Loading...
HomeMy WebLinkAboutAgenda - 06-08-2004-5vORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 8, 2004 SUBJECT: Efland Cheeks Park (Phase II) Lighting Plan DEPARTMENT: Purchasing, ERCD, R &P ATTACHMENT(S): 1) Projected Timetable of Activities 2) Site Plan Action Agenda Item No. 5-y PUBLIC HEARING: (Y /N) No INFORMATION CONTACT: David Stancil, 245 -2590 Lori Taft, 245 -2660 Pam Jones, 245 -2650 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hilt 968 -4501 Durham 688 -7331 Mebane 336 - 227 -2031 PURPOSE: To authorize staff to contract for a lighting plan for the field and walking track lighting as the initial part of construction of Phase II of Efland- Cheeks Park. BACKGROUND: In March 2004, the Board authorized the submittal of a site plan for Phase II of Efland Cheeks Park. Prior to this action, the Board received the report of the Efland Cheeks Park Concept Plan Review Committee in December 2003. Efland Cheeks Park is co- located with Efland- Cheeks Elementary School in western Orange County. Funding for Phase II of the park was included in voter- approved the 2001 Parks and Open Space Bond. With the site plan for Phase II of the park approved in March, the pre - construction process may now begin. Because of the small scope of this project, staff has prepared a timetable of activities that lay out the activities needed to construct the pieces of Phase Il. The timetable is shown as Attachment 1. As the first step in the construction process, staff would like to have a lighting plan developed over the summer. This would feature a lighting plan specific to the site, complete with construction documents suitable for bidding the project. Construction schedules for the other two pieces of contracted work, the playground and picnic shelter, would be pursued later in 2004 as lighting installation is concluded. FINANCIAL IMPACT: Cost of preparing a lighting plan are expected to be less than $5,000. The attached timetable would call for a bid award for installation of field /walking track lighting in September. Preliminary cost estimates for Phase II of the park (playground, picnic shelter, lighting) are projected to range from $231,000 - $297,000 (actual costs may vary as construction bids are received). Trail construction is expected to be done by volunteers or in house. A total of $250,000 is available for Phase II of the park from the 2001 bond, RECOMMENDATION(S): The Manager recommends that the Board authorize staff to have a lighting plan for the playing field and walking track developed over the summer. 3 Proposed Timetable of Pre -Bid and Construction Activities Efland Cheeks Park, Phase II March June 8 July August September Site Plan approved Timetable for park construction, authorization for lighting plan Lighting plan prepared that can be replicated by other vendors Bids solicited for lighting construction Lighting bid award to BOCC (Lighting installation September- December, 2004) December Bids solicited for playground and picnic shelter February Bid award to BOCC May — September 2005 Construction of playground /picnic shelter (also trail construction by staff and volunteers) Fall 2005 Phase 2 park opening?