Loading...
HomeMy WebLinkAboutOUTBoard Mar 17 2025 ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty AGENDA ORANGE UNIFIED TRANSPORTATION BOARD March 17, 2025, 6:30 pm 131 W Margaret Ln, Hillsborough, NC 27278 OUTBoard meetings are held in person and open to the public. Any member of the general public who wishes to make public comment should attend or email Orange County Transportation Director Nishith Trivedi at ntrivedi@orangecountync.gov. All comments will be read to the OUTBoard during the public comment portion of the meeting. 1. Call to Order 2. Consideration of Additions or Changes to Agenda 3. Public Comments 4. Minutes— February 17, 2024- postponed 5. Regular OUTBoard Agenda a. Orange County Transportation Priorities for SPOT 8.0 i. Action: Recommend Approval b. Transportation DAC Memo V 2.5 i. Action: Provide comments 6. Staff Report/Updates a. MPO, RPO, and NCDOT 7. Adjournment-The next meeting—April 21, 2025 It is the policy of Orange County Transportation Services to ensure that no person shall, on the ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty Item 5.a. Subject: Orange County Transportation Priorities for SPOT 8.0 Attachment: 1. CPRPO—OC Priority List 2. TWTPO—OC Priority List 3. BG MPO—OC Priority List PURPOSE: Recommend Board of County Commissioners (BOCC) approve the Orange County Transportation Priorities for Strategic Prioritization of Transportation (SPOT) process. BACKGROUND: Every two years,the North Carolina Board of Transportation (BOT) adopts a ten- year Statewide Transportation Improvement Program (STIP) to allocate funding and establish a project schedule for transportation initiatives across the state. This comprehensive plan encompasses projects for all modes of transportation and is designed to align with the long-term strategies outlined in the Comprehensive Transportation Plan (CTP) and the Metropolitan Transportation Plan (MTP), which are developed and adopted by Metropolitan Planning Organizations (MPOs) and Rural Planning Organizations (RPOs). CTP and MTP serve as foundational planning tools that guide MPOs and RPOs in selecting transportation projects for submission to STIP. Project selection is conducted through the Strategic Prioritization of Transportation (SPOT) process, ensuring a data-driven approach to transportation investments. SPOT P7.0 Schedule and Process Between spring and fall 2025, MPOs and RPOs across North Carolina will submit a limited number of transportation projects to the North Carolina Department of Transportation (NCDOT) for consideration in SPOT scoring. The number of projects each MPO/RPO can submit is determined by their population size and total centerline miles. Before submission, each project must receive approval from the respective governing Boards of the MPOs/RPOs. Additionally, in Orange County, the Board of County Commissioners (BOCC) is required to approve the list of county transportation priorities before these projects can be submitted to the relevant MPO/RPO. Each MPO/RPO employs its own process to determine which projects to submit for consideration under SPOT. Examples include: • Triangle West Transportation Planning Organization (TWTPO): Utilizes a Technical Subcommittee to develop a draft project list, which is then made available for public review before finalizing the draft list for its Board consideration. • Central Pine Rural Planning Organization (CPRPO): Employs a Geographic Equity approach, ensuring that each county is allocated an equal number of projects for each transportation mode, later submitted to its Board for consideration. • Burlington-Graham Metropolitan Planning Organization (BG MPO): Uses preliminary SPOT scores as a key criterion for determining which projects to submit. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation Before final approval, each MPO/RPO will conduct a public review period and a public hearing to ensure community input is incorporated into the decision-making process. SPOT P8.0 Project List OCTS staff is recommending Orange County transportation priorities be updated so that projects may compete better. These changes are provided in Attachments 1 - 3. Many Orange County transportation priorities are carried forward. • Staff recommending removal of independent bike/ped projects by State Transportation Investment law North Carolina General Statutes § 136-189.11 (d).(3).c. • Independent bike/ped projects can be pursued through Federal Surface Transportation Block Grant Direct Allocation (SDBGDA) which is part of STIP. They require 20% local match and local administration. TRANPORTATION ADVISORY SERVICE (TAS): FINANCIAL IMPACT: Transit tax is reimbursed to respective project sponsors per the approved annual work program and any subsequent amendments. ALIGNMENT WITH STRATEGIC PLAN: • GOAL 4: MULTI-MODAL TRANSPORTATION • OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. • OBJECTIVE 3. Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. • OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. • OBJECTIVE 6. Update transportation related plans to provide more multi-modal options including rural Orange County. ACTION: OUTBoard recommend BOCC approve Orange County Transportation Priorities for SPOT 8.0 (Attachment 1—3). Attachment 1: Draft Central Pine Rural Planning Organization (CPRPO) Project List MPO/ Recommendations # RPO Project Description/Need Staff OUTBoard Description: Modernize Old Greensboro Road (SR-1005)from Jones Ferry Road (SR-1942)to Alamance County with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR- CPRPO/ Old Greensboro 1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR-1956). Meets RPO 1 TWTPO (SR-1005) Road SPOT process Improvement** Need: This project would provide a continuous paved bikeway segment from Carrboro through the southwestern portion of Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route. The project is not likely to score very high using either the State's highway or bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. Description: Modernize Orange Grove Road (SR-1106)from 1-85 to Dodson Crossroad (SR-1007)with NCDOT standard street cross-section 213 (60' row, 11'travel lanes, with 5' Orange Grove paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR-1131), Davis CPRPO/ Road Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102) Meets RPO 2 TWTPO (SR-1006) SPOT process Improvement** Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Dairyland Road (SR-1177)from Orange Grove Road (SR-1006)to Old NC-86 (SR-1009)with NCDOT standard street cross-section 213 (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR-1113), Bethel CPRPO/ Dairyland Road Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 (SR-1009)to Roundabout. Meets RPO 3 TWTPO Improvement** Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the SPOT process safety of the subject thoroughfare for motorized vehicular travel. The project is not likely to score very high using the State's bile/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. Description: Modernize Dodson Crossroad (SR-1102)from Orange Grove Road (SR-1006)to NC-54 with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' Dodson Crossroad Paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR-1177) 4 CPRPO/ SR-1102 Meets RPO TWTPO Improvement** Need: This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from the area south of the schools and connect to a proposed SPOT process bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Mebane Oaks Road (SR 1007)from NC 54 to 1-85 with NCDOT standard street cross-section 213 (60' row, 11'travel lanes, with 5' paved shoulder), add turn Mebane Oaks lanes and safety improvements at Old Hillsborough Road Road (SR-2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Church Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR-1119), Bradshaw Quarry Road (SR-1100), and NC-54 5 CPRPO Road Meets RPO (SR-1007) Need: This project would provide multimodal and safety improvements along a north-south corridor that connects Orange and Alamance County. This corridor is growing more unsafe SPOT process Improvement** P 1 P y P g g y g g with increasing accidents, two of them being fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Description: Modernize Old NC-86 (SR-1009)from 1-40 to Eubanks Road (SR-1727)with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), Old NC-86 add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723) 6 CPRPO/ SR-1009 Meets RPO TWTPO ( ) Need: This project would provide multimodal and safety improvements along a north-south corridor for commuters travel between Hillsborough and Carrboro. This corridor is growing SPOT process Improvement** more unsafe with increasing accidents, three of them being fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Traffic along this corridor will continue increasing making the area more hazardous and will eventually exceed the capacity of the existing road. Description: Widen from NC-57 to Caswell County Line with additional lanes and multimodal facilities along the corridor and safety improvements at each intersection. NC-86 Meets RPO 7 CPRPO Need: This project would provide multimodal and safety improvements along a north-south corridor for commuters travel between Orange and Caswell County. This corridor is growing Improvement** more unsafe with increasing accidents, nine of them being fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic SPOT process at key locations along the corridor. Traffic along this corridor will continue increasing making the area more hazardous and will eventually exceed the capacity of the existing road. Description: Widen from Mebane Oaks Road (SR-1007)to Dodson Crossroads (SR 1102)with additional lanes and multimodal facilities along the corridor and safety improvements at NC-54 each intersection. Meets RPO 8 CPRPO Improvements ** SPOT process Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Dodson Crossroads will substantially exceed the existing roadway capacity by 2035, warranting an increase in capacity through widening. NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic and crashes along corridor. Notes: * STI Law§ 136-189.11.Transportation Investment Strategy Formula section (d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. ** Sidewalk subject to NCDOT sidewalk cost share policy 40% Orange County for V 5 feet of sidewalk and 100% Orange County for any additional sidewalk. Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List MPO/ Recommendations # RPO Project Description/Need Staff OUTBoard Description: Widen US-70 and improve intersections from Buckhorn Road (SR-1114)to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, 11'travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR-1310), TWTPO/ US-70 Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), 1 BG MPO Improvements Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N Scotswood Boulevard (SR-2300). County priority Need: This is a major east-west corridor linking Mebane, Hillsborough and Durham through Orange County. Traffic continues increasing with more commuters traveling from Mebane and Hillsborough into Durham. Many use this corridor to avoid 1-85. It is also designated at a Strategic Freight Corridor in the DCHC MPO adopted Freight Plan. Description: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four(4) lanes with intersection improvements at U.S. 70 Bypass and NC 57 NC 86 Need: The segment of NC 86 between NC 57 and U.S. 70 is highly congested. Traffic counts indicate that this segment of NC 86 is over capacity for average annual daily counts. 2 TWTPO Improvements Capacity improvements would ease congestion and improve travel time along this primary north-south corridor connectingthe Town of Hillsborough to NC 57 and northern Orange Count priority North of p y p g p g p y g g Y p y Hillsborough County. Additionally, this area is identified in the Orange County Safe Routes to School Plan and the Town of Hillsborough Connectivity Plan as an area in need of improvements for pedestrians, particularly for school age residents of the Fairview neighborhood that walk to Orange High School and Stanford Middle School. The Town of Hillsborough Connectivity Plan also calls for bike lanes in this area as well. Eno Mountain Description: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192)with Orange Grove Road (SR 1006) and make safety improvements. 3 TWTPO Road/Mayo Count riorit Street at Orange Need: The project would improve safety, reduce travel time, and improve traffic flow between residential and commercial areas in the Town of Hillsborough. Y p Y Grove Rd. Description: Modify the 1-85/1-40 Connector(SR 1239) interchange at U.S. 70 to provide access from all directions U.S. 70 East/1- Need: The project would enable traffic from northwestern Orange County to access 1-85 more easily without risking the many points of traffic conflict through Efland. Traffic has 4 TWTPO 85/1-40 increased on Efland-Cedar Grove Road as an alternative to NC 86. Much of that traffic currently"dog-legs"through Efland via Forrest Avenue to Mt. Willing Road to access 1-85/1-40. County priority Connector Traffic counts reveal that traffic has increased approximately 40% over the past 10 years on Mt. Willing Road just south of Forrest Avenue, while traffic on U.S. 70 east of Efland-Cedar Grove Road has increased only 2%. The project would dramatically improve travel time for traffic from northwestern Orange County to 1-85/1-40 and would dramatically ease congestion during peak periods in Efland. Description: Modernize Old Greensboro Road (SR-1005)from Jones Ferry Road (SR-1942)to Alamance County with NCDOT standard street cross-section section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl Durham Road (SR- TWTPO/ Old Greensboro 1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and Orange Chapel Clover Garden Road (SR-1956). 5 CPRPO (SR-1005) Road County priority Improvement" Need: This project would provide a continuous paved bikeway segment from Carrboro through the southwestern portion of Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route. The project is not likely to score very high using either the State's highway or bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier Description: Modernize Dairyland Road (SR-1177)from Orange Grove Road (SR-1006)to Old NC-86 (SR-1009)with NCDOT standard street cross-section section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR-1113), Bethel TWTPO/ Dairyland Road Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 (SR-1009)to Roundabout. 6 CPRPO (SR-1177) County priority Improvement" Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Dodson Crossroad (SR-1102)from Orange Grove Road (SR-1006)to NC-54 with NCDOT standard street cross-section section 2B (60' row, 11'travel lanes, with Dodson 5' paved shoulder), add turn lanes and safety improvements at Orange Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and Dairyland Road (SR-1177) 7 TWTPO/ Crossroad (SR- Need: This project would provide bicycle facilities to the Grad Brown ElementarySchool and Cedar Ridge High School from the area south of the schools and connect to a proposed Count priority CPRPO 1102) p l p y y g g p p Y p y Improvement bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Description: Modernize Orange Grove Road (SR-1106)from 1-85 to Dodson Crossroad (SR-1007)with NCDOT standard street cross-section section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR-1131), Davis Drive TWTPO/ Orange Grove (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102) 8 Road (SR-1006) County priority CPRPO Improvement" Need: This project would provide one segment of a bikeway connection through western Orange Count from Carrboro to the Buckhorn Road and Mebane area and improve the safety of p P 1 p 9 Y 9 9 Y P Y the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. Attachment 2: Draft Triangle West Transportation Planning Organization (TWTPO) Project List MPO/ Recommendations # RPO Project Description/Need Staff OUTBoard TWTPO/ Description: Intersection and safety improvements along Lebanon Road (SR-1306)from Mill Creek Road (SR-1345)to Efland-Cedar Grove Road (SR-1004) 9 BG MPO Lebanon Road County priority Need: Road continues experiencing increasing traffic and crashes, intersection and safety improvements along the corridor will help provide safe travel for all users. Description: Modernize Old NC-86 (SR-1009)from 1-40 to Eubanks Road (SR-1727)with NCDOT standard street cross-section 2E (60' row, 11' travel lane, 5' bike lane, c&g, and TWTPO/ Old NC-86 (SR- sidewalk), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723) 10 1009) County priority CPRPO Need: This project would provide multimodal and safety improvements along anorth-south corridor for commuters travel between Hillsborough and Carrboro. This corridor is growing Improvement** more unsafe with increasing accidents, three of them being fatal. Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key locations along the corridor. Traffic along this corridor will continue increasing making the area more hazardous and will eventually exceed the capacity of the existing road. Description: Improve current Dimmocks Mill Rd (#735154S) grade separation and close Bellvue St (#735152D) rail crossing Dimmocks Mill 11 TWTPO Trestle Need: The NCRR trestle on Dimmock's Mill currently does not allow trucks or pedestrians to safely cross underneath the railroad. By restructuring this trestle and reconfiguring the County priority Improvements intersection, this area will provide a safe crossing between Hillsborough and destinations south for all users. Additionally, improving this trestle will allow large trucks to avoid using Churton Street and will help create a back entrance to West Hillsborough. Description: Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian link from the proposed train station to downtown Hillsborough. Exchange Park 12 TWTPO Lane Rail Trestle Need: Currently, the NCRR trestle on Exchange Park Lane only accommodates one vehicle at a time and provides no safe accommodations for pedestrians. Once the Hillsborough Train County priority Improvements Station is constructed, Exchange Park Lane will be the only safe pedestrian route from the Train Station to Downtown Hillsborough. With substantial pedestrian demand forecast between the Train Station and Downtown Hillsborough, creating a safe pedestrian environment is a crucial need in this area. Orange Grove Description: Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road (SR 1221)to include both pedestrian and bicycle improvements along the Rd. Widening roadway. The 1-40 bridge would be widened to accommodate both pedestrian and bicycle amenities and one additional travel lane. 13 TWTPO with Bicycle and County Priority Pedestrian Need: There are significant safety issues along this stretch of roadway for motorists, but also for pedestrians and bicyclists. Increased traffic along Orange Grove Road has led to a Improvements** significant safety risks for all users of the roadway. Description: Construct a roundabout at the intersection of Old NC 86, Dairyland Road (SR 1004/1113/1177), and Homestead Road (SR 1777) in Calvander outside of Carrboro. 14 TWTPO Calvander County Priority Roundabout Need: Included at the request of the Orange Unified Transportation Board, this project would enhance safety at this intersection and improve traffic flow, while also facilitating a safe left turns for bicyclists. Orange County Description: Provide one (1) bus to serve a new route for Orange Public Transportation providing service to major trip generators in Hillsborough Public 15 TWTPO Transportation Need: This project would provide a fixed route for underserved areas of Orange County(not being covered by the Hillsborough Circulator)to major points of interest such as medical, County Priority Circulator II employment, retail, municipal and social services. The project is currently in the unfunded category of the Orange County Bus and Rail Investment plan, yet remains a priority for our Vehicles County Board of commissioners. It is only eligible for funding at the Division Needs tier. Description: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road Orange High from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along School entrance roads to CW Stanford Middle School. 16 TWTPO Road/Harold County priority Latta Road Need: Orange High School Road serves two schools north of U.S. 70, Orange High School and CW Stanford Middle School. There are currently no dedicated pedestrian facilities along Sidewalk Orange High School Road to accommodate students accessing the schools from residential areas to the north and east. The project would provide safe and comfortable pedestrian Improvements** connections from these areas to the schools. The Orange County Safe Routes to School Action Plan identifies these sidewalk and crosswalk improvements as central elements in the plan for both Orange High School and CW Stanford Middle School. Description: Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, Daniel Boone Village, and Downtown Hillsborough. 1-85 Pedestrian Prohibited by 17 TWTPO Bridge* Need: Neighborhoods to the south of 1-85, such as those along Cates Creek Parkway and Beckett's Ridge Drive, lack pedestrian and bicycle connections to commercial amenities and STI neighborhoods north of the highway. Constructing a bridge across 1-85 would create a safe access point for pedestrians and bicyclists and link areas of Hillsborough south of 1-85 to § 136-189.11 Downtown Hillsborough and commercial amenities along Churton Street. Receiving sidewalks will be present on both sides of the proposed pedestrian bridge. 18 TWTPO NC-10 Description: NC 10 from NC 86 to US 70 Business with NCDOT standard street cross-section 2B (60' row, 11'travel lanes, with 5' paved shoulder), add turn lanes and safety County priority Improvements improvements at Lawrence Road SR-1561 New Hope Church Road SR-1723 , University Station Road SR-1712 , Mt. Harmon Church Road SR-1339 and US 70 Business. 19 TWTPO Regional Description: Centralized mobility hub in Orange County connecting all transit agencies together to Amtrak, bike/ped facilities and park-n-ride lot, also considered a Regional Transfer County priority Multimodal Hub Center. Notes: * STI Law§ 136-189.11.Transportation Investment Strategy Formula section (d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. ** Sidewalk subject to NCDOT sidewalk cost share policy 40% Orange County for Is'5' of sidewalk, 100%Orange County for any additional sidewalk. Attachment 3: Draft Burlington-Graham Metropolitan Planning Organization (BGMPO) Project List MPO/ Recommendation # RPO Project Description/Need Staff OUTBoard Description: Widen US-70 and improve intersections from Buckhorn Road (SR-1114)to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, BG MPO/ US-70 11'travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier 1 TWTPO Improvements" Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove County priority Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N Scotswood Boulevard (SR-2300). 2 BG MPO Mattress Factory Description: Construct a new interchange at the existing grade-separated crossing of Mattress Factory Road and 1-85/1-40 County priority Road Interchange Mattress Factory Description: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the 3 BG MPO Road Extension to existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East County priority U.S. 70 Washington Street. Buckhorn Road 4 BG MPO (SR 1114) Description: Widen Buckhorn Road from 1-40/1-85 to West Ten Road (SR1144)to multiple lanes with bicycle and pedestrian facilities with grade separation over railroad to US-70. County priority Widening" BG MPO/ Lebanon Road 5 TWTPO (SR-1306) Description: Intersection and safety improvements along Lebanon Road (SR-1306)from Mill Creek Road (SR-1345)to Efland-Cedar Grove Road (SR-1004) County priority Improvements" Notes: * STI Law§ 136-189.11.Transportation Investment Strategy Formula section (d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. ** Sidewalk subject to NCDOT sidewalk cost share policy 40% Orange County for Is'5' of sidewalk, 100%Orange County for any additional sidewalk. ORANGE TRANSPORTATION COUNTY GOVERNMENT TRANSPORTATION SERVICES DEPARTMENT COUNTY NoKm CALIQLLNA PUBLIC TRANSIT OrangeCounty Item 5.b. Subject: Transportation Development Advisory Committee (DAC) Memo V2.5 Attachment: 1. OCTS DAC Memo V2.5 PURPOSE: Provide comments on the Revised DAC Memo Template. BACKGROUND: The Director of Orange County Transportation Services (OCTS) has completed a comprehensive study aimed at refining the department's roles and responsibilities within the County's DAC. This effort was conducted in coordination with the North Carolina Department of Transportation (NCDOT)and included a thorough investigation into best practices for multimodal assessment. To inform this initiative, the research incorporated guidance from leading organizations in transportation planning and engineering, including: • American Society of Civil Engineers (ASEC)— DEI Best Practices: Universal Design (link) • American Planning Association —Complete Street: Best Policy and Implementation Practices (link) • American Association of Retired Persons— Evaluating Complete Streets Projects (link) • Charlotte Unified Development Ordinance— Multimodal Assessment (link) Previously, the OCTS DAC template provided only limited guidance to developers, primarily referencing: • UDO • Orange County Complete Street Policy • Orange County Vision Zero Policy • Short Range and Long-Range Transit Plans • All other Transportation Plans This initial framework offered minimal insight into the specific multimodal impacts of new developments, limiting the county's ability to comprehensively assess and guide sustainable transportation planning. Recognizing the need for a more robust approach, Orange County has made substantial progress in addressing multimodal transportation through locally adopted plans such as: • The Safe Routes to School Plan • The Transportation Multimodal Plan Both plans have been recognized for their forward-thinking approach and have been selected for presentation at the North Carolina Metropolitan Planning Association Annual Conference. 600 Hwy 86 N - Hillsborough, North Carolina 27278 Phone (919)245-2008 - Fax (919) 732-2137 orangecountync.gov/transportation To better serve the public and improve the county's approach to multimodal transportation planning, OCTS has developed an advanced DAC Memo Template.This new template shifts from a broad policy reference document to a data-driven, fact-based analysis and recommendation report(Attachment 1).The revised framework provides developers with clearer expectations and actionable guidance on addressing the multimodal impact of their projects. Next Step: • Update the Unified Development Ordinance (UDO): Incorporate best practices for multimodal assessment in collaboration with the Planning Department to enhance transportation planning and development review processes. • Encroachment Agreement Guidance: Follow the North Carolina Department of Transportation's (NCDOT) recommendation to evaluate and implement Encroachment Agreements on a case-by-case basis to ensure appropriate infrastructure integration. To ensure transparency and incorporate community insights, OCTS is seeking comment on the revised DAC Memo Template. Stakeholder input will help refine the document further, ensuring that it aligns with the county's goals of safe, inclusive, and sustainable transportation infrastructure. For further details or to provide feedback, please refer to Attachment 1. TRANPORTATION ADVISORY SERVICE (TAS): FINANCIAL IMPACT: No financial impact currently. ALIGNMENT WITH STRATEGIC PLAN: • GOAL4: MULTI-MODAL TRANSPORTATION • OBJECTIVE 2. Increase community awareness of all modes of transportation including transit, bike and pedestrian, vehicle, and all other modes. • OBJECTIVE 3. Support road projects that address congestion and reduce commute time using the County' s Complete Streets policy. • OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to reduce vehicle miles travelled and to provide more equitable access to shopping, employment, medical centers, college campuses, etc. • OBJECTIVE 6. Update transportation related plans to provide more multi-modal options including rural Orange County. ACTION: Provide comments on the Revised DAC Memo Template (Attachment 1). ORANGE COUNTY GOVERNMENT COUNTYORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NORTH GLROLLNA PULICTRANSIT OCTS DAC Memo V2.2 TECHNICAL MEMORANDUM TO: FROM: DATE: SUBJECT: The following memo provides Orange County Planning Department and the applicant a Multimodal Impact Assessment (MIA) for the proposed application [app ID] Site Review Immediate Surrounding Assessment 1 Assessment 2 Facilities Initial assessment of the immediate site and surrounding area, through GIS, aerial views, and other field visit and digital resources, this includes and not limited to: • Pictures of sites and surroundings, focusing on o Access/Egress o Right-of-way o Environmental o Demographic o Benefits/Burdens o Complete Street o Safety, etc. • Professional observations/assessment— technical details ORANGE COUNTY GOVERNMENT ORL ORANGE TRANSPORTATION SERVICES DEPARTMENT ri NOMI CAROLINA OrangeCouBty NSIT Data Functional class - Current AADT- Build out AADT- Crashes (by type) - Current ROW - Build out ROW - Current LOS - Build out LOS - Trip Gen Detailed data of public Right-of-Way this includes and not limited key data points listed Plans • TMP • CTP • STIP • SRTP • MTP • HMIP • SRTS • Freight • SPOT • Transit Plan • CMP 1011Safety/Mobiliy/HSIP • UDO • CHSTP • Strategic Plan • EJ Summary of all adopted plans in relationship to the project area, identify potential requirements on the developer to address. ORANGE COUNTY GOVERNMENT ORL ORANGE TRANSPORTATION SERVICES DEPARTMENT ri NoKrK CAROLLNA OrangeCouPULICTRAnty Residential/Non-Residential Performance Performance Measure - •n- Measure Climate Action Strategic Highway L Highway Bike/Ped Mobility EV Multimodal Accomodations Transit Access L Modernization L Mitigation L Public Detail analysis of Performance Measures and Prioritization (per adopted TMP) and the project's relationship to them. • Performance • Prioritization ORANGE COUNTY GOVERNMENT ORL ORANGE TRANSPORTATION SERVICES DEPARTMENT ri NORTH CAROLLNA OrangeCounty NSIT Goals and Objectives Goal 1-County • Strategic Plan • TMP Goal 2- Regional • CTP • M PT • MTIP Identification of adopted Goals and Objectives from adopted plans and how the project will help County meet them. • Goals: • Objectives: Safety Complete ?rV,—Is Streets Zero Assessment 1 Assessment 1 Assessment 2 Assessment 2 Detail Qualitative analysis of project and how it helps County meet its Complete Street and Vision Zero policies. ORANGE COUNTY GOVERNMENT COUNTYORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty NORTH GLROLLNA PULICTRANSIT Assessment Safety (5-year period) LMLM Detail Quantitative analysis of project and how it helps County meet it will address safety in the area. A thorough GIS analysis using best practices and identifying key recommendations for the developer. ORANGE COUNTY GOVERNMENT ORANGE TRANSPORTATION SERVICES DEPARTMENT ri COUNI `L :;,� `. O vueucr^xnns�r Access & Equity • %Vehicle • %Transit • % Bike/Pedestrian • % Freight • To/From Transit • To/From Bike/Pedestrian • Bike Racks • Bus Stops Detail data driven analysis of project impact and subsequent mitigation addressing multimodal accessibility. Economy New Jobs Created Employers within 1/2 mile Economic Develeopment District Detail data driven analysis of project impact and subsequent mitigation addressing economic impact and improvement. GRANGE ORANGE COUNTY GOVERNMENT ORANGE TRANSPORTATION SERVICES DEPARTMENT ri OrangeCounty i OKH i C.AROLINA PUBLICTRANSIT Department Comments: • Developer requested to: o Recommendation 1 o Recommendation 2 OF µORTHNCDOT TPD NEWS C P R9oJ H 7 Om p2 OF:TM9 NCDOT • Newsletter January 2025 Traffic Forecasts (TF) "Connecting people, products and places safely and efficiently A Project Level Traffic Forecasting is an essential part of the with customer focus, accounta- planning process. There is one traffic forecast in progress in bility and environmental sensi- the MPO: H23037: Maple Ave, 1-85, NC 54 realignment There is a map that provides information about past and cur- tivity to enhance the economy rent traffic forecasts: NCDOT Traffic Forecasting Data Map. and vitality of North Carolina...." BGMPO 2050 MTP - NCDOT Mission Statement The 2050 MTP update is underway. The Metropolitan Trans- portation Plan (MTP) is the federally required fiscally con- 2026 NC Traffic Safety Confer- strained 25-30 year multi-modal transportation plan. Kimley- ence & Expo Horn consulting firm is working with the MPO to complete the update. There was a kick-off meeting on December 17. Next Save the date for the 2026 NC Traffic Safety steps are to create a Steering Committee and finalize the identi- Conference & Expo which will be help June 2-5, fication of stakeholders to reach out to. 2026 at the Benton Convention Center in Win- ston-Salem, NC. There will be Pre-Conference The Piedmont Regional Travel Demand Model (PRTDM) will be workshops June 1. The NC Traffic Safety Con- used to inform the MTP and CTP. It is estimated that the model ference & Expo brings a variety of national and will be available to use for analysis by the end of February. local traffic safety experts together to inspire, share knowledge, and facilitate collaboration. N.C. to Develop Drone Program Learn about new research, programming strate- gies, enforcement efforts, technologies, design, A federal grant awarded to NCDOT' Division of Aviation in De- and more. For more information about the con- cember will allow NCDOT to study a `drone in a box' program, a ference, visit nctrafficsafetyconference.org. Program that better guides the agency's use of drones when it responds to natural disasters like Hurricanes Helene and Florence. Aviation staff will use the grant to develop a program that would use the `drone-in-a-box' technology in which an autonomous drone can be placed in a community before a storm and then deployed remotely to start collecting images of damage and deliver emergency supplies. Aviation officials hope to build upon what the agency was able to accomplish during Helene, when the division and its partners with the N.C. Department of Public Safety, the National Guard and the Civil Air Patrol were able to use drones, helicopters and fixed-wing aircraft to gather thousands of images of damage in places too difficult to reach by land. Those images were vital to help responders better understand what they needed to do to help people dur- ing the recovery effort in Western North Carolina. The Division of Aviation will use the grant money to pilot the `drone in a box' response system in Lumberton. Like many mountain communities, the Robeson County town is no stranger to natural disasters, as evidenced by what happened during Hurricane Florence in 2018. The Division of Aviation will work closely with Lumberton and the sur- rounding communities because public feedback will be important as the agency studies the issue and develops a better response program. 1 NCDOT Announces Release of NEVI Round 2 RFP GIS-based map of Proposed Charging Locations State officials have published a map online with the proposed locations for the second set of electric vehicle charging stations that will be funded through the National Electric Vehicle Infrastructure Program. The North Carolina Department of Transportation (NCDOT) has posted an updated GIS-based map with the proposed locations of the electric vehicle charging stations for Round 2 of the NEVI Program funding at NCDOT: National Electric Vehicle Infrastructure (NEVI) Program. NCDOT has worked to optimize these lo- cations based on the 50-mile spacing requirement. NCDOT has released this map ahead of the Request for Proposal (RFP) to facilitate planning by applicants wishing to construct and operate EV charging stations using the NEVI funding. A Request for Proposal (RFP) and application process will be issued in 2025. Information about the map a. Each location on the GIS map is a "cluster" of one or more exits along the alternative fuel corridors (AFCs) that are within the bounds of meeting NEVI's 50-mile spacing requirement. b. Round 2 will provide funding for 41 charging stations. c. Five clusters are in Western North Carolina and will have additional time to submit applications (shown in red). d. There will be one charging station per cluster. e. Any proposed charging station must be sited within a designated cluster and within 1-mile of the exit. This distance has been calculated and provided in the GIS-based map. f. The GIS map has layers that can be turned on to show disadvantaged communities and 100-year flood plains (see top right corner of GIS website). In addition to the map, NCDOT has also included several items to facilitate planning including; • List of exits numbers and crossroads for each cluster, • NCDOT Utility Data Request Form —to assist with determining the availability of power at a given site, • U.S. Department of Energy - Alternative Fueling Station Locator that provides a map of other DC Fact Charge sites in the state, • NEVI Utility Finder — an Excel spreadsheet provided by the federal government that provides the electric utilities that serve a given zip code, and • Registration for upcoming events. See the RFP List of Resources for Applicants to access these resources and more at NCDOT: National Elec- tric Vehicle Infrastructure (NEVI) Program. USDOT Issues Final Rule Establishing Accessibility Standards for Pedes- trian Facilities in the Public Right-of-Way On December 18, 2024, the U.S. Department of Transportation (USDOT) ) published a final rule that will in- crease accessibility for transit users by providing local governments and other owner-operators of the public right-of-way clear, uniform, and technically defined standards of accessibility to guide their design decisions for new construction and alterations of transit stops in the public right-of-way. The Americans with Disabilities Act (ADA) directs USDOT to adopt standards for accessible public transpor- tation facilities that are consistent with final minimum accessibility guidelines issued by the Architectural and Transportation Barriers Compliance Board (U.S. Access Board). The Final Rule on Transportation for Individ- uals with Disabilities: Adoption of Accessibility Standards for Pedestrian Facilities in the Public Right-of-Way adopts the U.S. Access Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way (referred to as PROWAG) as the Department's regulatory standards for new construction and alterations of transit stops in the public right-of-way. USDOT's adoption of the PROWAG means that there will no longer be a need for each state or local agency to evaluate sources of guidance and make an independent determination on how to design transit stops and other facilities to achieve accessibility for different types of users. Users of the transportation system will also benefit from uniformity in accessibility-related design standards. The Final Rule becomes effective on January 17, 2025. Federal Register :: Transportation for Individuals With Disabilities; Adoption of Accessibility Standards for Pedestrian Facilities in the Public Right-of-Way Miscellaneous Funding Opportunities (not through NCDOT) New Funding Opportunity: USDOT RAISE Grant Program The U.S. Department of Transportation (USDOT) Rebuilding American Infrastructure with Sustainability and Equity (RAISE) program provides grants for surface transportation infrastructure projects with significant local or regional impact. Eligible projects include capital projects and planning projects. Deadline: January 30, 2025. Learn More: FY 2025 RAISE Notice of Funding Opportunity New Funding Opportunity: America Walks Community Change Grants Program America Walks will support another cohort of the Community Change Grant program, which supports the growing network of champions, organizations, and agencies working to advance walkability. Small grants are awarded to innovative, engaging, and inclusive programs and projects that can create a real, tangible oppor- tunity for walking and movement at the community level. Applications will open on Monday, December 16th and close on Friday, January 17th. Learn More: Community Change Grants -America Walks 3 Tips to Improve Your DMV Experience • Renew early - Reminder cards are sent six months before expiration. Contact Us Renew online • Make an appointment -Appointments can be scheduled up to 90 days in advance at ski ptheline.ncdot.gov. WSMPO Coordinator • Walk-in availability— Each full-time driver license office accepts walk-in NCDOTTPD customers on weekdays from noon-5 p.m. Part-time and express offic 1 S. Wilmington Street - es service only walk-in customers. •- • NC 0••75 _ • Be prepared — Check the DMV website to make sure you bring the re- • ;; . •• quired documentation for your desired service. One frequently forgot- prcook@ncdot.gov ten item is a printed document proving liability insurance. REAL IID — The federal implementation date requiring a REAL ID to fly commercially or to visit federal, military, and nuclear facilities is May 7, Upcoming Date 2nd Quarter 5303 Claim due January 30, 2025 Draft FY26 UPWP due January 31, 2025 2nd Quarter invoice and work summary due February 10, 2025 Last day to have signed resolution to support NCDOT's safety targets February 27, 2025 (PM1) or otherwise establish targets. NCDOT Statewide Plans: To learn more, click on the following links or go to ncdot.gov and search using names in blue unless otherwise noted: NC Moves 2050 Plan • NCDOT Strategic Transportation Corridors • NCDOT Comprehensive State Rail Plan (25-Year Vision) Currently being updated • NC Statewide Multimodal Freight Plan (2023) NCDOT: Integrated Mobility Division - Great Trails State Plan NCDOT: Integrated Mobility Division - Statewide Strategic Plan • NCDOT Resilience Strategy Report (2021) • Statewide Pedestrian & Bicycle Plan (2013) • Strategic Highway Safety Plan (2024) Other Plans: N.C. Climate Risk Assessment and Resilience Plan by Department of Environmental Quality (or Google search: 2020-Climate-Risk-Assessment-and-Resilience-Plan.pdf) NC FIRST Commission Helpful Links: To learn more, click on the following links or go to ncdot.gov and search using names in blue unless other- wise noted: NCDOT home page—ncdot.gov Real-Time Traffic—d rive nc.gov I North Carolina Traffic & Travel Information • Report a pothole—NCDOT Contact Us Form (ncdot.gov & search "Report a pothole") • NCDOT: State Transportation Improvement Program - ncdot.gov/sti • Interactive Bicycle Routes Map—https://www.ncdot.gov/bikeped/ncbikeways/default.aspx— Links to all traffic count data information - Traffic Survey Group (connect.ncdot.gov & then search) NCDOT Interactive Traffic Volume Map—Traffic Volume Maps (ncdot.gov) Traffic Safety Data & Engineering—NCDOT: Traffic Safety Data & Engineering Federal Functional Classification Map—NCDOT Functional Class Map (ncdot.maps.arcgis.com) NCDOT Flickr Account: NCDOTcommunications I Flick r 4 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 9/16/25 FY2026 $5,900,000 Planning and design activities David Stutts underway EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/25/25 FY 2027 $700,000 Municipal Agreement required to City of Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen Robinson EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/25/25 FY2027 $930,000 Municipal Agreement required to City of (Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen Robinson U-6131 Install dual left turn lanes in westbound direction at NC 54(W. 1/15/26 FY2028 $3,500,000 Planning and design activities Brandon Green Harden Street)at NC 49(Maple Ave.)in Burlington pending 48916 Shift NC 61 and NC 100 intersection in Gibsonville to improve 1/15/26 TBD $650,000 Planning and design activities Trung Nguyen turning radii for trucks underway -ROW underway 50547 NC 49 at Green Level Church Road/James Boswell Road- 4/16/26 FY2027 $650,000 Planning and design activities Trung Nguyen Realign Intersection underway.65%plans complete.CFI meeting held. U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 8/18/26 FY2028 $19,100,000 Planning and design activities Suzana Matta 47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882.ROW 47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition 90% 47159.3.1 EB-5988 Construct sidewalk on Lee Ave./W.Lebanon Ave.to SR 1454 12/10/26 FY2028 $310,000 Municipal Agreement required to Town of (W.Haggard Ave.)in Elon begin work Elon/Stephen Robinson BGMPO Jan 2025 Pagel NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 AV-5851 Construct 100'paved overrun and make safety 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby enhancements at the Burlington-Alamance Regional Airport underway U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada Road)3/16/27 FY2030 $21,000,000 Planning and design activities Brandon Green 50234.1.1 to US 70(South Church Street)in Burlington underway-Field Inspection held. 50234.2.1 ROW acquisitions 75%complete. 50234.3.1 BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 10/7/27 FY2029 $1,200,000 Planning and design activities Daniel Dagenhart underway-Plans at 65% B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19. Sami Jasim 48709.1.1 SR 1928(Trollingwood Road)in Haw River Planning and design activities 48709.2.1 underway. 48709.3.1 15BPR.134.3 Rehab on Structure#197 in Guilford County on SR 1117(S. 1/18/28 FY2031 $3,312,100 Planning and design activities Kristy Alford Holden Street)over 1-85 Business and on Structure#148 on I- underway 40 over Haw River in Alamance County U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 5/16/28 FY2031 $10,000,000 Planning and design activities Suzana Matta 47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway, ROW certified and 47158.2.4 (non-system)in Mebane. utilities underay. 47158.3.4 U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $20,300,000 Planning and design activities Suzana Matta 47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington underway 47144.2.1 47144.3.1 BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 9/18/31 FY2033 $700,000 Planning and design activities Daniel Dagenhart underway BGMPO Jan 2025 Page 2 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart underway BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart underway U-6114 Install traffic signal and add turn lanes at NC 62(Atamance 1/1/40 post years $900,000 Planning and design activities Brandon Green Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending. (Funded for Prelim. in Burlington Engineering only) 1-6009 Interchange improvements at 1-40/1-85 and SR 1158(Huffman 1/1/40 post years $936,000 Planning and design activities Brandon Green 47962.1.1 Mill Road). Construct additional right turn lane on 1-40 WB pending. (Funded for Prelim. 47962.2.1 Ramp and improve operations at SR 1308(Garden Road) Engineering only) 47962.3.1 intersection in Burlington SS-6207AA NC 62 at SR 1002(Jeffries Cross Road),north of Green TBD TBD $25,000 Planning and design activities Dawn McPherson 51338 Level.Convert intersection to all way stop control. underway SS-6207AB SR 1500(Gibsonville Ossipee Road)at SR 1553(Midway TBD TBD $25,000 Planning and design activities Dawn McPherson 51339 Church Road/Guilford County Farm Road),southwest of underway Ossipee.Convert intersection to all way stop control. SS-6207AE SR 1003(Lindley Mill Road)at SR 2172(Moores Chapel TBD TBD $52,000 Planning and design activities Dawn McPherson 51426 Cemetery Road)near Graham.Convert intersection from two underway way stop to all-way stop with overhead flasher. SS-6207AG NC 87 at SR 2172(Moores Chapel Cemetery Road)near TBD TBD $49,000 Planning and design activities Dawn McPherson 51428 Graham.Convert intersection from two way stop to all-way underway stop with overhead flasher. BGMPO Jan 2025 Page 3 NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT TIP/WBS# Description Let/Start Completion Cost Status Project Lead Date Date 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. 48689.2.1 48689.3.1 SS-6207AH SR 2424(S. Maple Street)at W.Gilbreath Street in Mebane. TBD TBD $25,000 Planning and design activities Dawn McPherson 51471 Convert intersection to all way stop operation. underway SS-6207AI SR 1003(Lindley Mill Road)at SR 1005(Greensboro Chapel TBD TBD $25,000 Planning and design activities Dawn McPherson 51472 Hill Road),south of Saxapahaw.Convert intersection to all underway way stop traffic control.Change existing overhead flasher to all red displays. SS-6207AJ SR 1581 (Stony Creek Church Road)at SR 1587(Pagetown TBD TBD $25,000 Planning and design activities Dawn McPherson 51429 Road),north of Burlington.Convert intersection to all way stop underway control. SS-6207Y SR 1001 (Union Ridge Road)at SR 1002(Jeffries Cross TBD TBD $33,000 Planning and design activities Dawn McPherson 51342 Road),north of Burlington.Convert intersection to all way stop underway control. Revise existing overhead flasher to all red displays. Signal Inv#07-0002. U-6011 Intersection improvements at US 70(South Church Street) TBD TBD $4,900,000 Planning and design activities Chris Smitherman 47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified. Utilities 47146.2.1 underway. Bids rejected. Moved to 47146.3.1 central for re-let. BGMPO Jan 2025 Page 4 1/15/2025 North Carolina Department of Transportation Active Projects Under Construction - Alamance Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204438 B-5728 REPLACE BRIDGE #112 OVER REEDY FORK CREEK SMITH-ROWE, LLC Howell, Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 2/17/2025 99.99 98.62 ON NC 87 IN OSSIPEE C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70 (SOUTH APAC ATLANTIC INC. Howell, Bobby J $13,975,135.25 7/6/2022 1/13/2025 9/29/2022 1/24/2026 79.00 66.63 CHURCH STREET) AT SR 1226/SR 1311 THOMPSON ARTHUR UNIVERSITY DRIVE IN BURLINGTON DIVISION C204905 10 SECTIONS OF SECONDARY ROADS. CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.60 40.49 LLC C204959 29 SECTIONS OF SECONDARY ROADS. VECELLIO & GROGAN Hayes, PE, $5,067,692.35 7/8/2024 11/15/2025 7/6/2024 11/15/2025 99.98 99.69 INC DBA SHARPE Meredith D BORHTERS D000588 NC 87 AND SR 1719 (SELLARS MILL ROAD / FSC II LLC DBA FRED Howell, Bobby J $3,205,254.10 11/1/2023 5/1/2025 6/10/2024 5/1/2025 70.00 96.91 POMEROY ST) SMITH COMPANY D000609 SR 1125 IN ALAMANCE COUNTY AND 25 STATE RILEY PAVING INC Lorenz, PE, Kris $1 ,110,159.51 3/15/2024 9/15/2025 9/18/2024 9/15/2025 36.40 77.42 ROADS IN EASTERN GUILFORD COUNTY DG00613 U-6017 INTERSECTION IMPROVEMENTS AT NC 54 (EAST TRIANGLE GRADING & Howell, Bobby J $4,750,539.93 5/15/2024 11/11/2025 5/22/2024 1/16/2026 58.78 52.15 HARDEN ST) & NC 49 EAST ELM ST IN GRAHAM PAVING INC D000631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 55.20 58.07 ROUTES EARTHSCAPES & CONSTRUCTION LLC D000633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 50.00 76.25 ROUTES CONSTRUCTION SERVICES INC D000655 U- 1-40/1-85 AT NC 119 GRAHAM NATURAL CHOICE Howell, Bobby J $303,245.42 12/4/2024 7/31/2028 12/6/2024 7/31/2028 2.10 10.61 3109B(L) CONTRACTING LLC Page 1 of 1 NCDOT DIV 7 PROJECTS LOCATED IN CPRPO - UNDER DEVELOPMENT TIP/WBS # Description Let/Start Completion Cost Status Project Lead Date Date SS-6207T Portions of Twenty-One (21 ) Routes. Curve Warning Sign 9/20/23 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson 51112 Installation. Construction underway. BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/26 FY2028 $2,900,000 Planning and design activities underway Daniel Dagenhart BP7.R009.1 ROW has been certified. BP7.R009.2 BP7.R009.3 1-5958 Pavement rehabilitation on 1-40 / 1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Trung Nguyen 45910.1 .1 (Buckhorn Road) to west of SR 1006 (Orange Grove Road). 45910.3.1 BP7-R017 Replace Bridge #14 on SR 1548 (Schley Road) 9/7/28 FY2030 $1 ,500,000 Planning and design activities underway Daniel Dagenhart BP7.R017.1 BP7.R017.2 BP7.R017.3 R-5821A Construct operational improvements including 1/1/40 post years $3,194,000 PE funding approved 10/10/17, design Suzana Matta 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville with NC54 West Corridor Study 47093.3.2 Road). TARPO-Orange Co Feb 2025 Page 1 North Carolina Department of Transportation 2/5/2025 Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Crews, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 58 53.95 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Jacob T US-15/501 . CORPORATION C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.6 40.49 LLC D000595 FIFTY ONE SECONDARY ROADS RILEY PAVING INC Howell, Bobby J $2,494,634.93 4/8/2024 10/8/2025 4/1/2025 D000631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 55.2 58.07 UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND CONSTRUCTION LLC D000633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 50 76.25 UPGRADING OF NON-COMPLIANT ADA CURB RAMPS CONSTRUCTION SERVICES INC Page 1 of 1 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date SS-6207T Portions of Twenty-One (21) Routes. Curve Warning Sign 9/20/2023 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson 51112 Installation. Construction started. SS-6207A NC 54 Pedestrian improvements between SR 1902 (Manning 2/15/2024 6/1/2025 $171 ,000 Planning and design activities underway. Dawn McPherson 50337 Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill and Materials have arrived and work has begun. Carrboro. Improvements will include refuge islands, 4 of the 5 locations have been completed. crosswalks and pedestrian signals. Improvements to be completed by state forces. HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 2/6/2025 9/30/2026 $530,000 Planning and deisgn activities underway Suzana Matta Beacons (RRFB), raised center island, pedestrian signage, and approximately 125 linear feet of sidewalk on NC 86 at Critz Drive in Chapel Hill BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 4/17/2025 12/31/2025 $1 ,311 ,000 Construction funding to be requested once Trung Nguyen 49998.1 .1 15/501/NC 86 (South Columbia Street) interchange in Chapel municipal agreements are executed. Chapel Hill. Construct sidewalk and install pedestrian signals, Hill MA executed, Carrboro MA has also crosswalks, and refuge islands at selected locations. been executed. Utility Relocations near completion. P-5701 B Construct Platform, Passenger Rail Station Building at Milepost 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons 46395.1 .1 41 .7 Norfolk Southern H-line in Hillsborough and deisgn activities underway 46395.3.3 HL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River 7/31/2025 FY2028 $153,800 Agreement executed, Hillsborough to Town of from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and Hillsborough/Stephen plans. Review of final plans underway. Robinson HS-2007H SR 1009 (Old NC 86) at SR 1727 (Eubanks Road) near 8/7/2025 FY2027 $153,000 Planning and deisgn activities underway Trung Nguyen 49317.1 .9 Chapel Hill. Right Turn Lane Modifications. 49317.2.9 49317.2.10 49317.3.9 BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $6,400,000 Planning and design activities underway Alexander Foster EB-5721 Upgrade existing off-road path and construct new section of 9/25/2025 FY2026 $2,700,000 Bids opened 7/17/23 - Bids rejected. Project Town of Chapel path of Bicycle Route #1 from Cleland Drive to Willow Drive in on Hold. Chapel Hill to seek additional Hill/Stephen Robinson Chapel Hill funding and relet at a future date. Page 1 TWTPO Mar 2025 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and the 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Stephen Robinson 51177.1.1 streets in between from Merritt Mill Road to Henderson Street Municipal agreement executed. 51177.2.1 in downtown Chapel Hill. Install new mast arm and curb and 51177.2.2 51177. .1 sidewalk improvements. C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 4/9/2026 FY2028 $2,749,000 Carrboro approved to incorporate water line Town of Road/S. Greensboro St.) from Public Works Drive to the work into design. Env doc returned w Carrboro/Stephen northern end of Old Pittsboro Road in Carrboro comments on 12/10/21 . Document to be Robinson updated to include additional limits for resurfacing. NCDOT waiting on revised 1-3306AC 1-40 at NC 86 - Upgrade to superstreet from Northwood Drive 5/19/2026 FY2029 $10,970,000 Planning and design activities underway Radha Attaluri to Ramp C/D at 1-40 interchange BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart ROW acquisisition complete. EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from south 10/1/2026 FY2028 $3,968,000 Municipal agreement executed and project Town of Chapel of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) in development underway. Hill/Stephen Robinson Chapel Hill 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $9,500,000 Planning and design activities pending Trung Nguyen 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) 45910.3.1 B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 86 4/20/2027 FY2031 $14,080,000 Planning and design activities underway. Brandon Green 25% Plans complete. BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/16/2027 FY2030 $2,220,000 Planning and design activities underway Daniel Dagenhart Plans at 25% EB-5880 Construct sidewalk on the north side of SR 1005 (Jones Ferry 9/30/2027 FY2029 $950,000 Municipal agreement needs to be requested Town of Road) from Davie Road to SR 1010 (West Main St.) in and executed to begin work. Carrboro/Stephen Carrboro Robinson Page 2 TWTPO Mar 2025 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2027 FY2029 $740,000 Municipal agreement needs to be requested Town of 1005 (Jones Ferry Road) in Carrboro and executed to begin work. Carrboro/Stephen Robinson BR-0247 Replace Bridge #29 on US 70 Business/NC 86 over Cates 11/16/2027 FY2029 Pending Preliminary activities pending Bryan Key Creek EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 12/16/2027 FY29 $8,780,000 Municipal agreement needs to be requested Town of Chapel 1741/SR 1838 (Old Durham Chapel Hill Road) in Chapel Hill and executed to begin work. Hill/Stephen Robinson EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/21/2028 FY2031 $13,980,000 Municipal agreement needs to be requested Town of 1772 (North Greensboro Street) to south of Norfolk Southern and executed to begin work. Carrboro/Stephen Railroad Tracks in the Town of Carrboro Robinson BR-0091 Replace Bridge #32 on US 70 over the Eno River 10/17/2028 FY2032 $11 ,000,000 Planning and design activities underway Jon Gaillard BP7-R015 Replace Bridge #86 on SR 1942 (Jones Ferry Road) 9/6/2029 FY2031 $1 ,730,000 Planning and design activities underway. Daniel Dagenhart Detour needs improvements so will need to see if resurfacing funds available or switch to TIP project. TBD U-5845 Widen SR 1009 (South Churton Street) to multi-lanes from 1-40 7/16/2030 FY2033 $77,400,000 PE funding approved 5/14/15, Planning and Radha Attaluri 50235.1 .1 to Eno River in Hillsborough Design activities underway, Coordinate with 50235.2.1 1-0305B which was formerly 1-5967. 50235.3.1 BP7-R007 Replace Bridge #63 on Pleasant Green Road 9/5/2030 FY2033 $2,550,000 Planning and design activities underway Daniel Dagenhart 1-0305B Interchange improvements at 1-85 and SR 1009 (South 10/15/2030 FY2033 $102,200,000 PE funding approved 9/8/17, Planning and Colin Mellor 34142.1 .5 Churton Street) in Hillsborough Design activities underway, Coordinate with 34142.3.3 1-0305 and U-5845. (1-0305B was formerly I- 34142.3.4 34142.2.4 5967) Page 3 TWTPO Mar 2025 NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT TIP/WBS # Description LET/Start Completion Cost Status Project Lead Date Date R-5821A Construct operational improvements including 1/1/2040 post years $21 ,650,000 PE funding approved 10/10/17, design Suzana Matta 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville with NC54 West Corridor Study 47093.3.2 Road). 1-0305(A) Widening of 1-85 from west of SR1006 (Orange Grove Road) in 1/1/2040 post years $132,000,000 PE funding approved 6/5/18, Planning and Colin Mellor 34142.1 .2 Orange Co. to west of SR 1400 (Sparger Road) in Orange Co. design activities underway, Project 34142.2.2 reinstated per 2020-2029 STIP (funded 34142.3.2 project) and delete project 1-5983 1-0305C Interchange improvements at 1-85 and NC 86 in Hillsborough 1/1/2040 post years $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor 34142.1 .6 and Design activities underway, 1-0305C was formerly 1-5984. C-5181 Jones Creek Greenway Project - Fill Gap between the TBD TBD $910,000 Environmental document approved 8/14/23. Town of Carrboro Upper Bolin Trail and Twin Creeks Greenway and NCDOT to review plans once Carrboro Carrboro/Stephen also implement program to support on-vehicle trips to Morris develops and submits. Robinson Grove Elementary School EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro TBD TBD $1 ,568,000 Review comments provided to Carrboro in Town of June 2023 for revisions and resubmittal. Carrboro/Stephen Resubmittal under review. Robinson Page 4 TWTPO Mar 2025 North Carolina Department of Transportation 3/3/2025 Active Projects Under Construction - Orange Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Crews, PE, $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 65 55.4 COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION Jacob T US-15/501 . CORPORATION C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.6 43.04 LLC D000595 FIFTY ONE SECONDARY ROADS RILEY PAVING INC Howell, Bobby J $2,494,634.93 4/8/2024 10/8/2025 D000626 TWENTY THREE SECONDARY ROADS IN ORANGE COUNTY SUNROCK Howell, Bobby J $2,190,853.75 4/17/2024 10/17/2025 INDUSTRIES LLC DBA CAROLINA SUNROCK LLC D000631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 65 63.92 UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND CONSTRUCTION LLC D000633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 2/7/2025 100 100 UPGRADING OF NON-COMPLIANT ADA CURB RAMPS CONSTRUCTION SERVICES INC D000639 FIFTEEN SECONDARY ROADS IN ORANGE COUNTY SUNROCK Howell, Bobby $1 ,616,170.70 9/11/2024 3/11/2026 INDUSTRIES LLC DBA CAROLINA SUNROCK LLC Page 1 of 1