Loading...
HomeMy WebLinkAboutAgenda - 06-27-2002 - 8m 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 27, 2002 Action Agenda Item No. . SUBJECT: Bid Award: Scheduled Roof Replacements DEPARTMENT: Purchasing and Central PUBLIC HEARING: (YIN) No Services & Public Works Department ATTACHMENT(S): INFORMATION CONTACT: Pam Jones (919) 245-2652 Engineer Letter of Certification Wilbert McAdoo (919) 245-2625 w/Bid Tabulation TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968.4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider awarding a bid for roof replacement pursuant to the annual roof replacement schedule to Owens Roofing, Inc., of Raleigh, NC. BACKGROUND: Several years ago, Orange County contracted with CTL Engineering to evaluate the roofs on all County buildings. The results of the evaluation formed the basis of a schedule of roof replacements. The schedule considers, among other factors, the age and condition of the roof and its likelihood to fail within a given period of time. The schedule contemplates replacement prior to the estimated failure period, thereby eliminating the need to do remedial repairs because of water damage. The County solicits bids for work included under the roof replacement schedule annually. The 2001-2002 replacements include the following: • Animal Control building • Purchasing Building (old metal roof only) • 503 West Franklin Street—Sector 3 • Dickson House and outbuildings Bid Results The bids reflect a very positive change in the bidding climate as compared to our experience in the past several years. The low bid, including all roofs in the project, is $141,398 as submitted by Owens Roofing, Inc., of Raleigh, NC. The engineering estimate for this work was approximately $200,000. Schedule The work will begin upon execution of a contract and will be completed within 90 days. FINANCIAL IMPACT: Funds for this work are included in the 2001-2011 Capital Investment Plan. z RECOMMENDATION(S): The Manager recommends that the Board: • Award a bid to Owens Roofing, Inc., of Raleigh, NC in the amount of$141,398; and • Authorize the Chair to sign the resulting contract, contingent upon Attorney and staff review; and • Authorize the Manager to approve change orders within available funding for the project. su7UN.21.2002 i 3:35P114 ORANGE CTY PORCH:n'" Lnu. NO.734 3 CrL Engineering, Inc. r 4122 Bennet Manwdal Road,Soils 301,D wham,North Carolina 27705 1947 75 uUZ Phone;9191393.7583•Fax:919M.7683 ALLniversah` e-mail:cUncd&9eng,com 1 N EMPLOYER 0 WNae QOMPANY j Consulting Engineers • resting speclion Services •Analytical Laboratories I Esrsbnshed t7 i I June 14, 2002 I l I i I Wilbert McAdo i Orange County Public Works ! Highway 86 No th Hillsborough, N 27278 RE: Remedi Roofing Animal ontrol Dickson ouse 503— S ctor 3 Purchasi g Building CTL Job No. 01-070027 Dear Mr. McAdoo I� Enclosed pleas find one copy of the Certified Bid Tabulation for the refetienced project. Bids wtre received from the following contractors: i ContractDr Base Bid Owens I oofing, Inc $141,398 Hamlin oofing Company, Inc $148,795 CFE, In $230,994 ! Regarding the 4da, we have the following comments: Owens oofing, Inc I The bid i ippears to be in order with the following exceptions: AddendL m No. 1 was not acknowledged. i Manufa urers Certificate was not submitted with the bid. Hamlin F oofing Company, Inc. No comr ient. The bid appears to be in order. CFE, Inc. I No comr ient. The bid appears to be in order. Offices: Ohio, Indiana, North Carolina, West Virginia ! SUJUN.21.200211 3:35PMM ORRNGE CTY PLRCHCNG, xNU. yaycsno ""M0.734 P.2/5' 4 f Wilbert MoAOao i 1 4 Building Remedial Roofing CTL Job No,01.07C 327 June 14.2002 i Page 2 i In our opinion a deficiencies noted are minor in nature and should not! affect award of the ntract. i The bid submi by Owens Roofing, Inc, appears to be lowest responsi' a bid. Additionally, th bid is within the construction cost estimate of $201,300 or this project. The re, it is our recommendation that Orange County enter into a contract with O ns Roofing, Inc. for performance of all aspects of the proj�et. i Should you hati a any questions please contact our office at your convenien l ce, I Sincerely, CTL Engines 4d ,�RRC Inc. i C �I V Jeffrey S j Project Directo enc i i i i f Ranwdial Roofing - 4 BuMdlnlga Bldg Received- June 12. 2402 CTL Job Nom 01-070027 2:OD P.M. c 4 YM 8 CFE• Inc. Kivniln SAW SOFA N Animal nIrol m G A. Demolition $ 11858 S 1,000 $ 2,150 "' B. Deck w Una Cod $2.00 $15.00 $10.00 Lump Sum S 20 S 150 S 900 G Inallatlon S 1700 S 4,350 S 5 004 D. Membrane S 3.000 $ 19,035 $ 9.500 E. $heat Metal $ 21100 5 690 $ 815 A F. Blocking � Unit Coal $2.00 $3.00 $31.85 ri Lump Sum S 400 $ 000 S 770 G. Coping S 16200 $ 020 S 11350 H. Gultedl)awn" $ 1,!122 $ 2,730 $ 14550 I. Warranty see above S 200 S 1,500 ' J. Other Hems $ 1,070 $ 100 5 - Subtotal $ 13,070 $ 30,475 S 220546 $ - $ - Pumhowno Bldg c A. DemOIRIM $ 21219 S 1,000 S 2,250 B. Deck LhIt CAW $2.00 $15.OD $61110 tamp Sum S 100 S 750 $ 300 u C. Metal Root $ 178000 S 32,990 S 16,250 D. Gumrmmnww S 1,500 5 41600 S 2,318 n E. Painting S 8110 $ 21000 S Soo n F Warranty we above $ 1,000 $ 500 G. OBW Items $ 600 S - S 55D u z Subtotal S 22,219 S 434348 5 22,072 5 C In 4 Rome" �rm9 - 4 BWWIDVS Bide Received- June s2, 2002 2:00 P.M. c, CTL Job Mom 01 470627 c Omn ti N CFE, Inc. Hart lin Baker Seavi�r N Bid Security Bid Bond Bid Bond Bid Bond No Bid No Bid re Addenda Ae uwMedged None 1 1 License Nor 24442 1W60 5855 W MBE Form APPerK#x D Appendix D Appendix D m u Mankdackuer None Soprekrra Seprema 3 General Rems A . B. Mobilization $ 41000 $ 31800 $ 21000 z A. BondrArrswanoe $ 4,200 $ 2200 S 16253 M M C. Warranty $ 2,500 S 11000 see below � Subtotal S 10170D $ 74000 S 3,253 $ - $ c A C'] S 503 W. Fu nAl_n_ A. Demolklon S 42100 S 61500 $ 3,260 c B. Deck Repair Unit Cost $2.00 $7.00 $8.00 Lurnp Sum $ 100 S 350 $ 300 C. Root Drain S 800 S 178 $ 450 D. Insulation $ 131000 S 10,ODD S 5,804 E. Membrane $ 14,000 S 26,338 $ 16,036 F. Sheet Metal S 61223 $ 4,320 $ 2,454 u G. Coping $ 16000 S 14300 S 11150 H. Curbs $ 1,2DD $ 12,400 $ 11210 v Rail 5100.00 $400.00 $60.00 c Equip $100.00 $70000 $175.00 — c 1. Sarppem S 400 $ 670 S 250 k J. Warranty see above 5 100 $ 1.500 0 K. Other Reins S 11000 $ 5DD 5 - - -- - Subtotal-- -- - --5-#1;823— - -- $-62r74Cr---- ----$-36;4011~- -- - - 3- -- -v--- - - --5 ._---r - -- -- - -- - - A (n 1 rn i Remedial Roofing - 4 Buddingi Bide Received - June 12, 2402 CTL Job No. 41-OTOOV 2:00 P.M. 4 c z N r amn CFE. Inc KPIT11 l ice N Oicl�on Ftortse � A DemolRlon S 50800 $ 21320 s 20215 W B. DeckifiB m Unit Cost $2.00 $30.00 $10-00 3 C. Wood shingies $ 201040 $ 72,479 S 53,105 0 D. GuttermMmspoul $ 124000 S 51388 $ 41510 z E. Sheet Metal $ 8,000 $ 35480 $ 4,992 m F. Other Items $ 71780 $ 3,480 $ - subiotal $ 53.588 S 87A27 $ 84,922 s - $ { C C Total $ 141,398 $ 230,994 : 148,795 $ S - c 1 hereby erti at this Is a true tabuiatlon of the We: received Date BMW i w+ c Jeffrey L , RC Project Director CTL Engineed , Inc v v F n e c r z 0 v w in V