a threat (Figure 2). Low-density residential development is characterized by few dwelling units on a large land area (low population density). Low-density residential development most often takes the form of single-family suburban homes with large lots and large green spaces between homes. 11 DRAFT/March 27,2026 Figure 2. Representative verbatim responses regarding what respondents considered the most important threat to farming to the County in the 2023 Orange County Farmer and Landowner Survey "As farmers age out and are dying, "Encroaching urban areas, "Housing development.This...leads their heirs are selling land to cash farmland/forest land being sold to to increased cost of land and out on its purchase value to developers for multi-family homes decreased value of land for developers.More housing and multi-family developments agricultural purposes.There's a lot complexes are being built on instead of being kept in farmland while we are losing our farm/forest" more money in selling the land for resources for soil,foodshed,and 5-10 acre lots than keeping it as an farms.This will create a crisis for "[D]evelopment,particularly intact farm.None of the land I see both our environment and local sprawling development that ecosystem as well as for food encourages large(ao acre) for sale around me is selling as production and water retention and lots. The county development farmland.It's simply not worth it. filtering.We need to stop policies should encourage It's subdivided into plots and houses developing every square inch of the clusters of homes leaving a county?It took me 20 years of large percent of open space are built.This leads to ecosystem working two jobs and investing to rather than making it easy to deterioration which decreases the scrape together a down payment for develop io acre lots,s acre quality of farmland as well.I'm in my small little farm.It should not lots. The problems of sprawl be like this.There needs to be more in our county are the far northern reaches of the done to save our farmland and COMPLETELYpredictable county....This is not isolated counteract incentives to sell to based on the policies in place towards the southern more urban developers." currently." parts of the county." American Farmland Trust projections show that, if historical trends in farmland conversion from 2001 to 2016 hold true through 2040 in a Business as Usual scenario, Orange County will lose an additional 14,300 acres of farmland to development (Hunter, 2022; American Farmland Trust, 2022). In a Runaway Sprawl scenario characterized by low-density development and poor planning, Orange County is projected to lose an additional 19,900 acres to development (Figure 3). Most of that farmland conversion---70% of it through 2040---is predicted to occur on the County's most productive farmland. Figure 3. Projected conversion of Orange County farmland to development through 2040 (Hunter, 2022; American Farmland Trust, 2022) Business as Usual: 14,300 acres Runaway Sprawl:19,900 of farmland lost of farmland lost .S Y Converted from - Farmland* _ to Development 54 S4 h � . https:(/de�elopment204o.farmland.org/ 'Farmland=cropland+pasture woodland associated with farms 12 DRAFT/March 27,2026 Most of the farmland conversion in Orange County is projected to involve low- density residential development as opposed to urban, commercial, or industrial land uses (Figure 4). Low-density residential development is especially harmful for farming because it fragments agricultural land, thereby restricting its potential agricultural uses, and negatively impacts operations of adjacent farms through effects including run- off and beneficial habitat destruction (Box 1). Low-density residential development also inflates the prices of adjacent farmland to make acquiring farmland difficult or impossible for new and beginning farmers. Low-density residential development also paves the way for further development (Freedgood, 2020). In North Carolina areas where low-density residential development is occurring, agricultural land is five times more likely to be converted to urban and highly developed uses than agricultural land in areas without it (Freedgood, 2020). Farmers in areas with development pressure and high land values have been characterized as exhibiting impermanence syndrome---a shortening of their planning horizon associated with uncertainty and apprehension about the future (Adelaja et al., 201 1; Perrin et al., 2020). The impermanence syndrome, in the context of the opportunity to profit from sale of farmland, can make farmers reluctant to invest in the farming operation and can impel them to sell their farmland for development. Figure 4. Projected conversion of farmland in Orange County to 2040 (Hunter, 2022; American Farmland Trust, 2022) Business 14,300 acres as Usual of farmland lost Runaway Sprawl 19,900 acres of farmland lost 0 5,000 10,000 15,000 20,000 Acres converted Urban and highly developed N Low-density residential Urban and highly developed(UHD)land use includes commercial,industrial,and moderate-to-high density residential areas. Low-density residential(LDR)land use includes scattered subdivislons and large-lot housing,which fragment the agricultural land base and limit production. 13 DRAFT/March 27,2026 Box 1.Totten Farm's Story I have many concerns about the loss of farmland, farming culture and community. I live in eastern Orange County, and the expansion of houses and neighborhoods on both forested and agricultural land is monumental. Last year/was gathering hay a quarter mile from my house. In the span of nine months there are three houses being built there with a fourth on the way. On property next to my driveway, there is a house that went up this month and another on the way. So for me I have to find another hay source, and deal with increased runoff on my land from development, which cost me thousands of dollars in new driveway pipe installation and loss of pasture due to erosion. Choices have to be made by societies as to what is really important. The loss of farmland and farmland impacted by development are a reality that has become a nightmare for many who try to hold on to their land and way of life. Once it's gone, it's not coming back.... Billy Totten, Orange County Farmer We must learn to grow like a tree, not like a fire. ---Wendell Berry Challenge: Agriculture is not an economically viable profession for most farmers. Achieving farm profitability is challenging for farmers across the agricultural spectrum from small farms selling directly to customers to large commodity farms (Burchfield, 2022). Orange County farmers are no exception. In the 2023 Orange County Farmer and Landowner Survey (Appendix 1 for summary), the most frequently cited challenges to making a living farming were small profit margins and high cost of land. Farming/forestry was the main source of income for only 30% of respondents. Two in three respondents (67%) employed 2 or fewer people including themselves in their agricultural operation. USDA Census of Agriculture data show that, for Orange County farmers in 2022, average gross income was $3655; average net income was -$2213 (negative $2213) (Agricultural Census, 2022). Nearly 40% of farms (271 of 687) had <$2500 in sales (Figure 5). Farming/forestry was the main source of income for only 30% of respondents in the Census of Agriculture as in the 2023 Orange County Farmer and Landowner Survey. 14 DRAFT/March 27,2026 Considered in aggregate, the results suggest that, for many Orange County farm businesses, off-farm employment is necessary to support the continuance of the farm. These data are consistent with national data showing that US households operating small farms (those with gross cash farm income less than $350,000) usually depend on off-farm sources for the majority of their household income (USDA Economic Research Service, 2024). Figure 5. Number of Orange County farms by value of sales, 2022 $100,000 or more 41 $50,000-$99,999 _40 $25,000-$29,999 ss $10,000-$24,999 99 $5000-$9999 84 $2500-$4999 as a$2500 271 0 50 100 150 200 250 300 Number of Farms 2022 Census of Agriculture—Orange County Data USDA,National Agricultural Statistics Service The varied, diverse causes of lack of farm profitability include volatility in the weather; high labor costs; high costs of land, infrastructure, and supplies; and artificially low prices for farm products (Burchfield, 2022). These factors have been attributed to inherent vulnerabilities in the industrial food system, overproduction and associated government subsidies, vertical integration (whereby single corporations control suppliers, distributors, and sales outlets to consolidate the food supply chain), and prioritization of corporate profit over animal husbandry, natural resource conservation, and soil health (Wallinga, 2009). 15 DRAFT/March 27,2026 4. Opportunities for Agriculture in Orange County The challenges to agriculture in Orange County, while daunting, are not insurmountable. Opportunities for agriculture in the County could catalyze development of a strong agriculture that supports a robust local food system and contributes to the food and agricultural security that many Orange County residents seek. Orange County soils, climate, and water resources can support agriculture now and into the future. Located in the Piedmont of North Carolina, Orange County has soils, climate, and water resources that make it well suited for sustainable agriculture supporting the County's 2025-2029 Strategic Priorities of Environmental Protection and Climate Action (Orange County, 2009). Approximately three- fourths of the County's land area consists of Prime Farmland or Farmland of Statewide Importance. Prime Farmland is defined by the US Code of Federal Regulations as land that "has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops, and is also available for these uses" (US Code of Federal Regulations, 2024). Farmland of Statewide Importance is defined as lands that are generally "nearly prime farmland and that economically produce high yields of crops when treated and managed according to acceptable farming methods" (US Code of Federal Regulations, 2024). The long growing season runs from mid-April to mid-October with the opportunity, with warmth-conserving measures, for extension to winter and early spring months. The County receives approximately 45 inches of rain annually. More than half of the County's 256,000 acres is forestland, which is an important carbon sink (Hurteau, 2021). Orange County has strong and growing communities of small, diversified farms and new and beginning farmers. Orange County in 2024 is home to a growing community of small, diversified farms that are critical for supporting the County's 2025-2029 Strategic Priorities of Environmental Protection and Climate Action and for developing local foodshed resilience. Agriculture in the County has transitioned over the past century from being dominated by traditional commodity farms growing tobacco and producing Grade A cow's milk to small farms (49 or fewer acres) producing a diversity of crops and livestock (Orange County, 2009). According to the 2022 USDA Agricultural Census (Agricultural Census, 2022), the top three crops in the County by sales are nursery/greenhouse/floriculture, grains/oilseeds/dry beans/dry peas, and vegetables/melons/potatoes/sweet potatoes. Poultry and eggs account for most livestock-related sales. One in five farms sells directly to customers. 16 DRAFT/March 27,2026 Orange County is also home to an increasing number of new and beginning farmers. Of the 1 199 producers in Orange County in the 2022 Agricultural Census (data collected for up to four producers per farm), 474 (about 40%) were new and beginning farmers, an increase from 353 in 2017. The growing community of small, diversified farms practicing sustainable agriculture in Orange County is critical for supporting the County's 2025-2029 Strategic Priorities of Environmental Protection and Climate Action and for developing Local foodshed resilience. Established Orange County farmers are passionate about their work and want to keep their land in farming. Established Orange County farmers across the spectrum of farm sizes and types of crops produced are passionate about their roles as stewards of the land and providers of essential goods and services. Many wish to keep their land in farm use after they retire. The most common plan for the future of farmland/forestland in the 2023 Orange County Farmer and Landowner Survey was transfer to family member(s) for farm use. Orange County citizens value agriculture and recognize its benefits to the County, and community members seek food grown sustainably and locally. Three of four (75%) of Orange County citizens surveyed for input to the County's 2050 Land Use Plan indicated that local farms and agritourism should be the foundation of the County's regional identity in 2050 (Land Use Plan Feedback, 2024). They also identified farmland stewardship as a core need for the future. Protecting agricultural/working lands and healthy soils was identified as a most important environmental need, second only to ensure water sources are clean. Asked about the type of development/growth desired in the County, 47% cited family farms. Orange County local farm customer Amy Thomas' views on the importance of local agriculture and farmland (Box 2) typify those of many of her fellow citizens. 17 DRAFT/March 27,2026 Box 2. Orange County Citizen Amy Thomas on the Importance of Local Farms and Food "Local farming is S000 important for many reasons. Here are just a few that resonate with me; 1)Food grown by trusted local farmers is much fresher, flavorful,packed with nutrition, and free of potential contaminants as compared with food that is grown at and transported over a distance(sometimes a GREAT distance)to end up in 'supermarkets. 2)Food grown locally helps reduce environmental impacts by reducing the carbon footprint associated with airplane, truck, and train fuels, (as well as traffic!) during transportation of products. 3)Local farming equals support of local economies. Period. In keeping with residents' view of the importance of local agriculture, direct-to- consumer sales from Orange County farms have increased steadily over the past decade coincident with growth in market opportunities including farmers markets, CSAs (community supported agriculture programs), grocery store cooperatives, intermediated sales, and restaurants (Kelmenson, 2016; Agricultural Census, 2022). Orange County citizens surveyed for input to the County's 2050 Land Use Plan identified protecting agricultural/working lands and healthy soils as a most important environmental need. Local food hubs have operational expertise and capacities in food aggregation and distribution to support Orange County farmers in expanding their markets. Local food hubs such as Farmer Foodshare and Happy Dirt house aggregation and distribution centers within short drives of Orange County farmers, and they have systems in place for marketing and sales to local and regional institutional and individual buyers. They offer the potential to expand wholesale market opportunities for farmers and farmer cooperatives. Food hubs can aggregate, store, and distribute products from multiple farmers to achieve and distribute wholesale quantities that individual small farmers cannot achieve on their own. 18 DRAFT/March 27,2026 5. Goals for Agriculture in Orange County Building on its assets and strengths, Orange County can minimize continued farmland loss and foster a thriving agricultural community in which • Farm viability is enhanced, and farmland is maintained and stewarded for agricultural uses through judicious land use planning and educational, logistical, and financial support. • Citizens and decision-makers have the information and resources they need to support local agriculture and the farming community. • Farmers are supported in their livelihoods with educational, financial, and infrastructural resources. Studies and experiences of other locales show that Planning FOR Agriculture, Conserving Farmland through Direct Measures, and Enhancing the Economic Viability of Agriculture are essential to helping the County realize this vision. Goal 1: Plan FOR Agriculture A robust local food and farming community cannot be developed or sustained if County farmland continues to be lost at the rate described in Section 3 of this document. Continued farmland loss can be mitigated through proven land use planning approaches such as smart growth, which emphasizes compact development, minimization of sprawl, strengthened development in areas where development has already occurred, and permanent protection of farmland and open space (Gazillo, 2020; Hunter, 2022). The American Farmland Trust projects that, in a Better Built Cities scenario employing measures such as these, farmland loss in Orange County through 2040 can be limited to 6100 acres compared with 14,300 acres with the Business As Usual scenario and 19,900 acres with Runaway Sprawl as described above (Figure 6) (Hunter, 2022). Figure 6. Projected conversion of Orange County farmland to development through 2040 (Hunter, 2022; American Farmland Trust, 2022) Business as Usual: Runaway Sprawl: Better Built Cities: 14,300 acres of farmland lost 19,900 acres of farmland lost 6,100 acres of farmland lost G j ` # ; AIN •. Si hn'llde loPm t2040.fa Im d.a,g( 19 DRAFT/March 27,2026 Land use planning efforts in Orange County---like other counties experiencing rapid population growth---have historically deprioritized agriculture over other community needs such as housing and transportation. Further, in land use planning, farmland has often been conflated with other categories of open space such as parkland, natural areas, and wildlife habitats. The County can elevate the importance of agriculture in its land use planning by prioritizing it in the 2050 Land Use Plan, which is being developed at the time of this writing. If agriculture is to remain viable---and if the County is to sustain agriculture's economic, environmental, and cultural benefits and to support a resilient local food system---the County must plan for agriculture in the same way it does for other community needs. Planning efforts should be informed by the perspective that, while farmland can be considered a category of open space, its material, environmental, and economic contributions distinguish it from other categories of open space. Thus, farmland protection not only protects open space, it also facilitates continuance of the material, environmental, and economic benefits that farmland provides. Accordingly, Goal #1 of this Plan is to Plan FOR Agriculture: Elevate farmland stewardship to being a central consideration in land use planning and decisions. Goal 2: Conserve Farmland Through Direct Measures The most effective means of protecting farmland are direct measures: namely permanent agricultural conservation easements (Freedgood, 2020). Orange County's Lands Legacy program grants and administers conservation easements in the County as do nonprofit entities such as Triangle Land Conservancy, Eno River Association, and Working Lands Trust. The County also administers the North Carolina Department of Agriculture and Consumer Sciences Voluntary Agricultural District/Enhanced Voluntary Agricultural District (VAD/EVAD) program, in which farmer/landowners voluntarily protect their land from non-farm development for a period of at least 10 years. As of 2024, these programs have permanently conserved 3004 acres of farmland in the County and enrolled 155 farms comprising 14,864 acres in nonbinding conservation agreements. These numbers, while encouraging, can be improved. While a small minority (16%) of respondents to the 2023 Orange County Farmer and Landowner Survey had their land in a conservation easement, the topic of most interest for an informational or training session was preserving my land through a conservation easement (Appendix 1 for summary). Like agricultural conservation easements, farm transition or estate plans that provide for continuing operation of farms when owners retire or die are important tools for farm viability. Most farmers lack such plans (Upendram, 2021). The majority of Orange County farmers responding to the 2023 Orange County Farmer and Landowner Survey indicated an intention to keep their land in agriculture after they retire (Appendix 1 for summary). The most common plan for the future of farmland upon retirement was transfer to a family member for 20 DRAFT/March 27,2026 farm use. However, 7 of 10 respondents lacked a documented transition plan or estate plan. These findings and considerations highlight the needs to strengthen and expand County conservation programs and to assist farmers with transition planning. Accordingly, Goal #2 of this Plan is to Conserve Farmland Through Direct Measures: Promote the benefits of and strengthen opportunities for farmers to use direct measures to conserve their farmland. Goal 3: Enhance the Economic Viability of Agriculture Viable farm businesses are the foundation of a resilient local food system. Data from the 2022 USDA Census of Agriculture and the 2023 Orange County Farmer and Landowner Survey (Appendix 1 for summary) show that farming is not profitable for the majority of farmers in the County, a finding mirrored in counties across the state and nationally. Increasing agricultural revenue can set the stage for continuing to attract new farmers and new capital. New capital in turn can increase the value of agriculture and contribute to increasing agricultural revenue (Triangle Farms for Food, 2016). Enhancing the economic viability of agriculture in the County entails agricultural development that increases agricultural productivity as well as market development that increases demand for local agricultural products. Given these considerations, Goal #3 of this Plan is to Enhance the Economic Viability of Agriculture through both farmer- and citizen-targeted approaches: • Provide new business opportunities for farmers through market development, education, diversification, and cooperation; and • Increase local demand for Orange County farm products by increasing awareness of their value and benefits. 21 DRAFT/March 27,2026 6. Recommendations and Priority Actions This section details Recommendations and associated Priority Actions supporting each of the three Goals outlined in Section 5 of this document. GOAL #1: Plan FOR Agriculture Recommendation 1: Assess, document, and communicate the status of agriculture in Orange County. To effectively Plan FOR Agriculture, decision- makers require data on farmland conversion and agricultural trends including those related to economic and extra-economic costs and contributions of agriculture to the County. Priority Actions 1 a through 1 e provide for the collection and communication of these data. • Priority Action 1 a: Assess farmland conversion trends in the County on a biennial basis through GIS mapping. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES Land cover assessment and map of 0 County staff including new farmland conversion completed proposed Ag Viability and biennially Farmland Stewardship position • Planning Department • Priority Action 1 b: Conduct a biennial County-wide agricultural census. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES County agricultural census distributed Funding required and summarized every two years • Priority Action 1 c: Complete an Economic Impact Assessment of agriculture in the County. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Partners identified and recruited Funding required • Funding secured • Assessment completed • Findings summarized and communicated • Priority Action Id: Complete anew Cost of Community Services study of agriculture in the County. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Partners identified and recruited Funding required • Funding secured • Assessment completed • Findings summarized and communicated 22 DRAFT/March 27,2026 • Priority Action 1 e: Communicate farmland conversion trends, County agricultural census results, and economic data in the biennially updated Agricultural Viability and Farmland Stewardship Plan and on a County agriculture web page/website. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • County agriculture website or web County staff including new proposed page published Ag Viability and Farmland • Website updated monthly Stewardship position • County agriculture presence on social media sites established • Number of followers on social media Recommendation 2: Elevate agriculture to a primary use in land use planning, regulations, and policy. Priority Actions 2a and 2b provide mechanisms for ensuring that agriculture is represented among the key County functions and priorities in land use planning. Priority Actions 2c and 2d provide for development of policy, guidelines, and regulations that can help mitigate farmland loss and preserve the County's most productive land for agriculture. The Prioritization Method of Priority Action 2c (Appendix 2), used in conjunction with Lands Legacy Program prioritization criteria when appropriate, can help the County to identify the land best suited for continued agricultural use, prioritize farms for conservation and other programs, and target farmland stewardship efforts for best results. For the modifications and additions to County land use policies and ordinances in Priority Action 2d, a stepwise approach (Appendix 3) and a reliance on the Avoid-Minimize-Mitigate framework (Figure 7 below) are recommended. Ample precedents and examples from other locales are available for modeling agriculture-supportive policy and regulatory modifications (California Council of Land Trusts, 2014; CALAFCO, 2018; New England Access Policy Project, 2016). • Priority Action 2a: On the Planning Board, include an Agricultural Preservation Board member. On the Agricultural Preservation Board, include a Planning Board member. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES Establishment of permanent seats on No funding required the APB by a Planning Board member and on the Planning Board by an APB member 23 DRAFT/March 27,2026 • Priority Action 2b: Adopt the Agricultural Viability and Farmland Stewardship Plan as a reference in or a component of the 2050 Comprehensive Plan. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES Agricultural Viability and Farmland No funding required Stewardship Plan is referenced and/or included in the 2050 Comprehensive Plan • Priority Action 2c: Adopt a Prioritization Method to identify and target farmland for conservation to be used in conjunction with Lands Legacy Program prioritization criteria when appropriate. Draft recommendations for such a Prioritization Method are summarized in Appendix 2. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Prioritization Method drafted No funding required • Prioritization Method adopted • Priority Action 2d: Adopt modifications and additions to the Unified Development Ordinance (UDO) and to County policies to elevate agriculture to a primary use in land use regulations and policy. Appendix 3 summarizes recommendations for a framework for these modifications and additions. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Stage 1: Identify and include prime No funding required farmland areas in the development concept application processes that fall under the umbrella of the LIDO. • Stage 2: Adopt amendments and modifications to the existing UDO. • Stage 3: Adopt policy additions and new ordinances that support conservation of farmland. • Stage 4: Adopt agriculture-and farmland-supportive revisions and amendments in County policy areas that impact or are impacted by agriculture or agricultural policy (e.g., tax policy, climate policy, economic development, health policy). 24 DRAFT/March 27,2026 Figure 7. Avoidance-Minimization-Mitigation Framework for Farmland Stewardship (CALAFCO, 2018) y Refers to steering growth away from agricultural tan' using options such as an alternative project location � a smaller KoIt project in order to avoid Conversion of uJ IL agricultural lands_This is the hest strategy when there Wy 0 isava€la bi lity of vacant or underutilized lands within Avoid d existing boundaries and there is no demonstrated need for expanding boundaries based on more Impacts efficient development patterns_ Refers to considering alternatives in the location, siting and scale of a project;uOlzing design Features such as agricultural buffers,and for adopting regulations such as Right to Farm ordinances,in order to minimize conversion and impacts an/conflicts Minimize with,agricultural operatlans or uses.This strategy is used to rnaKirnIte preservation when there are Impacts signif cant ccnstraints to entirely avoiding impacts. 4;WF* Refers to measures meant to compensate for the conversion of agricultural lends,such as dedication of i agricultural ronservation easements,payrnant of in- 9 lieu fees,or purchase and transfer of agficultural L lands,to an agricultural conservation entity,This uJ Mitigate strategy is used as a last resort and only when all y W Impactsefforts to avoid and minimize conversion of (n R agricultural hands have been enhausted. �7 N J J GOAL #2: Conserve Farmland Through Direct Measures Recommendation 3: Increase the rate at which Lands Legacy Program conservation easements are granted. The Lands Legacy Program maintains a list of landowners seeking to put their land in a conservation easement. Priority Actions 3a and 3b are intended to mitigate the impact of two (of the several) factors that contribute to the length of time to complete easement agreements: insufficient or uncertain funding and County bureaucratic requirements. 25 DRAFT/March 27,2026 • Priority Action 3a: Increase the funds available for County purchase of Lands Legacy Program conservation easements. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Source of funding agreed Funding required • Funding secured • Increase in annual number of agricultural working lands easements granted • Priority Action 3b: Identify and implement new/additional frameworks for County collaboration with non-County conservation organizations (e.g., Triangle Land Conservancy, Eno River Foundation) to secure easements. Explore the possibility of reactivating the Orange County Conservation Alliance, which provided a forum for collaboration to develop joint projects or partnerships. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Increase in annual number of Funding required collaborative agricultural working lands easements granted • Orange County Conservation Alliance reactivated Recommendation 4: Use the VAD/EVAD (Voluntary Agricultural District/Enhanced Voluntary Agricultural District) program as a steppingstone to permanent Lands Legacy Program conservation easements. Farmers/landowners enrolled in the VAD/EVAD program have made a voluntary, nonbinding commitment to keep their land in farming and out of development for a period of at least 10 years. Respondents to a 2022 Orange County VAD/EVAD Farmer and Landowner Survey expressed interest in permanent protection of their land through a conservation easement, but to date, few VAD/EVAD farmers/landowners have conservation easements in place. Having demonstrated commitment to protecting their farmland, VAD/EVAD farmers are particularly good candidates for easement-related outreach and education. Priority Actions 4a through 4c are intended to educate County farmers/landowners about conservation options and to reward and incentivize VAD/EVAD farmers/landowners seeking to learn about and/or pursue permanent conservation easements. 26 DRAFT/March 27,2026 • Priority Action 4a: Intensify VAD/EVAD recruiting efforts through direct mail, County website, direct outreach, and Agricultural Preservation Board member engagement. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Increase in annual number of County staff including new proposed VAD/EVAD enrollees Ag Viability and Farmland • Increase in VAD/EVAD acreage Stewardship position (annual) • Priority Action 4b: Encourage farmers in the VAD/EVAD program to participate in a conservation easement workshop, and incentivize enrollment. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Conservation easement workshop Funding required held annually • Number of VAD/EVAD farmer- participants in workshop • Priority Action 4c: Fund complimentary easement-related legal and financial consulting for VAD/EVAD landowners considering putting their land in a conservation easement. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Number of VAD/EVAD farmers Funding required taking advantage of legal consulting • Number of VAD/EVAD farmers entering into conservation easements Recommendation 5: Provide farmers with education and resources on transition planning and farmland conservation. The majority of Orange County respondents to the 2023 Orange County Farmer and Landowner Survey indicate a desire to keep their land in farming and an interest in learning about measures to conserve their farmland (Appendix 1 for summary). However, 7 in 10 lack a documented transition plan, and very few farms have land in conservation easements. Priority Actions 5a through 5c provide mechanisms for facilitating transition planning and conservation of farmland including forestland. Priority Action 5c provides a mechanism for encouraging conservation and management of forestland, an important carbon sink (Hurteau, 2021). More than half of the County's 256,000 acres is forested. The more forestland is preserved, the more the County's potential to sequester carbon in the interest of mitigating the impacts of climate change. 27 DRAFT/March 27,2026 Priority Action 5d provides a framework for County-facilitated education and assistance customized to individual farmers' goals and plans. Farmers' willingness to sell their land varies depending on factors such as financial need and personal values. Each Orange County farm/farmer is unique with respect to these factors. Some farmers are unwilling to sell their land for development at any price. For others, financial considerations can outweigh the desire to keep their land in farming---particularly in the context of the high land prices in the County. An understanding of where each farm in the County stands with respect to stewardship goals and transition planning will help the County to customize approaches to conserving farmland and to keeping it actively farmed. • Priority Action 5a: Fund complimentary transition planning consulting to VAD/EVAD landowners and farmer-landowners holding Lands Legacy Program conservation easements. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Number of farmers/landowners Funding required taking advantage of transition planning consulting • Number of farmers/landowners with transition plans (a) initiated; b completed • Priority Action 5b: Convene an annual Transition Planning/Estate Planning summit for County farmer-landowners. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Transition Planning/Estate Planning Funding required summit convened annually • Annual increase in number of farmers/landowners with transition plans (a) initiated (b) completed • Priority Action 5c: Educate owners of forestland about the benefits to the environment and the climate of conserving forestland and the financial benefits of managed forestland. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Annual increase in number of County staff including new farmers/landowners with forest proposed Ag Viability and management plans Farmland Stewardship position • Annual increase in number of Agricultural Preservation Board farmers in forestry PUV members • Annual increase in number of Orange County Extension agents acres of forestland permanently conserved 28 DRAFT/March 27,2026 • Priority Action 5d: Conduct a County-wide outreach program to better understand farmer and landowner perspectives on transition planning to support customized approaches to transition planning and conservation. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Number of farmers/landowners County staff including new contacted for inclusion in the proposed Ag Viability and database Farmland Stewardship position • Number of farmers/landowners Agricultural Preservation Board with data represented in the members database Orange County Extension agents • Number of farmers/landowners initiating transition or conservation tans as a result of outreach Recommendation 6: Establish an Agricultural Viability and Farmland Stewardship coordinator role in the County. Currently in Orange County, the duties and responsibilities related to agricultural viability and farmland stewardship are divided among several staff members, all of whom have other primary job responsibilities. As illustrated by the Priority Actions outlined in this Plan, the needs related to agriculture in the County are sufficiently numerous and wide-ranging to justify a County staff position dedicated to agricultural viability and farmland stewardship. Other North Carolina counties, including Chatham County and Wake County, have a staff member dedicated solely to agricultural development and farmland protection. • Priority Action 6a: Define the duties of the coordinator role with attention to complementing and synergizing with the duties of the County's Land Conservation Manager position. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES Job description completed and 0 County staff approved 0 County Extension agent • Priority Action 6b: Assign the position a place in the County organizational structure and allocate funding for it. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Funding secured Funding required • Job posted • Position filled 29 DRAFT/March 27,2026 GOAL #3: Enhance the Economic Viability of Agriculture Recommendation 7: Expand educational opportunities in agriculture and agricultural business development. The changing nature of agriculture in the County from traditional commodity farms to small, diversified farms and the increasing population of beginning farmers in the County necessitate provision of education and training to help both new and established farmers thrive. Priority Action 7a provides a mechanism for education and training in a program that emulates and expands the successful PLANT at Breeze program previously offered by Orange County. • Priority Action 7a: Offer both new- and established-farmer-targeted coursework and bootcamp with curriculum to include business development, agritourism, crop production, livestock management, marketing. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Program developed and launched • County staff including new • Number of participants enrolled proposed Ag Viability and • Number of participants Farmland Stewardship position completing the program 0 County Extension agents • Number of participants completing the program and going on to farm • Participant ratings of program Recommendation 8: Support farmers in expanding and diversifying their businesses through agritourism. Agritourism, or welcoming visitors to the farm for recreation, education, and/or purchasing farm products, is a means of diversification and potentially significant income generation (UC Sustainable Agriculture Research and Education Program, 2017). In the 2023 Orange County Farmer and Landowner Survey (Appendix 1 for summary), agritourism was cited nearly two times more often than any other measure as a way respondents would consider to enhance their farm business. Besides being a source of direct financial gain for farms, agritourism benefits farms by fostering customer relationships and enhancing customers' understanding of agriculture---non- material impacts that can lead to sustained financial support. In the 2023 Orange County Farmer and Landowner Survey, only one of three respondents indicated that they practice any form of agritourism on their farm. Priority Actions 8a and 8b are intended to introduce farmers to agritourism in its various forms and to support them in exploring agritourism initiatives. 30 DRAFT/March 27,2026 • Priority Action 8a: Form a County Agritourism Networking Group for peer-to- peer agritourism education and support. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Agritourism Networking Group County Extension agent formed • Number of participants • Participant ratings • Priority Action 8b: Incorporate an agritourism module into the new and beginning farmer education program (Priority Action 7a). BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES Module completed and launched 0 County Extension agent • County staff including new proposed Ag Viability and Farmland Stewardship position Recommendation 9: Support farmers in efforts to expand into wholesale markets. Agriculture in Orange County is evolving toward a preponderance of small, diversified farms selling directly to the customer. Although Orange County has a sizable customer base buying directly from farmers through outlets such as farmers markets and CSAs, direct-to-customer sales alone are insufficient to support profitability of many of these farms. Wholesale selling to institutional buyers such as schools and hospitals can help increase profitability. However, most small farms do not sell wholesale because of factors including wholesale buyers' reluctance to contract directly with small farms, insufficient volume of product, and lack of food safety certification (Good Agricultural Practices, or GAP certification) required by most wholesale buyers. Priority Actions 9a through 9d provide mechanisms for addressing these challenges. Local food aggregators/distributors such as Farmer Foodshare have the expertise, systems, and infrastructure to support Priority Actions 9b and 9c. A local-hub-supported farm-to-school program (Priority Action 9b) is being run successfully in Durham County. • Priority Action 9a: Educate farmers about the benefits of, and provide funding for, their GAP certification. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Number of GAP educational 0 County staff including new sessions conducted proposed Ag Viability and • Number of farmers completing Farmland Stewardship position GAP certification training 0 County Extension agent, Carolina Farm Stewardship Association 31 DRAFT/March 27,2026 • Priority Action 9b: Fund and implement a farm-to-school pilot program to get food from Orange County farmers into Orange County Public Schools. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Partners identified and recruited 0 County staff including new • Pilot funding secured proposed Ag Viability and • Pounds of County-sourced fresh Farmland Stewardship position food going to the program 0 County Extension agent • $paid to Orange County farmers 0 US Department of Agriculture through pilot program • School and student survey ratings of pilot program • Priority Action 9c: Provide opportunities for aggregation, sale, and distribution of Orange County farm products to County and NC-wide markets through collaboration with a local food aggregator/distributor. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Parameters of program agreed County staff including new with local food proposed Ag Viability and aggregator/distributor Farmland Stewardship position • Number of Orange County farmer County Extension agent participants • Pounds of County-sourced food sold through program • $paid to Orange County farmers through program • Priority Action 9d: In collaboration with the NC Department of Agriculture and in consultation with Tri-COG FEEDS (Food Ecosystem Economic Development Strategy), conduct a feasibility study for a regional market and aggregation/distribution center in the vicinity of 1-40/1-85. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Collaborators identified and 0 County staff including new recruited proposed Ag Viability and • Funding secured Farmland Stewardship position • Study completed 0 County extension agent • Results summarized and 0 NC Department of Agriculture,Tri- communicated COG FEEDS Recommendation 10: Provide citizens and decision-makers with information and education on agriculture in Orange County and with opportunities to engage with the farming community. While a segment of Orange County community members and decision-makers advocate and support local farms and food, Orange County is not exempt from the larger societal trends of disconnection of citizens from the sources of their food and a decline in understanding of farming and food production. Community members and decision-makers who are knowledgeable about the need for and benefits of farmland and local food 32 DRAFT/March 27,2026 production are likely to buy local farm products and to support stewardship of local farmland. Priority Actions 1 Oa through 1 Od provide mechanisms for enhancing community members' and decision-makers' awareness and understanding of the contributions of agriculture in Orange County. • Priority Action 10a: Update the Agricultural Viability and Farmland Stewardship Plan biennially, and present and discuss the update at a Board of County Commissioners meeting dedicated to agricultural viability in the County. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Plan update issued biennially No funding required • BOCC meeting conducted biennial) • Priority Action 10b: Publicize and communicate about Orange County agriculture through an Agriculture web page or website, social media, and other electronic means. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • County agriculture website or web County staff including new proposed page published Ag Viability and Farmland • Website updated at least monthly Stewardship position • County agriculture presence on social media sites established • Number of followers on social media • County agriculture electronic newsletter circulated monthly • Number of subscribers to newsletter • Priority action 10c: Convene a periodic agricultural festival for the public. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Festival held County staff including new proposed • Number of attendees Ag Viability and Farmland • Attendee ratings or feedback Stewardship position • Priority action 10d: Expand the County Farm-to-Table event for fourth graders to reach more children. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Event held County staff including new proposed • Number of attendees Ag Viability and Farmland • Attendee ratings or feedback Stewardship position In current DEAPR budget 33 DRAFT/March 27,2026 Recommendation 11: Offer financial incentives for agriculture and agricultural development in the County. Skyrocketing land prices and high infrastructure costs in Orange County discourage and prevent new farmers from farming and impel established farmers to sell farmland for development. Direct financial incentives for agriculture are necessary to help counteract these deterrents. County programs in place include a) the Present-Use Value Property Tax Program with reduced tax rates for land in agriculture and related uses; b) economic development programs such as Agricultural Economic Development grants; and c) the Breeze Farm Incubator, which provides new and aspiring farmers with access to land, tools, infrastructure, and services in an arrangement that minimizes the start-up capital need to start a small farm. Priority Actions 11 a through 1 1 d provide mechanisms for enhancing and expanding these opportunities. The Priority Actions below are restricted to those that can be implemented at the County level (although the PUV pilot program described in 1 1 d would require State approval). Additional financial incentives requiring State approval and/or financial support should be explored in parallel with these County-level efforts. • Priority Action 11 a: Broaden eligibility criteria for Agricultural Economic Development grants to include agricultural support entities (e.g., NC FarmLink, Farmer Foodshare), and allow flexibility in awarding grant funds across three categories of recipient (new farmers, established farmers, agricultural support entities). BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Grant criteria revised and Funding required publicized • Number of applicants per year in each recipient category • $awarded per year to each recipient category • Priority Action 11 b: Fund new-farmer-startup grants and develop tax credits to assist qualified new farmers with purchase of farmland. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Funds secured 0 County staff including new • Criteria for grant award proposed Ag Viability and established Farmland Stewardship position • Grant awarded 0 County Extension agent • Funding required 34 DRAFT/March 27,2026 • Priority Action 11 c: Identify and establish property tax incentives to support farm sustainability. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Tax incentives identified Funding required • Criteria for qualifying farms established • County agreement to offer tax exemption obtained • Number of farms applying for exemption • Number of farms granted exemption • Priority Action 11 d: Conduct a multi-County pilot program to reduce the acreage requirement of the Present Use Value Program to 1 acre. BENCHMARK/PROGRESS INDICATORS FUNDING/RESOURCES • Assessment of farmer interest 0 County Extension agent completed 0 County staff including new • Collaborating counties recruited proposed Ag Viability and • State permission to conduct pilot Farmland Stewardship position granted 0 Collaborating counties • Number of farms enrolling in PUV as result of meeting new criteria 35 DRAFT/March 27,2026 7. Potential Sources of Funding This section describes the potential funding sources associated with Priority Action Steps outlined in Section 6 of this document. This list is not exhaustive. 7. 1. Taxes Deferred Taxes from Farmland Coming Out of the Present Use Value Program Properties in the Present Use Value program coming out of agricultural use are subject to deferred taxes with accrued interest, immediately due and payable, for the year of disqualification and the three previous years. Revenue generated from these tax dollars could be directed to an Agricultural Trust Fund. Similar successful programs are currently operating in Cabarrus County, Chatham County, and Wake County. Land Transfer Tax North Carolina counties have the ability, granted by the North Carolina General Assembly, to levy a tax on the sale of real property. For Orange County, the tax can amount to 0.4% of the sale price of real estate levied in the year of the sale. To be implemented, the tax must be approved by a majority vote of citizens. 7.2. Grants Agricultural Development and Farmland Preservation Trust Fund. The material below is quoted from httl2s://www.resilienceexchange.nc.gov/find- funding/funding-database/agricultural-development-farmland-preservation- trust-fund The NC Agricultural Development and Farmland Preservation Trust Fund (ADFP), administered by the NC Department of Agriculture and Consumer Services (NC DA&CS) Division of Farmland Preservation, provides funding for preservation of farming, forestry, and horticulture industries in North Carolina. ADFP promotes sustainable farming through the purchase of agricultural conservation easements, conservation agreements and the funding of public and private enterprise programs that assist farmers in developing plans to maintain sustainable and profitable food production and marketing activities. Golden Leaf The material below is quoted or paraphrased directly from https://aoldenleaf.org: The Golden LEAF Foundation, a North Carolina grant- making organization, helps eligible state, regional and local economic development entities with job creation projects in tobacco-dependent or economically distressed areas of the state. Golden LEAF offers three grant programs that can address infrastructure needs. 36 DRAFT/March 27,2026 NC Tobacco Trust Fund The material below is quoted directly from https://tobaccotrustfund.org/: The NC Tobacco Trust Fund funds projects that address one or more of the following goals: • Alleviating and avoiding unemployment in the tobacco-related sector of the state's agricultural economy • Preserving and increasing the local tax base in agricultural areas • Encouraging the economic stability of participants in the state's agricultural economy • Optimally using natural resources in the tobacco-related segment of the state's agricultural economy • Supporting and fostering the vitality and solvency of a tobacco-related sector. Orange County Farm Bureau The Orange County office of the North Carolina Farm Bureau has indicated its willingness to allocate funds to assist with agricultural viability and farmland stewardship projects undertaken by the County's Agricultural Preservation Board. 37 DRAFT/March 27,2026 8. References Adelaja A, et al. Endogenizing the planning horizon in urban fringe agriculture. Land Use Policy 201 1;28:66-75. Agricultural Census, 2022. USDA census of agriculture. US Department of Agriculture, National Agricultural Statistics Service. Available at: https://www.nass.usda.gov/Publications/AgCensus/2022/FuII Report/Volume 1, Chapt er 2 County Level/North Carolina/ Agricultural Trade Multipliers, 2024. USDA Economic Research Service. Available at: https://www.ers.usda.gov/data-products/agricultural-trade-multipliers/. American Farmland Trust, 2022. Farms under threat mapping tool and state summaries. 2022. Available at: https://development2040.farmIand.orq. / Burchfield EK, et al. The state of US farm operator livelihoods. Front Sustain Food Syst 2022;5: article 795901 . CALAFCO. State of the Art on Agricultural Preservation. CALAFCO White Paper. February 2018. Available at: mendolafco.org/files/485edbca3/CALAFCO_AFT+White+Paper+on+Ag+Preservation_F e b+2018%28R EV%29.pdf California Council of Land Trusts. Conserving California's harvest: a model mitigation program and ordinance for local governments. 2014. Sacramento, CA. Available at: https://calandtrusts.org/resources/conserving-californias-harvest/ Chao K. Family farming in climate change: Strategies for resilient and sustainable food systems. Heliyon 2024;1 O:e28599. Freedgood JM, et al. Farms under threat: The state of the states. Washington, DC: American Farmland Trust, 2020. Available at: https://farmlandinfo.org/wp- content/uploads/sites/2/2020/09/AFT FUT StateoftheStates rev.pdf Gazillo C, et al. Planning for agriculture: a guide for Connecticut municipalities. 2020 edition. A publication of American Farmland Trust and Connecticut Department of Agriculture. Available at: https://communityfoodstrategies.org/wp- content/uploads/2014/03/cfa-report_final.pdf Hunter MA, et al. Farms under threat 2040: choosing an abundant future. Washington, DC: American Farmland Trust, 2022. Hurteau MD. Chapter 27---The role of forests in the carbon cycle and in climate change. Climate Change, 3rd edition. Elsevier, 2021 . Kelmenson S, et al. Orange County baseline community food assessment. 2016. Available at: https://communityfoodstrategies.org/wp-content/uploads/2014/03/cfa- report_final.pdf 38 DRAFT/March 27,2026 Land Use Plan Feedback. Orange County Land Use Plan 2050. Community engagement window #1 : confirming community aspirations. 2024. Available at: https://www.orangecountylanduseplan.com/resources Naresh RK, 2023. Re: What is sustainable agriculture how it can help in environmental protection to ensure food security in climate resilient agriculture?. From: https://www.researchgate.net/post/What is sustainable agriculture how it can help i n environmental protection to ensure food security in climate resilient agriculture/6 512d2cd4b43fcb3270419ba/citation/download. New England Access Policy Project, 2016. Policy options for strengthening farmland mitigation in Massachusetts and other New England States. Available at: https://Iandforgood.org/wp-content/uploads/LAPP-Policy-Options-For-Strengthening- Farmland-Mitigation-in-Massachusetts-and-other-New-England-states.pdf. North Carolina Forest Service. 2022 forestry contributions, Orange County, NC. Available at: North Carolina General Statutes. Article 62. Agricultural Development and Preservation of Farmland. Available at: https://www.ncleg.aov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter 106/Article 61 .pdf. NC State University, 2019. NC State University College of Agriculture and Life Sciences. Economic contribution of North Carolina agriculture and agribusiness. Available at: https://www.ces.ncsu.edu/wp-content/uploads/2019/10/Economic-Contribution- VaIue-of-N.C.-Agricultu re-Boo klet_CALS-NC-State-Extension.pdf?fwd=no MacFall J, et al. Toward resilient food systems through increased agricultural diversity and local sourcing in the Carolinas. J Environ Stat Sci 2015;5:608-622. Orange County, 2009. Orange County Agricultural Development and Farmland Protection Plan. Adopted November 17, 2009. Orange County, 2024. Orange County North Carolina Strategic Plan FY2025-2029. Available at: https://www.orangecountync.gov/DocumentCenter/View/26972/Orange-County- Strategic-Plan?bidld= Perrin C, et al, 2020. Preserving farmland on the urban fringe: a literature review on land policies in developed countries. Land 2020, 9(7), 223; https://doi.org/10.3390/land9O7O223 Pretty J. Agricultural sustainability: concepts, principles and evidence. Phil Trans R Soc B 2008;363: 447-465. Renkow M. The cost of community services in Orange County. January 2006. Available at: https://www.ces.ncsu.edu/wp-content/uploads/2019/10/Economic-Contribution- Value-of-N.C.-Agriculture-Booklet CALS-NC-State-Extension.pdf?fwd=no 39 DRAFT/March 27,2026 UC Sustainable Agriculture Research and Education Program. 2017. Agritourism. What is Sustainable Agriculture? UC Division of Agriculture and Natural Resources. Available at: https://sarep.ucdavis.edu/sustainable-ag/agritourism Triangle Farms for Food. Triangle Farms for Food Strategy + Action Plan. November 2016. Conservation Trust for North Carolina and Community Food Lab. Available at: https://ctnc.org/wp-content/uploads/2019/06/2017-1 1-29-F4F-FINAL_rev 1 .pdf Upendram S, et al. Chapter 1: why succession planning? University of Tennessee Extension Institute of Agriculture. 2021 . Available at: https://utia.tennessee.edu/publications/wp- content/uploads/sites/269/2023/10/SP822A.pdf US Code of Federal Regulations, 2024. Part 657. Prime and unique farmlands. Available at: https://www.ecfr.gov/current/title-7/subtitle-B/chapter-VI/subchapter-F/part-657 USDA, 2023. US Department of Agriculture, National Agricultural Statistics Service. 2023 North Carolina agricultural statistics. Available at: https://www.nass.usda.aov/Statistics by State/North Carolina/Publications/Annual Sta tistical Bulletin/AgStat/NCAgStatBook.pdf USDA Economic Research Service, 2024. Farming and farm income. Available at: https://www.ers.usda.gov/data-products/ag-and-food-statistics-charting-the- essentials/farming-and-farm-income/. Walden ML. Economy-wide impacts of agricultural sectors in North Carolina. May 2014. Available at: https://cals.ncsu.edu/agricultural-and-resource-economics/wp- content/uploads/sites/46/2017/07/Economy-Wide-Impacts-of-Agricultural-Sectors-in- North.pdf Walinga D. Today's food system: how healthy is it? J Hunger Environ Nutrition 2009*251- 281. WeConservePA, 2024. Cost of community service studies. Available at: https://library.weconservepa.org/guides/15-cost-of-community-services-studies. 40 DRAFT/March 27,2026 Appendix 1. Summary of 2023 Orange County Farmer/Landowner Survey 41 DRAFT/March 27,2026 Appendix 2. Recommendations for Criteria for Identifying Farmland for Protection in Orange County Overview The foregoing Orange County Agricultural Preservation Board (APB) Farmland Stewardship Subcommittee recommendations for criteria for identifying farmland for protection in Orange County are intended to inform land use planning decisions in the County. The recommended criteria constitute a simple, objective, easily applied framework for identifying the resource to be protected. The framework lends itself to supplementation, when needed, with secondary farm-unit-based criteria that can guide development of specific land use policies and administration of farmland stewardship programs. Background In formulating its recommendations, the Subcommittee reviewed various county, state, and national frameworks for identifying and prioritizing agricultural land for protection. Two approaches to framing agricultural land protection were identified: resource based and farm based. The resource-based approach centers on protecting the land that is best for farming (i.e., the soil resource). In the resource-based approach, agricultural lands are designated for protection based on measures or assessments of the suitability of the soil for agriculture---for example, the National Resource Conservation Service (NRCS) "Prime Farmland" and "Farmland of Statewide Importance," the NRCS Land Capability Classes, and the American Farmland Trust's Productivity/Versatility/Resilience index (PVR). The farm-based approach centers on protecting the total (individual) farm unit, which in addition to its association with the soil resource has geographic, historic, ecological, and cultural characteristics that affect its conservation value. In the farm-based approach, agricultural lands are designated for protection based on the suitability of the soil for agriculture as well as additional measures or assessments such as tract size, development pressure, adjacency to developed areas, presence of or adjacency to critical environmental areas or unique natural resources, adjacency to other protected land including wildlife habitat, adjacency to other farmland, and potential for climate-change mitigation. The APB recommends adopting a resource-based approach based on agricultural suitability of the soil to guiding County land use decisions and policies involving farmland. A resource-based approach delineates highly productive farmland more effectively than a farm-based approach: The agricultural productive capacity of rural landscapes varies depending on geology, soils, and topography. Each farm is a unique combination of these characteristics with landscape units that can range from highly productive to nonproductive farmland. Furthermore, the resource-based approach lends itself to objective, durable land use decisions that are less easily supported by a farm- 42 DRAFT/March 27,2026 based approach that considers cultural criteria such as ownership, farm size and type, and location. While the APB favors a resource-based approach over a farm-based approach as a framework for guiding land use decisions and policies, a farm-based approach that considers secondary criteria in addition to soil quality might be most appropriate for guiding administration of farmland protection programs. Recommendations The APB recommends that County land meeting the following criteria be designated as most important to protect for agriculture through policies and practices including avoidance, minimization, and mitigation: • The land is Prime Farmland* as defined by the US Department of Agriculture (USDA). Agricultural lands are designated for protection based on soil type and slope determined from soil map units in the Orange County Soil Survey (which may be further verified by field determination). A soil map unit in the Orange County Soil Survey comprises a specific soil type and a slope modifier (e.g., Georgeville soil on slopes of 2-6%). The following map units indicate Prime Farmland conditions: o HrB Herndon o CfB Cecil o CrB Creedmoor o EnB Enon o HeB Helena o VaB Vance o ApB Appling o GeB Georgeville o HwB Hiwassee o Aa Altavista o HhA Helena-Sedgefield • The land has <8% slope. • The land is not developed (as specified in the definition of Prime Farmland) and is outside the municipalities and the Extraterritorial Jurisdictions. Prime Farmland is a widely recognized and understood designation with extensive historic and current precedent as a primary criterion for delineating agricultural land for protection. It is among the criteria in the Orange County Lands Legacy Program ranking matrix for prioritizing farmland for conservation. Further, Prime Farmland lends itself to simple, objective, site-specific identification and mapping of lands designated for protection. While Prime Farmland is arguably the most suitable criterion for identifying County farmland for protection, it should be applied with the understanding that it is based on map units in the 1977 Orange County Soil Survey, which has limitations associated with mapping scale, methods used at the time, dated aerial 43 DRAFT/March 27,2026 photographic base, and challenges with digital cartographic data transference. *The National Resource Conservation Service (NRCS) describes Prime Farmland as of major importance in meeting the Nation's short- and long-range needs for food and fiber. Because the supply of high-quality farmland is limited, the USDA recognizes that responsible levels of government, as well as individuals, should encourage and facilitate the wise use of our Nation's prime farmland. . .. Prime farmland, as defined by the USDA, is land that has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops and is available for these uses. It could be cultivated land, pastureland, forestland, or other land, but it is not urban or built-up land or water areas. The soil quality, growing season, and moisture supply are those needed for the soil to economically produce sustained high yields of crops when proper management, including water management, and acceptable farming methods are applied. In general, prime farmland has an adequate and dependable supply of moisture from precipitation or irrigation, a favorable temperature and growing season, acceptable acidity or alkalinity, an acceptable salt and sodium content, and few or no rocks. The water supply is dependable and of adequate quality. Prime farmland is permeable to water and air. It is not excessively erodible or saturated with water for long periods, and it either is not frequently flooded during the growing season or is protected from flooding. Slope ranges mainly from 0 to 6 percent. 44 DRAFT/March 27,2026 Appendix 3. Recommendations for Framework for Revisions and Additions to Protection the Unified Development Ordinance to Strengthen Farmland Protection Sections of the Unified Development Ordinance that present opportunity for amendment to strengthen farmland protection include (but are not limited to) 7. 12 Flexible Developments, 1.6 Planning Board, 2.4 Zoning Compliance Review, 2.5 Site Plan Review, 2. 13 Exempt Subdivisions, 2. 1412. 15 Minor/Major Subdivisions, 4 Overlay Districts, 5 Uses, 5. 13 Standards for Agricultural Uses, 6 Development Standards, 6.6 Additional Standards for Overly Districts, 7. 13 Specifications for Plat Drawings, and a Use Authorization Certificate for conserved farmland. Definition of the Resource: The resource targeted for conservation is Prime Farmland* rather than the farm itself as a cultural element defined by ownership, property boundary, and land use. Prime Farmland in Orange County is mapped in the 1977 Orange County Soil Survey. Eleven (1 1) map units are identified as prime farmland: HrB, CfB, CrB, EnB, HeB, VaB, ApB, GeB, HwB, Aa, HhA. For these soil map units, the first one or two letters indicate the soil series (soil type), and the last letter indicates the slope range. These Prime Farmland units represent 123,730 acres of the 256,640 acres in Orange County (48.2%) per the 1977 Orange County Soil Survey. Identification: Field identification of Prime Farmland represented on a map layer is required as part of any site development application package (plat drawings). Statement of Resource Avoidance and Minimization: The applicant must address how the plan avoids and minimizes impact to Prime Farmland. Impact is defined as any non-agricultural disturbance of the natural soil profile (i.e., the naturally occurring soil layers). Such activities include grading (cut or fill). Mitigation may be considered as an additional measure to reduce loss of Prime Farmland. That is, once the resource has been identified and the applicant has demonstrated satisfactory avoidance and minimization of impacts to prime farmland, mitigation of those impacts may include protective easements on remaining Prime Farmland on site, acquisition of protective easements on comparable off-site farmland resource, in-lieu fee payment to the Orange County Lands Legacy program or similar land conservancy, fee purchase of off- site farmland resources. Best Management Practices: Standards for best management practices may be developed for agricultural areas that are retained as common space in any development. 45 DRAFT/March 27,2026 *The National Resource Conservation Service (NRCS) describes Prime Farmland as of major importance in meeting the Nation's short- and long-range needs for food and fiber. Because the supply of high-quality farmland is limited, the USDA recognizes that responsible levels of government, as well as individuals, should encourage and facilitate the wise use of our Nation's prime farmland. . .. Prime farmland, as defined by the USDA, is land that has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops and is available for these uses. It could be cultivated land, pastureland, forestland, or other land, but it is not urban or built-up land or water areas. The soil quality, growing season, and moisture supply are those needed for the soil to economically produce sustained high yields of crops when proper management, including water management, and acceptable farming methods are applied. In general, prime farmland has an adequate and dependable supply of moisture from precipitation or irrigation, a favorable temperature and growing season, acceptable acidity or alkalinity, an acceptable salt and sodium content, and few or no rocks. The water supply is dependable and of adequate quality. Prime farmland is permeable to water and air. It is not excessively erodible or saturated with water for long periods, and it either is not frequently flooded during the growing season or is protected from flooding. Slope ranges mainly from 0 to 6 percent. 46 ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty Item 5.b. Subject: OUTBoard Policies and Procedures Update Attachment: Orange County Advisory Board Policy OUTBoard Policies and Procedures with Track Changes PURPOSE: To discuss and recommend approval of updates to OUTBoard Policies and Procedures. BACKGROUND: On March 18, 2025, the Orange County Board of County Commissioners approved updates to the Advisory Board Policy. Attachment 1 includes a track-changes version of the revised guidelines applicable to all County Advisory Boards. Notable updates include: • Public access to meeting notices and agendas at least seven days in advance • Revised roles and responsibilities for Board Chairs and Secretaries In light of these updates—and following a review of the Orange Unified Transportation Board's (OUTBoard) achievements over the past two years—the Orange County Transportation Services Director recommends further enhancements to the OUTBoard Policies and Procedures(Attachment 2), as follows: • Addition of Section I.C.3—OUTBoard to maintain and update the Stakeholder List • Revision to Section III.B.—Modify Board composition to include 11 voting members and 2 youth delegates • Addition of Section III.C.—Attendance notice requirements aligned with County policy • Addition of Section IV— Policy-aligned improvements, including: o Enhanced agenda review procedures o Packet distribution at least seven days before meetings o Guidance for special meetings, subcommittees, and voting practices • Improved orientation process in accordance with updated County policy These proposed revisions aim to align OUTBoard's operations with current County standards and strengthen board governance and engagement. FINANCIAL IMPACT: No financial impact currently. ALIGNMENT WITH STRATEGIC PLAN: • GOAL 4: MULTI-MODAL TRANSPORTATION • OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. • OBJECTIVE 3.Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. • OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 • Fax (919)732-2137 orangecountync.gov/transportation ACTION: Recommend BOCC approves the OUTBoard Policy and Procedure Update (Attachment 2). 17 Attachment 2 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ADVISORY BOARD POLICY SECTION I: SCOPE A. Purpose 1. To establish a policy and procedures whereby the Orange County Board of Commissioners will make appointments to Orange County advisory boards, committees, commissions, and councils (hereinafter "advisory boards"). B. Authority 1. North Carolina General Statute 153A-76 grants boards of county commissioners the authority to establish advisory boards. 2. The Orange County Board of Commissioners may establish rules and regulations in reference to managing the interest and business of the County. 3. The Orange County Board of Commissioners has the responsibility to appoint residents to serve as members of advisory boards established by the Commissioners. 4. Orange County department directors and staff are responsible for providing support to the advisory boards. C. Policy and Periodic Review 1. This Advisory Board Policy establishes some parameters for: a. Appointments to state-mandated, regional, and/or county-developed advisory boards. b. Removals from such advisory boards. c. Quorum and voting standards. d. A code of general conduct for advisory board members. e. Other aspects of advisory board service the Orange County Board of Commissioners wishes to address. 2. Periodic Review a. Periodic review of this Advisory Board Policy will be conducted every two (2) years by the Orange County Board of Commissioners. b. This Advisory Board Policy may be changed or adjusted as deemed necessary by the Orange County Board of Commissioners regardless of whether it is scheduled for a review. D. Applicability 1. To the extent it does not conflict with the statute or ordinance creating a specific advisory board, where applicable, this Advisory Board Policy applies to the following Orange County advisory boards, pelieies, ee;RFAiSS ensued EeHIRIc-+Is: a. Adult Care Home and Nursing Home Community Advisory Committee b. Advisory Board on Aging c. Affordable Housing Advisory Board d. Agricultural Preservation Board e. Animal Services Advisory Board f. Arts Commission Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 1 18 Attachment 2 g. Chapel Hill Orange County Visitors Bureau Advisory Board h. Commission for the Environment i. Economic Development Advisory Board j. Historic Preservation Commission k. Human Relations Commission m. Opioid Advisory Committee n. Orange County Parks and Recreation Council o. Orange County Planning Board p. Orange Unified Transportation Board 2. This Advisory Board Policy shall also apply to any new boards, commissions, councils, committees, or taskforces with At-Large positions upon creation by the Orange County Board of Commissioners. 3. Except as otherwise provided herein or through a specific advisory board policies and procedures document,y this Advisory Board Policy shall control the appointment, reporting, operation, and other requirements of the advisory boards listed above except to the extent the same are controlled by a specific statute or ordinance. In those cases, as noted above,where a statute or ordinance controls the requirements of the advisory board and the terms of this Advisory Board Policy conflict with the terms of the statute or ordinance the statute or ordinance shall prevail. 4. Although not advisory boards the Board of Adjustment, Board of Equalization and Review, and Animal Services Hearing Panel shall comply with the terms of this Advisory Board Policy to the extent those boards are specifically addressed herein. SECTION II: DUTIES A. Community Contact 1. Advisory boards, through their membership and subcommittees, shall maintain contact with stakeholder groups. In this manner,the advisory board is kept apprised of current information related to matters under the jurisdiction of Orange County. B. Primary Responsibilities 1. Individual advisory boards shall maintain awareness of their goals and objectives as those goals are related to the Orange County Board of Commissioners' adopted overall goals and objectives for Orange County. 2. All actions or recommendations of the advisory board shall be communicated to the Orange County Board of Commissioners as provided herein. SECTION III: MEMBERSHIP A. Authority and Appointment Eligibility 1. North Carolina General Statute 153A-76 grants boards of county commissioners the authority to establish advisory boards and to appoint members to and remove members from those advisory boards. In acting on this authority the Orange County Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 2 19 Attachment 2 Board of Commissioners hereby establishes certain general conditions to which applicants and members of advisory boards should conform. a. All members of standing, statutory boards must meet the qualifications for the specific statutory requirements for an appointed position. b. All boards members must be eighteen (18) years of age or older unless applying for a youth-designated position. c. Except as otherwise provided in a specific advisory board policies and procedures document, Aall board members shall be residents of Orange County and shall maintain their demmdle residence in Orange County unless they a n deF eighteen (1 8)yeaFs of age and applying fee a., �nth_designated pesitien. The Clerk shall confirm applicants are residents of Orange County. T Bemicile is refined- as ene's ieffna rent esta-blFshed herneas distinguished fre.m. ene's temperaFy aftheugfa—caetuul place 9f i. Residence is defined as the place, especially the house, in which a person lives or resides; dwelling; home d. All board members shall have good reputations for integrity and an interest in community service. e. No nominee to a board shall be currently employed by Orange County government and serve on a board that directly affects their work. f. No nominee may currently be a party to or be the actual legal representative in litigation against Orange County. The Clerk shall confirm nominees are not involved in such litigation. g. Each nominee must be prepared and committed to participate in advisory board work in a manner that enhances relationships between the county and the community. h. All board members are representatives of the Orange County Board of Commissioners and shall conduct themselves, both in their official actions and personal actions so as to be above reproach in their conduct and shall not bring disrepute to either the County or the Commissioners. i. No person appointed to an advisory board may concurrently serve in any publicly elected office. *(Does not apply where the appointment is required by law, intergovernmental agreement, or approved Orange County board specific policy—applies to all boards, committees, and quasi-judicial boards) J. The Orange County Board of Commissioners may waive any of the conditions within this section, with the exception of statutorily imposed conditions. B. Composition 1. The Orange County Board of Commissioners shall appoint all voting and nonvoting ex-officio members to advisory boards. The Orange County Board of Commissioners shall endeavor to appoint members who represent the ethnic, racial, cultural, demographic, and geographic diversity of the community. C. Selection Criteria 1. Appointed members, except for ex-officio members, shall be qualified by the Clerk to the Board of County Commissioners. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 3 20 Attachment 2 2. Members shall be appointed from applicants whose who have properly filed and submitted applications were submit to the Clerk to the Board of Qfat-ge CountyCountV Commissioners. D. Application L ^ppountrr ent Nomination, and Appointment Process Procedures 1. All members of advisory boards serve at the pleasure of the Orange County Board of Commissioners. 2. Appointments to advisory boards will be initiated with a public application process. 3. All appointments to advisory boards will be made by the Orange County Board of Commissioners. a. The Orange County Board of Commissioners may elect to interview applicants to certain advisory boards. b. In the event the Orange County Board of Commissioners conducts such interviews the advisory board to which the applicant seeks appointment may identify and suggest interview questions to the Orange County Board of Commissioners. 4. Applicant nominations and appointment recommendations from advisory boards to the Orange County Board of Commissioners are welcome, but are not guaranteed to result in appointment. a. Advisory boards may elect to interview applicants prior to making a nomination or recommendation. b. In the event an advisory board conducts such interviews the Orange County Board of Commissioners may identify and suggest interview questions to the advisory board. S. The QFange County Beard of r direct the Clerk to the Board e Athprrn hAArraT E. Term 1. No person appointed to an Orange County advisory board shall serve on that board for more than two consecutive terms of three years each. Any appointment to a vacant position for less than a full three year term shall be considered a full term if the time of membership is 24 months or greater. 2. Extension of a member's term may be approved by the Orange County Board of Commissioners if it is determined that it is in the best interest of Orange County to allow an individual to continue to serve. 3. In order to establish staggered terms the original voting members of the advisory board shall be appointed as follows: a. One-third for a one year term. b. One-third for a two year term. c. One-third for a three year term. d. Thereafter, each newly appointed voting member shall serve for a three year term. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 4 21 Attachment 2 4. Advisory board members whose terms are due to expire may request they be appointed to a second term or be asked to accept a second term appointment to the position. 5. The membership of any advisory board member whom the Orange County Board of Commissioners decline to appoint to a second term shall immediately terminate upon the expiration of their term. 6. Advisory board members may not serve concurrently on more than two (2) Orange County advisory boards. This restriction does not impact an individual's service on boards and commissions that are not Orange County advisory boards or short term task forces or work groups. F. Resignation 1. If a member wishes to resign,the member shall submit their resignation in writing to the Chair of the advisory board on which the member serves and the Clerk to the Board of Orange County Commissioners, noting the effective date of the resignation. 2. The Orange County Board of Commissioners may recognize the individual's service via a letter or certificate. 3. An announcement of the open seat will be made ;# ;t- timeafter the resignation becomes effective. G. Vacancies 1. Upon the expiration of the term of service of members or should a vacancy otherwise occur, the Orange County Board of Commissioners shall have the responsibility of selecting and appointing new members to the advisory board. 2. Should any vacancy for which there is a board specific requirement that such vacancy be filled by a nominee of a municipal corporation or a resident of a specific Orange County township remain unfilled for six(6) consecutive months the board specific requirements may be set aside and the Orange County Board of Commissioners may fill the vacancy with any applicant otherwise qualified to serve. H. Removal 1. Members of Orange County's advisory boards serve at the pleasure of the Orange County Board of Commissioners and may be removed for any reason or no reason, with or without cause, upon a majority vote. 2. Members of Orange County's advisory boards are expected to abide by the highest ethical and professional standards. 3. In addition to Section III(H)(1) above, the Orange County Board of Commissioners shall may remove any member of an advisory board for neglect of duty,- or nonparticipation that becomes problematic to the advisory board's functioning and purpose. Neglect of duty and non participation are defined as follows: a. Missing three (3) consecutive meetings; or b. Missing twenty-five percent(25%) of meetings within any twelve (12) month period. 4. The advisory board Chair or staff liaison shall notify a member if the member is at risk of being removed pursuant to section III(H)(3). Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 5 22 Attachment 2 5. The advisory board Chair or staff liaison shall notify the Clerk to the Board of Orange County Commissioners if a member has violated section III(H)(3). I. Release from Service 1. When it is deemed necessary by the Orange County Board of Commissioners to release a member from his eF he their term of appointment on an advisory board, the affected individual shall be notified by the Clerk to the Board of County Commissioners by letter and/or electronic mail. 2. When an advisory board has completed its function, the members shall be informed of the completion of their service and the termination of the advisory board by letter and/or electronic mail. SECTION IV. ROLES AND RESPONSIBILITIES HA a meeting, We -.A.Advisory Board 1. The Orange County Board of Commissioners will consider all advisory board recommendations and/or concerns. a. Should any concerns remain unresolved after a response has been received from the advisory board, the Orange County Board of Commissioners may request that the matter be referred to the County Manager. 2. To enhance trust between Orange County Government and the community, Orange County advisory boards shall: b. Assist the staff of Orange County in achieving a greater understanding of the nature and causes of community issues, with an emphasis on improving relations between the department and the residents. c. Recommend methods to encourage and develop the advisory board's ability to accomplish their work. d. Work throughout the community to gain relevant information about advisory board issues and communicate these to the staff of Orange County and the Orange County Board of Commissioners. e. Promote public awareness of contemporary issues Orange County must address to achieve the Orange County Board of Commissioners' goals and priorities. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 6 23 Attachment 2 B. Members 1. Members shall attend meetings of the advisory board serve on subcommittees, and perform other functions as assigned by the advisory board chair with the approval of the advisory board. 2. If a member is unable to attend a meeting, the member shall contact the Chair or designated staff as soon as possible. and at least forty-eight (48) hours before the scheduled meeting. 3. Ex officio members may be appointed by the Orange County Board of Commissioners for the purpose of meeting subject matter expertise needs. Ex officio members are nonvoting members of the advisory board. —Upon review of the above matters. the Orange County advisory board shall address recommendations and concerns, if any, to the Orange County Board of Commissioners in writing. C. Chair,Vice Chair, Secretary 1. Selection i. Election 1. Chair, Vice-Chair, and Secretary shall be elected by the advisory board unless otherwise specified by the Board of Commissioners. 2. Chair,Vice--Chair,and Secretary shall be elected to one-year terms. 3. Chair, Vice--Chair, and Secretary shall serve no more than three consecutive one-year terms. 4. Chair, Vice--Chair, and Secretary shall assume office on the date of their election. At the first advisory board meeting upon assuming office the advisory board Chair or department staff shall present members with a copy of the advisory board's charge, scope of authority, membership responsibilities, and code of conduct. 4 5.The Clerk's Office shall be notified of the results of each election. 2. Responsibilities i. The advisory board Chair: 1. Calls all meetings. 2. Serves as the presiding officer and conducts advisory board meetings. 3. Acts as the authorized spokesperson for the advisory board. 4. Assists staff in developing the advisory board meeting agenda. 5. Appoints and dissolves subcommittees, and the Chair and members thereof,of the body in consultation and with approval of the advisory board. 6. Sets goals for the advisory board in consultation with the Orange County Board of Commissioners. 7. Carries out advisory board assignments as required by the Orange County Board of Commissioners. 8. Reviews all advisory board minutes and proposeset recommendations or assigns another member of the advisory board to do so. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 7 24 Attachment 2 9. Assists staff in preparing the annual report and work plan of the advisory board each year. 10. Signs correspondence and represents the board before the Board of County Commissioners with the formal approval of the advisory board by motion and vote. 11. The Chair or a quorum of the commission may call a special meeting. The Chair may also cancel a regular meeting. 12. Performs other duties necessary or customary to the office. ii. The advisory board Vice--Chair: 1. Serves as the presiding officer and conducts advisory board meetings in the absence of the Chair. 2. Has all the responsibilities of the Chair in the Chair's absence. iii. The advisory board Secretary: 1. Takes (or oversees the taking of) minutes for all advisory board meetings. 4�2.Keeps attendance records. -2-3.Submits minutes to the Chair and staff liaison to be distributed to advisory board members in advance of meetings. 84.Submits approved advisory board minutes to the Clerk to the Orange County Board of Commissioners for retention and distribution to the Orange County Board of Commissioners. 45.Assures that other records of the advisory board are kept as directed by the Chair or the Orange County Board of Commissioners. iv. Removal 1. The Chair, Vice--Chair and/or Secretary may be replaced at any time by the Orange County Board of Commissioners. SECTION V. ORGANIZATION A. Orientation and Training 1. Orange County will make available for advisory board members and department staff per+edie-training on state and/or county goals and priorities as well as relevant statutes and policies, including open meetings, public records, conflicts of interest and ethics. 2. Each member shall a d-COMplete an orientation to familiarize the advisory board members with the operation of County government, applicable department rules, and the operating procedures of the advisory board. a. The r=ha4F and Viee Chair, of newly elected, shall t+er.a: 3. Each voting member will be encouraged to complete the orientation within the time frame established by the policy of the specific advisory board to which they have been appointed. 4. Advisory board members will be issued a manual and should become familiar with its contents. B. Operating Expenses Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 8 25 Attachment 2 1. Members, when in service on the board, are not employees of Orange County. 2. Members serve in a voluntary capacity and shall receive monetary compensation or reimbursement only per standard county policy and with Orange County Board of Commissioners approval. 3. Members shall receive no financial or employee benefits from the County unless authorized by another section of this policy and specifically approved by the Orange County Board of Commissioners. 4. The County will provide office supplies and assume responsibility for other reasonable expenses necessary for the operation of the board. C. Confidentiality 1. No member of the advisory board shall make any written or oral statement of any confidential county matter to any individual, business, or agency. A violation of this section will result in that member's immediate removal from the advisory board. This prohibition does not apply to communications with county staff, officials, or their agents conducting official county investigations. 2. Members of the advisory board may receive information regarding personnel matters and other information of a sensitive or confidential nature. It shall be the duty and responsibility of each member to respect and maintain the confidentiality of county issues presented before the board. Neither the advisory board nor any individual member shall disseminate confidential information received during advisory board meetings. 3. Advisory board members may be required to sign confidentiality statements as necessary and will be removed from the advisory board upon violation of the confidentiality agreement. SECTION VI. MEETINGS A. Regular Meetings 1. All meetings are to be open to the public as required by the applicable North Carolina General Statutes. 2. Unless otherwise specified, public meetings will follow the standard rules of procedure defined by the Orange County Board of Commissioners. 3. The Board of Commissioners of Orange County or the Orange County Manager may authorize any or all advisory boards to meet remotely, as needed, pursuant to the remote meeting rules set out herein. 4. The advisory board members shall determine the date, time, and place for each meeting, consistent with the guidelines below. a. Regular advisory board and subcommittee meetings. i. The advisory board convenes upon call of the Chair and meets on schedule as established by the specific advisory board policy. ii. Subcommittee meeting dates shall be set by the subcommittee Chairs and shall be scheduled in conjunction with advisory board meetings. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 9 26 Attachment 2 iii. A schedule of all meeting dates, times, and places shall be properly posted in accordance with North Carolina Law and delivered to the Clerk to the Board. B. Special Meetings 1. A majority of advisory board members or the Chair may call special meetings at any time for any specific business. Special meetings shall be convened at a location selected by the Chair. 2. All called special meetings shall be noticed in accord with North Carolina Law and delivered to the Clerk to the Board. C. Emergency Meetings 1. A majority of advisory board members or the Chair may call a meeting in emergency circumstances by providing telephone notice to media outlets at least one hour prior to the meeting. 2. An emergency situation includes a disaster that severely impairs the public's health or safety. In the event telephone services are not working, notice that the meetings occurred must be given as soon as possible after the meeting in accord with North Carolina Law and by delivery to the Clerk to the Board. D. Remote meetings 1. Advisory boards subject to this policy may meet remotely as authorized by the County Manager, except the Orange County Planning Board, Board of Adjustment, Board of Equalization and Review, and Animal Services Hearing Panel. 2. A remote meeting is an official meeting, or any part thereof, with a majority or all of the members of the advisory board participating by simultaneous communication. a. Simultaneous communication is any communication by conference telephone, conference video, or other electronic means. 3. Advisory Boards shall coordinate with the Clerk to the Board of Commissioners to notify the public of the means by which the public may access the remote meetings. 4. If at any time during a remote meeting the number of members needed for a quorum is disrupted by a loss of simultaneous communication, the meeting will not continue until simultaneous communication is restored and if simultaneous communication cannot be restored, the meeting will be adjourned without further action. E. Notice of Meetings Generally 1. Notice of advisory board meetings,including public hearings and appeals if applicable, and agendas shall be made available to all members and interested parties, and to any person who requests such notice, at least seven 7 9} days in advance of the meeting by e-mail and by posting on the Orange County government website. 2. All applicable notice requirements established by North Carolina law shall be followed. 3. Prior to January 51" of each calendar year advisory boards shall post—submit their meeting schedules in a readly &—wCh se ied- le Shall be delmveFed—to the Clerk to the Board of Commissioners for posting to a readily accessible location. the QFaRg^ County ^"sit^ Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 10 27 Attachment 2 F. Agendas 1. Board members and/or staff members shall submit agenda items to the Chair and staff for consideration at least fifteen (15) days prior to a scheduled meeting. 2. The agenda must provide a description of each item of business to be transacted or discussed so that interested members of the public will be capable of understanding the nature of each agenda item. 3. As a general rule,only those items appearing on the agenda will be discussed or voted on. However, if an item is raised by a member of the public,the advisory board may accept public comment and discuss the item so long as no action is taken until a subsequent meeting. 4. With the Chair's agreement, the designated staff will develop and distribute to each member an agenda listing the matters to be considered at upcoming advisory board meetings. Also, so far as practicable, copies of all written reports that are to be presented to the advisory board for members' review will be included in this package at least ten (10) days before the meeting. 5. All recommendations and reports of the advisory board, approved in the form of motions,shall be conveyed exclusively to the Orange County Board of Commissioners for consideration, approval or denial. Outcomes are reported back to the advisory board. G. Minutes 1. Minutes shall be taken of all advisory board meetings and submitted to the Clerk to the Board of Orange County Commissioners for retention and distribution to the Orange County Board of Commissioners. SECTION VII. SUBCOMMITTEES A. Purpose and Formation 1. Subcommittees may be formed by the advisory board to research and make special recommendations on special issues or areas in order to carry out the duties of the advisory board. 2. All subcommittees shall be reviewed by the appointing body on an annual basis to determine continued need and realignment with the priorities of the advisory board. 3. Approved subcommittees must have documented goals,deliverables, and a timeline. The subcommittee will cease to meet when these are satisfied. 4. The advisory board Chair may request that the Orange County Board of Commissioners change the structure and/or operating procedures of the advisory board if he or she deems it essential for improving the board's productivity and effectiveness. 5. A subcommittee can be formed with the approval of the advisory board chair and majority vote of the advisory board. 6. Subcommittees shall operate as directed by the advisory board. B. Procedure and Membership 1. A member of the subcommittee shall take responsibility for taking minutes of subcommittee meetings and shall report to the advisory board the subcommittee's progress toward its stated objectives, including dissenting viewpoints. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 11 28 Attachment 2 2. Subcommittees shall operate by majority vote. 3. Subcommittees may request a technical representative be approved by the County Manager. 4. Subcommittees shall operate openly as defined by applicable North Carolina State law and local ordinances and policies. 5. Membership on subcommittees shall be voluntary unless the specific advisory board policy dictates otherwise. SECTION VIII. QUORUM AND VOTING A. Quorum 1. A quorum for a meeting of an advisory board and any subcommittee thereof shall consist of a majority of the number of appointed members. Vacant positions are not counted when determining if a quorum is present. 2. Members who remotely attend a meeting may be counted present for purposes of a quorum. B. Voting 1. Unless otherwise required by law, all decisions shall be reached by a simple majority vote. 2. All voting will be conducted in open meetings, except when in closed session where such closed session is permitted by North Carolina law. 3. No issues can be voted upon unless a quorum is present. 4. Only appointed members can vote at advisory board meetings. 5. Appointed members shall not delegate their vote to another member. 6. The Chair of the advisory board may participate and vote on all issues. 7. Voting by proxy is not authorized and shall not be allowed. 8. Members may not abstain from voting but where a member has a conflict of interest the member may be excused by majority vote of the advisory board. 9. Members of advisory boards must be present to vote. Presence may be accomplished through remote attendance or physical attendance. 10. Individuals appointed as ex officio members of the advisory board are not authorized to vote on any issue before the advisory board. SECTION IX. ETHICS A. This section also applies to the Board of Adjustment, Board of Equalization and Review, and Animal Services Hearing Panel. B. Conflict of Interest 1. During advisory board meetings, a member shall immediately disclose any potential conflict of interest and request to be excused from voting when he or she has a conflict of interest. 2. During appeal proceedings,the applicant has the right to question the interest of any voting member. The advisory board chair should consult with the County Attorney or staff attorney on any potential conflict of interest in appeal matters. 3. In determining from existing facts and circumstances whether a conflict of interest exists the determining party shall consider the facts and circumstances as would an Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 12 29 Attachment 2 ordinary and reasonable person exercising prudence,discretion, intelligence,and due care. C. Gifts 1. An advisory board member shall not directly or indirectly ask, accept, demand, exact, solicit, seek, assign, receive, or agree to receive any gift or honorarium for the advisory board member, or for another person, in return for being influenced in the discharge of the advisory board member's official responsibilities. 2. This section shall not apply to gifts or awards authorized by Orange County Policies, Resolutions, or Ordinances. D. Code of Ethics 1. Advisory board members should act with integrity and with independence from improper influence as they exercise the functions of their offices. Characteristics and behaviors that are consistent with this standard are: a. Adhering firmly to a code of sound values. b. Behaving consistently and with respect towards everyone with whom they interact. c. Exhibiting trustworthiness. d. Living as if they are on duty as appointed officials regardless of where they are or what they are doing. e. Using their best independent judgment to pursue the common good as they see it, presenting their opinions to all in a reasonable, forthright, consistent manner. f. Remaining incorruptible, self-governing, and not subject to improper influence, while at the same time being able to consider the opinions and ideas of others. g. Disclosing contacts and information about issues that they receive outside of public meetings, and refraining from seeking or receiving information about quasi-judicial matters outside of the quasi-judicial proceedings themselves. h. Treating other advisory boards and advisory board members and the public with respect, and honoring the opinions of others even when they disagree. i. Being careful not to reach conclusions on issues until all sides have been heard. j. Showing respect for their appointed office and not behaving in ways that reflect badly on the office,the advisory board, Orange County, or the Orange County Board of Commissioners. k. Recognizing that they are part of a larger group and acting accordingly. I. Recognizing that individual board members are not generally allowed to act on behalf of the board, but may only do so if the board specifically so authorizes, and that the board must take official action as a body. m. Being faithful in the performance of the duties of their offices. n. Acting as especially responsible residents whom others can trust and respect. o. Faithfully attending and preparing for meetings. p. Carefully analyzing all credible information that is properly submitted to them, and when applicable, being mindful of the need not to engage in communications outside the meeting in quasi-judicial matters. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 13 30 Attachment 2 q. Being willing to bear their fair share of the board's workload. r. To the extent appropriate,they should be willing to put the board's interests ahead of their own and shall avoid the appearance of a conflict of interest and shall, under no circumstances, use their position on any board for personal gain or profit. 2. Members of the Planning Board, Board of Adjustment, Economic Development Commission, and Board of Equalization and Review shall upon initial appointment, and prior to December 31 annually thereafter, disclose: a. Any interest he or she or his or her spouse or domestic partner has in real property situated in whole or in part in Orange County and the general description of that property. b. Any legal, equitable, beneficial or contractual interest he or she or his or her spouse or domestic partner has in any business,firm or corporation,which is currently doing business with Orange County pursuant to contracts awarded by Orange County, or which is attempting, or has attempted in the past calendar year, to secure the award of a bid from Orange County or the approval of any Board or Agency of Orange County. c. Failure to file a disclosure statement setting out the above required information shall result in immediate removal of the member from the applicable board. SECTION X. COMPENSATION AND TRAVEL REIMBURSEMENT A. Compensation 1. As a general rule advisory board service is voluntary and appointed members shall receive no form of compensation for their services. 2. However, should the Orange County Board of Commissioners determine, in its sole discretion, that an advisory board's members should be compensated, such compensation shall be addressed in that advisory board's specific policy and rules of procedure as adopted by the Commissioners. B. Travel Expense Reimbursement 1. The Chair shall, to the extent practicable, schedule all hearings and advisory board meetings to minimize travel and per diem costs. 2. Payment of expenses to advisory board members shall occur only when travel has been approved by the County Manager prior to the time the expenses are incurred. 3. Orange County shall reimburse reasonable and necessary travel and incidental business expenses from pre-approved travel to advisory board members 4. Advisory board members shall be reimbursed in accordance with current local and/or state rules and regulations. Expense claims shall be submitted as required pursuant to the Orange County travel policy. 5. Transportation expense claims shall include charges essential for transportation to and from the meeting place. Reimbursement shall be made only for the local government's standard mileage allowance. Travel should be via the shortest, most commonly traveled route. 6. Travel expense does not include hotel/motel expenses. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 14 31 Attachment 2 SECTION XI. LIMITATION OF POWER AND AUTHORITY A. Nothing contained in this Advisory Board Policy shall be construed to conflict with any North Carolina law or Orange County ordinance. Should there be an appearance of conflict, the appropriate North Carolina law or Orange County ordinance shall prevail. B. The activities of the advisory board shall, at all times, be conducted in accord with applicable Federal law, North Carolina law, and Orange County ordinances. C. Advisory Boards, the Board of Adjustment, Board of Equalization and Review, and Animal Services Hearing Panel, and any members thereof shall not(and shall not have the express or implied authority to): 1. Incur expense or obligate Orange County in any manner. a. Any expense incurred must have been pre-approved either through the department director overseeing the advisory board's budget, the Orange County Board of Commissioners, or the County Manager. b. It is specifically acknowledged that no member of an advisory board has the authority, express or implied, to, contractually or otherwise, bind Orange County. 2. Identify or release any draft document that has not been approved for release by the Orange County Board of Commissioners or County Manager. 3. Take positions, in their capacity as an advisory board member, on any political issue or support or oppose any candidate for public office. 4. Independently investigate resident complaints against Orange County, any department or any employee of a department. 5. Conduct any activity that might constitute or be construed as an official governmental review of departmental or employee actions. 6. Conduct any activity that might constitute or be construed as establishment of Orange County or departmental policy. 7. Violate the confidentiality of any information related to matters involving pending or forthcoming civil or criminal litigation. 8. Engage in any act to impose or attempt to impose discipline on any advisory board member, department, or employee. 9. Interfere, attempt to interfere or involve themselves in any way in staff personnel matters regardless of the nature of the matter. Adopted 2-21 12;Dates of Amendment 8-21-12;11-8-12;3-3-15;6-18-19;6-2-20;10-6-20;4-5-22;6-21-22;12-5-22;3-18-25 15 Amended January 16, 2024 Orange Unified Transportation (OUT) BOARD POLICIES AND PROCEDURES SECTION I: SCOPE A. Purpose 1. To establish a policy and procedures whereby the Orange County Board of Commissioners will establish the specific policies and procedures governing the Orange Unified Transportation (OUT) Board. 2. The Orange County Board of Commissioners may appoint an advisory board whose duty is to serve in an advisory capacity in regards to planning and programming transportation infrastructure improvements and other County transportation planning initiatives, as determined by the Board of Commissioners. B. Authority 1. North Carolina General Statute 153A-76 grants boards of county commissioners the authority to establish advisory boards. 2. The Orange County Advisory Board Policy serves as the underlying policy document to which the OUT Board, in addition to this policy and procedure document, is subject. The Orange County Advisory Board Policy is attached hereto as "Exhibit A". 3. In the event that there is a conflict between the Orange County Advisory Board Policy and this Policies and Procedures document this Policies and Procedures document shall control. C. Charge 1. The OUT Board is charged with advising the Board of County Commissioners on the planning and programming of transportation infrastructure improvements and other County transportation planning initiatives, as directed by the Board. 2. Upon request, OUT Board may advise other boards regarding transportation. -2-.3. Maintain a current list of stakeholder groups and ensure ongoing communication to keep them informed about developments in multimodal transportation. SECTION II: GOALS AND OBJECTIVES A. Goals The Transportation Element of the 2030 Comprehensive Plan includes the County's goals for transportation planning and provides guidance for the OUT Board, Planning Board, Board of County Commissioners, and staff. B. Objectives The OUT Board shall: Amended January 16, 2024 1. Identify and provide prioritization recommendations on the County's roadway, transit, rail, bicycle, and pedestrian needs. 2. Assist in development and review of updates to the Transportation Element of the County's Comprehensives Land Use, and other Plans as requested. 3. Provide recommendations to the Board regarding Federal and State legislation affecting transportation in Orange County. 4. Provide recommendations on innovative techniques and methods to improve the efficiency and capacity of existing and future multimodal transportation systems. 5. Carry out special projects as assigned by the Board of County Commissioners. 6. Serve as an advisory body to the Administrative Staff of the Orange Public Transit (OPT) System. The roles of assistance may include but are not limited to being: a. A forum to discuss relevant issues related to public transportation; b. An advocate in promoting new or expanded transit services; c. Sounding board on program operations, goal setting and monitoring; d. As a guardian of passenger rights for the general public and special targeted populations; and e. When directed by the BOCC, recommends NCDOT grants, contracts, and studies that affect the current or future service levels of public transportation in Orange County. SECTION III: MEMBERSHIP A. Authority 1. North Carolina General Statute 153A-76 grants boards of county commissioners the authority to establish advisory boards and to appoint members to and remove members from those advisory boards. In acting on this authority the Orange County Board of Commissioners hereby establishes certain general conditions to which applicants and members of advisory boards should conform. B. Composition 1. The OUT Board is composed of twelve eleven (4-211) voting members, including one from each township, if possible. —Each voting member shall serve a three-year term and may serve a maximum of two consecutive terms. A member appointed to fill a vacancy shall be considered to have completed a full term if the period served is 24 months or more. 2. 944e-Two non-voting youth delegate between the ages 13 and 17 will be appointed to serve annually. 3. Members shall represent diverse demographic, geographic, cultural and professional characteristics Amended January 16, 2024 C. Attendance 1. Meeting attendance will be in accordance with Section III, H of the County Commissioners Advisory Board Policy. 2. Members are encouraged to attend in-person. Remote options will be available to voting members upon request. 2-3. If a member can't attend a meeting, they should notify the Chair or staff at least 48 hours in advance. SECTION IV.MEETINGS A. Staffing 1. Orange County Transportation Services staff may serves as support function to the OUT-Board upon the approval of the Orange County Manager. B. Agendas 1. Items for agendas shall be approved by the OUT-Board Chair and Orange County staf l-ransportation Services Director and Deputy Director. 2. OUTBoard Agenda Review will be conducted between Chair, Vice- Chair, OCTS Director and Deputy Director. C. Date, Time, and Location of Regular Meetings 1. Regular meetings of the OUT Board shall be held as needed to address items that require Board action consistent with its Charge and Duties identified herein. 2. Notice of advisory board meetings, along with agendas, shall be provided at least seven (7) days in advance via hard copy, email and the Orange County website to all members, interested parties, and anyone who requests it. -2-3. Meetings are held on the third Monday of the month at 6:30 pm. The meeting will be held the second Monday of the month, in the event of Holiday. The start time and location of the meeting shall be included on the agenda and shall typically be at: West Campus Office Building 131 West Margaret lane Hillsborough, NC 27278 4. The OUTBoard Chair, in consultation with staff, shall have the authority to change the start time and location of a regular meeting to meet any Amended January 16, 2024 special circumstances, provided the information is included on the distributed agenda. �— Special meetings may be called at any time by the Chair or a majority of advisory board members to address specific matters. Such meetings will be held at a location designated by the Chair and will be publicly noticed in accordance with North Carolina law, with notice provided to the County Clerk to the Board. D. Subcommittee 1. Established to research and make special recommendations on special issues or areas in order to carry out the duties of the advisory board and must have documented goals, deliverables, and a timeline. The subcommittee will cease to meet when these are satisfied. E. Voting 1. All decisions require a simple majority vote, provided a quorum is Present. Only appointed members may vote, and proxy or delegated voting is not allowed. The Chair may vote on all matters. Voting must occur in open meetings, unless a closed session is permitted by North Carolina law. Members must be present—either in person or remotely— to vote. Abstentions are not permitted unless a member is excused due to a conflict of interest by a majority vote of the board. SECTION V. ORIENTATION A. Each member shall attend an orientation presented by the Orange County Transportation Services Department to familiarize the advisory board members with the operation of County government, Each voting member will be encouraged to complete the orientation within six weeks of his or her appointment. They will also receive a manual outlining the key principles, policies, and programs related to multimodal transportation planning. SECTION VI.BY-LAWS A. By-Laws 1. Any Bylaws adopted by the OUT Board are void and no further bylaws shall be adopted. Procedure shall be governed solely by this policy document and the General Orange County Board of County Commissioners Advisory Board Policy DO ; . 2. Should the OUT Board determine modifications to policies and procedures are necessary, the OUT Board may recommend the Board of County Commissioners for such modifications. ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty Item 5.c. Subject: Orange County Bike Ped Plan Update PURPOSE: Provide comments on the Orange County Bicycle and Pedestrian planning process. BACKGROUND: In the winter of 2024, Orange County initiated its first-ever Comprehensive Bicycle and Pedestrian Plan in collaboration with planning and engineering firm Stantec. This ambitious undertaking is currently in the Listening and Testing phases, with the Refinement and Final Plan stages anticipated in late 2025. The project is tentatively scheduled for completion in the fall of 2025. Progress to Date: Several key milestones have been achieved as part of the planning process: • A project website has been launched, featuring public surveys and interactive mapping tools to gather community input. • The team has successfully conducted one pop-up event and four focus group meetings with a diverse group of stakeholders. • Public Workshop #1 has taken place, providing an opportunity for broader community engagement. • A thorough review of existing plans, policies, and programs has been initiated, alongside an ongoing analysis of existing conditions. IS Two meetings with the Core Technical Team have been held to guide the project and ensure alignment with key transportation goals. Highlights of Public Engagement and Technical Review: The input gathered and analysis conducted so far have generated several important insights: • The interactive map has grown from an initial 37 user-submitted points to over 170 entries, reflecting strong community interest, along with more than 20 complete surveys. • A detailed inventory has been completed of the county's roadway network, including: o 920 miles of state roads and 801 miles of town or private roads o Data collected includes functional classification, speed limits, traffic volumes, crash history, and more. • The team assesses transit accessibility, analyzing the Transportation Disadvantage Index (TDI), and aligning all efforts with the plan's Guiding Principles. • Efforts are currently underway to build a realistic bicycle and pedestrian network while also establishing a prioritization workgroup to ensure future investments are effectively targeted. As part of the ongoing process, the Orange County Transportation Director will provide a brief presentation summarizing the work completed to date and outlining the next steps. All feedback received will be compiled and shared with the consulting team for consideration as the project moves forward. 600 Hwy 86 N • Hillsborough, North Carolina 27278 Phone (919)245-2008 • Fax (919)732-2137 orangecountync.gov/transportation FINANCIAL IMPACT: No financial impact currently. ALIGNMENT WITH STRATEGIC PLAN: • GOAL 4: MULTI-MODAL TRANSPORTATION • OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. • OBJECTIVE 3. Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. • OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. • OBJECTIVE 6. Update transportation related plans to provide more multi-modal options including rural Orange County. ACTION: Provide comments on the Orange County Bicycle and Pedestrian planning process. ���E ORANGE COUNTY GOVERNMENT ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT ri ,� No rH CARQLLNA Ora"g;„8�,�,u„5nt Item 5.c. Subject: Transportation - Development Advisory Committee (DAC) Memo V2.5 Attachment: OCTS DAC Memo Example PURPOSE: Provide comments on the new Transportation DAC Memo Example. BACKGROUND: The Director of Orange County Transportation Services (OCTS) has completed a comprehensive Multimodal Assessment utilizing the newly developed assessment template, as previously introduced. This initial assessment, included as Attachment 1, serves as a model for how OCTS staff will conduct all future development application reviews—particularly following the formal approval and adoption of the new Multimodal Assessment Program by all relevant stakeholders. The completed assessment has been submitted to the Planning and Inspections Department for preliminary review and feedback. It will also be presented to the Planning Board for additional evaluation and consideration as part of the broader implementation process. To further formalize and enhance the new Multimodal Assessment practice, the OCTS Director has initiated the following key actions: • Collaboration with WSP to refine the assessment template and incorporate the best national practices into the final work product • Ongoing research into fee structures currently in use across North Carolina and throughout the United States to inform a sustainable and equitable funding model Is Review of potential updates to the Unified Development Ordinance (UDO) to ensure alignment with emerging multimodal transportation policies and objectives The finalized Orange County-specific Multimodal Assessment framework is expected to be completed and ready for implementation by Fall/Winter 2025. TRANPORTATION ADVISORY SERVICE (TAS): FINANCIAL IMPACT: No financial impact currently. ALIGNMENT WITH STRATEGIC PLAN: • GOAL 4: MULTI-MODAL TRANSPORTATION • OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. • OBJECTIVE 3. Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. • OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 • Fax (919)732-2137 orangecountync.gov/transportation • OBJECTIVE 6. Update transportation related plans to provide more multi-modal options including rural Orange County. ACTION: Provide comments on the new Transportation DAC Memo Example (Attachment 1). ORANGE COUNTY GOVERNMENT COUNTYORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NORrH GLROLLNA PULICTRANSIT OCTS DAC Memo V2.2 TECHNICAL MEMORANDUM TO: Taylor Perschau, Current Planning and Zoning Manager FROM: Nishith Trivedi,Transportation Director DATE: April 7, 2025 SUBJECT: DAC Transportation Review: HOA22-0001 The following memo provides Orange County Planning Department and the applicant a Multimodal Impact Assessment (MIA) for the proposed application HOA22-0001 SITE REVIEW Immediate Orange*Single family home in southern rural Private, • •• *10.2 acres, including small portion Surrounding eSouthern connection to Jones Ferry Road in Chatham County-State maintained *Northern connection - .-.. end Ridge*Large lot Single Family Homes along Uwharie •... *PartFacilities -- Subdivision, in Chatham County Property is end . -. This single-family home is located in southern rural Orange County on a quiet 10.2-acre lot that partly extends into Chatham County. It's at the end of Uwharie Ridge Road, a private road with a 50-foot right-of-way. The road ends to the north and connects south to state-maintained Jones Ferry Road. Surrounded by large-lot homes in the Deer Mountain Subdivision,the property sits at the edge of the Haw River Protected Watershed,offering a peaceful,natural setting. This home occupation permit application proposes the construction of a 594 sq. ft. accessory building for office use, approximately 400 feet from the private road. Field observations, surrounding conditions, aerial imagery, and other site assessments indicate no significant impact on the transportation network. The entire area is privately owned and maintained. While the project may result in a slight increase in vehicle ownership on the property, no changes are anticipated along Uwharie Ridge Road. ORANGE COUNTY GOVERNMENT COUNTYORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NOKIM C.AROLINA RUBLICTRRNSIT Transportation Modes Overview + ti �' J f — — • Bike& Pedestrian i J I r i� o Data Availability: I Currently,there is no data -r I I # available regarding existing bike y i + or pedestrian infrastructure I 1 I 1 within the area. o Planned Projects: There are no bike or pedestrian J improvement projects currently planned or proposed. r I a 41 }' + o Funding Status: I + r There are no improvements for bike or pedestrian facilities that have received funding currently. [f • Transit& Rail + o Data Availability: I ti R ' No current data is available on existing transit or rail services or infrastructure specific to the area. o Planned Projects: There are no planned transit or �.�. rail projects identified in the pipeline. o Existing Services: "^ The area is currently served by I Demand Response (DR) and iiaube Class FuncUonal Class + . ' 0""ONrhm=ftFrwm%- Mobility on Demand (MOD) r—�Nmx — —�+�a transit services, which provide Awkzbmb 250 saa — ovWtx flexible transportation options INEEZZZI Feel L without fixed routes. • Highway o Road Classification: The primary access road within this area is classified as a Private Road, which typically means it is maintained by a private entity rather than a public agency. o Data Availability: There is no existing traffic, condition, or infrastructure data available for the highway network in this area. o Planned Projects: No highway improvements or expansion projects are currently planned. o Funding Status: There are no funded highway infrastructure improvements ORANGE COUNTY GOVERNMENT COUNTYORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NORrH GLROLLNA PULICTRANSIT DATA Functional class- Private - Uwharie Ridge Road Current AADT- N/A Build out AADT-+2 Note: Crashes (by type) - N/A New office may generate traffic Current ROW-50' Build out ROW-50' Current LOS- A Build out LOS-A Trip Gen -+2 (Home Office) PLANS • • State/Federal• TMP - No projects • CTP - No projects • STIP - No projects • SRTP - DR and MOD • MTP- No projects • HMIP- No projects • SRTS - No projects • Freight- No projects • SPOT Safety/ • Transit - DR and MOD • CMP- No projects Mobiliy/HSIP - No • LIDO - N/A • EJ - not COC projects • Strategic Plan - N/A Current: • No County recommended project identified in any locally adopted plan • No multimodal project identified in regionally approved plans including CPRPO and TWTPO, area is outside BG MPO • Not a Community of Concern as determined by Environmental Justice Report • No state funded project committed or programmed in the immediate or surrounding area Future: • Transit—County Strategic Plan and Short-Range Transit Plan recommend increase access to transit in rural Orange County. o Uwharie Ridge Road serves as access for County's Demand Response and Mobility-on-Demand • There are no NCDOT administrative—HMIP, SPOT Safety/Mobility/HSIP—projects programmed or planned for the surrounding area o Uwharie Ridge Road would have to be built to state standards and dedicated to NCDOT in order for them to add it to state maintenance system. ORANGE COUNTY GOVERNMENT ORL ORANGE TRANSPORTATION SERVICES DEPARTMENT ri NoKrK CAROLLNA OrangeCouPULICTRAnty RESIDENTIAL/NON-RESIDENTIAL Performance Performance Measure - Non- Measure Highway Climate Action Plan Strategic Plan Highway Bike/Ped Mobility EV Multimodal Accomodations Transit Access Modernization Mitigation Public Performance • There is no significant impact anticipated on the transportation network across any mode: • Bicycle/Pedestrian:The project may encourage increased walking and biking activity along the private road. • Transit:There may be an increased demand for Demand Response and Mobility on Demand (MOD) services. • Highway Mobility: A slight increase in vehicle traffic to and from the proposed office is expected. • Highway Modernization: The private road will need to be upgraded to meet current state standards. Climate Action • Future trips to and from the proposed office may or may not involve electric vehicles. • No mitigation measures are recommended at this time. Strategic Plan Alignment • The proposed application does not conflict with the County's Strategic Plan or its performance measures. • It may result in a greater need for public transit access along Uwharie Ridge Road. Project Prioritization • The proposed application does not adversely affect the County's prioritization process and does not contribute to identifying potential future projects for prioritization. ORANGE COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT ri ORAWY NORrK CAROLLNA OrangeCouPULICTRAnty GOALS AND OBJECTIVES County TMP 1) Protect Human and Natural Environment and minimize Climate Change a) Reduce emissions, GHG, and energy consumption b) Reduce negative impacts on natural and cultural environment 2) Promote Safety, Health and Well-Being a) Increase safety of travelers and residents Promote public health through transportation choices 3) Stimulate Economic Vitality and Opportunity a) Coordinate land use and transportation. 4) Provide a safe,secure, comprehensive,and effective transportation a) Enhance mobility and accessibility and manage congestion across the transportation system and across modes of transportation SAFETY Complete Streets The proposed development does not currently align with any planned or programmed Complete Streets projects in the immediate or surrounding area. However, a review of potential multimodal impacts has been conducted: • Project Scope:There are no existing or proposed Complete Streets projects in the vicinity of the development. As such, no immediate integration or coordination with such projects is anticipated. • Highway Considerations: Any additional vehicular traffic resulting from the proposed development will utilize a private road.This limits the impact on public roadways and associated Complete Streets initiatives. • Bicycle and Pedestrian: Similarly, any increase in bike or pedestrian activity is expected to occur along the same private road, not affecting existing public infrastructure or planned improvements. • Transit Access: While no transit infrastructure projects are currently planned in the area,the development may increase the need for Demand Response and Mobility on Demand (MOD) services to support access to the proposed office space.This should be monitored as the project evolves to ensure adequate transit service availability. Vision Zero The area surrounding the proposed development site has not experienced any fatal or serious injury crashes based on available safety data: • Crash History: A review of recent traffic safety records shows no fatality or serious injury accidents in the vicinity of the project area.This indicates that current conditions are generally consistent with Vision Zero goals. • Mitigation Measures: Given the absence of crash history and the limited impact on public roadways, no specific safety mitigation measures are recommended at this time. However, continued monitoring of traffic patterns and safety data is encouraged to maintain a safe environment as development proceeds. ORANGE COUNTY GOVERNMENT COUNTYORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NORrH GLROLLNA PULICTRANSIT ASSESSMENT Safety (5-year period) LMLW No NCDOT crash data available along Uwharie Ridge Road ECONOMY New Jobs Created - unknown from home based office Employers within 1/2 mile - unknown,this includes Chatham County Economic Develeopment District- Not Applicable The number of new jobs associated with the proposed home-based office is currently unknown. Employment data within a %-mile radius is unavailable, though it may include Chatham County facilities. The site is not located within a designated Economic Development District. ORANGE ORANGE COUNTY GOVERNMENTri ORANGE TRANSPORTATION SERVICES DEPARTMENT Co OmMeW `[-K I I I ,,,,r1 17, vueuc r^xens�r ACCESS & EQUITY Mode Split Based on the current land use context,infrastructure availability,and transportation access,the anticipated mode split for the proposed development is as follows: • 100% Vehicle: All trips to and from the proposed office development are currently expected to occur via personal or passenger vehicles.This is primarily due to the lack of nearby transit access, pedestrian facilities, and bike infrastructure. • 0%Transit: There is currently no direct access to fixed-route public transit within the immediate vicinity of the development site, resulting in no anticipated transit use under current conditions. • 0% Bicycle/Pedestrian: With no sidewalks, greenways, or designated bike lanes in the area, pedestrian and bicycle travel is not currently feasible or anticipated. • 0%Freight:The proposed use does not support or attract freight activity,and there is no expected commercial freight movement associated with the site. First& Last Mile Connectivity Connectivity to other modes of transportation remains limited, though some opportunities may exist for future improvement: • To/From Transit:The nearest transit service is located approximately% mile away on Jones Ferry Road.While not directly accessible from the development site, this proximity suggests potential for future Demand Response, Mobility on Demand (MOD), or first-mile/last-mile service solutions to bridge the gap. • To/From Bicycle/Pedestrian Facilities: There are no existing bike lanes, sidewalks, or pedestrian pathways within a %-mile radius of the site.This lack of non-motorized infrastructure significantly limits access for bike and pedestrian users. • Bike Racks: There are currently no bike racks proposed on-site or in the surrounding area, reducing the feasibility of encouraging active transportation as a viable mode. • Bus Stops: No bus stops are currently located within or adjacent to the site. If future demand for transit increases,the installation of a nearby stop or shelter may be considered in coordination with transit providers. CONCLUSION OCTS Comments: A 594 sq. ft. home-based office is proposed on a quiet, 10.2-acre rural lot in southern Orange County. Located 400 feet off a private road, the project has minimal impact on transportation infrastructure. All access will be by private vehicle due to a lack of transit, bike, or pedestrian facilities. No safety, equity, or environmental justice concerns are identified,though future transit demand may grow.The site aligns with county Transportation Multimodal Plan goals but does not influence current multimodal planning or project prioritization. Developer requested to: o Recommendation 1 - ensure adequate access is provided along Uwharie Ridge Road for County transit services. ORANGE COUNTY GOVERNMENT ORA�Y TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NORrH GLROLLNA PULICTRANSIT SUMMARY SITE REVIEW The proposed project is for a home occupation permit on a 10.2-acre rural lot in southern Orange County, partially extending into Chatham County. The property is at the terminus of Uwharie Ridge Road, a privately maintained road with a 50-foot right-of-way connecting south to state-maintained Jones Ferry Road. The applicant seeks approval to construct a 594 sq. ft. accessory office building approximately 400 feet from the private road. Field observations and site assessments (including aerial imagery and on-site conditions) indicate that this development will not significantly impact the transportation network. While there may be a minor increase in vehicle traffic associated with the office, no modifications to Uwharie Ridge Road are proposed or expected. PLANS Current Planning Context: • No County-recommended transportation projects in any adopted plan. • No multimodal projects identified in CPRPO,TWTPO, or within the BG MPO area. • Not designated as a Community of Concern in the Environmental Justice Report. • No state-funded transportation projects planned or committed nearby. Future Considerations: • The County Strategic Plan recommends improving transit access in rural areas. • Uwharie Ridge Road currently supports County Demand Response and Mobility-on-Demand (MOD). • Uwharie Ridge Road must be upgraded to state standards to be added to state system Note: The proposed office may contribute to slight traffic generation. TRANSPORTATION IMPACT Performance (All Modes): • Bicycle/Pedestrian: Potential for modest increase in activity along the private road. • Transit: Potential rise in MOD service demand. • Highway Mobility: Minor increase in vehicle trips expected. • Modernization: Road upgrades required for any NCDOT assumption. Climate Action: • Trips may involve EVs in the future. • No mitigation measures required currently. Strategic Plan Alignment: • No conflicts with County Strategic Plan. • May enhance the case for transit services along Uwharie Ridge Road. Project Prioritization: 0 No influence on current County prioritization or future project identification. ORANGE COUNTY GOVERNMENTri TRANSPORTATION SERVICES DEPARTMENT OmMeComt vue ucrxnnsr y COUNTY TRANSPORTATION MULTIMODAL PLAN ALIGNMENT Key Goals& Objectives: • Protect the natural environment and reduce GHG emissions. • Promote safety and health through multimodal options. • Enhance economic opportunity by aligning transportation with land use. • Provide a secure, efficient, and equitable transportation network. SAFETY Complete Streets Review: • No existing or proposed Complete Streets projects in the vicinity. • No public infrastructure will be directly affected due to the private road. • Potential for future MOD transit need should be monitored. Vision Zero Review: • No reported fatal or serious injury crashes nearby(5-year review). • No mitigation needed, but ongoing monitoring is encouraged. ECONOMY • The number of jobs created by the home-based office is undetermined. • No employment data available within a %-mile radius. • The site is not within a designated Economic Development District. ACCESS& EQUITY Mode Split Estimates: • 100%Vehicle: All trips by personal vehicles. • 0%Transit/Bike/Pedestrian/Freight: No current infrastructure to support these modes. First/Last Mile Connectivity: • Closest transit access is—Y2 mile away on Jones Ferry Road. • No sidewalks, bike lanes, or bus stops in the area. • No bike racks are proposed on-site. CONCLUSION The proposed 594 sq. ft. home-based office will have minimal impact on existing transportation infrastructure. Given the absence of nearby multimodal facilities, all site access will remain automobile-dependent. No concerns related to safety, environmental justice,or equity have been identified.While future transit needs could arise,the current application aligns with the County's transportation goals but does not influence project prioritization. Recommendation: The applicant should ensure that access on Uwharie Ridge Road remains adequate to support County transit operations. OF NORTH C i.P 2 NCDOTPD 9 qT a,�v �iFNT OF TR N11 NCDCIT Transportation • Newsletter April 2025 NCDOT Updates "Connecting people, The below and next pages contain NCDOT press releases, local products and places CTP Status Updates, USDOT NOFO, FHWA Newsletter Issue, safely and efficiently plan links and more. with customer focus, Impressive NCDOT Efforts Continue 6 Months After He- accountability and lene (3/28/2025) environmental sensi- ASHEVILLE — N.C. Department of Transportation employees first provided tivity to enhance the access to citizens impacted by Hurricane Helene by cutting their way economy and vitality through forests of downed trees. of North Carolina...." Six months after the most destructive storm in state history, NCDOT em- - NCDOT Mission ployees and dedicated industry partners continue working for the resi- Statement dents, businesses and visitors of western North Carolina. The emergency has passed. But not the urgency. NCDOT has reopened 90 percent of the roads damaged by the hurricane. Crews have repaired or re- placed 270 bridges and 870 culverts and reopened Interstate 40 connecting North Carolina and Ten- nessee. "Lives were forever changed by this storm," NCDOT Division 13 Engineer Tim Anderson said. "Local NCDOT staff, NCDOT staff from other divisions and our contract partners have completed a great deal of emergency repairs and we will not stop." Crews worked through the winter, with limited daylight and in freezing temperatures. On some days, NCDOT crews worked on Helene repairs in the morning then worked snow and ice operations later in the same day. "We knew right away when this storm hit that we needed to do all we could to get these roads ready for winter. Our crews did a great job in the fall, and the winter was indeed a challenge," NCDOT Divi- sion 11 Engineer Michael Poe said. "With spring now coming, we're really excited about the next six months and what we'll accomplish in that timeframe." Reopening 1-40 to one lane in each direction provides area residents with a critical connection to both states and long-range drivers a better route to transport cargo. Although slight delays are com- mon as traffic merges into one lane, a drive through the Pigeon River Gorge shows the devastating damage, the incredible efforts of NCDOT and its partners to date, and the immense task ahead. "We are happy to have 1-40 open and operating in a limited capacity, and we also know that tons — literally thousands of tons — of work remains to restore 1-40 completely," NCDOT Division 14 Engi- neer Wesley Grindstaff said. "Our employees and our contractors are up to the challenge for the benefits of our residents and interstate commerce." For full article, visit this NCDOT webpage: Impressive NCDOT Efforts Continue 6 Months After Helene Page 1 North Carolina Litter Sweep: April 12-26 The 2025 Spring Litter Sweep is taking place April 12-26. Traditionally scheduled for the last two weeks of April and September, Litter Sweep is the N.C. Depart- ment of Transportation's biannual statewide roadside litter removal initiative. Residents throughout the state participate in local efforts to help clean up North Carolina's roadways. In addition to volunteers, NCDOT maintenance crews devote one week of their time to pick up litter and collect orange bags placed on the roadsides by volunteer pickups. Volunteers are provided cleanup supplies, such as reversible orange/blue trash bags, gloves and orange safety vests, from their local NCDOT County Maintenance Yard office. Ready to Get Involved? You Found...What? If you or your team needs supplies, or if you have any questions, con- If you find anything unusual tact your local NCDOT litter program coordinator. Coordinators work or interesting during your with volunteers to select an available stretch of state-maintained high- litter sweep cleanup, use the way and can answer questions about the program. Contact infor- hashtag, #StrangeLitter mation can be found here. on social media. Webpage: Litter Sweep Volunteer Resources For full article including Frequently Asked Questions, visit this NCDOT webpage: NCDOT: Litter Sweep . . / CTP Status Updates Chatham County& Pittsboro - Status— Siler City, Chatham County, and Pittsboro agreed to do a uni- TPD Contacts:Julie Bogle fied CTP plan; a CTP update should begin around Summer 2025. Lead & Phil Geary ° Next Steps— Model development is continuing. Started Future Year pageary@ncdot.gov model development and currently scheduling a meeting with local (919) 707-0930 staff to develop SE data. DCHC MPO Status— A new CTP study has started in coordination with the devel- TPD Contact:Julie Bogle opment of the MPO's 2055 MTP called Destination 2055. jebogle@ncdot.gov ° Next Committee Meeting— Monday, April 14, 2025 @Central Pines RC (919) 707-0945 ° Status— The Orange County Transportation Multimodal Plan has been Orange County approved by County Commissioners. The plan consolidates all ap- TPD Contact:Julie Bogle proved transportation related plans, projects and programs into a sin- gle document. No status change for the following CTPs: Moore County ° Status— In the process of scheduling meetings with local entities to TPD "Interim"Contact: discuss preliminary plan of action. Dominique Boyd ° Next Steps— Model development is continuing. The Base Year model dlboydl@ncdot.gov is close to complete and development of Future Year projections will (919) 707-0932 begin afterwards to inform the CTP and MTP processes. o Status—Working on data verification. Finished Future Year projections Lee County and reviewing new draft Capacity Deficiency maps at staff level before TPD Contact:Julie Bogle bringing for Committee review. Next Steps—Continue developing multi-modal analysis and hold Steering Committee meeting. Page 2 FY25 Safe Streets and Roads for All (SS4A) NOFO Now Follow Us Live! (Email notice from USDOT dated 3/31/2025) Facebook The Department of Transportation has released the fiscal year (FY) 2025 X (formerly Twitter) Notice of Funding Opportunity (NOFO) for the Safe Streets and Roads for All SS4A program. YouTube Established by the Infrastructure Investment and Jobs Act (IIJA), the Safe Streets and Roads for All grant program funds regional, local, and Tribal initiatives through grants to prevent roadway deaths and serious injuries. Over$982 million is made available by this NOFO, and a similar amount is expected to be available next year in a future funding round. Two Available Grant Types March/April 2025 The SS4A program provides funding for two main types of grants: Innovator News- Planning and Demonstration Grants are used to develop, complete, or letter (From email supplement an Action Plan, as well as carry out demonstration activi- ties that inform an Action Plan. dated 3/31/2025, by Implementation Grants are used to implement strategies or projects FHWA) • that are consistent with an existingAction Plan and may also bundle Y From Simulation to Real- funding requests for supplemental planning and demonstration activi- ity: Puerto Rico's First ties that inform the Action Plan. Diverging Diamond In- Applications and Deadline terchange The NOFO is posted on Grants.gov. The deadline for applications is June 26, The Puerto Rico Highway 2025, at 5:00 p.m. (EDT). and Transportation Au- Applications must be submitted via Valid Eval, an online application portal thority used a driving used by USDOT. simulation tool to sup- Implementation Grant Application: https://usg.valideval.com/teams/ port design and commu- • usdot ss4a 2025 implementation/signup nity outreach for the is- land'sfirst diverging dia- • Planning and Demonstration Grant Application: htt s: mond interchange. usg.valideval.com/teams/usdot ss4a 2025 planning demo/signup Customer support for Valid Eval is available at support@valideval.com. Find out more in the lat- est Innovator. Webinar Dates USDOT will host a series of webinars to review pertinent components of Also in this issue: this year's NOFO. Visit the SS4A Webinar Series page for details on the . Concrete Innovation: webinar and webinar schedule. ODOT's Strategic Ap- Please visit the updated SS4A website for additional information on how to proach to Internal apply, frequently asked questions, and resources for filling out your appli- Curing cation. EDC Legacy: Collabo- g About Safe Streets and Roads for All rating to Solve Road Established by the Infrastructure Investment and Jobs Act, the Safe Streets Data Challenges and Roads for All (SS4A) competitive grant program will provide $5 billion Systemic Safety Anal- in grant funding over five years. Funding supports regional, local, and Tribal ysis:The Power of initiatives through grants to prevent roadway deaths and serious injuries. Prevention Read about how SS4A is impacting communities here. Page 3 NCDOT Statewide Plans: USDOT/FHWA To learn more, click on the following links or go to ncdot.gov and search Helpful Links: using names in blue unless otherwise noted: NC Moves 2050 Plan To learn more, click on the following links or go NCDOT Strategic Transportation Corridors (or go to ncdot.gov and to transportation.gov and search: Strategic Transportation Corridors) search for key words. NCDOT Comprehensive State Rail Plan (25-Year Vision) FHWA's Bipartisan Infra- 0 2023 NC Statewide Multimodal Freight Plan structure Law (BIL) web- Great Trails State Plan (2022) site serves as a one-stop Connecting North Carolinians to Opportunities (Public Transportation shop for FHWA's imple- • Strategic Plan-2018) mentation of the law, including information • NCDOT Resilience Strategy Report (2021) on funding, assistance, • Statewide Pedestrian & Bicycle Plan (2013) education, and guid- Other Plans: ance. • N.C. Climate Risk Assessment and Resilience Plan by Department of U.S. DOT's Equity web- Environmental Quality (or Google search: 2020-Climate-Risk- site provides plans and Assessment-and-Resilience-Plan.pdf) resources for delivering • NC FIRST Commission a more equitable trans- portation system. Helpful Links: • DOT Navigator helps To learn more, click on the following links or go to ncdot.gov and search communities under- using names in blue unless otherwise noted: stand the best ways to apply for grants, and • NCDOT home page— ncdot.gov plan for and deliver • Real-Time Traffic— transformative infra- drivenc.gov I North Carolina Traffic &Travel Information structure projects and • Report a pothole— NCDOT Contact Us Form (ncdot.gov & search services. "Report a pothole") • NCDOT: State Transportation Improvement Program— ncdot.gov/sti • Interactive Bicycle Routes Map Contact Us - https://www.ncdot.gov/bikeped/ncbikeways/defauIt.aspx • Links to all traffic count data information— Traffic Survey Group (connect.ncdot.gov &then search) • NCDOT Interactive Traffic Volume Map CPRPO Coordinator - Traffic Volume Maps (ncdot.gov) 09' • Traffic Safety Data & Engineering— -••• - •• • • NCDOT: Traffic Safety Data & Engineering • Federal Functional Classification Map— NCDOTTPD NCDOT Functional Class Map (ncdot.maps.arcgis.com) 1 S. Wilmington Street • Climate Change & Clean Transportation Raleigh, INIC - NCDOT: Climate Change & Clean Energy Visit us on the web at • Transportation Emission Reduction Projects— NCDOT: N.C. Clean www.ncdot.go Transportation Plan -Transportation Emission Reduction Projects Page 4 NCDOT DIV 7 PROJECTS LOCATED IN CPRPO - UNDER DEVELOPMENT TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date SS-6207T Portions of Twenty-One (21 ) Routes. Curve Warning Sign 9/20/23 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson 51112 Installation. Construction underway. BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/26 FY2028 $2,900,000 Planning and design activities underway Daniel Dagenhart BP7.R009.1 ROW has been certified. B P7.R009.2 B P7.R009.3 1-5958 Pavement rehabilitation on 1-40 / 1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Trung Nguyen 45910.1 .1 (Buckhorn Road) to west of SR 1006 (Orange Grove Road). 45910.3.1 BP7-R017 Replace Bridge #14 on SR 1548 (Schley Road) 9/7/28 FY2030 $1 ,500,000 Planning and design activities underway Daniel Dagenhart BP7.R017.1 BP7.R017.2 BP7.R017.3 R-5821A Construct operational improvements including 1/1/40 post years $3,194,000 PE funding approved 10/10/17, design Suzana Matta 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville with NC54 West Corridor Study 47093.3.2 Road). TARPO-Orange Co April 2025 Page 1 North Carolina Department of Transportation 3/31/2025 Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Crews, PE, Jacob $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 67 56.47 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION T US-15/501 . CORPORATION C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.6 53.42 LLC D000595 FIFTY ONE SECONDARY ROADS RILEY PAVING INC Howell, Bobby J $2,494,634.93 4/8/2024 10/8/2025 3/17/2025 DG00626 TWENTY THREE SECONDARY ROADS IN ORANGE COUNTY67 SUNROCK Howell, Bobby J $2,190,853.75 4/17/2024 10/17/2025 INDUSTRIES LLC DBA CAROLINA SUNROCK LLC DG00631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 65 63.92 UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND CONSTRUCTION LLC DG00639 FIFTEEN SECONDARY ROADS IN ORANGE COUNTY SUNROCK Howell, Bobby J $1 ,616,170.70 9/11/2024 3/11/2026 INDUSTRIES LLC DBA CAROLINA SUNROCK LLC DG00652 HS-2007J ADD MID-BLOCK PEDESTRIAN CROSSING ON NC 86 AND CRITZ ATLANTIC Howell, Bobby J $437,772.00 3/5/2025 3/23/2026 5/5/2025 DRIVE IN CHAPEL HILL CONTRACTING COMPANY INC Page 1 of 1 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date SS-6207T Portions of Twenty-One (21) Routes. Curve Warning Sign 9/20/2023 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson 51112 Installation. Construction started. SS-6207A NC 54 Pedestrian improvements between SR 1902 (Manning 2/15/2024 6/1/2025 $171 ,000 Planning and design activities underway. Dawn McPherson 50337 Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill and Materials have arrived and work has Carrboro. Improvements will include refuge islands, begun. 4 of the 5 locations have been crosswalks and pedestrian signals. Improvements to be completed. completed by state forces. BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 6/19/2025 12/31/2025 $1 ,311 ,000 Construction funding to be requested once Trung Nguyen 49998.1 .1 15/501/NC 86 (South Columbia Street) interchange in Chapel municipal agreements are executed. Hill. Construct sidewalk and install pedestrian signals, Chapel Hill MA executed, Carrboro MA has crosswalks, and refuge islands at selected locations. also been executed. Utility Relocations complete. P-5701 B Construct Platform, Passenger Rail Station Building at 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons 46395.1 .1 Milepost 41 .7 Norfolk Southern H-line in Hillsborough and deisgn activities underway 46395.3.3 HL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River 7/31/2025 FY2028 $153,800 Agreement executed, Hillsborough to Alex Stankovic from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and plans. Review of final plans complete. CE submitted. HS-2007H SR 1009 (Old NC 86) at SR 1727 (Eubanks Road) near 8/7/2025 FY2027 $153,000 Planning and deisgn activities underway Trung Nguyen 49317.1 .9 Chapel Hill. Right Turn Lane Modifications. 49317.2.9 49317.2.10 49317.3.9 BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $6,400,000 Planning and design activities underway Alexander Foster EB-5721 Upgrade existing off-road path and construct new section of 9/25/2025 FY2026 $2,700,000 Bids opened 7/17/23 - Bids rejected. Alex Stankovic path of Bicycle Route #1 from Cleland Drive to Willow Drive in Project on Hold. Chapel Hill has secured Chapel Hill additional funding and relet at a future date. Page 1 TWTPO April 2025 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Alex Stankovic 51177.1.1 the streets in between from Merritt Mill Road to Henderson Municipal agreement executed. 51177.2.1 Street in downtown Chapel Hill. Install new mast arm and 51177.2.2 51177. .1 curb and sidewalk improvements. C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 4/9/2026 FY2028 $2,749,000 Carrboro approved to incorporate water line Alex Stankovic Road/S. Greensboro St.) from Public Works Drive to the work into design. Env doc returned w northern end of Old Pittsboro Road in Carrboro comments on 12/10/21 . Document to be updated to include additional limits for resurfacing. NCDOT waiting on revised 1-3306AC 1-40 at NC 86 - Upgrade to superstreet from Northwood Drive 5/19/2026 FY2029 $10,970,000 Planning and design activities underway Radha Attaluri to Ramp C/D at 1-40 interchange BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart ROW acquisisition complete. EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from south 10/1/2026 FY2028 $3,968,000 Municipal agreement executed and project Alex Stankovic of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) in development underway. Chapel Hill 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $9,500,000 Planning and design activities pending Trung Nguyen 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) 45910.3.1 B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 86 4/20/2027 FY2031 $14,080,000 Planning and design activities underway. Brandon Green 25% Plans complete. BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/16/2027 FY2030 $2,220,000 Planning and design activities underway Daniel Dagenhart Plans at 25% Page 2 TWTPO April 2025 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date EB-5880 Construct sidewalk on the north side of SR 1005 (Jones Ferry 9/30/2027 FY2029 $950,000 Municipal agreement needs to be Alex Stankovic Road) from Davie Road to SR 1010 (West Main St.) in requested and executed to begin work. Carrboro EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2027 FY2029 $740,000 Municipal agreement needs to be Alex Stankovic 1005 (Jones Ferry Road) in Carrboro requested and executed to begin work. BR-0247 Replace Bridge #29 on US 70 Business/NC 86 over Cates 11/16/2027 FY2029 Pending Preliminary activities pending Bryan Key Creek EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 12/16/2027 FY29 $8,780,000 Municipal agreement needs to be Alex Stankovic 1741/SR 1838 (Old Durham Chapel Hill Road) in Chapel Hill requested and executed to begin work. EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/21/2028 FY2031 $13,980,000 Municipal agreement needs to be Alex Stankovic 1772 (North Greensboro Street) to south of Norfolk Southern requested and executed to begin work. Railroad Tracks in the Town of Carrboro BR-0091 Replace Bridge #32 on US 70 over the Eno River 10/17/2028 FY2032 $11 ,000,000 Planning and design activities underway Jon Gaillard BP7-R015 Replace Bridge #86 on SR 1942 (Jones Ferry Road) 9/6/2029 FY2031 $1 ,730,000 Planning and design activities underway. Daniel Dagenhart Detour needs improvements so will need to see if resurfacing funds available or switch to TIP project. TBD U-5845 Widen SR 1009 (South Churton Street) to multi-lanes from 1- 7/16/2030 FY2033 $77,400,000 PE funding approved 5/14/15, Planning Radha Attaluri 50235.1 .1 40 to Eno River in Hillsborough and Design activities underway, Coordinate 50235.2.1 with 1-0305B which was formerly 1-5967. 50235.3.1 Page 3 TWTPO April 2025 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date BP7-R007 Replace Bridge #63 on Pleasant Green Road 9/5/2030 FY2033 $2,550,000 Planning and design activities underway Daniel Dagenhart 1-0305B Interchange improvements at 1-85 and SR 1009 (South 10/15/2030 FY2033 $102,200,000 PE funding approved 9/8/17, Planning and Colin Mellor 34142.1.5 Churton Street) in Hillsborough Design activities underway, Coordinate with 34142.3.3 I-0305 and U-5845. (I-0305B was formerly 34142.3.4 34142.2.4 5967) R-5821A Construct operational improvements including 1/1/2040 post years $21 ,650,000 PE funding approved 10/10/17, design Suzana Matta 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Coordinating with NC54 West Corridor 47093.3.2 Road). Study 1-0305(A) Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 post years $132,000,000 PE funding approved 6/5/18, Planning and Colin Mellor 34142.1 .2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange design activities underway, Project 34142.2.2 Co. reinstated per 2020-2029 STIP (funded 34142.3.2 project) and delete project 1-5983 1-0305C Interchange improvements at 1-85 and NC 86 in 1/1/2040 post years $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor 34142.1 .6 Hillsborough and Design activities underway, 1-0305C was formerly 1-5984. C-5181 Jones Creek Greenway Project - Fill Gap between the TBD TBD $910,000 Environmental document approved Alex Stankovic Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT reviewing 90% plans. also implement program to support on-vehicle trips to Morris Grove Elementary School EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro TBD TBD $1 ,568,000 Review comments provided to Carrboro in Alex Stankovic June 2023 for revisions and resubmittal. Resubmittal under review. CE under review. Page 4 TWTPO April 2025 North Carolina Department of Transportation 3/31/2025 Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Crews, PE, Jacob $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 67 56.47 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION T US-15/501 . CORPORATION C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.6 53.42 LLC D000595 FIFTY ONE SECONDARY ROADS RILEY PAVING INC Howell, Bobby J $2,494,634.93 4/8/2024 10/8/2025 3/17/2025 DG00626 TWENTY THREE SECONDARY ROADS IN ORANGE COUNTY67 SUNROCK Howell, Bobby J $2,190,853.75 4/17/2024 10/17/2025 INDUSTRIES LLC DBA CAROLINA SUNROCK LLC DG00631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 65 63.92 UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND CONSTRUCTION LLC DG00639 FIFTEEN SECONDARY ROADS IN ORANGE COUNTY SUNROCK Howell, Bobby J $1 ,616,170.70 9/11/2024 3/11/2026 INDUSTRIES LLC DBA CAROLINA SUNROCK LLC DG00652 HS-2007J ADD MID-BLOCK PEDESTRIAN CROSSING ON NC 86 AND CRITZ ATLANTIC Howell, Bobby J $437,772.00 3/5/2025 3/23/2026 5/5/2025 DRIVE IN CHAPEL HILL CONTRACTING COMPANY INC Page 1 of 1 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/20/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 9/16/25 FY2026 $11,050,000 Planning and design activities David Stutts underway EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/25/25 FY 2027 $1,470,000 Municipal Agreement required to City of Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen Robinson EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/25/25 FY2027 $5,180,000 Municipal Agreement required to City of (Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen Robinson U-6131 Install dual left turn lanes in westbound direction at NC 54(W. 1/15/26 FY2028 $8,800,000 Planning and design activities Brandon Green Harden Street)at NC 49(Maple Ave.)in Burlington pending 48916 Shift NC 61 and NC 100 intersection in Gibsonville to improve 1/15/26 TBD $650,000 Planning and design activities Trung Nguyen turning radii for trucks underway -ROW underway 50547 NC 49 at Green Level Church Road/James Boswell Road- 4/16/26 FY2027 $650,000 Planning and design activities Trung Nguyen Realign Intersection underway.65%plans complete. CFI meeting held. U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 8/18/26 FY2028 $21,800,000 Planning and design activities Suzana Matta 47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882. ROW 47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition 90% 47159.3.1 BGMPO Mar 2025 Page 1 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/20/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 EB-5988 Construct sidewalk on Lee Ave./W. Lebanon Ave.to SR 1454 12/10/26 FY2028 $630,000 Municipal Agreement required to Town of (W. Haggard Ave.)in Elon begin work Elon/Stephen Robinson AV-5851 Construct 100'paved overrun and make safety 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby enhancements at the Burlington-Alamance Regional Airport underway U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada Road) 3/16/27 FY2030 $36,900,000 Planning and design activities Brandon Green 50234.1.1 to US 70(South Church Street)in Burlington underway-Field Inspection held. 50234.2.1 ROW acquisitions 75%complete. 50234.3.1 B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $3,000,000 PE funding approved 5/6/19. Sami Jasim 48709.1.1 SR 1928(Trollingwood Road)in Haw River Planning and design activities 48709.2.1 underway. 48709.3.1 15BPR.134.3 Rehab on Structure#197 in Guilford County on SR 1117(S. 1/18/28 FY2031 $3,312,100 Planning and design activities Kristy Alford Holden Street)over 1-85 Business and on Structure 4148 on I- underway 40 over Haw River in Alamance County U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 5/16/28 FY2031 $16,400,000 Planning and design activities Suzana Matta 47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway, ROW certified and 47158.2.4 (non-system)in Mebane. utilities underay. 47158.3.4 BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 8/7/28 FY2030 $1,240,000 Planning and design activities Daniel Dagenhart underway-Plans at 65% BGMPO Mar 2025 Page 2 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/20/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $52,000,000 Planning and design activities Suzana Matta 47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington underway 47144.2.1 47144.3.1 BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 9/18/31 FY2033 $720,000 Planning and design activities Daniel Dagenhart underway BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $710,000 Planning and design activities Daniel Dagenhart underway BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $710,000 Planning and design activities Daniel Dagenhart underway U-6114 Install traffic signal and add turn lanes at NC 62(Alamance 1/1/40 post years $2,210,000 Planning and design activities Brandon Green Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending.(Funded for Prelim. in Burlington Engineering only) 1-6009 Interchange improvements at 1-40/1-85 and SR 1158(Huffman 1/1/40 post years $1,800,000 Planning and design activities Brandon Green 47962.1.1 Mill Road). Construct additional right turn lane on 1-40 WB pending.(Funded for Prelim. 47962.2.1 Ramp and improve operations at SR 1308(Garden Road) Engineering only) 47962.3.1 intersection in Burlington SS-6207AA NC 62 at SR 1002(Jeffries Cross Road),north of Green TBD TBD $25,000 Planning and design activities Dawn McPherson 51338 Level.Convert intersection to all way stop control. underway BGMPO Mar 2025 Page 3 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/20/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 SS-6207AB SR 1500(Gibsonville Ossipee Road)at SR 1553(Midway TBD TBD $25,000 Planning and design activities Dawn McPherson 51339 Church Road/Guilford County Farm Road),southwest of underway Ossipee.Convert intersection to all way stop control. SS-6207AE SR 1003(Lindley Mill Road)at SR 2172(Moores Chapel 9/12/24 TBD $52,000 Planning and design activities Dawn McPherson 51426 Cemetery Road)near Graham.Convert intersection from two underway way stop to all-way stop with overhead flasher. SS-6207AG NC 87 at SR 2172(Moores Chapel Cemetery Road)near 9/11/24 TBD $49,000 Planning and design activities Dawn McPherson 51428 Graham.Convert intersection from two way stop to all-way underway stop with overhead flasher. SS-6207AH SR 2424(S.Maple Street)at W.Gilbreath Street in Mebane. TBD TBD $25,000 Planning and design activities Dawn McPherson 51471 Convert intersection to all way stop operation. underway SS-6207AI SR 1003(Lindley Mill Road)at SR 1005(Greensboro Chapel TBD TBD $25,000 Planning and design activities Dawn McPherson 51472 Hill Road),south of Saxapahaw.Convert intersection to all underway way stop traffic control.Change existing overhead flasher to all red displays. SS-6207AJ SR 1581 (Stony Creek Church Road)at SR 1587(Pagetown TBD TBD $25,000 Planning and design activities Dawn McPherson 51429 Road),north of Burlington.Convert intersection to all way stop underway control. SS-6207Y SR 1001 (Union Ridge Road)at SR 1002(Jeffries Cross TBD TBD $33,000 Planning and design activities Dawn McPherson 51342 Road),north of Burlington.Convert intersection to all way stop underway control. Revise existing overhead flasher to all red displays. Signal Inv#07-0002. BGMPO Mar 2025 Page 4 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/20/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 SS-6207AP SR 1754(McCray Road)at SR 1729(Fleming Graham Road/ TBD TBD $35,000 Planning and design activities Dawn McPherson 51642 Deep Creek Church Road)near Burlington. Convert two-way underway stop to all-way stop. SM-6107J Eastlawn Elementary School located at 502 N Graham TBD TBD $375,000 Planning and design activities Matthew Whitley 51622 Hopedale Road(SR 1716)in Burlington. Internal campus underway improvements as identified in Traffic Operations Study SCH- 2021-023 to contain school-related traffic queues on campus with 2460 feet of double-stacked queue. U-6014(2025 let)will improve SR 1716 and provide bike-pedestrian accommodations.This project is not expected to conflict with U-6011 Intersection improvements at US 70(South Church Street) TBD TBD $4,900,000 Planning and design activities Chris Smitherman 47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified. Utilities 47146.2.1 underway. Bids rejected. Moved to 47146.3.1 central for re-let. BGMPO Mar 2025 Page 5