HomeMy WebLinkAboutAgenda - 05-04-2004-9cORANGE COUNTY
BOARD OF COMMISSIONERS
AGENDA ITEM ABSTRACT
Meeting Date: May 4, 2004
Action Age da
Item No.
SUBJECT: Authorization to Contract with Corley Redfoot Zack (CRZ) for Design Services far
West Ten Soccer Park
DEPAR'iMENT: Purchasing and Central Services PUBLIC HEARING: (Y!N) No
Recreation and Parks
Planning and Inspections
ATTACHMENT(S):
Vicinity Map
Subject Property Map
Scope of Services
CRZ Proposal Cover Letter
INFORMATION CONTACT:
Pam Jones, ext, 2652
Lori Taft, ext. 2673
Craig N.. Benedict, ext, 2592
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To consider authorizing a contract with Corley Redfoot Zack (CRZ) for design services
of the 34-acre West Ten Road Soccer Park,
BACKGROUND: In June 2003, the Board of County Commissioners (BOCC) appropriated funding
that enabled the Orange County Board of Education to obtain options to purchase several parcels
of property on West Ten Road approximately, 1 mile between Mt, Willing and Buckhorn Roads,
south of I-85/I-40 (see attached Map). The property, totaling slightly more than 100 acres, was
being considered for use by the Orange County Schools (OCS) as the site of a planned new middle
school, and possibly other uses,
In subsequent months, the Board of Education determined that it would not need for the middle
school the 33+ acre Euliss property that was part of the overall 100 acres. In March 2004, the
Board of Education purchased the remaining 67 acres, and Orange County purchased the Euliss
property with the intent of using it primarily as the site of a soccer complex.
In recognition of previously adopted resolutions that establish a policy of pursuing County/Schools
coordinated and joint use facility planning when it is feasible to do so, County and OCS staff and
the middle school architects have held discussions about how the adjacent locations of the middle
school and soccer park sites might lead to economies of scale during design and construction and
could possibly lead to many "smart growth"' cost savings in both projects.
County staff developed a team to investigate the feasibility of using the existing middle school
design firm of Corley Redfoot Zack (CRZ) for the soccer park design, The team included Rod
Visser, Assistant County Manager; Lari Taft, Recreation & Parks Direator; Pam Jones, Purchasing
Director; Geof Gledhill, County Attorney; Craig Benedict, Planning Director; Dave Stancil, ERCD
Director; Paul Thames, Caunty Engineer; and Dianne Reid, Economic Development Direator, A
subgroup consisting of Lori Taft, Craig Benedict, Paul Thames and Pam Jones interviewed the
CRZ design team and their subaansultants to confirm the acceptability of their credentials far this
project. Based on the interview and extensive positive experience with CRZ on other County and
school projects over the past fifteen years, staff believe that CRZ and other members of their
design team have exhibited their ability to design athletic fields of this nature. In addition, CRZ can
coordinate soccer park design and development with the school site design and construction
activities to ensure a master planned project with savings possible in the areas of earthwork,
parking, access, road improvements, lighting, irrigation, electric, etc. Other joint use opportunities
such as the gymnasium, locker rooms, and bathrooms of the school may be passible in the short
term and adjunct as part of the long term park program,
Based an a scope of work produced by County staff, CRZ submitted a design fee of $119,000 for
the project. The scope of work and proposal letter are attached, Staff, in collaboration with the
County Attorney and CRZ, will prepare a contract incorporating the scope of work far signature by
the Ghair,
NCGS § 143-64,32 permits elected bodies, in the sole discretion of the governing body and stating
the reasons and circumstances attendant thereto, to exempt projects from the qualifications-based
selection process of the design firm where the design fees exceed $30,000. Because of the
synergies between the two projects and the extraordinary coordination opportunities that exist by
retaining the same designer for both projects, staff recommends that the Board exercise this
statutorily permitted exemption for this project,
CRTs contract would run concurrently with the school site construction, which is anticipated in late
summer, after final planning process approvals that are anticipated in late June 2004. The BOCG
would review draft plans as the owner of the soccer park property.
FINANCIAL IMPACT: Funding would come from 2001 general obligation bond funds for the
"Satter Superfund" that will be included in the bond sale that is scheduled for later in 2004.
RECOMMENDATION(S): The Manager recommends that the Board: 1) exempt this project from
qualification-based selection process as allowed by GS 143-64,32 for the reasons cited above; 2)
authorize the preparation of an appropriate agreement with CRZ, contingent upon staff and
Attorney review; and 3)authorize the Chair to sign the agreement an behalf of the Board.
2
Vi~init~/ ap 7
_egend
Euliss Property
Municipal Limits
> US Interstate
US Highway
NC Highway
County
~ 0.5
L~iLq MingatlW 0.putlnml
M'DMEA ANw fWU W 35.3DJ~
repubn WWPw
a~
a
0
L
a
.~
W
A~
W^^
ii
V
L
V
O
O
^i~
•/i
`~
Lam- ~ ~
~~i
\ ..
oa nno~~oa~ooae-
..
°d~\,
_ F ~ ~~~>~s,,
\__ ~ /~f~
~n ., ~~
~3 N i LJ \,
~~
\Y /-
i
r ~ ~ ~
~....,/ /~~ ~ i
~~ \ ~ ~
\ ~~ T ~ ~
o y 3 3 m
o
~~~
,,
~.
~~
€~
~ 8~
_ _____ a
_--- ~sa e
a~~~
I ~ F~6~p
\ ~y~~
~ 6-
t
,~ I ~~
~' ~ ~ ;~_
W
~~
~,
.._..----~-- _."_.._~ W
~--_'s
J ~ °-'
i ~ ~
0
r~
,;~ o
~~ ~_--~-
~ ~:
O
~'1
oal'NaoHN~ne
,,~ _
~ o
Od,;y •-
oy~~ a
J
Development of the Euliss Property as the proposed
West Ten Soccer Center
Orange County desires to enter into a contractual agreement with Corley Redfoot Zack
for the purpose of receiving consulting services for the design of this project, Orange
County proposes to include in the agreement, the items listed below,
Scope of the Project:
• Create a Master Plan for the soccer center (design level of park conceptual
plan), with special attention to synergies and potential economies of scale
with the adjoining school site.
• Conduct and Coordinate necessary site evaluation, testing and permitting.
• Assist with a public meeting to receive input on the proposed plan.
• Develop cost estimates for each separate program element of the project.
• Present final draft of the proposed plan to the Board of County
Commissioners by June 8 or at the latest, June 24`s.
• Prepare and revise all necessary site plans (including grading, mechanical,
layout, etc.) and subsequent construction drawings and specifications.
• Develop and prepare all necessary contract documents.
• Assist with construction management (hourly), to the degree indicated in
subsequent discussions.
• Coordinate process requirements to align with the school project timeline.
• Assistance as needed throughout the project, as design liaison between
Orange County and Orange County Board of Education.
Program Elements of the project are:
• Design for the maximum number of full size soccer fields (360' x 225') that
the site can yield, within design and development standard parameters.
• Smaller (Ul l or younger) fields if space allows.
• One field designed as a championship field.
• Irrigation and water fountains
• Field lighting and security lighting
• Perimeter fencing for security purposes.
• Perimeter walking track if space allows.
• Required landscaping and stormwaterldrainage%rosion control
• Full electric, plumbing and water service
• Parking and entry and internal roadways
• A building to include: Restrooms, Concession stand, Office, Equipment
room, Team/Meeting room, supply room, HVAC (1,500 - 2,000 sq ft) plus an
extended pad with roof overhang for picnic tables, shelter during
thunderstorms, first aid station, referee station, etc.
Please provide your "lump sum" cost to complete this project as detailed above,
Include mention of your experience with other similar projects, Identify the members of
your team and related experience, along with the individual who will take the lead on this
project and their qualifications,
We hope to hear from you by Thursday, April 15 with your response to this request.
Please feel free to direct any questions to Pam .Tones, Craig Benedict or myself. Thank
you for your interest in this project and we look forward to the opportunity to work with
you.
7
~ ~ ~ CORLEY REDFOOT ZACK ~.~
:1 R C I-I I T' G C T S E N G I N E E Ii 5 P L :\ N N E R ti
April 15, 2004
Orange County Government Services
GLENN D. CORLEY, AIA
PresiilcJ,r. Ceo
P, O. Box 8181
Hillsborough, NC 27278-8181
KENNETH E. RBDEOOT,A(A
via Prrsidenr ATTN: Ms. Pam Jones
MARK ZACK, AlA
via P.c,idenr RE: Request for Proposal for West Ten Soccer Center
MICHAGL. L. HAMhiERSLEY, PG Orange County, NC
Principal
LAURENCE W. 6UNCH, AIA Dear Ms. Jones:
Associnh•
ANDREW 11. CRUICKSHANK, AIA Corley Redfoot Zack. Inc. is pleased to submit our qualifications and a
Ascucinfc
design fee proposal for the new soccer center on the Euliss Property in
DAVID M. TAYLOR, A,A Orange County,
Aesncinte
HARRY M. )ENSEN
A550iiaM Our firm has a long successful history of designing sports/athletic
facilities for various Universities, SclTOOI Systems and Towns
KENNETH E. SMITH
Assadarc throughout Orange County and North Carolina. Recent projects similar
to your request included the park/school site at Chapel Hill High School
(Carrboro Fields), the three Practice Fields at North Carolina State
University in Raleigh, the Athletic Fields at East Chapel Hill High
School and Smith Middle School, the Toilet and Concessions Buildings
at East Chapel Hill High and Chapel Hill High School.
Our approach to a project such as this would be to look to ways to
PO l3ox 2368 integrate and provide synergy with your scope of work and the work at
Chapel HiII, NC 27515-2368 Middle School #.3. We would meet and establish your needs and
222 Cio~sleT c_oarr program with ,your staff. We would then look carefully at ways to
Chapel Hill, NC 27514-?212 benefit both projects by utilizing similar construction timelines and
sharing facilities where feasible.. This would require that we act as a
design liaison between Orange County and the Orange County Board of
Education..
Corley Redfoot Zack would assist with preparation of a Master Plan for
the site and all related meetings and approvals. We would also provide
all drawings and specifications for the final contract docwnents
including the Site Plan Approval process as outlined for the EDD
(919) 942-8586 Telephone
(919) 929-4802 Fax
Ms Pam cones April 15, 2004
RE: West Ten Soccer Center Page two
District (Requirements attached). The proposal is based upon the scope
information provided by email dated April 8. ?004 titled "West Ten
Soccer Center"(Attached) The total design fees for the project will be a
lump sum amount of $1 19.000.
We are proposing to utilize the following list of consultants for the
specialties as listed on this project:
Carolina Green Corporation Athletic Field Improvements
Swanson & Associates Landscaping
Reece Noland McElrath Mechanical/Electrical & Plumbing
Lasater I-Iopl:ins Chang Structural
This design team has worked together on the similar projects, which are
highlighted in the attached information. Firm profiles, references and
resumes are attached for your review..
Corley Redfoot Zack, Inc. is excited for the opportunity to work on this
important project for our commwrity. We pledge our expertise and
entlwsiasm to creating the Soccer Center. which Orange County will he
proud to share.
Sninncerely.
/ - '~ ..
Michael I IY'amme ley, PE
Principal
ENCLOSURE
cc: Glenn D. Corley, AIA
MLN/jh isocccr camcr
~ ~ ~ CORLEY REDFOOr ZACK~k.