Loading...
HomeMy WebLinkAboutAgenda - 06-27-2002 - 8d t ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 27, 2002 Action Age 0a Item No. SUBJECT: Housing Rehabilitation Contract Award DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Tara L. Fikes, ext 2490 Bid Results Work Specifications TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 -Durham 688-7331 Mebane 336-227-2031 PURPOSE: To award one housing rehabilitation contract for the HOME Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program. The informal bidding process is governed by North Carolina General Statute §143- 131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. Additionally, all contractors participating in the County's Rehabilitation Program are required to utilize current deconstruction and material recycling methods during the repair process. Sealed bids were solicited from participating contractors on May 28, 2002. Bid results are attached. Three bids were received with Taylor Home Improvement Company submitting the lowest bid. FINANCIAL IMPACT: The HOME Program provides total funding for this program. RECOMMENDATION(S): The Manager recommends awarding the following housing rehabilitation contract: Dwelling Unit Bid Amount Contractor 6803 High Rock Rd., Mebane, $14,220 Taylor Home Improvements 2 RESULTS OF BID OPENING OWNER: Addie Bradshaw APPLICATION NUMBER: ADDRESS: 6803 High Rock Rd. COST ESTIMATE:—$14, 443 Mebane, NC 27302 PERCENTAGE OF BID OVER UNDER—I% COST ESTIMATE CHECK ONE: JOB BID—X— JOB NEGOTIATED COMPANY BID AMOUNT 1. Jordan Construction Co. $17, 930 2 . Taylor Home Improvements $14, 220 3 . William Long Construction $19,280 4 . 5 . 6 . BID OPENED BY: David Saconn TIME OF BID OPENING: 2 :00 PM DATE OF BID OPENING: May 28, 2002 WITNESSED BY: Donna Galloway ee***********ire*eeeee:eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee*eeeeee Lowest Acceptable Bid: $14, 220 Negotiated Amount: N/A Contractor: Taylor Home Improvements NAME _605 Ruby Street; Durham, NC 2770.4 ADDRESS 919-220-0480 TELEPHONE NUMBER COMMENTS: Submitted by: Tara L. Fikes Date_06-12-2002_ Bid Approval Date Proceed Order Issued 3 ORANGE COUNTY HOUSING AND REHABU.TT'ATION PROGRAM SPECIFICATIONS FOR 6W HIGH ROCK RD. FOR ADDIS BRADSHAW PHONE 563-3895 DATE: 04112/02 BY: JIM AXELROD R$$AB,SPECLk lST - NOTE TO CONTRACTOR CONTRACTOR SHOULD REM TO THE BASIC SPECIFICATIONS,PROPERTY REHAB=ATION STANDARDS,GENERAL CONUnONS,NORTH CAROLINA BUILDING CODES MANUAL,AND ORANGE COUNTY MDAWJM HOUSING CODE DOCUMInkm. IT IS NOT THE INTENT OF THE WRTTEIR TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER-OF MATERIALS CALLED Rid FOR IN THIS WORK WRITE-UP ONLY TO SPECIFIYA TYPE THAT WOULD ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM 4 Addie Bradshaw 6803 High Rock Rd. Mebane 563-3895 April 11,2002. EXTERIOR: 1. Prepare the soffitt,fascia,trim, windows, doors, awnings and porch ceiling for paint. Paint those surfaces with at least two coats of exterior semigloss latex paint. Remove all rust from the wrought iron front porch columns. Prime and paint. Paint to cover all surfaces completely. 2. Install wrought iron handrails on the rear porch and steps. 3. Install one replacement foundation vent. 4. Install soffitt,vents every eight feet in the front and rear soffitt. 5. Install four storm windows on the living room windows. ROOF: 1. Remove the porch and front section of the living room roof covering to the sheathing. Install 15.1b. felt, aluminum drip edge and three tab fiberglass shingles. Step flash the shingles against the siding. 2. Replace approx. 64 sq. ft. of sheathing. 3. Install a shingle type ridge vent ventilation system. 4. Remove the turbine vent.Repair the plywood. Install matching shingles. 5. Remove the shingles to the sheathing on the left side porch. Install 15 lb. felt, aluminum drip edge and three tab fiberglass shingles. Step flash the shingles to the siding and buck. Addie Bradshaw 5 6803 High Rock Rd. Mebane 563-3895 April 11, 2002 INTERIOR: LIVING ROOM: 1. Cover the water stains on the ceiling. Paint the ceiling with ceiling white paint, the door with semigloss latex paint. Paint to cover completely. 2. Remove the existing door unit and storm door. Install a six panel metal insulated door unit with weather-stripping and aluminum threshold. Install lockset and deadbolt to be keyed the same. Install a wide-angle peephole. 3. Reinstall the existing storm door. KITCHEN: 1. Remove the kitchen base cabinets on the rear wall,counter top and hot water heater. 2. Repair the subfloor and finish floor. 3. Install i/4 inch lauan plywood.Prepare the plywood for vinyl. 4. Install vinyl floor covering, metal trim and shoe mold. Vinyl to cost not less than $14/yd. 5. Reinstall the kitchen base cabinets and counter top. HALL: 1. Repair the subfloor and finish floor. 2. Install i/4 inch lauan plywood. Prepare the plywood for vinyl. Addie Bradshaw 6 6803 High Rock Rd. Mebane 563-3895 April 11, 2002 3. Install vinyl floor covering, metal trim and shoemold. 4. Install an attic access and trim. Prime and paint the trim. RIGHT/FRONT BEDROOM: 1. Remove all loose paint from the ceiling. Paint the ceiling with ceiling white latex paint. Paint to cover completely. 2. Repair the damaged sheetrock. 3. Paint the walls with flat latex paint and the trim, windows and doors with semigloss latex paint. FRONT HALL: 1. Repair the texture on the ceiling. SIDE PORCH: 1. Replace the broken glass. ELECTRIC: 1. Install GFI outlets in the kitchen and bath. 2. Install electric smoke alarms in each bedroom and the hall. 3. Install arc fault protectors on each bedroom circuit. 4. Install a fixture and switch in the crawlspace and attic. f 7 Addie Bradshaw 6803 High Rock Rd. Mebane 563-3895 April 11, 2002 5. Replace the damaged wire from the service to the receptacle on the rear porch and the attic. 6. Repair the light fixture in the left/rear bedroom. PLUMBING: 1. Install a handicap commode, cutoff and supply line. 2. Install a p-trap assembly, cutoffs and supply lines for the kitchen sink 3. Install a table top hot water heater. MECHANICAL: 1. Install a propane gas pack heat and air system. The system will have a 92% efficiency rating. Install insulated ductwork. INSULATION: 1. Repair the insulation in the crawlspace. 2. Repair the 6-mill vapor barrier in the crawlspace. Provide a termite inspection and treatment. TOTAL: i 8 REAR FH 8X1 BEDROOM BEDROOM 9X13.6 10.5X12 KITCHEN 16X12.5 HALL HALL BATH 11.5X5 9X7 6.5X7.5 LIVING ROOM SIDE PORCH DEN 15.5X12.5 10X12 BEDROOM 16X12 11.6X11.6 BRADSHAW LIVING AREA 1301 sq R