Loading...
HomeMy WebLinkAboutAgenda - 12-13-2005 - 8aORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 13, 2005 Action Agenda Item No. g - q SUBJECT: Public Hearing far Buckhorn Road EDD/Community Water/Sewer Project Engineering Report DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) Yes ATTACHMENT(S): Engineering Report (under separate cover) Project Timetable INFORMATION CONTACT: Paul Thames, 919-245-2303 PURPOSE: To held a public hearing on the Engineering Report for the sewer expansion portion of the Buckhorn Road EDD/Community Water and Sewer Expansion Project. BACKGROUND: The process for State and Tribal Assistance Grants (STAG) funded projects such as the Buckhorn utility project involves a requirement that a public hearing be held on the Preliminary Engineering Report. The primary purpose of the hearing is to advise potential customers of the funded utility project as to the cost of a typical utility bill (generally about 5000 gallons per month). The requirements for the hearing and for reporting the outcome of the public hearing to the funding agency are as outlined below: Public Participation 1. One public hearing, with a 2-week notification, is required. • A copy of the Engineering Report should be available far review by the public at least 2 weeks prior to the public hearing An advertisement for the hearing shall be placed in a newspaper having local area circulation, and should include the following information: • Identify the time and location of the public hearing • Advise when and where a copy of the Engineering Report can be reviewed • Provide a brief description of the proposed project • Advise how much funding is required and identify the source of funding 3. The information presented during the public hearing must: a. Identify the problem • Address failing on-site septic system failures in residences and churches along Buckhorn Road from West Ten Road to I-85/40 and from I-84/40 to Norfolk- Southern Railroad. • Provide basic sewer infrastructure for the new middle school on West Ten Road and for the southern portion of the Buckhorn Road Economic Development District (EDD) b. Discuss the solution to the problem • Install a gravity sewer collection system -connected to the existing City of Mebane sewer collection system just east of the GE Plant on Industrial Drive - along Buckhorn Road between I-85/40 and Norfolk-Southern Railroad. • Install a gravity sewer collection system -connected to the existing City of Mebane sewer collection system at the PetroMart -between I-85/40 and West Ten Road. • Construct a wastewater pumping station on the site of the middle school on West Ten Road at the confluence of all drainage channels from the Buckhorn Road EDD and the school site. • Construct a sewer farce main (not a sewer service line) from the pumping station to the end of the new gravity sewer line on Buckhorn Road near the intersection of Buckhorn Road and West Ten Road. c, Identify the amount of the anticipated loan or grant and projected costs • Orange County has been awarded, through the efforts of the Board of County Commissioners and Congressman David Price, two State and Tribal Assistance Grants (STAG) -one for $900,000 and one for $500,000, • Once grant administrative fees are paid to the Construction Loans and Grants Section of the NC Division of Water Quality (DWO), the net grant funding available is approximately $1,365,000. • The consultant's (Coulter ,Jewell Thames) cost estimate for this portion of the project is $1,424,047, not including engineering casts (estimated $175,000 with construction administration/inspection). A detailed construction cost breakdown is provided on pages 20-22 in the Preliminary Engineering Report. • The funding is a 55%/45% match, with the local (Orange County) share being the 45% match. • The grant funding for sewer construction in the Efland and Cheeks communities was initially intended to provide far a single project providing sewer extension in the Buckhorn EDD/Community area and in central Efland, Time constraints associated with providing utilities for the middle school on West Ten Road (for an August 2006 opening) caused the overall project to be split into two components - the Buckhorn Road project and the Central Efland project, The Central Efland project is anticipated to run approximately 5 months behind the Buckhorn Road project. Funds remaining from this -the Buckhorn Road -portion of the project will be applied to Central Efland portion of the project. d, Discuss any required inter-local agreements • Orange County developed an inter-local agreement with the City of Mebane as necessary to have the City agree to allow extension of its utilities to the areas described above and to accept ownership and operational/maintenance responsibilities for those utilities when complete, e, Identify the effect this project will have on the monthly sewer bill for a typical residential user of 5,000 gallons per month, • Under the City of Mebane's current rate structure for sewer-only (no water) use and applicable to out-of-town customers, the monthly sewer bill for 5,000 gallons of sewer usage is $45,00 per month, If a sewer customer is within the city limits, the current cost for 5,000 gallons of sewer-only use is $22.50, 4. Provide a summary of the hearing 5. Provide an affidavit of publication of the hearing notice The required advertisement for the public hearing was published in the Chapel Hill Herald in the November 29, 2005 edition. The Preliminary Engineering Report is in hand at this time and is now available for public viewing at the offices of the Clerk to the Board of County Commissioners and the County Engineer. FINANCIAL IMPACT: There is no financial impact associated with the public hearing, RECOMMENDATION(S): The Manager recommends that the Board conduct a public hearing on the Buckhorn EDD/Community Sewer Expansion Project Preliminary Engineering Report and provide comments, questions and any further direction to staff as appropriate, 4 Submit Engineering Construction Documents tc Construction Time 0 Lcans and Grants Section for review/approval (12/19/2005) Advertise far Construction Bids Time 0 + 2 weeks (1 /03/2006) Open Bids Time 0 + 4 weeks contract to BOCC for approval (1/31/2006) Awazd Bids Time 0 + 4.2 weeks (2/07/2006) Notice to Proceed Time 0 + 4.2 weeks (2/08/2006) Complete waterline constructicn Time 0 +3 months (4/08/2006) Complete waterline testing, retesting, repairs (if required) Time 0 + 4 months Chlorination (disinfection), put in service (5/08/2006) Complete pumping station/sewer line construction EDD area Time 0 + 6 months (6/23/2006) Complete pumping station/sewer line testing, servicing, etc„ Time 0 + 6.5 months EDD area (6/23/2006) Complete sewer line construction north Buckhorn Community Time 0 + 7,5 months (7/23/2006)