HomeMy WebLinkAboutORD-2025-015-FY25 Quarter 4 Annual Work Program Amendments for Transit and Approval of Budget Amendment #9-B 1
ORD-2025 -015
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date : May 20 , 2025
Action Agenda
Item No . 8 - h
SUBJECT : FY25 Quarter 4 Annual Work Program Amendments for Transit and Approval of
Budget Amendment #9 - B
DEPARTMENT : Orange County Transportation Services ( OCTS )
ATTACHMENT( S ) : INFORMATION CONTACT :
1 . FY25 Q4 AWP Amendments Nishith Trivedi , Transportation Director,
2 . Year-To- Date Budget Summary 919 -245-2007
PURPOSE : To approve a Fiscal Year 2025 Quarter 4 Annual Work Program ( FY25 Q4 AWP )
amendments and approve Budget Amendment #9- 13 .
BACKGROUND : On April 16 , 2025 , the Orange County Staff Work Group recommended the FY
25 Q4 AWP be amended following a 21 -day public review period . The amendments are detailed
in Attachment 1 and summarized below .
Orange County :
Decreases :
• Project 20OPTTSO4 - Hillsborough Circulator 2 . 0 : Decrease of $42 , 880
• Project 20OPTTS06 — Orange County Mobility-on - Demand : Decrease of $42 , 880
• Total Decrease : $ 85 , 760
Increases :
• Project 240PTCD15 — Five ( 5 ) Mobility-on - Demand ( MOD ) Vehicles : Increase of $ 10 , 440
• Project 240PTCD12 — Trapeze ( now TripSpark ) : Increase of $ 75 , 320
• Total Increase : $ 85 , 760
Total impact on FY25 AWP - $ 0 from Transit Tax fund balance
OCTS remains on track to complete the procurement of the five (5 ) MOD vehicles before the
end of the current fiscal year, ensuring the project' s successful closure . Completion of the project
also removes it from the FY26 AWP ,
GoTriangle
Transit Assistance Program
In Spring 2023 , GoTriangle ' s board directed staff to resume fare collection in July 2024 and
introduce a new low- income fare program , later named the Transit Assistance Program (TAP ) .
Developed in collaboration with GoRaleigh and inspired by similar programs nationwide , TAP
2
aimed to reduce access barriers for low- income riders while minimizing administrative burdens .
Launched in July 2024 alongside the return to fares , TAP was well - received , with over 12 , 000
participants and accounting for roughly 40 % of GoTriangle 's ridership — consistent with 2023
data showing 51 % of riders earned $ 35 , 000 or less . Due to strong adoption , GoTriangle is
requesting increased funding across the three counties , including a $ 24 , 000 reallocation in
Orange County from Youth GoPass and Fare Collection Technology , plus an additional
$ 14 , 000 to fully support TAP in the County through FY25 .
Decrease :
• Project ID : 21 GOT0001 Youth GoPass — Decrease original FY25 budget by $ 9 , 0006
• Project ID : 21 GOT0002 Fare Collection Technology — Decrease original FY25 budget by
$ 15 , 0000
Increase :
• Project ID : 24GOTTP21 Low Income Fare Pass — Increase original FY25 budget by $ 38 , 000
Total impact on FY25 AWP - $ 14 , 000 from Transit Tax fund balance
Paratransit Services
The proposed change is a $22 , 681 budget increase for project 19GOTTS8 , " Paratransit Services , "
which funds GoTriangle 's paratransit operations on Sundays and partial Saturdays to align with
fixed -route service hours . The amendment reflects year-to-date and expected service demand ,
driven by a significant rise in weekend ridership — more than double the levels seen in FYI when
the Paratransit budget was last updated .
Increase
• Project ID : 25GOT0014 Low Income Fare Pass - Increase original FY25 budget by $22 , 681
Total impact on FY25 AWP - $22 , 681 from Transit Tax fund balance
FINANCIAL IMPACT : Orange County and GoTriangle will receive quarterly reimbursements as
approved . Orange County does not receive any funds where local jurisdictions are the project
sponsor (e . g . Hillsborough , Chapel Hill , Carrboro and Mebane ) .
Budget Amendment #9 - 13 reallocates $ 10 , 440 from the Mobility on Demand ( MOD ) Operating
project to the capital project to complete the one -time purchase of five ( 5 ) MOD vehicles . This
amendment reduces the General Fund by $ 10 , 440 and amends the Capital Project Ordinance for
the purchase of vehicles and provides for the reimbursement of this purchase from the Transit
Tax via Go Triangle within the County Capital Fund .
Mobility on Demand Vehicle Purchases ($ 10, 440) - Project # 30083
Revenues for this project :
Current FY 2024-25 FY 2024-25
FY 2024-25 Amendment Revised
Transit Tax Proceeds $250 , 000 $ 10 ,440 $260 , 440
Total Project Funding $250 , 000 $ 10 ,440 $260 ,440
3
Appropriated for this project :
Current FY 2024-25 FY 2024-25
FY 2024-25 Amendment Revised
Vehicle Purchase Expenditures $250 , 000 $ 10 , 440 $260 , 440
Total Costs $250 , 000 $ 10 ,440 $ 260 , 440
ALIGNMENT WITH STRATEGIC PLAN : This item supports :
• GOAL 4 : MULTI -MODAL TRANSPORTATION
OBJECTIVE 1 . Identify priorities and resources necessary to implement the Orange
County Transit Plan .
OBJECTIVE 2 . Increase community awareness of all modes of transportation including
transit , bike and pedestrian , vehicle , and all other modes .
OBJECTIVE 3 . Support road projects that address congestion and reduce commute time
using the County' s Complete Streets policy .
OBJECTIVE 4 . Coordinate transit investments with municipal and county land use
planning to reduce vehicle miles travelled and to provide more equitable access to
shopping , employment , medical centers , college campuses , etc .
OBJECTIVE 5 . Invest in implementing the County' s Safe Routes to Schools plan .
OBJECTIVE 6 . Update transportation related plans to provide more multi - modal options
including rural Orange County .
RECOMMENDATION (S ) : The Manager recommends that the Board approve the FY25 Q4 AWP
amendments (Attachment 1 ) and approve Budget Amendment #9 - B .
Attachment 1 4
REQUEST # FY 2026 FY START DATE
Orange Transit Work Plan Jul 2025
240PTCD15 Request Form Total Project Cost
Operating and/or Capital $ 260,440
Project Name Requesting Agency Project Contact 3nge Transit Estimated Operating Cc
Base Year
Orange County Transportation
MOD Vehicles 5 Nishlth Trivedi FY 2027
Services
Cumulative
Estimated Start Date Estimated Completion Notes range Transit Estimated Capital Cos
Jul-24 Jun-25 Base Year $ 260,440
Cumulative $ 260,440
Project Description/Scope Enter below a summary of the project that may later be used as the project description in the FY 2026 Work Plan.
OCTS advanced its Mobility-on-Demand (MOD) services under Phases I and II of the Multi-Year Transit Plan, successfully expanding operations to six days a week as
of May 1, 2023 .
Project Justification / Business Case Provide responses to EACH of the questions below. Answer the questions as fully as possible. Enter Not
Applicable (N/A) as appropriate.
Please detail project justification
However, due to fleet challenges, service levels have been temporarily reduced. To address this, OCTS is requesting a portion of the approved MOD budget to be
allocated for a one-time purchase of five (5) vehicles. This procurement will enable the full restoration of MOD services and improve overall service reliability.
1. Is this a New Project, Scope Change or Financial Change? New ❑ Scope ❑ Financial I]
See Instructions for definitions
Ia. If Scope Change or Financial Change - Indicate previous project ID 24OPTCDIS
2. Is this project Operating, Capital or Both? Operating ❑ Capital Q Both ❑
3. Is this a one-time request? Yes (] No ❑
4. What is the timeframe for the request? Are you requesting a full year off unds in FY26 or a partial year to he annualized in future fiscal years?
This is a one-time funding request aimed at improving Mobility-on-Demand (MOD) operations, ensuring better service delivery and increased efficiency for transit
users.
S. Where is this project located, who will this project serve and how will it improve service or overall implementation of the Orange Transit Plan?
The Orange County Transportation Services Administration building serves as the central hub for managing transit operations, while the county transit fleet provides
vital transportation services to meet the mobility needs of residents across the county.
6. Is this project programmed in the adopted Transit Plan FYs 2026-2032 Multi-Year Operating Program or ❑ ❑
CIP?
Yes No
6a . If yes, how does this request relate to what was envisioned in the adopted Multi-Year Operating Program, CIP, or Orange Transit Plan? Specify which
component(s) of the Multi-Year Operating Program, CIP, or Orange Transit Plan the request supports.
6b. If no, is this project in addition to projects and services included in the adopted Multi-Year Operating Program, CIP, or Orange Transit Plan or in lieu of
projects and services included in those programs/plans?
FY25 Orange Transit Work Program
Pagel or3 Request Fomr
5
7. Is the request identified in any Orange Transit governing board-adopted plans, or any other SWG- Yes ❑ No ❑
endorsed plans or studies?
7a. If yes, how does this request relate to what was envisioned in these adopted or SWG-endorsed plans or studies? Specify which component(s) of these plans
or studies the request supports. Specify goals and outcomes desired by final project completion. If this request involves a capital or bus operating project,
please include a map showing the location of the project as an attachment to this form .
8. What is the impact/alternative if the request is not funded?
Orange County remains dedicated to ensuring that all residents and businesses, particularly those in rural areas, continue to receive reliable and accessible public
transit services. These services are essential for maintaining the mobility of residents who may not have other transportation options. Discontinuing these services
would not only limit access to jobs, healthcare, and education, but it would also have a profound and detrimental impact on the economic stability and quality of life
for individuals and businesses in the incorporated areas of the county. This disruption would create significant barriers for rural communities, highlighting the
im ortanceof maintaining consistent and equitable transitservicesacrosstheentirecount .
9. For bus operating projects, please provide:
b) Assets Used (Vehicles, etc.)
c) Geographic Termini
d) Major Destinations Served
e) Annualized Revenue Hours
Weekday Saturday Sunday
f) Span of Service
TIME PERIOD
AM Peak
g) Frequency Midday
PM Peak
Evening
10. List any Implementation Metrics/Deliverables.
11 . Please enter estimated revenues below. If there are other revenues besides Orange County Tax Revenue to support this request, please enter the
anticipated revenue amounts next to the appropriate funding source for each fiscal year shown below.
Revenue
Tax Revenue FY26 FY27 FY28 FY29 " ' FY30 FY31 " ` FY32
Orange County Transit Tax Revenue 260,440
Other Revenue
Federal
State
Other
Subtotal Other
TOTAL REVENUE 260,440
FY25 Orange Transit Work Program
Page 2 of 3 Request Fomi
6
12. For Non Orange County Tax Revenue (federal, state, other), who is the proposed recipients) and who will be in charge of applying for the revenue(s)? Please
provide status of other revenues (Application submitted, Committed, Awarded, Other) .
13. Please enter estimated appropriations to support expenses. Enter FY 2026 and the estimated annualized cost in FY 2027 using the 2. 5% growth factor, if
applicable. The spreadsheet will calculate 2028 and beyond by 2.5%. If your project is not expected to have recurring costs in FY 2028 and/or beyond, delete
the calculation (s) in columns E-H .
Cost Break Down of Project Request
OPERATING COSTS FY26 FY27 FY28 FY29 FY30 FY31 FY32
Growth Factors 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%
Salary & Fringes
Contracts
Bus Operations :
Estimated Hours
Cost per Hour
Estimated Operating Cost
Bus Leases
Park & Ride Lease
Other
Other
Subtotal : Bus Operations
Other (Describe)
Other (Describe)
Other (Describe)
TOTAL OPERATING COSTS
14. Please enter Operating category that best represents the project above (This will be reviewed during Work Plan development)
Bus Operations 0 Transit Plan Administration ❑ Tax District Administration ❑
15 . Please enter estimated appropriations to support contractual commitments and other expenses related to proposed capital projects.
CAPITAL COSTS FY26 FY27 FY28 FY29 FY30 FY31 FY32
Planning
Design
Construction
Equipment
Land - Right of Way
Other 260,440
TOTAL CAPITAL COSTS 260,440
16. For multi-phase capital projects, please indicate the respective fiscal quarter and fiscal year each phase will begin and end in the timeline below.
Fiscal Quarter and Fiscal Year Fiscal Quarter and Fiscal Year End
Begin
Planning
Design
Construction
Equipment
Land - Right of
Other Q3FY25 Q4FY25 Updated
17. Please enter Capital category that best represents the project above (This will be reviewed during workplan development)
Transit Infrastructurqo, Vehicle Acquisition❑ BRT ❑ CRT ❑ Other ❑
Assumptions for Costs and Revenues Above:
18. Please state any assumption(s) used to calculate the capital and operating dollars and revenues shown above.
This is a one-time funding request for the improvement of services, based on a detailed quote received from a trusted vendor. The quote outlines the required costs
and deliverables for the proposed work, ensuring that the request is backed by accurate and reliable financial estimates.
FY25 Orange Transit work Program
Page 3 or3 Request Fomr
7
REQUEST #! FY 2026 FY START DATE
Orange Transit Work Plan Jul 2025
240PTTS12 Request Form Total Project Cost
Operating and/or Capital $ 275,320
Project Name Requesting Agency Project Contact nge Transit Estimated Operating C
Base Year
Orange County Transportation
Trapeze Nishith Trivedi FY 2027
Services
Cumulative
Estimated Start Date Estimated Completion Notes oange Transit Estimated Capital Co
Jul-24 Jun-25 Software transition to mirror other transit provider Base Year $ 275,320
Cumulative $ 275,320
Project Description/Scope Enter below a summary of the project that may later be used as the project description in the FY 2026 Work Plan.
OCTS is converting from EocLane to Trapeze to enhance data quality, improve service delivery, and strengthen coordination with other transit providers across the
county and region. This transition will also support clear and timely communication with customers regarding changes to transit schedules
Project Justification / Business Case Provide responses to EACH of the questions below. Answer the questions as fully as possible. Enter
Not Applicable (N/A) as appropriate.
Please detail project justification
OCTS aims to collaborate with local transportation partners to enhance the timeliness of transit services for clients. Additionally, OCTS will work closely with
transit agencies to optimize scheduling and resource allocation, ensuring more efficient service delivery.
1. Is this a New Project, Scope Change or Financial Change? New ❑ Scope ❑ Financial
See Instructions for definitions _
la . if Scope Change or Financial Change - Indicate previous project ID 240PTTS12
2. Is this project Operating, Capital or Both? Operating ❑ Capital ❑e Both ❑
3. is this a one-time request? Yes E) No ❑
4. What is the timeframe for the request? Are you requesting a full year of funds in FY26 or a partial year to be annualized in future fiscal years?
This is a one-time funding request to enhance transit operations, with the project expected to be completed by July 2025.
S. Where is this project located, who will this project serve and how will it improve service or overall implementation of the Orange Transit Plan?
The Orange County Transportation Services Administration building oversees operations, while the county transit fleet provides essential mobility services to
residents across the county.
6. Is this project programmed in the adopted Transit Plan FYs 2026-2032 Multi-Year Operating Program ❑ ❑
or CIP? Yes No
6a . If yes, how does this request relate to what was envisioned in the adopted Multi-Year Operating Program, CIP, or Orange Transit Plan? Specify which
component(s) of the Multi-Year Operating Program, CIP, or Orange Transit Plan the request supports .
6b. if no, is this project in addition to projects and services included in the adopted Multi-Year Operating Program, CIP, or Orange Transit Plan or in lieu of
projects and services included in those programs/plans?
FY25 Orange Transit Work Program
Page I of Request Fomt
8
7. Is the request identified in any Orange Transit governing board-adopted plans, or any other SWG- Yes ❑ No ❑
endorsed plans or studies?
7a. Ifyes, how does this request relate to what was envisioned in these adopted orSWG-endorsed plans or studies? Specify which component(s) of these
plans or studies the request supports. Specify goals and outcomes desired by final project completion . If this request involves a capital or bus operating
project, please include a map showing the location of the project as an attachment to this form .
8. What is the impact/alternative if the request is not funded?
All residents and businesses in rural Orange County will continue to receive public transit services. Discontinuing these services would have a significant and
detrimental impact on all incorporated areas of the county.
9. For bus operating projects, please provide:
b) Assets Used (Vehicles, etc. )
c) Geographic Termini
d) Major Destinations Served
e) Annualized Revenue Hours
Weekday Saturday Sunday
f) Span of Service
TIME PERIOD
AM Peak
g) Frequency Midday
PM Peak
Evening
10. List any Implementation Metrics/Deliverables,
11, Please enter estimated revenues below. If there are other revenues besides Orange County Tax Revenue to support this request, please enter the
anticipated revenue amounts next to the appropriate funding source for each fiscal year shown below.
Revenue
Tax Revenue FY26 FY27 " FY28 FY29 FY30 < FY31 FY32
Orange County Transit Tax Revenue 275,320
Other Revenue
Federal
State
Other
Subtotal Other
TOTAL REVENUE 275,320
FY25 Orange Transit Work Program
Page 2 of 3 Request Fomr
9
12, For Non Orange County Tax Revenue (federal, state, other), who is the proposed recipient(s) and who will be in charge of applying for the revenue(s)?
Please provide status of other revenues (Application submitted, Committed, Awarded, Other).
13. Please enter estimated appropriations to support expenses. Enter FY 2026 and the estimated annualized cost in FY 2027 using the 2. 5% growth factor, if
applicable. The spreadsheet will calculate 2028 and beyond by 2.5%. If your project is not expected to have recurring costs in FY 2028 and/or beyond, delete
the calculation(s) in columns E-H .
Cost Break Down of Project Request
OPERATING COSTS FY26 FY27 FY28 FY29 FY30 FY31 ` FY32
Growth Factors 2.50% 2. 50% 2.50% 2.50% 2.50% 2.50% 2.50%
Salary & Fringes
Contracts -
Bus Operations:
Estimated Hours
Cost per Hour
Estimated Operating Cost
Bus Leases
Park & Ride Lease
Other
Other
Subtotal : Bus Operations
Other (Describe)
Other (Describe)
Other (Describe)
TOTAL OPERATING COSTS
14, Please enter Operating category that best represents the project above (This will be reviewed during Work Plan development)
Bus Operations Q Transit Plan Administration ❑ Tax District Administration ❑
15. Please enter estimated appropriations to support contractual commitments and other expenses related to proposed capital projects.
CAPITAL COSTS FY26 FY27 FY28 FY29 FY30 FY31 FY32
Planning
Design
Construction
Equipment
Land - Right of Way
Other 1 275,320
TOTAL CAPITAL COSTS 275,320
16. For multi-phase capital projects, please indicate the respective fiscal quarter and fiscal year each phase will begin and end in the timeline below.
Fiscal Quarter and Fiscal Year Fiscal Quarter and Fiscal Year
Begin End
Planning
Design
Construction
Equipment
Land - Right of
Other Q3 FY25. Q2 FY26 Updated
17, Please enter Capital category that best represents the project above (This will be reviewed during workplan development)
Transit Infrastructurq ]i Vehicle Acquisition❑ BRT ❑ CRT ❑ Other ❑
Assumptions forCosts and Revenues Above:
18. Please state any assumption(s) used to calculate the capital and operating dollars and revenues shown above.
This one-time funding request is based on a detailed quote provided by the vendor, ensuring accurate cost estimation forthe proposed improvements.
FY25 Orange Transit Work Program
Page 3 of 3 Request Form
10
REQUEST # FY 2025 FY START DATE
Transit Work Plan Jul 2oz4
24GOTTP21 Low Income Fare OrangeProject Amendment Request Form
Pass
Operating and/or Capital
Type of Amendment Minor QQ Major [
Minor Amendments:
a . An amendment that requires a transfer between budget ordinance appropriations but requires less than a 20% change to a project appropriation for
projects equal to or less than $ 250,000;
b. Changes to any adopted financial assumptions supporting the applicable Work Program that does not have a significant impact on the overall revenue
or expenditure forecast, which is defined to be no more than a one percent ( 1%) over the life of the plan;
c. Changes in reporting requirements for performance on implementation elements authorized in the applicable Work Program;
d. Changes in funding amounts less than $250,000 for implementation elements programmed in future fiscal years;
e. Any other change that does not meet any of the criteria of a Minor Amendment is a Major Amendment.
Major Amendments are required when:
a . A project requested to be added to the Work Plan
b. A project requested to be removed from the Work Plan
c. Changes to any adopted financial assumptions supporting the applicable Work Program that does have a significant impact on the overall revenue or
expenditure forecast, which is defined to be over one percent ( 1%) over the life of the plan;
d. Changes in scope for implementation elements programmed in current and future fiscal years;
e. Any amendment that requires a transfer of funds between capital or operating funding categories
f. Any change that requires a change in budgeted reserves or fund balance.
These definitions are based on the Orange County Transit Work Plan Amendment Policy Update, which gives more clarity to the definitions without changing
their meaning .
New/Amended Project Name Requesting Agency Project Contact nge Transit Estimated Operating C
25G0T0014 Low Income Fare Austin Stanion astanion@gotriangle.org Base Year
Pass
GoTriangle FY 2025 $ 14,000
_.. . ..—
Cumulative
Estimated Start Date Estimated Completion Notes mange Transit Estimated Capital Co
In Progress Base Year
Cumulative 24GOTTP21
Project Description/Scope Enter below a summary of the project amendment and impact on approved plan.
In Spring of 2023, GoTriangle's board of trustees directed staff to return to fare collection in July 2024 and launch a new low-income fare program . The low-
income program was later branded the Transit Assistance Program, or TAP.
Based on research of other low-income programs across the county, GoTriangle and GoRaleigh collaborated on the development of the TAP program with
the goal of reducing barriers to access for low-income riders, and reducing staff resources needed for administration of the program . The Transit Assistance
Program was launched in July 2024 coinciding with GoTriangle's return to fares.
The TAP program was received enthusiastically by riders; over 12,000 individuals have benefited from the program on GoTriangle or GoRaleigh since July
2024. The TAP benefit accounts for about40% of GoTriangle's ridership. This level of adoption is in line with 2023 rider survey data which found that 51% of
GoTriangle riders reported their income at or below $35, 000.
Due to the robust adoption of the TAP program, GoTriangle is seeking increased funding forthe program in all three counties based on TAP ridership across
each county. To accommodate this need for support, GoTriangle is proposing to transfer $9,000 from Youth GoPass and $ 15,000 from Fare Collection
Technology ($24,000 Total ) to the TAP program in FY 25 in Orange .
Beyond these transfers GoTriangle anticipates requiring an additional $ 14,000to coverthe TAP program in Orange County for the remainder of FY25 . This
estimate is based on actual program use data from Q1 and Q2 .
FY25 Durham Transit Work Program
Page t of 3 Request Form
11
1. Enter Orange Transit Project ID(s) to Increase
Appropriation Recurring
Project ID Project Category Amount Amount Notes
25GOT0014 Low Income g g project
Fare Pass 38,000 0 Adding $38,000 to existing ro ect
TOTAL $ 38,000 $
2. Orange Transit Project ID (s) to Reduce
Appropriation Recurring
Project ID Project Category Amount Amount Notes
21GOT0001 Youth GoPass -$91000
21GOT0002 Fare Collection -$15,000
Subtracting $24,000 from existing projects.
Technology
$ (24,000) $
3 . Impact on Transit Plan Project Costs
From above, indicate whether amounts impact operating or capital budgets in Orang Current Year $ (14,000)
Estimated Operating Cost
Transit Plan. Recurring $
Base Year
Estimated Capital Cost Cumulative $
4. Is this New/Amended project Operating, Capital or Both? Operating 0 Capital ❑ Both ❑
S. What is the timeframe for the request? Are you requesting a full year of funds or a partial year to be annualized in future fiscal years?
FY25
6. What is the expected outcome (s) if this request is funded ? What is the alternative if the request is not funded?
If funded, GoTriangle will have sufficent funds to provide the TAP benefit for riders in Orange County.
7. List any other relevant information not addressed.
N/A
8. Please enter estimated appropriations to support expenses. Enter FY 2024 and the estimated annualized cost in FY 2025 using the 2.5% growth
factor, if applicable . The spreadsheet will calculate 2026 and beyond by 2. 5%. If your project is not expected to have recurring costs in FY 2026 and/or
FY25 Durham Transit Work Program
Page 2 of 3 Request Form
12
Cost Break Down of Project Request
OPERATING COSTS (If Applicable) FY25 FY26 FY27 FY28 FY29 " FY30 FY31
Growth Factors 2. 50% 2.50% 2.509P. 2, 50% 2.50% 2.50%
Administration -
Bus Operations :
Estimated Hours -
Cost per Hour
Estimated Operating Cost -
Bus Leases -
Park & Ride Lease
Maintenance
Other
Subtotal : Bus Operations - -
Operating: Low Income Pass 38,000
Operating Fare Collection ( 15,000)
Operating Youth GoPass (91000)
TOTAL OPERATING COSTS 1 14,000 -
9. Please enter estimated appropriations to support contractual commitments and other expenses related to proposed capital projects.
CAPITAL COSTS FY25 FY26 FY27 FY28 FY29 - FY30 FY31
Planning
Design
Construction
Equipment
Land - Right of Way
Other
TOTAL CAPITAL COSTS -
Assumptions for Costs and Revenues Above:
10, Please state any assumption (s) used to calculate the capital and operating dollars and revenues shown above. (include details)
Q3 and Q4 TAP expenses projected based on Q1 and Q2 actuals. This amendment does not impact previously submitted FY26 budget proposal .
FY25 Durham Transit Work Program
Page 3 of 3 Request Form
13
REQUEST #t FY 202S FY START DATE
Orange Transit Work Plan Jul 2025
19GOTS8 Project Amendment Request Form
Operating and/or Capital
Type of Amendment Minor ❑ Major
Minor Amendments:
a. An amendment that requires a transfer between budget ordinance appropriations but requires less than a 20% change to a project appropriation for projects equal to or less than
$250,000;
b. Changes to any adopted financial assumptions supporting the applicable Work Program that does not have a significant impact on the overall revenue or expenditure forecast,
which is defined to be no more than a one percent (1%) over the life of the plan;
c. Changes in reporting requirements for performance on implementation elements authorized in the applicable Work Program;
d. Changes in funding amounts less than $250,000 for implementation elements programmed in future fiscal years;
e. Any other change that does not meet any of the criteria of a Minor Amendment is a Major Amendment.
Major Amendments are required when:
a. A project requested to be added to the Work Plan
b. A project requested to be removed from the Work Plan
c. Changes to any adopted financial assumptions supporting the applicable Work Program that does have a significant impact on the overall revenue or expenditure forecast, which is
defined to be over one percent (1%) over the life of the plan;
d. Changes In scope for implementation elements programmed in current and future fiscal years;
e. Any amendment that requires a transfer of funds between capital or operating funding categories
f. Any change that requires a change in budgeted reserves or fund balance.
These definitions are based on the Orange County Transit Work Plan Amendment Policy Update, which gives more clarity to the definitions without changing their meaning.
New/Amended Project Name Requesting Agency Project Contact ' Orange Transit Estimated Operating Cost
Jay Heikes Base Year $ 47, 196
Paratransit Services GoTriangle FY 2026 $ 48,128
jheikesngotriangl" Cumulative $ 354,591
Orange Transit Estimated Capital Cost
Base Year $
Cumulative
Project Description/Scope Enter below a summary of the project amendment and impact on approved plan.
Due to span increases on Saturday, Sundays and holidays for Routes 400, 700, and 800, there are additional ADA paratransit costs incurred. These costs are split 64% to Durham County
and 36% to Orange County.
Y. Enter Orange Transit Project ID(s) to Increase
Project ID Project Appropriation Amount Recurring Notes
Category Amount
19GOTTS8 Patransit Servies Transit Operations 22,668.01 23,235
TOTAL $ 22,668 $ 230235
2. Orange Transit Project ID(s) to Reduce
Project ID Project Appropriation Amount Recurring Notes
Category Amount
$
3. Impact on Transit Plan Project Costs
From above, indicate whether amounts Impact operating or capital budgets in Orange Current Year
Estimated Operating Cost
Transit Plan. Recurring
Estimated Capital Cost Base Year
Cumulative $
4. Is this New/Amended project Operating, Capital or Both? Operating ❑� Capital ❑ Both ❑
5. What is the timeframe for the request? Are you requesting a full year of funds or a partial year to be annualized in future fiscal years?
FY25 Durham Transit Nod: Program
Page I of Request Fonn
14
Ful Year
6. What is the expected outcome(s) if this request is funded? What is the alternative if the request is not funded?
If funded, GoTriangle will have sufficent funds to provide Paratransit Services that match expanded Sunday (all day), and Saturday (2 hours) span for fixed route services.
7. List any other relevant information not addressed .
8. Please enter estimated appropriations to support expenses. Enter FY 2025 and the estimated annualized cost in FY 2026 using the 2.5% growth factor, if applicable. The
spreadsheet will calculate 2027 and beyond by 2.5%. If your project is not expected to have recurring costs in FY 2027 and/or beyond, delete the calculation(s) in columns &H .
Cost Break Down of Project Request
OPERATING COSTS (If Applicable) FY25 FY26 FY27 FY28 FY29 " FY30 ` FY31
Growth Factors 2.50% 2.50% 2.50% 2, 50% 2.50% 2.50%
Administration
Bus Operations:
Estimated Hours 311 311 311 311 311 311 311
Cost per Hour 152 155 159 163 167 171 175
Estimated Operating Cost 47, 196 48, 128 49,370 50,612 511854 53,096 54,338
Bus Leases
Park & Ride Lease
Maintenance
Other
Subtotal : Bus Operations 47, 196 48, 128 49,370 50,612 51,854 5%096 54,338
Operating Fare Collection
Operating Youth GoPass
TOTAL OPERATING COSTS 47,196 48,128 49,370 50,612 51,854 531096 54,338
9. Please enter estimated appropriations to support contractual commitments and other expenses related to proposed capital projects.
CAPITALCOSTS FY25 FY26 " FY27 FY28 FY29 FY30 FY31
Planning
Design
Construction
Equipment
Land - Right of Way
Other
TOTAL CAPITAL COSTS
Assumptions for Costs and Revenues Above:
10. Please state any assumption(s) used to calculate the capital and operating dollars and revenues shown above. (include details)
FY25 Durham Transit Work Program
Page 2 of Request Fonn
Attachment 2 15
Year-To - Date Budget Summary
Fiscal Year 2024-25
Fund Budget Summary General Fund County
Capital
Original Budget Revenue $ 286, 304, 076 $ 15 , 889, 808
Interfund Transfer Revenue $ 1, 006, 039
Fund Balance Appropiation $ 7, 100, 000
Total Original Budget $294 , 4103115 $ 15, 889 , 808
Additional Revenue Received Through
Budget Amendment #9 =B ( May 20th )
Grant Funds $ 712, 394 $ 832, 560
Non Grant Funds $ 219, 923 -$ 1, 139, 004
Additional Interfund Transfer Revenue $ 143 , 779 $ 12 % 920
Additional Fund Balance Appropriation $ 2, 241, 528
Total Amended Budget $297 , 727, 739 $ 151713, 284
Dollar Change in 2024- 25 Approved Budget $ 3 , 317, 624 ( $ 1761524 )
% Change in 2024-25 Approved Budget 1 . 13 % 4011%