HomeMy WebLinkAboutAgenda - 05-20-2004-5ORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 20, 2004
Action Agenda
Item No. ~__
SUBJECT: Discussion of Plans for Twin Creeks (Moniese Nomp)
DEPARTMENT: Environment and Resource PUBLIC HEARING: (Y/N) No
Conservation
ATTACHMENT
1) Master Plan Draft Map
2) List of Previous Discussions /Other Issues
3) Possible Schedule of Activities
4) Letter from Carrbaro Mayor Nelson
INFORMATION CONTACT:
David Stancil, 245-2590
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To review and discuss the Master Plan (received on 12/9/2003) far Twin Creeks
(Moniese Nomp), a 193-acre park and educational campus site located north of Carrboro,
BACKGROUND: From September 30, 2002 to May 22, 2003, the 23-member Chapel Hill
Township Park and Educational Campus (CHATPEC) Work Group met to create a proposed
Master Plan far this 193-acre County-owned site near the intersection of Eubanks Road and
Old 86. This Master Plan project was the largest design project ever undertaken by Orange
County and was undertaken using a process and set of guiding principles adopted by the
Board. Significant attention was paid to the potential sharing of facilities between the
educational campus and the park, and several playing field and parking areas are located
with this in mind. The design for the site, following site analysis and group discussions of
needed/desired facilities, was accomplished via design charettes conducted with the two
subcommittees of the Work Group (Educational Campus Subcommittee and Township Park
Subcommittee), and subsequent discussions of the Work Group as a whole.
On May 22, the Work Group held its final meeting and adopted the attached report, with the
opportunity to submit subsequent proposed revisions to the report (these suggested changes
were compiled over the summer by staff and are included as an appendix to the report). On
June 26, a brief status report was presented to the Board.
The Master Plan design contains a 96-acre park with a balance of low-impact and active
recreation. While the majority of the total land area in the park is left in a natural state or
proposed for low-impact recreation, there is a substantial active recreation portion of the
park. The design for the park would make this the largest active recreation node in the
2
County. Six playing fields have been designed, along with a variety of court sports, a senior
activities area, picnic shelters and other amenities. Several meadow areas, in keeping with
the Olmsteadian vision for the park, are also proposed for flexible open space uses.
The proposed Educational Campus on the northernmost 76 acres features a co-located
elementary and middle school with associated facilities. A separate "pod" in the campus was
identified but not designed, and the Plan suggests that it could feature a second elementary
school or another facility, to be determined at a later date. The remaining 21-acre part of the
site (designated in the Pre-Concept Plan as "Potential School Site") was discovered to
contain an archaeological site of some significance, and the Master Plan proposes only a
tentative trail section in the perimeter of this area, pending further research.
On December 9, the Board received the Master Plan report and selected a name for the site
- Twin Creeks (Moniese Nomp*). The Board agreed to consider the Master Plan at a work
session after the first of the year, and asked staff to send the Master Plan to the Town of
Carrboro. On March 29, an update on the project was provided at the Joint Planning Area
public hearing. Staff has developed a summary listing of previous Board comments and
discussion points (attached), which also includes additional information related to the site
and Master Plan since the report. On April 29, the Town of Carrboro forwarded a letter
asking the County to conduct a public input session for additional public comment, including
the possibility of conducting a charrette. This concept had already been considered and is
reflected in the attached proposed schedule of activities.
This item is presented tonight to allow the Board to.°
1. Review the Master Plan and previous comments and discussion points (color copies
of the draft map will be available at the meeting)
2. Discuss potential revisions fo the Master Plan and provide direction to staff on
changes (maps for potential revisions will be available for this purpose)
3. Consider a public input session to gather further public comment on the Master Plan
(either as is or revised based on BOCC comment)
4. Consider a schedule for actions later this year to culminate in a Conditional Use
Permit application to Carrboro for Phase 1 of the park.
Once the Board has completed revisions and changes to the Master Plan, staff will prepare
the materials for the required Conditional Use Permit (CUP) application to the Tawn of
Carrboro for phase I of the park. The CUP application will require additional level of design
detail not yet developed. Town review of this application is estimated to take 12 months.
- Tutelo-Saponi for Twin Creeks. Pronounced Mo-nee-ay-say nom-p
FINANCIAL IMPACT: There is no impact associated with discussion of the report. Funding
for Phase I of the park was included in the 2001 Parks and Open Space bond in the amount
of $1.2 million. $200,000 was included in the first bond sale in 2002, and an additional
$200,000 is proposed for FY 2003-04. The remaining $800,000 is proposed for FY 2004-05.
RECOMMENDATION(S): The Manager recommends that the Board:
• Review and discuss the Master Plan for the site;
Identify potential revisions or changes to the Master Plan that are desired, providing
guidance to staff;
Consider a possible public comment session for feedback on the Master Plan (either
revised or existing); and
Authorize staff to begin the preparation of revisions to the Master Plan and the CUP
application over the summer for review and eventual submittal to Carrboro for Phase
of the park.
Chapel Hill Township Parlc
--, and Educational Campus
r~ Draft Master Plan
1.100..1
Revised 6 I? 03
Orany+c County
Emvoninent and Resource
Conscn~mion Dcpmnnsm
. ]. I.ii"l.li 5'na
Twin Creeks / Moniese Nomp*
Issues Previously Raised by the Board for Further Discussion
• Location of the proposed Lake Hogan Farm Road connector road
segment
• Layout of the educational campus (traditional design versus
compact/smart growth design)
• Shared park entranceway with proposed new subdivision (Villages at
Berkeley) to the south and timing of road improvements?
• The degree to which sharing of facilities between park and
educational campus was addressed (fields, track, parking, community
gym, other)
• Plans for extension of water and sewer service
• Plans for public transportation service
• Parlc Phasing Plan and Cost Estimates
Other Topics Raised By Individual Worlc Group Members at Time of
Final Report (June 2003)
• Swap educational campus site with park site?
• Equestrian trails?
• Outdoor swimming pool?
• Alternative school as part of educational campus?
There were a number of other suggested wording changes et al -listed in Appendix 7 of
the report.
- Tufelo-Saponi for Twin Creeks, Pronounced Mo-nee-ay-say nom-p
?/6/04
Possible Timetable (Tentative) for
Twin Creeks (Moniese Nomp*) Park
~.
BOCC review of Master Plan and May-June, 2004
discussion of ossible revisions
Public Input on Master Plan June or August, 2004
New Zandscape Architect Starts Mid-late June
Staff begins work on draft Phase I Sumner 2004
and Conditional LTse Permit detailed
plans (all contingent on future
revisions)
BOCC makes revisions to Master August-September,2004
Plan and ado is Plan
CL1P application for Phase I of park October, 2004
submitted to Carrboro
Discussion of educational cam us? November-December 2004?
Town approval of CUP application October 2005
Pre-Bid Process (construction October, 2005 -February, 2006
drawings, bid documents pre ared)
Construction Bids solicited for Phase March, 2006
I
Construction of Phase I Spring 2006 - S ring 2007
Parlc Phase I Opening? (tentative) Spring 2007
All times are tentative and based on best available information at this time
* -Pronounced Mo-nee-ay-say-nom-p. Tutelo-Saponi for Twin Creeks.
NORTH CAROLINA ~~ ~ ~~~~-'~;~
~_..
WWW TOW NOPCARROORO ORO U
Apri129, 2004 II ~' I r~'l~~l' 0 2 2004
Ban-y Jacobs, Chair
Orange County Board of Connnissioners
P.O. Box 8181
Hillsborough, NC 27278
Dear Commissioner .Jacobs:
Now that the Chapel I-Iill Township Park and Educational Campus (CHATPEC) Work
Group has developed a master plan for Twin Creeks, the Carrboro Boaz-d of Aldermen
and I are requesting that the County conduct a chazrette or another public input process
for Orange County residents.
Being the lazgest active recreational facility in Orange County, this park will be a
significant addition to the recreational amenities available in our County. We would like
for a greater number of Orange County residents to have an opportunity to participate in
the design process. Please let me know what role the Town of Carrboro can play to
ensure the success of our proposed public meeting.
We appreciate your consideration and look forward to working with the County on this
wonderful addition to our community.
Sincerely,
~~~,t~
Michael Nelson, Mayor
cc: Carrboro Boazd of Aldermen
Steve Stewart
lolm Linlc