AGENDA
ORANGE UNIFIED TRANSPORTATION BOARD
February 17, 2025, 6:30 pm
131 W Margaret Ln, Hillsborough, NC 27278
OUTBoard meetings are held in person and open to the public. Any member of the general public
who wishes to make public comment should attend or email Orange County Transportation
Director Nishith Trivedi at ntrivedi@orangecountync.gov. All comments will be read to the
OUTBoard during the public comment portion of the meeting.
1. Call to Order
2. Consideration of Additions or Changes to Agenda
3. Public Comments
4. Minutes—January 20, 2025
5. Regular OUTBoard Agenda
a. 2019 Efland-Buckhorn-Mebane Access Management Plan Update
i. Action: Approve Scope of Work
b. Orange County Safe Routes to School—Steering Committee
i. Action: Recommend BOCC approve SRTS Steering Committee
c. Non-STIP
i. Action: Provide comments
6. Staff Report/Updates
a. MPO, RPO, and NCDOT
7. Adjournment-The next meeting— March 2025
It is the policy of Orange County Transportation Services to ensure that no person shall, on the
ground of race, color, sex, age, national origin, or disability, be excluded from participation in, be
denied the benefits of, or be otherwise subjected to discrimination under any program or activity
as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987.
600 Hwy 86 N - Hillsborough, North Carolina 27278
Phone (919)245-2008 - Fax (919) 732-2137
orangecountync.gov/transportation
ORANGE UNIFIED TRANSPORTATION BOARD MEETING MINUTES
Monday January 21, 2024, 6:30 pm
131 W. Margaret Lane, Hillsborough, NC 27278
1 Attendance:
2 Member Representation Present
3 Micheal Hughes (Chair) At Large No
4 Art Menius (Vice Chair) Little River Township Yes
5 Natalie Ziemba Hillsborough Township Yes
6 Jamie Crandell Eno Township Yes
7 Amy Cole At Large Yes
8 Gregory Woloszczuk At Large Yes
9 Heidi Perry At Large Yes
10 Gene Owen At Large Yes
11 Sherry Appel At Large Yes
12 Roy Schonberg Chapel Hill Township Yes
13 Chloe Pankratz Youth Delegate Yes
14 Darlene Weaver Staff Yes
15 Nishith Trivedi Staff Yes
16 EmmaLea Ange Staff Yes
17
18 AGENDA ITEM 1: CALL TO ORDER
19 The meeting was called to order at 6:33pm and the roll was taken.
20
21 AGENDA ITEM 2: CONSIDERATIONS OF ADDITIONS TO AGENDA
22 No additions to the agenda
23
24 AGENDA ITEM 3. PUBLIC COMMENTS
25 No public comments
26
27 AGENDA ITEM 4. MINUTES-November 18, 2024
28 Correct Michael name
29 Motion: Heidi P.
30 Second: Sherry A.
31 Approval: Unanimously
32
33 AGENDA ITEM 5. OUTBOARD AGENDA
34
35 a. 2024 Annual Report and 2025 Work Plan
36 Nish provided an updated 2024 Annual Report and 2025 Work Plan for the members consideration. All
37 current year's accomplishments and next year's objectives were updated.Art M clarified the past tense
38 of some bullets. Sheery A. recommended adding the extensive public engagement done on recently
39 adopted plans as another accomplishment and continue finding ways to get more people involved as a
40 new work objective.These were added to both as an accomplishment and future work objective.
41
42 Motion: Heidi P.
43 Second: Gene O.
44 Unanimously Approved
45
46
47 b. Multimodal Assessment—Best Practice
48 Nish T. presented findings from his independent research on the topic.
49
50 Amy C. inquired about the annual frequency of such reviews. Nish explained that DAC meetings occur
51 once or twice a month, are hosted by the Planning Department, and cover projects ranging from small-
52 scale to large-scale developments. Amy also asked about the potential revenue generated from this
53 practice. Nish clarified that the revenue would depend on the fee structure, which is currently under
54 evaluation, using best practices established in other counties.
55
56 Sherry A. asked about incorporating analytics and whether establishing an hourly rate could help
57 determine the fee structure. Nish described how Durham and other counties approach this and
58 discussed how Orange County could integrate similar strategies into its existing processes. The
59 consensus was that the fee should not be set too low.
60
61 Heidi P. inquired about integrating performance measures. Nish explained that incorporating these
62 measures would support the implementation of the Transportation Multimodal Plan, which outlines
63 priorities in alignment with other locally adopted plans. Heidi also asked about the UDO, and Nish
64 confirmed that it serves as the primary framework for implementing this project and will include a
65 County-controlled update.
66
67 Amy C. asked how and when the funds would be utilized. Nish stated that this is still being researched.
68 He noted that best practices favor a consolidated pool of funds, such as a CIP, to be used across the
69 County rather than solely in the developed area. Other options include using the funds as a local match
70 for larger capital projects and grants.
71
72 AGENDA ITEM 6. STAFF REPORT/UPDATES
73 a. MPO, RPO,and NCDOT
74 Nish provided updates on key projects.
75
76 AGENDA ITEM 8:ADJOURNMENT
77 OUTBoard meeting was adjourned at 7:25pm.
���E ORANGE COUNTY GOVERNMENT
ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT No rH CARQLLNA Ora"g; �m utt
8,
Item 5.a.
Subject: 2019 Efland-Buckhorn-Mebane Access Management Plan Update
Attachment: Scope of Work
PURPOSE: To approve Scope of Work for 2019 Efland-Buckhorn-Mebane Access Management
Plan (2019 EBM AMP) Update.
BACKGROUND: On July 17, 2024, the Orange Unified Transportation Board (OUTBoard)
conducted a review of the 2019 Efland-Buckhorn-Mebane Access Management Plan (EBM AMP)
as part of its efforts to prepare for a comprehensive update.This update is deemed necessary to
address the multimodal transportation impacts of several approved developments within the
study area. The developments include:
Approved Developments:
• R+L Carriers: A freight terminal spanning 83.4 acres located at Buckhorn and 1-40/1-85.
• Medline:A 1.2 million square-foot medical supply distribution center on 176 acres along West
Ten Road.
• Buckhorn Industrial: A light manufacturing facility on 49.3 acres at Buckhorn and West Ten.
• West Ten Industrial: A light manufacturing facility on 47.5 acres at Buckhorn and West Ten.
• Buckhorn Business Center: A master-planned light manufacturing campus on 128.8 acres at
Buckhorn Industrial Parkway and Buckhorn Road.
• Carolina Achieve: A charter school approved 15.7 acres at West Ten Road and Rock Quarry.
• Efland Industrial: An 886,240 square-foot light industrial facility at Mt. Willing Road and the
I-40/US 70 Connector.
In addition, Orange County has adopted several plans with specific projects in the study area:
• US 70 Multimodal Corridor Study
• Short Range Transit Plan
• Safe Routes to School Plan
• The 2022 County Strategic Plan
• The Hillsborough Connectivity Plan
• The Mebane Bicycle and Pedestrian Plan
During the July 17, 2024, meeting, OUTBoard members recommended that staff conduct a
thorough review of the multimodal transportation impacts associated with all approved
developments. This review would include an evaluation of any Traffic Impact Analyses (TIA)
conducted for these projects and a comparison of the findings against the projections outlined
in the 2019 EBM AMP. If the cumulative traffic impacts from the approved development meet or
exceed the forecasts established in the original plan, an update will be initiated in accordance
with the presented Scope of Work.
ORANGE TRANSPORTATION
COUNTY GOVERNMENT
TRANSPORTATION SERVICES DEPARTMENT
COUNTY
,A OraflJeCounty
NoKm CAROLIN
ueuc rxnrvsi*
This proactive approach ensures that the transportation infrastructure and multimodal systems
remain aligned with the area's growth and development, supporting the efficient and sustainable
movement of people and goods.
FINANCIAL IMPACT:There is no financial impact. All work will be done by County staff.
ALIGNMENT WITH STRATEGIC PLAN:This item supports:
• GOAL 4: MULTI-MODAL TRANSPORTATION
OBJECTIVE 2. Increase community awareness of all modes of transportation including transit,
bike and pedestrian, vehicle, and all other modes.
OBJECTIVE 3. Support road projects that address congestion and reduce commute time using
the County' s Complete Streets policy.
OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to
reduce vehicle miles travelled and to provide more equitable access to shopping,
employment, medical centers, college campuses, etc.
OBJECTIVE 6. Update transportation related plans to provide more multi-modal options
including rural Orange County.
Action: Approve the 2019 EBM AMP Scope of Work (Attachment 1).
2019 Efland-Buckhorn-Mebane Access Management Plan Update
Scope of Work
Contents
ProjectOverview........................................................................................................................................................2
Task A—Analysis of Existing Conditions.....................................................................................................................2
KeyDeliverables: ....................................................................................................................................................2
TaskB— Public Engagement.......................................................................................................................................2
KeyDeliverables:....................................................................................................................................................2
TaskC—Draft Plan......................................................................................................................................................2
KeyDeliverables:....................................................................................................................................................3
Task D—Final Plan &Action Strategies......................................................................................................................3
KeyDeliverables:....................................................................................................................................................3
2019 Efland-Buckhorn-Mebane Access Management Plan Update
Scope of Work
Project Overview
• Project Lead: In-House Staff
• Project Timeline: March—December 2024
• Public Engagement: Orange County Transportation Services Public Involvement Plan (OCTS PIP)
Task A — Analysis of Existing Conditions
A comprehensive planning-level analysis will be conducted to assess existing conditions by reviewing adopted
plans, evaluating the transportation network, and utilizing a data-driven approach. This analysis will incorporate
locally approved Traffic Impact Analyses (TIA) and other relevant datasets.
Methodology:
• Utilize publicly available data, fieldwork, and independent research sources such as the U.S. Census, Triangle
Regional Model, NCDOT databases, and local studies.
• Consolidate all information into a clear and concise format, including maps, charts, and tables.
• Develop an Existing Conditions Report that will serve as the foundation for future recommendations.
Key Deliverables:
✓ Updated GIS maps
✓ Data visualizations (charts, graphs,tables)with supporting narrative
✓ Multimodal network analysis
✓ Existing Conditions Report
Task B — Public Engagement
Public engagement will be conducted in alignment with the approved Department-specific Public Involvement
Plan (PIP). Engagement activities will include but are not limited to:
• Two rounds of public workshops and additional pop-up events in the planning area.
• OUTBoard meetings and a formal Public Hearing before the Board of County Commissioners (BOCC).
• A dedicated project website for continuous updates and public feedback.
Staff will prepare a Public Engagement Summary Report detailing community feedback,visual representations
of public input, and how this feedback shaped the recommendations.
Key Deliverables:
✓Two public workshops within the planning area
✓ Project-specific website for ongoing engagement
✓ Public Engagement Report summarizing outreach efforts and feedback
TaskC — Draft Plan
Following the completion of the Existing Conditions Analysis and Public Engagement Report, staff will develop a
draft plan outlining short-, mid-, and long-term strategies for transportation improvements.
• The draft plan will be presented to the Orange Unified Transportation Board (OUTBoard)for feedback.
• After incorporating necessary revisions, the final draft will be submitted to the Board of County
Commissioners (BOCC)for public hearing and review.
2019 Efland-Buckhorn-Mebane Access Management Plan Update
Scope of Work
Key Deliverables:
✓ Draft alternatives and recommendations
✓ Draft 2019 Efland-Buckhorn-Mebane Access Management Plan Update
Task D — Final Plan & Action Strategies
Project Timeline Overview
Task March April—June July—September October- December
A- Existing Conditions kh
B- Public Engagement
C- Draft Plan
D - Final Plan
Action Strategies Development:
The final phase will focus on developing an Action Strategies Plan that outlines:
• Data collection methodologies,timelines, estimated costs, and assigned responsibilities.
• Coordination efforts with stakeholders, partnerships with relevant agencies, and community engagement
strategies.
• A roadmap for implementing recommendations.
• The draft Action Strategies Plan will be reviewed by OUTBoard for input before being finalized.
• Final Plan & Presentation
• The project will conclude with the release of a Final Report,which includes:
• A comprehensive table of projects with updated maps and recommendations.
• Final Action Strategies Plan outlining implementation steps.
• Updated graphics and maps for clarity.
The final plan will be presented to:
1. Transportation Advisory Service for technical review.
2. OUTBoard for public approval.
3. Board of County Commissioners (BOCC)for final adoption.
Key Deliverables:
✓ Final Action Strategies Plan
✓ Comprehensive Final Report
✓ Updated maps and graphics
ORANGE TRANSPORTATION
COUNTY GOVERNMENT
TRANSPORTATION SERVICES DEPARTMENT
COUNTY
NoKm CALIQLLNA PUBLIC TRANSIT
OrangeCounty
Item 5.a.
Subject: Safe Routes to School —Steering Committee
PURPOSE:To recommend the Board of County Commissioners approve the Safe Routes to School
Steering Committee
BACKGROUND: On November 7, 2024, the Orange County Board of County Commissioners
(BOCC) approved the 2024 Safe Routes to School (SRTS) Plan [link]. This plan establishes a
framework to enhance safety for students traveling to and from all thirteen Orange County Public
Schools.
Following its adoption by Orange County, the plan received approvals from key regional
transportation organizations, including:
• Triangle West Transportation Planning Organization
• Burlington-Graham Metropolitan Planning Organization
• Central Pine Rural Planning Organization
Additionally,the Orange County Board of Education received the plan during its December public
meeting. The plan has also gained statewide recognition and has been selected for presentation
at the 2025 North Carolina Association of Metropolitan Planning Organizations Annual
Conference in Wilmington.
Recommendation: Establishment of an SRTS Steering Committee
To support the implementation of the plan, Orange County Transportation Services (OCTS) staff
recommend the formation of an SRTS Steering Committee, as outlined in the approved plan.The
committee would be responsible for overseeing implementation efforts and would include
representatives from:
• School administrators
• Local government officials
• Parents, Students, Teachers
• Urban and transportation planners
The Steering Committee's primary responsibilities would include:
• Coordinating implementation efforts and ensuring alignment with the adopted plan.
• Engaging key stakeholders to promote collaboration and community involvement.
• Developing action plans to facilitate short- and long-term recommendations.
Governance and Next Steps
While the OUTBoard By-laws authorize the formation of subcommittees with limited scope
within its membership, a Steering Committee of this scale would require formal approval from
the Board of County Commissioners.
���E ORANGE COUNTY GOVERNMENT
ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT ri
nt
NoKrH CAROLIN,A to u„ Y
Therefore, OCTS requests that the OUTBoard review the proposed Steering Committee structure
and provide a recommendation for the BOCC to formally establish an SRTS Steering Committee
dedicated to the successful implementation of the plan.
This initiative is a critical step in ensuring that the 2024 Safe Routes to School Plan achieves its
intended impact, fostering a safer, more accessible, and sustainable transportation environment
for Orange County students.
FINANCIAL IMPACT:There is no financial impact. All work will be done by County staff.
ALIGNMENT WITH STRATEGIC PLAN:This item supports:
• GOAL 4: MULTI-MODAL TRANSPORTATION
o OBJECTIVE 2. Increase community awareness of all modes of transportation including
transit, bike and pedestrian, vehicle, and all other modes.
o OBJECTIVE 3. Support road projects that address congestion and reduce commute time
using the County' s Complete Streets policy.
o OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning
to reduce vehicle miles travelled and to provide more equitable access to shopping,
employment, medical centers, college campuses, etc.
o OBJECTIVE 6. Update transportation related plans to provide more multi-modal options
including rural Orange County.
Action: Recommend Board of County Commissioners approve the Safe Routes to School Steering
Committee
ORANGE TRANSPORTATION
COUNTY GOVERNMENT
TRANSPORTATION SERVICES DEPARTMENT
COUNTY
NoKm CALIQLLNA PUBLIC TRANSIT
OrangeCounty
Item 5.b
Subject: Non-STIP
Attachment: Non-STIP Project List
PURPOSE: Comment on County's Non-State Transportation Improvement Projects (Non-STIP).
BACKGROUND: The Orange Unified Transportation Board (OUTBoard) conducts a quarterly
review of the County's Non-State Transportation Improvement Program (Non-STIP) projects.This
review is conducted both in preparation for and following the quarterly meetings between the
County, local municipalities, and the North Carolina Department of Transportation (NCDOT).
NCDOT administers various funding programs that allow local transportation projects to proceed
without requiring inclusion in the State's Prioritization of Transportation (SPOT) process. These
funding sources include, but are not limited to:
• Highway Safety Improvement Program (HSIP - link)
• Spot Safety/Mobility Programs (link)
• Highway Maintenance Improvement Program (HMIP - link)
Key Funding Stipulations
✓ Right-of-way acquisition and utility relocations must be completed prior to funding approval.
✓ Projects must be under contract within 12-24 months of receiving funding.
✓ For projects exceeding$250,000, resolution of support from the local elected body is required
✓ Funding can be combined with other sources to maximize project feasibility.
✓ Most projects are subject to Board of Transportation (BOT) approval.
Project Identification and Review Process
Transportation staff from Orange County and NCDOT work collaboratively to:
• Analyze the existing road network.
• Address public concerns regarding traffic safety, mobility, and infrastructure needs.
• Identify small-scale, cost-effective improvements that can be implemented administratively
without lengthy approval processes.
To ensure transparency and strategic decision-making, County staff maintain and update an
ongoing list of Non-STIP projects (Attachment 1), which is reviewed quarterly with the
Transportation Advisory Service and OUTBoard. These regular assessments help prioritize local
transportation enhancements and ensure that funding opportunities are effectively leveraged to
improve safety and mobility across the County.
���E ORANGE COUNTY GOVERNMENT
ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT ri
nt
NoKrH CAROLIN,A to u„SIT Y
Orange County and NCDOT transportation staff analyze the road network, receive concerns from
the public and try to find the most efficient and economical way to make immediate small scare
improvements, administratively. County staff will review the on-going list of these projects
quarterly with Transportation Advisory Service and OUTBoard.
FINANCIAL IMPACT:There is no financial impact.
ALIGNMENT WITH STRATEGIC PLAN:This item supports:
• GOAL 4: MULTI-MODAL TRANSPORTATION
OBJECTIVE 2. Increase community awareness of all modes of transportation including transit,
bike and pedestrian, vehicle, and all other modes.
OBJECTIVE 3. Support road projects that address congestion and reduce commute time using
the County' s Complete Streets policy.
OBJECTIVE 4. Coordinate transit investments with municipal and county land use planning to
reduce vehicle miles travelled and to provide more equitable access to shopping,
employment, medical centers, college campuses, etc.
OBJECTIVE 6. Update transportation related plans to provide more multi-modal options
including rural Orange County.
ACTION: Provide comments on County Non-STIP projects.
County Non-STIP Projects 2/10/2025
# Segment Improvement Update
1 Rocky Ridge from Dairyland to Arthur Minnis w/shoulder Review HMIP and coordinate with NCDOT for update.
2 Grading improvement-Jones Ferry- County to Carrboro Bridge replacement 2029. HMIP resurfacing 2025.
3 NCDOT Bike signs Updating in County Bike/Ped Plan - High Priority
4 Old NC-86 at Arthur Minnis Staff will analyze and request SPOT Safety/Mobility/HSIP
5 Orange Grove Road at Davis Road Staff will analyze and request SPOT Safety/Mobility/HSIP
6 1 NC 86 from Hillsborough to Chapel Hill County Priority, staff analysing
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
SS-6207T Portions of Twenty-One (21)Routes. Curve Warning Sign 9/20/2023 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson
51112 Installation. Construction started.
SS-6207A NC 54 Pedestrian improvements between SR 1902 2/15/2024 6/1/2025 $171,000 Planning and design activities underway. Dawn McPherson
50337 (Manning Drive)and SR 1937 (Old Fayetteville Road)in Materials have arrived and work has
Chapel Hill and Carrboro. Improvements will include begun. 4 of the 5 locations have been
refuge islands, crosswalks and pedestrian signals. completed.
Improvements to be completed by state forces.
SS-6207AF SR 1004 (Efland-Cedar Grove Road)at SR 1306 (Lebanon 7/1/2024 7/1/2024 $25,000 Planning and design activities underway. Dawn McPherson
51427 Road),west of Hillsborough. Convert intersection to all way Project complete.
stop traffic control (without flasher).
U-4726DF Bicycle detection at signalized intersections in Carrboro 8/15/2024 Spring 2025 $130,000 Plans at 90%completion-Plan review Town of
comments returned back to the Town of Carrboro/Stephen
Carrboro for revisions. Re-Let Robinson
Department has concurred for the
contract to be awarded.
BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 1/16/2025 7/31/2025 $1,311,000 Construction funding to be requested Trung Nguyen
49998.1.1 15/501/NC 86(South Columbia Street)interchange in once municipal agreements are
Chapel Hill. Construct sidewalk and install pedestrian executed. Chapel Hill MA executed,
signals, crosswalks, and refuge islands at selected Carrboro MA has also been executed.
locations. Utility Relocations near completion.
P-5701 B Construct Platform, Passenger Rail Station Building at 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons
46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough and deisgn activities underway
46395.3.3
HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno 7/31/2025 FY2028 $153,800 Agreement executed, Hillsborough to Town of
River from South Churton Street to Faribult Lane in prepare environmental documents and Hillsborough/Stephen
Hillsborough plans. Review of final plans underway. Robinson
BR-0092 Replace Bridge#37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $2,900,000 Planning and design activities underway Alexander Foster
Page 1 DCHCMPO Dec 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
EB-5721 Upgrade existing off-road path and construct new section 9/25/2025 FY2026 $2,400,000 Bids opened 7/17/23-Bids rejected. Town of Chapel
of path of Bicycle Route#1 from Cleland Drive to Willow Project on Hold. Chapel Hill to seek Hill/Stephen Robinson
Drive in Chapel Hill additional funding and relet at a future
date.
HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/16/2025 6/30/2026 $530,000 Planning and deisgn activities underway Suzana Matts
Beacons(RRFB), raised center island, pedestrian signage,
and approximately 125 linear feet of sidewalk on NC 86 at
Critz Drive in Chapel Hill
HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Stephen Robinson
51177.1.1 the streets in between from Merritt Mill Road to Henderson Municipal agreement executed.
51177.2.1 Street in downtown Chapel Hill. Install new mast arm and
51177.2.2
51177.3.1 curb and sidewalk improvements.
C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 4/19/2026 FY2028 $1,718,000 Carrboro approved to incorporate water Town of
Road/S. Greensboro St.)from Public Works Drive to the line work into design. Env doc returned w Carrboro/Stephen
northern end of Old Pittsboro Road in Carrboro comments on 12/10/21. Document to be Robinson
updated to include additional limits for
resurfacing. NCDOT waiting on revised
1-3306AC 1-40 at NC 86-Upgrade to superstreet from Northwood 5/19/2026 FY2029 $4,350,000 Planning and design activities underway Radha Attaluri
Drive to Ramp C/D at 1-40 interchange
BP7-R009 Replace Bridge#11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart
ROW acquisisition complete.
EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from 9/17/2026 FY2029 $848,000 Municipal agreement needs to be Town of
SR 1772 (North Greensboro Street)to south of Norfolk requested and executed to begin work. Carrboro/Stephen
Southern Railroad Tracks in the Town of Carrboro Robinson
EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 9/30/2026 FY2028 $2,044,000 Municipal agreement needs to be Town of Chapel
1741/SR 1838(Old Durham Chapel Hill Road)in Chapel requested and executed to begin work. Hill/Stephen Robinson
Hill
Page 2 DCHCMPO Dec 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from 10/1/2026 FY2028 $3,104,000 Municipal agreement executed and Town of Chapel
south of Norfolk Southern Railroad to NC 86(MLK Jr. project development underway. Hill/Stephen Robinson
Blvd.) in Chapel Hill
1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 11/17/2026 FY2028 $8,690,000 Planning and design activities pending Trung Nguyen
45910.1.1 1114(Buckhorn Road)to West of SR 1006 (Orange Grove
45910.3.1 Road)
B-6037 Replace Bridge#49 over Norfolk Southern Railway on NC 4/20/2027 FY2031 $10,600,000 Planning and design activities underway Brandon Green
86
BP7-R013 Replace Bridge#90 on SR 1940 (Damascus Church Road) 9/16/2027 FY2030 $800,000 Planning and design activities underway Daniel Dagenhart
Plans at 25%
EB-5880 Construct sidewalk on the north side of SR 1005(Jones 9/30/2027 FY2029 $441,000 Municipal agreement needs to be Town of
Ferry Road)from Davie Road to SR 1010 (West Main St.) requested and executed to begin work. Carrboro/Stephen
in Carrboro Robinson
EB-5890 Construct sidewalk on Barnes Street from King Street to 9/30/2027 FY2029 $230,000 Municipal agreement needs to be Town of
SR 1005 (Jones Ferry Road)in Carrboro requested and executed to begin work. Carrboro/Stephen
Robinson
BR-0247 Replace Bridge#29 on US 70 Business/NC 86 over Cates 11/16/2027 FY2029 Pending Preliminary activities pending Bryan Key
Creek
BR-0091 Replace Bridge#32 on US 70 over the Eno River 10/17/2028 FY2032 $4,000,000 Planning and design activities underway Jon Gaillard
Page 3 DCHCMPO Dec 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
BP7-R015 Replace Bridge#86 on SR 1942 (Jones Ferry Road) 9/6/2029 FY2031 $1,700,000 Planning and design activities underway. Daniel Dagenhart
Detour needs improvements so will need
to see if resurfacing funds available or
switch to TIP project. TBD
U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 7/16/2030 FY2033 $49,238,000 PE funding approved 5/14/15, Planning Radha Attaluri
50235.1.1 1-40 to Eno River in Hillsborough and Design activities underway,
50235.2.1 Coordinate with 1-0305B which was
50235.3.1 formerly 1-5967.
BP7-R007 Replace Bridge#63 on Pleasant Green Road 9/5/2030 FY2033 $2,500,000 Planning and design activities underway Daniel Dagenhart
1-0305B Interchange improvements at 1-85 and SR 1009 (South 10/15/2030 FY2033 $16,900,000 PE funding approved 9/8/17, Planning Colin Mellor
34142.1.5 Churton Street)in Hillsborough and Design activities underway,
34142.3.3 Coordinate with 1-0305 and U-5845. (I-
34142.3.4 0305B was formerly 1-5967)
34142.2.4
R-5821A Construct operational improvements including 6/17/2031 FY2033 $7,000,000 PE funding approved 10/10/17, design Suzana Matta
47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR activities currently suspended,
47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old Coordinating with NC54 West Corridor
47093.3.2 Fayetteville Road). Study
1-0305(A) Widening of 1-85 from west of SR1006(Orange Grove 1/20/2032 FY2036 $132,000,000 PE funding approved 6/5/18, Planning Colin Mellor
34142.1.2 Road)in Orange Co.to west of SR 1400(Sparger Road)in and design activities underway, Project
34142.2.2 Orange Co. reinstated per 2020-2029 STIP(funded
34142.3.2 project)and delete project 1-5983
1-0305C Interchange improvements at 1-85 and NC 86 in 11/16/2032 FY2035 $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor
34142.1.6 Hillsborough and Design activities underway, 1-0305C
was formerly 1-5984.
C-5181 Jones Creek Greenway Project-Fill Gap between the TBD TBD $654,000 Environmental document approved Town of
Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT to review plans once Carrboro/Stephen
also implement program to support on-vehicle trips to Carrboro develops and submits. Robinson
Morris Grove Elementary School
Page 4 DCHCMPO Dec 2024
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT
TIP/WBS# Description LET/Start Completion Cost Status Project Lead
Date Date
EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro TBD TBD $372,000 Review comments provided to Carrboro Town of
in June 2023 for revisions and Carrboro/Stephen
resubmittal. Resubmittal under review. Robinson
Page 5 DCHCMPO Dec 2024
North Carolina Department of Transportation 1/7/2025
Active Projects Under Construction - Orange Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Crews, PE, Jacob $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 58 53.64
COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION T
US-15/501 . CORPORATION
C204806 RESURFACING 27 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $4,512,658.45 3/15/2023 9/15/2024 5/22/2023 12/5/2024 100 100
LLC
C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.6 39.98
LLC
DG00631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 49 48.13
UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND
CONSTRUCTION LLC
DG00633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 50 76.25
UPGRADING OF NON-COMPLIANT ADA CURB RAMPS CONSTRUCTION
SERVICES INC
Page 1 of 1
NCDOT DIV 7 PROJECTS LOCATED IN CPRPO - UNDER DEVELOPMENT
TIP/WBS # Description Let/Start Completion Cost Status Project Lead
Date Date
SS-6207T Portions of Twenty-One (21 ) Routes. Curve Warning Sign 9/20/23 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson
51112 Installation. Construction underway.
BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/26 FY2028 $2,900,000 Planning and design activities underway Daniel Dagenhart
BP7.R009.1 ROW has been certified.
BP7.R009.2
BP7.R009.3
1-5958 Pavement rehabilitation on 1-40 / 1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Trung Nguyen
45910.1 .1 (Buckhorn Road) to west of SR 1006 (Orange Grove Road).
45910.3.1
BP7-R017 Replace Bridge #14 on SR 1548 (Schley Road) 9/7/28 FY2030 $1 ,500,000 Planning and design activities underway Daniel Dagenhart
BP7.R017.1
BP7.R017.2
BP7.R017.3
R-5821A Construct operational improvements including 1/1/40 post years $3,194,000 PE funding approved 10/10/17, design Suzana Matta
47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating
47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville with NC54 West Corridor Study
47093.3.2 Road).
TARPO-Orange Co Feb 2025
Page 1
N N C O
O O O
O O O
W d7 CP O W M
W N
CF z
C
�I v O
00 OD 0') a
D D
cz cz o cc) r
Tm Tm Cf)m ° o 0
Z 0
c)
� ;az
om omz C) z
zn zn m O rp v
G) j G) � C/) z zr CD
N
M
U)
� czn � czn m 00 O z CD
-
zp0 zp0 z m 00 0.
z z D n
< < p O
O � O � 0 � cn
00
O T O O > U) z
Cn Cn D -j O
z � z � C �l O00 y
� p cZ
D Z D Z D z p
0 n 0 n 0 0 m
n z 0 z z 0
cC) co oc
m U' X U) c z
D p D p -j 0
� C � C n0 rr z
-' O
� m � m C 2 m
cn cn z m
� � _O n
m = �'n O
_
c1) C) m0 > mm rC) C) C) 0 C �
m 0 0 0 z > > rD 00 = o p
XZrZOXW m C) � ;aZm Q �D
z
cmncU' c nz D z � cm o 0 �-
< D D
n C) -j C) O
z z cn � z
n0 O m z zz0 N
z z Cn z X z cD
r C) O O
0
0,0 2 2 2 2 C- C) m ;u 0
rD O O O O n CD o CD CO
o CAD CD CD CDO * (Q Cl)
00 % � O
0- � CT � V
�< l< l< �<
L- C- CDO.
0
CO CO N W N O
N CO (o W 0 O
d7 d7 W C
N � a7 CD - �
NJ
N O Ul 00 W
O O CO O Q
W N
O
O
00 N v D
00 00 N N M
N N O O N �'
N N N a
w co 00
a) O
00 00 00 N m 3
N N N N O
O O O O NN
0') d7 CP Ln G
v *
O �_ o
N N N CD
N O
� N
0 0 m
o a) O to
°° °° CD
N N N N
O O O O
0') 0') UI C CD
O �
U1 U1 W Ul _0 cn
O Ul O) 00 CD n G
N O� S
(D CC
N
�D N
G) 0000 O W M 0
O tJ
0
cNn cn 3 iv
� � N
vn
o'
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT
TIP/WBS# Description Let/Start Completion Cost Status Project Lead
Date Date
1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner
48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery.
48689.2.1
48689.3.1
BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 9/16/25 FY2026 $5,900,000 Planning and design activities David Stutts
underway
EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/25/25 FY 2027 $700,000 Municipal Agreement required to City of
Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen
Robinson
EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/25/25 FY2027 $930,000 Municipal Agreement required to City of
(Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen
Robinson
U-6131 Install dual left turn lanes in westbound direction at NC 54(W. 1/15/26 FY2028 $3,500,000 Planning and design activities Brandon Green
Harden Street)at NC 49(Maple Ave.)in Burlington pending
48916 Shift NC 61 and NC 100 intersection in Gibsonville to improve 1/15/26 TBD $650,000 Planning and design activities Trung Nguyen
turning radii for trucks underway -ROW underway
50547 NC 49 at Green Level Church Road/James Boswell Road- 4/16/26 FY2027 $650,000 Planning and design activities Trung Nguyen
Realign Intersection underway.65%plans complete.CFI
meeting held.
U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 8/18/26 FY2028 $19,100,000 Planning and design activities Suzana Matta
47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882.ROW
47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition 90%
47159.3.1
EB-5988 Construct sidewalk on Lee Ave./W.Lebanon Ave.to SR 1454 12/10/26 FY2028 $310,000 Municipal Agreement required to Town of
(W.Haggard Ave.)in Elon begin work Elon/Stephen
Robinson
BGMPO Jan 2025
Pagel
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT
TIP/WBS# Description Let/Start Completion Cost Status Project Lead
Date Date
1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner
48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery.
48689.2.1
48689.3.1
AV-5851 Construct 100'paved overrun and make safety 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby
enhancements at the Burlington-Alamance Regional Airport underway
U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada Road)3/16/27 FY2030 $21,000,000 Planning and design activities Brandon Green
50234.1.1 to US 70(South Church Street)in Burlington underway-Field Inspection held.
50234.2.1 ROW acquisitions 75%complete.
50234.3.1
BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 10/7/27 FY2029 $1,200,000 Planning and design activities Daniel Dagenhart
underway-Plans at 65%
B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19. Sami Jasim
48709.1.1 SR 1928(Trollingwood Road)in Haw River Planning and design activities
48709.2.1 underway.
48709.3.1
15BPR.134.3 Rehab on Structure#197 in Guilford County on SR 1117(S. 1/18/28 FY2031 $3,312,100 Planning and design activities Kristy Alford
Holden Street)over 1-85 Business and on Structure#148 on I- underway
40 over Haw River in Alamance County
U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 5/16/28 FY2031 $10,000,000 Planning and design activities Suzana Matta
47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway, ROW certified and
47158.2.4 (non-system)in Mebane. utilities underay.
47158.3.4
U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $20,300,000 Planning and design activities Suzana Matta
47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington underway
47144.2.1
47144.3.1
BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 9/18/31 FY2033 $700,000 Planning and design activities Daniel Dagenhart
underway
BGMPO Jan 2025
Page 2
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT
TIP/WBS# Description Let/Start Completion Cost Status Project Lead
Date Date
1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner
48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery.
48689.2.1
48689.3.1
BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart
underway
BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart
underway
U-6114 Install traffic signal and add turn lanes at NC 62(Atamance 1/1/40 post years $900,000 Planning and design activities Brandon Green
Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending. (Funded for Prelim.
in Burlington Engineering only)
1-6009 Interchange improvements at 1-40/1-85 and SR 1158(Huffman 1/1/40 post years $936,000 Planning and design activities Brandon Green
47962.1.1 Mill Road). Construct additional right turn lane on 1-40 WB pending. (Funded for Prelim.
47962.2.1 Ramp and improve operations at SR 1308(Garden Road) Engineering only)
47962.3.1 intersection in Burlington
SS-6207AA NC 62 at SR 1002(Jeffries Cross Road),north of Green TBD TBD $25,000 Planning and design activities Dawn McPherson
51338 Level.Convert intersection to all way stop control. underway
SS-6207AB SR 1500(Gibsonville Ossipee Road)at SR 1553(Midway TBD TBD $25,000 Planning and design activities Dawn McPherson
51339 Church Road/Guilford County Farm Road),southwest of underway
Ossipee.Convert intersection to all way stop control.
SS-6207AE SR 1003(Lindley Mill Road)at SR 2172(Moores Chapel TBD TBD $52,000 Planning and design activities Dawn McPherson
51426 Cemetery Road)near Graham.Convert intersection from two underway
way stop to all-way stop with overhead flasher.
SS-6207AG NC 87 at SR 2172(Moores Chapel Cemetery Road)near TBD TBD $49,000 Planning and design activities Dawn McPherson
51428 Graham.Convert intersection from two way stop to all-way underway
stop with overhead flasher.
BGMPO Jan 2025
Page 3
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT
TIP/WBS# Description Let/Start Completion Cost Status Project Lead
Date Date
1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner
48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery.
48689.2.1
48689.3.1
SS-6207AH SR 2424(S. Maple Street)at W.Gilbreath Street in Mebane. TBD TBD $25,000 Planning and design activities Dawn McPherson
51471 Convert intersection to all way stop operation. underway
SS-6207AI SR 1003(Lindley Mill Road)at SR 1005(Greensboro Chapel TBD TBD $25,000 Planning and design activities Dawn McPherson
51472 Hill Road),south of Saxapahaw.Convert intersection to all underway
way stop traffic control.Change existing overhead flasher to
all red displays.
SS-6207AJ SR 1581 (Stony Creek Church Road)at SR 1587(Pagetown TBD TBD $25,000 Planning and design activities Dawn McPherson
51429 Road),north of Burlington.Convert intersection to all way stop underway
control.
SS-6207Y SR 1001 (Union Ridge Road)at SR 1002(Jeffries Cross TBD TBD $33,000 Planning and design activities Dawn McPherson
51342 Road),north of Burlington.Convert intersection to all way stop underway
control. Revise existing overhead flasher to all red displays.
Signal Inv#07-0002.
U-6011 Intersection improvements at US 70(South Church Street) TBD TBD $4,900,000 Planning and design activities Chris Smitherman
47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified. Utilities
47146.2.1 underway. Bids rejected. Moved to
47146.3.1 central for re-let.
BGMPO Jan 2025
Page 4
1/15/2025
North Carolina Department of Transportation
Active Projects Under Construction - Alamance Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204438 B-5728 REPLACE BRIDGE #112 OVER REEDY FORK CREEK SMITH-ROWE, LLC Howell, Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 2/17/2025 99.99 98.62
ON NC 87 IN OSSIPEE
C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70 (SOUTH APAC ATLANTIC INC. Howell, Bobby J $13,975,135.25 7/6/2022 1/13/2025 9/29/2022 1/24/2026 79.00 66.63
CHURCH STREET) AT SR 1226/SR 1311 THOMPSON ARTHUR
UNIVERSITY DRIVE IN BURLINGTON DIVISION
C204905 10 SECTIONS OF SECONDARY ROADS. CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.60 40.49
LLC
C204959 29 SECTIONS OF SECONDARY ROADS. VECELLIO & GROGAN Hayes, PE, $5,067,692.35 7/8/2024 11/15/2025 7/6/2024 11/15/2025 99.98 99.69
INC DBA SHARPE Meredith D
BORHTERS
D000588 NC 87 AND SR 1719 (SELLARS MILL ROAD / FSC II LLC DBA FRED Howell, Bobby J $3,205,254.10 11/1/2023 5/1/2025 6/10/2024 5/1/2025 70.00 96.91
POMEROY ST) SMITH COMPANY
D000609 SR 1125 IN ALAMANCE COUNTY AND 25 STATE RILEY PAVING INC Lorenz, PE, Kris $1 ,110,159.51 3/15/2024 9/15/2025 9/18/2024 9/15/2025 36.40 77.42
ROADS IN EASTERN GUILFORD COUNTY
DG00613 U-6017 INTERSECTION IMPROVEMENTS AT NC 54 (EAST TRIANGLE GRADING & Howell, Bobby J $4,750,539.93 5/15/2024 11/11/2025 5/22/2024 1/16/2026 58.78 52.15
HARDEN ST) & NC 49 EAST ELM ST IN GRAHAM PAVING INC
D000631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 55.20 58.07
ROUTES EARTHSCAPES &
CONSTRUCTION LLC
D000633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 50.00 76.25
ROUTES CONSTRUCTION
SERVICES INC
D000655 U- 1-40/1-85 AT NC 119 GRAHAM NATURAL CHOICE Howell, Bobby J $303,245.42 12/4/2024 7/31/2028 12/6/2024 7/31/2028 2.10 10.61
3109B(L) CONTRACTING LLC
Page 1 of 1
OF µORTHNCDOT TPD NEWS
C
P R9oJ
H 7
Om p2
OF:TM9
NCDOT • Newsletter January 2025
Traffic Forecasts (TF) "Connecting people, products
and places safely and efficiently
A Project Level Traffic Forecasting is an essential part of the with customer focus, accounta-
planning process. There is one traffic forecast in progress in bility and environmental sensi-
the MPO: H23037: Maple Ave, 1-85, NC 54 realignment
There is a map that provides information about past and cur- tivity to enhance the economy
rent traffic forecasts: NCDOT Traffic Forecasting Data Map. and vitality of North Carolina...."
BGMPO 2050 MTP - NCDOT Mission Statement
The 2050 MTP update is underway. The Metropolitan Trans-
portation Plan (MTP) is the federally required fiscally con- 2026 NC Traffic Safety Confer-
strained 25-30 year multi-modal transportation plan. Kimley- ence & Expo
Horn consulting firm is working with the MPO to complete the
update. There was a kick-off meeting on December 17. Next Save the date for the 2026 NC Traffic Safety
steps are to create a Steering Committee and finalize the identi- Conference & Expo which will be help June 2-5,
fication of stakeholders to reach out to. 2026 at the Benton Convention Center in Win-
ston-Salem, NC. There will be Pre-Conference
The Piedmont Regional Travel Demand Model (PRTDM) will be workshops June 1. The NC Traffic Safety Con-
used to inform the MTP and CTP. It is estimated that the model ference & Expo brings a variety of national and
will be available to use for analysis by the end of February. local traffic safety experts together to inspire,
share knowledge, and facilitate collaboration.
N.C. to Develop Drone Program Learn about new research, programming strate-
gies, enforcement efforts, technologies, design,
A federal grant awarded to NCDOT' Division of Aviation in De- and more. For more information about the con-
cember will allow NCDOT to study a `drone in a box' program, a ference, visit nctrafficsafetyconference.org.
Program that better guides the agency's use of drones when it responds to natural disasters like Hurricanes Helene
and Florence. Aviation staff will use the grant to develop a program that would use the `drone-in-a-box' technology
in which an autonomous drone can be placed in a community before a storm and then deployed remotely to start
collecting images of damage and deliver emergency supplies.
Aviation officials hope to build upon what the agency was able to accomplish during Helene, when the division and
its partners with the N.C. Department of Public Safety, the National Guard and the Civil Air Patrol were able to use
drones, helicopters and fixed-wing aircraft to gather thousands of images of damage in places too difficult to reach
by land. Those images were vital to help responders better understand what they needed to do to help people dur-
ing the recovery effort in Western North Carolina.
The Division of Aviation will use the grant money to pilot the `drone in a box' response system in Lumberton. Like
many mountain communities, the Robeson County town is no stranger to natural disasters, as evidenced by what
happened during Hurricane Florence in 2018. The Division of Aviation will work closely with Lumberton and the sur-
rounding communities because public feedback will be important as the agency studies the issue and develops a
better response program.
1
NCDOT Announces Release of NEVI Round 2 RFP GIS-based map of
Proposed Charging Locations
State officials have published a map online with the proposed locations for the second set of electric vehicle
charging stations that will be funded through the National Electric Vehicle Infrastructure Program.
The North Carolina Department of Transportation (NCDOT) has posted an updated GIS-based map with the
proposed locations of the electric vehicle charging stations for Round 2 of the NEVI Program funding at
NCDOT: National Electric Vehicle Infrastructure (NEVI) Program. NCDOT has worked to optimize these lo-
cations based on the 50-mile spacing requirement.
NCDOT has released this map ahead of the Request for Proposal (RFP) to facilitate planning by applicants
wishing to construct and operate EV charging stations using the NEVI funding. A Request for Proposal (RFP)
and application process will be issued in 2025.
Information about the map
a. Each location on the GIS map is a "cluster" of one or more exits along the alternative fuel corridors
(AFCs) that are within the bounds of meeting NEVI's 50-mile spacing requirement.
b. Round 2 will provide funding for 41 charging stations.
c. Five clusters are in Western North Carolina and will have additional time to submit applications (shown in
red).
d. There will be one charging station per cluster.
e. Any proposed charging station must be sited within a designated cluster and within 1-mile of the exit. This
distance has been calculated and provided in the GIS-based map.
f. The GIS map has layers that can be turned on to show disadvantaged communities and 100-year flood
plains (see top right corner of GIS website).
In addition to the map, NCDOT has also included several items to facilitate planning including;
• List of exits numbers and crossroads for each cluster,
• NCDOT Utility Data Request Form —to assist with determining the availability of power at a given site,
• U.S. Department of Energy - Alternative Fueling Station Locator that provides a map of other DC Fact
Charge sites in the state,
• NEVI Utility Finder — an Excel spreadsheet provided by the federal government that provides the electric
utilities that serve a given zip code, and
• Registration for upcoming events.
See the RFP List of Resources for Applicants to access these resources and more at NCDOT: National Elec-
tric Vehicle Infrastructure (NEVI) Program.
USDOT Issues Final Rule Establishing Accessibility Standards for Pedes-
trian Facilities in the Public Right-of-Way
On December 18, 2024, the U.S. Department of Transportation (USDOT) ) published a final rule that will in-
crease accessibility for transit users by providing local governments and other owner-operators of the public
right-of-way clear, uniform, and technically defined standards of accessibility to guide their design decisions
for new construction and alterations of transit stops in the public right-of-way.
The Americans with Disabilities Act (ADA) directs USDOT to adopt standards for accessible public transpor-
tation facilities that are consistent with final minimum accessibility guidelines issued by the Architectural and
Transportation Barriers Compliance Board (U.S. Access Board). The Final Rule on Transportation for Individ-
uals with Disabilities: Adoption of Accessibility Standards for Pedestrian Facilities in the Public Right-of-Way
adopts the U.S. Access Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way
(referred to as PROWAG) as the Department's regulatory standards for new construction and alterations of
transit stops in the public right-of-way.
USDOT's adoption of the PROWAG means that there will no longer be a need for each state or local agency
to evaluate sources of guidance and make an independent determination on how to design transit stops and
other facilities to achieve accessibility for different types of users. Users of the transportation system will also
benefit from uniformity in accessibility-related design standards.
The Final Rule becomes effective on January 17, 2025.
Federal Register :: Transportation for Individuals With Disabilities; Adoption of Accessibility Standards for Pedestrian
Facilities in the Public Right-of-Way
Miscellaneous Funding Opportunities (not through NCDOT)
New Funding Opportunity: USDOT RAISE Grant Program
The U.S. Department of Transportation (USDOT) Rebuilding American Infrastructure with Sustainability and
Equity (RAISE) program provides grants for surface transportation infrastructure projects with significant local
or regional impact. Eligible projects include capital projects and planning projects. Deadline: January 30,
2025.
Learn More: FY 2025 RAISE Notice of Funding Opportunity
New Funding Opportunity: America Walks Community Change Grants
Program
America Walks will support another cohort of the Community Change Grant program, which supports the
growing network of champions, organizations, and agencies working to advance walkability. Small grants are
awarded to innovative, engaging, and inclusive programs and projects that can create a real, tangible oppor-
tunity for walking and movement at the community level. Applications will open on Monday, December 16th
and close on Friday, January 17th.
Learn More: Community Change Grants -America Walks
3
Tips to Improve Your DMV Experience
• Renew early - Reminder cards are sent six months before expiration. Contact Us
Renew online
• Make an appointment -Appointments can be scheduled up to 90 days
in advance at ski ptheline.ncdot.gov. WSMPO Coordinator
• Walk-in availability— Each full-time driver license office accepts walk-in NCDOTTPD
customers on weekdays from noon-5 p.m. Part-time and express offic 1 S. Wilmington Street
-
es service only walk-in customers. •- • NC
0••75 _
• Be prepared — Check the DMV website to make sure you bring the re- • ;; . ••
quired documentation for your desired service. One frequently forgot- prcook@ncdot.gov
ten item is a printed document proving liability insurance.
REAL IID — The federal implementation date requiring a REAL ID to fly
commercially or to visit federal, military, and nuclear facilities is May 7,
Upcoming Date
2nd Quarter 5303 Claim due January 30, 2025
Draft FY26 UPWP due January 31, 2025
2nd Quarter invoice and work summary due February 10, 2025
Last day to have signed resolution to support NCDOT's safety targets February 27, 2025
(PM1) or otherwise establish targets.
NCDOT Statewide Plans:
To learn more, click on the following links or go to ncdot.gov and search using names in blue unless
otherwise noted:
NC Moves 2050 Plan
• NCDOT Strategic Transportation Corridors
• NCDOT Comprehensive State Rail Plan (25-Year Vision) Currently being updated
• NC Statewide Multimodal Freight Plan (2023)
NCDOT: Integrated Mobility Division - Great Trails State Plan
NCDOT: Integrated Mobility Division - Statewide Strategic Plan
• NCDOT Resilience Strategy Report (2021)
• Statewide Pedestrian & Bicycle Plan (2013)
• Strategic Highway Safety Plan (2024)
Other Plans:
N.C. Climate Risk Assessment and Resilience Plan by Department of Environmental Quality (or Google
search: 2020-Climate-Risk-Assessment-and-Resilience-Plan.pdf)
NC FIRST Commission
Helpful Links:
To learn more, click on the following links or go to ncdot.gov and search using names in blue unless other-
wise noted:
NCDOT home page—ncdot.gov
Real-Time Traffic—d rive nc.gov I North Carolina Traffic & Travel Information
• Report a pothole—NCDOT Contact Us Form (ncdot.gov & search "Report a pothole")
• NCDOT: State Transportation Improvement Program - ncdot.gov/sti
• Interactive Bicycle Routes Map—https://www.ncdot.gov/bikeped/ncbikeways/default.aspx—
Links to all traffic count data information - Traffic Survey Group (connect.ncdot.gov & then search)
NCDOT Interactive Traffic Volume Map—Traffic Volume Maps (ncdot.gov)
Traffic Safety Data & Engineering—NCDOT: Traffic Safety Data & Engineering
Federal Functional Classification Map—NCDOT Functional Class Map (ncdot.maps.arcgis.com)
NCDOT Flickr Account: NCDOTcommunications I Flick r 4