Loading...
HomeMy WebLinkAboutAgenda - 04-01-2025; 6-a - Orange County Transportation Priority List for SPOT 8.0 - FY 2027-2036 STIP 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 1, 2025 Action Agenda Item No. 6-a SUBJECT: Orange County Transportation Priority List for SPOT 8 / FY 2027-2036 STIP DEPARTMENT: Orange County Transportation Services (OCTS) ATTACHMENT(S): INFORMATION CONTACT: 1. Projects in CPRPO Nishith Trivedi, Transportation Director, 2. Projects in TWTPO 919-245-2007 3. Projects in BGMPO 4. Draft Resolution PURPOSE: To approve the resolution for Orange County Transportation Priorities for Strategic Prioritization of Transportation version 8 (SPOT 8) and the subsequent State Transportation Improvement Program Fiscal Year 2027 — 2036 (STIP) BACKGROUND: Every two years, the North Carolina Department of Transportation (NCDOT) initiates the Strategic Prioritization Office of Transportation (SPOT) process to develop the State Transportation Improvement Program (STIP) for the next ten (10) years. This process, conducted in accordance with North Carolina General Statute 136 Article 14B, follows a data-driven approach to allocating the State's limited financial resources across three (3) funding categories. These funds are distributed among North Carolina's seven (7) regions, which encompass fourteen (14) divisions and 100 counties. Projects submitted for state funding are evaluated based on a structured scoring methodology that incorporates both quantitative data and local input points: • Statewide Impact — 100% data-driven • Regional Mobility— 70% data, 15% Metropolitan Planning Organization (MPO)/Rural Planning Organization (RPO) points, 15% NCDOT division points • Division Needs — 50% data, 25% MPO/RPO points, 25% NCDOT division points Orange County submits the Board of County Commissioners (BOCC)-approved priorities to the relevant regional TPO/MPOs and RPOs for those boards' consideration (Attachments 1 —3). Each MPO and RPO, based on population size and centerline miles, submits a limited number of projects per transportation mode to NCDOT for scoring. Key Updates: • Project list are the same as SPOT 7 with some independent bicycle and pedestrian projects removed, as they are restricted to local and federal funding sources. • Highway projects have been consolidated into multimodal initiatives, ensuring alignment with state and County Complete Streets policy. 2 Orange County Transportation Services will provide a brief presentation on this round of multimodal priorities for the BOCC's consideration. Orange County Transportation Advisory Services and the Orange Unified Transportation Board (OUTBoard) have reviewed the department's proposal and offer the following recommendations: Transportation Advisory Services — March 13, 2025 • Recommended BOCC approval of Orange County Priorities for SPOT 8 Orange Unified Transportation Board — March 18, 2025 • Recommended BOCC approval of Orange County Priorities for SPOT 8 with changes: o US 70 improvements - change - modernize with intersection improvements and complete street considerations o NC 54 improvements — remove o NC 86 improvements — remove but pursue multimodal corridor study FINANCIAL IMPACT: There is no immediate financial impact associated with this item. However, should the County seek any bicycle or pedestrian projects, it will be required to provide 20 percent local match for the project's overall cost and to provide local administration. All bike and pedestrian projects will require a resolution or letter of commitment from Orange County indicating the County will provide the local match and administration if any such projects are selected for funding. This would be choreographed with the County's budget process. ALIGNMENT WITH STRATEGIC PLAN: This item supports: • GOAL 4: MULTI-MODAL TRANSPORTATION OBJECTIVE 1. Identify priorities and resources necessary to implement the Orange County Transit Plan. OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. OBJECTIVE 3. Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. OBJECTIVE 5. Invest in implementing the County' s Safe Routes to Schools plan. OBJECTIVE 6. Update transportation related plans to provide more multi-modal options including rural Orange County. RECOMMENDATION(S): The Manager recommends that the Board approve the resolution for Orange County Transportation Priorities for SPOT 8 and STIP FY 2027 — 2036 (Attachment 4). 3 Attachment 1: Draft Central Pine Rural Planning Organization (CPRPO) Project List # MPO/ Project Description/Need Recommendations RPO Staff TAS OUTBoard Description: Modernize Old Greensboro Road (SR-1005)from Jones Ferry Road (SR-1942)to Alamance County with NCDOT standard street cross-section 213 (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Old Road (SR-1945), Carl Durham Road (SR-1950), White Cross Road (SR-1951), Greensboro Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR- 1 TWTPO PO/ (SR-1005) 1956). Approve Approve Approve TWTPO Road Need: This project would provide a continuous paved bikeway segment from Improvement* Carrboro through the southwestern portion of Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route. The project is not likely to score very high using either the State's highway or bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. Description: Modernize Orange Grove Road (SR-1106)from 1-85 to Dodson Crossroad (SR-1007)with NCDOT standard street cross-section 2B (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Orange Grove Cemetery Road (SR-1131), Davis Drive (SR-1129), Kimbro Road (SR-1128)and CPRPO/ Road Dodson Crossroads (SR-1102) 2 SR-1006 Approve Approve Approve TWTPO ( ) Need: This project would provide one segment of a bikeway connection through Improvement* western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Dairyland Road (SR-1177)from Orange Grove Road (SR- 1006)to Old NC-86 (SR-1009)with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Dairyland Rocky Ridge Road (SR-1113), Bethel Hickory Grove Church Road (SR-1104) and CPRPO/ Road convert intersection at Old NC-86 (SR-1009)to Roundabout. 3 (SR-1 Approve Approve Approve TWTPO ( ) Need: This project would provide one segment of a bikeway connection through Improvement* western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for motorized vehicular travel. The project is not likely to score very high using the State's bile/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. CPRPO/ Dodson Description: Modernize Dodson Crossroad (SR-1102)from Orange Grove Road 4 TWTPO Crossroad (SR-1006)to NC-54 with NCDOT standard street cross-section 2B (60' row, 11' Approve Approve Approve travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at 4 Attachment 1: Draft Central Pine Rural Planning Organization (CPRPO) Project List (SR-1102) Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road Improvement* (SR-1115), and Dairyland Road (SR-1177) Need: This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from the area south of the schools and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Mebane Oaks Road (SR 1007)from NC 54 to 1-85 with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Old Hillsborough Road (SR- 2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Mebane Oaks Church Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), 5 CPRPO Road Nicks Road (SR-1119), Bradshaw Quarry Road (SR-1100), and NC-54 Approve Approve Approve (SR-1007) Improvement* Need: This project would provide multimodal and safety improvements along a north-south corridor that connects Orange and Alamance County. This corridor is growing more unsafe with increasing accidents, two of them being fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Description: Modernize Old NC-86 (SR-1009)from 1-40 to Eubanks Road (SR- 1727)with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723) CPRPO/ Old NC-86 Need: This project would provide multimodal and safety improvements along a 6 TWTPO (SR-1009) north-south corridor for commuters travel between Hillsborough and Carrboro. This Approve Approve Approve Improvement* corridor is growing more unsafe with increasing accidents, three of them being fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Traffic along this corridor will continue increasing, making the area more hazardous and will eventually exceed the capacity of the existing road. Description: Widen from NC-57 to Caswell County Line with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. Need: This project would provide multimodal and safety improvements along a Remove, NC-86 north-south corridor for commuters travel between Orange and Caswell Count 7 CPRPO Improvement* g y� Approve Approve conduct p This corridor is growing more unsafe with increasing accidents, nine of them being study fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Traffic along this corridor will continue increasing, making the area more hazardous and will eventually exceed the capacity of the existing road. 5 Attachment 1: Draft Central Pine Rural Planning Organization (CPRPO) Project List Description: Widen from Mebane Oaks Road (SR-1007)to Dodson Crossroads (SR 1102)with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. 8 CPRPO NC-54 Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Approve Approve Remove Improvement* Dodson Crossroads will substantially exceed the existing roadway capacity by 2035, warranting an increase in capacity through widening. NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic and crashes along the corridor. Notes: * Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for 1st 5 feet of sidewalk and 100%Orange County for any additional sidewalk. 6 Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List # MPO/RPO Project Description/Need Recommendations Staff TAS OUTBoard Description: Widen US-70 and improve intersections from Buckhorn Road (SR-1114)to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, 11'travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR- 1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Change, Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road Modernization 1 TWTPO/ US-70 (SR-1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road Approve Approve with BG MPO Improvements (SR-1567), Orange High School Road (SR-1588), and N Scotswood Intersection Boulevard (SR-2300). Improvement and CS Need: This is a major east-west corridor linking Mebane, Hillsborough and Durham through Orange County. Traffic continues increasing with more commuters traveling from Mebane and Hillsborough into Durham. Many use this corridor to avoid 1-85. It is also designated at a Strategic Freight Corridor in the DCHC MPO adopted Freight Plan. Description: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57 Need: The segment of NC 86 between NC 57 and U.S. 70 is highly congested. Traffic counts indicate that this segment of NC 86 is over NC 86 capacity for average annual daily counts. Capacity improvements would 2 TWTPO Improvements ease congestion and improve travel time along this primary north-south Approve Approve Remove, North of corridor connecting the Town of Hillsborough to NC 57 and northern conduct study Hillsborough Orange County. Additionally, this area is identified in the Orange County Safe Routes to School Plan and the Town of Hillsborough Connectivity Plan as an area in need of improvements for pedestrians, particularly for school age residents of the Fairview neighborhood that walk to Orange High School and Stanford Middle School. The Town of Hillsborough Connectivity Plan also calls for bike lanes in this area as well. Description: Realign the intersection of Eno Mountain Road (SR 1148) and Eno Mountain Mayo Street (SR 1192)with Orange Grove Road (SR 1006) and make Road/Mayo safety improvements. 3 TWTPO Street at Need: The project would improve safety, reduce travel time, and improve Approve Approve Approve Orange Grove traffic flow between residential and commercial areas in the Town of Rd. Hillsborough. 7 Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List Description: Modify the 1-85/1-40 Connector(SR 1239) interchange at U.S. 70 to provide access from all directions Need: The project would enable traffic from northwestern Orange County to access 1-85 more easily without risking the many points of traffic conflict U.S. 70 East/ through Efland. Traffic has increased on Efland-Cedar Grove Road as an 4 TWTPO 1-85/1-40 alternative to NC 86. Much of that traffic currently"dog-legs" through Approve Approve Approve Connector Efland via Forrest Avenue to Mt. Willing Road to access 1-85/1-40. Traffic counts reveal that traffic has increased approximately 40% over the past 10 years on Mt. Willing Road just south of Forrest Avenue, while traffic on U.S. 70 east of Efland-Cedar Grove Road has increased only 2%. The project would dramatically improve travel time for traffic from northwestern Orange County to 1-85/1-40 and would dramatically ease congestion during peak periods in Efland. Description: Modernize Old Greensboro Road (SR-1005)from Jones Ferry Road (SR-1942)to Alamance County with NCDOT standard street cross- section section 2B (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Old Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR- Greensboro 1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and 5 TWTPO/ (SR-1005) Orange Chapel Clover Garden Road (SR-1956). Approve Approve Approve CPRPO Road Improvement* Need: This project would provide a continuous paved bikeway segment from Carrboro through the southwestern portion of Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route. The project is not likely to score very high using either the State's highway or bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier Description: Modernize Dairyland Road (SR-1177)from Orange Grove Road (SR-1006)to Old NC-86 (SR-1009)with NCDOT standard street cross-section section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR- 1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR-1113), Dairyland Bethel Hickory Grove Church Road (SR-1104)and convert intersection at 6 TWTPO/ Road (SR- Old NC-86 (SR-1009)to Roundabout. Approve Approve Approve CPRPO 1177) Improvement* Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. TWTPO/ Dodson Description: Modernize Dodson Crossroad (SR-1102)from Orange Grove 7 CPRPO Crossroad Road (SR-1006)to NC-54 with NCDOT standard street cross-section Approve Approve Approve 8 Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List (SR-1102) section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn Improvement lanes and safety improvements at Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR-1177) Need: This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from the area south of the schools and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Orange Grove Road (SR-1106)from 1-85 to Dodson Crossroad (SR-1007)with NCDOT standard street cross-section section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR- Orange Grove 1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson 8 TWTPO/ Road (SR- Crossroads (SR-1102) Approve Approve Approve CPRPO 1006) Improvement* Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Intersection and safety improvements along Lebanon Road (SR-1306)from Mill Creek Road (SR-1345)to Efland-Cedar Grove Road TWTPO/ (SR-1004) 9 BGMPO Lebanon Road Approve Approve Approve Need: Road continues experiencing increasing traffic and crashes, intersection and safety improvements along the corridor will help provide safe travel for all users. Description: Modernize Old NC-86 (SR-1009)from 1-40 to Eubanks Road (SR-1727)with NCDOT standard street cross-section 2E (60' row, 11' travel lane, 5' bike lane, c&g, and sidewalk), add turn lanes at Davis Road TWTPO/ Old NC-86 (SR-1129), and New Hope Church Road (SR-1723) 10 CPRPO (SR-1009) Approve Approve Approve Improvement* Need: This project would provide multimodal and safety improvements along a north-south corridor for commuters travel between Hillsborough and Carrboro. This corridor is growing more unsafe with increasing accidents, three of them being fatal. Intersection improvements such as 9 Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Traffic along this corridor will continue increasing making the area more hazardous and will eventually exceed the capacity of the existing road. Description: Improve current Dimmocks Mill Rd (#735154S)grade separation and close Bellvue St (#735152D) rail crossing Dimmocks Mill Need: The NCRR trestle on Dimmock's Mill currently does not allow trucks 11 TWTPO Trestle or pedestrians to safely cross underneath the railroad. By restructuring this Approve Approve Approve Improvements trestle and reconfiguring the intersection, this area will provide a safe crossing between Hillsborough and destinations south for all users. Additionally, improving this trestle will allow large trucks to avoid using Churton Street and will help create a back entrance to West Hillsborough. Description: Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian link from the proposed train station to downtown Hillsborough. Exchange Need: Currently, the NCRR trestle on Exchange Park Lane only 12 TWTPO Park Lane Rail accommodates one vehicle at a time and provides no safe Approve Approve Approve Trestle accommodations for pedestrians. Once the Hillsborough Train Station is Improvements constructed, Exchange Park Lane will be the only safe pedestrian route from the Train Station to Downtown Hillsborough. With substantial pedestrian demand forecast between the Train Station and Downtown Hillsborough, creating a safe pedestrian environment is a crucial need in this area. Description: Construct one additional lane between Patriot's Pointe Drive Orange Grove and New Grady Brown School Road (SR 1221)to include both pedestrian Rd. Widening and bicycle improvements along the roadway. The 1-40 bridge would be with Bicycle widened to accommodate both pedestrian and bicycle amenities and one 13 TWTPO and additional travel lane. Approve Approve Approve Pedestrian Need: There are significant safety issues along this stretch of roadway for Improvements motorists, but also for pedestrians and bicyclists. Increased traffic along Orange Grove Road has led to a significant safety risks for all users of the roadway. Description: Construct a roundabout at the intersection of Old NC 86, Dairyland Road (SR 1004/1113/1177), and Homestead Road (SR 1777) in Calvander Calvander outside of Carrboro. 14 TWTPO Roundabout Approve Approve Approve Need: Included at the request of the Orange Unified Transportation Board, this project would enhance safety at this intersection and improve traffic flow, while also facilitating a safe left turns for bicyclists. 15 TWTPO I Orange Description: Provide one (1) bus to serve a new route for Orange Public Approve Approve Approve Count Public Transportation providingservice to major tripgenerators in Hillsborough 10 Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List Transportation Circulator II Need: This project would provide a fixed route for underserved areas of Vehicles Orange County(not being covered by the Hillsborough Circulator)to major points of interest such as medical, employment, retail, municipal and social services. The project is currently in the unfunded category of the Orange County Bus and Rail Investment plan, yet remains a priority for our County Board of commissioners. It is only eligible for funding at the Division Needs tier. Description: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road signage at school Orange High entrances and exits on Orange Grove Road, and construct a sidewalk School along entrance roads to CW Stanford Middle School. Road/Harold Need: Orange High School Road serves two schools north of U.S. 70, 16 TWTPO Latta Road Orange High School and CW Stanford Middle School. There are currently Approve Approve Approve Sidewalk no dedicated pedestrian facilities along Orange High School Road to Improvements * accommodate students accessing the schools from residential areas to the north and east. The project would provide safe and comfortable pedestrian connections from these areas to the schools. The Orange County Safe Routes to School Action Plan identifies these sidewalk and crosswalk improvements as central elements in the plan for both Orange High School and CW Stanford Middle School. Description: Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, Daniel Boone Village, and Downtown Hillsborough. 1-85 Need: Neighborhoods to the south of 1-85, such as those along Cates 17 TWTPO Pedestrian Creek Parkway and Beckett's Ridge Drive, lack pedestrian and bicycle Approve Approve Approve Bridge* connections to commercial amenities and neighborhoods north of the highway. Constructing a bridge across 1-85 would create a safe access point for pedestrians and bicyclists and link areas of Hillsborough south of 1-85 to Downtown Hillsborough and commercial amenities along Churton Street. Receiving sidewalks will be present on both sides of the proposed pedestrian bridge. Description: NC 10 from NC 86 to US 70 Business with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' paved shoulder), 18 TWTPO NC-10 add turn lanes and safety improvements at Lawrence Road (SR-1561) Approve Approve Approve Improvements New Hope Church Road (SR-1723), University Station Road (SR-1712), Mt. Harmon Church Road (SR-1339)and US 70 Business. 11 Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List Regional Description: Centralized mobility hub in Orange County connecting all 19 TWTPO Multimodal transit agencies together to Amtrak, bike/ped facilities and park-n-ride lot, Approve Approve Approve Hub also considered a Regional Transfer Center. Notes: ** Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for VY 5' of sidewalk, 100%Orange County for any additional sidewalk. 12 Attachment 3: Draft Burlington-Graham Metropolitan Planning Organization (BGMPO) Project List MPO/ Recommendation # RPO Project Description/Need Staff TAS OUTBoard Description: Widen US-70 and improve intersections from Buckhorn Road (SR- 1114)to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, 11'travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and Change, safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Modernization 1 BGMPO/ US-70 Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Approve Approve with TWTPO Improvements* Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR- Intersection 1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Improvement Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N and CS Scotswood Boulevard (SR-2300). Mattress Description: Construct a new interchange at the existing grade-separated crossing 2 BGMPO Factory Road of Mattress Factory Road and 1-85/1-40 Approve Approve Approve Interchange Mattress Description: Extend Mattress Factory Road northward across East Washington Factory Road Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 3 BGMPO Extension to and close the existing railroad crossover road connecting East Washington Street Approve Approve Approve U.S. 70 and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. Buckhorn Description: Widen Buckhorn Road from 1-40/1-85 to West Ten Road (SR1144)to 4 BGMPO Road (SR multiple lanes with bicycle and pedestrian facilities with grade separation over Approve Approve Approve railroad to US-70.Wideni Lebanon Road 5 BGMPO/ (SR-1306) Description: Intersection and safety improvements along Lebanon Road (SR- Approve Approve Approve TWTPO improvements* 1306)from Mill Creek Road (SR-1345)to Efland-Cedar Grove Road (SR-1004) Notes: ** Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for VY 5' of sidewalk, 100%Orange County for any additional sidewalk. RES-2025-015 13 Attachment 4: Draft Resolution Endorsing Transportation Projects for State Funding ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S LIST OF TRANSPORTATION PROJECTS FOR THE BURLINGTON-GRAHAM METROPOLITAN PLANNING ORGANIZATION (BGMPO) AND TRIANGLE WEST TRANSPORTATION PLANNING ORGANIZATION (TWTPO) AND THE CENTRAL PINES RURAL PLANNING ORGANIZATION (CPRPO) FOR CONSIDERATION OF INCLUSION IN THE 2027 — 2036 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next ten years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the FY 2027-2036 STIP; and WHEREAS, the BGMPO, TWTPO and CPRPO Board are charged with the administration of the State Prioritization of Transportation (SPOT) process or regional priority list; and WHEREAS, Orange County is a member jurisdiction of the BGMPO, TWTPO, and CPRPO; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County encourages the NCDOT to design all roads, bridges, and right-of-way so as to protect ecosystems and non-renewable resources; and WHEREAS, Orange County has outlined its transportation needs within the BGMPO, TWTPO, and CPRPO planning areas in attachments to this resolution; and NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following list of transportation projects to be submitted for scoring by the State and to ultimately be considered for inclusion in FY 2027-2036 STIP. 14 CPRPO: 1. Old Greensboro Road Improvement: Modernize Old Greensboro Road (SR-1005) from Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR- 1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR-1956). 2. Orange Grove Road Improvements: Modernize Orange Grove Road (SR-1106) from 1-85 to Dodson Crossroad (SR-1007) with NCDOT standard street cross-section 213 (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR- 1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR-1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102) 3. Dairyland Road Improvements: Modernize Dairyland Road (SR-1177) from Orange Grove Road (SR-1006) to Old NC-86 (SR-1009) with NCDOT standard street cross-section 2B (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR-1113), Bethel Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 (SR-1009) to Roundabout. 4. Dodsons Crossroads Improvements: Modernize Dodson Crossroad (SR-1102) from Orange Grove Road (SR-1006) to NC-54 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR- 1177). 5. Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC 54 to 1-85 with NCDOT standard street cross-section 213 (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Old Hillsborough Road Road (SR-2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Church Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR-1119), Bradshaw Quarry Road (SR-1100), and NC-54. 6. Old NC-86 Improvements: Modernize Old NC-86 (SR-1009) from 1-40 to Eubanks Road (SR- 1727) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723). 7. NC-86 Improvements: Widen from NC-57 to Caswell County Line with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. 8. NC-54 Improvements: Widen NC-54 from Mebane Oaks Road (SR-1007) to Butler Rd (SR 1951) / Dodsons Cross Rd (SR 1102) with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. 15 TWTPO: 1. US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road (SR-1114) to Durham County with NCDOT standard street cross-section 4G (110, row, 17.5' median, 11, travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N Scotswood Boulevard (SR- 2300). 2. NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. 3. Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and make safety improvements. 4. U.S. 70 East/1-85/1-40 Connector: Modify the 1-85/1-40 Connector (SR 1239) interchange at U.S. 70 to provide access from all directions. 5. Old Greensboro Road Paved Shoulders: Modernize Old Greensboro Road (SR-1005) from Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR- 1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR-1956). 6. Dairyland Road Improvements: Modernize Dairyland Road (SR-1177) from Orange Grove Road (SR-1006) to Old NC-86 (SR-1009) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR-1113), Bethel Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 (SR-1009) to Roundabout. 7. Dodson Crossroad Improvements: Modernize Dodson Crossroad (SR-1102) from Orange Grove Road (SR-1006) to NC-54 with NCDOT standard street cross-section 2B (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR- 1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR-1177). 8. Orange Grove Road Improvements: Modernize Orange Grove Road (SR-1106) from 1-85 to Dodson Crossroad (SR-1007) with NCDOT standard street cross-section 2B (60' row, 11, travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR- 1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR-1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102). 9. Lebanon Road Improvements: Intersection and safety improvements along Lebanon Road (SR- 1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR-1004). 10. Old NC-86 Improvements: Modernize Old NC-86 (SR-1009) from 1-40 to Eubanks Road (SR- 1727) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723). 11. Dimmocks Mill Trestle Improvements: Improve current Dimmocks Mill Rd (#735154S) grade separation and close Bellvue St (#735152D) rail crossing. 16 12. Exchange Park Lane Rail Trestle Improvements: Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian link from the proposed train station to downtown Hillsborough. 13. Orange Grove Rd. Widening with Bicycle and Pedestrian Improvements: Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road (SR 1221) to include both pedestrian and bicycle improvements along the roadway. The 1-40 bridge would be widened to accommodate both pedestrian and bicycle amenities and one additional travel lane. 14. Calvander Roundabout: Construct a roundabout at the intersection of Old NC 86, Dairyland Road (SR 1004/1113/1177), and Homestead Road (SR 1777) in Calvander outside of Carrboro 15. Orange County Public Transportation Circulator 11 Vehicles: provide one (1) bus to serve a new route for Orange Public Transportation providing service to major trip generators in Hillsborough 16. Orange High School Road/Harold Latta Road Sidewalk Improvements: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle School. 17. 1-85 Pedestrian Bridge: Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, Daniel Boone Village, and Downtown Hillsborough. 18. NC 10 Improvements: Modernize NC 10 from NC 86 to US 70 Business with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Lawrence Road (SR-1561) New Hope Church Road (SR-1723), University Station Road (SR-1712), Mt. Harmon Church Road (SR-1339) and US 70 Business. 19. Regional Multimodal Transportation Center: Centralized mobility hub in Orange County connecting all transit agencies together to Amtrak, bike/ped facilities and park-n-ride lot, also considered a Regional Transfer Center. 17 BGMPO: 1. US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road (SR-1114) to Durham County with NCDOT standard street cross-section 4G (110, row, 17.5' median, 11, travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N Scotswood Boulevard (SR- 2300). 2. Mattress Factory Road Interchange: Construct a new interchange at the existing grade-separated crossing of Mattress Factory Road and 1-85/1-40 3. Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. 4. Buckhorn Road (SR 1114) Widening_ Widen Buckhorn Road from 1-40/1-85 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities with grade separation over railroad to US-70. 5. Lebanon Road (SR-1306) Improvements: Intersection and safety improvements along Lebanon Road (SR-1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR-1004) Upon motion of Commissioner , seconded by Commissioner the foregoing resolution was adopted this the 1s' day of April 2025. 1, Laura Jensen, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on April 1, 2025, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of 2025. Clerk to the Board of Commissioners 114%��W-MMOMM. ORANGE COUNTY NORTH CAROLINA Orange County Transportation Priorities for SPOT 8mO April 1 , 2025 Board of County Commissioners Outline 19 • Process Summary • Local Priorities - CPRPO - TWTPO - BGMPO • Action 2 =Background Transportation 20 North Carolina General Statute ( N .C.G.S.) 136 - Transportation NCDOT, MPO, RPO, DEQ, County, Municipality, etc. Comprehensive State required for MPOs and RPOs Transportation Plan only; multimodal vision 20+ Year MPO Federally required for MPOs only; CMP �'�/letropolitan TRM � must be fiscally constrained ransportation Plan CV EJ NCDOT Prioritization - SPOT 4STIP - z year process Rio-Year State Transportatio ,lmprovemen Funded projects; includes MPO's TIPS Program (STI P) �0 plus rural projects [First 5 years- committed, - Federal Approval of first 4 years Latter 5 years - developmental ] All modes in all processes 3 How Roads Get Built / Improved -21 SPOT/STIP • Strategic Prioritization of Transportation (SPOT) — N .C.G.S 136 (DOT) — Article 14B — Orange County - Region D • Division 7 - Alamance, Caswell, Orange, Guilford and Rockingham • Not Durham, Wake, Person (Division 5) or Chatham (Division 8) Orange County and member Bore?west a meat Piedmont Triadrr-Ter SARY STOXES s x �� jurisdictions submitting KJNC.X.M CASWai projects through DCHC MPO, R D JWN YORS�Tm Greensboro B G M P O and TARPO rrsrerr- fe APO �WAVCE D MM compete against: Forsyth fV1 BUrffrrgte Du am DAWE} Graham fHiff Piedmont Triad RPO mpo ca pro capita Greensboro MPO ,UnEll High Po in . . Arez • NW Piedmont RPO ,j ,OWAN MPO��� �.���1� ��F MPC A �6arrus- Winston-Salem MPO Rau van • High Point MPO JWFU Cabarrus-Rowan MPO xaRxFrr s7dN1}f OJVMO EJ?Y MOORF � : F Not D C H C MPO or CAM PO 4 Process Summary 22 Determined . local • • CPRPO BG MPO • Orange • Orange County County • + 3 other • ^��hane counties anal t.^.vdi j • + 2 Counties and towns TWTPO • Orange County • 3 towns CPRPO — MTP/subcommittee • + Durham City • • " and County TWTPO — Geographic Equity TWTPO ; • • _ MBG LTA II:Lem Top prelim scores i P • • • ' • • MPO & RPO Limited # of • ' Public review period (& public hearing) NCDOT Districts also submit - • projects NCDOT How Roads Get Built / Improved -23 SPOT/STIP Draft P8 schedule Ocbber8, 2024 Fixed Dates 211124 2025 2026 2027 ■ Partner Input N D J F M M J J A O N D J F M M J J N D J F F• • a F Jun: t30T.4pproves P8 Methodology F rkgroup Kickoff Jul:SPOT Online Go-li+re Oct-Mar:Data Review and Scoring Project Submittal Jul-Sep: Project Submittal Window I I Scoring I End of Apr:Quantitative Scares& Feb:Partner Data Review Statewide Mobility Programmed IProjects Released Apr:Program Statewide Mobility I I I End of Aug: Regional Impact F Metr —JuL•Regional Impact Local Input Point Assignment I I I I Total Scores&Programmed F +, Aug:Program Regional Impact Projects Released Sep—Nov:division Needs Local Input Point Assignment Dec-Jan: Program Division Needs Wi rater 2027: ;ra ft 2O2&-2037 STI P Released at BOT meeting(Final STIP approval in Summer 2027) 6 How Roads Get Built / Improved SPOT/STIP Highway Criteria Weights Histode Default Criteria Weights Regional Impact 7Regitconal Impact P P4.0 P .O P6.01P7.0 P6.01P7.0 of 70 Pta) Mobility Modernization Congestion 30% 0% 20% 0% 5% Benefitf ost 30% 0% 20% 20% Safety 10% 10% 10% 10% 25% Access/Connectivity 10% 10% 10% Freight 10% 10% 10% 10% Multimodal Lane Width 10% Shoulder Width 10% Pavement Condition 10% 7 Background - CPRPO 25 • Old Greensboro - (SR-1005) Road Improvement - Modernization • Orange Grove Road - (SR-1006) Improvement - Modernization • Dairyland Road - (SR-1177) Improvement - Modernization • Dodson Crossroad - (SR-1102) Improvement - Modernization • Mebane Oaks Road - (SR-1007) Improvement - Modernization • Old NC-86 - (SR-1009) Improvement - Modernization • NC-86 Improvement - Mobility w/CS OUTBoard — Remove and Study • NC-54 Improvement - Mobility with CS OUTBoard - Remove (limited to RPO area) Background - BGMPO • US-70 Improvements - Mobilityw/CS OUTBoard - Modernize w/CS • Mattress Factory Road Interchange - Mobility • Mattress Factory Road Extension - Mobility • Buckhorn Road (SR 1114) Widening - Mobility w/CS • Lebanon Road (SR-1306) Improvements - Modernization 8 Background - TWTPO 26 • US-70 Improvements Modernize w/ CS • NC 86 Improvements North of Hillsborough Remove Remove and study • Eno Mountain Road/Mayo Street at Orange Grove Rd. Mobilityw/CS • U.S. 70 East/1-85/1-40 Connector Mobility w/CS • Old Greensboro (SR-1005) Road Improvement Modernization • Dairyland Road (SR-1177) Improvement Modernization • Dodson Crossroad (SR-1102) Improvement Modernization • Orange Grove Road (SR-1006) Improvement Modernization • Lebanon Road Modernization • Old NC-86 (SR-1009) Improvement Modernization • Dimmocks Mill Trestle Improvements Rail • Exchange Park Lane Rail Trestle Improvements Rail • Orange Grove Rd. Widening with Bicycle and Pedestrian Mobility w/CS • Calvander Roundabout Mobility • Orange County Public Transportation Circulator II Vehicles Transit • Orange High School Road/Harold Latta Road Sidewalk Mobilityw/CS • 1-85 Pedestrian Bridge* Bike/Ped • NC-1 0 Improvements Modernization • Regional Multimodal Hub Rail & Transit 9 requested Action 27 • The Manager recommends that the Board approve the resolution for Orange County Transportation Priorities for SPOT 8 and STIP FY 2027 — 2036 (Attachment 4). 10