Loading...
HomeMy WebLinkAboutOTHER-2025-021- Efland EMS Station Stormwater Operations and Maintenance Plan Agreement with Orange County 3800 US 70 West,Efland so - -P , �Il ) lay ORANGE COUNTY NORTH CAROLINA STORMWATER OPERATION AND MAINTENANCE AGREEMENT Prepared By : Sean A Dolle , Grounded Engineering Return To : Travis Myren , Orange County In accordance with the provisions of Section (s ) 2 . 21 and 6 . 14 of the Orange County Unified Development Ordinance ( UDO ) , this document shall serve as the Operations and Maintenance Agreement for stormwater control measure (s ) for the following . ORANGE COUNTY STORMWATER MANAGEMENT PLAN PROJECT FILE NUMBER : LDP21 -0062 / SPR21 -0005 PROJECT NAME : Efland EMS Station PROJECT ADDRESS : 3800 US 70 W , Efland , NC 27243 PROPERTY OWNER ( legally responsible party) : Orange County PARCEL IDENTIFICATION NUMBERS ( PINs ) : 9844789258 PROJECT ENGINEER : Sean A Dolle BRIEF DESCRIPTION OF PROPERTY : 3 . 74 acres BRIEF DESCRIPTION OF PROJECT : County EMS Station Hereafter the ` Project' . i STORMWATER OPERATION AND MAINTENANCE PLAN / CONDITIONS : Attachment A , ( Dry Detention Basin Operation and Maintenance Agreement ) establishes the operation and maintenance plan for the approved stormwater control measures approved for the Project . The undersigned Orange County — Travis Myren ( Property Owner) acknowledges and agrees by signing below that they are responsible for the performance of the stormwater control measures (SCMs ) contained within Attachment A and that these restrictions shall be binding on it and its successors in interest . Further, Orange County — Travis Myren ( Property Owner) hereby acknowledges and agrees to inform the Orange County Planning and Inspections Department of any problems , including maintenance issues , with the system and further acknowledges and agrees to inform Orange County of any modification of the previously approved stormwater control measures (SCMs ) or a change in the responsible party prior to the initiation of said modification . Sign ° re Dat ( NOTE: The Property Owner (legally responsible party) should not be a homeowners association unless more than 50 % of the individual lots within the development have been sold and a resident of the subdivision has been named president. Further, maintenance of a stormwater control measure (s) (SCMs) shall not be transferred to a homeowners association without the holding of required meetings as detailed within the Orange County Unified Development Ordinance (UDO) . NOTARY INFO HERE Operation & Maintenance Agreemlent Project Name . Efland EMS Station Project Location : 3800 US 70 W, Efland , NC 27243 Cover Page Maintenance records shall be kept on the following SCM (s ) . This maintenance record shall be kept in a log in a known set location . Any deficient SCM elements noted in the inspection will be corrected , repaired , or replaced immediately. These deficiencies can affect the integrity of structures , safety of the public, and the pollutant removal efficiency of the SCM (s ) . The SCM (s ) on this project include (check all that apply & corres onding O & M sheets will be added automatically) : Infiltration Basin Quantity: Location (s ) : Infiltration Trench Quantity: Location (s ) : Bioretention Cell Quantity: Location (s ) : Wet Pond Quantity: Location (s ) : Stormwater Wetland Quantity: Location (s ) : Permeable Pavement Quantity: Location (s ) : Sand Filter Quantity: Location (s ) : Rainwater Harvesting Quantity: Location (s ) : Green Roof Quantity: Location (s ) : Level Spreader - Filter Strip Quantity: Location (s ) : Proprietary System Quantity: Location (s ) : Treatment Swale Quantity: Location (s ) : Dry Pond Quantity: 1 Location (s ) : North end of site Disconnected Impervious Surface Present : No Location (s ) : User Defined SCM Present : No Location (s ) : Low Density Present : No Type : I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above , and attached O & M tables . I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Travis Myren , in his capacity as County Manager Title & Organization : Title & Org - County Manager, Orange County Street address : 300 West Tryon Street City, state , zip : Hillsborough , NC 27278 Phone number(s ) : 919 .245 .2308 Email : tmyren@orangecountync . gov Signature : Date : I , , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal , Seal My commission expires STORM- EZ 3/10/2025 Version 1 .5 O&M Agreement Page 1 of 1 Dry Pond Maintenance Requirements Important operation and maintenance procedures : - The drainage area will be managed to reduce the sediment load to the dry pond . - Immediately after the dry pond is established , the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks ) . - After the initial fertilization to establish vegetation in the dry pond , fertilizer will not be applied to the dry pond . - The vegetation in and around the basin will be maintained at a height of approximately six inches . - At least once annually, a dam safety expert will inspect the embankment . Any problems that are found will be repaired immediately . After the dry pond is established , it shall be inspected quarterly and within 24 hours after every storm event greater than 1 . 0 inches (or 1 . 5 inches if in a Coastal County) . Records of operation and maintenance shall be kept in a known set location and shall be available upon request . Inspection activities shall be performed as follows . Any problems that are found shall be repaired immediately. SCM element : Potential problem : How to remediate the problem : The entire SCM Trash /debris is present . Remove the trash /debris . Areas of bare soil and /or Regrade the soil if necessary to remove the gully, plant ground The perimeter of the SCM erosive gullies have cover and water until it is established . Provide lime and a one - formed . time fertilizer application . The inlet pipe is clogged ( if Unclog the pipe . Dispose of the sediment in a location where it applicable ) . will not cause impacts to streams or the SCM . The inlet pipe is cracked or The inlet device otherwise damaged ( if Repair or replace the pipe . applicable ) . Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale ( if applicable ) . devices such as reinforced turf matting or riprap to avoid future problems with erosion . Sediment has accumulated Search for the source of the sediment and remedy the problem if to a depth greater than the possible . Remove the sediment and dispose of it in a location original design depth for where it will not cause impacts to streams or the SCM , sediment storage . The forebay Erosion has occurred . Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems . Weeds are present . Remove the weeds , preferably by hand . If pesticide is used , wipe it on the plants rather than spraying . Sediment has accumulated Search for the source of the sediment and remedy the problem if to a depth greater than the possible . Remove the sediment and dispose of it in a location original design depth for where it will not cause impacts to streams or the SCM . sediment storage . The main treatment area Water is standing more Check the outlet structure for clogging . If it is a design issue , than 5 days after a storm consult an appropriate professional . event . Weeds and noxious plants Remove the weeds , preferably by hand . If pesticide is used , wipe are growing in the main it on the plants rather than spraying . treatment area . I) Pond Maintenance Requirements continued SCM element : Potential problem : How to remediate the problem . Shrubs have started to Remove shrubs immediately. grow on the embankment . Evidence of muskrat or Consult a professional to remove muskrats or beavers and repair beaver activity is present . any holes or erosion . The embankment A tree has started to grow Consult a dam safety specialist to remove the tree , on the embankment . An annual inspection by an appropriate professional shows that the Make all needed repairs immediately. embankment needs repair. Clogging has occurred . Clean out the outlet device . Dispose of the sediment in a location gg g The outlet device where it will not cause impacts to streams or the SCM . The outlet device is Repair or replace the outlet device . damaged Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure . the outlet . The receiving water Discharges from the dry pond are causing erosion Contact the local NCDEQ Regional Office . or sedimentation in the receiving water. Dry Detention Pond Design Summary Dry Pond Diagram DRY POND ID FOREBAY MAIN POND Temporary Pool El : Temporary Pool El : Clean Out Depth : 0 Clean Out Depth : 0 Pretreatment Yes Sediment Storage El : Sediment Storage El : Has Veg . Filter Yes Bottom Elevation : Bottom Elevation : I I L US HWY 70 (60' PUBLIC R/W) - - - - - - - - - I - - - - - - -I- - - - - - I STORMWATER CONTROL I I MEASURE I I I I I , PROPOSED BUILDING (FFE= SSAM) I ( I I I I SCM LOCATION MAP � I