Loading...
HomeMy WebLinkAbout2024-766-E-Solid Waste-Draper Aden Associates-Orange County Regional Landfills Closed MSW Landfill Leachate PFAS Study – Phase 1 Task Order Request TO: Mr. Robert Williams REVISED Orange County Solid Waste FROM: David Garrett, PG, PE Senior Project Manager DATE: December 6, 2024 SUBJECT: Orange County Regional Landfills Closed MSW Landfill Leachate PFAS Study – Phase 1 Leachate Sampling and Analysis Proposal for Survey & Engineering Services TRC Proposal No. TBD Estimated Fee = $28,550 2024 PN: 635043.9990 At your request, Draper Aden Associates/TRC Engineers, Inc. (TRC), is pleased to offer this proposal for a Leachate PFAS Study at the closed MSWLF unit (South landfill), located at the Orange County Regional Landfill Facility (Facility) on Eubanks Road in Chapel Hill, NC. This proposal outlines our understanding of the project scope, tasks we will complete, assumptions underlying our proposal, and proposed fees. PROJECT UNDERSTANDING: TRC understands the project will consist of sampling leachate at the South landfill unit, for the purpose of complying with North Carolina Department of Environmental Quality (NCDEQ) Solid Waste regulations. The regulations require sampling and reporting of per- and poly-fluoroalkyl substances (PFAS) in leachate, surface water discharges and groundwater at all permitted landfills. The Orange County Solid Waste Management Department (OCSWD) has requested TRC to perform the leachate sampling and make recommendations on treatment options based on the results. This proposal describes services to meet this request in three tasks. Based on reviewed construction plans (ca. 2005), there are two leachate pumping stations at the South landfill unit, one shared by Phases 1 and 2 (PS #1) and another shared by Phases 3 and 4 (PS #2). The plans also show that PS #2 connects to PS #1 by a force main. Recent aerial photography shows a landfill gas (LFG) plant near PS #1; condensate from the LFG plant drains into PS #1. The liquids are pumped from PS #1 to a Publicly Owned Treatment Works (POTW) for wastewater treatment. Phases 1 and 2 contain the older waste placed in the South landfill, while Phases 3 and 4 contain younger waste. Published research indicates that wastes of different ages can exhibit different PFAS compounds and concentrations, hence treatment options may differ. Docusign Envelope ID: 911DA9D6-C358-4231-B7E3-0443B926487C Mr. Robert Williams December 6, 2024 – Closed MSW Landfill Leachate PFAS Study – Phase 1 Page 2 of 5 The wet well for PS #1 was “dry” for both 2023 and the Spring 2024 sampling events, but leachate was present in PS #1 during the Fall 2024 sampling event, conducted in mid-November. TRC had initially prepared a contingency plan to find alternative access points for sampling the leachate, but it appears the leachate may be sampled in a conventional manner from one or both sumps. TRC recommends we examine the Landfill Gas (LFG) production records, in pursuit of a better understanding of the causes for the leachate sump going dry. TRC also recommends performing a visual inspection of the landfill cover to detect potential maintenance needs. SCOPE OF SERVICES Task 1 - Site Visit and Records Review: TRC engineers and a sampling technician will visit the landfill with Facility staff to confirm that we can sample leachate at one or both pump stations and inspect the landfill cover for regulatory compliance, e.g., healthy vegetation, no erosion or obvious settling. We will request records for the leachate system and LFG production. TRC will prepare a list of field and laboratory analytes to detect whether PFAS compounds are present in the leachate, and if so, what chemical compounds and other characteristics are present that would affect treatability. Task 2 - PFAS Sampling Event: TRC’s experienced staff will conduct the leachate sampling and test key field parameters using specialized PFAS sampling protocols at one or both pump stations. TRC will deliver the samples to subcontractor Pace Analytical in Raleigh, NC (Pace), which will analyze the samples under strict chain-of-custody protocols. Pace will analyze the samples for PFAS using EPA Method 1633f with other constituents specified by NCDEQ and basic water chemistry. Task 3 - Reporting and Project Management: TRC will provide the Facility with a draft summary report for the sampling event. TRC will treat the data as confidential and review our findings with Facility management, prior to issuing any final reports. The report will describe in brief whether PFAS are present in the South Landfill leachate; if so, what specific PFAS compounds are present, and what other constituents are present that might affect treatability. This report will not be a full treatability study, whereas more data may be required. Please keep in mind the POTW will be facing similar concerns over the discharge of PFAS, and it makes sense for these entities to cooperate – this itself will drive some of the treatment effort needed by the landfill. This study will be left for a future Phase 2. Our report will provide an opinion on which of the many available technologies OCSWD may wish to evaluate further, pursuant to a full treatability study or a “proof of concept” field demonstration. We will provide Orange County with an opinion on order-of-magnitude treatment costs, based on what is known at the time. The content of this report can be better defined once the sampling data is in hand. TRC will make a brief statement concerning landfill cover maintenance issues, based on our observations. After reviewing the findings with OCSWD, TRC will finalize the report for your records and prepare the sampling data only for submittal to NCDEQ – only what is required. Other findings and preliminary recommendations are not required to be submitted. Docusign Envelope ID: 911DA9D6-C358-4231-B7E3-0443B926487C Mr. Robert Williams December 6, 2024 – Closed MSW Landfill Leachate PFAS Study – Phase 1 Page 3 of 5 SCHEDULE: The following schedule is contingent on when TRC receives the authorization, weather conditions, and end-of-year scheduling concerns. TRC plans to initiate the site visit and records review within two weeks of receiving authorization from OCSWD. TRC anticipates completion of this phase of work within three weeks of commencement. TRC anticipates the fieldwork will start within one to two weeks of completing our records review, likely during the first quarter of 2025. TRC expects to complete the field inspection and leachate sampling in one working day, assuming at least one of the pump stations exhibits leachate on the day of sampling. The sampling could be delayed if both pump stations are dry. TRC anticipates the laboratory analyses to take 4 to 6 weeks after the sampling date. TRC will prepare the draft report within four weeks of receipt of the laboratory reports and finalize the report within one week of receipt of Orange County comments. FEES: TRC will invoice Orange County monthly on a time and materials basis, with the following recommended not-to-exceed costs. Due to uncertainties in where, and how many, leachate samples are possible (1 or 2), and the level of difficulty in obtaining the samples (depending on location), TRC has prepared the budget such that most sampling scenarios will be covered. TRC may adjust the invoice(s) accordingly. The following represent anticipated costs for three tasks within Phase 1. 1. Site Visit and Records Review ......................................................................... $6,850 2. Leachate Sampling and Analysis ..................................................................... $7,700 3. Reporting and Project Management ............................................................ $14,000 Note: the budget includes allowances for reimbursable costs (mileage, printing). DELIVERABLES: The project deliverables will consist of 1) a draft report describing the sampling event data, field observations, and preliminary recommendations for leachate treatment options and recommended landfill cover maintenance, to be reviewed with OCSWD; 2) a final report addressed to OCSWD including their review comments, and 3) a sampling report prepared in accordance with NCDEQ electronic data delivery (EDD) protocols and a PDF format. The report to NCDEQ will include customary figures and data tables, a brief narrative summarizing the sampling event, plus the field and laboratory data sheets but no other observations or recommendations. EXCLUSIONS: TRC does not anticipate any intrusive investigation of the LFG wells, nor will these services include recommendations for the LFG system. TERMS AND CONDITIONS: TRC will provide the proposed services in accordance with the terms and conditions within the existing service agreement between Draper Aden Associates (now TRC) and Orange County Solid Waste Management. Docusign Envelope ID: 911DA9D6-C358-4231-B7E3-0443B926487C Mr. Robert Williams December 6, 2024 – Closed MSW Landfill Leachate PFAS Study – Phase 1 Page 4 of 5 CLOSING: TRC appreciates the opportunity to work with Orange County on this important project and we look forward to providing our services. Please tell us if you have questions or need more information about our proposal. Sincerely, G. David Garrett, PG, PE Senior Project Manager cc: Bruce Woody (OCSWM) Cheryl Young (OCSWM) Deborah Coakley (TRC) Wendy Karably, TRC Tyrus Clayton, PE (TRC) Docusign Envelope ID: 911DA9D6-C358-4231-B7E3-0443B926487C Mr. Robert Williams December 6, 2024 – Closed MSW Landfill Leachate PFAS Study – Phase 1 Page 5 of 5 Orange County Solid Waste Closed MSW Landfill Leachate PFAS Study – Phase 1 Draper Aden Associates Proposal No. 635043.9990 AUTHORIZATION TO PROCEED _____________________________________________ ________________ Orange County Solid Waste Management Date THIS INSTRUMENT HAS BEEN PRE-AUDITED IN THE MANNER REQUIRED BY THE LOCAL GOVERNMENT BUDGET AND FISCAL CONTROL ACT: ____________________________________________ ________________ Office of the Chief Financial Officer Date THIS SCOPE OF WORK IS SUBMITTED PURSUANT TO THE TERMS OF THE AGREEMENT DATED FEBRUARY 22, 2017 BETWEEN DRAPER ADEN ASSOCIATES AND ORANGE COUNTY. ____________________________________________ _______________ C. Tyrus Clayton, Jr., PE Date Budget Code: 50351020-805000 Docusign Envelope ID: 911DA9D6-C358-4231-B7E3-0443B926487C 12/13/2024 12/13/2024 12/16/2024